Delhi Development Authorityy Unified Traffic &Transportation Infrastructure 7171T T (Planning& Engineer1ng) Centre 2nd Flaor, Vikas Minar I.P. Estate. New Delhi-110002 Ph. No 23379042, Email ID diruttipec@gmailcom 461 330ur, i:
[email protected] No. F.6 (01)08/Dir./UTTIPEC/Pt-I/D-353 Dated: 12.10.2020 Minutes of the 79h meeting of the UTTIPEC Working Group l1-B (Retrofitting of video Existing Corridor), held under the Chairmanship of Secretary, PWD (through conferencing) on 24.09.2020 at 11:30 AM. 79th meeting of the UTTIPEC Working Group I1-B (WG-I1-B) was held under the Chairmanship of Secretary, PWD (through video conferencing) on 24.09.2020 at 11:30 AM. The list of participants who attended the meeting is annexed as Annexure- 'A'. 1. Confirmation of the minutes of the 78h wG-I B meeting held on 26.06.2020. Since there was no observation received from members/ special invitee, the minutes of the 78th WG-IB meeting held on 26.06.2020 were confirmed 2. Item discussed: MMIPlan of Metro Stations Background i.In the meeting held on 18.10.2019, under the chairmanship of Addl. Secy (D), MoHUA, DDA was asked to evaiuate the MMI plan of all 96 metro stations with a view to providing adequate parking facilities both for cycles/ E-cycles under Public Bike Share Schemes (PBSS) and individually owned cycle / E-cycle. i. DMRC had submitted MMI Concept Plans of 60 Metro Stations of Phase-l for approval. The same were discussed in the meeting under the chairmanship of Hon'ble LG, Delhi held on 21.10.2019 and 17.01.2020.