Report on Rule Levels for Major Reservoirs of KSEBL

Total Page:16

File Type:pdf, Size:1020Kb

Report on Rule Levels for Major Reservoirs of KSEBL Report on Rule Levels for Major Reservoirs of KSEBL May, 2019 RULE CURVE FOR MAJOR RESERVOIRS OF KSEBL MAY 2019 CONTENTS 1. Introduction ................................................................................................................................................... 1 2. Data Collection ............................................................................................................................................... 2 3. Methodology .................................................................................................................................................. 2 3.1 Variables ................................................................................................................................................ 2 3.2 Procedure .............................................................................................................................................. 3 4. Rule Levels for Idukki reservoir ...................................................................................................................... 4 4.1 General .................................................................................................................................................. 4 4.2 Salient Levels ......................................................................................................................................... 4 4.3 Elevation - Storage - Area Details .......................................................................................................... 4 4.4 Scheduled release for power generation .............................................................................................. 5 4.5 Inflow to Idukki Reservoir in critical years ............................................................................................ 6 4.6 10-Daily inflow series ............................................................................................................................ 7 4.7 10-Daily inflow series with 50% and 90% percentage of dependability ............................................. 11 4.8 Deriving Rule Levels ............................................................................................................................ 12 4.9 Rule levels corresponding to 50% dependable inflow ........................................................................ 13 4.10 Upper Rule Levels ................................................................................................................................ 13 4.11 Lower rule Level .................................................................................................................................. 15 4.12 Rule Curve ........................................................................................................................................... 16 4.13 Lay out - Idukki Hydro Electric Project including Diversion Structures ............................................... 17 5. Rule levels of Idamalayar Reservoir ............................................................................................................. 18 5.1 General ................................................................................................................................................ 18 5.2 Salient Levels ....................................................................................................................................... 18 5.3 Elevation - Storage – Area Details ....................................................................................................... 18 5.4 Scheduled release for power generation ............................................................................................ 19 5.5 Inflow to Idamalayar Reservoir in critical years .................................................................................. 19 5.6 10-Daily inflow series .......................................................................................................................... 20 5.7 10-Daily inflow series with 50% and 90% percentage of dependability ............................................. 24 5.8 Deriving Rule Levels ............................................................................................................................ 25 5.9 Rule levels corresponding to 50% dependable inflow ........................................................................ 26 5.10 Upper Rule Levels ................................................................................................................................ 27 5.11 Lower rule Level .................................................................................................................................. 27 5.12 Rule Curve ........................................................................................................................................... 29 5.13 Layout Map – Idamalayar Hydro Electric Project ................................................................................ 30 6. Rule Levels for Kakki reservoir ..................................................................................................................... 31 6.1 General ................................................................................................................................................ 31 6.2 Salient Levels ....................................................................................................................................... 31 6.3 Elevation - Storage - Area Details ........................................................................................................ 31 6.4 Scheduled release for power generation ............................................................................................ 32 6.5 Inflow to Kakki reservoirs in critical years ........................................................................................... 32 6.6 10-Daily inflow series .......................................................................................................................... 33 6.7 10-Daily inflow series with 50% & 90% dependability ........................................................................ 35 6.8 Deriving Rule Levels ............................................................................................................................ 36 6.9 Rule levels corresponding to 50% dependable inflow ........................................................................ 37 6.10 Upper Rule Levels ................................................................................................................................ 37 6.11 Lower rule Level .................................................................................................................................. 38 Page ii RULE CURVE FOR MAJOR RESERVOIRS OF KSEBL MAY 2019 6.12 Rule Curve ........................................................................................................................................... 40 6.13 Lay out of Structures of Hydroelectric Projects in Pamba basin ......................................................... 41 7. Rule levels of Banasurasagar Reservoir........................................................................................................ 42 7.1 General ................................................................................................................................................ 42 7.2 Salient Levels ....................................................................................................................................... 42 7.3 Elevation - Storage Details .................................................................................................................. 42 7.4 Inflow to Banasurasagar Reservoir in critical years ............................................................................ 43 7.5 10- Daily Dependable inflow series ..................................................................................................... 43 7.6 Deriving Rule Levels ............................................................................................................................ 44 7.7 Rule levels corresponding to 50% dependable inflow ........................................................................ 44 7.8 Upper Rule Levels ................................................................................................................................ 45 7.9 Layout of Structures under Kuttiyadi Hydro Electric Project .............................................................. 46 8. Rule levels of Sholayar Reservoir ................................................................................................................. 47 9. Recommendations ....................................................................................................................................... 47 Annexures ANNEXURE A1 - Idukki Reservoir – Flood Hydrograph - 100 Yr return period ..................................................... 50 ANNEXURE A2 - Idukki Reservoir – Flood routing with flood - 100 Yr return period ........................................... 51 ANNEXURE B1 - Idamalayar Reservoir – Flood Hydrograph - 100 Yr return period ............................................ 54 ANNEXURE B2 - Idamalayar Reservoir – Flood routing with flood - 100 Yr return period ................................... 55 ANNEXURE C1 - Kakki Reservoir- Flood Hydrograph - 100 Yr return period .......................................................
Recommended publications
  • Dam Break Analysis of Idukki Dam Using HEC RAS
    International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 07 | July-2017 www.irjet.net p-ISSN: 2395-0072 Dam Break Analysis of Idukki Dam using HEC RAS Abhijith R1, Amrutha G2, Gopika Vijayaraj3, Rijisha T V4 1 Asst. Professor, Department of Civil Engineering, Viswajyothi College of Engineering and Technology, Vazhakulam, Kerala, India 2,3,4 UG Scholar, Department of Civil Engineering, Viswajyothi College of Engineering and Technology, Vazhakulam, Kerala, India ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - Idukki reservoir, with an active capacity of developments, contingency evacuation planning and real 1459000000 m3 is a part of the Idukki Hydroelectric Project time flood forecasting. For assessing the flood damage due and comprises of Idukki Arch Dam, Kulamavu Dam and to dam breach it is necessary to predict not only the Cheruthoni dam. During the monsoon period when the dams possibility and mode of a dam failure, but also the flood hydrograph of discharge from the dam breach and the are full at its Maximum Reservoir Level (MRL) or in an propagation of the flood waves. The studies are to map or adverse event of dam break, the maximum discharge gets delineate areas of potential flood inundation resulting from released from these dams. This results into floods on a dam breach, flood depth, flow velocity and travel time of downstream and may cause disaster in cities or towns the flood waves etc. Knowledge of the flood wave and settled on the banks of the reservoir. This paper presents a flood-inundation area caused by a dam breach can case study of dam break analysis of Idukki Arch Dam using potentially mitigate loss of life and property damage.
    [Show full text]
  • Hydro Electric Power Dams in Kerala and Environmental Consequences from Socio-Economic Perspectives
    [VOLUME 5 I ISSUE 3 I JULY – SEPT 2018] e ISSN 2348 –1269, Print ISSN 2349-5138 http://ijrar.com/ Cosmos Impact Factor 4.236 Hydro Electric Power Dams in Kerala and Environmental Consequences from Socio-Economic Perspectives. Liji Samuel* & Dr. Prasad A. K.** *Research Scholar, Department of Economics, University of Kerala Kariavattom Campus P.O., Thiruvananthapuram. **Associate Professor, Department of Economics, University of Kerala Kariavattom Campus P.O., Thiruvananthapuram. Received: June 25, 2018 Accepted: August 11, 2018 ABSTRACT Energy has been a key instrument in the development scenario of mankind. Energy resources are obtained from environmental resources, and used in different economic sectors in carrying out various activities. Production of energy directly depletes the environmental resources, and indirectly pollutes the biosphere. In Kerala, electricity is mainly produced from hydelsources. Sometimeshydroelectric dams cause flash flood and landslides. This paper attempts to analyse the social and environmental consequences of hydroelectric dams in Kerala Keywords: dams, hydroelectricity, environment Introduction Electric power industry has grown, since its origin around hundred years ago, into one of the most important sectors of our economy. It provides infrastructure for economic life, and it is a basic and essential overhead capital for economic development. It would be impossible to plan production and marketing process in the industrial or agricultural sectors without the availability of reliable and flexible energy resources in the form of electricity. Indeed, electricity is a universally accepted yardstick to measure the level of economic development of a country. Higher the level of electricity consumption, higher would be the percapitaGDP. In Kerala, electricity production mainly depends upon hydel resources.One of the peculiar aspects of the State is the network of river system originating from the Western Ghats, although majority of them are short rapid ones with low discharges.
    [Show full text]
  • Munnar Landscape Project Kerala
    MUNNAR LANDSCAPE PROJECT KERALA FIRST YEAR PROGRESS REPORT (DECEMBER 6, 2018 TO DECEMBER 6, 2019) SUBMITTED TO UNITED NATIONS DEVELOPMENT PROGRAMME INDIA Principal Investigator Dr. S. C. Joshi IFS (Retd.) KERALA STATE BIODIVERSITY BOARD KOWDIAR P.O., THIRUVANANTHAPURAM - 695 003 HRML Project First Year Report- 1 CONTENTS 1. Acronyms 3 2. Executive Summary 5 3.Technical details 7 4. Introduction 8 5. PROJECT 1: 12 Documentation and compilation of existing information on various taxa (Flora and Fauna), and identification of critical gaps in knowledge in the GEF-Munnar landscape project area 5.1. Aim 12 5.2. Objectives 12 5.3. Methodology 13 5.4. Detailed Progress Report 14 a.Documentation of floristic diversity b.Documentation of faunistic diversity c.Commercially traded bio-resources 5.5. Conclusion 23 List of Tables 25 Table 1. Algal diversity in the HRML study area, Kerala Table 2. Lichen diversity in the HRML study area, Kerala Table 3. Bryophytes from the HRML study area, Kerala Table 4. Check list of medicinal plants in the HRML study area, Kerala Table 5. List of wild edible fruits in the HRML study area, Kerala Table 6. List of selected tradable bio-resources HRML study area, Kerala Table 7. Summary of progress report of the work status References 84 6. PROJECT 2: 85 6.1. Aim 85 6.2. Objectives 85 6.3. Methodology 86 6.4. Detailed Progress Report 87 HRML Project First Year Report- 2 6.4.1. Review of historical and cultural process and agents that induced change on the landscape 6.4.2. Documentation of Developmental history in Production sector 6.5.
    [Show full text]
  • Film Tourism in India – a Beginning Towards Unlocking Its Potential
    Film tourism in India – a beginning towards unlocking its potential FICCI Shoot at Site 2019 13 March 2019 Film tourism is a growing phenomenon worldwide, fueled by both the growth of the entertainment industry and the increase in international travel. Film tourism sector has seen tremendous growth in the past few years. It represents a gateway to new and more intense ways of experiencing destinations. At the same time, it creates the potential for new communities by way of an exchange of insights, knowledge and experience among the tourists themselves. Films play a significant role in the promotion of tourism in various countries and different states of India. A film tourist is attracted by the first-hand experience of the location captured on the silver screen. Not only is film tourism an excellent vehicle for destination marketing, it also presents new product development opportunities, such as location tours, film museums, exhibitions and the theme of existing tourist attractions with a film connection. This report focusses on the concept of film tourism and the various initiatives taken by both the state and central government of India for boosting film induced tourism through their respective film production policies. Dilip Chenoy Secretary General - Federation of Indian Chamber of Commerce and Industry Foreword The significance of cinema in today’s times has gone beyond its intended purpose of mass entertainment. Cinema is a portal for people to escape from reality and into their world of fantasy. Cinema is a source of inspiration for some, a source of entertainment for some and a source of education for some.
    [Show full text]
  • Dam Disclosures
    Dam disclosures The Hindu, New Delhi Dated: September 13, 2018 MORE-IN The people of Kerala have braved the worst calamity since the great flood of 1924. The floodwaters have receded from most of the affected areas barring Kuttanad. Most people have gone back to their homes from relief camps, only to find them battered beyond redemption. As the State is coming back to a “new normal” after the devastation, it is time to ponder on the reasons for the floods. Rubbishing the contention from the Opposition as well as studies from international experts that the mismanagement of dams was the primary reason for the floods, the Kerala government has stood firm that incessant rainfall in August is what caused the floods. This is in contrast to the affidavit filed in the Supreme Court by the Chief Secretary of Kerala, which cited the water released from a dam as the major cause of the floods. While there was considerable deviation in rainfall in August, it is unacceptable to put the onus only on that. In fact, according to a India Meteorological Department study, the rainfall in August was only the sixth highest in the past 143 years (1875-2017) in Kerala. Mismanagement of dams One of the major functions of dams is flood protection — to attenuate the flow of water and its impact downstream. The golden rule followed in dam management is to maintain a flood cushion (buffer) in case of unexpectedly high rainfall. Kerala has 39 major dams. Their maintenance is shared between the Kerala State Electricity Board (KSEB) and the Water Resources Department.
    [Show full text]
  • Revitalizing the Disaster Response Mechanism in Face of Calamity in India
    REVITALIZING THE DISASTER RESPONSE MECHANISM IN FACE OF CALAMITY IN INDIA A Dissertation submitted to the Panjab University, Chandigarh for the award of Master of Philosophy in Social Sciences, in Partial Fulfillment of the requirement for the Advanced Professional Programme in Public Administration (APPPA) By Brigadier Kuldip Pathak, SM, VSM (Roll Number 4617) Under the guidance of Prof Vinod Kumar Sharma 46th ADVANCED PROFESSIONAL PROGRAMME IN PUBLIC ADMINISTRATION (2020-21) INDIAN INSTITUTE OF PUBLIC ADMINISTRATION NEW DELHI iii ACKNOWLEDGEMENTS I wish to place on record my sincere gratitude to Director General IIPA for giving me this opportunity to research and write this dissertation, which has immensely increased my awareness about the subject. I am indebted to Prof Vinod Kumar Sharma for support and valuable guidance at every stage of my dissertation work. He was the inspiration behind my taking up a subject of Disaster Management for my dissertation. My sincere thanks to the IIPA Library for making the research material available to me at a very short notice. I am also grateful to the staff of APPPA Office for their positive and timely administrative support. March 2021 Brigadier Kuldip Pathak Roll Number :4617 iv TABLE OF CONTENTS LIST OF TABLES vi LIST OF FIGURES vii ACRONYMS AND ABBREVIATIONS viii EXECUTIVE SUMMARY xi Chapter 1: Introduction 1 Statement of the Problem 3 Aim and Objectives of the Research 4 Hypothesis 5 Rationale and Justification 5 Research Questions 6 Methodology 6 Research Design 7 Literature Review 7 Research
    [Show full text]
  • Idukki Reservoir Break Analysis
    ISSN (Online) 2456-1290 International Journal of Engineering Research in Mechanical and Civil Engineering (IJERMCE) Vol 6, Issue 7, July 2021 Idukki Reservoir Break Analysis [1] Sajna K Anas, [2] Ruben A Varughese, [3] Anoop P D [1][2] Student, Department of Physics, Catholicate College Pathanamthitta, [3] Assistant Professor, Department of Physics, Catholicate College Pathanamthitta Abstract:-- Idukki reservoir is a part of the Idukki Hydroelectric Project and comprises of Idukki Arch Dam, Kulamavu Dam and Cheruthoni dam. The two reservoirs- Mullaperiyar Dam and Idukki reservoir together form 24 per cent of Periyar’s catchment. This study is aimed to evaluate the wave which forms when water from the Mullaperiyar hits the water column of the Idukki reservoir that could overtop the Cheruthoni Dam and how it affects the Kulamavu dam which is 22km apart from Cheruthoni dam, Kerala, India. These dams are operational since 1976 and 1977 respectively. It is important to examine the effect of water that rushes into it at the time of emergency and the magnitude of kinetic energy at the time of breaching. The present study includes the dam-break flood analysis of the Mullaperiyar dam up to the Idukki reservoir. This project is an extension of it. Dam break failures are often caused by overtopping of the dam due to inadequate spillway capacity during large inflows into the reservoir from heavy rainfall-generated runoff. Dam failure may also be caused by seepage or piping through the dam or along internal conduits, earthquake and landslide generated waves in the reservoir. For a cascade of dams, the breaking of one dam may cause subsequent damage to other dams located downstream due to their overtopping.
    [Show full text]
  • National Disaster Response Force Strength & Weaknesses and It’S Synergy with the Armed Forces
    NATIONAL DISASTER RESPONSE FORCE STRENGTH & WEAKNESSES AND IT’S SYNERGY WITH THE ARMED FORCES A Dissertation submitted to the Panjab University, Chandigarh for the award of Master of Philosophy in Social Sciences, in Partial Fulfillment of the requirement for the Advanced Professional Programme in Public Administration (APPPA) By Brigadier Rajesh Srivastava, SM (Roll Number 4433) Under the guidance of Prof V K Mishra 44rd ADVANCED PROFESSIONAL PROGRAMME IN PUBLIC ADMINISTRATION (2018-19) INDIAN INSTITUTE OF PUBLIC ADMINISTRATION NEW DELHI ii CERTIFICATE I have the pleasure to certify that Brigadier Rajesh Srivastava, SM has pursued his research work and prepared the present dissertation titled “National Disaster Response Force: Strength & Weaknesses And its Synergy with the Armed Forces” under my guidance and supervision. The dissertation is the result of his own research and to the best of my knowledge, no part of it has earlier comprised any other monograph, dissertation or book. This is being submitted to the Panjab University, Chandigarh, for the purpose of Master of Philosophy in Social Sciences in partial fulfillment of the requirement for the Advanced Professional Programme in Public Administration of the Indian Institute of Public Administration (IIPA), New Delhi. I recommend that the dissertation of Brigadier Rajesh Srivastava, SM is worthy of the award of M.Phil degree of Panjab University, Chandigarh. (Prof VK Sharma) Indian Institute of Public Administration I.P. Estate, Ring Road, New Delhi-110002 iii ACKNOWLEDGEMENTS I wish to place on record my sincere gratitude to Director IIPA for giving me this opportunity to research and write this dissertation, which has immensely increased my awareness about the subject.
    [Show full text]
  • TOP 100 Indian Geography Questions for RRB JE | NTPC | RRC | SSC | UPSC
    TOP 100 Indian Geography Questions for RRB JE | NTPC | RRC | SSC | UPSC TOP 100 Indian Geography Questions for RRB JE | NTPC | RRC | SSC | UPSC Stay Connected With SPNotifier EBooks for Bank Exams, SSC & Railways 2020 General Awareness EBooks Computer Awareness EBooks TOP 100 Indian Geography Questions for RRB JE | NTPC | RRC | SSC | UPSC Click Here to Download the E Books for Several Exams Click here to check the topics related RRB NTPC RRB NTPC Roles and Responsibilities RRB NTPC ID Verification RRB NTPC Instructions RRB NTPC Exam Duration RRB NTPC EXSM PWD Instructions RRB NTPC Forms RRB NTPC FAQ Test Day TOP 100 Indian Geography Questions for RRB JE | NTPC | RRC | SSC | UPSC 1) Which one of the following are the oldest and Yarkand in the Tarim Basin. The Karakoram mountains in India according to the Pass falls on the boundary of Indian geographical history? administrative state of Jammu and Kashmir and China. A. Vindhyas B. Aravallis 3) Which one of the following is the highest C. Nilgiris peak in Western Ghats and South-India? D. Satpuras A. Mullayanagiri Peak Answer: B B. Anamudi Peak Explanation: C. Doddabetta Peak D. Sonsogor Peak The Aravalli Range is a range of mountains Answer: B running approximately 692 km in a southwest direction, starting in North India from Delhi and Explanation: passing through southern Haryana, through to Anamudi is a mountain located in the Indian Western India across the states of Rajasthan and state of Kerala. It is the highest peak in the ending in Gujarat. The Aravalli Range is the oldest Western Ghats and South India, at an elevation range of Fold Mountains in India.
    [Show full text]
  • Seasons of India
    SEASONS OF INDIA DR. UPMA CHATURVEDI The India Meteorological Department (IMD) designates four climatological seasons: ✓Winter, occurring from December to February. ... ✓Summer or pre-monsoon season, lasting from March to May. ... ✓Monsoon or rainy season, lasting from June to September. ... ✓Post-monsoon or autumn season, lasting from October to November. Seasons remind us that change is the law of nature and a sign of progress. In India, there are mainly six seasons as per the ancient Hindu calendar (the Lunisolar Hindu). The twelve months in a year are divided into six seasons of two-month duration each. These seasons include Vasant Ritu (Spring), Grishma Ritu (Summer), Varsha Ritu (Monsoon), Sharad Ritu (Autumn), Hemant Ritu (Pre-Winter) and Shishir Ritu (Winter). However, as per the India Meteorological Department (IMD), there are four seasons in India like other parts of the world. 1) Spring Season (Vasant Ritu) • The spring season in India is a season of two-month duration which are March and April. In the Hindu calendar, this season occurs in the months of Chaitra and Baisakh respectively. • It is a pleasant and beautiful season with an average temperature of 32 degree centigrade. It starts after the winter and lasts till summer starts. The day becomes longer and nights become shorter in this season. The people come out of the blankets and woolen clothes and start wearing light clothes. They are filled with excitement and happiness. The tree shed their leaves, new leaves start appearing. Birds and animals also love this season and are happy in this season. Birds start chirping, singing and butterflies start hovering over the flowers.
    [Show full text]
  • Telegram @Dheeraj1882 Masters in Current Affairs 6.30 Am on All Week Days Telegram @Dheeraj1882
    Masters in Current Affairs 6.30 am on all Week Days Telegram @dheeraj1882 Masters in Current Affairs 6.30 am on all Week Days Telegram @dheeraj1882 #ican&iwill Masters in Current Affairs 6.30 am on all Week Days Telegram @dheeraj1882 Inspirational Quotation • Organization, Headquarters, Important Day Establishment, Head, Short Form Current Affairs Analysis • NATO • Financial Awareness News • Nationalisation • International News MCQ (Previous Year Paper) • National & State News • Person In News • Miscellaneous News Static GK • Who is Who • State, Capital, Governor, CM • Country, Capital, Currency • Park, State, Established • International Airport, Location Masters in Current Affairs 6.30 am on all Week Days Telegram @dheeraj1882 Masters in Current Affairs 6.30 am on all Week Days Telegram @dheeraj1882 Important Day/ महत्वपूर्ण दिवस 1 July National Doctors' Day 1 July Van Mahotsav 1 July National Postal Worker Day 1 July Chartered Accountants Day 2 July World UFO Day 3 July International Plastic Bag Free Day 4 July Dree Festival (Arunachal Pradesh) 6 July World Zoonoses Day 7 July Global Forgiveness Day Masters in Current Affairs 6.30 am on all Week Days Telegram @dheeraj1882 Current Affairs Analysis करंट अफेयसण दवश्लेषर् Masters in Current Affairs 6.30 am on all Week Days Telegram @dheeraj1882 Financial Awareness News Masters in Current Affairs 6.30 am on all Week Days Telegram @dheeraj1882 • The Government has said the World Bank will provide 400 million dollars to enhance support for rejuvenating the Ganga. The Finance Ministry said, the World Bank and the Government signed a loan agreement in this regard. • सरकार ने कहा है कक गंगा के पनु रोद्धार के किए किश्‍ि बℂक 40 करो蔼 डॉिर उपिब्‍ध कराएगा। कित्‍त मंत्रािय ने कहा कक किश्‍ि बℂक और सरकार ने इस संबध मᴂ एक ऋण समझौते पर हस्‍ताक्षर ककए। Formation: July 1944 Headquarters: Washington, D.C., U.S.
    [Show full text]
  • Cheruthoni Dam Break Analysis
    Published by : International Journal of Engineering Research & Technology (IJERT) http://www.ijert.org ISSN: 2278-0181 Vol. 10 Issue 06, June-2021 Cheruthoni Dam Break Analysis Sajna K Anas Ruben A Varughese Student, Department of Physics Student, Department of Physics Catholicate College Pathanamthitta Catholicate College Pathanamthitta Mahatma Gandhi University Mahatma Gandhi University Abstract— This study is aimed to evaluate the wave which such a flood disaster can be mitigated to a great extent, if the forms when water from the Mullaperiyar hits the water column resultant magnitude of flood peak and its time of arrival at of the Idukki reservoir that could overtop the Cheruthoni Dam different locations downstream of the dam can be estimated, Kerala, India. This dam was constructed in the year 1976. It is facilitate the planning of emergency action measures. The important to examine the effect of water that rushes into it at most suitable instruments for analysis and prediction of a the time of emergency. The present study includes the dam break flood analysis of the Mullaperiyar dam up to the Idukki dam break flood are mathematical hydrodynamic simulation reservoir. This project is an extension to it. models. These models can be used for prediction of dam Dam break failures are often caused by overtopping of the breach flood hydrograph and its routing through downstream dam due to inadequate spillway capacity during large inflows valley to obtain the time series of discharge and water level at into the reservoir from heavy rainfall-generated runoff. Dam different locations of the valley. The present study includes failure may also be caused by seepage or piping through the the dam break flood analysis of the Mullaperiyar dam up to dam or along internal conduits, earthquake and landslide the Idukki reservoir.
    [Show full text]