Planning Performance Framework Report 2020-21

Total Page:16

File Type:pdf, Size:1020Kb

Planning Performance Framework Report 2020-21 1 PLANNING PERFORMANCE FRAMEWORK REPORT 2020-2021 CONTENTS INTRODUCTION 3 ABOUT HISTORIC ENVIRONMENT SCOTLAND 4 What we do in the planning system 5 Our staf 6 Our decision -making 6 Efects of Covid 19 7 Response to Covid 19 7 PERFORMANCE MARKERS 9 Placemaking 9 A. Strategic planning 9 B. Development plan engagement 10 C. Development management 12 Capacity building 13 D. Sharing good practice, skills and knowledge 13 E. Evidence and data-sharing 20 Service 20 F. Decision -making timescales 20 G. Service statements and joint working agreements 34 H. Engagement with service users 36 Service improvements 38 PLANNING PERFORMANCE FRAMEWORK REPORT 3 2020-21 INTRODUCTION This Report details the planning performance of Historic Key areas of our work include: Environment Scotland (HES) from 1 April 2020 to 31 March • providing advice within the planning system 2021. It sets out our role in the planning system and gives an • regulating works on scheduled monuments update on our ongoing work to secure positive outcomes • supporting the development of national plans, for the historic environment. programmes and strategies • designating new sites and places, and reviewing We have prepared the Report in line with the requirements existing designations of the ‘Key Agencies Group Model’ for the Planning • producing historic environment policy and guidance Performance Framework Review Reports. Using this model, • monitoring activities related to our works we have demonstrated how we have performed against the • actively engaging with and training stakeholders, agreed Performance Markers for 2020-21, and described our owners and communities contribution to the planning system under the following • sponsoring awards to promote high quality themes: development • Placemaking • providing advice via Design Review Panels and grant • Capacity building aid applications • Service • supporting works for the conservation and • Service improvements management of historic assets and places The Report gives both quantitative and qualitative evidence The signifcant challenges of this year have afected every area of our performance and highlights the impacts that the of our work. Much of the staf in our Designations team were Coronavirus pandemic has had on our work and service furloughed, and we also had to make procedural changes delivery. to enable designation decisions to be made digitally. This afected our performance against targets in this work area. We have four teams who lead our planning engagement Despite these challenges, we were able to push forward role – Planning, Consents and Advice, Heritage with our programme of business improvement, making the Management Policy, Designations and Business Support. designation process more transparent and easier to engage All four teams sit within the Heritage Directorate. Our key with. aim is to promote consideration of the historic environment at all stages of the planning process. We have continued to exceed our planning and consents target of dealing with 90% of regulatory activities, consultations and decisions within required timescales. We continue to work on ensuring our decisions are open, transparent and easy to understand. PLANNING PERFORMANCE FRAMEWORK REPORT 4 2020-21 ABOUT HISTORIC ENVIRONMENT SCOTLAND We are the lead public body established to investigate, care We want the historic environment to make a real diference for and promote Scotland’s Historic Environment. to people’s lives. A diference to our health, to our economy, to our culture, to our environment. We want heritage to • We care for more than 300 sites of national importance involve everyone so that we all beneft. Our Corporate Plan, all across the country and are the largest operator of paid Heritage for All, sets out our vision and priorities from 2019 visitor attractions in Scotland. onwards. • We look after internationally signifcant archives and Our vision is that the historic environment is cherished, artefacts. understood, shared and enjoyed with pride, by everyone. • We are at the forefront of investigating and researching These are the fve outcomes that we want to achieve and the historic environment and addressing the impacts of that will help us realise our vision: climate change on its future. 1. The historic environment makes a real • We protect our historic places through designations and diference to people’s lives. consents, promote their sustainable development, and 2. The historic environment is looked after, protected provide millions of pounds each year to local communities and managed for the generations to come. to repair and revitalise their historic environment. 3. The historic environment makes a broader contribution to the economy of Scotland and its • We provide advice and guidance about the historic people. environment, and ofer a wide range of training and 4. The historic environment inspires a creative and learning opportunities. vibrant Scotland. 5. The historic environment is cared for and • In every aspect of our work we strive to follow our fve championed by a high-performing organisational values – we are collaborative, professional, organisation. innovative, open and respectful. PLANNING PERFORMANCE FRAMEWORK REPORT 5 2020-2021 WHAT WE DO IN THE PLANNING Our Planning, Consents and Advice Service provides advice on the potential impacts of development on the historic SYSTEM environment. This advice is often linked to our statutory functions relating to various planning and consenting The Heritage Directorate leads our work in the planning processes. These include listed building consent and system, coordinating the wide range of relevant skills, conservation area consent, and our role as regulator for knowledge and expertise available across HES. This Report scheduled monument consent. We are also a consultation focuses on the work of our Planning, Consents and Advice body for developments requiring an Environmental Impact Service, Heritage Management Policy Team, Designations Assessment. and Business Support Team. These teams, in consultation with others when appropriate, carry out most of our planning Our new Heritage Management Policy Team leads on related activities. strategic planning matters and ongoing development and implementation of heritage management policy and The aim of our work in the planning system is to inform guidance. They also provide advice on the development of and enable good decision-making, so that the historic planning policy and strategies, and engage with strategic environment of Scotland is valued and protected. stakeholders and communities on the management the of the historic environment. This includes supporting Our Designations Team compiles and maintains lists of regional and local development plan preparation and acting nationally important historic buildings, archaeological sites as a Consultation Authority for Strategic Environmental and monuments, gardens and designed landscapes and Assessment. historic battlefelds. They also advise Scottish Ministers on the designation of historic marine protected areas. Our Business Support Team co-ordinates our planning and consenting processes, liaising with applicants and decision- making bodies to ensure we are consistent and on time. The fshing vessel graveyard at Findhorn Bay contains the remains of at least 30 Zulu-type sail-powered fshing drifters used in the late 19th and early 20th century in connection with the commercial herring fshery on the northeast coast of Scotland. The remains were protected as a scheduled monument in July 2020. PLANNING PERFORMANCE FRAMEWORK REPORT 6 2020-2021 OUR STAFF OUR DECISION-MAKING The Planning, Consents and Advice Service, Heritage Decision-making processes are standardised across the Management Policy, Designations and Business Support Planning, Consents and Advice Service, Heritage Management Teams are specialists with knowledge of architectural history, Policy and Designations Teams, underpinned by a set of sign- archaeology, planning and environmental assessments. We of and quality control procedures. We publish our detailed employ 76 members of staf within the four teams. schedule of governance for decision-making for designations and casework online. Planning, Consents and Advice Service Head of Service 1 Deputy Head of Service 6 Senior Ofcer 17 Ofcer 5 Field Ofcer 6 Graduate Trainee 1 Casework Support Ofcer 1 Team total 37 Designations Team Head of Designations 1 Deputy Head of Designations 3 Senior Designations Ofcer 6 Designations Ofcer 8 Designations Support Manager 1 Designations Support Ofcer 3 Designations Support Assistant 1 Team total 23 Heritage Management Policy Team Head of Heritage Management Policy 1 Deputy Head 1 Senior Ofcer 3 Ofcer 1 Team total 6 Business Support Team Head of Business Support and Improvement 1 Casework Technician 4 Business Support Assistants 5 Team Total 10 TOTAL 76 PLANNING PERFORMANCE FRAMEWORK REPORT 7 2020-2021 EFFECTS OF COVID-19 RESPONSE TO COVID-19 In light of the Covid-19 outbreak facing Scotland and the Covid-19 has had a dramatic impact upon all our lives. This world, we have revised our workplan for the immediate includes direct and immediate impacts to how we work, live future. This addresses the direct impact of the outbreak on and socialise. More fundamental is the impact Covid-19 has our organisation, to ensure that we maximise the resources had accelerating changes in our environment. For example, still available to us to contribute to our Corporate Plan and the our town centres have been a focus for our communities
Recommended publications
  • Tamfourhill: Temporary Camp
    TAMFOURHILL: TEMPORARY CAMP Between Falkirk town centre and the Falkirk Wheel, to the south of Watling Lodge, in an open field between the Union Canal and Tamfourhill Wood, is the site of a Roman temporary camp. The camp is sometimes visible in aerial photographs, but cannot be seen on the ground today. To the north, along Tamfourhill Road is the best-preserved section of Antonine Wall Ditch and the site of a Roman fortlet on the grounds of Watling Lodge. HISTORY OF DISCOVERY AND EXCAVATION: The Tamfourhill camp was first identified as This new extension bypasses the camp on its cropmarks in aerial photographs in 1977. In north side, and archaeological investigations 2000, the Falkirk Millennium Link Project built a were carried out prior to construction, but no new extension on the Union Canal to join it with excavations took place within the area of the Forth and Clyde Canal at the Falkirk Wheel. the camp. DESCRIPTION AND INTERPRETATION: Examination of aerial photographs and been recorded in front of entrance gaps investigation on the ground have revealed on the camp’s north, east, and south sides. that the Tamfourhill camp lies about 300m The camp appears to face the nearby fortlet, south of the Antonine Wall and about 400m and has been interpreted as a probable south-west of the fortlet at Watling Lodge. construction camp used during the building The camp is oriented on a slight north-east to of the Antonine frontier. south-west axis and encloses an area of about 2.7ha (6.7 acres). Tituli (staggered sections of bank and ditch that offered extra protection to the entryways or gates of Roman camps) have BIBLIOGRAPHY: CANMORE Record: http://canmore.rcahms.gov.uk/en/ site/46750/ Goodburn, R.
    [Show full text]
  • Falkirk Wheel, Scotland
    Falkirk Wheel, Scotland Jing Meng Xi Jing Fang Natasha Soriano Kendra Hanagami Overview Magnitudes & Costs Project Use and Social and Economic Benefits Technical Issues and Innovations Social Problems and Policy Challenges Magnitudes Location: Central Scotland Purpose: To connecting the Forth and Clyde canal with the Union canal. To lift boats from a lower canal to an upper canal Magnitudes Construction Began: March 12, 1999 Officially at Blairdardie Road in Glasgow Construction Completed: May 24, 2002 Part of the Millennium Link Project undertaken by British Waterways in Scotland To link the West and East coasts of Scotland with fully navigable waterways for the first time in 35 years Magnitudes The world’s first and only rotating boat wheel Two sets of axe shaped arms Two diametrically opposed waterwater-- filled caissons Magnitudes Overall diameter is 35 meters Wheel can take 4 boats up and 4 boats down Can overcome the 24m vertical drop in 15 minute( 600 tones) To operate the wheel consumes just 1.5 kilowattkilowatt--hourshours in rotation Costs and Prices Total Cost of the Millennium Link Project: $123 M $46.4 M of fund came from Nation Lottery Falkirk Wheel Cost: $38.5 M Financing Project was funded by: British Waterways Millennium Commission Scottish Enterprise European Union Canalside local authorities Fares for Wheel The Falkirk Wheel Experience Tour: Adults $11.60 Children $6.20 Senior $9.75 Family $31.20 Social Benefits Proud Scots Queen of Scotland supported the Falkirk Wheel revived an important
    [Show full text]
  • Abstract Title: Measuring the Health Impacts of Scotland's Canals
    Abstract Title: Measuring the Health Impacts of Scotland’s Canals Lead Author: Stephen Canning Postal Address: MVA Consultancy, 2nd Floor, Prospect House, 5 Thistle Street, Edinburgh, EH2 1DF Position and Affiliation: Senior Consultant (MVA Consultancy) and Scottish Branch Representative for the Transport Planning Society Telephone Number: 0131 240 8923 E-mail Address: [email protected] Author 2: Richard Millar Postal Address: 1 Applecross Street, Glasgow, G4 9SP Position and Affiliation: Waterway Development Manager, Scottish Canals Telephone Number: 0141 332 6936 E-mail Address: [email protected] Author 3: Karen Moore Postal Address: New Port Downie, Lime Road, Falkirk, FK1 4RS Position and Affiliation: Development Director, The Waterways Trust Scotland Telephone Number: 01324 677 820 E-mail Address: [email protected] Other information I do not want this abstract considered a “Pecha Kucha” presentation. The lead author will be under the age of 30 on 16 May 2012 and would like to be considered for the “Best Paper Presented at the Conference by a Young Professional”. Summary Scotland’s network of canal towpaths is extensively used for different forms of active travel eg walking, jogging / running and cycling. This is for leisure purposes and for commuting trips. This paper will consider the health benefits generated by use of Scotland’s canal towpaths in terms of increased physical activity; absenteeism; air quality; and road safety. Based on an extensive survey of canal users, this paper, using new and innovative techniques will set out how Scotland’s canals contribute almost £7 million of additional public health benefits per annum.
    [Show full text]
  • 1 Lowland Canals Customer Forum 25.10.14 Venue
    Lowland Canals Customer Forum 25.10.14 Venue: The Falkirk Wheel, Falkirk Scottish Canals’ attendees: Andrew Thin Chair Steve Dunlop Chief Executive David Lamont Director of Operations Richard Millar Director of Heritage, Enterprise & Sustainability Katie Hughes Director of Estates Alasdair Smart Lowland Canals Waterways Manager Josie Saunders Head of Corporate Affairs Actions agreed SC to speak to Edinburgh City Council about getting double yellow lines put across the slipway in Harrison Park SC to rearrange meeting with Andy Davenport and include SC Operations Director David Lamont SC not to let all the visitor moorings at Cadder until situation onsite is resolved Linlithgow – No more Living on Water lettings to be undertaken until situation involving visitor moorings is resolved Lock 16 – SC to relocate the bins and address the issue of slippy pontoons SC to review the terms of Living on Water agreement, specifically the issue of the sale of a boat being tied to the berth in the legal agreement (even if the customer has left and the berth has been relet) SC to consider ways of marking 25th anniversary of trail boat rally at the Falkirk Wheel Meeting to be arranged before Christmas with the Seagull Trust to discuss mooring opportunities at The Helix SC to publicise date for The Helix flotilla before Christmas SC to arrange meeting for Lowland Canal Key Stakeholder meeting close to Christmas SC to write to all boaters before the review on charging is carried out 1. Welcome by Guthrie Hutton, Chair of Lowland Customer Forum – Guthrie gave a run-down of the agenda.
    [Show full text]
  • The Edinburgh Union Canal Strategy
    The Edinburgh Union Canal Strategy DECEMBER 2011 The Edinburgh Union Canal Strategy The Edinburgh Union Canal Strategy Contents THE EDINBURGH UNION CANAL STRATEGY 3 ince its re-birth as part of the Millennium Link Project the Union Canal has come a long way from a derelict CONTENTS 3 S backwater to become one of Edinburgh’s most important heritage, recreational and community assets. The BACKGROUND 4 Union Canal is now enjoyed on a daily basis by people from across the city and beyond for a variety of uses such as boating, rowing, walking, cycling and fi shing. THE EDINBURGH UNION CANAL STRATEGY KEY AIMS AND OBJECTIVES 5 The Union Canal is also a focus for new development, The City of Edinburgh Council (CEC) and British Current Context 7 particularly at Fountainbridge, for new canal boat Waterways Scotland (BWS) have prepared this strategy SCOTLAND’S CANALS 9 moorings and marinas and for canal-focused for the Union Canal within the Edinburgh area to THE UNION CANAL IN EDINBURGH 9 community activities. However, as the canal is guide its development and to promote a vision of the HISTORY AND HERITAGE 10 developed, it must also be protected and its potential place we wish the Union Canal to be. PLANNING AND DEVELOPMENT 11 maximised for the for the benefi t of the wider ENVIRONMENT AND BIODIVERSITY 12 community and environment. MOVEMENT AND CONNECTIVITY 13 COMMUNITY AND TOURISM 14 The Strategy 15 “The Union Canal is one of Edinburgh’s hidden gems. We hope this Strategy OPPORTUNITY 1 - ACCESS TO THE UNION CANAL 16 will allow more of our citizens to appreciate and benefi t from its beauty as OPPORTUNITY 2 - WATERWAY, DEVELOPMENT AND ENVIRONMENT 18 well as the economic development potential it provides.” OPPORTUNITY 3 - COMMUNITY, RECREATION AND TOURISM 20 Councillor Tim McKay, Edinburgh Canal Champion OPPORTUNITY 4 - INFRASTRUCTURE, DRAINAGE, CLIMATE CHANGE 22 The Canal Hubs 23 “The publication of the new Edinburgh Canal Strategy is a major milestone in the renaissance of the RATHO 26 two hundred year old Union Canal.
    [Show full text]
  • Scotland: the Falkirk Wheel: World's Only Rotating Boatlift
    Scotland: The Falkirk Wheel: World's Only Rotating Boatlift Canals, as in many countries, were an important means of transporting people, but especially goods during the industrial revolution. Canals were the best means of transportation prior to the era of railroads and improved roads and conveyances. Scotland was no different. In 1768, by an Act of Parliament, the Forth & Clyde Canal was initiated; however, due to funding and other issues, the canal was not opened until 1790. For over 150 years canals were in operation. During their history, railway companies owned them and eventually railroads helped cause their decline. In 1948, canals were nationalized and administered by the British Transport Commission. <scottishcanals.co.uk> The Forth & Clyde Canal is in central Scotland. It is 35 miles long and enabled seagoing vessels to traverse the central part of the country. Railroads were just not the downfall of canals. Canal upkeep and repair and not realizing their potential as tourist attractions caused the decline to begin sharply during the 1930s. Closures and back‐fill took place. Rights of navigation were stopped by the British Parliament and the Forth & Clyde closed in 1963 to build a highway. <scottishcanals.co.uk> The back filling became housing tracts and the dream of re‐connection was lost for a coast‐to‐coast canal. However, the Millennium Link Project, including the Falkirk Wheel, made the connection possible to unite the Forth & Clyde and Union (Edinburgh and Glasgow Union Canal) Canals for the first time in over 70 years. The connection provided east/west navigation across the Scottish Lowlands.
    [Show full text]
  • Re-Valuing Canals Valuation of Ecosystem Services Provided by the Smart Canal Project
    Master of urban climate and sustainability (MUrCS) Re-valuing canals Valuation of ecosystem services provided by the Smart Canal project Ala' Al Dwairi August 2020 Re-valuing canals Valuation of ecosystem services provided by the Smart Canal project Ala' Al Dwairi Submitted in partial fulfillment for the requirements of Master of Urban Climate & Sustainability (MUrCS) Glasgow Caledonian University, UK; LAB University of Applied Sciences, Finland; University of Huelva, Spain Supervisor: Prof. Slobodan B. Mickovski August 2020 Declaration of originality 'This dissertation is my original work and has not been submitted elsewhere in fulfillment of the requirements of this or any other award.' Ala' Al Dwairi August 17, 2020 ABSTRACT The primary purpose of this work was to provide a new view of the role canals can play in cities. In Glasgow city, canals were held highly for its role in shaping the industrial image of the city during the industrial revolution (1790-1930). After the Forth & Clyde canal (‘the Canal’ in further text) demise due to the uprise of railway transport, it moved to hold a scheduled monument status with recreational uses in the city. This dissertation aims to highlight the different roles canals can play in cities by mapping the provision of Ecosystem Services (ES) provided by the Smart Canal project in the north of Glasgow city. Furthermore, the performed ES mapping started by adopting a Multi-Criteria Decision Analysis (MCDA) using Geographic Information System (GIS). Eight ES (one provisioning, five regulating, and two cultural) were mapped based on available spatial data for land use and landcover classes combined with other criteria.
    [Show full text]
  • 10 Walking and Cycling Routes in and Around Kirkintilloch and Lenzie
    10 WALKING AND CYCLING ROUTES IN AND AROUND KIRKINTILLOCH AND LENZIE The routewise way to feel better, look better & live longer Contents Introduction This booklet describes 10 walks and cycles in and around Kirkintilloch and Lenzie to give you a taste of the variety of on and off road routes around the town and Introduction 3 surrounding countryside. Routes It has been prepared by the Healthy Habits team and the East Dunbartonshire and 3.7m Route 1 Kirkintilloch – Lenzie Moss loop 4 Mugdock Country Park Ranger Service as part of the Government funded Smarter Choices, Smarter Places initiative. The main aims of this programme are to promote the benefits of active, sustainable travel; to enhance the health and wellbeing of the 7.8m Route 2 Kirkintilloch – Torrance loop 6 local community and to make sure that Kirkintilloch and Lenzie continue to be great places in which to live, work and shop while enjoying the outdoor benefits on our doorstep. 1.9m Route 3 Luggie Park loop 8 New signs have been installed on the main walking and cycling paths to show the distances and times to key locations in the area. Look out for these blue signs when 4.7m Route 4 Barleybank – Merkland loop 10 you are out and about. The walks in this booklet have been graded depending on their difficulty as follows: 1.1m Route 5 Merkland Nature Reserve 12 Gentle: Mostly flat, with good surfaces and less than 5 miles long. Moderate: A mixture of flats, hills and variable surfaces. Map, showing all routes 14 Note: All distances are approximate.
    [Show full text]
  • John Muir Coast to Coast Trail: Economic Benefit Study
    Scottish Natural Heritage Commissioned Report No. 508 John Muir coast to coast trail: Economic benefit study COMMISSIONED REPORT Commissioned Report No. 508 John Muir coast to coast trail: Economic benefit study For further information on this report please contact: Rob Garner Scottish Natural Heritage 231 Corstorphine Road EDINBURGH EH12 7AT E-mail: [email protected] This report should be quoted as: The Glamis Consultancy Ltd and Campbell Macrae Associates (2012). John Muir coast to coast trail: Economic benefits study. Scottish Natural Heritage Commissioned Report No.508. This report, or any part of it, should not be reproduced without the permission of Scottish Natural Heritage. This permission will not be withheld unreasonably. The views expressed by the authors of this report should not be taken as the views and policies of Scottish Natural Heritage. © Scottish Natural Heritage 2012. i COMMISSIONED REPORT Summary John Muir coast to coast trail: Economic benefit study Commissioned Report No. 508 Contractor: The Glamis Consultancy Ltd. with Campbell Macrae Associates Year of publication: 2012 Background This study sets out an estimate of the potential economic impact of the proposed John Muir Coast to Coast (JMC2C) Long Distance Route (LDR) across Central Scotland. This report provides an assessment of the overall economic impact that could accrue from the development of the JMC2C route, as well as disaggregating this down to the individual local authority areas which comprise the route. It also recommends ways of maximising the economic impact of the route through targeting its key user markets. Main findings: Estimated impact of the JMC2C proposal - It is estimated there will be 9,309 potential coast to coast users in the first year of the JMC2C potentially generating £2.9m of direct expenditure and creating or safeguarding 127 FTE jobs in year one.
    [Show full text]
  • Recreational Use Towpaths 2009 2Mb
    Recreational use of Towpaths A Study Commissioned by the Inland Waterways Committee of the Heritage Council By Roger Butler Inland Waterways Consultant 1 © An Chomhairle Oidhreactha / The Heritage Council 2009 All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or any other information storage and retrieval system, now known or hereafter invented, without either the prior written consent of the publishers or licence permitting restricted copying in Ireland issued by the Irish Copyright Licensing Agency Ltd The Writers’ Centre 19 Parnell Square, Dublin 1 Published by the Heritage Council Kilkenny, Ireland 2009-03-23 Telephone: +353 (0)56 7770777 Fax: +353 (0)56 7770788 E-Mail: [email protected] www.heritagecouncil.ie Heritage Council of Ireland Series ISBN 978 1 906 304 07 2 2 Table of Contents Foreword 5 Executive Summary 6 Achoimre Fheidhmeach 7 1 Introduction 9 1.1 Why were towpaths built? 9 1.2 Contemporary role of towpaths 9 1.3 Towpaths in Ireland 9 1.4 Funding for towpath work 9 1.5 The need for this guide 9 2 Towpath improvements: benefits, opportunities and issues 10 2.1 Why improve towpaths? 10 2.2 Heritage and Environment 10 2.3 Regeneration 10 2.4 Transport 10 2.5 Sport and Recreation 11 2.6 Tourism 11 2.7 Issues to consider when planning a towpath project 11 2.8 Maintenance 12 3 Policy context 12 3.1 Waterways Ireland 12 3.2 Heritage and Environment Legislation 12 4 Built heritage 13 4.1 Unique and
    [Show full text]
  • The Falkirk Wheel and South Falkirk
    Walk, Ride and Cycle in and around The Falkirk Wheel and South Falkirk easy to use map and 12 suggested locations something for everyone Walk, Ride and Cycle in and around The Falkirk Wheel and South Falkirk Paths Key Enjoy Scotland’s outdoors responsibly! 1 The Falkirk Wheel Shortie Everyone has the right to 2 Falkirk Wheel to Rough be on most land and Camelon Castle Roman Fort inland water providing Falkirk Wheel 3 Falkirk Wheel to they act responsibly. Rough Castle Your access rights and Roughcastle 1 Community Woodland responsibilities are Roman Fort Falkirk 4 Falkirk Wheel to explained fully in the 2 3 Rough Castle Scottish Outdoor Access Community Woodland Code. 5 5 Tamfourhill Local Loop Whether you’re in the 6 Bantaskine Park outdoors or managing 6 Circular the outdoors, the key 7 The Falkirk Tunnel things are to: Finding your way 4 9 Callendar House Circular Take responsibility for A map & Park 8 Hallglen Local Loop your own actions Take a close look at 7 9 Falkirk Wheel to Battle Respect the interests the map for each of Falkirk Monument of other people route. This should be 10 10 Falkirk Wheel to Care for the all you need to find Shieldhill Circular environment the start point and 8 11 Falkirk Wheel and get on your way. OS Community Woodland Visit Explorer map 349 12 Hallglen Circular www.outdooraccess- covers the area. 12 Callendar Estate Cycle scotland.com or contact Trails your local Scottish Natural Heritage office. Signs 11 Look out for sign posts and interpretation boards giving more information along the way.
    [Show full text]
  • The Falkirk Wheel
    THE FALKIRK WHEEL Image licensed under Creative Commons by beltzner on Flickr Canals are sometimes called ‘the motorways of the past’. They were used for linking big towns and for moving goods around the country. They were very busy and important. They had their own special kind of engineering to help them to change levels, to join up together and to get round natural obstacles like hills and valleys. Canal builders have always had to tackle the problems of keeping the canals level when they go up and down hills. Locks were used to do this, and later on boat lifts were invented. A boat lift was built in Cheshire in 1875 to transfer barges from the River Weaver to the Trent canal which was 50 feet higher up than the river. In 1998 engineers built another boat lift in Scotland which is a very dramatic sight. £84 million was spent on joining up canals and rivers to make a waterway right from the east to the west coast of Scotland. The Falkirk Wheel joins two canals that had previously needed a boat lift. Boats have to be lifted 82 feet (25m) from one canal to the other, and 11 locks had been needed to do this. The locks were too old to use and they had been closed in 1933. The engineers decided to design a boat lift instead as part of the Millennium Link project. The Falkirk Wheel takes two boats up and two boats down at the same time. Altogether 400 tons is moved from one canal to the other, including the weight of water.
    [Show full text]