<<

This drawing is copyright to Salford City Council. It shall not be used without permission for any purpose. Reproduction is only permitted by prior arrangement. Do not scale from this drawing. All discrepancies to be related back to the originator for verification prior to commencing the works. All dimensions are in millimetres unless otherwise stated. N COMMERCIAL IN CONFIDENCE © Crown copyright and database rights 2020 Ordnance Survey 100019737 SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION In addition to the hazards/risks normally associated with the types of work detailed on this drawing, note the following

It is assumed that all works will be carried out by a competent contractor working, where appropriate, to an approved method statement Notes: 1. This drawing is to be read in conjunction with all other relevant drawings. Any discrepancies, errors or omissions to be brought to the attention of the supervising Engineer. 2. All dimensions to be checked before commencement of work on site. 3. All dimensions in metres unless otherwise stated.

Key:

RT Scheme Extent BS STOP Blackfriars RoadBUS Proposed Asphalt Carriageway

Proposed Imprinted Ashpalt Carriageway

Proposed Asphalt Footway

TI Bury Street Proposed Paved Footway

Proposed Paved Footway within private land subject to Developer agreement Blackfriars Junction Tie-in to existing Proposed Cycletrack

Proposed Tactile Blister paving at controlled crossing point

B Proposed Tactile Blister Paving at uncontrolled crossing point Caxton Street Proposed Cycle Tactile paving

BUSP Chapel Street Proposed Soft Landscaping SLOW

BUS STOP Existing Development Block Paving to remain

Existing Unadopted Block Paving to remain

Highway Adoption Boundary

Proposed Tree B Booth StreetDYE B DYE Proposed Seating

DY Proposed Sett Paving B B Barlows Croft Proposed Bollard

SYE Proposed Sandstone Block

SYE 110 Clowes Street Proposed Cycle Stand Chapel Wharf

(Dandara Development) SLOW 114 SLOW

Chapel Wharf DB DB Cook Street DB (Dandara Development)

DYE DRAFT

SYE

P02.6 Highway adoption boundary amended along the frontage of 11/12/2020 PR ML ML Chapel Wharf adjacent to Clowes Street and the landscaping amended to suit.

Landscaped area along the frontage of the Arch Co parking

SLOW amended.

STOP BUS Extents of Bury Street closure amended to prevent vehicular access P02.5 Landscape features amended at Bury Street and along the 19/11/2020 PR ML ML Arch Company frontage. Dearmans Place P02.4 Paving treatments amended around Bury Street, Cycle 26/10/2020 PR ML ML paving added, Landscape features, and highway adoption 20 boundary added to the drawing

P02.3 Arrow amended directing cyclists to the toucan crossing as 13/10/2020 PR ML ML 20 suggested by UTC. B Bury Street closure added with proposed loading bay. B Bury Street reverted back to two way to maintain access, B footways widened and parking bays removed P02.2 Crossing changed to a Toucan Crossing following 29/09/2020 PR ML ML B BUS discussions with TfGM (UTC) SLOW STOP B B P02.1 Crossing detail/alignment amended following comments 20/05/2020 PR ML ML from TfGM (UTC) Vehicular access provided to Arch Co Units 110 to 114

B REV DESCRIPTION DATE DRN CHK APP B

Quay Street

Tie-in to New Bailey Street/ Salford City Council Bloom Street Junction Chapel Street SALFORD CITY COUNCIL, CIVIC CENTRE, CHORLEY ROAD, SWINTON, , M27 5AW. T 0161 779 4800

B CLIENT Salford City Council

PROJECT Chapel Street East Phase 1 Spaw Street

DRAWING General Arrangement

PURPOSE OF ISSUE S2 - FOR INFORMATION

DRAWN CHECKED APPROVED SCALE @ A1 DATE PR ML SRH 1:500 25/09/2019 PROJECT REF. REVISION 008789 P02.6

DRAWING NUMBER project - originator - asset - loc - file type - role - number 008789-SCC-HGN-XX-DR-C-0001 www.salford.gov.uk

© Salford City Council J:\UV008789 Chapel Street East Ph1\03 Delivery\HGN HwayGeneral\03 Drawings\008789-SCC-HGN-XX-DR-C-0001.dwg