Compensation and Livelihood Restoration at Nam Theun 2 Hydropower Project Network for Sustainable Hydropower Development in the Mekong Region

Total Page:16

File Type:pdf, Size:1020Kb

Compensation and Livelihood Restoration at Nam Theun 2 Hydropower Project Network for Sustainable Hydropower Development in the Mekong Region Published by: Case Study Compensation and Livelihood Restoration at Nam Theun 2 Hydropower Project Network for Sustainable Hydropower Development in the Mekong Region Case Study Compensation and Livelihood Restauration at Nam Theun 2 Hydropower Project Case Study: Compensation and Livelihood Restauration at Nam Theun 2 Hydropower Project Page 5 Table of Contents 1 Introduction .................................................................................................................. 14 2 Case Study Scope ....................................................................................................... 23 3 Resettlement Policy Framework ................................................................................... 24 3.1 Involuntary Resettlement in Lao PDR ................................................................... 24 3.2 Donor Resettlement Policy .................................................................................... 25 3.3 Compensation ....................................................................................................... 26 3.4 Integrated Resource Development Plans for the Affected Population ................... 27 3.5 Indigenous People/Ethnic Minorities ..................................................................... 27 3.6 National Policy ...................................................................................................... 28 3.6.1 National Policy on Sustainable Hydropower ......................................................... 28 3.6.2 Compensation and Resettlement in Development Projects .................................. 28 3.6.3 Key Differences in Lao PDR Law and World Bank Policies .................................. 31 3.7 Legal Framework of NT2 Compensation Policy and Entitlements ......................... 31 3.7.1 The Constitution (August 14, 1991) ...................................................................... 32 3.7.2 The Land Law (October 21, 2003) ....................................................................... 32 3.7.3 Land Titling Legislation ........................................................................................ 32 3.7.4 The Road Law (April 3, 1999) .............................................................................. 33 3.7.5 Nam Theun 2 Resettlement Policy ....................................................................... 33 3.7.6 Resettlement Committee Regulations .................................................................. 33 3.7.7 ADB and World Bank Operational Procedures ..................................................... 34 3.7.8 The Concession Agreement ................................................................................. 35 3.7.9 General Principals of Compensation and Livelihood Restoration ......................... 35 4 Brief Introduction to the Nam Theun 2 Hydropower Project .......................................... 38 4.1 Background of the Project ..................................................................................... 39 4.2 Project Design and Operation ............................................................................... 40 4.3 Financing and Project Developers ........................................................................ 44 4.4 The Role of the WB and ADB in Supporting NT2 .................................................. 46 4.5 General Role and Benefits of NT2 in Lao PDR ..................................................... 47 4.5.1 Nam Theun 2 Revenue Management Arrangements ........................................... 48 4.5.2 Initial Resource Usage Charges........................................................................... 49 4.5.3 The Public Expenditure ........................................................................................ 49 4.6 NT 2 Social and Environmental Impacts and Monitoring and Evaluation ............... 50 4.6.1 Reservoir Area on the Nakai Plateau ................................................................... 50 4.6.2 Nam Theun Watershed ........................................................................................ 54 4.6.3 Xe Bang Fai Basin ............................................................................................... 54 Page 6 Case Study: Compensation and Livelihood Restauration at Nam Theun 2 Hydropower Project 4.6.4 The Nam Theun Basin ......................................................................................... 60 4.6.5 Other Project Lands ............................................................................................. 61 5 Implementation of Upstream Mitigation ........................................................................ 62 5.1 Implementation of Resettlement ............................................................................ 62 5.1.1 Government Structure for Compensation and Mitigation ...................................... 62 5.1.2 NTPC’s Resettlement Office ................................................................................ 64 5.2 Organisations Related to Resettlement and Compensation .................................. 65 5.2.1 Grievance Committee .......................................................................................... 65 5.2.2 Provincial Authorities ........................................................................................... 65 5.2.3 Lao Women’s Union ............................................................................................. 65 5.2.4 Consultants and Contractors ................................................................................ 66 5.2.5 NGO Involvement ................................................................................................ 66 5.3 Resettlement Process ........................................................................................... 66 5.3.1 Resettlement Stage 1: Consultation and Planning ............................................... 68 5.3.2 Resettlement Stage 2: Physical Relocation .......................................................... 70 5.3.3 Resettlement Stage 3: Livelihood Development ................................................... 74 5.4 Compensation in the Nakai Reservoir Area .......................................................... 74 5.5 Building New Livelihoods for the Resettled Nakai Communities ............................ 75 5.5.1 Pillar 1: Agriculture and Livestock ........................................................................ 76 5.5.2 Pillar 2: Community Forestry ................................................................................ 81 5.5.3 Pillar 3: Reservoir Fisheries ................................................................................. 85 5.5.4 Pillar 4: Off-farm Income ...................................................................................... 88 5.6 Household Income and Consumption ................................................................... 90 5.7 Education and Health ............................................................................................ 94 5.7.1 Education ............................................................................................................. 94 5.7.2 Health .................................................................................................................. 96 5.8 Community views .................................................................................................. 99 5.9 Capacities and Interests of the First and Second Generation of Resettled Families 102 5.10 The Handover Process ....................................................................................... 103 6 Implementation of Downstream Mitigation.................................................................. 105 6.1 Nam Theun Downstream .................................................................................... 106 6.2 Xe Bang Fai Downstream ................................................................................... 107 6.2.1 Mid-Term Review ............................................................................................... 107 6.2.2 Livelihood Improvement and Restoration ........................................................... 108 6.2.3 Village Restoration Fund .................................................................................... 112 6.2.4 Fish Catch Monitoring Programme ..................................................................... 114 Case Study: Compensation and Livelihood Restauration at Nam Theun 2 Hydropower Project Page 7 6.2.5 Water Supply, Sanitation, and Hygiene .............................................................. 115 6.2.6 Water Quality ..................................................................................................... 117 6.2.7 Riverbank Gardens ............................................................................................ 118 6.2.8 Handover of the Downstream Programme to the Government ........................... 118 7 Monitoring and Evaluation .......................................................................................... 120 8 Conclusion ................................................................................................................. 122 9 Lessons learned......................................................................................................... 124 10 Recommendations ................................................................................................. 128 11 Bibliography ..........................................................................................................
Recommended publications
  • The Mineral Industry of Laos in 2015
    2015 Minerals Yearbook LAOS [ADVANCE RELEASE] U.S. Department of the Interior October 2018 U.S. Geological Survey The Mineral Industry of Laos By Yolanda Fong-Sam In 2015, Laos produced a variety of mineral commodities, oversees and implements the mineral law, mine safety, and including barite, copper, gold, iron ore, lead, and silver. mine closure regulations; creates the necessary regulations and Laos had a variety of undeveloped mineral resources. The guidelines for the promotion of the mining and metallurgical Government recognized mining as a critical sector of the sector; and issues, rejects, extends, and withdraws mining economy, and it continued to support it while at the same time licenses (Department of Mineral Resources of Thailand, 2013; promoting other domestic and foreign investments. As of 2014, REDD Desk, The, 2015; Ministry of Natural Resources and employment in the mining sector was about 15,381 people, Environment, 2016). which represented about 0.3% of the total population of Laos. In 2015, the main producers of copper and gold in Laos were Lane Xang Minerals Ltd. (MMG LXML), which was Minerals in the National Economy a subsidiary of MMG Ltd. of Hong Kong (90% interest) and the Government (10% interest), and Phu Bia Mining Ltd. In 2015, Lao’s industrial sector, which included the (PBM), which was a subsidiary of PanAust Ltd. of Australia construction, electricity generation, manufacturing, and mining (90% interest) and the Government (10% interest). The and quarrying sectors, grew by 9.7% and contributed 29.3% to country’s major mineral industry facilities and their capacities Lao’s real gross domestic product (GDP) (at constant 2002 are listed in table 2.
    [Show full text]
  • Letters from the MEKONG TIME for a NEW NARRATIVE on MEKONG HYDROPOWER
    Time for a New Narrative on Mekong Hydropower Letters from the MEKONG TIME FOR A NEW NARRATIVE ON MEKONG HYDROPOWER by Richard Cronin and Courtney Weatherby OCTOBER 2015 1 © 2015 The Stimson Center All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means without prior written consent from the Stimson Center. Photo credits: Courtney Weatherby: front cover, page 17, 36, and back cover Rich Cronin: pages 12, 14, 15, 28, 31 Brian Eyler: pages 4, 20, 24, 26 International Rivers: page 22 NASA Observatory: page 34 STIMSON 1211 Connecticut Avenue NW, 8th Floor Washington, DC 20036 Tel: 202.223.5956 | Fax: 202.238.9604 www.stimson.org Time for a New Narrative on Mekong Hydropower CONTENTS Introduction 5 Background 7 Xayaburi and Don Sahong Dam Projects: Site Visits and Findings 13 Xayaburi Dam Site Visit 15 Don Sahong Site Visit 17 Emerging Need for a New Narrative 21 The China Factor 25 Recommendations 29 Conclusion 35 About and Acknowledgements 38 3 Letters from the Mekong THE CURRENT NARRATIVE IS OVERLY PESSIMISTIC… A NEW AND MORE NUANCED VIEW IS REQUIRED. Villages in the Siphandon region 4near the Don Sahong Dam site. CRONIN & WEATHERBY Time for a New Narrative on Mekong Hydropower INTRODUCTION This issue brief – the second in Stimson’s “Letters from the Mekong” series – examines the current status of mitigation efforts at Laos’ Xayaburi and Don Sahong dam projects and the relevance of the existing narrative surrounding hydropower development on the river’s mainstream. Based on extensive research on the status and expected impacts of these projects, the authors of this brief have concluded that the current narrative of inev- itability surrounding the future of the Mekong is increasingly at odds with what is in fact a very fluid situation.
    [Show full text]
  • Summary Environmental and Social Impact Assessment Nam Theun 2
    SUMMARY ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT NAM THEUN 2 HYDROELECTRIC PROJECT IN THE LAO PEOPLE’S DEMOCRATIC REPUBLIC November 2004 CURRENCY EQUIVALENTS (as of 14 November 2004) Currency Unit – Kip (KN) KN1.00 = $0.000093 $1.00 = KN10,773 ABBREVIATIONS ADB – Asian Development Bank AFD – Agence Française de Développement CIA – cumulative impact assessment EAMP – Environmental Assessment and Management Plan EDL – Electricité du Laos EGAT – Electricity Generating Authority of Thailand EMO – Environmental Management Office EMU – Environmental Management Unit HCC – head construction contractor HCCEMMP – Head Construction Contractor’s Environmental Management and Monitoring Plan HIV/AIDS – human immunodeficiency virus/acute immunodeficiency syndrome IUCN – International Union for the Conservation of Nature and Natural Resources Lao PDR – Lao People’s Democratic Republic MRC – Mekong River Commission NNT – Nakai Nam Theun NPA – national protected area NTFP – nontimber forest product NTPC – Nam Theun 2 Power Company Limited RMU – resettlement management unit ROW – right of way SDP – Social Development Plan SEMFOP – Social and Environment Management Framework and First Operational Plan SESIA – Summary Environmental and Social Impact Assessment SIA – Strategic Impact Assessment STD – sexually transmitted disease STEA – Science, Technology and Environment Agency WMPA – Watershed Management and Protection Authority WEIGHTS AND MEASURES µg – microgram cm – centimeter El – elevation above sea level in meters ha – hectare kg – kilogram km – kilometer km2 – square kilometer kV – kilovolt l – liter m – meter m3 – cubic meter m3/s – cubic meter per second masl – meters above sea level mg – milligram MW – megawatt ºC – degree Celsius NOTES (i) Throughout this report, the Lao words Nam, Xe, and Houay are used to mean “river” and Ban to mean “village”.
    [Show full text]
  • Khammouane Natural Cultural and Historic Heritage Tourism
    Natural, Cultural and Historic Heritage Tourism Preservation and Management Plan Khammouane Province 2016-2025 Mekong Subregion Tourism Infrastructure for Inclusive Growth Project Acknowledgements The Department of Information, Culture and Tourism of Khammouane Province would like to sincerely thank the Department of Tourism Devlopment, Ministry of Informaiton, Culture and Tourism (MICT) and the Khammouane Government that has provided funding support through the Mekong Sub region Tourism Infrastructure for Inclusive Growth Project to develop the Natural, Cultural and Historical Heritage Protection and Management Plan for Khammouane Province. Sincere gratitudes are extended to Mr. Thaviphet Oula, Deputy Director General of the Tourism Development Department and Project Director, Mrs. Phongsith Davading, Project Consultant for their technical support and guidance. High appreciation goes out to the related sectors for their consultation and comments on the draft heritage tourism protection and management plan for Khammouane Province. The team responsible for drafting this Natural, Cultural and Historical Heritage Protection and Management Plan, Khammouan Province 2016 – 2025 strived to include and provide as much information as possible, however at the time of writing certain details may have been omitted and incomplete. We envisioned that there will be more stakeholder consultations in order to gain feedback and comments to improve and make this plan more comprehensive and appropriate to the context of the economic and social development
    [Show full text]
  • Nam Theun 2 Dam Laos
    Nam Theun 2 dam Laos Sectors: Hydroelectric Power Generation On record This profile is no longer actively maintained, with the information now possibly out of date Send feedback on this profile By: BankTrack Created before Nov 2016 Last update: Nov 1 2015 Contact: Tania Lee, International Rivers Ame Trandem, SOMO Project website Sectors Hydroelectric Power Generation Location This project has been identified as an Equator Project About Nam Theun 2 dam The US$1.45 billion Nam Theun 2 Hydropower Project, in the small Southeast Asia country of Lao PDR, is involves a 39-meter high dam on the Theun River, a major Mekong tributary, and a 450-square kilometer reservoir on the Nakai Plateau. Water is diverted to a powerhouse before being released into another Mekong tributary, the Xe Bang Fai River. Nam Theun 2 has forcibly displaced 6,200 indigenous people living on the Nakai Plateau and affects more than 110,000 people whohave historically depended on the Xe Bang Fai River for fisheries, agriculture, transportation and water supplies. Thousands of other Lao villagers have lost land and resources for the construction of Nam Theun 2's downstream channel and transmission lines. This project is built with the stated intention of generating revenue for the Lao government by exporting over 90% of the electricity generated to neighboring Thailand. However, as a result of the complete lack of transparency of how revenues are being used by the authorities, there is no possible way to gauge how much money is being invested back into affected communities. Latest developments Latest update Jan 1 2013 What must happen International Rivers has been monitoring the implementation of Nam Theun Hinboun Corporations' (NTPC) social programs for resettled villagers on the Nakai Plateau and the situation of people living downstream, along the Xe Bang Fai River.
    [Show full text]
  • Nam Theun 2 Hydroelectric and Social and Environment Projects
    LAO PEOPLE’S DEMOCRATIC REPUBLIC Nam Theun 2 Hydroelectric and Social and Environment Projects Report No. 153963 DECEMBER 16, 2020 © 2021 International Bank for Reconstruction and Development / The World Bank 1818 H Street NW Washington DC 20433 Telephone: 202-473-1000 Internet: www.worldbank.org Attribution—Please cite the work as follows: World Bank. 2021. Lao People’s Democratic Republic—Nam Theun 2 Hydroelectric and Social and Environment Projects. Independent Evaluation Group, Project Performance Assessment Report 153963. Washington, DC: World Bank. This work is a product of the staff of The World Bank with external contributions. The findings, interpretations, and conclusions expressed in this work do not necessarily reflect the views of The World Bank, its Board of Executive Directors, or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. RIGHTS AND PERMISSIONS The material in this work is subject to copyright. Because The World Bank encourages dissemination of its knowledge, this work may be reproduced, in whole or in part, for noncommercial purposes as long as full attribution to this work is given. Any queries on rights and licenses, including subsidiary rights, should be addressed to World Bank Publications, The World Bank Group, 1818 H Street NW, Washington, DC 20433, USA; fax: 202-522-2625; e-mail: [email protected].
    [Show full text]
  • An Analysis of Nam Theun 2 Compliance with World Commission on Dams Strategic Priorities
    An Analysis of Nam Theun 2 Compliance with World Commission on Dams Strategic Priorities Executive Summary By Aviva Imhof, International Rivers Network and Shannon Lawrence, Environmental Defense Updated February 2005 The World Commission on Dams (WCD), an independent, multi-stakeholder process sponsored by the World Bank and IUCN, was established to review the development effectiveness of large dams and assess alternatives; develop a framework for assessing options and decision-making processes for water and energy services; and develop internationally acceptable criteria and guidelines for planning, designing, construction, operation, monitoring, and decommissioning of dams. In November 2000, WCD Commissioners released their final report, Dams and Development: A New Framework for Decision-Making. The World Bank has stated that it will use the WCD report “as a valuable reference to inform its decision-making process when considering projects that involve dams.”1 Additionally, World Bank donors, in the 2002 report of the Bank’s International Development Association (IDA) 13th Replenishment, “noted the Bank’s early support for the World Commission on Dams and asked that IDA take into account the core values and strategic priorities suggested by the WCD for preparing and evaluating dam projects.”2 In November 2004, IUCN members – including governments and non-governmental organizations – adopted a motion on “Financial institutions and the World Commission on Dams recommendations.” This recommendation urges financial institutions to assess all proposed dam projects in the context of WCD strategic priorities and to decline support for dam projects that do not respect WCD strategic priorities.3 It is with these statements in mind that the following analysis has been prepared.
    [Show full text]
  • UXO/Mine Action in Lao PDR
    2014 ANNUAL REPORT This document acts as Annual Report of the National Regulatory Authority for UXO/Mine Action in Lao PDR. For further information, please contact the: National Regulatory Authority for UXO/Mine Action Sector in Lao PDR (NRA) Sisangvone Village, P.O. Box 7621, Unit 19, Saysettha District, Vientiane, Lao PDR Website: www.nra.gov.la Telephone: (856-21) 262386 Donation for UXO victims: your support can make a difference. Your contribution to the National Regulatory Authority for UXO/Mine Action in Lao PDR can support for families and children whose lives have been suffered by the UXO from the Indo-China War. For how to give, please contact Victim Assistance Unit of the National Regulatory Authority for UXO/Mine Action in Lao PDR, Mr. Bountao Chanthavongsa via email: [email protected] Compiled and designed by: Vilavong SYSAVATH and Olivier BAUDUIN Photos: Photos that appear in the Operator Reports, unless individually credited, were taken by and are the property of that Operator. All other photos in this report, unless individually creditied, have been taken by the following people - Vilavong SYSAVATH Acknowledgements: The NRA would like to thank all UXO/Mine Action Sector Operators who provided images and information on their projects and activities in 2014 for this report. The NRA Programme and Public Relations Unit would also like to acknowledge the support and effort put in by all Members of the NRA team in helping to compile the UXO Sector Annual Report 2014. This report may be subject to change after publication. To find out more about changes, errors, or omissions please visit the website: www.nra.gov.la.
    [Show full text]
  • THE MEKONG and the WATER POLITICS of CHINA and SOUTHEAST ASIA Milton Osborne Lowy Institute Paper 02
    Lowy Institute Paper 02 river at risk THE MEKONG AND THE WATER POLITICS OF CHINA AND SOUTHEAST ASIA Milton Osborne Lowy Institute Paper 02 river at risk THE MEKONG AND THE WATER POLITICS OF CHINA AND SOUTHEAST ASIA Milton Osborne First published for Lowy Institute for International Policy 2004 by Longueville Media PO Box 102 Double Bay New South Wales 1360 Australia www.longmedia.com.au [email protected] Tel. (+61 2) 9386 0081 Copyright © Lowy Institute for International Policy 2004 Greater Mekong Subregion Map No. 4112 Rev. 2 January 2004 reproduced with permission from the UN Cartographic section. Upper Mekong Map reproduced from Osborne, M. The Mekong, Allen & Unwin Australia, 2001 All rights reserved. Without limiting the rights under copyright reserved above, no part of this publication may be reproduced, stored in or introduced into a retrieval system, or transmitted in any form or by any means (including but not limited to electronic, mechanical, photocopying, or recording), without the prior written permission of the copyright owner. Cover and text design by Shane Grantham Printed and bound in Australia Typeset in Esprit Book 10 National Library of Australia Cataloguing-in-Publication data Osborne, Milton, 1936- . River at risk : the Mekong and the water politics of Southeast Asia. Bibliography. ISBN 1 921004 02 9. 1. Mekong River. 2. Mekong River Valley - Social conditions. I. Lowy Institute for International Policy. II. Title. (Series : Lowy Institute for International Policy ; no. 2). 915.9 Greater Mekong subregion Milton Osborne has been associated with the Southeast Asian region since being posted to the Australian Embassy in Phnom Penh in 1959.
    [Show full text]
  • New Means, Old Ends? World Bank Governmentality in Thailand and Lao People's Democratic Republic
    University of Tennessee, Knoxville TRACE: Tennessee Research and Creative Exchange Masters Theses Graduate School 5-2012 New Means, Old Ends? World Bank Governmentality in Thailand and Lao People's Democratic Republic Nicholas Ryan Zeller [email protected] Follow this and additional works at: https://trace.tennessee.edu/utk_gradthes Part of the Politics and Social Change Commons Recommended Citation Zeller, Nicholas Ryan, "New Means, Old Ends? World Bank Governmentality in Thailand and Lao People's Democratic Republic. " Master's Thesis, University of Tennessee, 2012. https://trace.tennessee.edu/utk_gradthes/1224 This Thesis is brought to you for free and open access by the Graduate School at TRACE: Tennessee Research and Creative Exchange. It has been accepted for inclusion in Masters Theses by an authorized administrator of TRACE: Tennessee Research and Creative Exchange. For more information, please contact [email protected]. To the Graduate Council: I am submitting herewith a thesis written by Nicholas Ryan Zeller entitled "New Means, Old Ends? World Bank Governmentality in Thailand and Lao People's Democratic Republic." I have examined the final electronic copy of this thesis for form and content and recommend that it be accepted in partial fulfillment of the equirr ements for the degree of Master of Science, with a major in Sociology. Paul K. Gellert, Major Professor We have read this thesis and recommend its acceptance: Rachelle Scott, Damayanti Banerjee Accepted for the Council: Carolyn R. Hodges Vice Provost and Dean of the Graduate School (Original signatures are on file with official studentecor r ds.) New Means, Old Ends? World Bank Governmentality in Thailand and Lao People’s Democratic Republic A Thesis Presented for the Master of Arts Degree The University of Tennessee, Knoxville Nicholas Ryan Zeller May 2012 Copyright © 2012 by Nicholas R.
    [Show full text]
  • Data Collection Survey on Education Environment of Lower Secondary Schools in Lao P.D.R
    Final Report: Data Collection Survey on Education Environment of Lower Secondary Schools in Lao P.D.R February, 2016 Japan International Cooperation Agency (JICA) Mohri, Architect and Associates, Inc. 1R JR 16-04 Final Report: Data Collection Survey on Education Environment of Lower Secondary Schools in Lao P.D.R February, 2016 Japan International Cooperation Agency (JICA) Mohri, Architect and Associates, Inc. Contents Chapter 1 SUMMARY OF STUDY ............................................................................................. 1-1 1-1 Context of Study .............................................................................................................. 1-1 1-2 Objective of Study ........................................................................................................... 1-1 1-3 Timeframe of Study ......................................................................................................... 1-1 1-4 Members of Study Mission (Name, Responsibility, Organization belonging to) ...... 1-2 1-5 Concerned persons consulted and/or interviewed ......................................................... 1-2 1-6 Contents of Study .......................................................................................................... 1-2 1-6-1 Local Study I ............................................................................................................ 1-2 1-6-2 Local Study II ........................................................................................................... 1-3 CHAPTER
    [Show full text]
  • An Analysis of Nam Theun 2 Compliance with World Commission on Dams Guidelines
    An Analysis of Nam Theun 2 Compliance with World Commission on Dams Guidelines by Aviva Imhof May, 2001 International Rivers Network 1847 Berkeley Way Berkeley CA 94703, USA Tel: 510-848-1155, Fax: 510-848-1008 Email: [email protected] Web: www.irn.org An Analysis of Nam Theun 2 Compliance with WCD Guidelines Page 1 Introduction to the World Commission on Dams The World Commission on Dams (WCD) was an independent body sponsored by the World Bank and IUCN, chaired by South African cabinet minister Kader Asmal, and including representatives from both the dam industry and anti-dam people’s movements. The WCD’s mandate was to review the development effectiveness of large dams and assess alternatives; develop a framework for assessing options and decision-making processes for water and energy services; and develop internationally-acceptable criteria and guidelines for planning, designing, construction, operation, monitoring, and decommissioning of dams. Despite their many differences in background and political perspective, the 12 Commissioners managed to agree on a final report, Dams and Development: A New Framework for Decision- Making, which was released in London in November 2000.1 The report found that: · large dams have forced 40-80 million people from their homes and lands, with impacts including extreme economic hardship, community disintegration, and an increase in mental and physical health problems. Indigenous, tribal and peasant communities have been particularly hard hit. People living downstream of dams have also suffered from increased disease and the loss of natural resources upon which their livelihoods depended; · large dams cause great environmental damage, including the extinction of many fish and other aquatic species, huge losses of forest, wetland and farmland, and the release of greenhouse gases; and · the benefits of large dams have largely gone to the already well off while poorer sectors of society have borne the costs.
    [Show full text]