<<

DMRC ROLLING STOCK LEASING PROJECT

Introductory meeting August 18th, 2017 Overview

50:50 Joint venture Network of 218 kms 235 trainsets between GOI & Govt. of 100+ six car trainsets 164 stations 60+ eight car trainsets

NEED FOR ADDITIONAL ROLLING STOCK

Despite minimum headway of 3 minutes, trains overcrowded Project Objective

To reduce Access to Enabling smaller capital advanced metro systems expenditure maintenance across India to practices adopt this model

Procurement and Maintenance Lease of Rolling Stock for Line 5 Expression of Interest (EOI)

Lifelong Operation ( 35 years) and Design Supply Test Commission maintenance

Procurement cum maintenance Lease of 150 cars (25 trainsets of 6 car each) on Line 5 along with operation & maintenance of existing depot facilities at and

Lease period – 35 years

Train operators to be provided by Lessor

Payment to Lessor based on hourly availability of Trains

Increase in quantity up to 252 cars within 5 years of last train induction

Lessor to decide the traffic & maintenance reserves over & above DMRC requirement of 150 cars on the mainline Line-5 or ‘The ’ of DMRC

Planned under Phase-III; 11.18km, Expected to complete by early 2018 Currently under operation: Inderlok - Mundka: 15.1km, Kirti Nagar - Ashok Park Main :3.31km Tentative train Operation on Line-5

Peak Hours Morning peak Evening peak

Timing 0800 Hrs – 1100 Hrs 1700 Hrs – 2000 Hrs

Requirements of trains 25 trains per hour 25 trains per hour

 Trains do not operate during 0000 hours to 0500 hours  Further details indicating hourly train requirement shall be provided in RFP documents M&P Depots

Mundka depot – working depot at present – fully functional

Bahadurgarh – new depot – shall be fully functional by mid 2018

Depot Layout Bahadurgarh Mundka Workshop Lines 2 4 Inspection Bay Lines 2 3 Stabling Bay Lines 9 15 Test Track 1 1 Unloading Track - 1 Details of major M&P Depots

Equipment Bahadurgarh Mundka Depot Depot Auto Wash Plant * 1 Pit Jack - 1 (2 car) Mobile Jack 2 sets for 2 car 2 sets for 2 car each each Re-Railing Equipment 1 1 Bogie Turn Table 2 4 Rail Cum Road mover 1 1 (RRM) Rail cum Road Vehicle 1 1 (RRV) Pit Wheel Lathe * 1 Machine * Presently not planned but space is available Proposed Rolling Stock

Standard Gauge trains of 6-car configuration, 2.9m wide, 3.9m high

Operate on 25kV, 50Hz AC overhead supply

67% motoring

Energy Efficient with Maximum Regeneration

Compatible to existing Way-Side Signalling

State of the art Train Control & Management system, Passenger Information System and Display monitors. Project Stages (1/3)

EOI RFP Finalization of Delivery of End of Lease Lease agreement trainsets period

• Participation at RFP stage would be allowed to only those applicants who qualify at EOI stage • EOI opening - October 2017 • The evaluation process will be completed within 90 days of submission of the compliant EOIs EOI i.e. around January 2018. • Change in any consortium partner(s) except the Technology partner (manufacturer of Rolling Stock) may be allowed prior to submission of RFP, subject to his qualification under EOI req. Project Stages (2/3)

• Issue of RFP : February 2018 • RFP Submission : June 2018 • Evaluation of Bids RFP  Technical Package evaluation  Financial Package evaluation • The evaluation process will be completed within 180 days of submission of the compliant RFP documents i.e. End of 2018.

Finalization of the Lease • January 2019 Agreement

• Gradual relocation of Existing Stock owned by DMRC with introduction of New Stock by the Lessor on Line-5. • Depot at Bahadurgarh shall be handed over first Delivery of • Depot at Mundka shall be handed over only after the last trainset of New Stock is Trainsets commissioned on the line by the Lessor, and all the Existing Stock owned by DMRC have been shifted. • The timelines shall be detailed in the RFP documents. Project Stages (3/3)

• Train Operators required for testing, commissioning, service trials as well as driving the New Manpower Stock on mainline for Lessor • Staff required for Supply, Testing, Commissioning, Training and Maintenance of the New Stock • Staff required for Management & security of the handed over Depots.

• The Lessor shall provide DMRC with an option to acquire the leased trainsets at a nominal fee End of Lease at the end of lease period Period • The Depots shall be handed over to DMRC at the end of lease period with a balance life of M & P of at least 5 years Models Proposed

The Lessor is expected to form an SPV comprising of:

1. Rolling Stock Manufacturer 2. Rolling Stock Maintenance Co. 3. Rolling Stock financing Co.

Expected Model of Lessor

The decision on percentage equity participation among members of the SPV/JV/Consortium shall be finalized on receipt of response from the prospective applicants Responsibilities of the Lessor

Maintain Depot facilities such as E&M infrastructure, Depot Control Centre, all M&P

Ensure that 75% of the stock supplied is manufactured in India only

Source maximum number of equipment, materials and spares from India

Interfacing with other designated contractors

Address safety and environmental concerns

Payment of Energy consumption charges of Depots including traction energy within the Depot Submission of Performance Security against Performance Criteria to be specified in the RFP document Responsibilities of DMRC

Payment of lease charges on monthly basis

Maintenance of Traction distribution, Civil Tracks, Signalling and Telecommunication Systems for the Depots

Management of train operation on mainline

O&M of DMRC owned existing stock until complete transfer of trains takes place.

Mundka depot till handing over to Lessor Availability Based Payment

DMRC shall Penalties shall Daily service of specify to the Upon meeting the be imposed for 19 hours shall Lessor, the requirement in the non- totality, DMRC shall be divided into number of release the monthly availability of specified time trains required payment at hourly trains, to be slots for each time availability basis detailed in RFP slot documents Thank You. Contact : [email protected]