A guide to developing Kirkley waterfront and a new sustainable urban neighbourhood in Lowesto

Sustainable Urban Neighbourhood and Kirkley Waterfront Development Brief Supplementary Planning Document (SPD): Adopted May 2013 All maps in this document are reproduced from the Ordnance Survey mapping with the permission of the Controller of Her Majesty’s Stationery Office (c) Crown Copyright. Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. Waveney District Council Licence No. 100042052, 2013 /

Pedestrian / cycle bridge Retail Primary Housing centre school Marina and Employment leisure "0,5 facilities

! , ,1. .

.&!$",! "+*.(,!

,**". &)

     

2"+"5.&2"

& 0,.&,!

")),!  &* ".)"5,!

&.()"51+ ,* .&/-5

Employment Open space Housing Housing County Wildlife Site View the full draft outline masterplan on page 51

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | What is the purpose of this document?

The Sustainable Urban Neighbourhood and Kirkley Waterfront will be a large mixed-use development on the south-side of in Lowesto. This document provides praccal informaon and development guidelines to help implement this site.

Brooke Peninsula 1 Introducon 1 Appendix 1 Site Analysis 65 1.1 Purpose of the Brief 2 A1. Exisng Uses 1.2 Policy Context 2 A2. Constraints and Opportunies A3. Local Character Appraisal Contents 2 Context 5 Appendix 2 Evidence Base 72 3 Vision And Objecves 9 3.1 Vision 9 Appendix 3 Policy SSP3 from Lake Lothing 76 3.2 Objecves 9 and Outer Harbour Area Acon Plan

4 Land Use 13 Appendix 4 Energy and Water Policy from 81 the Lake Lothing and Outer Harbour Area 5 Streets and Transport 21 Acon Plan

6 Open Space and Biodiversity 29

7 Urban Design Guidance 37

8 Flood Risk Management 47

9 Outline Masterplan 51

10 Implementaon 53 10.1 Infrastructure Requirements 53 10.2 Strategic Phasing 57

11 Planning Applicaon Requirements 61

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | View north-west across the site 1 Introducon

Aerial view from to Brooke Peninsula Waterfront, Brooke Peninsula /

1. Purpose of the brief

0120.5 Miles

1. Introducon /

Peto Way 1.1 The Sustainable Urban Neighbourhood and Kirkley Waterfront (SUN) will be a large mixed-use development on the south-side of Lake Lothing in Denmark Road Lowesto. The 59.8 hectare site covers the Bridge Road majority of the southern shore of Lake Lothing Commercial Road stretching back from the shore to Victoria Road and Waveney Drive. Figure 1.1 shows the locaon and area of the site. The site comprises predominantly underulised or unoccupied

brownfield land and offers an unrivalled Waveney Drive waterfront opportunity to regenerate the south- Horn Hill Victoria Road side of Lake Lothing as a new employment area

Kirkley Run and residenal community and to open up access Dell Road to the waterfront for the public. Tom Crisp Way 0150 300 600 Metres

Figure 1.1 Locaon of the Sustainable Urban Neighbourhood and Kirkley Waterfront

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 1 1.1 PURPOSE OF THE BRIEF 1.2 POLICY CONTEXT

1.1.1 The Sustainable Urban Neighbourhood and Kirkley • the distribuon of land uses across the site, 1.2.1 Policy CS05 of the Adopted Waveney Core Strategy Waterfront (SUN) is allocated for a mixed-use • high level street network and transport idenfies Lake Lothing as an area for employment development under Policy SSP3 of the Lowesto proposals led regeneraon and the provision of 1,500 new Lake Lothing and Outer Harbour Area Acon Plan. • open space and landscape principles homes. Policy CS05 states that an Area Acon Plan Policy IMP4 of the Area Acon Plan requires the • design principles for the Lake Lothing area will be developed to preparaon of a Development Brief prior to the • flood risk migaon requirements provide further guidance. determinaon of planning applicaons. • implementaon strategy

1.1.2 The purpose of this Development Brief is to set out a site-specific vision and objecves for the delivery of the SUN. It builds upon the detail set out in the Area Acon Plan and seeks to ensure that a Figure 1.2 AAP Allocaons comprehensive approach to development is / achieved. In summary, the brief sets out:

Proposed Energy Related Employment (SSP1)

Proposed Retail, Leisure, Tourism and Port Related Acvies (SSP2).

Proposed Housing, Industrial and Community Facilies (SSP3).

Proposed East of Park (SSP4)

Proposed Housing, Employment and Community Facilies (SSP5).

Proposed Mixed Use Regeneraon (SSP6)

Proposed Housing and Community Facilies (SSP7)

Proposed Mixed Use Regeneraon and Enhancement (SSP8).

Proposed Employment (SSP9) 0400800200 Meters

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 2 1.2.2 The Adopted Lowesto Lake Lothing and Outer 1.2.3 Policy SSP3 is repeated in Appendix 2 for Harbour Area Acon Plan (AAP) sets out the reference. detailed policy framework for the Lake Lothing area which includes the Sustainable Urban 1.2.4 The Naonal Planning Policy Framework (NPPF) Neighbourhood and Kirkley Waterfront site (SUN). has been considered in the preparaon of this Figure 1.2 shows how the SUN allocaon fits with brief. The NPPF dislled guidance from a large other allocaons in the AAP area. The document number of naonal Planning Policy Statements contains a number of area-wide policies which and Planning Policy Guidance Notes which have been reflected in this document as well as a informed previous dras of this brief. site-specific policy for the site. Policy SSP3 of the AAP sets out detailed proposals for the development of the SUN including:

• Approximately 1,380 dwellings and a potenal connuing care rerement community

• Open space (3 hectares, dependant on actual density) and re-provision of the Jeld-Wen Playing Fields

• 12 hectares of employment land to be shared with Kirkley Waterfront (majority to be on the waterfront)

• Primary School

• Retail, restaurants, bars, cafes as acve ground floor uses

• Marina facilies and moorings for historic vessels

• Hotel

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 3 2 Context

Aerial view of the north eastern part of the site looking towards the North Sea View from seafront along Lake Lothing and towards the Broads

2. Context

2.1 Before it is possible to plan for the future of a site 2.2 Figure 2.3 highlights the constuent parts of the it is necessary to understand the historical and site that are referenced throughout the brief. For present context of the site and its surroundings. reference, throughout this document the 2. Context Figure 2.2 analyses the exisng physical context of Sustainable Urban Neighbourhood and Kirkley the site and its surroundings and Figure 2.1 Waterfront will be abbreviated to SUN. Where the analyses the exisng social infrastructure document refers to the western part of the SUN, surrounding the site and the key connecons to it means the area west of the Jeld Wen Factory and from the site. A detailed analysis of exisng site. uses, constraints and opportunies and local character is found in Appendix 1 of this brief. Figure 2.1 Social Infrastructure Context

Railway staon  / Health centre 

High school c   Shop SHOPl

Naonal Cycle Network 

Regional Cycle Network 

Main roads

Town centre area 

$#.'")/&.

!"&&,)/&. 

'.%,#*)/&.

#,(&%)".      #+).!!#((   

02004000200400100100 Meters Meters

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 5 Figure 2.2 Physical Context /

)'(/

)'(/ )'(/

)'(/ )'(/ '(3'.& '.-(3,+ *%/. %,'.% )'(/

)'(/ 0)-.3+ '(3'.& ''/1'3/ '.-(3,+ '(3'.& '.-(3,+

/1%$$/((

00200400100100 200 400 Meters Meters

19th Century Housing Character Port / Industry Character Open space Broads Authority Area

20th Century Housing Character Indicave Flood Risk Conservaon area

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 6 Figure 2.3 Constuent parts of the SUN /

Denmark Road Brooke Harbour Road Peninsula

Brooke Business Park Haven Marina SCA Kirkley Waterfront Recycling County Former Wildlife Sanyo Witham Site Riverside Factory Former Jeld Wen Factory Paints Road Jeld Wen Playing Waveney Drive Fields Victoria Road

Dell Road Kimberley Road

Tom Crisp Way

0200400100 Meters

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 7 3 Vision And Objecves

Aerial view of SCA Recycling, Witham Paints, Sanyo, Brooke Business Park and Brooke Peninsula in context with north Lowesto Waterfront, Copenhagen

3.2 OBJECTIVES

Objecve 1: Housing Objecve 3: Infrastructure Approximately 1380 new homes consisng of a New infrastructure will support new residents and mix of market and affordable housing will be businesses in the area. This will include a new 3. Vision and provided to meet local housing need. These will primary school, a pedestrian/cycle bridge over Objecves be of different housing types, sizes and tenures to Lake Lothing at Brooke Peninsula, a new road to provide for people of different ages, incomes and access the site and measures to reduce the risk of family sizes. New dwellings will be of high quality flooding. New infrastructure will be delivered in a and maximise the aributes of the local area comprehensive and integrated fashion. including the waterfront, public open space, access to goods and services and connecons with exisng residenal areas. Objecve 4: Retail 3. Vision and Objecves Small-scale retail facilies in the heart of the SUN will provide goods and services for the local 3.1 VISION community. These will reduce the need to travel, assist with the creaon of a focal point in the Development in the Sustainable Urban neighbourhood and complement the exisng Neighbourhood and Kirkley Waterfront will shopping areas of Kirkley, Oulton Broad and transform an underulised and una racve area central Lowesto. into a vibrant, inclusive community that is Objecve 2: Employment integrated with adjacent areas and provides New land available for employment uses along the access to employment, services and facilies in a waterfront will enable businesses to take high quality environment. advantage of the opportunies presented by the growing onshore and offshore renewable energy Shops Development will maximise the opportunies sector, new port related acvies and an exisng presented by the waterfront, the central locaon skilled work force. In conjuncon with the of Lowesto and linkages to the town centre. It PowerPark and supporng business start-up units, will be a place that will grow and develop in the the SUN development will assist with the creaon future, where people take pride in where they live of 5000 new jobs in the area. and they feel part of the community.

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 9 Objecve 5: Leisure and Tourism Objecve 6: Social Inclusion Objecve 8: Open Space and Environment New residents and visitors to the SUN will support The Sustainable Urban Neighbourhood and Kirkley A network of open spaces will be designed to a flourishing marina area and boang community Waterfront will be a comprehensive development create a sense of openness and legibility within that will encourage marime related business and that will provide housing to meet the needs of the neighbourhood. An aracve and interesng recreaon. Supported by leisure and recreaon people in the community, access to facilies public realm that contains a variety of useful facilies such as bars and restaurants this will needed by people of different ages and incomes facilies and spaces will encourage residents to create a focal point on the waterfront. A and spaces where people can interact and become more physically acve, enjoy a healthier pedestrian and cycle route along the waterfront socialise. Together these will contribute to a place lifestyle and provide greater opportunies for will improve connecons between Lowesto’s that has a local identy. social interacon. A well connected network of South Beach and Oulton Broad, support local open spaces will support biodiversity and provide tourism and encourage people to use the SUN. opportunies to improve connecons with the Objecve 7: High Quality Design exisng community. High quality design will be instrumental to achieving the aspiraons of the SUN. Site layout, new buildings, public spaces and movement Objecve 9: The Waterfront routes will be designed to the highest calibre, A new path along the water for pedestrians and highlighng the seng of the SUN between the cyclists will increase access to the waterfront and Broads and the North Sea and will contribute to significantly improve connecons with other areas achieving a ‘Lifeme Neighbourhood’. The interior such as Lowesto town centre, South Beach and of buildings will provide living and working spaces Oulton Broad. These connecons will be that are adaptable to meet the needs of a supported with views and landmarks orientated populaon that may change over me and towards Lake Lothing at Brooke Peninsula from support a high quality of life. various vantage points. Public access to and along the waterfront will build upon the historical links between the people of Lowesto and the sea.

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 10 Objecve 10: Sustainable Transport Objecve 11: Flood Risk Objecve 12: Sustainable Buildings A network of legible, aracve walkways and People and property in the SUN will be protected New buildings will be designed and built to be cycleways will enable convenient access to local from flooding. This may be achieved through new energy and water efficient. As an exemplar facilies and services. Supplemented by public flood defences or measures to migate flooding development, new buildings will show how best transport they will provide people with a choice of such as building design and land raising. A pracce can be achieved. The broader issues transport modes to get to their desnaon. This comprehensive surface water drainage system will related to sustainable buildings including; waste, will reduce the need to travel by private vehicle. A be built as part of the development to reduce the ecology, surface water flooding as well as the new pedestrian/cycle bridge across Lake Lothing risk of surface water flooding. Addional flood wider construcon process will have been at Brooke Peninsula will improve access to local protecon may also benefit exisng properes considered. This together will have helped facilies and benefit people living in both north providing a more secure and safe environment for contribute to a Sustainable Urban Neighbourhood. and south Lowesto. local residents and businesses.

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 11 4 Land Use

Aerial view of the north western part of the site Estuary Business Park, Merseyside

4. Land Use Acon Plan. The broad distribuon of uses across the site is set out in Figure 4.1. The distribuon of 4. Land Use 4.1 The expectaon for the Sustainable Urban land uses shown in Figure 4.1 reflect the key Neighbourhood and Kirkley Waterfront (SUN) is development objecves and principles outlined in that it will be a thriving and diverse mixed-use Secon 3. This distribuon creates a central focus development. Mixed-use developments help to the development and ensures the key provide convenient access to services and facilies community needs such as the primary school and to help reduce the need to travel. They also help local centre are accessible to the majority of create a sense of place that has life, feels safe and people in the SUN. The distribuon of uses has provides a greater opportunity for social taken into account the sequenal approach to interacon. The mix of uses should blend and flooding with housing focused in areas of no flood integrate well together. The types and quantum of risk or less hazardous flood risk. A land use budget is shown in Table 4.1. New housing County Wildlife Site each use is outlined in Policy SSP3 of the Area Figure 4.1 Proposed Land Use New/exisng employment Exisng educaon

Marina Exisng residenal /

Primary School Leisure focus

Replacement open space Local centre

Land Use Approximate Area (hectares)

Housing 24.5   Employment (new and exisng) 20 Open Space 2 Primary School 2 County Wildlife Site 6.2 0*/*-'*

Exisng Marina 2.4 $!&'0-)&0. Exisng Residenal 2.2 Exisng School 0.5 Total 59.8 Table 4.1 Land Use Budget

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 13 4.2 The boundaries between land-uses should not 4.5 Figure 4.2 shows how density should vary across Area Approximate been seen as rigid zones of uses. A degree of the site considering the character of surrounding Number of Dwellings overlap and blending of uses, both horizontally areas and opportunies provided by the Brooke Business Park Between 550 and 600 and vercally, may be acceptable in some waterfront. locaons of the site, subject to amenity Former Sanyo Factory Between 250 and 300 consideraons. 4.6 The waterfront areas of the site are more Site appropriate for mul-storey apartments to Jeld Wen Playing Fields Between 100 and 150 provide a landmark focus for the development. Former Jeld Wen Between 250 and 300 Housing Addionally, densies should be higher nearer the Factory Site local centre, where apartments can be provided SCA Recycling Site Between 80 and 100 Density and Quantum above shops and commercial units. Witham Paints Site Between 10 and 30 4.3 Figure 4.1 shows the distribuon of housing across Table 4.2 Quantum of housing development based on density guidelines the site. The majority of this housing is proposed to be located in the western part of the site in Figure 4.2 Indicave Residenal Density close proximity to the key community facilies proposed in the area. /

4.4 The waterfront locaon of the site is close to the geographic centre of Lowesto. This, in conjuncon with the character of the surrounding residenal area, means that the site naturally lends itself to higher densies of residenal  development. Policy SSP3 requires densies of  broadly between 50 and 90 dwellings per hectare across the site. The policy provides scope for lower and higher densies where they are appropriate,

considering site constraints and surrounding land &*%$#$")!+/%$ uses. The land proposed for housing on the site for residenal development is approximately 24.5 0/.-,+/*)(,*' hectares which indicates an average gross density of 56 dwellings per hectare across the site is to be expected. Dwellings per hectare <50 65 90

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 14 4.7 Properes along Victoria Road to the immediate Mix of Housing 4.12 In the early phases of development, up to 2015, south of the SUN have an average density of planning applicaons for development should approximately 40 dwellings per hectare despite 4.11 Central to the achievement of a sustainable include at least 20% affordable housing. This having relavely long back gardens. The average community will be housing with a mix of sizes, percentage requirement is expected to rise to 35% densies of the area surrounding the western types and tenures of housing. Approximately 40% post 2015 when the achievement of this target is secon vary between 30-60 dwellings per hectare. of the residenal units delivered on the site should likely to be more viable. For planning applicaons Densies on the southern parts of the western be smaller sized dwellings, typically 1-2 bed in the SUN area that propose development that secon of the SUN should reflect this character. properes, with the preference for 2 bed will take place before and aer 2015; phases that There will be scope within these areas for dwellings. It is likely that a large proporon of will be largely complete before 2015 will require densies as low as 40 dwellings per hectare for these smaller units will be provided on the 20% affordable housing and later phases that will some blocks. There may also be potenal for a waterfront in the form of apartments, however, largely complete aer 2015 will require 35% limited number of detached and semi-detached there will need to be provision elsewhere in the affordable housing. style dwellings in this locaon. development in the form of smaller terraces and apartments in corner blocks. This mix of dwellings 4.13 An indicave split of affordable housing tenure is 4.8 The density of properes facing Waveney Drive is should help meet district accommodaon needs given in Policy HC1 of the Area Acon Plan as 90% approximately 34 dwellings per hectare. The as evidenced in the latest Strategic Housing social rented and 10% intermediate. The precise eastern secon of the SUN should create a high Market Assessment. Developers should also mix of tenure will need to reflect the most up to quality, residenal frontage along Waveney Drive consider housing need for people with disabilies date Strategic Housing Market Assessment and of a similar density. As the development moves and the elderly. Providing dwellings that include have regard to the viability of development. closer to the waterfront the density should the principles set out in the 'Lifeme Homes' Advice from the Council’s Housing Officer will also increase to over 50 dwellings per hectare standards is encouraged. be important to establish the tenure split. consisng of mostly terrace and townhouse typologies. 4.14 Viability is a key issue with respect to the development of the SUN, especially given the 4.9 Across the rest of the site, densies should Marram Green, likely costs of site preparaon and infrastructure. average 50 dwellings per hectare consisng of Where viability becomes a concern, the approach mostly terraced townhouse style dwellings to affordable housing delivery will need to be arranged in blocks1. flexible. More detail on this approach to viability is included in Secon 10. 4.10 At present, the SUN is in mulple ownerships and it is likely that development proposals will come forward through a number of planning applicaons. Table 4.2 gives an indicaon of the quantum of housing development for each area of the SUN considering the above density guidance.

1 See Secon 3.5 on Design

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 15 4.15 The affordable housing provided on the site 4.16 Most affordable housing on the site should be Employment should be integrated with the market housing to provided in the form of houses such as terraces or avoid high concentraons of single tenures in any townhouses rather than flats. Where affordable 4.18 At least 12 hectares of new industrial land should one locaon. Small clusters of affordable housing flats are provided these should be in corner blocks be provided as part of the development of the of between 5 and 10 units should be provided as of terraces. Whilst there may be small differences Sustainable Urban Neighbourhood and Kirkley part of larger perimeter blocks which also contain in the size of dwelling, ideally there should be no Waterfront (SUN) and should be broadly market housing. This approach encourages discernible differences in the appearance of distributed in accordance with Figure 4.1. The community integraon but also makes market and affordable units on the site. This will majority of industrial land is proposed in the management easier. Figure 4.3 shows how this can generally require consistency of design, materials eastern part of the site where there is already a be achieved within a perimeter block. and detailing. This approach should also help cluster of operaonal employment uses and good integraon and at the same me reduce any access to the quay for port related acvies. Figure 4.3 Suggested Tenure Mix impact on values of market housing. 4.19 The Great Yarmouth and Lowesto Enterprise Zone includes a 4.5 hectare poron of the SUN at Riverside Road. The focus of the Enterprise Zone is to encourage employment development in the offshore energy sector. New and expanding businesses seng up in the Enterprise Zone will benefit from a business rate discount and will also potenally benefit from a simplified planning regime. In implemenng a simplified planning regime the Council has introduced the Riverside Road Local Development Order (LDO) which grants condional planning permission for operaonal business development in the ports, logiscs, offshore engineering and the energy sectors. The LDO covers a larger area of land than the 4.17 The Affordable Housing Supplementary Planning Enterprise Zone, covering most of the Document (SPD) contains more detail on employment area indicated in Figure 4.1. The LDO affordable housing provision and the principles of requires development permied to be in that SPD should be applied in preparing detailed accordance with a Design Code. The Design Code Market housing proposals for the SUN. for the LDO in the SUN area has been prepared to Affordable housing ensure consistency with this Development Brief.

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 16 Figure 4.4 Local Development Order on Riverside Road and Jeld-Wen Factory Site 4.20 Prior to 2020 it is envisaged that land on the Jeld- Wen Factory site idenfied for housing will be / used temporarily for employment in connecon with the energy industry. The LDO does not cover this area. Temporary planning permissions (for the period up to 2020) for employment development will be considered favourably in this area where the amenity of exisng residents living along Waveney Drive is not disturbed.

4.21 Figure 4.4 above shows the locaon of the LDO and the area of land where temporary employment uses will be considered.

4.22 In the longer-term (post 2020), careful consideraon will need to be given to the interface between housing and employment on the eastern part of the SUN. Uses such as offices and light industrial/research and development will coexist beer with residenal uses and this should be reflected in proposals. Live-work units2 would also be suitable in this locaon. A blend of 4.23 There may also be scope for addional Area covered by Local Development uses in this locaon will help produce a more employment development as part of the mixed- Order on Riverside Road and Jeld Wen sustainable form of development that allows use development proposed in the western parts people to live close to where they work whilst of the site. This could be in the form of small scale respecng the amenity of residenal properes. premises and live-work units. In these locaons, The Design Code for the LDO requires landscaping where the majority of housing is proposed, care and more strict design controls in this area to will be needed to ensure the amenity of new and minimise the impact on the planned adjacent exisng residents is not disturbed. residenal community.

2 A live-work unit is property where the floorspace is shared between domesc space and working space. Working space is normally provided on the ground floor with residences above.

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 17 Retail local centre by the central open space and primary school 4.24 There are a number of exisng operaonal employment uses within the SUN. These include exisng operaonal businesses at Riverside Road and business units on Lowesto Enterprise Park including Silkcuers House and Quayside Business Centre. Figure 4.1 idenfies these areas for employment and therefore these sites will Shops connue to remain in their exisng uses. There are other areas of the SUN where current employment acvies are idenfied for housing such as on Brooke Business Park, Witham Oil and Paints, SCA Recycling and Survitec-SD. Where businesses need or choose to relocate they will be assisted by the Council. In ancipaon of this, a relocaon strategy3 has been prepared which idenfies potenal opportunies for relocaon. Prior to relocaon and redevelopment it is likely that business uses will connue to operate on the site.

Retail

4.25 A well located local retail centre in the SUN will 4.26 The Retail Capacity Update4 undertaken in 2010 4.27 To support a small convenience retail outlet that provide access to local goods, facilies and stated that new provision should be of a scale can act as an anchor store, provision should be services that will benefit people living in the local appropriate to the role and funcon of the centre. made for premises with a gross floor area of community. A five minute walk (approximately The findings of the study suggest that the local approximately 300m2 with net sales area of about 400m) is commonly referenced as a centre would likely benefit from a small anchor 200m2. Two addional retail units, each with a recommended distance for people to have access store that could provide convenience goods floorspace of approximately 50-100m2 should be to their local facilies. This catchment area covers supported by a couple of small shops to provide provided to support small businesses. most of the proposed development in the SUN. other goods and services.

4 Waveney District Retail Capacity Update (DTZ, 2010) 3 1st East Relocaon Strategy For Brooke Peninsula – Roche www.waveney.gov.uk/site/scripts/download_info.php?fileID= Chartered Surveyors (June 2010) 1202)

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 18 Haven Marina Marina and Leisure 4.32 The level of development proposed will create the need for a new primary school to serve the area 4.28 The exisng Haven Marina provides an important as the surrounding primary schools have no role in the funcon and amenity of the area and capacity to accommodate the increased number will be retained as part of the development of the of children in the area resulng from the SUN. However, it is currently ‘hidden’ from the development. For this scale of development a general public in an otherwise industrial area. The primary school is essenal in creang a development of the SUN provides an opportunity sustainable form of development that encourages to open this area up and become a focal point of walking and cycling. The primary school should be the development. 4.30 Figure 4.1 shows a leisure focus around the located in the area shown on Figure 4.1. This northern part of the exisng Haven Marina. New central locaon, helps form a central focal point to 4.29 As part of the development, new marina facilies restaurants, bars and cafes should be developed development in the SUN and should minimise car including a public slipway could be provided in this area to complement the exisng offer journeys to the school. around the Brooke Peninsula to enhance the associated with the Marina. This development tourism offer and exploit the waterfront locaon should be reasonably small-scale so it does not 4.33 The use of school buildings for community use between the North Sea and the Broads. New compete with Peto Square in the town centre should be explored. School buildings can act as moorings should be provided for private cra and where the main leisure focus of the AAP is being meeng places for various groups outside of the potenal for moorings for historic vessels channelled. These uses should be orientated school hours and help make the facility the heart should be invesgated to enhance the cultural towards the west to maximise the views towards of the community. The District Council will work appeal of the area. Addionally, waterfront space Oulton Broad and make the best out of the with Suffolk County Council and any future school should be reserved for a potenal water taxi aernoon/evening sun. Public ‘spill out’ space provider to ensure that the school is designed in service. which could serve the area between the should be provided in front of these uses, fronng such a way that facilitates community use. Bascule bridge and Oulton Broad. This space onto the waterfront. should be located adjacent to an area that is 4.34 In terms of other facilies, the SUN is in close publically accessible and should be designed into proximity to many services Lowesto and Oulton any proposals. Any new marina development and Community Uses Broad have to offer. New pedestrian links such as new moorings must not inhibit navigaon or the the proposed pedestrian/cycle bridge over Lake ability to dredge Lake Lothing. It should be noted 4.31 The main community uses to be provided on the Lothing at Brooke Peninsula will provide good that new moorings and marina facilies that site are a primary school and a network of open access to secondary and further educaon and extend on to Lake Lothing will likely require a spaces. The network of open spaces is described health and other community facilies in the area. license from the Marine Management in detail in Secon 6. Organisaon. The Statutory Harbour Authority should also be consulted as part of any proposal for addional moorings in Lake Lothing.

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 19 5 Streets and Transport

Looking towards former Jeld-Wen factory and Riverside Road Cycle parking, London

5.2 Transport modelling undertaken to support the originang from the development by private car AAP found that the full development of all sites during the morning peak hour, compared to a “do- allocated in the AAP would have a significant nothing” scenario. A precise target will be agreed impact on traffic flows in the town. Reducing car through the producon of a Travel Plan and use will be key to migang the negave impacts through discussions relang to parking provision 5. Streets and traffic has on the town and ensuring new on site. In addion there will need to be town- Transport development is truly ‘sustainable’. The proposals wide comprehensive sustainable transport and requirements in this secon should help to iniaves to help reduce the impact of improve accessibility to modes of transport other development on traffic which developers in the than the car and therefore help produce a ‘modal SUN may be required to contribute to. The shi’. However, through transport assessments proposed pedestrian and cycle bridge detailed and travel plans, all applicaons for development below will be important in contribung to these within the SUN will need to include measures iniaves. 5. Streets and Transport which secure a reducon of at least 15% in trips

5.1 Figure 5.1 illustrates an indicave movement Figure 5.1 Indicave Movement Framework framework for the site. The movement framework / has been designed to promote permeability and legibility as well as maximise views of the waterfront. The use of straight roads and an irregular grid reflects the planned nature of the sea front area of South Lowesto. The proposed network has considered links to exisng areas and  desnaons across the town and should promote  sustainable modes of transport.

New streets

Exisng streets

Pedestrian and cycle network

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 21 Pedestrian and Cycle Network 5.6 Pedestrian and cycle routes should be constructed 5.8 The waterfront path should have a width of at with high quality materials using the palee least 5m to accommodate shared uses 5.3 Crical to ensuring the number of addional car established in the Lowesto Design Guide (2004). (pedestrians and cyclists). There are some journeys associated with the development is locaons along the waterfront that will provide minimised,will be the priorisaon of cycle and Waterfront Pedestrian/Cycle Path interesng views or support public acvies such pedestrian friendly streets and a comprehensive as the western side of Brooke Peninsula (including network of cycle and pedestrian routes. These 5.7 The development of the SUN should facilitate the the marina area). In these locaons the path routes should be well defined, legible and enhance creaon of a connual east-west pedestrian and should be widened to link into or incorporate a the permeability of the development as well as cycle path along the waterfront as shown in Figure public space. These areas should incorporate providing links with the exisng community. 5.2. This will provide a much needed traffic-free facilies such as seang for people to enjoy the link on the south shore of Lake Lothing from the environment around them. 5.4 Within Lowesto there is an exisng cycle network seafront to Oulton Broad. and new cycle routes in the SUN should connect into this. The development of cycle and pedestrian networks should be considered at the same me Figure 5.2 Indicave Pedestrian and Cycle Network as the development of road networks throughout the site. Figure 5.2 shows how cycle and / pedestrian routes should be accommodated in the SUN.

5.5 All streets, in addion to those shown on Figure 5.2, within the SUN should be cycle and pedestrian friendly. This can be achieved through innovave  5 shared surface designs such as ‘Home Zones’ . 

Pedestrian / cycle bridge

*.)('(&-%/3)( Off-street cycle path

43210/3.-,0.+ Waterfront pedestrian / cycle path

On-street cycle path

Exisng cycle path

5 See Department for Transport Circular 02/2006

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 22 5.9 Seang should also be provided at regular Authority to ensure that any path provided in this 5.13 To minimise the impact on navigaon within the intervals along the waterfront to encourage part of the site maintains safety. Where the path inner harbour, the bridge will need to be an greater pedestrian use for those who may be is away from the waterfront, the path should be opening bridge that is operaonal at short noce, unable to walk longer distances or those simply physically separated from any vehicular routes. 24 hours a day and 7 days a week, year round. intent on enjoying the view. The path should have This will create a route that is free from vehicles Adequate signalling on the approach to the bridge appropriate way-finding measures and points of along the enre length of the SUN encouraging would also be required. In developing the detailed interest along the route such as public art and greater use. proposals for the pedestrian bridge, the Council public informaon boards detailing any will work closely with the users of Lake Lothing to archaeological remains found during the 5.11 The path should be set back from the natural part ensure navigaon is not compromised. The redevelopment. The path should have barriers to of the shore which is designated as a County construcon of the pedestrian and cycle bridge provide safety for users but these should not be Wildlife Site (CWS). A key feature of the CWS is the will require a license and a Harbour Revision Order intrusive to the point of being detrimental to the linkage between the interdal areas and from the Marine Management Organisaon. seng. Consideraon should also be given to the scrubland. The path in this locaon may need to provision of life saving equipment along the route be more informal in nature to be of consistent 5.14 In addion to the crossing over the water there is where necessary. The Lowesto Design Guide character with the surroundings and to avoid any also a need for an improved crossing over the can provide guidance about appropriate use of unnecessary impact on the protected area. The railway line on the north shore of Lake Lothing to materials. width of the path in this locaon could be reduced improve the accessibility of Normanston Park and to 3 metres to lessen the impact. beyond. 5.10 Where the path crosses parts of the waterfront where new employment development is planned, Pedestrian and Cycle Bridge Cycle Parking care will need to be taken to ensure the twin objecves of both public and business access to 5.12 A new pedestrian/cycle bridge over Lake Lothing 5.15 Secure cycle parking should be provided in central the waterfront can be achieved. If it is at Brooke Peninsula will be required to provide locaons throughout the site. Ideally cycle parking demonstrated to the sasfacon of the Local quick and easy access to Normanston Park, Oulton will be sheltered and well overlooked to promote Planning Authority that the provision of the Broad North Staon, employment areas and a greater sense of security. ‘Sheffield stands’ waterfront path through the employment areas further educaon facilies in the north of the which provide 2 cycle parking spaces are preferred on the east of the site would undermine safe and town. It will improve north-south connecons as they allow both the frame and wheel of a secure business operaons, the path may need to within the town which will benefit the enre town bicycle to be chained. be set back from the waterside in appropriate and should further reduce the need to travel by places. Similar care will need to be taken at the car and therefore is essenal to minimise the 5.16 Suffolk County Council set standards for cycle Haven Marina site. It will be important than any traffic impacts of the development on the locality parking stands in Suffolk. The latest standards path in this locaon does not create health and and the wider town. published by Suffolk County Council should be safety issues for the operaon of the marina. adhered to in the development of the SUN. Provision of the path in this locaon will be subject to discussions with the Statutory Harbour

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 23 5.17 The provision of storage space for bicycles is Figure 5.3 Cross-secon of an avenue important to encourage people to use alternave modes of transport than the car for local journeys. This is parcularly important for apartments where there isn’t the opon of a garage or private garden. In apartments, communal space should be set aside for indoor cycle storage. Alternavely secure sheltered outdoor cycle parking should be provided. New premises for commercial uses should provide facilies such as secure cycle parking, showers and changing facilies to encourage acve travel such as walking and cycling.

Figure 5.4 Cross-secon of a small street

Public Transport 5.19 A central transport node situated close to the primary school and retail uses should be included 5.18 Provision should be made for a bus route to in the development. This should provide sheltered service the site. The route should make use of the bus waing facilies with real-me travel new access road in the western part of the SUN informaon. The node should also include and ensure that all new dwellings in the SUN are provision of secure cycle parking. within 400m of a bus service. Provision of frequent and accessible bus services improve access to 5.20 The provision of water taxis on Lake Lothing facilies and help reduce car use within the should be facilitated by the development through development. The bus service is expected to be a the provision of mooring space on the waterfront. commercial operaon that is self-sustaining in the longer-term. Such a service is likely to be as a minor extension to exisng services rather than a new service. The final configuraon of the bus route through the site will need to be confirmed with the bus operator and have regard to exisng services in the area.

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 24 Vehicular Network • Secondary Street: These will be smaller • Small Streets: These will provide access to through routes connecng different parts of small blocks of residenal properes and will 5.21 All roads within the SUN should be designed as the neighbourhood together. Traffic speeds exhibit ‘home zone’ principles and will ‘streets’ that priorise pedestrian and cycle will need to be lower on these roads with generally have a shared surface design. Figure movements, following the principles set out in appropriate traffic calming measures. 5.4 shows and indicave cross secon of a Manual for Streets6 (DfT, 2007) and Manual for Secondary streets in industrial areas on the small street. Streets 27 (CIHT, 2010). A hierarchy of streets eastern part of the site should conform to the within the SUN should be developed that guidelines set out in the Suffolk “Industrial integrates well with exisng streets and creates an Estate Roads: Notes for Guidance of environment that is permeable and legible, Developers”.7 parcularly for cyclists and pedestrians. For the areas of the site designated for industrial/employment use, the Suffolk “Industrial Estate Roads: Notes for Guidance of Avenue Small street No through route for vehicles 8 Developers” should be referred to. Secondary street Exisng street New access point * 5.22 Figure 5.5 idenfies three different types of vehicular street in the SUN. These being:

• Avenue: This should be a wide single carriage way street with deciduous tree planng alongside. There should be wide pavements of approximately 4m either side of the road  which accommodate a segregated cycle lane.  Development should front on to these roads. Traffic speeds will need to be limited to 30mph and appropriate speed controls will need to be

implemented, parcularly on the main access (10/0&- ' 10 road through the Jeld-Wen playing fields site. Figure 5.3 shows an indicave cross secon of  +$*' (-*() an avenue. 

6 www.d.gov.uk/publicaons/manual-for-streets Figure 5.5 Indicave Vehicular Network 7 www.ciht.org.uk/en/publicaons/index.cfm/manual-for-streets-2--wider-applicaon-of-the-principles-2010 8 Industrial Estate Roads: Notes for Guidance of Developers www.waveney.gov.uk/site/scripts/download_info.php?fileID=2436

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 25 Example of ’Home Zone’ off St Margarets Road, Lowesto 5.23 Figure 5.5 idenfies a number of indicave points 5.27 Where on-street parking is included it should where through traffic (with the excepon of buses, ideally be incorporated as short runs of parking pedestrians and cyclists) should be restricted. This bays (up to a maximum of 5 bays). Spaces should is to ensure the majority of private vehicles access be integrated into the street scene by the western part of the SUN by the main avenue interspersing them with features such as trees and which connects to Waveney Drive through the Jeld spaces. On-street parking should help support Wen Playing Fields. In the short-term before this traffic calming but not create a barrier to access road is complete, some development can pedestrian or cycle movement. As with all parking be supported by the exisng access points into the provision, on-street parking should be well site such as School Road and Heath Road. Once overlooked. Specific car parking bays located near the access road and other through routes are Car Parking the entrances of each workplace for people car- constructed the exisng access points should then sharing is encouraged. be blocked off to private vehicular traffic. 5.25 Suffolk County Council set standards for car parking provision in Suffolk. Development in the 5.28 For both industrial/commercial and residenal 5.24 Developers should consider the long-term SUN should adhere to the latest standards development off-street parking should be within aspiraon of the Council to secure a third vehicular published by Suffolk County Council. well designed, secure, rear courtyards within crossing over Lake Lothing. As such, avenues perimeter blocks that are well overlooked. For through the eastern part of the site should be built 5.26 The manner in which car parking is arranged residenal areas this can be achieved by designing within a corridor that can accommodate across the site is of fundamental importance to space within the rear curlage of a dwelling and upgrading to a specificaon to accommodate any the overall quality of development. Parked cars in spaces designated in communal parking courts. future proposal for a third road crossing over Lake should not dominate the public realm of the The Manual for Streets provides advice for design Lothing. Developer’s should speak to the Highway development and should not inconvenience of these areas. Authority to ascertain the standards required. It pedestrians and cyclists by blocking desire lines or will be important that development of the SUN restricng lines of sight. A mix of both on-street does not restrict future opportunies to deliver a and off-street parking should be provided. third river crossing.

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 26 5.29 Parking within the front curlage should generally be avoided as it breaks up the street frontage and restricts informal surveillance. It also gives the appearance of a car dominated environment. Where parking is provided within the curlage of a dwelling and has direct access onto the street, this should be to the side and in between dwellings, behind the building line. Integral garages could also be used in dwelling types such as mews and townhouses. However, they should be used sparingly along a single frontage in order to avoid 'dead' frontages.

5.30 Charging points for electrical vehicles should be provided in the street for public use, (eg. in the housing of a street sign) or connecon points can be included in the design of domesc and commercial buildings.

5.31 Electrical connecons for vehicles use standard three point connectors and can therefore be connected easily to the grid. New residenal buildings that have off-street parking should be designed to include an outdoor electrical socket that could support vehicle charging. The same is expected for parking areas associated with commercial buildings. It is uncertain how much of an immediate demand there will be but providing connecon points will future proof the buildings for future users.

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 27 6 Open Space and Biodiversity

Jeld-Wen playing fields and county wildlife site Biodiversity

Kirkley Fen, Lowesto

6. Open Space & Biodiversity Open Space

6.2 A hierarchical network of open spaces that 6.4 The role of an open space should be idenfied as performs different funcons within the part of the design process to maximise community will contribute to a more opportunies presented by exisng features such comprehensive development. Landscaping should as the waterfront, marina, slipways, County 6. Open Space and Biodiversity provide opportunies to create a smulang Wildlife Site and the proximity of the Broads and outdoor environment, improve local amenity and North Sea. Open spaces need to be accessible to 6.1 Well designed and maintained open spaces that enhance the biodiversity of the area. everyone and well overlooked to create a greater relate to their surroundings are an important part sense of security for people using these areas. of a quality public realm. Green areas of open 6.3 The design and form of the open spaces provided Open space and green infrastructure is a land use space within the site, including private gardens will reflect the nature and character of the area that can contribute towards flood risk and green roofs, can encourage a greater sense of they will serve. This will vary from small management in areas of flood risk. These spaces health and well-being, improve biodiversity and community blocks to neighbourhoods. Open can support vegetaon, provide visual amenity enhance the ecological network. space typologies in the SUN area will include: and useable open space, enhance biodiversity as well as reducing peak water flow during rainfall • semi-natural (e.g. County Wildlife Site) events and providing space to temporarily store • playing pitches (replacement playing fields) excess water when required. Green infrastructure • play spaces (LAPs, LEAPs and NEAPs)9 and is also important for climate change adaptaon. It parks aids with air quality in sequestering pollutants • paved areas for community use (there are local issues with air quality) and • green corridors contributes towards migang the urban heat • pedestrian walkways and cycleways island effect. • private spaces and courtyards • landscaped areas in employment areas • hard surfaced areas along the waterfront

9 Play space standards that need to be met are set out in Secon 7 of the Open Space SPD, Adopted January 2012

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 29 Open Space Provision 6.6 The total amount of open space provision as Normanston Park provides facilies for a variety required by policy will be difficult to achieve on of acvies including tennis courts, playing 6.5 Policy DM25 of the Development Management the site. Therefore, there will be a need to improve pitches, equipped play areas and a skate park. The Policies Development Plan Document and the connecons to exisng areas of open space in the park is also adjacent to the Local Nature Reserve Open Space Supplementary Planning Document locality and make enhancements to exisng open of Leathes Ham which is accessible by the public. (SPD) require developers to provide an space provision on the site. There are no similar sized open spaces in close appropriate amount of public open space on site. proximity to the site in South Lowesto which For each new dwelling the amount of public open 6.7 Figure 6.1 shows the exisng public open spaces provide the same funcons as Normanston Park. space required is between 27m2 and 53m2 in the Lake Lothing area. The geographically The proposed pedestrian/cycle bridge will allow depending on the density of the development. closest open space to the parts of the SUN access to Normanston Park from the SUN and will Private open space, such as back gardens, do not proposed predominantly for residenal is therefore assist in migang the shorall in count towards meeng these standards. Assuming Normanston Park on the north side of Lake provision on site. the total development of 1380 dwellings is built Lothing. out with an average density of 50dph, this will require approximately 4.4ha of new public open  / space to be provided to serve the development. 

   Amenity greenspace  Facilies for young people and teenagers Green corridor

Natural and semi-natural greenspace Outdoor sports facilies

Parks and gardens School playing field

Local area for play (LAP) l

.. Local equipped area for play (LEAP)  Neighbourhood equipped area for play (NEAP) Playing pitches # Tennis court .. ‘ 

Bowls 0200400100 Meters   Skate park Figure 6.1 Open Spaces Surrounding the SUN

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 30 Table 6.1 Open Space Provision On-Site 6.8 In addion to these measures, there will sll be a Type of New Open Space Typical size of Open Quanty of Provision Approximate Total need for some new open space to be provided on Space Area of Open Space the site. This will be principally in the form of areas to be Provided that can be used for play and local amenity. Table Local Area for Play (including 100sqm 4 400sqm 6.1 sets out the level of on-site provision required equipped area near Haven Marina) and Figure 6.2 shows how these spaces could be Local Equipped Area for Play 400sqm 1 400sqm distributed across the site. The open spaces in Figure 6.2 are indicave and the circles Neighbourhood Equipped Area for 1000sqm 1 1000sqm represenng play areas are not drawn to scale. Play (will be on playing fields) These details should be finalised as part of a detailed planning applicaon. Total 6 1800sqm

6.9 New open spaces are expected to have appropriate facilies provided on site that meet the quality standards set out in the Council’s Open / Space Supplementary Planning Document. Facilies may include play equipment, low level fencing, seang, rubbish and dog waste bins,  lighng, sheltered areas, sport facilies (field or court related), landscape features and planng. Where rubbish bins are provided these should be   designed to accept material can be recycled such  as paper waste as well as general waste.Facilies    will vary between spaces and will be dependant  on the funcon of the open space within the  neighbourhood.  Local Area for Play (LAP) l .   Local Equipped Area for Play (LEAP) . -1,+*+)0(26,+ Neighbourhood Equipped Area for Play (NEAP) . 765432610/31.  Amenity greenspace .

School Playing Field .

County Wildlife Site .

Playing Pitch # x Figure 6.2 Indicave Open Space Network

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 31 Figure 6.3 Indicave Playing Fields Plan Play Spaces

6.12 A local equipped area for play, approximately 40sqm in size is to be provided in the residenal area in the eastern part of the SUN. Ideally, this Football Equipped should be located on a corner where it is well pitch Play area overlooked and contributes to the openness of the area. This space should be large enough to be used for sport and play for people of all ages. Landscaping should be used to provide play for small children. Facilies such as seang and bins should be provided.

6.13 Other small open spaces should be designed as pocket parks and local areas for play that are generally unequipped. These spaces should be at Playing Fields least 100m2 and be designed with landscaping, planng and facilies such as seang so they 6.10 The exisng playing fields (2 hectares) located on 6.11 The playing fields will need to include a football provide recreaonal value for local residents. Waveney Drive have been zoned for housing. In pitch measuring approximately 90m by 60m and Ideally located on street corners this will increase accordance with Policy SSP3, like for like re also encompass a new Neighbourhood Equipped visibility and natural surveillance. In these placement playing fields are required (in terms of Area for Play (NEAP). The NEAP should be located locaons, sensive boundary treatments should size and quality) elsewhere in the SUN. The to the east of the playing fields close to the local be used to discourage the play area from replacement playing fields will not be considered centre and the new primary school. Figure 6.3 becoming a through route. Individual spaces as part of the open space provision needed to gives an indicaon of how the playing fields could should be designed so they have different meet the addional needs of the development as be designed. aributes and features to create and help foster a this space is already located on the site. Figure 6.2 sense of identy that reflects the role of the open shows the replacement playing fields will be space in the community. located in a central part of the site which will assist in creang a focal point for the community. They will also be an integral part of the wider open space and green infrastructure network and the sustainable urban drainage system (SUDS) scheme that will need to be delivered on site.

Children’s play area

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 32 Hard Surfaced Public Spaces Employment Areas Primary School Playing Fields

6.14 A mulfunconal, hard surfaced, open space 6.17 New employment areas are expected to 6.18 The primary school will have playing fields should be provided adjacent to the leisure area on contribute posively to the public realm. Non- associated with it. Given the locaon of the school the waterfront. Incorporated into the waterside residenal development is not required to provide there is an opportunity to incorporate part of the path, it is a seng that is conducive to leisure new open space. However, it is encouraged to adjacent County Wildlife Site into the school site. acvity and this site is likely to experience a provide open space to create a higher quality This could provide a more varied outdoor significant amount of use. A local area for play environment and improve the well-being of environment and contribute towards outdoor should also be located in this area with provision employees. Improving the amenity of educaon for young children. Dual use of the of an interacve medium such as play equipment employment areas will act as a ‘good neighbour’ school grounds between the primary school itself or public art that can support interacve use as to residenal areas and reduce the likelihood of and the public should be considered. This would well as enhance the public realm. an-social behaviour. provide a greater range of facilies available to the public but with the primary school retaining 6.15 A ered edge to the waterfront could be provided priority of use. Such an arrangement would need in this locaon to enable people to get closer to to be made with the school / educaon authority the water. Lake Lothing is dal therefore access aer the development is completed. below the high de mark is to be avoided. A pointed corner should also be avoided to soen the visual effect on the path. This area could also be used for informal performing arts and other street performers.

6.16 The open space should be created using the same paving as used along the waterfront path. This will provide connuity in the development and make public spaces more recognisable to passers by.

Indicave sketch of hard surfaced open space area near marina and leisure focus

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 33 Biodiversity and Ecological Networks 6.20 The most significant area for biodiversity on the 6.21 Protecng and enhancing the CWS from site in this network, as shown in Figure 6.4, is the development whilst encouraging greater public 6.19 The development of a network of green open County Wildlife Site (CWS). The CWS provides access is a key objecve idenfied in the Area spaces through the site will enhance the ecological habitat for species idenfied in the Biodiversity Acon Plan and this Development Brief. Proposals networks and improve biodiversity. The Suffolk Acon Plan (BAP) including birds and reples such that include greater access to the CWS should be Wildlife Trust Lowesto Wildlife Audit (2007)10 as the common lizard. The shoreline along the discussed and agreed with the County Council idenfied an ecological network of green spaces CWS is the only remaining natural shoreline along ecologist, Suffolk Wildlife Trust and the District and links across Lowesto. This network is shown the southern edge of Lake Lothing and is to be Council to ensure there is not an adverse impact in Figure A1.5 in Appendix 1. The distribuon of protected. of the biodiversity value of the CWS. open spaces and green corridors through the site will help enhance this network locally as shown in Figure 6.4 .

Sites of biological importance / Replacement playing field

432103/.-2,.+*)(1' School playing field &%$#$%"3.!%13

Green play areas / spaces . .

Potenal ecological corridors

Lake Lothing ecological corridor

**3.2 01/.2(#... 3$#.&3(.+*)(1'. &%$#$%"3.!%13

Figure 6.4 Potenal Ecological Network through the site 10www.waveney.gov.uk/site/scripts/download_info.php?dow nloadID=110

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 34 Leathes Ham, Lowesto 6.22 In addion to the CWS, the other areas of green open space provided on the site will be of benefit to the ecological network. The centre of the western part of the SUN includes a large area of green space encompassing the primary school playing fields and the relocated Jeld-Wen playing fields. These should have direct connecons to the County Wildlife Site and should include appropriate flora such as deciduous trees and shrubs. Smaller areas of green space such as children’s play areas will also provide some benefit for biodiversity.

6.23 The green corridors idenfied on Figure 6.4 are also beneficial to the ecological network by creang links between areas that will support wildlife movement between sites. Green corridors should include deciduous street trees that can provide habitat for birds, provide shelter and 6.24 Buildings, both residenal and commercial, • Broads Special Area of Conservaon (SAC) visual corridors for pedestrians and cyclists. This provide an opportunity to support wildlife through • Broadland Special Protecon Area (SPA) will enhance the appearance of the street scene the use of green/ brown roofs, balconies, private • Broadland Ramsar and reduce the visual and polluon impact of gardens and nest boxes for birds and bats. Care • Sprat’s Water and Marshes Site of Scienfic vehicular acvity. Deciduous trees also provide will be needed to ensure such measures do not Interest shade in the summer whilst maximising sunlight encourage pest species. • Broads Execuve Area receipts in the winter months. Planng should reinforce the network of exisng vegetaon. 6.25 There are several designated areas for protecon 6.26 Further informaon about these sites is available Exisng mature trees should be retained where near the SUN which need to be considered. in the Habitats Regulaons Screening Report for possible for their biodiversity benefits and their Potenal impact on these sites should be this brief and from the Broads Authority and contribuon to the amenity of the area. addressed as part of a planning applicaon. These Natural England. areas include:

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 35 7 Urban Design Guidance

Haven Marina towards Oulton Broad Galleons Reach Eco-Park, London

7.3 In residenal areas the perimeter blocks should be 7.5 There can be many benefits associated with new capable of accommodang all dwelling types industrial and commercial buildings facing onto a including apartments, terraces, townhouses and street giving them a ‘public face’: detached properes as well as other uses such as 7. Urban Design small shops and workshops. The internal areas of • buildings can be used as a barrier to enclose perimeter blocks should be ulised for private secure areas and can minimise the need for Guidance gardens for dwellings, communal garden space for fencing along frontages. This can improve the apartments and secure rear parking courts. quality of the public realm and improve security. This approach is compable with Perimeter Block many of the principles of ‘Secured by Design’ for commercial developments • general security can be further enhanced 7. Urban Design Guidance where industrial buildings provide windows (to offices, canteens, or other acve rooms) that 7.1 The Sustainable Urban Neighbourhood and Kirkley overlook the public street and provide Waterfront (SUN) should be an example of surveillance excellent urban design and architecture. Principles • buildings can screen noise and other of urban design run throughout this Development disturbances more effecvely than fences, and Brief but this secon focuses on the more generic thus reduce potenal conflicts between design principles which should be applied across neighbouring businesses and acvies the site. Nodes Site-wide Design Principles 7.6 At most crossroads, juncons and corners of Urban Form and Structure 7.4 The enclosed areas of commercial blocks can be blocks, buildings should be more disncve used for outside storage and 'break out' areas for through their height, massing and design. This can 7.2 The SUN should be structured around a grid layout staff. These internal areas can also provide space improve legibility and provide local focal points. consisng of straight streets that maximise views for parking to avoid large areas of surface parking Key juncons and cross roads provide an down to the waterfront. The resulng perimeter on the street. The issues should be considered opportunity for landmark buildings that help block structure should create a legible form and early in the design phase of any proposal. define the character of the area. Figure 7.2 allow for ease of movement. Blocks should ideally idenfies potenal locaons for key landmark be between 0.6 and 1 hectare in size although in buildings. Care should be taken to ensure all walls some locaons blocks may be smaller to be of corner buildings that front onto the street have consistent with the form of exisng development acve facades to ensure the building line turns the or where constraints exist. corner effecvely.

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 37 Amenity Security 7.13 Many of the street frontages will consist of residenal dwellings. Where opportunies arise, 7.7 An important consideraon of development in all 7.10 The design of streets, buildings and spaces should the space between the building and the footway parts of the SUN is to ensure an acceptable consider the best ways to promote public safety will provide a buffer that may be grassed or standard of amenity for residents. In the detailed and deter crime. Acve frontages and good separated into a small private space. design and layout of buildings, streets and blocks, surveillance will be key to deterring crime. As part care will be needed to ensure overlooking is of the design process, consideraon of the 7.14 Street calming measures and so boundaries that minimised and privacy is maintained. principles set out in ‘Secured By Design’ and separate areas intended for pedestrian and vehicle correspondence with Suffolk Constabulary’s use are to be implemented in residenal areas. 7.8 In areas close to exisng and proposed Architectural Liaison Officer are encouraged. These should avoid creang a sense of cluer. This employment uses and the waterfront, the design may include using items such as bollards instead of buildings and spaces will need to consider the Street Frontages and Movement Corridors of fencing, seang, rubbish bins and planng to impacts of noise. Noise issues can be migated create a sense of separaon without physical through landscaping and vegetaon planng, 7.11 In residenal and commercial areas throughout barriers being put in place. In line with Policy EHC1 glazing and posioning of bedrooms within the SUN acve frontages with regularly spaced of the Area Acon Plan, the Public Realm Strategy dwellings. A noise assessment will be required to windows and doors will be encouraged. Acve in the Lowesto Design Guide should inform the support all planning applicaons to ensure this is frontages help animate the street and provide design of public spaces. not an issue for residents and other users of the natural surveillance. The frequency of entrances site. from buildings onto the street is of parcular Light corridors importance. 7.9 There are some exisng residenal dwellings 7.15 Spaces that receive lots of light are more likely to which could be negavely affected by the 7.12 Streets and open spaces are oen the focus for be used by the public for recreaonal purposes. development’s construcon. There is potenal community acvity and social interacon. Streets Light corridors need to be considered to ensure that detrimental impacts could arise from noise, and juncons should be designed to encourage building design, layout of open spaces and dust, vibraon, transport movements among use of the public realm rather than simply being movement corridors do not result in areas that are others. Developers are encouraged to register with funconal routes for vehicular traffic. It is shaded for significant parts of the day. This will the Considerate Constructors Scheme11 which is a important to consider how facades of buildings reduce the potenal for spaces becoming devoid voluntary scheme that aims to make construcon complement their surroundings such as adjacent of acvity over me. sites beer neighbours in the community. footpaths and open spaces. Where it is necessary to provide signage, this should be sympathec to 7.16 Similar consideraon needs to be given to the the surroundings. For example, on a street it may avoidance of creang wind tunnel effects. The be appropriate to use metal signs, however, in a Brooke Peninsula is in an exposed locaon when park or green space it will be more appropriate to considering the regular easterly winds, parcularly use signage made of soer materials such as during the winter months. wood.

11www.ccscheme.org.uk

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 38 Character Areas Kirkley Extension Character Area 7.21 The main entrance to the development should exhibit two landmark buildings either side of the 7.17 The general site layout lends itself to the 7.19 This area is a northward extension of the access road that welcome people into the site. formaon of several character areas based on the residenal area (in the Kirkley and Whion wards) These buildings should be designed to a high aributes and opportunies associated with south of Waveney Drive and Victoria Road. The architectural quality and could be up 4 storeys in different parts of the site (Figure 7.1). area should be designed to connect into the built height. As part of the main entrance to the site, Development will need to ensure the different form of the exisng community. Development landscaping should be used to create an aracve areas relate to one another to achieve the overall should respect local vernacular but should not be seng that leads the visitor into the SUN aspiraons of the SUN. New development should a pasche of historic architectural styles. respect and complement the natural and built 7.22 A high quality residenal frontage should be character of the area without the constraint of 7.20 Development in the vicinity of Victoria Road provided along Waveney Drive that reflects the mirroring exisng buildings. should reflect the exisng fine grain urban form of exisng residenal properes on the south side of this area. Residenal densies should be similar Waveney Drive. Buildings should be set back from 7.18 The following paragraphs idenfy specific design to those found on School Road, Stanley Road and the road to provide space for small front gardens. issues for each character area idenfied in Figure Victoria Road. There should be a clear demarcaon between 7.1. Detailed design codes that cover maers such public and private space, however, this should not as materials, massing, façade treatment and be done in a way that will create significant visual building heights should be worked up for each barriers to people using the public realm.

character area to support detailed planning -.',1 applicaons. /

10'%0,)'1&

-!#10,)'1&



       Waterfront character area      Neighbourhood centre character area  

1 -!-,0 - Employment character area '0!,

/.'01,)'1& County wildlife site character area -,)'1& #-0-,)'1& 0-, Kirkley extension character area

) Figure 7.1 Character Areas

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 39 Indicave sketch of entrance to the site from Waveney Drive Indicave Sketch of Brooke Peninsula slipways Waterfront Character Area 7.27

7.25 This area should exhibit strong marime characteriscs that reflect its waterfront locaon. Buildings and spaces should be designed to relate to the water and maximise views of the wider Lake Lothing area. Key views into and out of the site will link the built up area and the waterfront which will act to reinforce the connecons within the wider SUN area. This area should showcase good architecture and sustainable design.

7.26 Less regard to local vernacular is needed in this Careful consideraon should be given to higher 7.23 The area of the site fronng onto the replacement locaon and the design of buildings and spaces density areas so that buildings do not playing fields in the central part of the SUN should should be innovave and contemporary. The inadvertently create an unwelcoming environment exhibit innovave architecture and provide a Brooke Peninsula provides an opportunity for for residents and visitors. The use of visual and strong frontage that overlooks the public space. taller landmark buildings (up to 6 storeys). These physical connecvity between buildings and Building heights could be up to four storeys in this taller buildings should reflect their unique posion surrounding spaces, so furnishings and locaon. The potenal for unique self-build plots in the heart of Lowesto and their proximity to the appropriate lighng should be used to encourage in this locaon should be explored. Broads. The only building of significant height in a greater sense of security. the area is the grain silo located in the Port 7.24 Between Stanley Road and Heath Road an un- Authority area on the north shore of Lake Lothing 7.28 This part of the SUN will provide the strongest metalled alleyway runs behind properes that therefore any proposal will be visually prominent. visual connecon between the new development front on to Victoria Road. Parts of the Sanyo site Design proposals will need to carefully consider and other areas around Lake Lothing because of and the SCA Recycling site back on to this alleyway. their contribuon and impact on their immediate its prominent waterfront locaon and the higher The best design response in this area would be for surroundings and other potenal effects from building heights. Visually smulang design new dwellings to back on to this alleyway with further away. The exisng slipways on the should be considered in the context of viewing garages to the rear. Garages could cover the enre peninsula should be maintained where possible areas of the SUN such as from Oulton Broad, rear frontage on to the alleyway to help improve and should be used innovavely. The slipways Normanston Park and the area east along the security. Extra lighng and an improvement to the could provide private access to the water for some waterfront. surface could also improve security. dwellings but some public access should also be retained. Careful consideraon should be given to the design and layout of buildings to minimise the potenal for permanent shading in some areas.

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 40 Indicave sketch of the Neighbourhood Centre Character Area County Wildlife Site Character Area

7.31 The County Wildlife Site provides aributes to the development that are disnctly different from those surrounding it. The site supports a significant amount of biodiversity and incorporates the only remaining natural shoreline on the south side of Lake Lothing. The site will provide an open break between the proposed residenal development in the SUN and the industrial development in the Kirkley Waterfront. This open break, alongside the playing pitch and primary school playing fields, will enhance the visual amenity of the area.

7.32 The CWS supports a variety of flora and fauna and has potenal to be an aracve space which would increase its importance in the local biodiversity network. To achieve this a 'habitat management plan' should be prepared whose implementaon would act to conserve and Employment Character Area enhance the biodiversity value of the site. Access Neighbourhood Centre Character Area should be directed towards the least ecologically 7.29 Most of this area is covered by a Local sensive parts of the site. 7.30 This area provides the community facilies that Development Order (LDO) through to at least 2017 make up the central focal point of the as described in Secon 4. The LDO has a Design 7.33 Arficial lighng in the immediate vicinity of the development. It encompass one of the largest Code aached to it which idenfies specific CWS, such as along the waterfront areas of public open space on site, the primary character areas within it, with strict design criteria pedestrian/cycle path, is likely to have a school and the local retail centre. The openness of that development should adhere to. Proposals in detrimental impact on wildlife, their behaviour the area will provide views across the site but this this area that do not meet the criteria set out in and their habitat. Any proposed lighng should will need to be complemented by a sense of the LDO, will sll require planning permission. In highlight the path but not create overspill into the enclosure in some locaons. This enclosure should these circumstances the principles of the Design adjacent CWS. Not using lighng during parcular be achieved by high quality, taller (up to four Code should apply in determining these planning hours of darkness could reduce the potenal storeys) buildings north and south of the central applicaons. impact on the CWS and discourage use at mes open space. that could be deemed inappropriate.

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 41 Key Views and Vistas and Landmarks Landmarks and Public Art

Views 7.37 Proposals should include landmarks such as well receive significant public use and sites that provide designed and architecturally disncve buildings, an important vantage point of the surrounding 7.34 Strategic views into and out of the development open spaces and public art to be located at area. Public art that is to be provided or funded will support the identy of the area by people who strategic points in the development. This will should involve discussions with the Council. live in the SUN and those who use the surrounding create idenfiable locaons for local people and Selecve use of interesng features on buildings areas north and south of Lake Lothing. Vistas contribute to the character of the development. that reflect the history of the area and its future looking out over Lake Lothing should be Potenal sites include key nodes, sites that will aspiraons should be considered. considered, parcularly from strategic points such as public open space. Consideraon should also be given to the views into the SUN from the waterfront. A sense of isolaon is likely to discourage use through a sense of insecurity. Key vistas Landmark building *

7.35 Important vantage points along the waterfront / include:

• the marina towards Oulton Broad • northern end of Brooke Peninsula across Lake Lothing • vantage points through the slipways looking east and west • line of sight from the access road intersecon 0/.-,+*)+('&*)%+$#)"! with Waveney Drive into the site  

7.36 Figure 7.2 idenfies potenal key views and vistas through the site that should be designed into the development.

Figure 7.2 Views, Vistas and Landmarks

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 42 Galleons Reach Eco-Park, London Solar panels on BRE demonstraon home Individual Building Approach for Energy

7.40 An independent building approach will require limited investment or infrastructure planning and will enable developers to adopt their own approach at different phases of the development. This will assist them to maximise the specific characteriscs of their site and use the technologies available. The downside to the individual building approach is that as the site is developed the benefits of scale are reduced. Inially, this will not be a significant issue, however, as 2016 approaches there will be Sustainable Design Energy Efficiency considerable challenges placed on new development. The Government has set out a 7.38 The Waveney Renewable Energy and Sustainable 7.39 The first priority for new development should be metable for all new residenal dwellings to be Construcon Study idenfies the area south of reducing energy demand. Consideraon will need 'zero carbon' from 2016 and all new buildings to Lake Lothing as a locaon where new to be given to the layout and design of buildings be 'zero carbon' from 2019. To meet these development could be designed and constructed and building clusters to include passive design standards, new dwellings will need to be designed to minimise energy demand, carbon emissions features. The main orientaon of the site is east- and built to be much more energy efficient than and water use. This is due to the scale and density west which will enable maximum solar gains on they currently are. This will have cost implicaons of development proposed in the AAP area. As such many building frontages, including in the streets for new development. Costs per dwelling are likely the energy and water requirements for new that front onto playing fields, but it may be to be higher for an individual building approach buildings in the SUN are higher than other areas necessary to incorporate shading measures to compared to a larger energy scheme that new of the District. How these requirements can be migate the risk of overheang in summer. At a buildings can be connected to, however, upfront achieved will need to be considered early in the more detailed design stage, high levels of building costs will be less. design process and alongside other planning fabric energy efficiency, low air permeability and requirements. The energy requirements to be reduced thermal bridging should be incorporated. achieved in the SUN, are set out in Policy WEW1 Two scenarios that need to be considered to of the AAP and repeated in Appendix 3. achieve the energy requirements include individual building soluons or larger scale community heang schemes such as a district heang network in combinaon with a combined heat and power (CHP) system.

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 43 7.41 If an individual building approach is adopted, 7.43 A decentralised energy network could source its Allowable Soluons consideraon should be given to achieving energy from a single, large generaon unit or Passivhaus standards, whereby space heang through several smaller generaon units within 7.46 It has been recognised that achieving the demand is reduced to negligible levels. In addion the SUN which could be installed in phases as the Government’s zero carbon energy standards by to passive design consideraons, building design development comes forward. This energy could 2016 and the requirements set out in the AAP will should incorporate exterior surfaces that could then be distributed to new dwellings and buildings be challenging. Allowable soluons have been potenally be used for solar PV and solar thermal through a network of insulated pipes carrying low proposed by the Government as a means to technologies. During construcon, there is an temperature water and electricity. In the future migate carbon emissions that cannot be abated opportunity for these technologies to be there is potenal for retrofing exisng buildings on site. Simply put, developers will be required to integrated into the roof during construcon. which could increase the long-term viability of meet a certain level of carbon reducon on site such a scheme if the network is expanded. and those who cannot go beyond this to meet the Decentralised Energy Approach full zero carbon standard will be required to make 7.44 If considering a decentralised heang network a payment to an allowable soluons provider who 7.42 The second approach is in the form of a that is powered by biomass or biofuel that will will take responsibility for ensuring that carbon decentralised energy network. An energy network result in airborne emissions, the applicant should savings projects deliver the remaining required that can distribute energy such as heat and/or be aware that current nitrogen dioxide carbon emissions reducon. Potenally, the electricity to new buildings should be considered, concentraons at Belvedere Road, Mill Road and Council could act as an allowable soluons parcularly with the pending 'zero carbon' Pier Terrace (i.e. in the vicinity of the Bascule provider where contribuons can be used to standards. The site has two disncve character Bridge in Lowesto) are only just below the invest in carbon reducon projects such as areas; residenal areas to the west (which will Naonal Air Quality Strategy Objecves improving the energy efficiency of the exisng have some mixed-uses) and industrial (prescribed by the Air Quality Regulaons 2000 (as housing stock which would off-set carbon development to the east. The range of uses and amended)). As such, the Council's Environmental emissions created by the new development. Such different paerns of energy demand through the Health Team should be consulted early on in proposals, however, remain uncertain as the day could support district heang. developing such schemes. Government connues to consider this approach.

7.45 Energy Service Companies (ESCos) provide an 7.47 To help meet the energy requirements further opportunity for developers to work with partners informaon will be available in the Renewable to deliver energy infrastructure. ESCos have Energy and Sustainable Construcon experse and may be able to assist with creang Supplementary Planning Document currently business plans, financial support and being prepared. implementaon strategies to deliver an energy scheme that is appropriate for the development. This can include small-scale and community-scale technologies.

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 44 Achieving Water Efficiency Standards Waste Management Delivery

7.48 A strategy seng out how CfSH Level 5 and 7.50 New developments generate considerable 7.53 The difficulty of achieving the energy and water BREEAM ‘Excellent’ standards for water efficiency amounts of waste material, both during the (including drainage) requirements jusfy the need can be delivered should be considered early in the construcon phase and throughout their lifeme. for developers to work together to find a soluon. design process. Water efficiency devices such as Waste is generated from the packaging of many It is unreasonable to expect a developer to low flow showers, aerated taps and water bus construcon products and cra based industries disproporonately invest in a community scheme will reduce water consumpon and are of brickwork, plastering, carpentry and decorang. that others may benefit from without contribung encouraged. However, to achieve significant water their fair share. Therefore a strategy should be savings a larger strategy that implements 7.51 If parts of the development are to be cleared, prepared and agreed between developers to rainwater harvesng and grey water recycling may levelled or excavated consideraon should be deliver new development that will comply at all be required to maximise the benefits of scale. This given to reusing the waste materials elsewhere on phases of development. can contribute towards non-potable water uses site. There may be opportunies, assuming any and reduce the amount of surface water run-off. excavated land is not contaminated, for waste 7.54 Any planning applicaon is expected to be Water can be collected from most forms of roof materials to be reused to assist with migang accompanied by an Energy Strategy that states surfaces. Water harvesng is compable with flood risk. how energy and water efficiency requirements will solar technologies and combined these will be delivered on individual sites or on a community contribute to the sustainability of the building. 7.52 Developers will be encouraged to submit a waste scale. If requirements cannot be met the strategy Waterwise and the Environment Agency can management plan to show how they can reduce should jusfy why. Consideraon should be given provide further informaon about reducing water waste associated with their development. Credits to the meframe of delivery and the increasing use. related to Construcon Waste Management of the Building Regulaons requirements. Code for Sustainable Homes and BREEAM 7.49 Achieving CfSH Level 5 and BREEAM ‘Excellent’ cerficaon schemes, or such issues or standards standards for water efficiency will be challenging. as replace these, should be targeted. This will Where a developer can demonstrate that assist a developer with achieving compliance with achieving these standards is not feasible or viable Policy DM04 'Sustainable Construcon' of the then alternave opons may be considered. This Development Management Policies. may include contribuons towards water efficiency off-site or financial contribuons to water efficiency schemes elsewhere in the area in a similar manner as being considered for ‘allowable soluons’.

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 45 8 Flood Risk Management

View from North Sea along Lake :pthing and towards the Broads SuDs / recreaon open space, Upton, Northampton

Table 8.1 Flood Vulnerability Classificaons NPPF Vulnerability Essenal Infrastructure Water Less More Highly Vulnerable Classificaon Compable Vulnerable Vulnerable Land Uses that may Essenal transport Flood Shops and Care homes Basement dwellings occur in SUN infrastructure (including controls services mass evacuaon routes) Housing Caravans, mobile 8. Flood Risk which has to cross the Marinas, Restaurants homes and park Management area at risk docks and Schools homes intended for wharves Offices and permanent Essenal ulity Industry Drinking residenal use infrastructure which has Water based establishments to be located in a flood recreaon Installaons risk area for operaonal requiring hazard ous reasons Open Space substances consent

8.2 However, to accommodate the proposed levels of 8.3 Taking new development out of risk of flooding 8. Flood Risk Management development it is necessary that some will ensure properes can get access to home development classified as ‘more vulnerable’ insurance. The current commitment to provide 8.1 Within the lifeme of the development the development will have to be located in flood risk flood insurance for domesc properes at risk majority of the Sustainable Urban Neighbourhood zones. To take advantage of the qualies of the from flooding does not apply to any new property and Kirkley Waterfront (SUN) will be at risk from waterfront the highest density residenal built aer 1st January 2009. Failure to obtain flooding. Some of the areas of the site are at risk development has also been proposed in flood risk insurance would mean it would be difficult to sell from high hazard flooding involving dangerous areas. Areas proposed for residenal development properes on the site as new property owners depths of water. The distribuon of land uses as outside of the flood zone are not suitable for high would struggle to obtain mortgages on shown in Figure 4.1 has considered the sequenal density housing given the character of the uninsurable property. The Government is approach to the development of the site where surroundings. The challenge will be ensuring this currently negoang with the Associaon of possible. Areas with lower flood risk have been development is safe from flooding by designing Brish Insurers on the provision of flood risk considered first for ‘more vulnerable’ flood resistant buildings, developing flood insurance in the future as the exisng development such as new homes. Less vulnerable migaon measures such as land raising and commitment is due to expire in June 2013. uses such as employment are proposed in areas ensuring there are safe means of access and of higher flood risk on the site. Water compable egress from the areas at risk. 8.4 For informaon, Table 8.1 shows the Naonal uses such as the playing fields are proposed in one Planning Policy Framework (NPPF) Technical of the most hazardous areas of flood risk on the Guidance flood risk classificaons for the types of SUN. development that are likely to occur in the SUN.

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 47 Figure 8.1 Potenal Flood Migaon Opon

Flood Risk Assessment Requirements Flood Risk Migaon Requirements

8.5 Site-specific Flood Risk Assessments (FRA) will 8.6 Allowances for climate change should be built into 8.8 It is important that all buildings on the site remain need to be prepared to build on the detail of the modelling and these should be applied for a 100 safe from flood risk for the people within them. Strategic Flood Risk Assessment and the years from the date of modelling for residenal For ‘more vulnerable’ development, ground floor Cumulave Land Raising Study (2008)12 to development. For industrial development and levels of mul storey buildings should be 300mm ascertain the exact risk, depth and hazard of other development on the SUN, climate change above the 1 in 200 year dal flood level (including flooding throughout the area. The site survey allowances should be applied for 75 years. climate change). First floor levels should provide should collect and ulise detailed topographical dry refuge 300mm above the 1 in 1000 year ground level data. The FRA should idenfy the 8.7 The Environment Agency have produced a new annual probability flood level including climate necessary defences and migaon measures flood model for the Lake Lothing area. FRAs should change. For single storey dwellings the ground needed to reduce risk to an acceptable level in line make use of this new model. The PPS25 Pracce floor levels should ideally be 300mm above the 1 with the NPPF. The FRA should also test whether Guide13 provides detailed informaon on how to in 1000 year dal flood level (including climate the migaon measures proposed will increase carry out FRAs. change). the risk of flooding elsewhere. Addionally, the FRA should include a flood warning and 8.9 For less vulnerable development such as evacuaon plan that details access and egress commercial development, the floor levels should arrangements and warning arrangements to be 300mm above the 1 in 20 year dal flood level ensure people are safe by unaided movement to (including climate change). a place of safety. This plan will need to be to the sasfacon of the Council’s emergency planners.

12www.waveney.gov.uk/site/scripts/download_info.php?down 13www.communies.gov.uk/publicaons/planningandbuilding loadID=116 and www.waveney.gov.uk/site/scripts/download /pps25guideupdate _info.php?downloadID=112

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 48 8.10 For all flood events up to the 1 in 1000 year annual 8.13 These above requirements do not mean that all 8.16 The SuDS (Sustainable Urban Drainage System) probability flood event including climate change, areas at risk from flooding need to be raised out Management Train is a hierarchical approach to people should be safe by unaided movement to a of the flood zone. Back gardens and rear parking sustainable drainage design to manage surface dry floor or refuge, or by other arrangements, courts could be at a lower level. Waterfront and water run-off from a site, both in terms of such as a flood warning and evacuaon. other pedestrian and cycle paths can also be at a reducing its volume and its rate. There are lower level if not needed for emergency access opportunies for integrang these principles into 8.11 It will also be important that buildings are and egress. Public open space and playing fields the SUN site. connected to roads or other pathways that are associated with the primary school are ‘water- also above the 1 in 200 year dal flood level to compable’ and therefore do not need to be 8.17 Suffolk County Council will be the SuDs Approval allow for access and egress in mes of flood and raised or defended from flood risk. Figure 8.1 Body (SAB) once the relevant aspects of the Flood to enable emergency vehicles to get into the site. shows an indicave approach to flood risk and Water Management Act 2010 have been migaon. Any flood migaon measures implemented. At that point it will assume 8.12 The development should also incorporate flood proposed should not increase the risk of flooding responsibilies for approving construcon work resilient construcon up to the 1 in 1000 year dal elsewhere. which has drainage implicaons, adopng all SuDS flood level (including climate change), as required schemes associated with surface water emanang in PPS25 Pracce Guide paragraph 6.31 for 8.14 Lake Lothing is classified as a “Main River” for from developments of a certain scale and ensuring development with raised floor levels. This is to consenng purposes. Therefore, any structures in, that all adopted SuDS schemes are properly ensure that if the building floods the damage will under or over Lake Lothing will require a Flood maintained. It is therefore essenal that the be minimised and so will allow faster re-occupancy Defence Consent from the Environment Agency. County Council is involved in discussions to deliver of the building. The flood resilient measures Addionally, any erecons or works within 9 the most appropriate water drainage system for should be implemented in accordance with the metres of the edge of the river will require consent the area. The Suffolk Local Flood Risk Communies and Local Government document under the Anglian Region Land Drainage and Sea Management Strategy15 should be referred to for ‘Improving the Flood Performance of New Defence Byelaws. guidance. Development will not be allowed to Buildings: Flood Resilient Construcon’14. commence unl a SuDS scheme is agreed with the Surface Water Run-off Management County Council. The same applies for foul water drainage where a strategy will need to be agreed 8.15 It is important for developments to integrate with Anglian Water. systems and techniques for managing surface water. A comprehensive water strategy that 8.18 When considering design proposals for a SuDS addresses both water conservaon and surface scheme there is potenal to include open space water run-off should be prepared to migate and water features. these water issues. This should reflect the phased nature of the site-wide development.

14www.communies.gov.uk/publicaons/planningandbuilding 15www.suffolk.gov.uk/your-council/decision- /improvingflood making/consultaons/flooding-are-you-prepared/

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 49 9 Outline Masterplan

Haven Marina, Quayside Business Centre and SCA Recycling Accordia, Cambridge

/ 9. Outline Masterplan ,3'25

5& (' '06 56  6.& ,2('5& 7,-$562('5&   '$$,6%.5/2('5&      

5!,-, 276.!,  .%3'6.52('5&  

7,//2('5&  .$ ,6/, 2('5&

.6/, 2(0- '$26.*)25

(,)6'&0%,&246'$23#,216&-5-%,2"06!, 2$5)).- 2.3#23#,2),6$.**.'-2'423#,2'-36'//,62'42,62+5,*3 *2"353.'-,6 2144.%,2%26'-2') 6. #32-503#'6.*,&26,)6'&0%3.'-2.-46.- ,*26'-2') 6. #325-&2$5 2/,5&23'2)6'*,%03.'-2'62%.!./2)6'%,,&.- *25!,-, 27.*36.%32'0-%./2.%,-%,2'2 2

New Housing Primary School Playing Field Exisng Residenal Open Space New / Exisng Employment Leisure Focus County Wildlife Site Pedestrian / Cycle Network * Landmark building Marina Local Centre Exisng Educaon Street Network * New access point Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 51 10 Implementaon

View from former Jeld-Wen factory towards North Quay Retail Park and Barnards Meadow, Flood resilient open space, Selby

10.1.2 The Council is planning to introduce a Community Shared Infrastructure Infrastructure Levy (CIL) which will be a standard charge applied across the District. It will be 10.1.3 Ideally the site will be delivered by a single possible to use some of the funds raised through developer or a consorum of developers working 10. the levy from wider developments to help deliver in collaboraon through a single planning Implementaon infrastructure within the SUN and the wider Area applicaon. In this scenario all infrastructure items Acon Plan area. Similar to other public funding could be more easily secured through a single CIL funds will not be used to subsidise developers planning obligaon. However, it is more likely that on the SUN and to give them a commercial the site will come forward through mulple advantage. CIL will not be used to fund planning applicaons relang to exisng land infrastructure where it will deliver developer ownership. In this scenario the cost of providing profits above normal levels or where it will shared infrastructure which is needed to support support historic or higher than normal residual the development on all parts of the SUN will need 10. Implementaon land values. CIL could be used to help unlock to be fairly apporoned across the site which development sites where viability is a problem and reflects the amount and type of development on 10.1 INFRASTRUCTURE REQUIREMENTS where infrastructure on or near those sites brings each part of the site. There will need to be a wider benefits to other developments, such as the mechanism to ensure landowners who provide 10.1.1 The development of the Sustainable Urban proposed pedestrian and cycle bridge over Lake infrastructure on-site will not be penalised for Neighbourhood and Kirkley Waterfront (SUN) is Lothing. However, the Council will need to ensure doing so in terms of land value. dependant on a number of items of infrastructure. that a balanced approach is taken to ensure that In the absence of confirmed public sector funding infrastructure across the District is funded and streams, infrastructure delivery to support delivered. Therefore, the majority of funding for development within the SUN will need to be infrastructure on the site will sll need to come funded almost enrely by development. The from the developments within the site as this is Council will be exploring sources of public funding the largest development in the District and to help deliver infrastructure in the Area Acon accounts for over half of the planned housing Plan area and to facilitate the delivery of increased development to 2025. levels of affordable housing. However, these sources of funding cannot be guaranteed at present.

Brooke Peninsula

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 53 10.1.4 One mechanism for achieving this as promoted by Primary School Pedestrian/Cycle Bridge over Lake Lothing the AAP is to ensure that where a piece of infrastructure is provided on a parcular 10.1.6 The level of development proposed on the site will 10.1.9 The pedestrian/cycle bridge over Lake Lothing on landowners land, that landowner will pay likely create a need for a 1.5 forms of entry the Brooke Peninsula is essenal to minimise commensurately less contribuons towards primary school. The level of development will also traffic impacts associated with new development infrastructure requirements based on the land necessitate addional pre-school provision. The planned in Lowesto and to provide access to value lost. This value will need to be determined primary school should therefore incorporate pre- Normanston Park for new residents, which by an independent valuer and should be based on school provision. To allow for future expansion, addresses the difficulty of providing adequate the benchmark land value used for viability the primary school will require a 2 hectare site and amounts of open space on the site. tesng. The value of land determined by the will need the core accommodaon of a 2 form independent valuer will need to be added to the entry school. The primary school will need to be 10.1.10 Ideally, the bridge will need to be in place prior to total infrastructure bill to ensure there is not a defended from the risk of flooding and as such the the compleon of all residenal units on the SUN. shorall towards the physical costs of providing finished floor levels will need to be 300mm above However, given the difficules in funding the infrastructure. This results in landowners who do 4.7m AOD. The cost of building a 1.5 form entry bridge as described below, this may not be not provide the infrastructure on their land paying primary school, including pre-school provision in possible. The bridge will need to be funded partly a higher per dwelling tariff than landowners who a flood zone is esmated to be £7.68 million. by developers on the SUN. There will also be do provide infrastructure on-site. potenal for funds raised through the Community 10.1.7 In the early phases of development on the SUN, Infrastructure Levy from wider developments in 10.1.5 This mechanism becomes more difficult where primary school pupils arising would have to be Lowesto to help pay for the bridge. The Council viability is an issue and individual development accommodated in off-site schools, possibly in will also explore other public funding streams as parcels cannot afford to pay the full amount of temporary accommodaon, prior to the opening and when they become available such as through infrastructure contribuons required. By ensuring of the new on-site school. Contribuons may be Local Transport Plan funding. that for viability tesng the ‘benchmark land requested from developers for the provision of value’16 includes the value of land lost to this temporary accommodaon. Suffolk County 10.1.11 A dra feasibility study established that a bridge infrastructure, the landowners providing Council esmate the cost of temporary with a soffit level of 3.5m above ordnance datum infrastructure will not lose out. If this approach is accommodaon would be £468,480. would have a capital cost of £4,810,382. taken there will be no further discounts from the tariff for those landowners as the land value lost 10.1.8 It is likely that the new school will be constructed for providing the infrastructure would have in two phases: a 210 place (1 forms of entry) already been accounted for. school by the compleon of 500 dwellings but on the basis of being able to add addional classrooms as development proceeds in later years as phase 2.

16Benchmark land value is the value that is determined to be a reasonable return to a landowner to enable them to release the site for development. This will be a funcon of the current use value of the site plus an upli. Given that most of the Sustainable Urban Neighbourhood and Kirkley Waterfront site is of a similar nature it is likely that benchmark land values of all parts of the site will be similar. The CIL Viability Study (BNP Paribas Real Estate, 2012) valued the benchmark value at £300,000 a hectare. This value will need to be reviewed and updated at the me of any planning applicaon by an independent valuer.

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 54 10.1.12 It is considered that the new pedestrian bridge will 10.1.15 Open spaces are to be brought forward at the 10.1.18 The Access Study found that the Waveney Drive support all development in Lowesto as it will same me as the part of the development they juncon could be a priority juncon with a ghost contribute to town wide traffic reducon are to serve. island allowing right turns into the site from measures as required to deliver the quantum of Waveney Drive or a signalised juncon. Detailed development proposed in Lowesto. As 1,869 10.1.16 As it is not possible to provide the full requirement specificaon will need to be determined through units are proposed for Lowesto a reasonable of open space on site, developers should idenfy Transport Assessments in discussion with the contribuon to the bridge from SUN developers, and implement opportunies to improve the CWS. Highways department at Suffolk County Council. assuming no other public funding is available This includes the provision of the path traversing would be £3,551,806. the site and improving the quality of the habitat 10.1.19 The new access road will traverse through areas itself. idenfied for development and therefore should 10.1.13 As stated in Secon 5, a new pedestrian and cycle form part of the scheme and have buildings bridge over the railway line next to the above Access Road fronng onto it. crossing over Lake Lothing will also be needed. However, developers in the SUN will not be 10.1.17 Fundamental to the deliverability of most of the Waterfront Pedestrian and Cycle Path expected to contribute towards this as it is not housing proposed in the western half of the SUN needed to migate the impacts of this is an access road that diverts traffic from the 10.1.20 This Development Brief requires the creaon of a development. western part of the new development away from waterfront pedestrian and cycle path along the Victoria Road and the minor access roads which enre length of the sites waterfront. As the Open Space currently connect the site to it. This road will be redevelopment reaches the waterfront it will be essenal for western secons of the site to be expected that the developer responsible will 10.1.14 As per the strategy in Secon 6, a playing field will developed fully without creang an unacceptable provide their secon of the waterfront path. At need to be provided in the central part of the impact on the exisng access juncons and Kirkley Ham, redevelopment proposals will need development to compensate for the loss of the Victoria Road. An Access Study19 has been to ensure land is reserved to enable a future exisng Jeld-Wen playing fields. This open space prepared that has shown that 563 dwellings can crossing over the inlet to link to the exisng path will need to accommodate a football pitch and be be developed using the exisng access roads running north of the Asda supermarket. Once the of approximately 2 hectares in size. The cost is which connect on to Victoria Road before the new path is needed in the area of the Haven Marina, esmated to be approximately £265,800. This access road going through the Jeld Wen Playing the Council will discuss and negoate with figure is calculated on the basis of £100,000 of Fields site is needed. Associated Brish Ports as to how public access to remediaon costs17 and a lay-out cost of the marina area could be safely provided to create £165,80018. There may be addional costs for a link between the Brooke Business Park demolion of exisng buildings as well. This area development and any new development on the of open space should also include a SCA Recycling site. Neighbourhood Equipped Area for Play as detailed in Secon 6 of this Brief.

17Based on assumpons in Best Pracce Note 27 – 19Sustainable Urban Neighbourhood and Kirkley Waterfront Contaminaon and Derelicon Remediaon Costs, English Access Study, Lowesto (AECOM, 2012) Partnerships 18Based on the cost of local examples (Waveney Norse, 2011) Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 55 Off-Site Infrastructure 10.1.24 Consultaon with other ulity providers will be 10.1.27 The CIL Viability Study (BNP Paribas, 2012)20 needed to ascertain whether any upgrades to included a high-level viability assessment of the 10.1.21 New development in the SUN will place addional other ulity infrastructure will be required. scheme. It concluded that in the current market pressures on libraries. There are plans to address there was limited potenal for any affordable this need in the AAP area by building a new, 10.1.25 Developers will be encouraged to ensure the housing to be provided on the site and potenal enhanced library in Oulton Broad on part of the development includes the provision of high-speed for only minimal contribuons to infrastructure. Oswald’s Boatyard site (allocated under Policy broadband for residents and businesses. However, the study idenfied that a small increase SSP7 of the AAP). Based on Suffolk County Council in sales values could deliver a quantum of standards, the 1,380 units planned for the SUN will Aerial view south-west across site affordable housing and a significant contribuon create an addional need for 91 sqm of library towards the infrastructure required. A 10% rise in space. Therefore the contribuon to the new sales values (above build cost inflaon) could library from the SUN will need to be £273,000. The allow the primary school and open space to be proposed pedestrian/cycle bridge over Lake viably delivered on site plus 10% affordable Lothing at Brooke Peninsula will help provide quick housing and a contribuon of £740,000 towards access to the library. the pedestrian bridge.

Site Specific Infrastructure 10.1.28 It is likely therefore that in negoang secon 106 planning obligaons for the site (or separate parts 10.1.22 In addion to the shared infrastructure above of the site) that a form of overage agreement, or there will be a need for some site-specific Viability conngent deferred contribuons will be required. infrastructure on each separate land holding. This will mean a small contribuon to shared 10.1.26 It may be that the site cannot viably contribute to infrastructure and affordable housing will be 10.1.23 As stated in Secon 8, flood defences or land the full costs of the infrastructure required to secured upfront that keeps the scheme viable. raising will be required across the site. This could support development. If this scenario arises the The agreement then allows for addional profits either be delivered on a site-specific basis or on a Council will need to priorise infrastructure (as a result of increased sales values or lower than strategic basis across the whole site. Sustainable delivery across the site and look for other sources expected build costs), over what were expected drainage systems will be required along with of funding. The Council will be able to draw on CIL (likely to be 20% of gross development value) to upgrades to the local sewerage network. It would receipts from a wider area to help deliver some of be shared between the developer and the Council be beneficial for landowners to jointly commission the infrastructure as stated above. It will be up to the level of the original contribuon a site-wide strategic study to idenfy the most cost important that the development delivers the required (plus inflaon). effecve ways of delivering this type of crical items of infrastructure such as any infrastructure. In a similar situaon to the access necessary flood protecon/migaon measures 10.1.29 Viability tesng will be undertaken in accordance road, it may be that some of the infrastructure and the access road. Without these types of with the methodology outlined in the Affordable becomes shared infrastructure but due to its infrastructure some parts of the development Housing Supplementary Planning Document. nature it may best be delivered by developers cannot proceed. 20www.waveney.gov.uk/site/scripts/download.php?fileID=2676 rather than by contribuon to the Council.

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 56 10.2 STRATEGIC PHASING Table 10.1 Infrastructure Trigger Points 10.2.1 The Sustainable Urban Neighbourhood and Kirkley Infrastructure Trigger Point Waterfront (SUN) is a large-scale development Primary School First phase complete following the compleon of 500 dwellings. that will take a significant period of me to complete. It is currently ancipated that the Pedestrian and Cycle Bridge Following the compleon of all residenal dwellings on the site scheme will be complete by 2028. The Open Space Playing fields to be relocated in tandem with development of development is dependant on a number of key exisng playing fields. pieces of infrastructure as detailed above, the site Access Road Compleon of 568 dwellings maximum is also in a number of different land ownerships. Waterfront Pedestrian and Cycle Path In tandem with the development of the waterfront parts of the site. As such, a careful approach to the phasing of the site is required that takes into account landownership as well as infrastructure need. Table 10.1 summarises when each piece of • Heath Road = 176 new dwellings (involving the 10.2.5 The Jeld Wen playing fields site is also ready to infrastructure is required. redevelopment of Brooke Business Park) develop and will involve the construcon of the • School Road = 343 new dwellings (involving access road connecng to the Brooke Business 10.2.2 Some parts of the SUN are available and ready to the redevelopment of the former Sanyo Park site. The delivery of this part of the site will develop now and can form part of the first phase Factory) require the relocaon of the exisng playing fields. of development. • Nelson’s Wharf = 24 new dwellings (involving The land use plan shown in Figure 4.1 earmarks the redevelopment of the SCA Recycling plant) the northern part of the former Sanyo site for 10.2.3 The Riverside Road area of the site is already • Stanley Road = 20 new dwellings (involving the these playing fields. Should the Jeld Wen Playing serviced and can be developed at the present me redevelopment of the Witham Paints Factory) Fields come forward for development before the for employment purposes. Some parts of the SUN former Sanyo factory is redeveloped the playing are ready to develop for residenal purposes. An 10.2.4 This means that a total of 563 new dwellings on fields could be temporally relocated to the land set Access Study has shown that the following the western part of the SUN can be developed aside for the new primary school on the southern amounts of residenal development can take prior to the access road being put in place. part of the Brooke Business Park site. place off the following access roads before the new access road going through the Jeld Wen Playing Fields site is needed.

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 57 Riverside Road and former Jeld-Wen factory 10.2.6 Before the compleon of 500 dwellings, a new 10.2.8 Figure 10.1 and the accompanying table below primary school will need to be provided within the shows an indicave approach to phasing on the SUN. Once this is in place and the access road, the site. Other approaches to phasing could take place final phase of residenal development on the providing they take into account the infrastructure western part of the site can move forward. constraints and general principles referred to above. Detailed phasing plans will need to be 10.2.7 A large part of the eastern part of the site developed as part of planning applicaons for the comprising of the former Jeld Wen Factory site is site. only available for industrial uses under lease agreements in the short term. It is likely that the site will become fully available in the later parts of the plan period, post 2020. At this point, residenal development could come forward on the southern part of the former factory site. /







       Phase 1: Residenal       

Phase 1: Temporary Employment / Phase 3: Residenal )-('&'%,$.2('

Phase 1: Employment 3210/.2-,+/-* Phase 2: Residenal / Primary School

Phase 1: Temporary Employment / Phase 3: Employment

Phase 3: Residenal Figure 10.1 Indicave Approach to Phasing

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 58 Phase 1 Phase 2 Phase 3

This phase would involve the residenal Phase 2 would take place following the compleon Phase 3 would see the development of the Brooke development of the former Sanyo factory, and the of the new access road and would start with the Peninsula for residenal development. residenal development of the Jeld Wen Playing compleon of the first part of the new primary Fields together with the relocaon of the playing school. Phase 3 would also involve the residenal fields to the northern part of the former Sanyo development of the southern part of the former site. Residenal development would follow on large Jeld Wen Factory site and industrial/office parts of the Brooke Business Park together with development of a more permanent nature on the The residenal development of the Jeld Wen the small scale retail facilies making up the local northern part of the site. Playing Fields would involve the creaon of the centre. The Brooke Peninsula would likely remain access road from Waveney Drive. in employment use during this phase. This phase would involve the compleon of the waterfront cycle and pedestrian path and the Using exisng access off Stanley Road, Witham Leisure facilies on the western part of the Brooke creaon of a pedestrian and cycle bridge over Lake Paints could be redeveloped for housing in this Business Park development would also be Lothing at Brooke Peninsula. phase following relocaon of their business. delivered in this phase. The primary school would be extended in this Residenal development would also occur on part Following the compleon of the access road, and phase to ensure it could accommodate pupils from of the Brooke Business Park site in this phase. other adjoining roads , residenal development of the whole of the SUN. Some parts of Brooke Business Park would likely the enre SCA Recycling site could take place in remain in employment use during this phase. this phase.

Approximately 500 new dwellings would be Parts of the waterfront pedestrian and cycle path delivered in this phase. covering the Brooke Business Park and SCA Recycling water frontage would be completed in Phase 1 also involves the development of office this phase. and industrial uses on the Riverside Road area of the site. Some of this development will likely take advantage of the exisng Local Development Order.

Employment development of a more temporary nature will likely take place on the enre former Jeld Wen Factory site.

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 59 11 Planning Applicaon Requirements

View across Lake Lothing to Riverside Road Solar panels on BRE demonstraon home

New development, Lowesto Outline Planning Applicaon Requirements

11.5 It is likely that most applicaons that come 11. Planning forward in the SUN area will be in the form of an Applicaon Outline Applicaon followed by Reserved Maer Applicaon or a series of Reserved Maer Requirements Applicaons. It is crucial to establish certain parameters and design principles to development 11.3 Pre-applicaon discussions will be essenal to proposals in Outline Applicaons to give more ensuring acceptable planning applicaons are clarity to what is actually being proposed and what submied. Developers are encouraged to meet has been assessed as part of the supporng with the Council and discuss their proposals well studies/documentaon such as Design & Access 11. Planning Applicaon Requirements in advance of subming an applicaon. The Statements, Transport Assessments and Council will be able to advise on the Environmental Statements. Outline Applicaons 11.1 This secon outlines the Council’s requirements documentaon required, the studies required and should include specific parameter plans as a for planning applicaons submied for the scope of such studies. The Council will also be formal part of the applicaon material that development within the Sustainable Urban able to check that proposals are being worked up idenfy the following: Neighbourhood and Kirkley Waterfront site. in accordance with the Development Brief and adopted planning policies. This will help save me • Land Use: the building / site use or uses 11.2 Although it is likely that the Sustainable Urban in the long run and by working closer together on proposed for the development Neighbourhood Development Brief will come a project from the outset, developers and the • A phasing plan for within the site forward through mulple planning applicaons, Council can achieve beer outcomes and save on • Areas of potenal built development. This these planning applicaons will sll be costs. For the larger parts of the site the Council should idenfy broad areas within the site applicaons for major development. To enable the would like to engage with the Developer in a within which proposed buildings would be Council to efficiently process and determine collaborave approach to developing the planning located applicaons it will be important that planning applicaon and supporng studies. This will oen • Building Heights. Plans should idenfy the applicaons submied are of an acceptable involve working groups consisng of officers from upper and lower limits for height within the standard. This means they are accompanied by the the Council and representaves of the Developer. areas of built development necessary studies and documentaon and are in • Landscape & open space structure. This should accordance with policy stated in the AAP and the 11.4 Applicaons for large scale developments in the idenfy strategic areas of open space guidance in this Development Brief. SUN should consult with the community prior to indicang the role & purpose of different submission of the applicaon. Ideally developers spaces, landscape and other facility (i.e. LEAP, should discuss with the Council their plans for NEAP) content public engagement.

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 61 • Access & movement: this should idenfy • Consultaon Statement. This briefly outlines i. Flood Risk Assessment incorporang a proposed access point/s, movement across the community engagement acvies defence and risk management/evacuaon the site including strategic highway, pedestrian undertaken prior to the submission of the strategy. and cycle routes applicaon and a summary of the main ii. Detailed site-specific Transport Assessment concerns raised and how they have been which includes public transport strategy and 11.6 In addion to the above, a schedule of addressed in the applicaon. travel plan. The scope of the transport development should also form part of the formal assessment will need to be discussed with the applicaon material. This should detail the 11.8 A number of supporng studies will also be Highway Authority. amount of development proposed for each use, required to support the applicaon these are iii. Contaminated Land Survey. In most cases an including the total gross square metres of built discussed below. intrusive study will be required at the Outline development, numbers of residenal units (with Applicaon stage given the previously tenure/size splits), and site areas. This should also developed nature of the site. be subdivided down to each idenfied phase as Types of Supporng Studies Required iv. Noise Assessment. appropriate. for Outline / Full Applicaons v. Archaeological Survey. vi. Energy and water efficiency strategy which 11.7 A number of supporng documents will also be 11.9 A number of studies will be required to support an demonstrates how energy and water required at the outline stage: applicaon in the SUN site. The list below gives an efficiency will be achieved up to a standards indicaon of the likely studies required. It is not equivalent to Code level 5 of the Code for • A planning statement seng out how the exhausve. Similarly it may be that in some cases Sustainable Homes or BREEAM 'Excellent' as proposal accords with planning policy and the not all studies are needed. All of the studies will appropriate. guidance in this Development Brief be required at the outline stage. However, it may vii. Landscape/ Townscape Assessment. • A Design and Access statement be that only desk studies are needed as part of the viii. Ecological Assessment. In parcular this will • Secon 106 heads of terms Outline Applicaon with more detailed studies need to examine the impact on the County • An Environmental Statement (if an secured as condions or as parts of reserved Wildlife Site and idenfy a programme of Environmental Impact Assessment is required) maers. This will need to be discussed with the migaon / enhancement works. This will • For larger sites, a detailed masterplan which Council in pre-applicaon discussions. The overall need to include a Habitat Management Plan demonstrates spaally how the principles of scope of all studies should be discussed with the seng out how the site will be managed and this Development Brief have been Council prior to the submission of a planning who will be responsible for this. incorporated into the applicaon applicaon. Addionally it would be helpful for the ix. Air Quality Assessment. • Design Statement/Code for character areas studies prepared to have the support of relevant x. Health Impact Assessment. statutory organisaons prior to submission of a planning applicaon. 11.10 The studies listed above for individual planning applicaons should consider the development of the enre SUN and other developments allocated in the AAP area.

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 62 Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 63 Appendices

Brooke Peninsula County Wildlife Site

Appendix 1 Site Analysis • Brooke Business Park which used to be a boat building factory A1. EXISTING USES • The former Sanyo electronics factory • The former Jeld-Wen factory Appendix 1 A1.1 The land upon which the Sustainable Urban • SCA Recycling Site Analysis Neighbourhood and Kirkley Waterfront will be • Survitec-SD premises built was previously used for industry. A small • Witham Oil and Paints proporon of the site is sll occupied by a number • Playing fields associated with Jeld-Wen factory of businesses. Most of the site is occupied by • County Wildlife Site underulised or unoccupied industrial units. The • Haven Marina site consists of: • Businesses on Riverside Road

/

  

  

              Vacant  '.$#*.&#('+)&

  

  Industry  

  %)$#"#!( *.$#      Marina  /.-,+*.)('+)& Educaon Centre

Open Space

County Wildlife Site

Figure A1.1 Exisng Uses

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 65 A1.2 There are a number of residenal properes A2. CONSTRAINTS AND OPPORTUNITIES Wider Traffic Issues within the site area. These properes will be retained as part of any redevelopment. Transport Issues A2.3 Transport modelling undertaken to support the Area Acon Plan found the full development of all A1.3 Figure A1.1 shows the exisng uses on the site. A2.1 The Sustainable Urban Neighbourhood and Kirkley sites within the Lake Lothing Area would have a Waterfront (SUN) site is near the geographic significant impact on traffic flows in the town. A1.4 To the immediate south of the site is a line of centre of Lowesto, close to the town centre and Even when taking the exisng Travel Smart residenal properes along Victoria Road and PowerPark and about 1.5km from the shopping iniave into consideraon alongside strong travel Waveney Drive. To the west of the site are area at Oulton Broad. As part of the wider planning and sustainable transport iniaves only residenal properes fronng Stanley Road and regeneraon of the Lake Lothing area, the site will 80% of the growth proposed in the Lake Lothing Lake View Road. To the east of the site is an inlet, be close to new leisure and retail development at area can be accommodated without having beyond which is an ASDA Supermarket. Across Peto Square (see Figure 1.2). significant implicaons on the exisng road Lake Lothing to the north of the site are industrial network. Therefore, town-wide traffic reducon units along Harbour Road and port facilies off Access measures will need to be explored and Commercial Road. implemented. Failure to address addional traffic A2.2 Despite the central locaon of the site, physical pressures arising from the development could A1.5 The exisng residenal areas surrounding the site access to parts of the site is problemac. The potenally have significant effects not only on the range from low density to medium density with a Brooke Peninsula and Sanyo parts of the site are environment of the immediate areas but also on mix of terraces and semi-detached homes along currently accessed by School Road and Heath businesses and residents elsewhere in the town. Victoria Road, School Road, Stanley Road and Road and the more western part of the site can be Heath Road. accessed from Nelson’s Wharf and Stanley Road. Crossings Congeson is already a problem on Victoria Road and further development could exacerbate the A2.4 A key consideraon in the development of this area issue. Therefore the parts of the SUN west of the will be to ensure future opons for a third road Jeld-Wen Factory will require a new access on to crossing of Lake Lothing are not jeopardised. Waveney Drive. An Access Study18 has been prepared which established that 563 units could A2.5 The development of the SUN presents an be accommodated off exisng access roads opportunity to deliver a new pedestrian/cycle bridge connecng to Victoria Road. across Lake Lothing at Brooke Peninsula, linking the development to Normanston Park, Harbour Road and the wider area. However, Lake Lothing in this locaon is navigated by a number of different vessels including dredgers and sail boats. It is important that the construcon and use of a bridge does not restrict navigaon along this stretch of Lake Lothing. Aerial view west across Lowesto and towards Oulton Broad

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 66 Figure A1.2 Flood Zones with Climate Change Allowance (From SFRA (2008))

Flood Risk

A2.6 In the context of the wider AAP area the SUN is, in A2.7 The Cumulave Land Raising Study (2008) flood risk terms, sequenally preferable for ‘more illustrated that the northern part of the site, the vulnerable’ development (such as housing) than Brooke Business Park, could be raised from other strategic sites. However, flooding does approximately 3.3m AOD to 4.7m AOD, taking the remain a major constraint to development on the site out of risk from flooding without increasing site. The Strategic Flood Risk Assessment21 (2008) risk elsewhere. The study also concluded that the (SFRA) shows that when considering climate area of the site at Riverside Road where the change, most of the site lies within Flood Zone 3. Waveney Campus was once proposed could also Figure A1.2 shows the extent of the Flood Zones be raised without increasing risk elsewhere. Figure A1.3 Flood Depths in 1 in 200 Year Event with Climate Change Allowance (Flood Zone 3a) (Adapted from SFRA (2008)) across the site. The difference between the SUN However, the Cumulave Land Raising Study did and other areas of Lake Lothing such as Peto not look at other parts of the SUN at risk from Square and the Outer Harbour PowerPark area is flooding which include the main Sanyo buildings, that the depth and hazard of flood risk is the Jeld-Wen site and the northern p of the SCA significantly less. Figures A1.3 and A1.4 show the paper recycling plant. It is likely that these areas depth and hazard modelling from the Strategic can be raised as well without causing increased Flood Risk Assessment for the 1 in 200 year event flood risk although this will need to be further (Flood Zone 3a, taking into account climate tested as part of site-specific Flood Risk change). Assessments. However, there is concern that the northern part of the Sanyo site, which the SFRA shows as being subject to high hazard flooding, could act as a conveyance route in mes of flood and therefore if this area was to be raised or defended from flood risk it could increase flood risk elsewhere. Figure A1.4 Flood Hazard Map in 1 in 200 Year Event with Climate Change Allowance (Flood Zone 3a) (Adapted from SFRA (2008))

21www.waveney.gov.uk/site/scripts/download_info.php?downl oadID=116

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 67 A2.8 The development of this site does present some Ecology and County Wildlife Site A2.10 The site is of high wildlife value and provides a opportunies to reduce flood risk in the area. The habitat for reples such as the common lizard, Cumulave Land Raising Study22 showed that A2.9 Part of the SUN area is taken up by the Brooke birds including the song thrush and linnet and raising land on Brooke Peninsula and Riverside Yachts and Jeld-Wen Mosaic County Wildlife Site small mammals. The structural diversity of the site Road did not have a negave effect on flood levels (CWS). The CWS is a semi-natural environment is very good with a mix of grassland, thick scrub or the speed at which flooding would occur. consisng of an open mosaic of habitats on and woodland. Addionally, new defences incorporated as part of previously developed land and a natural coastline the development may help protect exisng including a small area of interdal mudflat which properes from flooding. links to scrubland to the south.

Allotments and Open Space / Common Land and Village Greens

Ancient Woodland

County Wildlife Sites

Local Nature Reserve

Site of Special Scienfic Interest

Special Protecon Area and Special Areas of Conservaon

"/"-.

     22Waveney strategic Flood Risk Assessment Cumulave Land Figure A1.5 Ecological networks in Lowesto Raising Study www.waveney.gov.uk/site/scripts/download_ info.php?downloadID=112

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 68 A2.11 The CWS is considered to be a valuable piece of Ground Condions and Physical Amenity nature in an urban seng and will need a level of Structures protecon from development. However, the A2.16 The shores of Lake Lothing are sll home to a locaon of the County Wildlife Site in the centre A2.14 Given the past industrial use of the site it is likely number of industrial acvies including the port of the site could potenally restrict the there could be issues with ground contaminaon. operaons on the opposite side of the river to the connecvity between the western and eastern Further invesgaon work will be required to SUN. Noise travels well over open water therefore parts of the site. The CWS is also a constraint to ascertain the level and nature of any possible noise generated by port operaons and other delivering a new access road to service the contaminaon on the site. Contaminaon studies industries across Lake Lothing could be western part of the site. Any loss of County will also need to idenfy required remediaon detrimental to the amenity of new residents. It is Wildlife Site to improve accessibility will need to soluons. Parts of the site, parcularly around the likely that conflicng land uses may be adjacent or be migated with appropriately compensatory Brooke Peninsula consist of ‘made’ ground in close proximity to each other therefore careful measures taken. associated with the construcon of the boat consideraon of potenal impacts on amenity will building business in the mid 20th Century. need to be made. This is parcularly important A2.12 The SUN development provides some where residenal and outdoor public use areas in opportunies for the enhancement of the CWS A2.15 Parts of the site have derelict or vacant buildings the vicinity of employment areas are proposed. through extension of exisng habitats and the (some of which may contain asbestos) which will Noise assessments will need to be prepared as creaon of new ecological network linkages across need to be removed prior to commencement of part of planning applicaons. The SUN will be a the site and improving access to local nature and development. mixed-use community and therefore regard will ecology for community enjoyment. need to be had to compability of adjacent future uses. A2.13 Lowesto has more designated areas associated with it than any other town in Suffolk, many of A2.17 Whilst air quality is not a parcular issue within which support Biodiversity Acon Plan habitats the SUN itself, traffic emanang from the and species. The Suffolk Wildlife Trust Lowesto proposed development could have an impact on Wildlife Audit (2007)23 idenfied an ecological air quality elsewhere in the town, parcularly network of green spaces and links across around the Bascule Bridge. The potenal impacts Lowesto. This network has been reproduced in of this should be considered when preparing Figure A1.5. There is an opportunity for this planning applicaons and supporng studies such network to be enhanced by the provision of new as transport assessments. open spaces and linkages within the SUN. A2.18 The development of the site represents an opportunity to improve the visual amenity of the area through the removal of derelict buildings, aracve design and planng. Brooke Peninsula 23www.waveney.gov.uk/site/scripts/download_info.php?downl oadID=110

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 69 A3. LOCAL CHARACTER APPRAISAL / A3.1 The purpose of this secon is to briefly highlight the character of the built environment both on the site, immediately around it and in Lowesto in general. It is important to consider key features of local character that relate to the SUN area during the planning and design stages of the development.

A3.2 The exisng character of the SUN is predominantly 20th Century industrial. Most of the site is covered by operaonal and vacant/derelict industrial buildings. Prior to the industrial development of the site the area was predominantly undeveloped consisng of open fields and marshland around Lake Lothing.

A3.3 The Lake Lothing and Outer Harbour Area Acon Plan Cultural Heritage Assessment (2006) noted few of the buildings on the site have any architectural or historical interest.

A3.4 The ABP Haven Marina is located within the site and contributes to the wider marime character of the area. This is complemented by a strong marime character on the northern shore of Lake Lothing at the western end of the site.

Figure A1.6 Lowesto Character Areas (from Cultural Heritage Assessment (2006))

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 70 A3.5 To the south of the site is a predominantly 20th A3.6 Figure A1.6 is an extract from the Lowesto A3.7 North Lowesto is home to the historic core of Century residenal area with some older houses Design Guide (2004) and idenfies 17 wider Lowesto which is focused around the High Street. along Victoria Road. The area is characterised by character areas in Lowesto. A key feature of The High Street consists of buildings dang from straight roads and crescents in a distorted grid South Lowesto is the resort town built by Sir the 15th to 19th centuries. A key feature of this format creang a relavely legible and permeable Samuel Morton Peto in the mid-19th Century. character area are the narrow alleyways that link street paern. The majority of the houses on Centred around London Road South and the High Street to the North Denes area of Victoria Road are 19th Century terraced houses. Wellington Esplanade, these two long straight Lowesto which used to be home to the town’s Behind Victoria Road there is a mixture of semi- roads which are lined with large Victorian fishing industry. These alleyways, known locally as detached houses and bungalows which is mixed townhouse terraces are a defining feature of the ‘scores’, provide vantage points of the sea from with some local authority semi-detached and area. the historic core of the town. terraced housing. The area around Waveney Drive consists of predominantly mid 20th Century semi- detached houses.

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 71 Biodiversity

Employment Flood Risk Management

Employment Land Evidence Base Report Cumulave Land Raising Study DTZ, October 2009 Sco Wilson, June 2008 Appendix 2 This report presents the employment land Addendum to the Strategic Flood Risk Assessment. evidence base underpinning the Lowesto and An analysis of potenal impacts on the dal flood Evidence Base Great Yarmouth Area Acon Plans (AAPs). cell of Lake Lothing, Lowesto as a result of www.waveney.gov.uk/site/scripts/download_info. proposed land raising scenarios for several php?fileID=358 regeneraon sites. www.waveney.gov.uk/site/scripts/download_info. Employment Land Study php?downloadID=112 Bone Wells and Associates, January 2006 Community Infrastructure Levy Assessing future employment land needs for Great Strategic Flood Risk Assessment Yarmouth Borough Council and Waveney District Sco Wilson, February 2008 Waveney Community Infrastructure Levy Council, and employment land policy for the sub The purpose of the Strategic Flood Risk Viability Study region as a whole. Assessment is to enable a more detailed BNP Paribas Real Estate, March 2012 www.waveney.gov.uk/site/scripts/download_info. understand of flood risk and idenfy areas This report tests the ability of a range of php?fileID=218 vulnerable to flooding. development types throughout the District of www.waveney.gov.uk/site/scripts/download_info. Waveney to yield contribuons to infrastructure Outline Inspecon of Quay Walls at Lowesto php?downloadID=116 requirements through the Community Halcrow, February 2006 Infrastructure Levy (CIL). An overview of quay walls within the area www.waveney.gov.uk/site/scripts/download_info. designated for regeneraon at Lowesto as part Housing php?fileID=2676 of a baseline analysis to support the development of the URC master plan for Great Yarmouth and Affordable Housing Viability Study Waveney Infrastructure Study 2012 - 2025 Lowesto. Levvel, September 2009 Waveney District Council, March 2012 www.waveney.gov.uk/site/scripts/download_info. A study of the economic viability of affordable The purpose of this study is to provide evidence php?downloadID=173 housing provision. to jusfy the need for a Community Infrastructure www.waveney.gov.uk/site/scripts/download_info. Levy in Waveney. Relocaon Strategies: Brooke Peninsula php?downloadID=117 www.waveney.gov.uk/site/scripts/download_info. Roche Chartered Surveyors, March/October 2010 php?fileID=2675 Relocaon opons for Brooke Peninsula area. www.waveney.gov.uk/site/scripts/download_info. php?fileID=1199

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 72 Social Infrastructure Requirement Lowesto Biodiversity Audits Part 1 Streets and Transport Aecom, October 2010 Suffolk Wildlife Trust, December 2007 Invesgang the level of social infrastructure Audit of biodiversity in Lowesto. Lowesto Transport Strategy required to support growth projecons in the Area www.waveney.gov.uk/site/scripts/download_info. Suffolk County Council, June 2011 Acon Plan, determining the scale of php?fileID=702 Sets out the County Council's ambions and infrastructure needed and where and when it is objecves for transport in Lowesto. required. Lowesto Biodiversity Audits Part 2 www.suffolk.gov.uk/assets/suffolk.gov.uk/Environ www.waveney.gov.uk/site/scripts/download_info. Suffolk Wildlife Trust, December 2007 ment%20and%20Transport/Planning/2011-06- php?fileID=1205 Audit of biodiversity in Lowesto. 29%20Lowesto%20Transport%20Strategy.pdf www.waveney.gov.uk/site/scripts/download_info. php?fileID=703 Sustainable Urban Neighbourhood and Kirkley Open Space and Biodiversity Waterfront Access Study, Lowesto Aecom, December 2012 Suffolk Biodiversity Acon Plans Retail An assessment of the access proposals to serve Suffolk Wildlife Partnership, ongoing the Sustainable Urban Neighbourhood. Conserving, enhancing and restoring the natural Retail and Leisure Study www.consult.waveney.gov.uk/gf2./f/334338/882 condion of habitats through acon plans. DTZ, August 2006 6437.1/PDF/-/SUN%20Access%20Study%20LOW www.suffolkbiodiversity.org/biodiversity-acon- This study assesses the vitality and viability of the RES.pdf plans.aspx main shopping areas in Waveney and Great Yarmouth. It provides an indicaon of the likely A12 Lowesto Study - Lake Lothing Third Open Space Needs Assessment future capacity and demand for addional Crossing Feasibility Study Waveney District Council, July 2006 floorspace. Faber Maunsell Ltd / Highways Agency, February Provides informaon about exisng community www.waveney.gov.uk/site/scripts/download_info. 2009 needs and aspiraons in relaon to parks and php?downloadID=115 Preliminary work to help to determine whether a green spaces, plus a set of local standards. third river crossing and allied infrastructure www.waveney.gov.uk/site/scripts/download_info. Retail Capacity Update idenfied in the Lowesto Infrastructure Review php?downloadID=114 DTZ, September 2010 have the potenal to be progressed. Update of the 2006 retail capacity forecasts, a key www.waveney.gov.uk/site/scripts/download_info. Pitch and Non-Pitch Assessment part of the evidence base, parcularly in the light php?downloadID=167 Knight, Kavanagh & Page, March 2002 of changed economic condions. Assessing the supply of, and demand for, pitch and www.waveney.gov.uk/site/scripts/download_info. non-pitch sports provision in Waveney. php?fileID=1202 www.waveney.gov.uk/site/scripts/download_info. php?fileID=220

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 73 Technical Note 1 - Lowesto AAP Traffic Urban Design and Sustainable Water Cycle Strategy - Scoping Study Modelling Assumpons Construcon Sco Wilson, March 2009 Aecom, June 2010 Ensuring development is constructed in a Outlines the assumpons in undertaking the Lowesto Design Guide sustainable manner with respect to water traffic modelling for the Area Acon Plan (AAP). Waveney District Council, 2004 environment and water infrastructure. This note details how the modelling will be This design guide aims to improve and reinforce www.waveney.gov.uk/site/scripts/download_info. updated to a 2025 forecast. the identy of the town by promong good urban php?fileID=225 www.waveney.gov.uk/site/scripts/download_info. design and developing a robust palee of php?fileID=1207 materials, from surfacing and signage to bollards and benches. Other Planning and Supporng Technical Note 2 - Traffic Forecasts www.waveney.gov.uk/site/scripts/download_info. Documents Aecom, August 2010 php?downloadID=158 Detailing the outcomes from traffic modelling Naonal Planning Policy Framework undertaken for the Area Acon Plan. This Technical Baseline Report Lowesto Ground Condions CLG, March 2012 Note is a follow up to Technical Note 1 which Halcrow, December 2005 Sets out the Government’s planning policies for described the modelling assumpons that were to The study aims to idenfy the ground condions England and how these are expected to be be used. that may exist at the site of the URC applied. www.waveney.gov.uk/site/scripts/download_info. redevelopment along the corridor of Lake Lothing www.gov.uk/government/uploads/system/upload php?downloadID=443 and surrounding environment. s/aachment_data/file/6077/2116950.pdf www.waveney.gov.uk/site/scripts/download_info. Transport Evaluaon for 1st East Regeneraon php?fileID=380 Naonal Planning Policy Framework: Technical Sites in Lowesto - Stage 1 Report: Exisng Guidance Situaon and Scoping Note Renewable Energy and Sustainable Construcon CLG, March 2012 Atkins, January 2010 Study Provides addional guidance to local planning Assessment of transport issues associated with Aecom, November 2009 authories to ensure the effecve implementaon four key Intervenon Areas in Lowesto. Informing sustainable construcon & renewable of the planning policy set out in the Naonal www.waveney.gov.uk/site/scripts/download_info. energy policies to ensure that core strategy Planning Policy Framework on development in php?fileID=368 objecves can be delivered in a sustainable, areas at risk of flooding and in relaon to mineral carbon efficient way. extracon. www.waveney.gov.uk/site/scripts/download_info. www.gov.uk/government/publicaons/naonal- php?fileID=226 planning-policy-framework-technical-guidance

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 74 Suffolk Waste Core Strategy Development Plan o.php?documentID=100&categoryID=856&pageN Development Management Policies Document umber=1 Development Plan Document Suffolk County Council, Adopted March 2011 Waveney District Council, Adopted January 2011 Establishes the overarching principles and policy Sets out detailed policies to guide planning direcon for determining waste planning decisions to deliver the vision set out in the Core applicaons within Suffolk during this period. It Strategy. also idenfies strategic waste management sites across the County. www.waveney.gov.uk/site/scripts/download_info www.suffolk.gov.uk/environment-and- . transport/planning-and-buildings/minerals-and-w php?downloadID=497 aste-development-framework/waste-core- strategy-dpd/ Lowesto Lake Lothing and Outer Harbour Area Acon Plan Development Plan Document Suffolk Local Flood Risk Management Strategy Waveney District Council, Adopted January 2012 Suffolk County Council, Adopted January 2012 The Area Acon Plan helps to guide development The main aim of the strategy is to reduce the risk in the area surrounding Lake Lothing and the of flooding and the misery and economic damage Outer Harbour in Lowesto. that flooding causes. The acon plan outlines a www.waveney.gov.uk/site/scripts/documents_inf range of acons, from small-scale local acvies o.php?documentID=117&categoryID=200140&pa to long-term major plans and where possible geNumber=1 idenfied who will be involved, when things might happen and how they might be paid for. Raising funds for infrastructure delivery: Dra Charging Schedule www.suffolk.gov.uk/assets/suffolk.gov.uk/Emerg Waveney District Council, Submied December e 2012 ncy%20and%20Safety/Civil%20Emergencies/2012 To support new development the proposed -12%20Suffolk%20%20Flood%20Risk%20Strategy Community Infrastructure Levy will be payable by .pdf developers undertaking new building projects in an area to fund new infrastructure. The charge is Core Strategy Development Plan Document set out in the Community Infrastructure Levy Waveney District Council, Adopted January 2009 Charging Schedule. The document sets out the vision, objecves, www.waveney.gov.uk/site/scripts/documents_inf spaal strategy and core policies that will guide o.php?documentID=610&categoryID=200074&pa development unl to 2021 (2025 for housing). geNumber=1 www.waveney.gov.uk/site/scripts/documents_inf

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 75 Riverside Business Centre

SSP3 - Kirkley Waterfront and Sustainable Urban Neighbourhood

The Council and developers will work in partnership with other relevant stakeholders to deliver a Appendix 3 comprehensive approach to the development of Kirkley Waterfront and Sustainable Urban Neighbourhood (59.8ha). The following uses will be permied within this area: Policy SSP3 i. Approximately 1,380 residenal units will be developed to densies of broadly between 50 and 90 units/hectare. Lower and higher average densies will also be considered, taking account of site constraints and characteriscs, and surrounding land uses which may limit the development area; and the comprehensive masterplanning of the area. This density range will ensure the provision of a wide range of residenal accommodaon for individuals, couples and families including terraces, mews and townhouse typologies semi and detached houses, and apartments; Appendix 2 Policy SSP3 from Lake Lothing and Outer Harbour Area ii. Approximately 12 ha of reconfigured employment land comprising: Predominantly B1 office Acon Plan floorspace, research and development and workshop space in the area surrounding Riverside Road and adjacent to residenal areas;

iii. Waterfront industry to provide dock and mooring facilies and ancillary uses. (EMP1-4);

iv. A minimum of 3 ha of Open Space (depending upon density), plus retenon/reprovision of the exisng playing fields adjacent to the Jeld Wen site (or a like-for-like provision in areas at higher risk of flood);

v. Southern Access Routes;

vi. Connuing care rerement community;

vii. Primary School (1.7ha);

viii. Marina facilies with the potenal to provide permanent moorings for historic vessels;

ix. Retail, restaurants, bars, cafes as acve ground floor uses;

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 76 SSP3 - Kirkley Waterfront and Sustainable Urban Neighbourhood (connued)

x. Hotel.

xi. The site will be developed in accordance with the principles below and illustrated in Figure 4.3.3:

xii. Development of the site should seek to ensure that current employment acvies within the Brooke Business Park can be relocated on site as far as praccable (EMP1);

xiii. Development should retain the exisng business facilies and marina facilies on School Road (EMP1);

xiv. The full development of the site will require the construcon of a series of new access routes. The Jeld-Wen Playing Fields provides an opportunity for a new access to the site from Waveney Drive to serve the enre Sustainable Urban Neighbourhood. Access arrangements will be primarily funded by the sites to which the access serves.

xv. The site should be configured around a legible street paern that incorporates key views and provides good quality walking and cycling environments, using high quality materials consistent with the wider town. All residenal streets will be designed in accordance with Manual for Streets principles and be integrated with exisng neighbourhoods (EHC1, TML2, TML5);

xvi. New streets should be integrated with exisng roads, in parcular Heath Road, School Road, Nelson Wharf and Stanley Road. (EHC1, TML5);

xvii. Connecons within the site should be designed to provide quick, safe and aracve access by bus, on foot and by cycle to the railway staons, town centre and employment sites. A central transport “node” should provide convenient access from and to the site. This will benefit from sheltered bus waing facilies with real-me informaon, secure cycle parking and parking space for a potenal car club (TML1,2,3, EHC1);

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 77 SSP3 - Kirkley Waterfront and Sustainable Urban Neighbourhood (connued)

xviii. Development should respect and connect with the exisng residenal community to the south and provide a high quality residenal frontage along Waveney Drive (EHC1);

xix. Buildings should seek to provide acve and aracve frontages along Waveney Drive and any access route facilitang development (EHC1);

xx. Large areas of surface car parking should be avoided if possible (TML6);

xxi. The area should provide appropriate wayfinding measures to assist in moving visitors between the seafront and Broads area (EHC1);

xxii. Employment development should consider neighbouring residenal uses and should include appropriate landscaping and screening. Surface car parking should be appropriately screened through high quality site landscaping (EHC1);

xxiii. Development should not preclude a potenal third crossing which could be constructed in the future and new vehicular routes should take into consideraon potenal for future widening;

xxiv. Development should provide acvity along the waterfront. This may include the provision of parks, squares, play areas and acve frontages such as cafes, shops and workspace (EHC1);

xxv. A community hub should be created at the heart of the development with primary school, local shops, community facilies and other residenal amenies to which all development within the site should contribute. This should be accessible to new and exisng residents living south of Lake Lothing. This should provide an acvity focus at the centre of the site (HC3, RLT1);

xxvi. A new primary school should be included within the scheme to provide a central focus for development. The school should front the main access route and provide appropriate space for seng down/picking up. The school should be designed to enable out-of-hours acvies. Appropriate play space should be provided in a secure area to the rear. All development will be expected to contribute to development of the school (HC3);

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 78 SSP3 - Kirkley Waterfront and Sustainable Urban Neighbourhood (connued)

xxvii. New open spaces should be included to provide a network linked to the waterfront and other areas of green space. This may be as part of a Sustainable Drainage System (SuDS) for the site (EHC3);

xxviii. Appropriate green infrastructure should provide structure to the detailed site masterplanning in accordance with principles set out in Figure 4.3.4. The open space adjacent to Jeld Wen should be retained, either in situ, or as a like-for-like provision in parts of the site at greater flood risk (EHC3);

xxix. The area provides potenal to become a hub for tourism and should include hotel, restaurants, bars and marina to exploit the locaon between the North Sea and the Broads; LT2);

xxx. The construcon of new access routes may affect the Brooke Yachts and Jeld Wen Mosaic County Wildlife Site. Construcon of any new routes must minimise any loss of Wildlife sites, include appropriate migaon of impacts and ensure like-for-like reprovision for any habitat loss within the Strategic Site. Development should include provision to encourage wildlife habitats such as green/brown roofs and natural areas within green spaces (EHC4);

xxxi. All development should contribute to the construcon of a new pedestrian/cycle bridge to link Brooke Peninsula to the north of Lake Lothing (TML2);

xxxii. Secure cycle parking must be included throughout the site (TML2);

xxxiii. All new buildings will be designed to ensure energy, water and waste efficiency (WEW 1-3);

xxxiv. Where feasible buildings and streets should be orientated towards the south to maximise solar gain and energy efficiency (WEW1);

xxxv. Development must address sewage network capacity restricons at Lowesto Heath Road Pumping Staon, Lowesto Sunnyfield Pumping Staon and Lowesto Bridge Pumping Staon.

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 79 SSP3 - Kirkley Waterfront and Sustainable Urban Neighbourhood (connued)

All new development will be subject to a site specific Flood Risk Assessment. A flood evacuaon plan and details of appropriate migaon measures must be submied to the sasfacon of the Council’s emergency planners. Residenal and other ‘more vulnerable’ uses on site must be designed to ensure flood risk is migated with a safe means of escape. More vulnerable uses proposed on the site should be, as far as possible, located outside Flood Zone 3 or in areas of least flood risk. The design of buildings should promote resilience during flood events through appropriate use of materials and situaon of habitable uses above the flood level. Development will be protected through measures such as land raising, incorporaon of secondary defences and SuDS. Future pedestrian and vehicular access routes may offer potenal to act as a further mode of defence. SuDS will be considered as part of the comprehensive development of the site, potenally including swales, green/brown roofs and living walls integrated within a wider network of open spaces/habitats, including the Brooke Yachts and Jeld Wen Mosaic County Wildlife Site.

The following items of infrastructure will be required to support the development of the site:

i. New primary school; ii. Southern access routes; iii. New pedestrian and cycle routes and facilies; iv. Public transport improvements; v. Pedestrian and cycle bridge link; vi. Flood defences; vii. Remediaon of contaminated areas in accordance with PPS23; viii. On site renewable energy systems.

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 80 SuDs, Greenwich Millennium Village, London

WEW1 – Energy Requirements within the AAP Area

Within the main strategic sites (Kirkley Waterfront / Sustainable Urban Neighbourhood /Peto Square/ Appendix 4 PowerPark) developers must deliver the equivalent of the energy requirements of Code for Sustainable Policy WEW1 & Homes Level 5 (in residenal buildings) and BREEAM excellent (in other buildings) unless these technologies can be proven technically unsuitable or commercially unviable. Invesgaons should be WEW2 based on opportunies idenfied in the Renewable Energy and Sustainable Construcon Study.

Within the strategic sites opportunies should be sought to provide linked district heang networks to serve development sites within the AAP area. These will be designed to take advantage of the diversity of energy loads from the different proposed building uses. This process will be supported by Waveney District Council. Where a CHP system is delivered on-site, all buildings are required to connect. These may Appendix 3 Energy and Water be provided as self-contained systems on site, or link into a wider network incorporang other parts of Policy from the Lake Lothing and the AAP area and beyond. Outer Harbour Area Acon Plan Smaller sites within the AAP should seek to integrate into new or exisng networks, or provide self- contained on-site energy generaon.

An energy strategy and delivery plan must be submied alongside any planning applicaon for development within the AAP area outlining expected carbon reducons and the viability of exceeding district-wide energy targets on-site.

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 81 WEW2 – Water Efficiency and Quality

Developers must explore the potenal to implement water recycling measures on a building or site-wide scale to significantly reduce mains water demand as part of all new development within the AAP.

Within the main strategic sites (Kirkley Waterfront/Sustainable Urban Neighbourhood/Peto Square/PowerPark) developers must deliver infrastructure to reduce mains water consumpon to the equivalent requirement of Code for Sustainable Homes Level 5 (in residenal buildings) and BREEAM excellent (in other buildings) unless these strategies can be proven technically unsuitable or commercially unviable. Invesgaons should be based on opportunies idenfied in the area-wide Water Strategy for the AAP.

Opportunies should be sought to link together development within the AAP with site-wide recycled water networks, taking advantage of the diversity of water sources and uses on-site. This process will be supported by Waveney District Council. Where a recycled water network is delivered on-site, all buildings are required to connect.

All development must also consider implicaons upon the sewage network in Lowesto, ensuring that capacity is sufficient. Where this is not the case, appropriate contribuons will be required to upgrade the network. Development must ensure that no deterioraon in water quality occurs and where possible an improvement will be sought.

A water strategy and delivery plan should be submied alongside any planning applicaon for development within the AAP area outlining expected mains water demand reducons and the viability of exceeding District-wide water targets on-site.

Sustainable Urban Neighbourhood and Kirkley Waterfront | Development Brief | May 2013 | 82 If you would like a copy or a summary of this document in an alternative language or format please ask an English speaking friend to contact us at the address below.

MANDARIN 如果您需要此文件的其它言或格式的副本或摘要,一位英文的朋友按照上述地址与我联系。

HUNGARIAN Ha a jelen dokumentum más nyelvű vagy formátumú változatára vagy kivonatára van szüksége, kérje meg egy angolul tudó barátját, hogy vegye fel velünk a kapcsolatot a fenti címen.

POLISH Jeżeli są Państwo zainteresowani otrzymaniem kopii lub streszczenia niniejszego dokumentu w tłu- maczeniu na język polski lub w innym formacie, prosimy zwrócić się do osoby z Państwa otoczenia posługującej się językiem angielskim, aby skontaktowała się z nami w tej sprawie pod widocznym powyżej adresem.

SLOVAK Ak potrebujete kópiu alebo zhrnutie tohoto dokumentu v inom jazyku, alebo v inom formáte požiadajte prosím anglicky hovoriaceho priateľa/priateľku, aby nás kontaktovali na adrese uvedenej vyššie.

TURKISH Bu dokümanın bir kopyasını ya da özetini alternatif bir dilde veya formatta isterseniz, lütfen İngilizce konuşan bir arkadaşınızdan yukarıdaki adresten bizimle iletişime geçmesini isteyiniz.

PORTUGUESE Se pretender uma cópia ou um sumário deste documento num idioma ou formato alternativo, peça por favor a um(a) amigo(a) que fale inglês para nos contactar na morada acima indicada.

KURDISH SORANI دامائ ۆت ۆب د   وێش ب نا د ێنامز ب گڵ ب م ئ ل   ترو نا  پۆ تێو ت د ر گ ئ ڵ گ ل و ر س  ناشنوان و ئ اگێڕ ل ب اواد تێناز د زلگنئ  تۆخ ێر دارب ل ات تێرب .تاب دن و پ مێئ

LITHUANIAN Jei jums reikia šio dokumento kopijos ar santraukos kita kalba ar kitu formatu, paprašykite angliškai kalbančio draugo/draugės, kad jis/ji susisiektų su mumis aukščiau pateiktu adresu.

Waveney District Council Planning Policy Team Town Hall, High Street, Lowesto, Suffolk NR32 1HS

 01502 523029  [email protected]

All maps reproduced from the Ordnance Survey mapping with the permission of the Controller of Her Majesty’s Staonery Office (c) Crown Copyright. Unauthorised reproducon infringes Crown copyright and may lead to prosecuon or civil proceedings. Waveney District Council Licence No. 100042052, 2012 /