Transportation Outlook 2040 Project List

Transportation Outlook 2040 is the metropolitan transportation plan (MTP) for the greater City region. A major component of the MTP is identifying a list of regionally important projects to improve the transportation of people and goods (highway, transit, etc.). This federally required project listing is intended to help the region identify and prioritize future transportation investments based on goals, strategies and To demonstrate financial estimated financial resources. The projects in Transportation Outlook 2040 were developed, prioritized, and constraint in the plan, the ultimately selected through a comprehensive and coordinated process involving the general public, regional costs to operate, maintain transportation stakeholders and MARC planning committees. and preserve the transportation system, in the Incorporation by Reference of the MARC Transportation Improvement Program MARC MPO region, is The Transportation Improvement Program (TIP) is a detailed list of projects to be implemented in the next deducted from available four to five years, and is developed for the metropolitan transportation planning process in accordance with transportation revenues first, federal regulations (CFR §450.324). The TIP is incorporated into the MTP by reference, and therefore, upon and the remaining balance is adoption by the MARC Board, the MTP shall include all projects in the most recently approved TIP as well as available for other any future TIP amendments approved before the next MTP update. transportation investments. Financial Constraint The constrained project list Federal planning regulations (CFR §450.322) state that “For the purpose of developing the metropolitan includes examples of transportation plan, the MPO, public transportation operator(s), and State shall cooperatively develop operations, management and estimates of funds that will be available to support metropolitan transportation plan implementation.” preservation projects in The regulations also indicate “for illustrative purposes, the financial plan may (but is not required to) addition to non-preservation include additional projects that would be included in the adopted transportation plan if additional roadway and transit projects. resources beyond those identified in the financial plan were to become available.” Transportation Outlook 2040 includes “constrained” and “unconstrained” project lists. The financial plan described in Appendix E: Financial Capacity demonstrates the availability of funding for projects in the constrained list. The unconstrained list includes those projects that would be included in the plan if additional resources beyond those identified in Appendix E become available.

Appendix D: Project Listing preface D.0 2015 Plan Update

Category Time Period State Sponsor Project ID Facility / Program Location Description Capital Cost The extension of Nettleton Avenue north This project includes the construction of a standard Nettleton Avenue from dead end on NE side of K-7 width three lane curb and gutter street. Roadway 2015 to 2020 KS City of Bonner Springs 744 $2,500,000 Extension to Nettleton Avenue dead Improvements include curb and gutter, sidewalks, end south of Kansas Avenue. storm

This project includes the widening of a narrow two 134th Street from Metropolitan to Kansas Roadway 2015 to 2020 KS City of Bonner Springs 573 South 134th Street lane ditched road to a standard width three lane curb $4,050,000 Avenue and gutter street. Improvements include curb

This project includes the widening of a narrow two Metropolitan Avenue Metropolitan Avenue between Nettleton Roadway 2015 to 2020 KS City of Bonner Springs 563 lane ditched road to a standard width two lane curb $1,900,000 Improvement Project Avenue and Western City Limit line. and gutter street. Improvements include curb a

This project includes the widening of a wide three Kansas Avenue Kansas Avenue between 134th Street and lane road to a standard width four lane curb and Roadway 2015 to 2020 KS City of Bonner Springs 576 $2,700,000 Improvements 138th Street gutter street. Improvements include curb and gutters

This project includes the widening of a narrow two 138th Street 138th Street between K-32 Highway and Roadway 2015 to 2020 KS City of Bonner Springs 315 lane ditched road to a standard width three lane curb $8,100,000 Improvements Kansas Avenue and gutter street. Improvements include curb

Reconstruction from US-56 to 199th Street; Project Roadway 2015 to 2020 KS City of Edgerton 2010 Waverly Road Waverly Road includes additional capacity and grade separation at $30,000,000 BNSF rail crossing

Reconstruct 110th Street/ Edwardsville Drive from I- 110th 110th Street/Edwardsville Drive from I-70 Roadway 2015 to 2020 KS City of Edwardsville 87 70 south to K-32. Current road is a substandard 2 $7,035,580 Street/Edwardsville Dr. to K-32 lane road section with a typical roadway width

175th Street The improvement will include 3250 lineal feet of Roadway 2015 to 2020 KS City of Gardner 419 Improvements, I-35 to 175th Street, I-35 to Clare Road divided arterial street with sidewalks, street lights, $4,600,000 Clare Road storm sewer and a traffic signal at the Clare

Reconstruct rural-type 2-lane road to current On DeSoto Road (C-3414), from Ida DeSoto Rd ‐ Ida St to standard 4-lane facility to accommodate growing Roadway 2015 to 2020 KS City of Lansing 300 Street to Eisenhower Road, including $7,219,000 Eisenhower Rd traffic demand. Construct RCB. Construct 10 ft. approaches bicycle

Appendix D / Transportation Outlook 2040 2015 Plan Update Eisenhower Road from Beginning at the existing intersection of The existing alignment of Eisenhower Road is 155th Street west to Roadway 2015 to 2020 KS City of Leavenworth 539 Eisenhower Road and 155th Street, then approximately the City Limit Line between $30,000,000 (future) 30th Street continuing west for 4.3 mile Leavenworth and Lansing. (County Road 29)

This project includes the wideing of 143rd The project will improve the current 2-lane ditch 143rd Street Nall to Roadway 2015 to 2020 KS City of Leawood 79 Street from a 2-lane ditch street to a 4- street to a 4-lane street with curb and gutter, $23,400,000 Kenneth Road lane undivided curb and gutter street streetlights, stormsewer, sidewalk, bike/hike trail,

Improvements to the existing interchange to provide 87th & I-435 Roadway 2015 to 2020 KS City of Lenexa 261 87th Street and I-435 interchange capacity on the interchange ramps and on 87th $5,000,000 Interchange Street to meet the projected traffic demand.

New interchange including street lights, sidewalks, New Interchange at K- Roadway 2015 to 2020 KS City of Lenexa 254 K-10 Highway and Lone Elm Road storm sewers, landscaping and stormwater $20,000,000 10 & Lone Elm management, BMPs

Improve and widen to 4-lane divided roadway with 95th Street from Roadway 2015 to 2020 KS City of Lenexa 263 95th Street from Renner to I-35 sidewalks, street lights storm sewers, landscaping $15,000,000 Renner to I-35 and storm water management BMPs. This project

Improvements to the existing interchange to provide K-10 & Ridgeview Roadway 2015 to 2020 KS City of Lenexa 256 K-10 Highway and Ridgeview Road capacity on the interchange ramps and on Woodland $12,000,000 Interchange Road under K-10 to meet the projected traffic de

Roadway 2015 to 2020 KS City of Olathe 323 K-7 (135th to Old 56) K-7 from 135th to Old 56 Hwy. Capacity improvement, widening from 4 to 5 lanes. $6,000,000

135th (Clairborne to Roadway 2015 to 2020 KS City of Olathe 320 135th Street from Clairborne to Mur-Len. Capacity improvement, widening from 4 to 6 lanes. $8,000,000 Mur-Len) Interchange capacity improvement, installing College Blvd and K-7 Roadway 2015 to 2020 KS City of Olathe 322 College Blvd and K-7 Interchange at the ramp junctions. Extend life of $2,000,000 Interchange bridge. 119th (Iowa to Roadway 2015 to 2020 KS City of Olathe 324 119th Street from Iowa to Woodland. Capacity improvements from 2 lane to 4 lane. $4,000,000 Woodland) 119th (Lone Elm to Roadway 2015 to 2020 KS City of Olathe 325 119th Street from Lone Elm to Iowa. Capacity improvements from 2 lane to 4 lane. $4,000,000 Iowa) Lone Elm (159th to Lone Elm from 159th Street to 167th Capacity improvement for future K-7 alignment, from Roadway 2015 to 2020 KS City of Olathe 328 $8,000,000 167th) Street. a rural 2 lane to 4 lane divided arterial. Lone Elm (167th to Lone Elm from 167th Street to 171st Capacity improvement for future K-7 alignment, from Roadway 2015 to 2020 KS City of Olathe 329 $8,000,000 171st) Street. a rural 2 lane to 4 lane divided arterial.

Appendix D / Transportation Outlook 2040 2015 Plan Update Interchange capacity improvement, installing Ridgeview and K-10 Roadway 2015 to 2020 KS City of Olathe 332 Ridgeview and K-10 Interchange Roundabouts at the ramp junctions. Extend life of $2,000,000 Interchange bridge. Lone Elm (Old 56 to Lone Elm from Old 56 Hwy to 151st Capacity improvement for future K-7 alignment, from Roadway 2015 to 2020 KS City of Olathe 330 $10,000,000 151st) Street. a rural 2 lane to 4 lane divided arterial.

The project includes widening Blue Valley Pkwy from Blue Valley Pkwy, 123rd Blue Valley Pkwy, 123rd St. to US-69 in Roadway 2015 to 2020 KS City of Overland Park 308 a four-lane divided roadway to a six-lane divided $2,500,000 St. to US-69 Overland Park thoroughfare with turn lanes, storm sewers, a

The project includes widening Metcalf Avenue from a Metcalf Avenue, 119th Metcalf Avenue, 119th St. to 135th St. in Roadway 2015 to 2020 KS City of Overland Park 296 four-lane divided thoroughfare to a six-lane divided $8,000,000 St. to 135th St. Overland Park thoroughfare with turn lanes, storm sewers, a

The project includes reconstruction of 159th Street 159th Street, Metcalf to 159th Street, Metcalf to Kenneth in Roadway 2015 to 2020 KS City of Overland Park 289 from an unimproved two-lane roadway to a four-lane $15,000,000 Kenneth Overland Park divided thoroughfare with turn lanes, storm sew

The project includes reconstruction of Quivira Road Quivira Road, 151st St. Quivira Road, 151st St. to 159th St. in Roadway 2015 to 2020 KS City of Overland Park 249 from an unimproved two-lane roadway to a four-lane $6,000,000 to 159th St. Overland Park divided thoroughfare with turn lanes, storm sew

The project includes reconstruction of Metcalf Metcalf Avenue, 159th Metcalf Avenue, 159th St. to 183rd St. in Avenue from an unimproved two-lane roadway to a Roadway 2015 to 2020 KS City of Overland Park 280 $15,000,000 St. to 183rd St. Overland Park four-lane divided thoroughfare with turn lanes, storm s

The project includes widening 119th Street from a 119th Street, Pflumm to 119th Street, Pflumm to US-69 in Roadway 2015 to 2020 KS City of Overland Park 299 four-lane divided thoroughfare to a six-lane divided $8,000,000 US-69 Overland Park thoroughfare with turn lanes, storm sewers, a r

The project includes reconstruction of 159th Street 159th Street, Pflumm to 159th Street, Pflumm to Quivira in Roadway 2015 to 2020 KS City of Overland Park 287 from an unimproved two-lane roadway to a four-lane $6,000,000 Quivira Overland Park divided thoroughfare with turn lanes, storm sew

The project includes widening 135th Street from a 135th Street, Pflumm to 135th Street, Pflumm to Switzer in Roadway 2015 to 2020 KS City of Overland Park 306 four-lane divided thoroughfare to a six-lane divided $8,000,000 Switzer Overland Park thoroughfare with turn lanes, storm sewers, a r

Appendix D / Transportation Outlook 2040 2015 Plan Update The project includes reconstruction of 167th Street 167th Street, Antioch to 167th Street, Antioch to Metcalf in Roadway 2015 to 2020 KS City of Overland Park 290 from an unimproved two-lane roadway to a four-lane $5,000,000 Metcalf Overland Park divided thoroughfare with turn lanes, storm sew

The project includes widening Quivira Road from a Quivira Road, 119th St. Quivira Road, 119th St. to 143rd St. in Roadway 2015 to 2020 KS City of Overland Park 293 four-lane divided thoroughfare to a six-lane divided $12,000,000 to 143rd St. Overland Park thoroughfare with turn lanes, storm sewers, a r

The project includes widening Antioch Road from a Antioch Road, 119th St. Antioch Road, 119th St. to 135th St. in Roadway 2015 to 2020 KS City of Overland Park 294 four-lane divided thoroughfare to a six-lane divided $8,000,000 to 135th St. Overland Park thoroughfare with turn lanes, storm sewers, a r

The project includes widening Metcalf Avenue from a Metcalf Avenue, 135th Metcalf Avenue, 135th St. to 159th St. in Roadway 2015 to 2020 KS City of Overland Park 297 four-lane divided thoroughfare to a six-lane divided $12,000,000 St. to 159th St. Overland Park thoroughfare with turn lanes, storm sewers, a

The project includes widening east bound 119th 119th Street, Nall to Roadway 2015 to 2020 KS City of Overland Park 305 119th Street, Nall to Roe in Overland Park Street to complete a six-lane divided thoroughfare $1,000,000 Roe with turn lanes, storm sewers, a raised median, side

The project includes reconstruction of 151st Street 151st Street, Chadwick 151st Street, Chadwick to State Line in Roadway 2015 to 2020 KS City of Overland Park 284 from an unimproved two-lane roadway to a four-lane $5,000,000 to State Line Overland Park divided thoroughfare with turn lanes, storm sew

This project will include signalization of the on/off Johnson Drive and I-435 ramps related to I-435 and Johnson Drive Roadway 2015 to 2020 KS City of Shawnee 240 Johnson Drive and I-435 $2,000,000 Interchange interchange. During peak times the ramps produce backups The existing Nieman Road is a 4-lane roadway adjacent to mixed-use development. The project will Roadway 2015 to 2020 KS City of Shawnee 238 Nieman Road 64th Street to Johnson Drive $5,000,000 provide reconstruction of Nieman Road, from 64th Street

The existing Quivira Road, from 47th Street to 52nd Roadway 2015 to 2020 KS City of Shawnee 235 Quivira Road 47th Street to 52nd Terrace Terrace is a narrow 2-lane ditch section road. The $1,800,000 project will provide reconstruction, widening,

Beginning at the intersection of Laming This project will be built to comply with the planning Roadway 2015 to 2020 KS City of Tonganoxie 447 Laming Road Road and Leavenworth County Road to done in the US 24/40 Corridor Access and Traffic $2,540,000 4th Street. Management Plan.

Appendix D / Transportation Outlook 2040 2015 Plan Update The project is built to comply with the planning goals Beginning at the intersection of First and Roadway 2015 to 2020 KS City of Tonganoxie 446 1st Street Collector in US 24/40 Corridor Access and Traffic Management $8,000,000 Ridge thence east to 206th Street Plan

Starting at the intersection of Woodfield Woodfield Drive Comply with the planning provisions in the US 24/40 Roadway 2015 to 2020 KS City of Tonganoxie 445 Drive and Leavenworth County Road 5 $8,100,000 Extension Corridor Access and Traffic Management Plan thence east to 193rd Street

Southwest Johnson County, south of US- Construction of 191st Street will provide access to Johnson County, Kansas - 191st Street, Gardner Roadway 2015 to 2020 KS 108 56 and north of I-35 between the cities of the Gardner Road Interchange on I-35 for the $14,000,000 Public Works Road to Four Corners Gardner and Edgerton. proposed BNSF Intermodal site and logistics park.

Replacement of Bridges Construct Phase 1 of the selected alternative from Roadway 2015 to 2020 KS KDOT 1000 30 & 173 of the Lewis & I-70 the completed study of Project No. 70-105 KA-2130- $57,500,000 Clark Viaduct 01 (Westbound I-70 River Truss over the

Complete phases 2, 5, Reconstruction and capacity improvements of the I- 6, 7, 8 and 16 of 70/K-7 Interchange. A current interchange concept Roadway 2015 to 2020 KS KDOT 704 I-70/K-7 $101,500,000 interchange was developed as part of the K-7 Corridor improvements Management

State Highway K-5 from the intersection McIntyre Expressway The current alignment and the prevailing conditions of State Highway K-7 and McIntyre Road Roadway 2015 to 2020 KS Leavenworth County 674 (State Highway K-5 of K-5 between K-7 and I-435 do not facilitate $39,500,000 (in Lansing, KS) to at Realignment) efficient conveyance of traffic from the Lansing / Wolcott Road (in Wyandotte County, KS).

Centennial Bridge (K-92 The Centennial Bridge provides a means of transport Roadway 2015 to 2020 KS Leavenworth County 684 Bridge Over K-92 Bridge Over . over the Missouri River from Kansas State Highway K- $42,000,000 River) 92 in Leavenworth to Missouri State Highway M-

This project will replace an obsolete two lane bridge 39th Street Bridge Over On 39th Street at the Little Blue River in Roadway 2015 to 2020 MO City of Independence 202 on 39th Street over the Little Blue River. The new $3,000,000 the Little Blue River Eastern Independence bridge will have four through traffic lanes a

Roadway 2015 to 2020 MO City of Kansas City, MO 562 Green Hills NW 72nd Street to Barry Road Reconstruct existing road and widen to 3 lanes. $8,660,500 Roadway 2015 to 2020 MO City of Kansas City, MO 555 Englewood Rd Waukomis Drive TO US 169 Reconstruct existing road and widen to 4 lanes. $13,632,000 Roadway 2015 to 2020 MO City of Kansas City, MO 549 Cookingham Rd Platte Purchase Dr. TO Oak Trwy Reconstruct existing road and widen to 4 lanes. $14,910,000 Reconstruct existing road and widen to 4 lanes and Roadway 2015 to 2020 MO City of Kansas City, MO 646 Shoal Creek Pkwy Platte Purchase Dr. to Holly St. $4,846,600 parkway standards

Roadway 2015 to 2020 MO City of Kansas City, MO 543 Congress Ave NW 112th Street to Cookingham Drive Reconstruct existing road and widen to 4 lanes. $7,497,600

Appendix D / Transportation Outlook 2040 2015 Plan Update City Limits (Riverside) to Prairie View Roadway 2015 to 2020 MO City of Kansas City, MO 618 Northwood Reconstruct existing road and widen to 3 lanes. $7,668,000 Drive Roadway 2015 to 2020 MO City of Kansas City, MO 339 135th Street MO-150 to Oak Reconstruct existing road and widen to 3 lanes. $7,000,000 Roadway 2015 to 2020 MO City of Kansas City, MO 392 22nd/23rd Street Brooklyn to I-70 Reconstruct existing road and widen to 4 lanes. $10,738,220 Roadway 2015 to 2020 MO City of Kansas City, MO 546 Congress Ave Ambassador Dr. TO NW 108th Street Reconstruct existing road and widen to 4 lanes. $7,497,600 Roadway 2015 to 2020 MO City of Kansas City, MO 577 Lees Summit Road Phelps Road to US 40 Reconstruct existing road and widen to 3 lanes. $12,833,250 Roadway 2015 to 2020 MO City of Kansas City, MO 696 Tiffany Springs Road Congress Ave to Skyview Ave New 4 lane facility on new alignment $9,230,000

Roadway 2015 to 2020 MO City of Kansas City, MO 689 Tiffany Springs Pkwy Amity to I-29 New 4 lane facility and interchange improvement $15,336,000

Roadway 2015 to 2020 MO City of Kansas City, MO 582 Lees Summit Road 85th Street to Gregory Reconstruct existing road and widen to 4 lanes. $13,216,650

Capacity improvements to route 45/now 64th street Roadway 2015 to 2020 MO City of Kansas City, MO 729 NW 64th Street Cosby to Roanridge $16,655,000 and i-29 interchange including outer road relocation

Roadway 2015 to 2020 MO City of Kansas City, MO 578 Lees Summit Road Lakewood Blvd TO Phelps Road Reconstruct existing road and widen to 3 lanes. $11,498,095 Widen Lee’s Summit Road from a two‐lane Lees Summit Road - Lee’s Summit Road from Colbern Road to unimproved road to a four-lane urban standard with Roadway 2015 to 2020 MO City of Lees Summit 208 Colbern to West City $8,660,000 Lee’s Summit West City Limits turn lanes and traffic signal improvements between Limits the existing

The extension of Blackwell Road from Shenandoah Blackwell Interchange at Intersection of Blackwell Road (Extension) Roadway 2015 to 2020 MO City of Lees Summit 118 Drive to the extension of Oldham Parkway (approx. 1 $23,700,000 US 50 Highway and US 50 Highway mile) with a at US 50 Highway

I-35 and Pleasant Valley Road/South I-35 and Pleasant Valley The project area effects the On- and Off- Liberty Parkway affecting the cities of: Roadway 2015 to 2020 MO City of Liberty 234 Interchange Interim Ramps at US Highway 69 and Pleasant Valley Road, $0 Liberty, Claycomo, Pleasant Valley and Improvements US Highway 69 between proposed Flintlock Road Kansas City, Missouri

This project will resurface Business 7 Highway, install Business 7 Highway Business 7 Highway in Pleasant Hill from Roadway 2015 to 2020 MO City of Pleasant Hill 600 bike lanes, and reconstruct sidewalks including ADA $2,000,000 Improvements 7 Highway to 58 Highway. ramps. This is already a vital route in Pleasant Hill

350 Highway & Blue Missouri 350 Highway and Blue Ridge Modification of a limited access intersection to Ridge Boulevard Roadway 2015 to 2020 MO City of Raytown 654 Boulevard Intersection, Raytown, provide full access in all directions to support activity $20,000,000 Intersection Missouri. center, transit interconnectivity and metro Improvements

Appendix D / Transportation Outlook 2040 2015 Plan Update Raytown 350 Highway The 350 Highway / Blue Parkway Corridor Plan was a Roadway 2015 to 2020 MO City of Raytown 604 & Raytown Rd. 350 Hwy from Sterling to Maple collaboration between Raytown, Kansas City, and $36,988,517 Intersection Alignment MoDOT. This study calls for the divided 350 highway

TDD - Transportation US 71 & Route 291 This project includes modifications to the I-49/US-71 Roadway 2015 to 2020 MO Development District 805 Interchange I-49/US-71 and MO 291 Interchange & MO 291 Interchange and modifications to MO 291 $23,200,000 (Partners in Progress) Improvements in Harrisonville

175th Street, West of This project includes the widening of 175th Street 175th Street, West of Waverly Road to Roadway 2021 to 2030 KS City of Gardner 697 Waverly Road to City from a 2-lane ditch section to a 4-lane divided street $6,500,000 City Limits. Limits section along with sidewalk, trail, street l

On DeSoto Road (C-3414), from 4-H Road Reconstruct rural-type 2-lane road to current DeSoto Road, 4-H Road Roadway 2021 to 2030 KS City of Lansing 92 to Ida Street, including intersection standard 4- lane facility to accommodate growing $7,988,750 to Ida Street approaches. traffic demand. Replace functionally obsolete bridge.

On 147th Street (C-3414), from McIntyre Road (Future regional West By-Pass Reconstruct 2 1/2 miles of rural-type 2-lane road to 147th Street, McIntyre Roadway 2021 to 2030 KS City of Lansing 224 submitted by Leavenworth County), to 4- current standard 4-lane facility to accommodate $16,967,500 Road to 4-H Road H Road, including intersection growing traffic demand. Replace bridges. approaches.

The project is located in the City of The current roadway is a 2-lane ditch street that will Mission Road 135th to Leawood and is a major north south Roadway 2021 to 2030 KS City of Leawood 65 be improved to a 4-lane undivided curb and gutter $20,400,000 151st corridor. This improvement is located street with LED streetlights, stormsewer, sidewalks between 135th Street and 151st Street.

151st is the furthest south east west The improvements would include widening 151st 151st Street Nall to east street crossing for Leawood. The Roadway 2021 to 2030 KS City of Leawood 63 from a 2-lane ditch street to a 4-lane divided roadway $14,200,000 City Limit improvement would begin at Nall and go with LED streetlights, traffic signal, sidewalk, east to our east City Limit

Improvements to the existing interchange to provide 95th & I-435 Roadway 2021 to 2030 KS City of Lenexa 262 95th Street and I-435 interchange capacity on the interchange ramps and on the bridge $5,000,000 Interchange over I-435 to meet the projected traffic demand

Improve and widen to 4-lane divided roadway with Lackman from 107th to Lackman Road from 107th Street to Santa Roadway 2021 to 2030 KS City of Lenexa 267 sidewalks, street lights storm sewers, landscaping $6,000,000 Santa Fe Trail Drive Fe Trail Drive and storm water management BMPs.

Appendix D / Transportation Outlook 2040 2015 Plan Update Improvements to the existing interchange to provide K-10 & Woodland Roadway 2021 to 2030 KS City of Lenexa 255 K-10 Highway and Woodland Road capacity on the interchange ramps and on Woodland $5,000,000 Interchange Road under K-10 to meet the projected traffic de

Improve and widen to 4-lane divided roadway with Roadway 2021 to 2030 KS City of Lenexa 260 87th from K-7 to Haven 87th Street from K-7 Highway to Haven sidewalks, street lights storm sewers, landscaping $26,000,000 and storm water management BMPs.

Improve and widen to 4-lane divided roadway with Lone Elm from Prairie Lone Elm Road from Prairie Star Parkway Roadway 2021 to 2030 KS City of Lenexa 253 sidewalks, street lights storm sewers, landscaping $5,000,000 Star Parkway to K-10 to K-10 Highway. and storm water management BMPs.

Improve and widen to 6-lane divided roadway with College Boulevard from College Boulevard from Renner Boulevard Roadway 2021 to 2030 KS City of Lenexa 268 sidewalks, street lights storm sewers, landscaping $12,000,000 Renner to Pflumm to Pflumm Road. and storm water management BMPs.

175th (K-7 to Capacity improvement from a rural 2 lane to 4 lane Roadway 2021 to 2030 KS City of Olathe 498 175th Street from K-7 Hwy to Ridgeview $13,000,000 Ridgeview) divided arterial. K-7 Future (171st to Future K-7 Hwy from 171st Street to Realignment of existing K-7 Hwy in compliance with Roadway 2021 to 2030 KS City of Olathe 482 $0 183rd) 183rd Street. the K-7 corridor plan. Interchange capacity improvement, installing 119th and K-7 Roadway 2021 to 2030 KS City of Olathe 136 119th and K-7 interchange Roundabouts at the ramp junctions. Extend life of $3,000,000 Interchange bridge. Ridgeview (119th to Ridgeview from 119th Street to 127th Roadway 2021 to 2030 KS City of Olathe 355 Capacity improvement, widening from 4 to 6 lanes. $6,000,000 127th) Street. 135th Bridge widening Bridge widening and geometric modifications to Roadway 2021 to 2030 KS City of Olathe 481 135th Street bridge over I-35. $6,000,000 over I-35 serve increased traffic demand. Capacity improvement from a rural 2 lane to 4 lane Roadway 2021 to 2030 KS City of Olathe 354 Old 56 (K-7 to Bridge) Old 56 Hwy from K-7 Hwy to Bridge. $6,000,000 divided arterial. Capacity improvement from a rural 2 lane to 4 lane Roadway 2021 to 2030 KS City of Olathe 353 Old 56 (Bridge to 151st) Old 56 Hwy from Bridge to 151st. $6,000,000 divided arterial. Ridgeview (College to Ridgeview from College Blvd to 119th Roadway 2021 to 2030 KS City of Olathe 478 Capacity improvement, widening from 4 to 6 lanes. $6,000,000 119th) Street. Pflumm (143rd to Pflumm from 143rd Street to 151st Roadway 2021 to 2030 KS City of Olathe 493 Capacity improvements from 2 lane to 4 lane. $13,000,000 151st) Street. Construct missing link of 151st Street, including 151st (Old 56 to Lone 151st Street from Old 56 Hwy to Lone Roadway 2021 to 2030 KS City of Olathe 487 bridge over BNSF railroad and Cedar Creek. $15,000,000 Elm) Elm. Construct 4 lane divided arterial.

Appendix D / Transportation Outlook 2040 2015 Plan Update 159th (Ridgeview to Roadway project to improve capacity from 2 lanes to Roadway 2021 to 2030 KS City of Olathe 489 159th Street Ridgeview to Mur-Len $13,000,000 Mur-Len) four lanes. Roadway 2021 to 2030 KS City of Olathe 484 127th (K-7 to Iowa) 127th Street from K-7 Hwy to Iowa. Capacity improvements from 2 lane to 4 lane. $7,000,000 College Blvd (West Roadway 2021 to 2030 KS City of Olathe 492 College Blvd from west city limits to Clare. Capacity improvements from 2 lane to 4 lane. $20,000,000 Limits to Clare) Black Bob (151st to Black Bob from 151st Street to 159th Roadway 2021 to 2030 KS City of Olathe 491 Capacity improvements from 2 lane to 4 lane. $13,000,000 159th) Street. Black Bob (135th to Black Bob from 135th Street to 139th Roadway 2021 to 2030 KS City of Olathe 490 Capacity improvement, widening from 4 to 6 lanes. $2,000,000 139th) Street. Ridgeview (K-10 to Roadway 2021 to 2030 KS City of Olathe 479 Ridgeview from K-10 to College Blvd. Capacity improvement, widening from 4 to 6 lanes. $6,000,000 College) Ridgeview (KC Road to Roadway 2021 to 2030 KS City of Olathe 480 Ridgeview from KC Road to 135th Street. Capacity improvement, widening from 4 to 6 lanes. $6,000,000 135th) KC Road (Renner to Roadway 2021 to 2030 KS City of Olathe 352 KC Road from Renner to Ridgeview. Capacity improvement, widening from 4 to 5 lanes. $11,000,000 Ridgeview) 127th (Woodland to 127th Street form Woodland to Roadway 2021 to 2030 KS City of Olathe 486 Capacity improvements from 2 lane to 4 lane. $19,000,000 Ridgeview) Ridgeview. Woodland and K-10 Interchange capacity improvement, installing Roadway 2021 to 2030 KS City of Olathe 494 Woodland and K-10 Interchange $2,000,000 Interchange Roundabouts at the ramp junctions.

Roadway 2021 to 2030 KS City of Olathe 337 135th (Hedge to K-7) 135th Street Hedge Lane to K-7. Capacity improvement, widening from 4 to 6 lanes. $6,000,000

135th (MurLen to Black Roadway 2021 to 2030 KS City of Olathe 520 135th Street from Mur-Len to Black Bob. Capacity improvement, widening from 4 to 6 lanes. $6,000,000 Bob) 119th (Black Bob to Roadway 2021 to 2030 KS City of Olathe 333 119th Street from Black Bob to Pflumm. Capacity improvement, widening from 4 to 6 lanes. $6,000,000 Pflumm) College Blvd (Lone Elm Roadway 2021 to 2030 KS City of Olathe 351 College Blvd from Lone Elm to Woodland. Capacity improvements from 2 lane to 4 lane. $13,000,000 to Woodland) 135th (Black Bob to Roadway 2021 to 2030 KS City of Olathe 336 135th Street from Black Bob to Pflumm. Capacity improvement, widening from 4 to 6 lanes. $6,000,000 Pflumm) 135th (Ridgeview to 135th Street from Ridgeview to Roadway 2021 to 2030 KS City of Olathe 344 Capacity improvement, widening from 4 to 6 lanes. $8,000,000 Clairborne) Clairborne.

Roadway 2021 to 2030 KS City of Olathe 345 119th (K-7 to Lone Elm) 119th Street from K-7 to Lone Elm Increase from 2 lanes to 4 lanes $13,000,000

Capacity improvement, widening eastbound lanes Roadway 2021 to 2030 KS City of Olathe 346 119th (Renner to I-35) 119th Street from Renner to I-35. $2,500,000 from 2 to 3 lanes. Black Bob (127th to Black Bob from 127th Street to 135th Roadway 2021 to 2030 KS City of Olathe 511 Capacity improvement, widening from 4 to 6 lanes. $6,000,000 135th) Street. Black Bob (119th to Black Bob from 119th Street to 127th Roadway 2021 to 2030 KS City of Olathe 510 Capacity improvement, widening from 4 to 6 lanes. $6,000,000 127th) Street.

Appendix D / Transportation Outlook 2040 2015 Plan Update 119th (Ridgeview to Roadway 2021 to 2030 KS City of Olathe 347 119th Street from Ridgeview to Renner. Capacity improvement, widening from 4 to 6 lanes. $6,000,000 Renner) 127th and K-7 New Interchange replacing an at-grade Roadway 2021 to 2030 KS City of Olathe 335 127th and K-7 (future interchange) $2,000,000 Interchange intersection.

The project includes widening 175th/179th Street 175th/179th St, 175th/179th St, Lackman to Metcalf in Roadway 2021 to 2030 KS City of Overland Park 291 from a two-lane roadway to a four-lane divided $25,000,000 Lackman to Metcalf Overland Park thoroughfare with turn lanes, storm sewers, a raised

The project includes reconstruction of Quivira Road Quivira Road, 159th St. Quivira Road, 159th St. to 179th St. in Roadway 2021 to 2030 KS City of Overland Park 3000 from an unimproved two-lane roadway to a four-lane $15,000,000 to 179th St. Overland Park divided thoroughfare with turn lanes, storm sew

The project includes reconstruction of Quivira Road Quivira Road, 179th St. Quivira Road, 179th St. to 191st St. in Roadway 2021 to 2030 KS City of Overland Park 269 from an unimproved two-lane roadway to a four-lane $7,500,000 to 191st St. Overland Park divided thoroughfare with turn lanes, storm sew

The project includes reconstruction of Antioch Road Antioch Road, 167th St. Antioch Road, 167th St. to 179th St. in Roadway 2021 to 2030 KS City of Overland Park 276 from an unimproved two-lane roadway to a four-lane $7,500,000 to 179th St. Overland Park divided thoroughfare with turn lanes, storm sew

The project includes reconstruction of Kenneth Road Kenneth Road, 143rd St. Kenneth Road, 143rd St. to 159th St. in Roadway 2021 to 2030 KS City of Overland Park 281 from an unimproved two-lane roadway to a four-lane $10,000,000 to 159th St. Overland Park divided thoroughfare with turn lanes, storm sew

The project includes widening Antioch Road from a Antioch Road, 135th St. Antioch Road, 135th St. to 167th St. in Roadway 2021 to 2030 KS City of Overland Park 295 four-lane divided thoroughfare to a six-lane divided $16,000,000 to 167th St. Overland Park thoroughfare with turn lanes, storm sewers, a r

The project includes widening 151st Street from a 151st Street, Rosehill to 151st Street, Rosehill to Nall in Overland Roadway 2021 to 2030 KS City of Overland Park 307 four-lane divided thoroughfare to a six-lane divided $18,000,000 Nall Park thoroughfare with turn lanes, storm sewers, a r

The project includes widening 135th Street from a six- 135th Street, Switzer to 135th Street, Switzer to Nall in Overland Roadway 2021 to 2030 KS City of Overland Park 309 lane divided thoroughfare to a eight-lane divided $12,000,000 Nall Park thoroughfare with turn lanes, storm sewers, a

Appendix D / Transportation Outlook 2040 2015 Plan Update The project includes reconstruction of Antioch Road Antioch Road, 179th St. Antioch Road, 179th St. to 199th St. in Roadway 2021 to 2030 KS City of Overland Park 278 from an unimproved two-lane roadway to a four-lane $12,500,000 to 199th St. Overland Park divided thoroughfare with turn lanes, storm sew

The project includes widening 199th Street from a 199th Street, Antioch to 199th Street, Antioch to US-69 in two-lane roadway to a four-lane divided Roadway 2021 to 2030 KS City of Overland Park 292 $2,500,000 US-69 Overland Park thoroughfare with turn lanes, storm sewers, a raised median, The existing Renner Road varies from a 4-lane roadway adjacent to mixed development to a narrow Roadway 2021 to 2030 KS City of Shawnee 232 Renner Road 79th Street to Holliday Drive $22,000,000 2-lane ditch section road that meanders through an und

The existing Woodland Road is a narrow 2-lane ditch Roadway 2021 to 2030 KS City of Shawnee 228 Woodland Road 71st Street to 7900 Block section road that has horizontal and vertical sight $6,700,000 distance issues. The project will provide

The existing 75th Street is a narrow 2-lane ditch Roadway 2021 to 2030 KS City of Shawnee 229 75th Street Monticello Road to Mize Road section road that bisected by K-7 Highway. The $13,700,000 project will provide reconstruction and widening of

The proposed 67th Street does not exist today but would extend 67th west of Gleason Road and Roadway 2021 to 2030 KS City of Shawnee 230 67th Street Gleason Road to Mize Road $6,700,000 connect to Mize Road. This project includes pedestrian s

Shawnee Mission Parkway, between I-435 and K-7 Shawnee Mission Roadway 2021 to 2030 KS City of Shawnee 231 K-7 Highway to I-435 Highway is a 4- lane ditch section major arterial that $35,000,000 Parkway is the City's main east-west trafficway. This pro

The existing Lackman Road varies from a 4-lane roadway adjacent to mixed development to a narrow Roadway 2021 to 2030 KS City of Shawnee 233 Lackman Road 75th Street to Johnson Drive $10,000,000 2-lane ditch section road that dead-ends at an existing

Shawnee Mission Parkway, between Pflumm and I- Shawnee Mission Roadway 2021 to 2030 KS City of Shawnee 236 Pflumm Road to I-435 435 is a 4-lane ditch section major arterial that is the $15,000,000 Parkway City's main east-west trafficway. This project w

Appendix D / Transportation Outlook 2040 2015 Plan Update Intersections at 43rd Street, 47th Street, As part of the K-7 corridor study, KDOT has provided K-7 Highway Roadway 2021 to 2030 KS City of Shawnee 241 71st Street, 75th Street, Shawnee a guideline for intersections along K-7 Highway. A $75,000,000 Interchanges Mission Parkway and 83rd Street. long range goal is to convert all at-grade in

The existing Monticello Road is a narrow 2-lane ditch Roadway 2021 to 2030 KS City of Shawnee 67 Monticello Road Midland Drive to 7900 Block section road that traverses through a residential $13,700,000 neighborhood. The project will provide recons

206th Street Parkway Starting at US 24/40 south to future comply with the planning in the US 24/40 Corridor Roadway 2021 to 2030 KS City of Tonganoxie 431 $10,625,000 Phase II Honey Creek Road alignment Access and Traffic Management Plan Beginning at the intersection of 206th Street and Honey Creek Road thence 206th Street Parkway Roadway 2021 to 2030 KS City of Tonganoxie 443 south and west to the to Leavenworth Comply with the Tonganoxie Comprehensive Plan $9,860,000 Phase III County Road 1 between Honey Creek Road and Hemphill Road Beginning at the intersection of 14th The construction of this route is planned in the US Roadway 2021 to 2030 KS City of Tonganoxie 458 14th Street Street and US 24/40 thence east to 214 $2,188,000 24/40 Corridor Access and Traffic Management Plan Street Beginning at the intersection of 4th This project is built to comply with the provisions of Roadway 2021 to 2030 KS City of Tonganoxie 450 East Street Extension Street and East Street, thence south US 24/40 Corridor Access and Traffic Management $8,500,000 Honey Creek Road Plan 206th Street Parkway Starting at Leavenworth County Road 5 Comply with the planning goals in US 24/40 Corridor Roadway 2021 to 2030 KS City of Tonganoxie 411 $459,000 Phase I thence south to US 24/40 Access and Traffic Management Plan beginning at the intersection of This project is planned in the US 24/40 Corridor Washington Street and US 24/40 thence Access and Traffic Management Plan. The project Roadway 2021 to 2030 KS City of Tonganoxie 460 Washington Street $12,750,000 east along Washington Street to 198th includes a new street and a new bridge over Street. Tonganoxie 199th Street, Stilwell Improvement of a rural standard roadway to a 40 Johnson County, Kansas - Roadway 2021 to 2030 KS 120 Community area to Southeast Johnson County wide street with curb and gutter. The project $7,500,000 Public Works Mission Road includes a railroad grade separation. K-7 upgrade to 4-lane Roadway 2021 to 2030 KS KDOT 3004 K-7 from 215th Street to 175th Street Modify to freeway design standards $60,500,000 freeway From I-435 to 67th Street, reconstruct to Reconstruction and widening of approximately 5 Roadway 2021 to 2030 KS KDOT 655 add lanes and I-35 miles of I-35 in order to meet the corridors needs and $140,000,000 implement operations future expected travel demand. strategies

Appendix D / Transportation Outlook 2040 2015 Plan Update Arterial street Construct arterial street enhancements along K-7 Roadway 2021 to 2030 KS KDOT 3001 enhancements to K-7 from the end of the 4 lane freeway at the signal at $47,300,000 existing K-7 in Olathe 127th south along Lone Elm to I-35. K-7 upgrade to a 4-lane Roadway 2021 to 2030 KS KDOT 3002 K-7 from 43rd Street to K-10 Modify to freeway design standards $46,200,000 freeway

K-7 intersection Construct expressway intersection enhancements Roadway 2021 to 2030 KS KDOT 3003 K-7 from Lansing to State Ave $21,000,000 enhancements from the City of Lansing to State Avenue.

Complete phases 9-15 of interchange improvements. I-70/K-7 Interchange Roadway 2021 to 2030 KS KDOT 3010 I-70/K-7 Interchange A current interchange concept was developed as part $292,500,000 (phases 9-15) of the K-7 Corridor Management Plan. The

Commencing at K-7 west of Fort The existing alignment of K-7 conveys traffic flow Leavenworth, thence south and West Leavenworth / through the communities of Leavenworth and Roadway 2021 to 2030 KS Leavenworth County 698 southeasterly around the west city limits $62,000,000 Lansing K-7 Lansing. Numerous cross-streets, curb cuts, and of Leavenworth and Lansing to the traffic intersection of K-7 and McIntyre Road

Project is proposed to reconstruct to modern I-35 and Lamar Avenue (24th St) in Unified Government of I-35 and Lamar Avenue geometrics and safety standards the last remaining Roadway 2021 to 2030 KS 422 Kansas City, KS immediately adjacent to $18,000,000 WYCO/KCK Interchange interchange on I-35 from the original 1960s highway Mission, KS co

I-70 and Turner Re-configuration and reconstruction of existing Unified Government of Roadway 2021 to 2030 KS 407 Diagonal Interchange Re-I-70 and Turner Diagonal interchange that was originally built to accommodate $20,000,000 WYCO/KCK configuration turnpike traffic with room for toll booths and vehicles

The project will include improvements to N. N. Broadway Street N. Broadway- Englewood Road to NW Broadway from Englewood Road to NW 76th Street. Roadway 2021 to 2030 MO City of Gladstone 316 $7,000,000 Improvement 76th Street Portions of the existing roadway are 2 lane in each directions

This project will be along existing 39th The 39th Street, West City limits to Crysler Avenue, 39th Street, West City Roadway 2021 to 2030 MO City of Independence 225 Street from the West City limits east to Project will improve the last section of 39th Street $4,000,000 Limits to Crysler Crysler Avenue. from two lanes to three lanes. The roadway w

M-78 Highway This project is located on existing M-78 The M-78 Highway Improvements, Speck to Truman Roadway 2021 to 2030 MO City of Independence 361 Improvements, Speck to Highway from Speck Road northeast to Road, will improve the existing M-78 Highway from $12,500,000 Truman Road. two lanes to four lanes in Eastern Independence. The

Appendix D / Transportation Outlook 2040 2015 Plan Update The Winner Road, U.S. 24 Highway to Sterling Winner Road, U.S. 24 This project is located on existing Winner Avenue, Project will improve the existing Winner Roadway 2021 to 2030 MO City of Independence 372 Highway to Sterling Road from U.S. 24 Highway southeast to $7,200,000 Road from two lanes to three lanes in most areas. Avenue Sterling Avenue. The r M-7 Highway This project is located on existing M-7 The M-7 Highway Improvements, Pink Hill Road to Improvements, Pink Hill Roadway 2021 to 2030 MO City of Independence 349 Highway from its intersection with Pink U.S. 24 Highway, will improve approximately six miles $30,000,000 Road to U.S. 24 Hill Road, north to U.S. 24 Highway. of M-7 Highway into a four lane street with curb Highway Roadway 2021 to 2030 MO City of Kansas City, MO 637 Pleasant Valley N Brighton to Searcy Creek Pkwy Reconstruct existing road and widen to 3 lanes. $19,880,000

Roadway 2021 to 2030 MO City of Kansas City, MO 541 North Brighton Avenue Pleasant Valley Road to NE 76th Street Reconstruct existing road and widen to 4 lanes. $14,049,125

Roadway 2021 to 2030 MO City of Kansas City, MO 557 Front Street I-35 TO Chouteau Reconstruct existing road and widen to 3 lanes. $47,925,000 Roadway 2021 to 2030 MO City of Kansas City, MO 642 Red Bridge Blue River to US 71 Reconstruct existing road and widen to 3 lanes. $23,004,000 Roadway 2021 to 2030 MO City of Kansas City, MO 521 85th Street Troost to Prospect Reconstruct existing road and widen to 4 lanes. $10,576,160 Roadway 2021 to 2030 MO City of Kansas City, MO 547 Cookingham Rd Woodland Ave TO I-435 Reconstruct existing road and widen to 4 lanes. $19,820,000 Roadway 2021 to 2030 MO City of Kansas City, MO 550 Cookingham Rd Oak Trwy TO Woodland Ave Reconstruct existing road and widen to 4 lanes. $13,951,500 Roadway 2021 to 2030 MO City of Kansas City, MO 522 Amity Rd MO-152 to Tiffany Springs Pkwy Reconstruct existing road and widen to 4 lanes. $13,206,000 New 4 lane parkway facility to replace unimproved Roadway 2021 to 2030 MO City of Kansas City, MO 673 Shoal Creek Pkwy I-435 to NE 108th $49,940,000 road Roadway 2021 to 2030 MO City of Kansas City, MO 551 Cookingham Rd I-435 TO Skyview Ave Reconstruct existing road and widen to 4 lanes. $13,632,000 Roadway 2021 to 2030 MO City of Kansas City, MO 420 Ambassador NW Plaza Circle to NW 128th Street New 4 lane facility $17,863,600 Roadway 2021 to 2030 MO City of Kansas City, MO 2000 Shoal Creek Pkwy NE 108th to Woodland Ave Additional 2 lanes to parkway standards $6,400,000 Roadway 2021 to 2030 MO City of Kansas City, MO 579 Lees Summit Road Gregory to Lakewood Blvd Reconstruct existing road and widen to 3 lanes. $16,614,000 Reconstruct existing road and widen to 4 lanes and Roadway 2021 to 2030 MO City of Kansas City, MO 609 Maplewoods Parkway M-1 to SPRUCE $6,688,600 parkway standards

Roadway 2021 to 2030 MO City of Kansas City, MO 678 Skyview NW 108th Street to Cookingham Drive Reconstruct existing road and widen to 4 lanes. $14,200,000

Roadway 2021 to 2030 MO City of Kansas City, MO 605 Little Blue Road Woodson to Noland Reconstruct existing road and widen to 4 lanes. $14,995,200 Roadway 2021 to 2030 MO City of Kansas City, MO 620 NW 108th Congress Ave to Skyview Ave New 4 lane facility to replace unimproved road $8,990,000 Roadway 2021 to 2030 MO City of Kansas City, MO 680 Tiffany Springs Pkwy N. Revere to Green Hills Road New 4 lane parkway facility $11,400,000 Reconstruct existing road and widen to 4 lanes and Roadway 2021 to 2030 MO City of Kansas City, MO 608 Maplewoods Parkway NE 96th Street to Shoal Creek Pkwy $24,360,000 parkway standards Roadway 2021 to 2030 MO City of Kansas City, MO 2004 East Longview Pkwy MO-350 to E 82nd Street New 4 lane parkway facility $10,530,300 Roadway 2021 to 2030 MO City of Kansas City, MO 700 Woodland Shoal Creek Pkwy to I-435 Reconstruct existing road and widen to 4 lanes. $16,188,000 Roadway 2021 to 2030 MO City of Kansas City, MO 570 Indiana Ave Barry Road TO Shoal Creek Pkwy Widen improved facility to 4 lanes $7,313,000 Roadway 2021 to 2030 MO City of Kansas City, MO 567 Holmes Rd Martha Truman TO 115th Reconstruct existing road and widen to 4 lanes. $11,991,900

Appendix D / Transportation Outlook 2040 2015 Plan Update Todd George Intersection of Todd George Reconstruct/widen the existing interchange at Todd Roadway 2021 to 2030 MO City of Lees Summit 121 Interchange at US 50 Parkway/Ranson Road and US 50 George Parkway/Ranson Road and US 50 Highway. $18,000,000 Highway Highway Capacity improvements will upgrade the existing 4-la

Widen Pryor Road from a two-lane interim road Pryor Road - Longview Pryor Road from Longview Road to M- standard to a four-lane urban standard with turn Roadway 2021 to 2030 MO City of Lees Summit 122 $14,250,000 Road to M-150 150 Highway lanes and warranted traffic signals between Longview Ro

Interchange modifications at I-35 and M-291. By I-35/M-291 Interchange Roadway 2021 to 2030 MO City of Liberty 585 I-35 / M-291 Interchange replacing the aging bridge, eliminating traffic signals, $12,500,000 Improvements coordinating signals and expanding M291 with

Pleasant Valley I-35 Pleasant Valley Road / I-35 / US-69 Interchange modifications at I-35 & Pleasant Valley Roadway 2021 to 2030 MO City of Liberty 631 $0 Interchange Interchange. Road & US-69

Interchange improvements including: bridge I-35/MO 152 Roadway 2021 to 2030 MO City of Liberty 587 I-35/MO 152 widening to accommodate necessary lanes and the $10,000,000 Interchange improvement of left turn movements exiting off I-35;

The 211th Street project is proposed in conjunction 211th Street from State Route J to State Roadway 2021 to 2030 MO City of Peculiar 601 211th Street with a new interchange at 211th Street and I-49/U.S. $40,000,000 Route Y 71 Highway. The interchange will be a separate

The 211th Street & I-49/U.S. 71 Interchange project 211th Street & I-49/U.S. I-49/U.S 71 Highway at future 211th is proposed in conjunction with a new 5-mile Roadway 2021 to 2030 MO City of Peculiar 449 $14,289,588 71 Highway Interchange Street in northern Peculiar segment of 211th Street extending from State Route J

This project will continue improvements already M-7 Highway M-7 Highway from 50 Highway to 163rd Roadway 2021 to 2030 MO City of Pleasant Hill 204 made to M-7 Highway in south Blue Springs and in $20,000,000 Improvements Street. Pleasant Hill south of 163rd Street. It will provide

Safety Improvements, Widening to accommodate Improvements to MO Roadway 2021 to 2030 MO Platte County 653 From Leavenworth to I-29 current capacity, Multi-modal shared use path, Park $40,000,000 92 - Phase 1 and Ride facility at MO-169.

US-56, Moonlight Road to I-35 including Future capacity deficiencies of this section of US-56 US-56 Improvements - Roadway 2031 to 2040 KS City of Gardner 720 improvements or modifications to the have been identified in the Break-in-Access study and $50,000,000 Moonlight Road to I-35 interchange at New Century Parkway the draft Environmental Assessment for the

Appendix D / Transportation Outlook 2040 2015 Plan Update West Gilman Road, Extend Gilman Road (new location) per Lansing On West Gilman Road (C-3413), from Roadway 2031 to 2040 KS City of Lansing 223 Willow Street to 147th Comprehensive Plan. Currently shown on KDOT $3,148,800 Willow Street to DeSoto Road. Street Functional Classification Map as proposed collector.

Reconstruct rural-type 2-lane road to current 4-H Road, DeSoto Road On 4-H Road (C-3402), from DeSoto Road standard 4-lane facility to accommodate growing Roadway 2031 to 2040 KS City of Lansing 198 $6,622,000 to K-7 to K-7(US-73)(Main Street). traffic demand. Construct 10 ft. bicycle path and 5 ft. The project scope is located between 138th to 143rd Street. North of 138th The project will widen the current 2-lane road to a 4- Roadway 2031 to 2040 KS City of Leawood 74 Kenneth Road Widening Kenneth is 4-lanes. This project would lane undivided roadway. The improvements will $3,200,000 widen Kenneth from 2-lanes to 4-lanes include relocating the existing sidewalks along from 138th to 143rd Street.

Improve and widen to 4-lane divided roadway with 83rd Street Gleason to 83rd Street from Gleason to West city Roadway 2031 to 2040 KS City of Lenexa 203 sidewalks, street lights storm sewers, landscaping $20,000,000 West City Limits limits and storm water management BMPs.

New Interchange at New interchange at Clare and K-10 Highway to Roadway 2031 to 2040 KS City of Lenexa 248 Clare Road and K-10 Highway $20,000,000 Clare and K-10 provide access and connectivity. Modify and improve the existing Canyon Creek Canyon Creek Blvd & K- Canyon Creek Boulevard and K-10 Boulevard and K-10 interchange to provide the Roadway 2031 to 2040 KS City of Lenexa 247 $5,000,000 10 Interchange Highway needed capacity to support the anticipated development

New Interchange at Construction of a new interchange at Prairie Star Roadway 2031 to 2040 KS City of Lenexa 246 Prairie Star Parkway & K-Prairie Star Parkway and K-10 Parkway and K-10 to provide access and connection $20,000,000 10 to Prairie Star Parkway and areas in western Lenexa

New 4-lane divided roadway including sidewalks and Prairie Star Parkway Prairie Star Parkway from Mize Road to K- Roadway 2031 to 2040 KS City of Lenexa 244 a 10-foot wide bike/ped trail along one side. Also $15,400,000 from Mize to K-10 10 Highway. included are street lights, storm sewers, landscape

175th (Hedge to Lone 175th Street from Hedge Lane to Lone Capacity improvement from a rural 2 lane to 4 lane Roadway 2031 to 2040 KS City of Olathe 497 $13,000,000 Elm) Elm. divided arterial.

Roadway 2031 to 2040 KS City of Olathe 506 159th (Lone Elm to K-7) 159th Street from Lone Elm to K-7 Hwy. Capacity improvements from 2 lane to 4 lane. $13,000,000

159th (Black Bob to Roadway 2031 to 2040 KS City of Olathe 505 159th Street from Black Bob to Pflumm. Capacity improvements from 2 lane to 4 lane. $13,000,000 Pflumm) 151st Bridge widening Capacity improvement, widening bridge between Roadway 2031 to 2040 KS City of Olathe 496 151st Street and I-35 Interchange. $15,000,000 at I-35 Interchange ramps from 4 to 6 lanes.

Appendix D / Transportation Outlook 2040 2015 Plan Update 135th (West Limits to 135th Street from the west city limits to Roadway 2031 to 2040 KS City of Olathe 503 Capacity improvements from 2 lane to 4 lane. $5,000,000 Lakeshore) Lakeshore Drive. 175th (Ridgeview to Capacity improvement from a rural 2 lane to 4 lane Roadway 2031 to 2040 KS City of Olathe 501 175th Street from Ridgeview to Mur-Len. $13,000,000 Mur-Len) divided arterial. 159th (Mur-Len to Black Roadway 2031 to 2040 KS City of Olathe 507 159th Street from Mur-Len to Black Bob Capacity improvements from 2 lane to 4 lane. $13,000,000 Bob) Capacity improvement from a rural 2 lane to 4 lane Roadway 2031 to 2040 KS City of Olathe 499 175th (Lone Elm to K-7) 175th Street from Lone Elm to K-7 Hwy $13,000,000 divided arterial. 151st (West Limits to 151st Street from west city limits to Old Roadway 2031 to 2040 KS City of Olathe 504 Capacity improvements from 2 lane to 4 lane. $15,000,000 Old 56) 56 Hwy. KC Road (North Limits KC Road from the north city limits to Roadway 2031 to 2040 KS City of Olathe 495 Capacity improvement, widening from 4 to 5 lanes. $5,000,000 to Renner) Renner Road. 175th (Mur-Len to Black Capacity improvement from a rural 2 lane to 4 lane Roadway 2031 to 2040 KS City of Olathe 500 175th Street from Mur-Len to Black Bob. $13,000,000 Bob) divided arterial. 159th (West Limits to 159th Street from west city limits to Lone Roadway 2031 to 2040 KS City of Olathe 509 Capacity improvements from 2 lane to 4 lane. $26,000,000 Lone Elm) Elm. Black Bob (159th to Black Bob from 159th Street to 167th Roadway 2031 to 2040 KS City of Olathe 512 Capacity improvements from 2 lane to 4 lane. $13,000,000 167th) Street. Moonlight Interchange New interchange needed on K-10 Hwy to serve Roadway 2031 to 2040 KS City of Olathe 519 Moonlight at K-10 Hwy. $15,000,000 at K-10 increase demand due to economic development. Ridgeview (167th to Ridgeview from 167th Street to 175th Roadway 2031 to 2040 KS City of Olathe 517 Capacity improvements from 2 lane to 4 lane. $13,000,000 175th) Street. Black Bob (167th to Black Bob from 167th Street to 175th Roadway 2031 to 2040 KS City of Olathe 513 Capacity improvements from 2 lane to 4 lane. $13,000,000 175th) Street. 175th (West Limits to 175th Street from west City limits to Capacity improvement from a rural 2 lane to 4 lane Roadway 2031 to 2040 KS City of Olathe 502 $13,000,000 Hedge) Hedge Lane. divided arterial. Pflumm (151st to Pflumm from 151st Street to 159th Roadway 2031 to 2040 KS City of Olathe 514 Capacity improvements from 2 lane to 4 lane. $13,000,000 159th) Street. Ridgeview (151st to Ridgeview from 151st Street to 159th Roadway 2031 to 2040 KS City of Olathe 515 Capacity improvements from 2 lane to 4 lane. $13,000,000 159th) Street. Ridgeview (159th to Ridgeview from 159th Street to 167th Roadway 2031 to 2040 KS City of Olathe 516 Capacity improvements from 2 lane to 4 lane. $13,000,000 167th) Street.

Kenneth/State Line The project includes reconstruction of Kenneth Road Kenneth/, 159th St. to Roadway 2031 to 2040 KS City of Overland Park 282 Road, 159th St. to 199th and State Line Road from an unimproved two-lane $25,000,000 199th St. in Overland Park St. roadway to a four-lane divided thoroughfare with t

Leavenworth County Leavenworth County Road 1 from US Upgrade Leavenworth County Highway 1 from a 2- Roadway 2031 to 2040 KS City of Tonganoxie 705 $12,750,000 Road 1 Highway 24/40 to the KTA (I-70) lane county road to a 4-lane Parkway.

Appendix D / Transportation Outlook 2040 2015 Plan Update Leavenworth County Both sides of Leavenworth County Road 1 Build reverse frontage roads on both sides of Roadway 2031 to 2040 KS City of Tonganoxie 476 Road 1 Reverse from US 24/40 to the Leavenworth County Road 1 from US 24/40 to the $18,000,000 Frontage Roads Tonganoxie Interchange Kansas Turnpike Tonganoxie Interchange US Highway 24/40 from Kansas Highway Construct 4 lanes on US Highway 24/40 from Kansas Roadway 2031 to 2040 KS City of Tonganoxie 701 US Highway 24/40 16 south to Leavenworth County Highway $6,290,000 Highway 16 south to Leavenworth County Highway 1 1 Hemphill Road starting at it intersection Reconstruct Hemphill Road starting at it intersection Roadway 2031 to 2040 KS City of Tonganoxie 477 Hemphill Road with US 24/40 thence east to 206th $9,000,000 with US 24/40 thence east to 206th Street Street Beginning at the intersection of the East This road is planned in the Tonganoxie Roadway 2031 to 2040 KS City of Tonganoxie 473 East Side Collector Side Collector and 14th Street thence $2,125,000 Comprehensive Plan south to Kansas Avenue From the intersection of 4th Street and This project is being built to comply with the planning Pleasant Street thence east to the Roadway 2031 to 2040 KS City of Tonganoxie 466 4th Street done in the US 24/40 Corridor Access and Traffic $8,775,000 intersection of 4th Street and 198th Management Plan. Street. Beginning at 4th Street west of US 24/40 thence south and west along the This project is planned in the US 24/40 Corridor Roadway 2031 to 2040 KS City of Tonganoxie 472 West Side Collector $7,435,000 approximate horizontal alignment of US Access and Traffic Management Plan 24/40 to Honey Creek Road. Honey Creek Parkway between 222nd This project is planned in the Tonganoxie Roadway 2031 to 2040 KS City of Tonganoxie 475 Honey Creek Parkway $8,500,000 Street and 206th Street Comprehensive Plan. Johnson County Reconstruction and capacity improvements to this Roadway 2031 to 2040 KS KDOT 894 Gateway Project - Phase Various $300,000,000 interchange. 2 Reconstruction and capacity improvements of the I- Complete phases 2, 5, 70/K-7 Interchange. Full project cost is $101,500,000, 6, 7, 8 and 16 of and MTP cost reflects phases beyond those Roadway 2015 to 2020 KS KDOT 704 I-70/K-7 $38,100,000 interchange programmed in 2014-2018 TIP. The interchange improvements concept includes interchanges at I-70, 130th Street, and Kansas Avenue.

Leavenworth Road Reconstruct and widen Leavenworth Road (K-5) to a Unified Government of Leavenworth Road between I-635 and Roadway 2031 to 2040 KS 461 Improvements I-635 to 3-lane facility which would provide for dedicated left $20,000,000 WYCO/KCK 91st Street 91st St. turn lanes at major intersections, and a

Construct new 1 mile segment of Polfer Road, Unified Government of Polfer Road extending existing alignment east one mile to Roadway 2031 to 2040 KS 452 Polfer Road - 115th St to Hutton Road $6,200,000 WYCO/KCK Construction connect to Polfer Road. This would provide additional conn

Appendix D / Transportation Outlook 2040 2015 Plan Update Replacement of existing two lane roadway with a Unified Government of Roadway 2031 to 2040 KS 415 Donahoo Road Parkway Donahoo Road K-7 to I-435 four lane parkway with landscaped median, turn $20,000,000 WYCO/KCK lanes, and other urban amenities.

Leavenworth Road Widening and reconstructing existing 2-lane rural- Unified Government of Roadway 2031 to 2040 KS 464 Improvements K-7 to I- Leavenworth Road from K-7 to I-435 type roadway into 4-lane urban street including $18,000,000 WYCO/KCK 435 lighting, and signalization as warranted.

Roadway 2031 to 2040 MO City of Kansas City, MO 771 Red Bridge State Line to Holmes Reconstruct existing road and widen to 3 lanes. $17,556,000

Roadway 2031 to 2040 MO City of Kansas City, MO 776 Wornall Road Red Bridge Rd to 135th Street Reconstruct existing roadway and widen to 3 lanes $33,655,050

Roadway 2031 to 2040 MO City of Kansas City, MO 723 107th Street Hillcrest Rd to Raytown Rd Reconstruct existing roadway and widen to 3 lanes $12,335,000

Roadway 2031 to 2040 MO City of Kansas City, MO 724 Bannister Road James A Reed to Raytown Road Reconstruct existing roadway and widen to 4 lanes $21,132,000

Roadway 2031 to 2040 MO City of Kansas City, MO 769 Raytown Road 87th Street to I-470 Reconstruct existing roadway and widen to 4 lanes $11,233,650

St Andrews Drive to Grandview City Roadway 2031 to 2040 MO City of Kansas City, MO 725 Blue Ridge Blvd Reconstruct existing roadway and widen to 3 lanes $21,132,000 Limits Roadway 2031 to 2040 MO City of Kansas City, MO 617 NE 96th North Oak to Maplewoods Pkwy Reconstruct existing road and widen to 3 lanes. $9,372,000 Roadway 2031 to 2040 MO City of Kansas City, MO 586 Lewis and Clark Expwy I-435 to Sugar Creek New 2 lane facility $63,800,000 Roadway 2031 to 2040 MO City of Kansas City, MO 558 Front Street Chouteau TO I-435 Reconstruct existing road $30,615,200 Roadway 2031 to 2040 MO City of Kansas City, MO 526 Barry Road Highland Ave to Indiana Ave Reconstruct existing road and widen to 3 lanes. $6,390,000 Roadway 2031 to 2040 MO City of Kansas City, MO 621 NW 108th Skyview Ave to Platte Purchase Dr. Reconstruct existing road and widen to 4 lanes. $17,980,000 Roadway 2031 to 2040 MO City of Kansas City, MO 624 NW 72nd NW Prairie View to Roanridge Intersection and interchange improvements $12,840,000 Roadway 2031 to 2040 MO City of Kansas City, MO 633 Platte Purchase NW 76th Street to Barry Road Reconstruct existing road and widen to 3 lanes. $9,487,375 Roadway 2031 to 2040 MO City of Kansas City, MO 2006 Wornall Road Ward Parkway to Red Bridge Rd Reconstruct existing road to parkway standards $23,100,600 Roadway 2031 to 2040 MO City of Kansas City, MO 635 Platte Purchase MO-152 to Tiffany Springs pkwy Reconstruct existing road and widen to 4 lanes. $9,372,000 Reconstruct existing road and widen to 4 lanes and Roadway 2031 to 2040 MO City of Kansas City, MO 641 Raytown Road I-435 to Blue Ridge Cut-Off $16,600,000 parkway standards

Roadway 2031 to 2040 MO City of Kansas City, MO 545 North Brighton Avenue Barry Road TO Shoal Creek Pkwy Reconstruct existing road and widen to 3 lanes. $11,715,000

Roadway 2031 to 2040 MO City of Kansas City, MO 568 Holmes Rd Blue Ridge TO Martha Truman Reconstruct existing road and widen to 3 lanes. $13,781,100 Roadway 2031 to 2040 MO City of Kansas City, MO 554 Eastern Rd Cookingham Drive TO City Limits Reconstruct existing road and widen to 3 lanes. $12,141,000 Roadway 2031 to 2040 MO City of Kansas City, MO 594 Line Creek Pkwy I-29 TO NW 68TH STREET Reconstruct existing road and widen to 4 lanes. $24,600,000

Roadway 2031 to 2040 MO City of Kansas City, MO 2005 Line Creek Pkwy Stage Coach to Tiffany Springs Parkway New 4 lane parkway facility $16,477,300

Roadway 2031 to 2040 MO City of Kansas City, MO 687 Tiffany Springs Pkwy I-435 to Amity Ave New 4 lane facility and interchange $59,640,000 Roadway 2031 to 2040 MO City of Kansas City, MO 524 Barry Road Union Chapel to Chariton Reconstruct existing road and widen to 3 lanes. $13,667,500

Appendix D / Transportation Outlook 2040 2015 Plan Update Roadway 2031 to 2040 MO City of Kansas City, MO 566 Green Hills MO-152 TO NW 108th Street Reconstruct existing road and widen to 4 lanes. $17,750,000 Roadway 2031 to 2040 MO City of Kansas City, MO 632 Parvin Road Kentucky Ave to Route 210 New 4 lane facility extension $51,758,000 Roadway 2031 to 2040 MO City of Kansas City, MO 569 Holmes Rd 135th TO Blue Ridge Reconstruct existing road and widen to 3 lanes. $5,644,500 Roadway 2031 to 2040 MO City of Kansas City, MO 571 Interurban Rd Cookingham TO Route 92 Reconstruct existing road and widen to 3 lanes. $28,116,000 Tiffany Springs Pkwy to Shoal Creek Roadway 2031 to 2040 MO City of Kansas City, MO 2001 Line Creek Pkwy New 4 lane parkway facility $20,797,700 Parkway Roadway 2031 to 2040 MO City of Kansas City, MO 591 Line Creek Pkwy I-29 to Bell Street Reconstruct existing road and widen to 4 lanes. $17,466,000 Roadway 2031 to 2040 MO City of Kansas City, MO 548 Cookingham Rd Skyview Ave TO Platte Purchase Dr. Reconstruct existing road and widen to 6 lanes. $19,820,000

Operations, Management and Preservation projects Operations Category Time Period State Sponsor Project ID Facility or Program Location Description Capital Cost Cost Greater Kansas City metropolitan area - The RideShare program is a free service that assists Management & Jackson, Clay and Platte counties in MO; 2015 to 2020 MO MARC 205 RideShare program individual commuters and employers with $0 $250,000 Operations Johnson, Wyandotte and Leavenworth in identifying and using alternatives to driving alone. KS

Various Counties, Various Corridors on This program allows for the continued operation of Management & Motorist Assist 2015 to 2020 MO MoDOT 215 the state highway system in Missouri. the Motorist Assist program on the Missouri side of $18,440,000 $1,844,000 Operations Operations - Missouri Includes I-70, I-435, US 71, I-29 and I-35. the KC region.

Various Counties, Various Corridors This project is to provide support needed to Management & 2015 to 2020 MO MoDOT 214 KCScout ITS Operations including I-70, I-435, I-470, US 71, I-29 continue to operate and maintain the KC Scout $45,580,000 $4,558,000 Operations and I-35. system in the Kansas City Region. Construct Phase 1 of the selected alternative from Replacement of Bridges the completed study of Project No. 70-105 KA-2130- Roadway 2015 to 2020 KS KDOT 1000 30 & 173 of the Lewis & I-70 $57,500,000 $0 01 (Westbound I-70 River Truss over the Kansas Clark Viaduct River)

Roadway 2015 to 2020 MO MoDOT 227 I-70/I-435 Interchange I-70/I-435 Phase 1 - Replace 4 bridges $30,000,000 $150,000

Phase 1 - Replace 4 existing bridges at Wornall and Roadway 2021 to 2030 MO MoDOT 160 I-435 W of Kansas State Line to W of I-49 Holmes Rd and rehabilitate 4 existing bridges at $21,000,000 $100,000 103rd St and Blue River Roadway 2021 to 2030 MO MoDOT 2025 Broadway Bridge US-169 Phase 1 - Broadway Bridge replacement $140,000,000 $0 Phase 1 - Replace bridges at Pittman Rd, Blue Ridge Roadway 2031 to 2040 MO MoDOT 191 I-70 I-435 to I-470 Blvd, Crysler Ave, Phelps Rd and UP railroad $25,000,000 $240,000 overpass Roadway 2031 to 2040 MO MoDOT 157 I-435 Missouri River Phase 1 - Replace/rehab Missouri River Bridge $80,500,000 $150,000

Appendix D / Transportation Outlook 2040 2015 Plan Update Roadway Projects Summary >> *Operations, management and preservation projects include: 1. Replacement/reconstruction projects greater than $30 million on Operations, the National Highway System (NHS); Management and Non-Preservation 2. Interchange reconstruction projects requiring a break-in- Preservation* access/access justification report; and 3. Regional programs intended to improve operation and 2015 to 2020 $151,520,000 $770,512,612 management of the transportation system. These projects are examples of the types of activities necessary to 2021 to 2030 $161,000,000 $2,084,996,223 preserve and maintain the transportation system. As explained in Appendix E Financial Capacity Analysis (page E-15), the cost of system 2031 to 2040 $105,500,000 $1,498,420,775 operations, maintenance and preservation is deducted first from future transportation revenues, and the remaining balance is available for other types of projects.

Category Time Period State Sponsor Project ID Facility or Program Location Description Capital Cost Enhanced express bus service from CBD to Platte Transit 2015 to 2020 KS MARC 804 I-70 West Express Bus CBD to K-7 $10,927,000 County. Upgrade of fare collection system including new Regional Fare Collection Transit 2015 to 2020 MO KCATA 2011 Regional technologies that would be used across the entire $6,556,000 System system. Kansas City, Missouri along the This Project will design, construct and implement a Prospect Bus Rapid Prospect Corridor from the downtown Transit 2015 to 2020 MO KCATA 413 new bus rapid transit line in a corridor running from $46,987,000 Transit CBD to the vicinity of 85th Street in Downtown Kansas City, Missouri south along south Kansas City. Transit 2015 to 2020 MO KCATA 803 I-70 East Express Bus CBD into Eastern Jackson Co. New express bus service from CBD to K-7 $11,200,000

This project will implement Bus Rapid Transit in the State Avenue Corridor Wyandotte County, KS and Kansas City, Transit 2015 to 2020 MO KCATA 433 State Avenue Corridor from Village West in western $13,113,000 Bus Rapid Transit MO Wyandotte County to Downtown Kansas City, Kan.

Independence Ave. - Enhance transit service along Independence Ave Transit 2015 to 2020 MO KCATA 423 CBD into Eastern Jackson County $27,318,000 from CBD to Eastern Jackson County Jackson Co.

Appendix D / Transportation Outlook 2040 2015 Plan Update Purchase new revenue vehicles (buses). Vehicles Transit 2015 to 2020 MO KCATA 302 System Preservation Kansas City, Missouri will replace those vehicles (buses) that have met $54,636,000 their useful life in accordance with FTA guidelines

New Service to Kansas City, Ks., Kansas City, Mo., and Transit 2015 to 2020 MO KCATA 2019 New express bus service to Leavenworth County $2,185,000 Leavenworth County Leavenworth, Ks. I-435 Express Bus - Enhanced express bus service from CBD to Eastern Transit 2015 to 2020 MO KCATA 2018 Johnson County to Johnson County and Kansas City, Mo $36,060,000 Jackson County. KCMO Regional Mobility Implementation of a regional one-call center, and Transit 2015 to 2020 MO KCATA 2013 Regional $5,464,000 Management expansion of Paratransit Services Regional Vanpool Transit 2015 to 2020 MO KCATA 2012 Regional Regional expansion of the vanpool program. $2,732,000 Expansion Program

Downtown Kansas City, MO. through This Project will design, construct and implement a North Oak Bus Rapid North Kansas City, Gladstone and Transit 2015 to 2020 MO KCATA 428 new bus rapid transit line in the North Oak corridor $27,318,000 Transit Improvement Kansas City north to approximately from Downtown Kansas City to Missouri 152 in Missouri Highway 152.

Enhanced express bus service from CBD to Clay Transit 2015 to 2020 MO MARC 800 I-29 Express Bus CBD to Airport and Platte County $13,842,000 County. Enhanced express bus service from CBD to Cass Transit 2015 to 2020 MO MARC 801 I-35 North Express Bus CBD to Northern Platte/Clay County $13,842,000 County.

The project will provide enhanced transit service Metcalf/Shawnee Transit 2021 to 2030 KS Johnson County Transit 581 Johnson County, Kansas and support development and the redevelopment $13,842,000 Mission Parkway of Metcalf Avenue, plays a vital role in realizing the

Shawnee Mission Enhance transit service on Shawnee Mission Pkwy Transit 2021 to 2030 KS Johnson County Transit 588 Johnson County, Kansas $38,463,000 Parkway from Metcalf to K-7 Locations throughout the metropolitan This project will plan, design, and construct new Regional Park and Ride area. Specifics will be determined as Transit 2021 to 2030 MO KCATA 435 park and ride lots in the Kansas City metropolitan $6,921,000 Lot Development part of the regional transit service area. These will be coordinated with transit service planning process. System preservation includes replacement of buses Transit 2021 to 2030 MO KCATA 2023 System Preservation Regional at the end of their useful life and preservation of $138,423,000 other facilities and assets. US40 - CBD into Eastern Enhance transit service along US40 from CBD to Transit 2021 to 2030 MO KCATA 2016 Jackson County $6,921,000 Jackson Co. Eastern Jackson County

Appendix D / Transportation Outlook 2040 2015 Plan Update M-350 Express Bus - New express bus service from Johnson County to Transit 2021 to 2030 MO KCATA 2017 CBD into Eastern Jackson County $10,036,000 Kansas City, Mo/ along I-435 Jackson Co.

Regional/KCATA Reorganization of downtown transit routing and Transit 2021 to 2030 MO KCATA 2014 Downtown Transit Regional $24,916,000 construction of supperstops and related amenities. Center and Superstops

US24 - CBD into Eastern Enhance transit service along US24 from CBD to Transit 2021 to 2030 MO KCATA 2015 Jackson County $23,016,000 Jackson Co. Eastern Jackson County US 169 Express Bus - Downtown Kansas City, Mo. north on Transit 2021 to 2030 MO KCATA 2021 CBD to Northern Clay New express bus service to St. Joseph $2,768,000 US-169 to Northern Clay County County Transit 2021 to 2030 MO KCATA 2020 KCMO to St. Joseph Kansas City and St. Joseph, Mo. New express bus service to St. Joseph $6,921,000 Project is to upgrade and expand existing radio Radio Communications communication infrastructure and real-time Transit 2021 to 2030 MO KCATA 382 System\ITS Upgrade & Greater KCATA Service area $16,611,000 passenger information systems. It will include Improvements hardware upgrades Enhanced express bus service from CBD to eastern Transit 2021 to 2030 MO MARC 802 US-71/ I-49 CBD to Cass County $12,112,000 Jackson County.

New Transit ATA’s existing transit central service facility (for Transit 2031 to 2040 MO KCATA 364 Maintenance and TBD maintenance, daily servicing and administration) $124,644,000 Service Facility will be 50 years old in 2027. A new facility an

System preservation includes replacement of buses Transit 2031 to 2040 MO KCATA 2024 System Preservation Regional at the end of their useful life and preservation of $183,300,000 other facilities and assets.

Transit Projects Summary 2015 to 2020 $272,180,000 2021 to 2030 $300,950,000 2031 to 2040 $307,944,000 TOTAL $881,074,000

Appendix D / Transportation Outlook 2040 2015 Plan Update