LONDON GAZETTE, 16Fn MAY 1972 5869

Total Page:16

File Type:pdf, Size:1020Kb

LONDON GAZETTE, 16Fn MAY 1972 5869 LONDON GAZETTE, 16fn MAY 1972 5869 extends from a p'odnt 160 yards south-west of its (d) to stop iip private means of access to premises, junction with the classified road (A.3058) to a point (and 220 yards north-east of that junction. Exceptions will1 be provided 'in the Order to enable (e) provide new means of access to premises, a vehicle to wait for so Jong as may be necessary all between Thorpe and Chertsey in the County of for a person to board or alight from the vehicle, Surrey. to enable goods to be loaded on to or .unloaded 2. The M25 South Orbital Motorway (-Chertsey from the vehicle, or to enable the vehicle to be Interchange Connecting Roads) Scheme 197 (nicttice used in connection with any building operation or of which was published on 14th December 1971)'. demolition, the removal of any obstruction to traffic, This is a Scheme under sections 11, 12 and 14 of the maintenance of the road or the services therein. the Highways Act 1959, which, if made, will authorise, A copy of the Order, together with a plan illustrat- the Secretary of State" to provide for -the exclusive ing the proposal, may be inspected during all reason- use of traffic of Classes .1 and II of the classes of able hours at the offices of the County Council at traffic set out in Schedule 4 to the Highways Act County Hall, Truro. 1959 (as, amended), four special roads on routes Objections ito the Order may be sent to the Secre- described in the Schedule to that Scheme as means tary, Departrhent of the Environment, 2 Marsham of entry fo and exit from the M25 South Orbital Street, London, SW1P 3EB, by 6th June 1972, Motorway at Chertsey in the County of Surrey and quoting the reference TTP 5/8/087 and stating will provide for the special roads to become trunk the reasons for objection. roads on the date when the Scheme comes into H. Hollingshead. operation. 3. The M25 Motorway (Lyne—Chertsey Section) Compulsory Purchase Order (No. CSE ) 19 The Trunk Road (Blue Linhay Hill, Ashburton) (notice of which was published on 20th April 1972). (Prohibition of Driving) Order 1972 This is an Order under sections 214 and 215 of the The Secretary of State for the Environment has Highways Afct 1959 .and, sections 44, 47 and 51 of made an Order under section 1 of the Road Traffic the Acquisition of Land (Authorisation Procedure) Regulation Act 1967, as amended by Part IX of the Act 1946, which, if made, will authorise the Secre- Transport Act 1968. The effect of the Order is to tary of State to purchase . compulsbrily the land close the gap in the, central reservation of the described therein for the following purposes: London—Penzance Trunk Road (A.38) in the Urban (a) the construction of a new motorway in the District of Ashburton; in the County of Devon Urban District of Chertsey in the County of opposite its junction with Dolbeare Road. •Surrey in pursuance of ithe M25 South Orbital Any person who desires to question the validity Motorway (Egham—Chertsey Section) Scheme of, or of any provision contained in, the Order, 1971 and the M25 South Orbital Motorway on the ground that it is not within the powers with (Chertsey Interchange Connecting Roads) respect to the Order conferred by the above Act, or pn the ground that any requirement of, or of any Scheme 197 ; instrument made under, any provision of that Act (b) the construction and improvement of highways has hot been complied with in relation tq. the Order, and provision of new means of access to premises may within 6 weeks of llth May 1972 apply to the in the Urban District of Chertsey in the County High Court for the suspension or quashing of the of Surrey in pursuance of the M25 South Orbital Order or of any provision contained therein. Motorway (Thorpe—Chertsey Section Side Copies of the Order may be obtained by applica- Roads) Order 197 . tion to .the Secretary, Department of the Environ- 4. The Urban District of Chertsey, Holloway Hill ment, 2 Marsham Street, London, SW1P 3EB, quot- Roundabout Compulsory Purchase Order No. 2, 1971 ing the reference TTP 5/8/080. arid The Urban District of Chertsey (Ottershaw Roundabout) Compulsory Purchase Order No. 1, 1971 (notice of the making of which by the Urban HIGHWAYS ACTS 1959 TO 1971 District Council of Chertsey was published on 31st December 1971 and 6th January 1972 respectively). ACQUISITION OF LAND (AUTHORISATION PROCEDURE) These are Orders under section 214 of the Highways ACT 1946 Act 1959 and section 1 of the Acquisition of Land TOWN AND COUNTRY PLANNING ACTS 1962 AND 1971 (Authorisation Procedure) Act 1946 which, if con- The M25 South Orbital Motorway (Thorpe— firmed by the Secretary of State, will authorise the Chertsey Section Side Roads) Order 197 . Council to purchase compulsorily the land described therein for the purpose of constructing two round- The M25 South Orbital Motorway (jChertsey abouts and re-aligning other highways at or near to Interchange Connecting Roadsy Scheme 197 . the junction of Hardwick Lane and Hoiloway Hill The M25 Motorway (Lyne—Chertsey Section) with Guildford' Road (A320) Chertsey at or near to Compulsory Purchase Order (No. CSE ) 19 . Ottershaw Crossroads respectively. 5. An application by me Urban District Councu The Urban District of Chertsey, Hottoway Hill of Chertsey referred to the Secretary of State under Roundabout Compulsory Purchase Order No. 2, 1971 section 22 of the Town and Country Planning Act The Urban District of Chertsey (Ottershaw Round- 1962 (now section 35 of the Town and Country about) Compulsory Purchase Order No. 1, 1971 Planning Act 1971) for planning permission for the Application for Planning Permission for the Proposed construction of the Chertsey Western By-Pass along Chertsey Western By-Pass the route described in the application. Noticfe is hereby given that Public Local Inquiries Copies of the Scheme and Orders numbered 1-3 will be held by Mr. F. H. Carr, C.B.E., M.T.P.I., above (relating to the M25 South Orbital Motorway) Dip.T.P. (a person appointed by the Secretary of together with relevant plans have been deposited1 at State for the Environment for the purpose), begin- the Department of the Environment, 2 Marsham ning at 10.30 a.m. on Wednesday, 28th June 1972, Street, London S.W.I, and at the offices-of the at the Hythe Social Centre, Thorpe Lea Road, South Eastern Road Construction Unit, Federated Egham, Surrey, in connection with the Orders, House, London Road, Dorking, Surrey ;• and of the Scheme and application listed above when repre- South Eastern Road Construction Unit (Surrey sentations from persons who have objected to them County Sub-Unit), 28-30 High Street, Guildford, and from any other persons who desire to appear, Surrey; the Surrey C.C., County Hall, Kingston will be heard. upon Thames, Surrey ; the Egham U.D.C., Council The Orders, Scheme and Application referred to Offices, High Street, Egham, Surrey; the Chertsey above are as follows: U.D.C., Council Offices, Station Road, Addlestone, 1. The M25 South Orbital Motorway (Thorpe— Surrey; the Egham Public Library, High Street, Chertsey Section Side Roads) Order 197 (notice of Egham, Surrey ; the New Haw Branch Library, The which was published on 14th December 1971). This Broadway, New Haw, By-fleet, Surrey; the .Chertsey is an Order under sections 13 and 18 of the High- Central Library, Guildford Street, Chertsey, Surrey, ways Act 1959, section 27 of the Local Government andi the Egham Branch Library, Station Parade, Act 1966 and section 62 of the Highways Act 1971, Virginia Water, Surrey, where they may be inspected which, if made, will authorise the Secretary of State: free of charge at all reasonable hours. (a) to improve, raise, lower or otherwise alter Copies of the Orders and planning application highways, numbered 4 and 5 above have Been deposited at the (b) to stop up highways, offices of the Chertsey Urban District Council, (c) to construct new highways, Station Road, Addl'estone, Weybridge, Surrey..
Recommended publications
  • Highways England
    M25 junction 10/A3 Wisley interchange TR010030 6.5 Environmental Statement: Appendix 5.1 Air quality Regulation 5(2)(a) Planning Act 2008 Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 Volume 6 June 2019 M25 junction 10/A3 Wisley interchange TR010030 6.5 Environmental Statement: Appendix 5.1 Air quality Infrastructure Planning Planning Act 2008 The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 (as amended) M25 junction 10/A3 Wisley interchange The M25 junction 10/A3 Wisley interchange Development Consent Order 202[x ] 6.5 ENVIRONMENTAL STATEMENT: APPENDIX 5.1 AIR QUALITY Regulation Number: Regulation 5(2)(a) Planning Inspectorate Scheme TR010030 Reference Application Document Reference TR010030/APP/6.5 Author: M25 junction 10/A3 Wisley interchange project team, Highways England Version Date Status of Version Rev 0 June 2019 Development Consent Order application Planning Inspectorate scheme reference: TR010030 Application document reference: TR010030/APP/6.5 (Vol 6) Rev 0 Page 2 of 76 M25 junction 10/A3 Wisley interchange TR010030 6.5 Environmental Statement: Appendix 5.1 Air quality Table of contents Appendix Pages 5.1 PM2.5 5 5.2 Receptors 5 5.3 Comparison of background concentrations 18 5.4 Verification 20 5.5 Trend analysis of NO2 concentrations 26 5.6 Air quality monitoring 28 5.7 GAP Analysis and results 32 Tables Table 5.2.1: Discrete Human Health Receptors included in the Air Quality Model 5 Table 5.2.2: Ecological Receptors included in the Air Quality
    [Show full text]
  • 2013 No. 2383 ROAD TRAFFIC the M3 and The
    STATUTORY INSTRUMENTS 2013 No. 2383 ROAD TRAFFIC The M3 and the M25 Motorways (M3 Junctions 1 - 5) (Temporary Restriction and Prohibition of Traffic) Order 2013 Made - - - - 9th September 2013 Coming into force - - 9th September 2013 WHEREAS the Secretary of State for Transport, being the traffic authority for the M3 Motorway, the M25 Motorway and connecting roads, is satisfied that traffic should be restricted and prohibited on lengths of the M3 Motorway and on some of those connecting roads because works are proposed to be executed thereon: NOW, THEREFORE, the Secretary of State, in exercise of the powers conferred by section 14(1)(a) and 15(2) of the Road Traffic Regulation Act 1984( a), hereby makes the following Order:- 1. This Order may be cited as the M3 and the M25 Motorways (M3 Junctions 1 - 5) (Temporary Restriction and Prohibition of Traffic) Order 2013 and shall come into force on 9th September 2013. 2. In this Order: “the M3” and “the M25” mean, respectively, the M3 Motorway and the M25 Motorway in the Counties of Hampshire and Surrey; “the first length of motorway” means both carriageways of the M3 between Fleet Services footway overbridge (at marker post 59/8) west of Junction 4a (A327) near Fleet and Thames Side Road underbridge (at marker post 30/3+50) east of Junction 2 (Thorpe Interchange – M25 Junction 12) near Chertsey; “the westbound carriageway” and “the eastbound carriageway” mean, respectively, the westbound carriageway and the eastbound carriageway of the first length of motorway; “the Regulations” means the regulation 16(2) of the Motorways Traffic (England and Wales) Regulations 1982( b); “a second length of motorway” means – (i) both carriageways of the M3 between its junction with the A316 at Junction 1 (A308) and Junction 2 at Thorpe Interchange (M25 Junction 12), (ii) both carriageways of the M3 between the ‘off’ and ‘on’ link roads at Junction 2 at Thorpe Interchange (M25 Junction 12), (a) 1984 c.27; a new section 14 was substituted by the Road Traffic (Temporary Restrictions) Act 1991 (c.26), section 1(1) and Schedule 1.
    [Show full text]
  • Staines Town Centre Draft Urban Design Framework
    Spelthorne Borough Council Staines Town Centre Draft Urban Design Framework UI No 3041 Date 11/2008 Client Spelthorne Borough Council WE BELIEVE IN MAKING CITIES WORK THROUGH OUR UNIQUE INTER-DISCIPLINARY APPROACH TO URBAN DESIGN, TRANSPORTATION, REGENERATION AND DEVELOPMENT. 3041 CONTENTS STAINES Town CENTRE 1 INTRODUCTION .........................................................................................................................................5 THE TEAM URBAN INITIATIVES: 2 ConTEXT ...................................................................................................................................................9 URBAN DESIGN, PLANNING AND MOVEMENT 3 DRAFT URBan DEsign FramEwork .................................................................................................. 41 URBAN DELIVERY: 4 DELIVEring THE Vision ........................................................................................................................ 71 MARKET AND PROPERTY PROJECT DIRECTOR JOHN DALES DOCUMENT DATE 11/2008 1 Fitzroy Square London W1T 5HE t +44 (0)20 7380 4545 f +44 (0)20 7380 4546 www.urbaninitiatives.co.uk Aerial View of the Study Area N Terminal 5 Terminal 1-3 A3113 LONDON HEATHROW AIRPORT Cargo Terminal 01 Introduction Wraysbury Reservoir 1.1 Purpose and structure of the report King George VI Reservoir M25 This document presents a Draft Urban Design Staines Reservoir Framework (UDF) for Staines Town Centre prepared by Urban Initiatives on behalf of Spelthorne Borough Council. The report sets out the
    [Show full text]
  • Runnymede Borough Council
    Air Quality Action Plan for Runnymede Borough Council In fulfillment of Part IV of the Environment Act 1995 Local Air Quality Management April 2014 EXECUTIVE SUMMARY Under the system of local Air Quality Management introduced by the Environment Act 1995, local authorities have a duty to work in pursuit of air quality objectives and work towards their achievement in a cost effective way. An area identified as unlikely to meet the objectives must be designated as an Air Quality Management Area (AQMA). After declaring an AQMA, a local authority is required to prepare a remedial Air Quality Action Plan (AQAP) to improve air quality in that area. An AQAP must provide a quantification of the source contributions to the exceedences of the relevant objectives, evidence that all available options have been considered, a plan of how the local authority will use its powers and also work in conjunction with other organisations to implement the AQAP, timescales for AQAP implementation and an impact assessment of the proposed measures. Annual review and assessment reports (summarised in Section 1.4) give an account of the current air quality in Runnymede and identify areas where national targets might not be met. As road traffic is the major source of pollution in Runnymede, the main air pollutants are nitrogen dioxide (NO2) and fine particulates. The air quality across the Borough is generally good; however, nitrogen dioxide concentrations can be of concern close to roads carrying large traffic flows or near busy congested roads in town centres. So far, Runnymede declared two AQMAs in the following areas: along the M25 (all across the Borough – declared in 2001 for both nitrogen dioxide and particulate matter (PM) and in Addlestone Town Centre (declared in 2008 for nitrogen dioxide).
    [Show full text]
  • Runnymede Runnymede North Edition
    JULY 2O21 RUNNYMEDE RUNNYMEDE NORTH EDITION Connecting with Our Community LITERARY INSTITUTE NOW OPEN ADDLESTONE CANOE CLUB CELEBRATES 40TH GREEN LIGHT FOR RIVER THAMES SCHEME FREE: DISTRIBUTED IN EGHAM, ENGLEFIELD GREEN, HYTHE, THORPE & VIRGINIA WATER RUNNYMEDE JULY 2O21 RUNNYMEDE RUNNYMEDE NORTH EDITION Published by Community Life Magazines Advertising/Editorial: Mary Hammond Email: [email protected] Telephone: 07494 408761 www.community-life.co.uk would like to send a big thank you to everyone who contacted me regarding the first issue of I Runnymede Life: Runnymede North Edition. It's such a pleasure for me to work with residents on community issues (and sometimes problems and concerns). We are all in this together and I'll do my best to keep you informed about Runnymede Borough news and surrounding areas. This issue is packed with information of what is happening in the Borough and lots for you to take in so put down your smartphone, grab a lounge chair and find out what's happening in the community around you. Sadly, The Egham Royal Show and the Chertsey Agricultural Show had to make the difficult decision to cancel for 2021. We are still in a level of uncertainly and need to be vigilant a while longer until Covid and its variants is a bit more under The good news is that the Literary Institute is control. The organisers are looking forward to now open for you to enjoy. You will also be able putting on great shows next year on these events. to pick up copies of Runnymede Life magazines.
    [Show full text]
  • 5 MODELLING RESULTS 5.1 Summary Network Statistics 5.1.1
    Cumulative Assessment of Future Development Impacts on the Highway Network 5 MODELLING RESULTS 5.1 Summary Network Statistics 5.1.1 Tables 5.1 and 5.2 present the network based summary statistics for all modelled vehicles and links within Surrey. The summary statistics compare the key outputs from the modelling of the 2011 base, 2026 Do-Nothing and the 2026 Do- Something. The network statistics are disaggregated into road types. 5.1.2 Table 5.1 shows the amount and proportional breakdown of links modelled within the Surrey. % of Road No. of Road Road Type Length Links Length (Kms) (Kms) Motorway 223 284 7.4% Trunk A road 184 144 3.7% Principal A road 1,892 1,217 31.6% B road 989 823 21.4% Other road 1,520 1,384 35.9% Total 4,808 3,851 100% Table 5.1: Modelled links in Surrey Surrey Network Totals Absolute Difference Percentage Difference 2026 Do- 2026 Do- 2026 Do- 2026 Do- Statistic Road Type 2026 Do- 2026 Do- Something Something 2011 Nothing Nothing Nothing Something less 2026 less 2026 less 2011 less 2011 Do-Nothing Do-Nothing Motorway 1,192,870 1,200,8031,215,903 7,933 15,100 0.7% 1.3% Trunk A road 332,312 334,230 337,107 1,918 2,877 0.6% 0.9% Vehicle Principal A road 971,362 976,336 1,005,283 4,974 28,947 0.5% 3.0% Kilometres (veh kms) B road 445,914 451,490 465,251 5,576 13,761 1.3% 3.0% Other road 545,419 550,692 572,904 5,273 22,212 1.0% 4.0% Total 3,487,877 3,513,5513,596,448 25,674 82,897 0.7% 2.4% Motorway 18,747 19,223 19,861 476 638 2.5% 3.3% Trunk A road 5,145 5,226 5,329 81 103 1.6% 2.0% Vehicle Principal A road 21,123 21,314
    [Show full text]
  • Appendix TA - O
    Appendix TA - O TECHNICAL NOTE 3 (TN3) – MODE SHARE PUBLIC THE LONDON RESORT WSP Project No.: 70063529 | Our Ref No.: 70063529 December 2020 London Resort Company Holdings Ltd London Resort Company Holdings Ltd THE LONDON RESORT Technical Note 3: Mode Share 70063529 NOVEMBER 2020 CONFIDENTIAL London Resort Company Holdings Ltd THE LONDON RESORT Technical Note 3: Mode Share TYPE OF DOCUMENT (VERSION) CONFIDENTIAL PROJECT NO. 70063529 OUR REF. NO. 70063529 DATE: NOVEMBER 2020 WSP Mountbatten House Basing View Basingstoke, Hampshire RG21 4HJ Phone: +44 1256 318 800 Fax: +44 1256 318 700 WSP.com CONFIDENTIAL QUALITY CONTROL Issue/revision First issue Revision 1 Revision 2 Revision 3 Updates following Remarks Confidential Draft consultee response Date June 2020 November 2020 Prepared by P Moss P Moss / A Smith Signature Checked by A Smith A Smith Signature D Dixon / R D Dixon / R Authorised by Hutchings Hutchings Signature Project 70063529 70063529 number Report number \\Uk.Wspgroup.Com\Central Data\Projects\700635xx\70063529 - London Paramount Resort\03 WIP\TP File reference Transport Planning\05 Reports\TECHNICAL NOTES\TN3_Modeshare\20201126_LR_TN3_Mode Share_Update V1.3.Docx THE LONDON RESORT CONFIDENTIAL | WSP Project No.: 70063529 | Our Ref No.: 70063529 November 2020 London Resort Company Holdings Ltd CONTENTS EXECUTIVE SUMMARY 1 UPDATES FOLLOWING CONSULTATION 1 THE LONDON RESORT 2 REVIEW OF EXISTING DATA SOURCES 2 FORECAST VISITOR MODE SHARE AND TRAVEL DEMAND 3 REVIEW OF EXISTING DATA SOURCES – STAFF TRAVEL 3 1 INTRODUCTION 4 1.1 INTRODUCTION
    [Show full text]
  • Cumulative Assessment of Future Development Impacts on the Highway Network
    S Transport for Surrey CUMULATIVE ASSESSMENT OF FUTURE DEVELOPMENT IMPACTS ON THE HIGHWAY NETWORK Final Report Project Title: Cumulative Assessment of Future Development Impacts on the Highway Network Document Title: Final Report Client Reference: Date: 06 September 2011 Prepared By: Print Emma Brundle Sign ....... ......................................... Authorised By: Print Steve Howard Sign ................ ............................. Amendment List Iss. / Rev. Iss. / Rev Remove Insert Date Page Iss. / Rev. Page Iss. / Rev. 1 4/7/11 Final 5/9/11 0201SF10 07/08/02 Filename: I:\EAI\SY all\Economy Team\02. Infrastructure\02. CIL\03 County Council workstreams\SICP\Cumulative Assessment - Final Report.docc Issue No.Final Page 2 Document No. 3380\SICP\01 Cumulative Assessment of Future Development Impacts on the Highway Network CONTENTS EXECUTIVE SUMMARY 4 1 INTRODUCTION 8 1.1 Background 8 1.2 Aims and Objectives 9 1.3 Scope 9 1.4 Report Structure 10 2 MODEL DESCRIPTION 11 2.1 Context 11 2.2 Vehicle Types 11 2.3 Time Period 11 2.4 Assignment Method 11 2.5 Zoning System 12 2.6 Study Area 12 3 ESTIMATION OF TRIP RATES 14 3.1 Trip Generation 14 3.2 Planning Data & TRICS Trip Generation 14 3.3 TEMPRO Trip Generation 16 4 SCENARIOS AND FORECAST MATRICES 17 4.1 Modelled Scenarios 17 4.2 Additional Trips 17 4.3 Largest Increases in Trips 21 4.4 Forecast Matrices 29 5 MODELLING RESULTS 36 5.1 Summary Network Statistics 36 5.2 Strategic Route Network Journey Times 38 5.3 Cost of Congestion compared to Volume/Capacity Ratio 43 5.4 Volume/Capacity Ratio 49 5.5 Difference in Flow 57 5.6 Merge and Diverge Assessment of the SRN 66 6 CONCLUSION 70 6.1 Context 70 6.2 Traffic Impacts on the SRN in Surrey 71 6.3 Traffic Impacts on the LRN of Surrey 72 6.4 Summary of Impacts 73 6.5 Conclusions 74 6.6 Limitations of Study 75 Issue No.Final Page 3 Document No.
    [Show full text]
  • Surrey Heath
    SECTION 36(6)&(7) HIGHWAYS ACT 1980 LIST OF STREETS MAINTAINABLE AT PUBLIC EXPENSE WITHIN THE BOROUGH OF RUNNYMEDE APRIL 2015 Produced by Highways Information Team, Surrey County Council [email protected] 020 8541 8922 Class/Number, Road Name, Village, Town Length (km) (A30)A30 SLIP ROAD TO M25 ANTICLOCKWISE,,EGHAM 0.748 (A30)A30 SLIP ROAD TO M25 CLOCKWISE,,STAINES-UPON-THAMES 0.241 (A30)EGHAM BY-PASS,,EGHAM 1.573 (A30)EGHAM HILL,,EGHAM 1.500 (A30)LONDON ROAD,,EGHAM 1.090 (A30)LONDON ROAD,,VIRGINIA WATER 3.463 (A308)CHERTSEY LANE,,STAINES-UPON-THAMES 0.171 (A308)STAINES BRIDGE,EGHAM HYTHE,STAINES-UPON-THAMES 0.105 (A308)THE CAUSEWAY,,STAINES-UPON-THAMES 1.092 (A308)THE GLANTY,,EGHAM 0.599 (A308)WINDSOR ROAD,,EGHAM 2.979 (A317)CHERTSEY ROAD,,ADDLESTONE 0.497 (A317)EASTWORTH ROAD,,CHERTSEY 1.281 (A317)ST PETERS WAY,,ADDLESTONE 1.462 (A317)WEYBRIDGE ROAD,,ADDLESTONE 1.130 (A317)WOBURN HILL,,ADDLESTONE 1.179 (A318)BRIGHTON ROAD,,ADDLESTONE 0.568 (A318)BYFLEET ROAD,NEW HAW,ADDLESTONE 1.044 (A318)CHERTSEY ROAD,,ADDLESTONE 0.826 (A318)HIGH STREET,,ADDLESTONE 0.355 (A318)NEW HAW ROAD,,ADDLESTONE 1.092 (A319)CHOBHAM ROAD,OTTERSHAW,CHERTSEY 1.635 (A320)BELL BRIDGE R/A,,CHERTSEY 0.080 (A320)BELL BRIDGE ROAD,,CHERTSEY 0.444 (A320)CHERTSEY LANE,,STAINES-UPON-THAMES 2.593 (A320)CHILSEY GREEN ROAD,,CHERTSEY 0.464 (A320)GUILDFORD ROAD,,CHERTSEY 6.427 (A320)GUILDFORD STREET,,CHERTSEY 0.158 (A320)PYRCROFT ROAD,,CHERTSEY 0.703 (A320)R/A JUNC 11,,CHERTSEY 0.464 (A320)ST PETERS WAY,,CHERTSEY 1.133 (A320)STAINES ROAD,,CHERTSEY 2.474 2015 Runnymede
    [Show full text]
  • Surrey Infrastructure Study Executive Summary
    place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place SURREYimage here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place INFimage hereRplaceAS imageTru here CTplace imageure here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place image here place STimage hereUDplaceY image here place image
    [Show full text]
  • Surrey Heath Borough Council Local Plan
    S Surrey Heath Borough Council Local Plan Strategic Highway Assessment Part 1: Model Development, Validation and Forecasting Minnerva Networked Wisdom Project Title: Surrey Heath Borough Council Local Plan Document Title: Strategic Highway Assessment Part 1: Model Development, Validation and Forecasting Date: 18th July 2018 Prepared By: Miles Logie (Minnerva), Georgina Sharpe (SCC) Authorised By: Gemma Joyner All maps contained in this document are licensed © Crown copyright and database rights 2018 Ordnance Survey 100019613 and are orientated to grid north Amendment List Iss. / Rev. Iss. / Rev Date 0201SF10 07/08/02 Filename: S:\Project-current\3000 PROJECT NOS STARTING WTIH 3000\3613\53613T48_Surrey Heath Local Plan 2017\02 Reports\Doc02_Surrey Heath_SHAR_Part_1.docx Issue No. 01 Page 2 Document No. 53613T48/02 Surrey Heath Borough Council Local PlanStrategic Highway Assessment Part 1: Model Development, Validation and Forecasting CONTENTS 1 INTRODUCTION ................................................................................................................................... 6 1.1 REGULATION 18 APPRAISAL ..................................................................................................................... 6 1.2 ORGANISATION OF THIS REPORT ................................................................................................................ 6 2 BASE MODEL DEVELOPMENT .............................................................................................................. 7 2.1 MODEL AND SCOPE ...............................................................................................................................
    [Show full text]
  • Response to Matter 6 Representor Id 1998 Hearing Statement on Behalf of Wentworth Residents Association Runnymede 2030 Local
    RESPONSE TO MATTER 6 REPRESENTOR ID 1998 HEARING STATEMENT ON BEHALF OF WENTWORTH RESIDENTS ASSOCIATION RUNNYMEDE 2030 LOCAL PLAN EXAMINATION: STAGE 2 HEARINGS JANUARY 2019 Lion House, Oriental Road Woking, Surrey, GU22 8AR t: 01483 745 414/5 e: [email protected] w: www.shrimplinbrown.com Title: Hearing Statement Matter 6 Project: Runnymede 2030 Local Plan Examination Client: Wentworth Residents Association Issue: Final Project No: 17134 Prepared by: ……………………. Robert Shrimplin MRTPI MPhil TP Checked by: ……………………. James Brown MRTPI DiP TP Introduction 1) This Hearing Statement has been produced by ShrimplinBrown on behalf of the Wentworth Residents Association ("WRA") (representor ID 1998) in relation to the examination into the Runnymede Borough Local Plan 2030 ("the draft Local Plan"). It responds to Matter 6 of the Stage 2 Hearing Sessions. 2) As made clear in previous objections to the Local Plan, the WRA wishes to participate at the hearing sessions where this Matter will be considered by the Inspector. 3) The WRA represents the residents living on the Wentworth Estate (being over 1,000 households) and business interests in Virginia Water in all matters affecting the Estate. 4) The WRA objects to the draft Local Plan, specifically: the failure by the Council properly to discharge its duty to co-operate; the failure by the Council properly to undertake a sustainability appraisal (and related processes) into the draft Local Plan; and three proposed housing allocations which it considers should be deleted from the emerging Local Plan: • Policy SD20: Longcross Garden Village; • Policy SL9: Housing Allocation at Virginia Water North; and • Policy SL10: Housing Allocation at Virginia Water South.
    [Show full text]