International Job References - MasterSeal 700BG

2 DATE PROJECT CONTRACTOR CONSULTANT AREA [ M ]

ARABIAN GULF 3B+G+M+3 FLOORS+ROOF - TRA EXTENSION PARKWAY INTERNATIONAL HEADQUARTER ON PLOT NO. 134-1075, AL MAMZAR , ADNAN SAFFARINI 2016/12 CONTRACTING UAE STUDENT ACTIVITIES AND ATHLETIC FACILITIES, SABAH AL- SEG-QATAR GULF CONSULT 2016/12 SALEM UNIVERSITY CITY - KUWAIT UNIVERSITY, KUWAIT 3B+G+M+3 FLOORS+ROOF - TRA EXTENSION PARKWAY INTERNATIONAL HEADQUARTER ON PLOT NO. 134-1075, AL MAMZAR DUBAI, ADNAN SAFFARINI 2016/12 CONTRACTING UAE RAFT FOUNDATION WORKS FOR MARYAH PLAZA ON PLOT 2016/03 AL FARAA GENERAL CONT. CO. KEO INTERNATIONAL CONSULTANTS NO. EW-11-M18-C1 AT MARYAH ISLAND, ABU DHABI, UAE CONSTRUCTION OF SALWA RESORT - HOTEL (CONTRACT 1), 2015/08 CONTRACO WLL DAR AL HANDASAH DOHA, QATAR C0900 : COLLEGE OF SOCIAL SCIENCES, COLLEGE OF LAW, DAR SALEH AL QALLAF SHAPOORJI PALLONJI & CO. PVT. LTD. 2015/07 COLLAGE OF SHARI'A & ISLAMIC STUDIES, PRAYER AREA & ENGINEERING CONSULANTS / PAGE

FACULTY CLUB (1), KUWAIT SOUTHERLAND PAGE FIVE STAR HOTEL (5 BASEMENT+GROUND+4 PODIUM+32 2015/04 LEVELS+2 MEP+REFUGE FLOOR+ROOF) ON PLOT NO. H-24 AL FUTTAIM CARILLION LLC AEDAS LIMITED (E12-C42) - SARAYA, MINA ROAD - ABU DHABI, UAE 2014 SEAWATER BYPASS PUMPHOUSE AT BNPP GUSAN KEPCO 50,000

RESIDENTIAL BLDG. ON PLOT C-33 SECTOR E-9/2 2014 ACC APG 5,500 2014 AVENUE PH 2 AFC AECOM 100,000 COLLEGE OF BUSINESS & COLLEGE FOR WOMEN - SABAH SINOHYDRO CORPORATION LIMITED & CAMBRIDGE SEVEN 2014/01 AL SALEM UNIVERSITY CITY- KUWAIT UNIVERSITY, KUWAIT AL HANI ASSOCIATES/GULF CONSULT DESIGN, CONSTRUCTION, EQUIPMENT, FURNITUYRE AND ALGHANIM INTERNATIONAL GEN. TRAD. 2013/06 OPERATIONAL MAINTENANCE FOR THE EXPANSION OF AL & CONT. CO. WLL RAZI HOSPITAL - KUWAIT

International Job References - MasterSeal 700BG

2 DATE PROJECT CONTRACTOR CONSULTANT AREA [ M ]

DATE PROJECT CONTRACTOR CONSULTANT AREA [ M2 ]

2013 TAWAM HOSPITAL DIALYSIS CENTER CIVIL POWER CONSTRUCTION BURT HILL 4,500

2013 RESIDENTIAL BLDG. ON PLOT C-35 SECTOR E-12 ACC APG 5 500 2013 SAROUH COMMERCIAL BUILDING AT ABU DHABI, UAE ORIENT HOUSE CONSTRUCTION CO DAR AL KHALIJ 7,000

2013 PETROLIUM INSTITUTE BUILDING AT ABU DHABI, UAE AL JABER ENGINEERING JACOBS 10,000 2013 AL SAFOUH TRANSIT ( TRAM WAY ) SIXCONSTRUCT SYSTRA 20,000

BEACHFRONT RETAIL & ENTERTAINMENT DEVELOPMENT AT 2013 JBR, DUBAI, UAE KHANSAHEB BSBG 100,000

2013 LOTUS TOWER AT BUSINESS BAY DUBAI, UAE TAV CONSTRUCTION KHATIB & ALAMI 25,000

UPGRADE OF AL RAYYAN ROAD / JASSIM MOHAMMED HBK CONTRACTING / QBS 2013/02 ATKINS QATAR STREET, DOHA, QATAR INTERNATIONAL JV

2013 CITYWALK AL SHAFAR GEN. CONT. CO HALFORDS/ HYDER 100,000

TREATMENT AND REHABILITATION CENTER FOR DRUG JOANNOU & PARASKEVAIDES STANTEC / ARAB ENGINEERING 2013/01 ADDICTS (AL NAUFAR) - QATAR (OVERSEAS) LTD (J & P) BUREAU QATAR JV

CIVIL WORKS FOR UTILITY SERVICE TUNNEL (EAST), SABAH KCPC- KUWAIT COMPANY FOR 2013/01 CCA/SSH AL-SALEM UNIVERSITY CITY - KUWAIT UNIVERSITY, KUWAIT PROCESS PLANT CONST. CONT. K.S.C URBACON GENERAL CONTRACTING 2012/06 SOUQ WAQIF CARPARK, DOHA, QATAR PARSONS INTERNATIONAL QATAR (UCC) 2012 JALEELA HOSPITAL AFC STUDIO ATLIER 60,000

International Job References - MasterSeal 700BG

2 DATE PROJECT CONTRACTOR CONSULTANT AREA [ M ]

2012 BRIGHT STAR HOTEL AND RESORT DUBAI CINTRACTING CO. DSA/ HYDER 12,000

DATE PROJECT CONTRACTOR CONSULTANT AREA [ M2 ]

2012 4 POINT SHERATON AT DUBAI MARINA CARBON CONTRACTING CIONIN CONSULT 8,000

2012 BARAKA NUCLEAR POWER PLANT Ph 1 ( Unit 1&2 ) HYUNDAI SAMSUNG JV KEPCO 110,000

2012/01 SHERATON PARK PROJECT DOHA, QATAR QDVC ARUP QATAR

2012 DANAT AL EMARAT HOSPITAL TERNA CONTRACTING ECG 15,000

2010 DUCAB HV/EHV FACILITY AT DUBAI KHANSAHEB CIVIL ENGINEERING HYDER CONSULTANTS 12,000

2010 THE OPUS TOWER AT BUSINESS BAY MULTIPLEX LLC AREX CONSULTANTS 25,000

PARK HYATT HOTEL AND RESORT AT SADIYAT ABU 2009 ALEC AL JABER CONTRACTING EHAF CONSULTANTS DHABI 25,000

2009 ABU DHABI GOLF CLUB HOTEL LEIGHTON GULF HALCROWS 25,000

2009 AL WAHDA MALL EXTENSSION ALI AND SONS CONTRACTING KHATIB AND ALAMI CONSULTANTS 40,000

2008 SILVER WAVE TOWER SEIDCO CONT. CO. BAYNOUNHA CONSULTANTS 8,000

2008 COMMERCIAL BUILDING ON PLOT E25 ABU DHABI MATAC AL BURJ CONSULTANTS 9,000

2009 TUNNEL AT NAJMAT ABU DHABI CHINA HARBOUR ENG. CONT. HALCROWS/ HYDER 5,000

TELECOMMUNICATION REGULATORY AUTHORITY OFFICE 2009 PARKWAY INTERNATIONAL KLING CONSULT BUILDING AT PLOT NO. P-78, E-18/03 IN ABU DHABI 5,000 CONTRACTING 2008 KINGDOM OF SHEBA AT PALM JUMEIRAH DUBAI CONTRACTING CO ACE CONSULTANTS 80,000

International Job References - MasterSeal 700BG

2 DATE PROJECT CONTRACTOR CONSULTANT AREA [ M ]

TELECOMMUNICATION REGULATORY AUTHORITY OFFICE 2009 PARKWAY INTERNATIONAL KLING CONSULT BUILDING AT AL MAMZAR DUBAI 5,000 CONTRACTING DATE PROJECT CONTRACTOR CONSULTANT AREA [ M2 ]

2008 BURJ DUBAI BOULEVARD U/G CAR PARK BUILDING PH 2 AL FUTTAIM CONT CO. HYDER CONSULTING 80,000

2008 BURJ DUBAI BOULEVARD U/G CAR PARK BUILDING PH 2 AL FUTTAIM CONT CO. HYDER CONSULTING 80,000

2008 BURJ DUBAI BOULEVARD U/G CAR PARK BUILDING PH 2 AL FUTTAIM CONT CO. HYDER CONSULTING 80,000

2008 AL BATEEN TOWER AT DUBAI MARINA COMMODORE CONT CO. NEB CONSULTANTS 25,000

2008 PPM CONRAD HOTEL AT DUBAI DCC/ARABTEC JV ATKINS 10,000

2009 PRUDENTIAL TOWER AT JUMEIRAH VILLAGE SEG CONST CO. U&A CONSULT/ WHITBY AND BIRD 16,000

2009 DUJA TOWER AT SH ZAYED ROAD DUBAI AL SAQER ENG CONST CO ZAS CONSULTANTS 10,000

2009 OBEROI CENTER AT BUSINESS BAY DUBAI AL NABOODAH CONTRCTING CO HALCROWS 25,000

2009 MARINA STAR TOWER AT DUBAI MARINA CONDOR BLDG. CONT. CO. DIMESSION ENG. CONSULTANTS 6,000

2009 JASHANMALS HEAD QTRS BUILDING AT AL BARSHA CONVRGNT VALUE ENGINEERING APG CONSULTANTS 5,000

2009 ROYAL AMWAJ RESORT AT PALM JUMEIRAH GTCC/WATERMAN AEDAS/PJSI 21,000

2008 BONNINGTON TOWER AT JLT DUBAI DUBAI CONTRACTING CO WHITBY AND BIRD CONSULT. 10,000

THE TOWER ON PLOT NO. 392-567 MARSA HYDER COLSULTING MIDDLE EAST 2009 DUBAI ARABIAN CONSTRUCTION COMPANY LTD. 8,000 DUBAI WORLD TRADE CENTER COMPLEX (DISTRICT) - AL JABER L.E.G.T. ENGINEERING 2008 PHASE 1 - PACKAGE NO. CP37 AND CONTRACTING (ALEC) LLC WSP CONSULTANT 270,000

International Job References - MasterSeal 700BG

2 DATE PROJECT CONTRACTOR CONSULTANT AREA [ M ]

ELITE TOWER ON PLOT NO. 392-190 AT MARSA DUBAI 2008 4B+G+4P+82FLOORS(91LEVELS) ARABIAN CONSTRUCTION COMPANY ADNAN SAFFARINI 1,000 THE PAD - PROPOSED 3B+G+P+M+23F LEVELS 2008 RESIDENTIAL BUILDING ON PLOT NO. BB.B01.061 AT AL ROSTAMANI PEGEL LLC WHITBY AND BIRD ENGINEERS 70 BUSINESS BAY DUBAI

International Job References - MasterSeal 700BG

DATE PROJECT CONTRACTOR CONSULTANT AREA [ M2 ]

THE PAD - PROPOSED 3B+G+P+M+23F LEVELS 2008 RESIDENTIAL BUILDING ON PLOT NO. BB.B01.061 AT AL ROSTAMANI PEGEL LLC WHITBY AND BIRD ENGINEERS 70 BUSINESS BAY DUBAI

2008 THE AVIATION CLUB HOTEL ON PLOT NO. B214-233 AT AL AL ROSTAMANI PEGEL LLC R.M.J.M. 19,500 GARHOUD DUBAI 2007 CANAL POINT HOSPITAL ON SHEIKH ZAYED ROAD ON 5.5 AL NABOODAH CONTRACTING LLC BURT HILL CONSULTANTS 30,000 INTERCHANGE - PACKAGE 2, DUBAI BHATIA GENERAL CONTRACTING CO. LLC / 2008 3B+G+6 OFFICE BUILDING FOR OMD AT DUBAI MEDIA CITY AL SHIRAWI CONTRACTING ARCH GROUP 5,500

PROPOSED SHOPPING CENTER 2B+G+M+4 FLOORS ON 2007 PLOT NO. 318-864 AT AL KARAMA DUBAI AL HUDAIBA CONTRACTING DESIGN CENTRE 10,000 THE BUILDINGS BY DAMAN ON PLOT NOS. PA 03 & PA 04 2007 AT DUBAI INTERNATIONAL FINANCIAL CENTRE OGER DUBAI LLC ARIF & BINTOAK 30,000

PRINCESS TOWER - 6B+G+100 STOREY RESIDENTIAL 2007 TOWER ON PLOT NO. 392-192 AT MARSA DUBAI ARABIAN CONSTRUCTION COMPANY ADNAN SAFFARINI 10,000

AL GURG TOWER 3 ON PLOT NO. 125-117, REGGA AL 2007 BUTEEN - DUBAI KHANSAHEB CIVIL ENGINEERING LLC R.M.J.M. 6,000

2007 DUBAI LIGHT RAIL TRANSIT PROJECT PHASE I OBAYASHI / YAPI MERKEZI JV SYSTRA 45,000

THE FAIRMONT PALM RESIDENCES CONTRACT NO. DSA ARCHITECTS INTERNATIONAL / 2007 1003/12 AT PALM ISLAND DUBAI CONTRACTING COMPANY LLC LC CONSULTANT 85,000 DUBAI HEALTH CARE CITY PHASE 2 HOTEL PROJECT PE 2007 100 AL BASTI & MUKTHA LLC R.M.J.M. 27,000

2007 DUBAI BUSINESS BAY TOWER ON PLOT O-14 DUBAI CONTRACTING COMPANY LLC ERGA CONSULTANTS 6,700

International Job References - MasterSeal 700BG

DATE PROJECT CONTRACTOR CONSULTANT AREA [ M2 ]

AL FATTAN HOTEL AND RESIDENCES PALM JUMEIRAH AL FATTAN MRCB CONSTRUCTION CO. LLC DSA ARCHITECTS INTERNATIONAL / 2007 WSP 34,000 TRIDENT GRAND RESIDENCE MULTY STOREY 2007 RESIDENTIAL BUILDING ON PLOT 9AB DUBAI MARINA CSHK DUBAI CONTRACTING (L.L.C.) R.M.J.M. 13,500 BURJ DUBAI DEVELOPMENT PLOT 12 AND 13 BOULEVARD 2007 PLAZA SAMSUNG / BIN BELAILA BAYTUR JV HYDER CONSULTING 27,500 DAR CONSULT DESIGN & MIXED USE DEVELOPMENT ON PLOT NO 335-141 AND 335- BELHASA ENGINEERING & CONTRACTING ARCHITECTURE BUREAU / WHITBY 2007 178 TRADE CENTER CO. LLC AND BIRD 16,500 3B+G+45 FLOOR MULTI FUNCTION BLDG WITH PODIUMS ON PLOT NO. B-001-011 DIC SHEIKH ZAYED ROAD DUBAI APG ARCHITECTS & PLANNING 2007 SIDRA TOWER ZELAN HOLDINGS (M) SND BHD GROUP / ARKAN 13,000 GATE VILLAGE PROJECT, DUBAI INTERNATIONAL HOPKINS ARCHITECTS / LC 2006 FINANCIAL CENTRE ARABTEC CONSULTANTS 40,000

2006 BURJ DUBAI BOULEVARD CAR PARK BUILDING A.F.C HYDER CONSULTING 40,000

2006 BURJ DUBAI BELOW GROUND FOUNDATION NASA MULTIPLEX SOM/HYDER 51,000

2006 BURJ DUBAI PODIUM RAFT AND WALLS SANSUNG / ARABTEC & SIXCO JV SOM/HYDER 50,000

2006 DUBAI FESTIVAL CITY ZONE 8A CANAL WATERPROOFING AL FUTTAIM CARILLION HOK CANADA 10,000 DUBAI FESTIVAL CITY ZONE 2B. HARBOUR PLAZA PODIUM 2006 ROOF WATERPROOFING AL FUTTAIM CARILLION MAARAKI FBK 10,000

2006 DUTCO GROUP HEADQUARTERS BUILDING DUTCO BALFOUR BEATTY (DBB) BREWER SMITH BREWER (GULF) 5,500 4B+G+M+7 COMMERCIAL / RESIDENTIAL BUILDING FOR 2006 ETA STAR GROUP ASCON AL HASHEMI CONSULTANTS 7,000

International Job References - MasterSeal 700BG

DATE PROJECT CONTRACTOR CONSULTANT AREA [ M2 ] WOODS & BAGOT / SIR NORMAN 2006 INDEX TOWER AT DIFC NASA MULTIPLEX FOSTAR 45,000 5 STAR HOTEL AND MIXED USE TOWERS FOR ACICO 2006 PROPERTIES KELLY CONTRACTORS DIMENSIONS / FAITHFUL & GOULD 10,000 M3 AR CHARTERED ARCHITECTS / 2006 BONNINGTON TOWER AT JUMEIRAH LAKE TOWER DUBAI CONTRACTING COMPANY LLC WHITBY AND BIRD ENGINEERS 7,000 ETA STAR PROPERTIES TOWER ON PLOT NO. C-2 AT 2006 JUMEIRAH LAKETOWERS ASCON DAR CONSULTANT 10,000 PALM JUMEIRAH INFRASTRUCTURE PROJECT VEHICULAR HYDER / PARSONS DE LEUW CATHER 2006 UNDERPASSES AL NABOODAH ENGINEERING SERVICES OVERSEAS LTD 14,000 COMMERCIAL/RESIDENTIAL & OFFICE TOWER ON PLOT DESIGN AND ARCHITECTURE 2006 NO. C2 - ASCON BUREAU (DAR) 6,000 DAR CONSULT DESIGN & 2006 COMMERCIAL AND OFFICE BUILDING AT PORT SAEED KHANSAHEB CIVIL ENGINEERING LLC ARCHITECTURE BUREAU 5,000 CONSOLIDATED CONTRACTORS 2005 DUBAI CAPITAL TOWERS INTERNATIONAL CO. R.M.J.M. 15,000 ADDITIONAL CAR PARK BUILDING FOR CAPITAL TOWERS CONSOLIDATED CONTRACTORS 2005 PROJECT INTERNATIONAL CO. R.M.J.M. 5,000 TIGER INTERNATIONAL GENERAL 2005 TOWER, DUBAI MARINA CONTRACTING CO. NATIONAL ENGINEERING BUREAU 10,000

2005 DUBAI INTERNATIONAL AIRPORT ANLOR DAR AL HANDASAH / ADPI 1,000,000

2005 DUBAI INTERNATIONAL FINANCIAL CENTRE EAST TUNNEL PERUMBA CONTRACTING HALCROW 9,000

2005 SEWERAGE TREATMENT PLANT AT PALM JUMEIRAH AL NABOODAH ENGINEERING SERVICES HYDER & PARSONS BRINKERHOFF 7,500

2005 PALM JUMEIRAH SERVICE SHAFTS AL NABOODAH ENGINEERING SERVICES PARSONS BRINKERHOFF 4,000

International Job References - MasterSeal 700BG

AUSTRIA

LANDECK TUNNEL 100,000

ARLBERG TUNNEL 50,000

TRAUNFRIEDTUNNEL 30,000

HUNGENBICHL TUNNEL 25,000

KLAUSER TUNNEL 50,000

FALKESTEIN 10,000

MUGGENDORF 10,000

PLAUBUTSCHTUNNEL 270,000

SPERING TUNNEL 110,000

AMBERG TUNNEL (IN PROGRESS) 80,000

STRENGEN TUNNEL S16 (IN PROGRESS) 320,000

LOIBLTUNNEL (IN PROGRESS) 11,000

FRANCE

MARSEILLE LOT.3M 230,000

International Job References - MasterSeal 700BG

INFERNET 5,000

LAMBESC 20,000

ST.GENIES 5,000

GREECE

TEMPI 50,000

MAURI ORA 25,000

KAVALA 34,000

KALIDROMO 250,000

VERIA 40,000

DEMOKRITOS 63,000

CARS – NATO UNDERGROUND FACILITY 37,000

IOANINA 20,000

PORTUGAL

AUTOPISTA ISLA DE MADEIRA 140,000

METRO LISBONA 25,000

RAMELA 19,000

International Job References - MasterSeal 700BG

S. VICENTE/RIBERA BRAVA 18,000

SPAIN

LA CANIZA 120,000

PIEDRAFITA 56,000

TRABADELO 17,000

GIBRALFARO 3,000

BENICASIM 15,000

NERJA 5.000

DONCOS 45,000

CERROGORDO 60,000

VITORIA 3,000

BUBIERCA-DEHESILLAS-CASTEJÓN 160,000

ALHAMA 35,000

UTE PILES 35,000

UNITED KINGDOM

T4 STATION HEATHROW EXPRESS 25,000

International Job References - MasterSeal 700BG

CTRL 410 "NORTH DOWNS TUNNEL" 130,000

RAMSGATE TUNNEL 30,000

AUSTRALIA

MELBOURNE CITY LINK 130,000

BRISBANE 10,000

BULGARIA

TRAIANOVI VRATA 30,000

COLOMBIA

TUNNEL BELLAVISTA 25,000

CROATIA

TUNNEL SVETI MARKO 12,000

TUNNEL SVETI ROK 120,000

TUNNEL JAVOROVA KOSA (IN PROGRESS) 70,000

TUNNEL BRINJE/GRIC (IN PROGRESS) 150,000

EIRE

DUBLIN PORT TUNNEL LOTA (IN PROGRESS) 120,000

International Job References - MasterSeal 700BG

HONG KONG

TAI LAM TUNNEL 160,000

MALAYSIA

PENCHALA TUNNEL (IN PROGRESS) 40,000

MONTENEGRO

SOZINA (IN PROGRESS) 54,000

SLOVENIA

GOLO REBRO 31,700

TABOR 18,500

PLETOVARIJE 7,000

TREBNIE 21,000

TROJANE (IN PROGRESS) 160,000

SWITZERLAND

ALPTRANSIT BODIO TICINO 25,000

TUNNEL DEL TORBECCIO 6,000

International Job References - MasterSeal 700BG

TAIWAN

HO KOU TUNNEL – THSR (IN PROGRESS) 120,000

C260 PENGSSHUAN TUNNEL – THSR (IN 335,000 PROGRESS) TURKEY

NEW METRO INSTAMBUL (STATION) 20,000

BOLU TUNNEL 25,000

TRAB ZUM TUNNEL 75,000

DORUKHAN TUNNELL (MENGEN TR) 22,000

ISTANBUL METRO – TAKSIM TUNNEL 80,000

ISTANBUL METRO – SISHANE METRO STATION 22,000

ISTANBUL METRO – YENIKAPI TUNNEL (IN 120,000 PROGRESS) KARADENIZ MOTORWAY (GIRESUN) (IN 80,000 PROGRESS) ANKARA METRO (IN PROGRESS) 240,000

USA

BOSTON (IN PROGRESS) 5,000

International Job References - MasterSeal 700BG

VIETNAM

HAI VAN TUNNEL 15,000

AROANG II TUNNEL (IN PROGRESS) 10,000 EGYPT

PRIVATE BUILDING - CAIRO OWNER 2,000

MAF COMPOUND (PHASE 1) SPACE 2,000

NEW CAIRO CITY 2,000

RAYA BUIDING - 6 OCT. CITY OWNER 700

OFFICE BUILDING - SMART VILLAGE (IN EHAF 1,000 PROGRESS) ASUIT CENTER 3,500

SOFITEL HOTEL - CAIRO EHAF 3,500

CENTRAL BANK - TANTA DORAA 700

CENTRAL BANK - ASUIT ARC PLAN 1,500

WOMEN HEALTH UNITS - ALEX EHAF 30,000