International Job References - MasterSeal 700BG
2 DATE PROJECT CONTRACTOR CONSULTANT AREA [ M ]
ARABIAN GULF 3B+G+M+3 FLOORS+ROOF - TRA EXTENSION PARKWAY INTERNATIONAL HEADQUARTER ON PLOT NO. 134-1075, AL MAMZAR DUBAI, ADNAN SAFFARINI 2016/12 CONTRACTING UAE STUDENT ACTIVITIES AND ATHLETIC FACILITIES, SABAH AL- SEG-QATAR GULF CONSULT 2016/12 SALEM UNIVERSITY CITY - KUWAIT UNIVERSITY, KUWAIT 3B+G+M+3 FLOORS+ROOF - TRA EXTENSION PARKWAY INTERNATIONAL HEADQUARTER ON PLOT NO. 134-1075, AL MAMZAR DUBAI, ADNAN SAFFARINI 2016/12 CONTRACTING UAE RAFT FOUNDATION WORKS FOR MARYAH PLAZA ON PLOT 2016/03 AL FARAA GENERAL CONT. CO. KEO INTERNATIONAL CONSULTANTS NO. EW-11-M18-C1 AT MARYAH ISLAND, ABU DHABI, UAE CONSTRUCTION OF SALWA RESORT - HOTEL (CONTRACT 1), 2015/08 CONTRACO WLL DAR AL HANDASAH DOHA, QATAR C0900 : COLLEGE OF SOCIAL SCIENCES, COLLEGE OF LAW, DAR SALEH AL QALLAF SHAPOORJI PALLONJI & CO. PVT. LTD. 2015/07 COLLAGE OF SHARI'A & ISLAMIC STUDIES, PRAYER AREA & ENGINEERING CONSULANTS / PAGE
FACULTY CLUB (1), KUWAIT SOUTHERLAND PAGE FIVE STAR HOTEL (5 BASEMENT+GROUND+4 PODIUM+32 2015/04 LEVELS+2 MEP+REFUGE FLOOR+ROOF) ON PLOT NO. H-24 AL FUTTAIM CARILLION LLC AEDAS LIMITED (E12-C42) - SARAYA, MINA ROAD - ABU DHABI, UAE 2014 SEAWATER BYPASS PUMPHOUSE AT BNPP GUSAN KEPCO 50,000
RESIDENTIAL BLDG. ON PLOT C-33 SECTOR E-9/2 2014 ACC APG 5,500 2014 AVENUE PH 2 AFC AECOM 100,000 COLLEGE OF BUSINESS & COLLEGE FOR WOMEN - SABAH SINOHYDRO CORPORATION LIMITED & CAMBRIDGE SEVEN 2014/01 AL SALEM UNIVERSITY CITY- KUWAIT UNIVERSITY, KUWAIT AL HANI ASSOCIATES/GULF CONSULT DESIGN, CONSTRUCTION, EQUIPMENT, FURNITUYRE AND ALGHANIM INTERNATIONAL GEN. TRAD. 2013/06 OPERATIONAL MAINTENANCE FOR THE EXPANSION OF AL & CONT. CO. WLL RAZI HOSPITAL - KUWAIT
International Job References - MasterSeal 700BG
2 DATE PROJECT CONTRACTOR CONSULTANT AREA [ M ]
DATE PROJECT CONTRACTOR CONSULTANT AREA [ M2 ]
2013 TAWAM HOSPITAL DIALYSIS CENTER CIVIL POWER CONSTRUCTION BURT HILL 4,500
2013 RESIDENTIAL BLDG. ON PLOT C-35 SECTOR E-12 ACC APG 5 500 2013 SAROUH COMMERCIAL BUILDING AT ABU DHABI, UAE ORIENT HOUSE CONSTRUCTION CO DAR AL KHALIJ 7,000
2013 PETROLIUM INSTITUTE BUILDING AT ABU DHABI, UAE AL JABER ENGINEERING JACOBS 10,000 2013 AL SAFOUH TRANSIT ( TRAM WAY ) SIXCONSTRUCT SYSTRA 20,000
BEACHFRONT RETAIL & ENTERTAINMENT DEVELOPMENT AT 2013 JBR, DUBAI, UAE KHANSAHEB BSBG 100,000
2013 LOTUS TOWER AT BUSINESS BAY DUBAI, UAE TAV CONSTRUCTION KHATIB & ALAMI 25,000
UPGRADE OF AL RAYYAN ROAD / JASSIM MOHAMMED HBK CONTRACTING / QBS 2013/02 ATKINS QATAR STREET, DOHA, QATAR INTERNATIONAL JV
2013 CITYWALK AL SHAFAR GEN. CONT. CO HALFORDS/ HYDER 100,000
TREATMENT AND REHABILITATION CENTER FOR DRUG JOANNOU & PARASKEVAIDES STANTEC / ARAB ENGINEERING 2013/01 ADDICTS (AL NAUFAR) - QATAR (OVERSEAS) LTD (J & P) BUREAU QATAR JV
CIVIL WORKS FOR UTILITY SERVICE TUNNEL (EAST), SABAH KCPC- KUWAIT COMPANY FOR 2013/01 CCA/SSH AL-SALEM UNIVERSITY CITY - KUWAIT UNIVERSITY, KUWAIT PROCESS PLANT CONST. CONT. K.S.C URBACON GENERAL CONTRACTING 2012/06 SOUQ WAQIF CARPARK, DOHA, QATAR PARSONS INTERNATIONAL QATAR (UCC) 2012 JALEELA HOSPITAL AFC STUDIO ATLIER 60,000
International Job References - MasterSeal 700BG
2 DATE PROJECT CONTRACTOR CONSULTANT AREA [ M ]
2012 BRIGHT STAR HOTEL AND RESORT DUBAI CINTRACTING CO. DSA/ HYDER 12,000
DATE PROJECT CONTRACTOR CONSULTANT AREA [ M2 ]
2012 4 POINT SHERATON AT DUBAI MARINA CARBON CONTRACTING CIONIN CONSULT 8,000
2012 BARAKA NUCLEAR POWER PLANT Ph 1 ( Unit 1&2 ) HYUNDAI SAMSUNG JV KEPCO 110,000
2012/01 SHERATON PARK PROJECT DOHA, QATAR QDVC ARUP QATAR
2012 DANAT AL EMARAT HOSPITAL TERNA CONTRACTING ECG 15,000
2010 DUCAB HV/EHV FACILITY AT DUBAI KHANSAHEB CIVIL ENGINEERING HYDER CONSULTANTS 12,000
2010 THE OPUS TOWER AT BUSINESS BAY MULTIPLEX LLC AREX CONSULTANTS 25,000
PARK HYATT HOTEL AND RESORT AT SADIYAT ABU 2009 ALEC AL JABER CONTRACTING EHAF CONSULTANTS DHABI 25,000
2009 ABU DHABI GOLF CLUB HOTEL LEIGHTON GULF HALCROWS 25,000
2009 AL WAHDA MALL EXTENSSION ALI AND SONS CONTRACTING KHATIB AND ALAMI CONSULTANTS 40,000
2008 SILVER WAVE TOWER SEIDCO CONT. CO. BAYNOUNHA CONSULTANTS 8,000
2008 COMMERCIAL BUILDING ON PLOT E25 ABU DHABI MATAC AL BURJ CONSULTANTS 9,000
2009 TUNNEL AT NAJMAT ABU DHABI CHINA HARBOUR ENG. CONT. HALCROWS/ HYDER 5,000
TELECOMMUNICATION REGULATORY AUTHORITY OFFICE 2009 PARKWAY INTERNATIONAL KLING CONSULT BUILDING AT PLOT NO. P-78, E-18/03 IN ABU DHABI 5,000 CONTRACTING 2008 KINGDOM OF SHEBA AT PALM JUMEIRAH DUBAI CONTRACTING CO ACE CONSULTANTS 80,000
International Job References - MasterSeal 700BG
2 DATE PROJECT CONTRACTOR CONSULTANT AREA [ M ]
TELECOMMUNICATION REGULATORY AUTHORITY OFFICE 2009 PARKWAY INTERNATIONAL KLING CONSULT BUILDING AT AL MAMZAR DUBAI 5,000 CONTRACTING DATE PROJECT CONTRACTOR CONSULTANT AREA [ M2 ]
2008 BURJ DUBAI BOULEVARD U/G CAR PARK BUILDING PH 2 AL FUTTAIM CONT CO. HYDER CONSULTING 80,000
2008 BURJ DUBAI BOULEVARD U/G CAR PARK BUILDING PH 2 AL FUTTAIM CONT CO. HYDER CONSULTING 80,000
2008 BURJ DUBAI BOULEVARD U/G CAR PARK BUILDING PH 2 AL FUTTAIM CONT CO. HYDER CONSULTING 80,000
2008 AL BATEEN TOWER AT DUBAI MARINA COMMODORE CONT CO. NEB CONSULTANTS 25,000
2008 PPM CONRAD HOTEL AT DUBAI DCC/ARABTEC JV ATKINS 10,000
2009 PRUDENTIAL TOWER AT JUMEIRAH VILLAGE SEG CONST CO. U&A CONSULT/ WHITBY AND BIRD 16,000
2009 DUJA TOWER AT SH ZAYED ROAD DUBAI AL SAQER ENG CONST CO ZAS CONSULTANTS 10,000
2009 OBEROI CENTER AT BUSINESS BAY DUBAI AL NABOODAH CONTRCTING CO HALCROWS 25,000
2009 MARINA STAR TOWER AT DUBAI MARINA CONDOR BLDG. CONT. CO. DIMESSION ENG. CONSULTANTS 6,000
2009 JASHANMALS HEAD QTRS BUILDING AT AL BARSHA CONVRGNT VALUE ENGINEERING APG CONSULTANTS 5,000
2009 ROYAL AMWAJ RESORT AT PALM JUMEIRAH GTCC/WATERMAN AEDAS/PJSI 21,000
2008 BONNINGTON TOWER AT JLT DUBAI DUBAI CONTRACTING CO WHITBY AND BIRD CONSULT. 10,000
THE PENTOMINIUM TOWER ON PLOT NO. 392-567 MARSA HYDER COLSULTING MIDDLE EAST 2009 DUBAI ARABIAN CONSTRUCTION COMPANY LTD. 8,000 DUBAI WORLD TRADE CENTER COMPLEX (DISTRICT) - AL JABER L.E.G.T. ENGINEERING 2008 PHASE 1 - PACKAGE NO. CP37 AND CONTRACTING (ALEC) LLC WSP CONSULTANT 270,000
International Job References - MasterSeal 700BG
2 DATE PROJECT CONTRACTOR CONSULTANT AREA [ M ]
ELITE TOWER ON PLOT NO. 392-190 AT MARSA DUBAI 2008 4B+G+4P+82FLOORS(91LEVELS) ARABIAN CONSTRUCTION COMPANY ADNAN SAFFARINI 1,000 THE PAD - PROPOSED 3B+G+P+M+23F LEVELS 2008 RESIDENTIAL BUILDING ON PLOT NO. BB.B01.061 AT AL ROSTAMANI PEGEL LLC WHITBY AND BIRD ENGINEERS 70 BUSINESS BAY DUBAI
International Job References - MasterSeal 700BG
DATE PROJECT CONTRACTOR CONSULTANT AREA [ M2 ]
THE PAD - PROPOSED 3B+G+P+M+23F LEVELS 2008 RESIDENTIAL BUILDING ON PLOT NO. BB.B01.061 AT AL ROSTAMANI PEGEL LLC WHITBY AND BIRD ENGINEERS 70 BUSINESS BAY DUBAI
2008 THE AVIATION CLUB HOTEL ON PLOT NO. B214-233 AT AL AL ROSTAMANI PEGEL LLC R.M.J.M. 19,500 GARHOUD DUBAI 2007 CANAL POINT HOSPITAL ON SHEIKH ZAYED ROAD ON 5.5 AL NABOODAH CONTRACTING LLC BURT HILL CONSULTANTS 30,000 INTERCHANGE - PACKAGE 2, DUBAI BHATIA GENERAL CONTRACTING CO. LLC / 2008 3B+G+6 OFFICE BUILDING FOR OMD AT DUBAI MEDIA CITY AL SHIRAWI CONTRACTING ARCH GROUP 5,500
PROPOSED SHOPPING CENTER 2B+G+M+4 FLOORS ON 2007 PLOT NO. 318-864 AT AL KARAMA DUBAI AL HUDAIBA CONTRACTING DESIGN CENTRE 10,000 THE BUILDINGS BY DAMAN ON PLOT NOS. PA 03 & PA 04 2007 AT DUBAI INTERNATIONAL FINANCIAL CENTRE OGER DUBAI LLC ARIF & BINTOAK 30,000
PRINCESS TOWER - 6B+G+100 STOREY RESIDENTIAL 2007 TOWER ON PLOT NO. 392-192 AT MARSA DUBAI ARABIAN CONSTRUCTION COMPANY ADNAN SAFFARINI 10,000
AL GURG TOWER 3 ON PLOT NO. 125-117, REGGA AL 2007 BUTEEN - DUBAI KHANSAHEB CIVIL ENGINEERING LLC R.M.J.M. 6,000
2007 DUBAI LIGHT RAIL TRANSIT PROJECT PHASE I OBAYASHI / YAPI MERKEZI JV SYSTRA 45,000
THE FAIRMONT PALM RESIDENCES CONTRACT NO. DSA ARCHITECTS INTERNATIONAL / 2007 1003/12 AT PALM ISLAND DUBAI CONTRACTING COMPANY LLC LC CONSULTANT 85,000 DUBAI HEALTH CARE CITY PHASE 2 HOTEL PROJECT PE 2007 100 AL BASTI & MUKTHA LLC R.M.J.M. 27,000
2007 DUBAI BUSINESS BAY TOWER ON PLOT O-14 DUBAI CONTRACTING COMPANY LLC ERGA CONSULTANTS 6,700
International Job References - MasterSeal 700BG
DATE PROJECT CONTRACTOR CONSULTANT AREA [ M2 ]
AL FATTAN HOTEL AND RESIDENCES PALM JUMEIRAH AL FATTAN MRCB CONSTRUCTION CO. LLC DSA ARCHITECTS INTERNATIONAL / 2007 WSP 34,000 TRIDENT GRAND RESIDENCE MULTY STOREY 2007 RESIDENTIAL BUILDING ON PLOT 9AB DUBAI MARINA CSHK DUBAI CONTRACTING (L.L.C.) R.M.J.M. 13,500 BURJ DUBAI DEVELOPMENT PLOT 12 AND 13 BOULEVARD 2007 PLAZA SAMSUNG / BIN BELAILA BAYTUR JV HYDER CONSULTING 27,500 DAR CONSULT DESIGN & MIXED USE DEVELOPMENT ON PLOT NO 335-141 AND 335- BELHASA ENGINEERING & CONTRACTING ARCHITECTURE BUREAU / WHITBY 2007 178 TRADE CENTER CO. LLC AND BIRD 16,500 3B+G+45 FLOOR MULTI FUNCTION BLDG WITH PODIUMS ON PLOT NO. B-001-011 DIC SHEIKH ZAYED ROAD DUBAI APG ARCHITECTS & PLANNING 2007 SIDRA TOWER ZELAN HOLDINGS (M) SND BHD GROUP / ARKAN 13,000 GATE VILLAGE PROJECT, DUBAI INTERNATIONAL HOPKINS ARCHITECTS / LC 2006 FINANCIAL CENTRE ARABTEC CONSULTANTS 40,000
2006 BURJ DUBAI BOULEVARD CAR PARK BUILDING A.F.C HYDER CONSULTING 40,000
2006 BURJ DUBAI BELOW GROUND FOUNDATION NASA MULTIPLEX SOM/HYDER 51,000
2006 BURJ DUBAI PODIUM RAFT AND WALLS SANSUNG / ARABTEC & SIXCO JV SOM/HYDER 50,000
2006 DUBAI FESTIVAL CITY ZONE 8A CANAL WATERPROOFING AL FUTTAIM CARILLION HOK CANADA 10,000 DUBAI FESTIVAL CITY ZONE 2B. HARBOUR PLAZA PODIUM 2006 ROOF WATERPROOFING AL FUTTAIM CARILLION MAARAKI FBK 10,000
2006 DUTCO GROUP HEADQUARTERS BUILDING DUTCO BALFOUR BEATTY (DBB) BREWER SMITH BREWER (GULF) 5,500 4B+G+M+7 COMMERCIAL / RESIDENTIAL BUILDING FOR 2006 ETA STAR GROUP ASCON AL HASHEMI CONSULTANTS 7,000
International Job References - MasterSeal 700BG
DATE PROJECT CONTRACTOR CONSULTANT AREA [ M2 ] WOODS & BAGOT / SIR NORMAN 2006 INDEX TOWER AT DIFC NASA MULTIPLEX FOSTAR 45,000 5 STAR HOTEL AND MIXED USE TOWERS FOR ACICO 2006 PROPERTIES KELLY CONTRACTORS DIMENSIONS / FAITHFUL & GOULD 10,000 M3 AR CHARTERED ARCHITECTS / 2006 BONNINGTON TOWER AT JUMEIRAH LAKE TOWER DUBAI CONTRACTING COMPANY LLC WHITBY AND BIRD ENGINEERS 7,000 ETA STAR PROPERTIES TOWER ON PLOT NO. C-2 AT 2006 JUMEIRAH LAKETOWERS ASCON DAR CONSULTANT 10,000 PALM JUMEIRAH INFRASTRUCTURE PROJECT VEHICULAR HYDER / PARSONS DE LEUW CATHER 2006 UNDERPASSES AL NABOODAH ENGINEERING SERVICES OVERSEAS LTD 14,000 COMMERCIAL/RESIDENTIAL & OFFICE TOWER ON PLOT DESIGN AND ARCHITECTURE 2006 NO. C2 - JUMEIRAH LAKE TOWERS ASCON BUREAU (DAR) 6,000 DAR CONSULT DESIGN & 2006 COMMERCIAL AND OFFICE BUILDING AT PORT SAEED KHANSAHEB CIVIL ENGINEERING LLC ARCHITECTURE BUREAU 5,000 CONSOLIDATED CONTRACTORS 2005 DUBAI CAPITAL TOWERS INTERNATIONAL CO. R.M.J.M. 15,000 ADDITIONAL CAR PARK BUILDING FOR CAPITAL TOWERS CONSOLIDATED CONTRACTORS 2005 PROJECT INTERNATIONAL CO. R.M.J.M. 5,000 TIGER INTERNATIONAL GENERAL 2005 MARINA PINNACLE TOWER, DUBAI MARINA CONTRACTING CO. NATIONAL ENGINEERING BUREAU 10,000
2005 DUBAI INTERNATIONAL AIRPORT ANLOR DAR AL HANDASAH / ADPI 1,000,000
2005 DUBAI INTERNATIONAL FINANCIAL CENTRE EAST TUNNEL PERUMBA CONTRACTING HALCROW 9,000
2005 SEWERAGE TREATMENT PLANT AT PALM JUMEIRAH AL NABOODAH ENGINEERING SERVICES HYDER & PARSONS BRINKERHOFF 7,500
2005 PALM JUMEIRAH SERVICE SHAFTS AL NABOODAH ENGINEERING SERVICES PARSONS BRINKERHOFF 4,000
International Job References - MasterSeal 700BG
AUSTRIA
LANDECK TUNNEL 100,000
ARLBERG TUNNEL 50,000
TRAUNFRIEDTUNNEL 30,000
HUNGENBICHL TUNNEL 25,000
KLAUSER TUNNEL 50,000
FALKESTEIN 10,000
MUGGENDORF 10,000
PLAUBUTSCHTUNNEL 270,000
SPERING TUNNEL 110,000
AMBERG TUNNEL (IN PROGRESS) 80,000
STRENGEN TUNNEL S16 (IN PROGRESS) 320,000
LOIBLTUNNEL (IN PROGRESS) 11,000
FRANCE
MARSEILLE LOT.3M 230,000
International Job References - MasterSeal 700BG
INFERNET 5,000
LAMBESC 20,000
ST.GENIES 5,000
GREECE
TEMPI 50,000
MAURI ORA 25,000
KAVALA 34,000
KALIDROMO 250,000
VERIA 40,000
DEMOKRITOS 63,000
CARS – NATO UNDERGROUND FACILITY 37,000
IOANINA 20,000
PORTUGAL
AUTOPISTA ISLA DE MADEIRA 140,000
METRO LISBONA 25,000
RAMELA 19,000
International Job References - MasterSeal 700BG
S. VICENTE/RIBERA BRAVA 18,000
SPAIN
LA CANIZA 120,000
PIEDRAFITA 56,000
TRABADELO 17,000
GIBRALFARO 3,000
BENICASIM 15,000
NERJA 5.000
DONCOS 45,000
CERROGORDO 60,000
VITORIA 3,000
BUBIERCA-DEHESILLAS-CASTEJÓN 160,000
ALHAMA 35,000
UTE PILES 35,000
UNITED KINGDOM
T4 STATION HEATHROW EXPRESS 25,000
International Job References - MasterSeal 700BG
CTRL 410 "NORTH DOWNS TUNNEL" 130,000
RAMSGATE TUNNEL 30,000
AUSTRALIA
MELBOURNE CITY LINK 130,000
BRISBANE 10,000
BULGARIA
TRAIANOVI VRATA 30,000
COLOMBIA
TUNNEL BELLAVISTA 25,000
CROATIA
TUNNEL SVETI MARKO 12,000
TUNNEL SVETI ROK 120,000
TUNNEL JAVOROVA KOSA (IN PROGRESS) 70,000
TUNNEL BRINJE/GRIC (IN PROGRESS) 150,000
EIRE
DUBLIN PORT TUNNEL LOTA (IN PROGRESS) 120,000
International Job References - MasterSeal 700BG
HONG KONG
TAI LAM TUNNEL 160,000
MALAYSIA
PENCHALA TUNNEL (IN PROGRESS) 40,000
MONTENEGRO
SOZINA (IN PROGRESS) 54,000
SLOVENIA
GOLO REBRO 31,700
TABOR 18,500
PLETOVARIJE 7,000
TREBNIE 21,000
TROJANE (IN PROGRESS) 160,000
SWITZERLAND
ALPTRANSIT BODIO TICINO 25,000
TUNNEL DEL TORBECCIO 6,000
International Job References - MasterSeal 700BG
TAIWAN
HO KOU TUNNEL – THSR (IN PROGRESS) 120,000
C260 PENGSSHUAN TUNNEL – THSR (IN 335,000 PROGRESS) TURKEY
NEW METRO INSTAMBUL (STATION) 20,000
BOLU TUNNEL 25,000
TRAB ZUM TUNNEL 75,000
DORUKHAN TUNNELL (MENGEN TR) 22,000
ISTANBUL METRO – TAKSIM TUNNEL 80,000
ISTANBUL METRO – SISHANE METRO STATION 22,000
ISTANBUL METRO – YENIKAPI TUNNEL (IN 120,000 PROGRESS) KARADENIZ MOTORWAY (GIRESUN) (IN 80,000 PROGRESS) ANKARA METRO (IN PROGRESS) 240,000
USA
BOSTON (IN PROGRESS) 5,000
International Job References - MasterSeal 700BG
VIETNAM
HAI VAN TUNNEL 15,000
AROANG II TUNNEL (IN PROGRESS) 10,000 EGYPT
PRIVATE BUILDING - CAIRO OWNER 2,000
MAF COMPOUND (PHASE 1) SPACE 2,000
NEW CAIRO CITY 2,000
RAYA BUIDING - 6 OCT. CITY OWNER 700
OFFICE BUILDING - SMART VILLAGE (IN EHAF 1,000 PROGRESS) ASUIT CENTER 3,500
SOFITEL HOTEL - CAIRO EHAF 3,500
CENTRAL BANK - TANTA DORAA 700
CENTRAL BANK - ASUIT ARC PLAN 1,500
WOMEN HEALTH UNITS - ALEX EHAF 30,000