Author's Manual for Preparation Of

Total Page:16

File Type:pdf, Size:1020Kb

Author's Manual for Preparation Of USING EXISTING AND NEW INNOVATIVE METHODS TO ACCELERATE REHABILITATION OF FOUR I-89 BRIDGES Scott Burbank, PE, VHB, (802) 497-6157, [email protected] John Whittaker, Kubricky Construction Corp., (518) 792-5864, [email protected] ABSTRACT The Vermont Agency of Transportation (VTrans) used Accelerated Bridge Construction (ABC) with cross- overs and alternating traffic patterns on Interstate 89 (I-89) in Colchester, Vermont, to complete four deck replacement projects over six extended weekend closures. Several existing—but new to Vermont— practices as well as new innovative procedures and materials were used to successfully complete the deck replacements of all four bridges. INTRODUCTION For travelers to and from Burlington, Vermont—the state’s most populous city and a major economic center—Interstate 89 provides a critical north-south link for commuters from Franklin, Grand Isle, and northern Chittenden Counties (See Figure 1). When the VTrans identified the need to rehabilitate Bridges 76 N&S and 77 N&S in nearby Colchester, it became a priority to minimize the inconvenience to the 2,500 vehicles that pass through this corridor each hour during the morning and evening commute. Traffic volumes drop through the project area overnight and during the weekends. To complete the bridge deck replacements and maintain two lanes of traffic along I-89 during the weekday peak traffic times, it was necessary to use Accelerated Bridge Construction (ABC) techniques. Doing so required creativity, innovative techniques, and the use of existing practices that were new to the State of Vermont. VHB worked closely with Kubricky Construction Corporation (KCC), VTrans’ contractor for this Construction Manager/General Contractor (CM/GC) project. VTrans, VHB, and KCC decided to use AccelBridge’s proprietary prestressing methodology as the preferred method to achieve the deck replacements within the required 59-hour timeframe, between Friday at 7:00 PM, when the evening commute tapers off, and the start of the Monday morning commute at 6:00 AM. This project was the first in Vermont to use this methodology. In addition to AccelBridge’s proprietary prestressing system, the project required the use of a flowable, non-shrink, Figure 1 - Location of Bridges 76N&S and 77N&S quick-curing grout for the beam haunches and shear pockets of the precast concrete deck panels as well as a high-performance, rapid-setting concrete for the mid-span closure pour. Finally, a NYSDOT Class J Concrete, which is a stiffer concrete with a higher cementitious material, smaller aggregate and a higher volume of sand was used for the slip forming of the bridge rail—a process that had not previously been used in Vermont. To rehabilitate the four I-89 bridges in the allotted time, the team used a new-to-Vermont existing traffic management technique. This allowed KCC access to one lane of the bridge one week before the weekend closure. By alternating the direction of travel on the left lane of the barrel where the bridges were not under construction, it was possible to have two lanes of traffic in each commuting direction in the morning and evening, allowing KCC to demo half the bridge deck the week before a weekend closure. This approach, used more often in larger cities, is unusual for Vermont. As a result, educating the public about what to expect was an important component of the traffic control plan’s success. The team coordinated closely with state and local officials and developed an Incident Command System in the event the interstate should shut down or be reduced to one lane due to traffic accidents. Using this combination of ABC techniques, unique materials, and traffic management, the four bridge decks were successfully replaced on an accelerated schedule with minimal impacts to the traveling public. EXISITNG BRIDGE FEATURES AND SITE CONSTRAINTS The four bridges are two pairs of I-89 bridges (76N&S and 77N&S) constructed in 1964 when the interstate was constructed. The bridges consist of a paved concrete deck supported on continuous steel beams spanning a local road, Bay Road, and Mallets Creek, which flows immediately into Lake Champlain. Each bridge carries two lanes of traffic and consists of two 12-foot-wide travel lanes with a 3-foot-wide shoulder and 2’-6” wide curbs with New England Traffic Consortium (NETC) 2-rail bridge rail. The overall width of the bridges is 35’-0” (See Figure 2). Figure 2 - Existing Bridges 76N&S and 77 Bridges 76N&S are 154 feet long with three spans, 43’-68’-43’, and a 19-degree skew. Bridges 77N&S are 185 feet long with three spans, 50’-85’-50’, and a zero-degree skew. All four bridges consisted of five steel beams spaced at 7’-6”. Bridges 76N&S had residual camber placed into the beams. It was unclear if shear connectors were used on any of the four bridges, so deck coring was completed during design to verify they were not present. Each bridge had an expansion joint between the bridge deck, and a backwall that was supported on the abutment and independent of the bridge deck. The fixed end had a curtainwall connected to the existing concrete deck and the ends of the steel beams, making it independent of the abutment. All four concrete bridge decks were deteriorating, with Bridge 77S being structurally deficient with a Deck Condition Rating of 4. Bay Road is a local road that connects the Colchester Bay Area with US Route 2/7. There is a private campground immediately adjacent to I-89 on the northwest corner of Bridge 76S. In addition to vehicular traffic, Bay Road has a shared-use path on its south side that goes under the bridges (see Figure 3) and connects neighborhoods in the Colchester Bay area with those in Colchester Center. The shared-use path is also part of the Champlain Bike Way, which goes along state and local roads along Lake Champlain from southern Vermont to the Vermont/Canadian border. In addition to a local vehicular detour, a bike detour was required when Bay Road was closed for construction on Bridges 76N&S. Figure 3 - Bridge 76S Looking East Mallets Creek is an environmentally sensitive area with wetlands at the edges of the channel (see Figure 4) and a fish-breeding habitat. Due to its proximity to Lake Champlain, additional Vermont state permitting was required for the installation of a causeway to allow for the placement of cranes between and near the ends of the bridges during construction. In addition to the bridges’ physical condition and site constraints, traffic volumes on the bridges varied from the morning commute, which had a large volume of traffic heading southbound, to the evening commute, which had a large volume of traffic heading northbound. This fluctuation required two lanes be available in the morning for southbound traffic and two lanes in the evening for Figure 4 - Bridge 77N Looking North northbound traffic. From past experience, VTrans had determined that the vehicles per hour (VPH) volume needed to be less than 1300 if the interstate was to be reduced to a single lane; otherwise there would be significant traffic delays. Based on the traffic volumes, the interstate could only be reduced to one lane in both the northbound and southbound direction from 9:00 AM to 2:00 PM and 7:00 PM to 6:00 AM the following day. It also meant the interstate could be reduced to a single lane in each direction from 7 PM on Friday to 6 AM on the following Monday. PROJECT DEVELOPMENT Due to the need to accelerate the removal and replacement of the existing concrete backwall, curtainwall, and concrete deck, precast concrete was the appropriate choice for all three bridge elements. The issue, however, was the time between the morning and evening peak traffic flows and the desire to not impact the interstate traffic during the Memorial and Labor Day weekends, the Fourth of July week, and the Columbus Day weekend, which is also Canadian Thanksgiving. These holidays increase interstate traffic volumes; therefore, the use of CM/GC was selected for the collaborative design environment in order to implement an efficient and cost-effective bridge deck replacement project. Preliminary Design As it takes two to three years to develop a project from preliminary design to Contract Plans, VTrans decided to start the CM/GC process near the completion of the Preliminary Plans just before the start of final design. This would not only reduce the timeframe from when the CM/GC started on the project to when the project was constructed, but it would also allow the CM/GC to participate in the preliminary plan quantity and cost reconciliations and during the final plan development when most of the bridge deck replacement design would occur. While VTrans wanted the CM/GC to have input into and agree with the Traffic Control Plans (TCP), the overall method of managing traffic during construction was vetted prior to bringing the CM/GC on board and then further refined with the CM/GC’s input. As precast concrete deck panels where the preferred option, the preliminary design focused on how those panels would be configured. VHB reviewed half-width and full-width deck panels. Another issue was whether the deck panels needed to be post-tensioned or whether they could be placed on the existing beams with the shear pockets grouted in place without post-tensioning. During preliminary design, VHB looked at how the deck panels would interact with the existing curtain and backwalls and how the expansion joint would be handled. The first thought was to extend the precast concrete deck over the curtain and backwalls.
Recommended publications
  • BID DOCUMENTS,’ the Name and Address of the Bidder, the Date and Time of Opening, and the Title of the Project for Which the Bid Is Submitted
    TOWN OF ACTON INVITATION TO BID FOR THE REHABILITATION OF FIVE (5) TOWN OWNED BRIDGES A-02-008 River Street at Fort Pond Brook A-02-009 Brook Street at Nashoba Brook A-02-020 River Street at Fort Pond Brook A-02-021 River Street at Fort Pond Brook A-02-023 Martin Street at Fort Pond Brook CONTRACT NO. 9/3/2009-908 TOWN OF ACTON STEVEN L. LEDOUX TOWN MANAGER TABLE OF CONTENTS BIDDING DOCUMENTS, CONTRACT FORMS, AND GENERAL CONDITIONS CHECKLIST FOR BIDDERS [This Checklist is provided for Bidders' convenience only. Bidders are urged to read the Contract Documents carefully and use this form as an aid in the preparation of their bids.] CHECK ITEMS BIDDERS ARE REMINDED THAT IT IS THEIR RESPONSIBILITY TO 1. ____ The Bid is submitted on the Bid Form provided by the Authority. 2. ____ The name of the Bidder has been provided on the Bid Form. 3. ____ All Addenda have been acknowledged on the Bid Form. 4. ____ The Proposed Contract Sum has been set forth in both words and figures. 5. ____ The Bid Proposal, if any, has been completed. All multiplication and addition have been checked for accuracy. 6. ____ The Bid Form is signed by an authorized representative of the Bidder. 7. ____ Company information has been provided (following the signature section on the Bid Form). 8. ____ A Bid Deposit in the amount of a minimum of 5% of the Proposed Contract Price has been provided in the form of a certified check, cashier’s check, or treasurer’s check made payable to the Town of Acton, or in the form of a bid bond, signed and sealed by both the Bidder and Surety, with the Surety’s current Power of Attorney attached.
    [Show full text]
  • Pamela May, Performance Management Engineer DATE
    MEMORANDUM TO: Jason Hastings, Bridge Design Engineer FROM: Pamela May, Performance Management Engineer DATE: May 11, 2017 SUBJECT: Value Engineering Final Report for I-95 Wilmington Corridor Rehabilitation, Contract No. T201407404, EBHN – N748(01) Attached please find the final analysis report for the above referenced project. The Implementation Committee included the following: • Rob McCleary, Director, Transportation Solutions and Chief Engineer • Lanie Thornton, Director, Finance • Mark Alexander, Director, Maintenance & Operations • CR McLeod, Director, Community Relations • John Sisson, Chief Executive Officer, DTC The Implementation Committee reviewed the recommendations of the Value Engineering Committee and the Project Team and has endorsed several cost and or time savings ideas be pursued for the project (entire list of recommendations included at end of report): • Retrofitting instead of replacing the fascia girders on Brandywine River Bridge ($8.7M) • Partial bearing replacements on Brandywine River Bridge ($600k) • Removing bridge painting within Viaduct to future project ($19M) • Utilizing deck overhang method under parapets ($1.7M) • Not widening Jackson St. ramp – no Amtrak costs ($11M) • Use Test Level 4 barrier instead of Test Level 5 ($14.9M) (Includes indirect cost savings of $13.8M by maintaining some existing barrier) Total approximate cost savings: $55.9M It was a pleasure to work with you and your team on this endeavor. The ideas of the Value Engineering Team, Project Team, and Implementation Committee have yielded
    [Show full text]
  • Line Rd. Reconstruction Kamm Rd. to Aaron Dr
    CONTRACT DOCUMENTS FOR: CITY OF LYNDEN, WASHINGTON LINE RD. RECONSTRUCTION KAMM RD. TO AARON DR. CITY OF LYNDEN PROJECT NO. 2011-10 Consisting of: Bid Documents Contract Forms Specifications & Conditions Drawings Provided for: Engineer: City of Lynden Reichhardt & Ebe Engineering, Inc. Steve Banham, P.E. Public Works Director 423 Front St. 300 4th Street Lynden, WA 98264 Lynden, WA 98264 Phone: (360) 354-3687 Phone: (360) 354-3446 TABLE OF CONTENTS INVITATION FOR BID .............................................................................................................. 4 BID PROPOSAL PACKAGE ...................................................................................................... 6 BID PROPOSAL ........................................................................................................................ 7 BIDDER IDENTIFICATION ................................................................................................... 13 NON-COLLUSION DECLARATION ..................................................................................... 14 BID PROPOSAL SIGNATURE AND ADDENDUM ACKNOWLEDGMENT ..................... 15 BID BOND ............................................................................................................................... 16 SPECIFICATIONS AND CONDITIONS ................................................................................ 17 AMENDMENTS TO THE STANDARD SPECIFICATIONS ................................................ 18 INTRODUCTION TO THE SPECIAL PROVISIONS .........................................................
    [Show full text]
  • University of Cincinnati
    UNIVERSITY OF CINCINNATI Date: 9-Apr-2010 I, Kelley I. Romoser , hereby submit this original work as part of the requirements for the degree of: Master of Architecture in Architecture (Master of) It is entitled: Borrowed From the Earth: Midwest Rammed Earth Architecture Student Signature: Kelley I. Romoser This work and its defense approved by: Committee Chair: George Bible, MCiv.Eng George Bible, MCiv.Eng Rebecca Williamson, PhD Rebecca Williamson, PhD 5/26/2010 489 Borrowed From the Earth: Semiology of Midwest Rammed Earth Architecture A thesis submitted to the Graduate School of the University of Cincinnati in partial fulfillment of the requirements for the degree of Master of Architecture In the School of Architecture of the Department of Design, Architecture, Art, and Planning by Kelley I. Romoser B.S. Ohio University June 2004 Committee Chairs: Thomas Bible, MCiv. Eng Rebecca Williamson, PhD Abstract This thesis explores the material rammed earth and its potential for application in the Midwest, specifically in Southern Ohio. Examining the specifics of rammed earth construction in this context will generate conclusions that have a broader application. Rammed earth construction has been used for hundreds of years in various locales for its many advantages including low material cost, low-energy processing, recyclability, indoor environmental quality, and uniquely beautiful aesthetic. The technique produces massive walls that can help mitigate temperature fluctuation, moderate indoor humidity levels, and dampen sound. Despite these advantages, there are numerous difficulties encountered in contemporary rammed earth construction, particularly in the United States. Rammed earth is highly susceptible to moisture and accepted codes and standards of practice in the U.S.
    [Show full text]
  • B a R R I E R W a L
    CHAPTER FIVE B A R R I E R W A L L S CONTENTS BARRIER WALLS ..................................................................................................................................... 5-2 WHAT TO CHECK BEFORE CONCRETE PLACEMENT ......................................................................... 5-3 WHAT TO CHECK DURING CONCRETE PLACEMENT .......................................................................... 5-5 WHAT TO CHECK AFTER CONCRETE PLACEMENT ............................................................................ 5-5 QUIZ ........................................................................................................................................................... 5-6 ANSWERS TO QUESTIONS ..................................................................................................................... 5-7 5-1 BARRIER WALLS Barrier walls are constructed after the deck is placed and, along with the deck, are the most visible elements of the bridge to motorists. Because of this, the surface finish and alignment of the walls are very important. There is usually no maximum time limit on the age of the deck before barrier walls are placed. However, there may be a minimum time or strength limit on the age of the deck. You will find these limits in the Standard Specifications or Special Provisions as well as detailed information about barrier walls in Specification 521. Be sure that no work is begun prior to the minimum allowable specified time shown in the specification or contract documents. There are two barrier wall forming methods: stationary forming and slip forming. For the stationary forming method, metal or wooden forms that are the shape of the vertical barrier wall surfaces are firmly set in place on top of the deck. Concrete is placed in the forms and cured and then the forms are removed and reused for the next section of wall. For the slip forming method, a machine guided by a string line, slowly moves along the deck while it covers the barrier wall rebars with a steel form in the shape of the barrier.
    [Show full text]
  • History of the Slip Form Paver – Developed in Iowa
    Todd Hanson, Concrete History of the Slip Form Paver – Materials Engineer Iowa Department of Developed in Iowa Transportation Credits • L.M. Clauson (Chief Engineer 1960-66), Slip-Form Paving As Developed and Pioneered in Iowa, Presentation at Annual Highway Conference Maine Section ASCE, Bangor, ME, November 3, 1961 • Gordon Ray & Harold Halm, Fifteen Years of Slip-Form Paving, Journal of American Concrete Institute No. 62-8, February 1965 • Olubayo Olateju, Techniques in Slipform Paving and Continuously Reinforced Concrete Pavement Construction, JHRP Purdue University and Indiana State Highway Commission, March 1971 Introduction • Early Roads in the US • First Prototypes • Johnson paver • Improvements to Slip Form • First Commercial Paver • Advantages • Slip Form Changes Pavement Construction • Other Manufacturers Early Roads • After WWI, War Department noted importance of highways for national defense • Army transcontinental convoy in 1919 • War Department teamed up with the Lincoln Highway Association • 81 vehicles - 62 day trip from Washington DC to San Francisco • Lt. Col. Eisenhower on the trip • Registered vehicles – 6,679,133 cars and 897,755 trucks Army Convoy in Tama, Iowa 1919 Early Roads • Found many poor roads • Dusty when dry, muddy in the rain • Stuck in mud in Nebraska and sand in Nevada • Destroyed 14 bridges in one day in Pennsylvania • Not adequate for large scale travel and needed to be paved • Led push to pave Lincoln Highway Interstate Highway System • During WWII, Eisenhower drove the German Autobahns and saw the benefit of travelling with ease and speed • Post WWII, President Eisenhower knew an interconnected highway system would facilitate routine travel and provide an efficient escape route in the event of an attack.
    [Show full text]
  • Providence Viaduct I-95 Southbound Bridge 578 Replacement
    NuclearHighways Decommissioning & Bridges Providence Viaduct I-95 Southbound Bridge 578 Replacement PROJECT The Rhode Island Department of Transportation Providence Providence Viaduct I-95 Viaduct Southbound Bridge 578 Replacement Project involved Southbound Bridge 578 the construction of a new 1,290 foot four lane bridge to carry Replacement RT 95 Southbound through downtown Providence, RI. The Project also required removal and replacement of adjacent MARKETS Bridge Ramp Structures 577 and 579 as well as widening Highways & Bridges sections of Bridge 578 and 579. Due to very tight logistical Alternative Project Delivery constraints, the project required seven separate phases of Civil & Utility traffic control and all work was required to be planned and Concrete scheduled in a very coordinated and detailed manner. The work CONTRACT TYPE included extensive earth excavation and temporary support Prime Contractor of excavation, pile driving, concrete substructure, bridge superstructure, temporary bridge, bridge demolition, cast in PROJECT OWNER place concrete retaining walls, precast concrete retaining walls, The Rhode Island storm drainage, roadway reconstruction, highway approach, Department of highway signage, and highway lighting work. Transportation Manafort developed and executed a number of value LOCATION engineering approaches to complete the project including Providence, RI concrete slip forming of bridge parapets, the first ever application on a Rhode Island Department of Transportation Project. Accelerated Construction Methods
    [Show full text]
  • Section 601 Concrete
    SECTION 601 ⎯ CONCRETE 601.01 DESCRIPTION. Use concrete consisting of a mixture of cement, fine aggregate, coarse aggregate, and water, with admixtures as specified, combined in the proportions and mixed to the consistency specified, when forming or casting to dimensions specified in the Plans or as the Engineer directs. Provide the materials, material proportions, equipment, and construction methods necessary to ensure that the concrete produced conforms to the Contract. Structural concrete is concrete for structures such as bridges, culverts, and retaining walls. Non-structural concrete is concrete for non- structural items such as sidewalks, entrances, curb and gutter, and roadway median barrier. 601.02 MATERIALS AND EQUIPMENT. 601.02.01 Steel Reinforcement. Conform to Section 811. 601.02.02 Cement. Conform to Section 801. Use Type I cement. The Department will allow the use of Type IA, Type IP, Type IPA, Type IS, Type I(SM), Type II, Type IIA, and Type III when the Engineer approves. The Engineer will condition his approval upon satisfactory means of storage and handling to ensure the ready identification of these cements when used in portions of the work. If unsatisfactory test results are obtained using Types IA, IP, IPA, IS, I(SM), II, IIA, or III cement, complete the work using Type I cement. Do not intermix cement types in any structural unit. 601.02.03 Admixtures. Conform to Section 802. Use air-entraining and water reducing admixtures in all classes of concrete. Water reducing admixtures are not required when slip forming is used for concrete placement. Use other admixtures when the Engineer directs or approves.
    [Show full text]
  • Causes & Cures for Cracking of Concrete Barriers
    MDOT RC-1448 CSD-2003-01 CAUSES & CURES FOR CRACKING OF CONCRETE BARRIERS August 2004 Center for Structural Durability A Michigan DOT Center of Excellence This report presents the results of research conducted by the authors and does not necessarily reflect the views of the Michigan Department of Transportation. This report does not constitute a standard or specification. Technical Report Documentation Page 1. Report No. 2. Government Accession No. 3. MDOT Project Manager Research Report RC-1448 John F. Staton, P.E. 4. Title and Subtitle 5. Report Date Causes and cures for cracking of concrete barriers August 2004 7. Author(s) 6. Performing Organization Code Dr. Haluk Aktan, Ph.D, P.E. and Mr. Upul Attanayaka WSU 9. Performing Organization Name and Address 8. Performing Org Report No. Department of Civil & Environmental Engineering College of Engineering Wayne State University CSD-2003-01 5050 Anthony Wayne Drive Detroit, MI 48202 12. Sponsoring Agency Name and Address 10. Work Unit No. (TRAIS) Michigan Department of Transportation Construction and Technology Division 11. Contract Number: P.O. Box 30049 Lansing, MI 48909 2002-0341 11(a). Authorization Number: 15. Supplementary Notes 13. Type of Report & Period Covered Final 03/2002 – 08/2003 14. Sponsoring Agency Code 16. Abstract The research objective was to investigate the causes of premature deterioration of concrete bridge barriers with the goal of developing strategies for corrective actions. The synthesis of all the data collected in various tasks revealed that barrier deterioration starts with early formation of vertical cracking as a result of the tensile stress due to early-age thermal load.
    [Show full text]
  • Title 9 Streets and Sidewalks
    TITLE 9 STREETS AND SIDEWALKS Chapters: 9.02 Minimum Design Standards for Streets 9.03 Sidewalks 9.04 Excavations and Alterations 9.05 Driveway and Driveway Approaches 9.08 Naming Streets CHAPTER 9.02 MINIMUM DESIGN STANDARDS FOR STREETS Sections: 9.02.01 Definitions 9.02.02 Minimum street design requirements 9.02.03 Miscellaneous design requirements 9.02.04 Street construction standards 9.02.05 Street construction observation and inspection 9.02.06 Street testing 9.02.07 Signage and striping 9.02.08 Final acceptance of streets 9.02.09 Warranty period responsibilities 9.02.01 Definitions Street Arterial street – A street or road of considerable continuity that serves, or is intended to serve, as the principal traffic way between separated areas or districts which is the main means of access to the primary street system or expressways. Minor arterial street – a street or road that does not meet the definition of a full arterial street, but which is expected to carry more traffic than the typical collector street, especially more truck traffic. 91 Collector street – a street which in addition to serving abutting properties, intercepts neighborhood streets, connects with community facilities and carries neighborhood traffic to the arterial street system. Typically residential lots do not front on collector streets. Neighborhood streets – a street used primarily to carry traffic from abutting properties. Industrial streets – a street that serves an industrial park or district, or that carries primarily industrial traffic. (Ord. No. 2006-44, Sec. 1.) 9.02.02 Minimum street design requirements A. Streets The location and width of all streets and roads shall conform to the official Master Street Plan.
    [Show full text]
  • CITY of SUMMERSIDE TENDER Demolition of Four Downtown Core
    CITY OF SUMMERSIDE TENDER Demolition of Four Downtown Core Buildings 8 & 12 Summer street 281 and 285 Water Street Project 2020 Specifications & Tender Documents City of Summerside Tender(s) Sealed tenders will be received by the City of Summerside at the Tender Box, 1st Floor, Summerside City Hall, and 275 Fitzroy St until 1:00pm, Wednesday August 5 th, 2020 for the following project(s): Building demolition of four downtown core buildings 8 & 12 Summer street, and 281 and 285 Water street. This tender consists of the demolition of the four downtown buildings noted above, the removal from the site, and reinstatement of the site to grade level. Tender Forms, Specifications and Plans may be obtained from the Technical Services Department, please e-mail [email protected], it is mandatory to register for a copy of the tender documents and to receive any addendums for the project to be sent to your e-mail address. If a printed copy of the tender is required, there will be a non-refundable fee of $25 per set of drawings. Lowest or any tender not necessarily accepted. Mike Thususka Summerside Director of Economic Development Logo 902 432 0103 [email protected] Please Publish: July 24& 25th 2020 TABLE OF CONTENTS SECTION DESCRIPTION Tender Ad Title Page Tender Table of Contents Instructions to Tenderers Tender Form Schedule of Contract Unit Prices Supplementary General Conditions Specific Instructions Municipal Services Forms 1005 General Instructions with funding March 2020 1410 Materials Testing July 2019 1545 Safety Requirements
    [Show full text]
  • An Experimental Study on the Configuration Management for the Construction of Tapered Concrete Pylon of Super Long Span Bridge Using K-Slip Form System
    IACSIT International Journal of Engineering and Technology, Vol. 7, No. 4, August 2015 An Experimental Study on the Configuration Management for the Construction of Tapered Concrete Pylon of Super Long Span Bridge Using K-Slip Form System Won Jong Chin, Young Jin Kim, Hee Seok Kim, and Hyejin Yoon the tapered slip form system. Abstract—The Korea Institute of Construction Technology As part of the Super Long Span Bridge R&D Program, the (KICT) developed the K-slip form system by improving radically Korea Institute of Construction Technology (KICT) succeeded the previous slip form system for the erection of the tapered in overcoming the technical limits of the tapered slip form concrete pylon of super long span bridge. This innovative K-slip system after 4 years of research that started at the end of 2009. form system adopts the latest tapered slip form design technology using BIM, lightweight GFRP module favoring the early strength This enabled us to secure the design and construction development of concrete owing to its outstanding insulation, technology of an innovative tapered slip form system electromotive spindle for the sectional adjustment, estimation providing safe and very fast construction and, adopting the system of concrete strength using ultrasonic wave, remote control latest lightweight GFRP form, estimation technique of the system of the hydraulic jacks for the raising of slip form, and early setting of concrete, configuration management GPS-based configuration management system. A 10 m-high technology using GPS and IT, and remote and automated concrete pylon was erected successfully within 5 days using the K-slip form system as a mockup test.
    [Show full text]