Federal Register/Vol. 74, No. 112/Friday, June 12
Total Page:16
File Type:pdf, Size:1020Kb
28036 Federal Register / Vol. 74, No. 112 / Friday, June 12, 2009 / Notices period, as extended, will be considered (District), Steven J. Klein, General Chaplain and the Sultan River during preparation of the Final EIS. Manager, 2320 California Street, P.O. immediately upstream of the diversion FOR FURTHER INFORMATION CONTACT: For Box 1107, Everett, WA 98206–1107. dam; (12) a 120-foot-long, 20-foot-high, information regarding the WVDP or this i. FERC Contact: David Turner (202) concrete gravity diversion dam which Draft EIS, contact Catherine Bohan at 502–6091 or via e-mail at was originally constructed to divert the above address. The following Web [email protected]. water from the Sultan River to Lake sites may also be accessed for additional j. This application is not ready for Chaplain; and (13) other appurtenant information on the Draft EIS or the West environmental analysis at this time. equipment. Project operations are Valley Site: http:// k. Project Description: The existing guided by reservoir rule curves which www.westvalleyeis.com or http:// project consists of the following: (1) are designed to minimize spill at Spada www.wv.doe.gov. Spada Lake, with a surface area of 1,802 Lake while providing minimum flow releases to the Sultan River downstream Issued in Washington, DC, on June 5, 2009. acres at a normal maximum water of the diversion dam. The District Michael C. Moore, surface elevation of 1,445 feet msl; (2) Culmback dam, a 640-foot-long, 262- proposes the following changes to the Director, Office of Small Sites. foot-high earth and rockfill dam with a project: (1) Modifications to the project [FR Doc. E9–13837 Filed 6–11–09; 8:45 am] crest elevation of 1,470 feet msl located boundary that include additional land BILLING CODE 6450–01–P at River Mile (RM) 16.5 on the Sultan and exclude certain land included in River; (3) a concrete morning glory the existing project boundary; (2) a new Operations Plan based on revised Spada DEPARTMENT OF ENERGY spillway with a crest elevation of 1,450 feet msl located approximately 250 feet Lake rule curves; (3) aquatic habitat enhancement measures; (4) measures to Federal Energy Regulatory from the right bank; (4) a system of protect and enhance wildlife habitat; (5) Commission conduits and valves under the dam which provide the minimum flow measures to enhance recreational [Project No. P–2157–188] downstream of Culmback dam; (5) a opportunities; and (6) measures to 110-foot-tall concrete powerhouse protect historic properties. Public Utility District No. 1 of intake structure located approximately l. Locations of the Application: A Snohomish County; Notice of 250 feet upstream of the dam with three copy of the application is available for Application Tendered for Filing With 20-foot movable panels to allow review at the Commission in the Public the Commission and Establishing withdrawal from different depths; (6) a Reference Room or may be viewed on Procedural Schedule for Licensing and penstock consisting of a 3.8-mile-long, the Commission’s Web site at http:// Deadline for Submission of Final 14-foot-diameter unlined tunnel leading www.ferc.gov using the ‘‘eLibrary’’ link. Amendments to a 3.7-mile-long, 10-foot-diameter Enter the docket number excluding the June 5, 2009. underground pipeline; (7) a two-story last three digits in the docket number Take notice that the following reinforced-concrete powerhouse located field to access the document. For hydroelectric application has been filed at RM 4.3; (8) four generating units with assistance, contact FERC Online with the Commission and is available a total installed capacity of 111.8 MW; Support at for public inspection. Units 1 and 2 are 47.5 MW Pelton [email protected] or toll- a. Type of Application: New Major turbines, which discharge water directly free at (866) 208–3676, or for TTY, (202) License. into a 40-foot-long discharge canal to 502–8659. A copy is also available for b. Project No.: P–2157–188. the Sultan River; Units 3 and 4 are 8.4 inspection and reproduction at the c. Date Filed: June 1, 2009. MW Francis turbines, which discharge address in item (h) above. d. Applicant: Public Utility District water through the Lake Chaplain water m. You may also register online at No. 1 of Snohomish County. supply pipeline; (9) the approximately http://www.ferc.gov/esubscribenow.htm e. Name of Project: Henry M Jackson 3.5-mile-long, 72-inch-diameter Lake to be notified via email of new filings Hydroelectric Project. Chaplain water supply pipeline, which and issuances related to this or other f. Location: The existing project is routes water from the Francis turbines pending projects. For assistance, contact located on the Sultan River in to the Portal 2 structure at Lake FERC Online Support. Snohomish County, Washington, about Chaplain; (10) the Portal 2 structure, n. Procedural Schedule: 20 miles east of Everett, Washington. which diverts flows from the Lake The application will be processed The project penstock underlies 10.9 Chaplain pipeline to Lake Chaplain (a according to the following Hydro acres of Mount Baker-Snoqualmie 450-acre reservoir which serves as the Licensing Schedule. Revisions to the National Forest. City of Everett’s water supply) or to the schedule may be made as appropriate. g. Filed Pursuant to: Federal Power diversion dam tunnel and pipeline; (11) For example, issuance of the Ready for Act 16 U.S.C. 791(a)–825(r). a 1.5-mile-long, concrete-lined tunnel Environmental Analysis Notice is based h. Applicant Contact: Public Utility and a 2,000-foot-long, 72-inch-diameter on the assumption that there will be no District No. 1 of Snohomish County concrete pipeline connecting Lake additional information. Milestone Date Application Deficiency Determination Letter and Issuance of Additional Information Requests (AIRs) ............................... July 2009. Notice of Acceptance/Notice of Ready for Environmental Analysis ...................................................................................... July 2009. Filing of Interventions, Recommendations, Terms and Conditions, and Fishway Prescriptions .......................................... September 2009. Reply Comments Due ............................................................................................................................................................ November 2009. Issuance of Draft EA .............................................................................................................................................................. March 2010. Comments on Draft EA Due .................................................................................................................................................. April 2010. Filing of Modified Terms and Conditions ............................................................................................................................... June 2010. Issuance of Final EA .............................................................................................................................................................. September 2010. VerDate Nov<24>2008 17:53 Jun 11, 2009 Jkt 217001 PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 E:\FR\FM\12JNN1.SGM 12JNN1 Federal Register / Vol. 74, No. 112 / Friday, June 12, 2009 / Notices 28037 o. Final amendments to the Comment Date: 5 p.m. Eastern Time Docket Numbers: RP09–693–000. application must be filed with the on Monday, June 15, 2009. Applicants: Pine Needle LNG Commission no later than 30 days from Docket Numbers: RP09–687–000. Company, LLC. the issuance date of the notice of ready Applicants: Equitrans, L.P. Description: Pine Needle LNG for environmental analysis. Description: Equitrans, L.P. submits Company submits Sixth Revised Sheet Second Revised Sheet 286 et al. to its 89 et al. to its FERC Gas Tariff, Original Kimberly D. Bose, Volume 1 effective 8/1/09. Secretary. FERC Gas Tariff, Original Volume 1 to be effective 8/1/09. Filed Date: 06/01/2009. [FR Doc. E9–13787 Filed 6–11–09; 8:45 am] Filed Date: 06/01/2009. Accession Number: 20090603–0038. BILLING CODE 6717–01–P Comment Date: 5 p.m. Eastern Time Accession Number: 20090603–0034. on Monday, June 15, 2009. Comment Date: 5 p.m. Eastern Time on Monday, June 15, 2009. Docket Numbers: RP09–694–000. DEPARTMENT OF ENERGY Applicants: National Fuel Gas Supply Docket Numbers: RP09–688–000. Corporation. Federal Energy Regulatory Applicants: WestGas InterState, Inc. Description: National Fuel Gas Supply Commission Description: WestGas InterState, Inc. Corporation submits Ninth Revised submits Eighth Revised Sheet 92 et al. Combined Notice of Filings Sheet 457 and Seventh Revised Sheet to its FERC Gas Tariff, First Revised 458 to FERC Gas Tariff, Fourth Revised Volume 1 to be effective 8/1/09. June 4, 2009. Volume 1, to be effective 8/1/09. Filed Date: 06/01/2009. Take notice that the Commission has Filed Date: 06/01/2009. Accession Number: 20090603–0035. received the following Natural Gas Accession Number: 20090603–0148. Comment Date: 5 p.m. Eastern Time Pipeline Rate and Refund Report filings: Comment Date: 5 p.m. Eastern Time on Monday, June 15, 2009. on Monday, June 15, 2009. Docket Numbers: RP09–683–000. Applicants: Caledonia Energy Docket Numbers: RP09–689–000. Docket Numbers: RP09–695–000. Partners, LLC. Applicants: North Baja Pipeline, LLC. Applicants: Dauphin Island Gathering Description: Caledonia Energy Description: North Baja Pipeline, LLC Partners. Partners, LLC submits First Revised submits Third Revised Sheet 101 et al. Description: Dauphin