Application for Landuse Consent.Pdf

Total Page:16

File Type:pdf, Size:1020Kb

Application for Landuse Consent.Pdf CONTACT ENERGY LIMITED GEOFUTURE Expansion of Te Mihi Power Station Land Use Consent Application to Taupo District Council 6 August 2021 TABLE OF CONTENTS Part A: Resource Consent Application Part B: Assessment of Environmental Effects Executive Summary 1. Introduction __________________________________________________________ 5 1.1 Contact Energy Limited 5 1.2 Te Mihi Power Station 5 1.3 Proposed Expansion of the Te Mihi Power Station 7 1.4 Geofuture - The Wider Context 9 1.5 AEE Report Structure 10 1.6 Technical Studies Undertaken 11 2. Description of the Existing Environment ____________________________________ 12 2.1 Geology, Topography and Land Uses 12 2.2 Wairakei Geothermal Power Scheme 14 2.3 Terrestrial Ecology and Waterbodies 14 2.4 Cultural History and Setting 15 2.5 Other Environmental Characteristics 17 2.6 The Existing Environment – Legal Context 17 3. Proposed Activities ____________________________________________________ 19 3.1 Location of Future Power Plants 19 3.2 Te Mihi Electricity Generation Plant Options 22 3.3 Key Features of the Proposed Expansion of Te Mihi Power Station 25 3.4 Switchyards and Electricity Transmission 25 3.5 Site Access 25 3.6 Construction Activities 26 3.7 Plant Operations and Maintenance Activities 27 3.8 Future of the Wairākei A & B Power Stations 27 4. RMA Status of Activities ________________________________________________ 28 4.1 Taupō District Council Jurisdiction 28 4.2 Waikato Regional Council Jurisdiction 33 4.3 Joint Applications 33 5. Assessment of Applications _____________________________________________ 35 5.1 Section 104 of the RMA 35 5.2 Section 104B of the RMA 35 6. Positive Effects _______________________________________________________ 37 6.1 Economic Benefits 37 6.2 Decarbonising the Economy 39 7. Landscape and Visual Effects ___________________________________________ 40 8. Noise Effects ________________________________________________________ 42 Expansion of Te Mihi Power Station 9. Transportation Effects _________________________________________________ 46 10. Archaeological Effects _________________________________________________ 48 11. Cultural Values _______________________________________________________ 49 12. Management of Hazardous Substances ____________________________________ 51 12.1 Current Use of Hazardous Substances 51 12.2 Hazardous Substances Review 51 12.3 Hazardous Substances to be stored and used 52 12.4 Major Hazard Facilities and Hazardous Substances Compliance 52 12.5 Major Incident Analysis 53 13. Contaminated Soils, Fault LInes and Hot ground ____________________________ 57 13.1 Contaminated Soils 57 13.2 Fault Lines and Hot Ground Hazard 57 14. Air Quality Effects ____________________________________________________ 58 15. Effects on Terrestrial Ecology and Thermotolerant Vegetation __________________ 59 16. Policy and Planning Assessment _________________________________________ 60 16.1 Vision and Strategy for the Waikato River 60 16.2 National Policy Statement for Renewable Electricity Generation 61 16.3 National Policy Statement on Electricity Transmission 61 16.4 National Environmental Standard for Contaminants in Soil 62 16.5 Waikato Regional Policy Statement 62 16.6 Waikato Regional Plan 63 16.7 Taupō District Plan 63 16.8 Ngāti Tūwharetoa Iwi Environmental Management Plan 64 16.9 Part 2 of the RMA 65 17. Consultation and Engagement __________________________________________ 69 17.1 Taupō District Council 69 17.2 Waikato Regional Council 69 17.3 Tangata Whenua 70 17.4 Transpower NZ Limited 71 17.5 Department of Conservation 71 17.6 Waka Kotahi / New Zealand Transport Agency 72 17.7 Neighbours and General Public 72 18. Proposed Consent Conditions ___________________________________________ 73 19. Lapse Period and Term of Consent _______________________________________ 74 19.1 Lapse Period 74 19.2 Term of Consent 74 20. Notification of the Application ___________________________________________ 75 21. Conclusion __________________________________________________________ 76 Expansion of Te Mihi Power Station LIST OF APPENDICES Appendix 1: Records of Title and Survey Office Plan Appendix 2: Plans of Proposed Power Station Options Appendix 3: Taupo District Plan - Analysis of Rules and Performance Standards Appendix 4: Hot Ground Assessment Appendix 5: Economic Benefit Assessment Appendix 6: Landscape and Visual Assessment Appendix 7: Acoustical Assessment Appendix 8: Independent Peer Review of Acoustical Assessment Appendix 9: Integrated Transportation Assessment Appendix 10: Archaeological Assessment Appendix 11: Te Mihi Binary Plant Major Incident Analysis Appendix 12: Preliminary Site Investigation Appendix 13: Analysis of Policy and Planning Documents Appendix 14: Draft Land Use Consent and Proposed Conditions Expansion of Te Mihi Power Station REPORT INFORMATION Report Status FINAL Our Reference MDL001036 File Location Contact – GeoFuture – Application and AEE – Taupo District Council – Final – 060821 Author Mark Chrisp Review By GeoFuture Project Team Version Number 1 Version Date 6 August 2021 © Mitchell Daysh Limited (2021). This document and its contents are the property of Mitchell Daysh Limited. Any unauthorised employment or reproduction, in full or in part, is forbidden. LIST OF ABBREVIATIONS AND ACRONYMS ACC Air Cooled Condensers BOI Board of Inquiry CIA Cultural Impact Assessment Contact Contact Energy Limited DOC Department of Conservation ESCP Erosion and Sediment Control Plan FP Flash Plant GGC Geothermal Group Control HAIL Hazardous Activities and Industries List Expansion of Te Mihi Power Station ITA Integrated Transportation Assessment LP Low Pressure MDCT Mechanical Draft Cooling Tower NES-ETA Resource Management (National Environmental Standards for Electricity Transmission Activities) Regulations 2009 NES-CS Resource Management (National Environmental Standard for Assessing and Managing Contaminants in Soil to Protect Human Health) Regulations 2011 NPS-ET National Policy Statement on Electricity Transmission 2008 NPS-REG National Policy Statement for Renewable Electricity Generation 2011 NZECP New Zealand Code of Practice for Electrical Safe Distances (NZECP 34:2001) PSI Preliminary Site Investigation RMA Resource Management Act 1991 RPS Waikato Regional Policy Statement SGF Significant Geothermal Feature SGW Separated Geothermal Water SNA Significant Natural Area STG Steam Turbine Generator TDC Taupō District Council TDP Taupō District Plan WBF Western Bore Field WRC Waikato Regional Council WRP Waikato Regional Plan Expansion of Te Mihi Power Station A PART A Resource Consent Application FORM 9 APPLICATION FOR RESOURCE CONSENT Under section 88 of the Resource Management Act 1991 To: Taupō District Council 30 Tongariro Street TAUPŌ 3330 1. CONTACT ENERGY LTD, whose address is Level 2, Harbour City Tower, 29 Brandon Street, PO Box 10742, Wellington 6143 (note address for service below) applies for the following type(s) of resource consent: Land Use Consent 2. The activity to which the application relates (the proposed activity) is as follows: To construct, operate, maintain, replace, renew, and undertake minor upgrading of an expansion to the Te Mihi Power Station and all associated structures, equipment, facilities, signage, earthworks, internal site roading, and 220kV grid connection, to the extent that it involves activities beyond that which are authorised by Land Use Consent RM0703041 (more fully described in Part B of this document) including: o Option 1 (THI_1) – A single large steam turbine located within the existing consented footprint (Site THI A), with a gross output up to 180MW; or o Option 2 (THI_2) – Two smaller steam turbines, one on the existing consented footprint (Site THI A) and one further southeast (Site THI B), with a combined gross output up to 180MW; or o Option 3 (THI_3) – Organic Rankine Cycle Binary Plant, consisting of up to four units located on a footprint to the southeast of the existing Te Mihi Power Station (Site THI B), with a gross output up to 165MW. A Land Use Consent is required due to the proposed activity exceeding several performance standards in the Taupō District Plan. 3. A lapse period of 10 years is sought in relation to the above application. 1 As amended by consent granted by Taupō District Council on 4 August 2010 under s.127 of the RMA (referred to as Land Use Consent RM070304A). Expansion of Te Mihi Power Station 1 4. The applicant requests its application be publicly notified. 5. The site on which the proposed activity is to occur is in the vicinity of the existing Te Mihi Power Station within the area shown on the following plans attached as Schedule 1 to this application: Plan 1: Te Mihi Power Station Expansion – Land Use Consent Area; and Plan 2: Te Mihi Power Station Expansion Sites THI A and THI B. Physical Address: 136 Oruanui Road, Taupō. Legal Description: Lot 3 DP 454472 (Record of Title 583496); Section 4 SO 355555; and Area 1 DP 445146. The relevant Records of Title and Survey Office Plan are presented in Appendix A. 6. Contact Energy Limited is the owner and occupier of Lot 3 DP 454472 and is the lessee and occupier of Section 4 SO 355555. The owner of Section 4 SO 355555 is: The Crown acting through the Commissioner of Crown Lands C/o Land Information New Zealand PO Box 5501 WELLINGTON Attention: Naomi Bray and Megan McKinstry Transpower New Zealand Ltd is the owner and occupier of Area 1 DP 445146 (being the switchyard located immediately north of Te Mihi Power Station). 7. There are no other activities that are part of the proposal to
Recommended publications
  • TOI MOANA BAY of PLENTY GROWTH STUDY: OPPORTUNITIES REPORT May 2015 P R E FA C E
    MINISTERS’ FOREWORD As Ministers for Economic Development, Primary Industries and Māori Development, we believe strongly that building successful and more resilient regions is key to building a prosperous nation. Recognising and capitalising on the opportunities and strengths of different regions is vital to enable each region to provide employment and a good standard of living for its people and to maximise each region’s contribution to the economic and social wellbeing of New Zealand. The Regional Economic Activity Reports and Enterprise and regional economic (REAR) have allowed us to understand development agencies to bring investment and compare regional performance at a and ultimately employment into the high level. Through the REAR’s, we know regions. that the current economic and social The Bay of Plenty Regional Growth Study performance of regions varies significantly. is the second study in this programme and The Regional Growth Studies programme follows the Northland Regional Growth provides an independent view of specific Study which was released in February regions chosen because their potential is 2015. It provides a view that has been not yet fully realised. Within each of these developed through evidence and with input regions there are excellent success stories from key businesses and economic players and some pockets of high deprivation. This in the region. It provides the region and deprivation can only be fully addressed central government with a shared view through wealth creation and higher levels of the potential of the region and its local of employment. communities. The Regional Growth Studies explore The Bay of Plenty region (that includes opportunities to achieve growth in the Taupo district for the purposes of this investment, incomes and employment by study) is blessed with enviable natural sector.
    [Show full text]
  • News Release
    December 27, 2017 NEWS RELEASE www.jogmec.go.jp Japan Oil Gas and Metals National Corporation Division in Charge: Planning and Finance Division TEL:+81-3-6758-8001 FAX:+81-3-6758-8087 PR in Charge: Public Relations Division TEL:+81-3-6758-8106 FAX:+81-3-6758-8008 Report of “JAPAN-NEW ZEALAND GEOTHERMAL WORKSHOP” Japan Oil, Gas and Metals National Corporation (JOGMEC), GNS Science International Limited (GNS Science) and New Zealand Trade and Enterprise (NZTE) held the “JAPAN - NEW ZEALAND GEOTHERMAL WORKSHOP” in Rotorua, New Zealand, on the 20th and 21st of November 2017. This was the second time for JOGMEC and GNS Science to host the event, and more than 100 people joined from New Zealand and Japan. The workshop covered the fields of geothermal development, hot springs and geysers, and the environment, for each of the countries; and 14 speakers ranging from geothermal developers, local governments, research institutes, and representatives from Maori and local community groups presented their achievements and experience of sustainable geothermal development. JOGMEC and GNS Science also organized a field trip, which included visiting geothermal power plants, showing direct and cascade usage of geothermal, and geysers. This workshop was based on the MOU signed the 16th of July 2015, between JOGMEC and GNS Science. The MOU contained cooperative bilateral relations in order to facilitate technical cooperation in the field of evaluation and mitigation of environmental impacts, the development of survey methodologies, improving methods for management, the sustainability of geothermal reservoirs, and promotion of public acceptance of geothermal developments. New Zealand has more than 6 decades of history of geothermal power generation, and plenty of geothermal resources, with double the geothermal power plant capacity of Japan - even though Japan has 50 years’ experience of geothermal power generation.
    [Show full text]
  • Te Mihi Power Station Contact Energy | Investor Day | 6 November 2018 6 November 20181 Disclaimer
    2018 Investor day Te Mihi Power Station Contact Energy | Investor day | 6 November 2018 6 November 20181 Disclaimer This presentation may contain projections or forward-looking statements regarding a variety of items. Such forward-looking statements are based upon current expectations and involve risks and uncertainties. Actual results may differ materially from those stated in any forward-looking statement based on a number of important factors and risks. Although management may indicate and believe that the assumptions underlying the forward-looking statements are reasonable, any of the assumptions could prove inaccurate or incorrect and, therefore, there can be no assurance that the results contemplated in the forward-looking statements will be realised. EBITDAF, underlying profit, free cash flow and operating free cash flow are non-GAAP (generally accepted accounting practice) measures. Information regarding the usefulness, calculation and reconciliation of these measures is provided in the supporting material. Furthermore, while all reasonable care has been taken in compiling this presentation, Contact accepts no responsibility for any errors or omissions. This presentation does not constitute investment advice. Contact Energy | Investor day | 6 November 2018 2 Agenda 1 Wholesale James Kilty 2 Geothermal advantage Mike Dunstall 3 Geothermal options James Kilty 4 Closing remarks and Q&A Dennis Barnes Contact Energy | Investor day | 6 November 2018 3 Wholesale – James Kilty Contact Energy | Investor day| 6 November 2018 Wholesale James Kilty – Chief Generation and Development Officer 1 Environment and strategy 2 Organising for success 3 Wholesale market outlook Contact Energy | Investor day | 6 November 2018 5 About Contact * - All figures as at June 30 2018 Contact Energy | Investor day | 6 November 2018 6 Sustainability is business as usual Sustainability is about integrating diverse interests into our strategy to ensure long term People value creation.
    [Show full text]
  • March 2012 Newsletter
    East Harbour Energy Ltd PO Box 11-595, Manners St Wellington 6142, New Zealand Tel: 64-274-771 009 Fax: 64-4-385 3397 E-mail: [email protected] www.nzgeothermal.org.nz Newsletter March 2012 Welcome to the March 2012 issue of the newsletter. It’s set out as follows: President’s Report Geothermal News / Articles o NZ News o International News Board and Executive Officer Update o Board Matters o Elections to the Board o NZGA Special Interest Group – Geothermal Heat Pumps o Meetings – Recent and Planned Submissions – Recent and Planned Industry Papers Training Update Tenders and Funding Opportunities Forthcoming Events/Conferences NZGA Action Plan (last updated March 2012) Membership Keeping in Touch Use of and contributions to this Newsletter President’s Report Welcome to another NZGA Newsletter packed with a lot of information and updates on the New Zealand and increasingly global geothermal scene. Brian White has provided some information on the call for volunteers to participate (and in some cases to lead) the various interest groups that NZGA has committed to launching. This is a practical way to build a stronger and more beneficial Association. Please consider joining one of the Interest Groups. A form has been provided to send to [email protected] but if you have queries contact Brian White. Brian White’s email is [email protected]. Under Brian Carey’s leadership the Geothermal Heat Pump Association has got underway. NZGA, jointly with the IGA Western Pacific Regional Branch, is hosting a Resource Assessment Seminar in Taupo from 11-14 June 2012.
    [Show full text]
  • Annual Report 2014
    Full steam ahead Annual Report 2014 Te Mihi geothermal power station Investment decision – February 2011 Commissioned – May 2014 Officially opened – August 2014 Contact 2014 Contact 2014 2 Geothermal Resource Geothermal Resource 3 Contents We are… 04 Geothermal Resource One of New Zealand’s largest listed companies but we operate with the same genuine concern for our customers 10 New Customer System and communities as the smallest. We are integral to our customers’ lives – and our customers are integral to us. 14 At a Glance 16 Our Business Model 18 Where We Operate 20 KPIs 22 Q&A 28 Our Board 30 Our Leadership Team This Annual Report is dated 5 September 2014 and is signed on behalf of the Board by: 32 Case Studies 40 Our People Governance 46 Financial Statements 59 Grant King Sue Sheldon Remuneration Report 52 Independent Auditor’s Report 87 Chairman Director Statutory Disclosures 55 Corporate Directory 88 Contact 2014 Geothermal Resource 5 Another milestone in the journey Contact is a company committed to the development and use This investment programme has dramatically grown the breadth of geothermal energy. Why? It’s renewable, it’s clean, it’s fi nancially of expertise within our organisation. With Te Mihi, we have proven secure, and it’s always available to power Kiwi homes and our ability to develop and operate large, world-class geothermal OUR businesses – today and into the future. power stations. Our combined gross geothermal generation output is now 431 megawatts (MW) and is globally signifi cant in Our Taupō steamfi eld operation is large by international standards.
    [Show full text]
  • Geothermal Power
    WORLD-CLASS RESULTS. GEOTHERMAL POWER World-class skills. World-class team. GEOTHERMAL STEAMFIELD & POWER PLANT ENGINEERS 42 George Street, Mt Eden, Auckland 1024, New Zealand P: +64 9 638 3447 E: [email protected] www.mtlnz.co.nz Mechanical, Civil & Structural Engineers HYDRO GEOTHERMAL THERMAL WATER INDUSTRIAL HYDRO GEOTHERMAL THERMAL WATER INDUSTRIAL GEOTHERMAL POWER GEOTHERMAL POWER GEOTHERMAL GEOTHERMAL POWER Front End Engineering Don Purdie Input and review of design Chris Mann Process / Mechanical Design concepts for operation and Project and Contract Project & Contract Management Detailed Design cost effectiveness Civil Structural Management, Commissioning Commissioning Management Steamfield, Design to accommodate Management and HAZOP Asset Management Power Station and challenges faced with Facilitator balance of plant geothermal structures Project Management Commissioning Management of risk, Power Station design teams, project and Steamfield programme, Commissioning procurement and Matt Chubb Phillip Orr construction contracts. Civil and Structural Geothermal Implementation of Design Steamfield project controls Project & Contract Design HAZOP Management Design risk Asset Management assessments of Geothermal Controls* Power Stations Specialist *We partner with Electrical geothermal and Controls Consultants controls WORLD-CLASS SKILLS. experience WORLD-CLASS TEAM. Key Software Capabilities: Process Modelling – Fluid Flow Head Loss – Pipeflow Process Design Transient Modelling – Hytran Pipe Stress Analysis – AutoPipe Steamfield and
    [Show full text]
  • Geothermal Resources Council
    GEOTHERMAL RESOURCES COUNCIL Vol. 43, No. 5 Bulletin September/October 2014 GRC Annual Meeting & GEA Expo Geothermal: A Global Solution The Geothermal World Comes Together Again PERMIT #1698 #1698 PERMIT SACRAMENTO, CA CA SACRAMENTO, PAID US POSTAGE US NON-PROFIT ORG NON-PROFIT fifteen dollars 38th GRC Annual Meeti ng & GEA Geothermal Energy Expo Portland, Oregon USA September 28 - October 1, 2014 www.geothermal.org Geothermal: A Global Soluti on www.geo-energy.org Global Geothermal News There are a number of ways to get the latest Global The GRC ’s award-winning Global Geothermal News Geothermal News from the global geothermal has posted over 3,800 stories since its launch community: on December 21, 2011. In all there have been over 217,710 page views. • On the web at http://globalgeothermalnews.com • View the mobile version at http:// geothermalresourcescouncil.blogspot.com/?m=1 Or scan this QR code to link directly: • Read the Global Geothermal News through My Yahoo!, Newsgator, Bloglines, and other news readers at http://feeds.feedburner.com/ GlobalGeothermalNews • Get the news delivered by email. Sign up to receive a daily summary of Global Geothermal News at http://goo.gl/5nNZE Or scan this QR code to link directly: Vol. 43, No. 5 Bulletin September/October 2014 7 President’s Message by Louis Capuano, Jr. Executive Director Steve Ponder 9 Executive Director’s Message Email: [email protected] by Steve Ponder Communications Director/Editor Ian Crawford 11 Communication from the GRC Email: [email protected] by Ian Crawford
    [Show full text]
  • New Zealand Geothermal Association (NZGA) News - 23 July 2014
    East Harbour Energy Ltd PO Box 11-595, Manners St Wellington 6142, New Zealand Tel: +64-274-771 009 E-mail: [email protected] www.nzgeothermal.org.nz New Zealand Geothermal Association (NZGA) News - 23 July 2014 Dear Members and friends, welcome to this issue of the NZGA Newsletter! President’s Report WHAT’S IN THIS ISSUE? Welcome Welcome to the July 2014 New Zealand Geothermal Association Geothermal News Newsletter. EO and Board Update (including WGC World Geothermal Congress (WGC) 2015 – Momentum 2015 planning update) Gathers! Events/Training; Industry Papers Membership Government Support - WGC 2015 has been identified by the NZ government as a strategically important event and has committed funding to the NZ Inc. project through the provision GEOTHERMAL FACTS – Record of a Project Manager, administrative support and direct matched High Geothermal Electricity cash funding of $100k. For more details read the ‘NZ Inc’ Production following 3 paragraphs down. Event Registration - Registration is open with early bird Geothermal electricity production reached registration fees applicable if you register and pay before 1 a new high in mid-July – an 850 MWh February 2015. Early bird registration will save you at least average was achieved for the week ending A$140. 20 July. If you are an NZGA member then you are an International Geothermal Association (IGA) member as NZGA is affiliated to IGA and the early bird fee is A$1,050. It is time to register and to get your accommodation booked. Event Papers - There are expected to be about 1400 papers delivered which is about 300 more than at Bali in 2010.
    [Show full text]
  • Pioneer Geothermal Power Station Still Abundant Electricity Supplier
    ELECTRICITY Earth Energy accessible reliable renewable Wairakei Power Station on the banks of the Waikato River. Pioneer Geothermal Power Station Still Abundant Electricity Supplier The world’s first Mike Dunstall, General Manager of Geothermal Resources and KEY BENEFITS: geothermal power Development at Contact Energy, says station to use wet “The construction of Wairakei saw • Renewable energy source New Zealand become the second • Minimal greenhouse steam technology largest producer of geothermal energy, gas emissions and a pioneer in the field.” was commissioned • Generates base load in 1958 at Wairakei, “Since 1960 Wairakei Power Station has electricity which is not been running at 90% or more of its impacted by weather north of Taupō. maximum output and is an important base load station, providing constant electricity to over one hundred KEY FEATURES: thousand homes. Just recently, we have reduced our utilisation of the • Operational for over 60 years oldest Wairakei machines, as our new • 175 MW installed capacity Te Mihi station takes over some of Wairakei’s role” • 1000 GWh of electricity per annum Wairakei’s 25 km2 borefield contains over 150 wells, with a typical depth of 600 m in older wells and as deep as 3000 m in newer wells. Of these, about 65 are in production, extracting hot water and steam from the earth at a rate of 245,000 tons per day, while twenty are injection wells that put about 180,000 tons of water back into the field daily. “WAIRAKEI PAVED THE WAY FOR NEXT GENERATION POWER STATIONS, LIKE TE MIHI. IT HAS PROVEN THAT GEOTHERMAL IN NEW ZEALAND IS ONE OF OUR BEST RENEWABLE AND CLEAN ENERGY RESOURCES AND THE TECHNOLOGY FIRST DEVELOPED AT WAIRAKEI CONTINUES TO INFLUENCE GEOTHERMAL POWER STATION DESIGN AROUND THE WORLD.” Wairakei borefield, where the hot steam is drawn from.
    [Show full text]
  • Economic Benefit Assessment
    www.concept.co.nz GeoFuture project: economic benefit assessment Final report July 2021 Disclaimer Except as expressly provided for in our engagement terms, Concept and its staff shall not, and do not, accept any liability for errors or omissions in this report or for any consequences of reliance on its content, conclusions or any material, correspondence of any form or discussions, arising out of or associated with its preparation. The analysis and opinions set out in this report reflect Concept’s best professional judgement at the time of writing. Concept shall not be liable for, and expressly excludes in advance any liability to update the analysis or information contained in this report after the date of the report, whether or not it has an effect on the findings and conclusions contained in the report. This report remains subject to any other qualifications or limitations set out in the engagement terms. © Copyright 2021 Concept Consulting Group Limited All rights reserved Contents Executive summary ................................................................................................................................. 0 1 Introduction .................................................................................................................................... 2 1.1 Purpose ................................................................................................................................... 2 1.2 Structure of report .................................................................................................................
    [Show full text]
  • Powerlines, Issue 24
    Issue 24 : August 2013 Powerlines News and industry comment from Parsons Brinckerhoff around the globe Planning for a brighter future Plans to increase access to electricity in Kenya Plus Private power expansion in Thailand End of an era in St Lucia Full steam ahead in the Philippines Securing geothermal power for the future A royal honour Onwards and upwards Belgrade bound Pupil power in Kenya A strong alliance Delivering power in remote Australia Powerlines Issue 24 : August 2013 Planning for a brighter future Contact: Mark Fraser ([email protected]) Access to electricity provides huge benefits for individuals and communities, raising standards of living and providing a catalyst for economic growth. Electricity facilitates the use of computers in schools and machinery in industry; electric lighting in homes allows students to study in the evenings without the health risks posed by kerosene lamps. Electricity is a scarce resource in many African countries, with many of the areas currently The supplied with electricity suffering from poor levels of reliability and quality of supply. Only around counterpart 25 percent of Kenyans currently enjoy access to team was electricity; 50 percent in urban areas and just five percent in rural areas. The Kenyan pivotal during government aims to increase this access to 98 percent in urban areas and 58 percent in rural the data- areas by 2030. gathering Major investments are being made in the stage and generation and bulk transmission of electricity, but for benefits to be realised, similar levels of provided investment are required in the distribution of electricity. This investment must be carefully invaluable planned to ensure that scarce resources are local used efficiently.
    [Show full text]
  • Green Infrastructure Investment Opportunities AUSTRALIA & NEW ZEALAND
    Green Infrastructure Investment Opportunities AUSTRALIA & NEW ZEALAND Sponsors Green Infrastructure Investment Opportunities, Australia & New Zealand Contents This report highlights green infrastructure investment opportunities in Australia and New Zealand 3 Executive This report highlights green infrastructure superannuation funds and asset summary investment opportunities in Australia and managers and their global counterparts, New Zealand. It has been prepared to potential issuers, infrastructure owners 4 Green help meet the growing demand for green and developers, as well as relevant infrastructure: an investment opportunities – including Government ministries (Finance, Planning, green bonds - as well as to support the Energy, Transport, Environment). It is part opportunity for two countries’ transition to a low-carbon of a research series which commenced growth economy. It aims to facilitate greater with the Green Infrastructure Investment engagement on this topic between Opportunities, Indonesia report in 5 Macroeconomic project owners and developers, and May 2018 and will investigate green institutional investors. infrastructure investment opportunities outlook around the world, initially focusing on the Green finance instruments and trends Asia-Pacific region. 6 Infrastructure are explored in the report, with sector- by-sector options presented. Green In developing this report, the Climate financing infrastructure investment opportunities Bonds Initiative consulted with key are also explored sector-by-sector, with Government bodies, industry, the 8 Green finance projects presented in reference case financial sector, peak bodies, NGOs studies and a sample green pipeline and think tanks – in partnership with 13 Green standards of opportunities. The sample pipeline ANZ, Commonwealth Bank of Australia, is not exhaustive – rather a snap shot Macquarie Group, NAB, Westpac, the 16 Green of the different types of opportunities Clean Energy Finance Corporation infrastructure available in the short and medium-term (CEFC), IFM Investors, the Investor future.
    [Show full text]