The Design and Construction of New Mizen Head Footbridge Murt Coleman, BE CEng FIEI, Chartered Engineer Managing Director, Carillion Irishenco Ltd. Enda Collery, BA BAI CEng MIEI, Chartered Engineer Contracts Manager, Carillion Irishenco Ltd. Eoghan Lehane, BE Eur Ing CEng MIEI MCIWEM, Chartered Engineer Civil Engineering and Property Manager, Commissioners of Irish Lights Brendan Minihane, BE Eur Ing CEng MIEI, Chartered Engineer Project Resident Engineer, Cork County Council Ross O’Donovan, Dip Eng BEng CEng MIEI, Chartered Engineer Senior Resident Engineer, RPS Consulting Engineers Ltd. Noel O’Keeffe, BE Eur Ing CEng FIEI MICE, Chartered Engineer County Engineer, Cork County Council Kevin Power, BE CEng FIEI MICE MCIWEM, Chartered Engineer Director, RPS Consulting Engineers Ltd. Kieran Ruane*, BE MSc(Eng) CEng MIStructE MIEI MICE, Chartered Engineer Technical Director, RPS Consulting Engineers Ltd. Paper first presented to a joint meeting of Engineers Ireland, Institution of Structural Engineers and The Irish Concrete Society in Cork on 08.03.2011. *Corresponding author: Tel +353 (0) 21 4665900,
[email protected]. Design and Construction of New Mizen Head Footbridge Paper first presented to Engineers Ireland, IStructE and ICS in Cork on 08.03.2011 The Design and Construction of New Mizen Head Footbridge Overview On the 18th of October 1907, sanction was given for the erection of a reinforced concrete Mizen Head Footbridge in County Cork is a bridge to give access to the island. reinforced concrete through-arch structure Construction of the bridge commenced in 1908 spanning 50m. The original structure was and was completed in 1909. The Contractor completed in 1909.