RFP Document No. GIPCL/GEOTECHNICAL INVESTIGATION & TOPOGRAPHICAL SURVEY/2020/ 13th Aug, 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATION,

CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR /WIND/ HYBRID PARK AT GREAT RANN OF KUTCH AREA,

Issued by: Gujarat Industries Power Company Ltd.(GIPCL) GIPCL Corporate office: PO : Petrochemicals-391346 Dist. Vadodara, Gujarat Ph. No: +91-265 – 2230185 / +91-265-2232768 FAX No: +91-265-2230029

Website: www.gipcl.com

Email: [email protected]; [email protected]

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

Gujarat Industries Power Company Limited (GIPCL)

(Regd. Office: PO: Petrochemicals-391346, Dist: Vadodara, Gujarat)

Website: - www.gipcl.com

Bid for Detailed Geotechnical Investigation and Topographical survey of proposed Solar/ Wind/ Hybrid Park at Great Rann of Kutch area, Gujarat

ISSUED BY:

CHIEF GENERAL MANAGER (RE & BO)

GUJARAT INDUSTRIES POWER COMPANY LIMITED (GIPCL)

ON

13th Aug- 2020

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 2 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

Table of Contents:

DOCUMENTS CHECKLIST: ...... 12 DISCLAIMER: ...... 13 1 Definition and Interpretation ...... 15 2 Introduction ...... 18 2.1 About GIPCL ...... 18 2.1 About Wind/Solar/Hybrid Park: ...... 18 3 Instruction to Bidders ...... 19 3.1 General Instructions: ...... 19 3.2 Pre-Qualifying Requirements (PQRs)/ Eligibility Conditions: ...... 20 3.2.1 Technical Criteria: ...... 20 3.2.2 Financial Criteria: ...... 21 3.2.3 Other Criteria for Qualification: ...... 22 3.3 Local Conditions: ...... 23 3.4 Local Regulatory Frame Work: ...... 24 3.5 Clarifications to Tender Document: ...... 25 3.6 Amendments to Tender Document: ...... 25 3.7 Acceptance of Bids: ...... 25 3.8 Withdrawal of Invitation to Bid: ...... 25 3.9 Representative/ Agent of Bidder: ...... 25 3.10 Financial Proposal and Currencies: ...... 26 3.11 Bank Guarantees & EMD...... 26 3.12 Right to Accept or Reject any or all Bids ...... 27 4. Submission of Bid ...... 28 4.1 General terms ...... 28 4.2 Format and Signing of Bid ...... 29 4.3 Sealing and Marking of Bid ...... 29 4.4 Enclosures of the Bid ...... 30 4.5 Bid Due Date ...... 32 4.6 Late Bids ...... 32 4.7 Confidentiality ...... 32 4.8 Correspondence with the Bidder ...... 32

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 3 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

4.9 Bid Opening and Evaluation ...... 32 4.10 Tests of Responsiveness ...... 32 4.11 Modification and Withdrawal of Bids ...... 33 4.12 Evaluation of Bid and selection of Bidder ...... 33 4.13 Contacts during Bid Evaluation ...... 34 4.14 Employment of Officials/ Ex-Official of the Owner ...... 35 4.15 Declaration on Bidder's Relation to Directors ...... 35 4.16 Letter of Intent (“LOI”) and Notification to Proceed ...... 35 4.17 Security Deposit ...... 35 4.18 Fraudulent Practices ...... 36 5 Standard Technical Specifications and Scope of Work ...... 37 5.1 Introduction: ...... 37 5.2 Scope of Work for Contour and Topographic Survey: ...... 37 5.3 Scope of Work for Geotechnical Investigations: ...... 39 5.3.1 Purpose ...... 39 5.3.2 Scope of Work ...... 39 5.3.3 General Requirements: ...... 41 5.3.4 CODES AND STANDARDS: ...... 42 5.3.5 CALIBRATION OF EQUIPMENT ...... 44 5.3.6 PERSONNEL FOR GEOTECHNICAL INVESTIGATION AND REPORT ...... 44 5.3.7 FIELD INVESTIGATIONS IN SOIL: ...... 44 5.3.8 Sampling: ...... 48 5.3.9 FIELD INVESTIGATION – ROCK ...... 62 5.3.10 LABORATORY TESTING: ...... 65 5.3.11 REPORT:...... 68 5.3.12 RATES AND MEASUREMENTS: ...... 74 5.3.13 DELIVERABLES ...... 76 5.3.14 Annexure-A: List of Equipments to be Mobilised to Site for Topography survey and Geotechnical Investigation (Suggested Minimum) ...... 76 5.3.15 Annexure-B Suggested Minimum Staff to be Deployed ...... 76 6 General Terms & Conditions/General Conditions of Contract (GCC) ...... 77 6.1 Use of Contract Documents & Information ...... 77 6.2 Patent Rights ...... 77

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 4 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

6.3 Statutory Responsibility ...... 77 6.4 Insolvency and Breach of Contract ...... 77 6.5 Deleted ...... 77 6.6 Deleted ...... 77 6.7 Delay in Execution or Failure to complete the Contract ...... 77 6.8 Liquidated Damages for Delay ...... 78 6.9 Termination for Default ...... 79 6.10 Breach and Cancellation of the Contract ...... 79 6.11 Force Majeure ...... 79 6.12 Progress Report of Work ...... 80 6.13 Insurance ...... 80 6.14 Tools and Tackles ...... 81 6.15 Construction Water and Power ...... 81 6.16 Safety Measures ...... 81 6.17 Hazardous Material ...... 81 6.18 Stoppage of Work ...... 81 6.19 Responsibility of the Contractor ...... 81 6.20 Governing Language ...... 81 6.21 Order Amendments ...... 81 6.22 Assignments or Subletting of Contract ...... 82 6.23 Subcontracts ...... 82 6.24 Terms of Payment ...... 82 6.25 Payments Procedure ...... 82 6.26 Arbitration ...... 83 6.27 Court of Competent Jurisdiction ...... 83 6.28 Law and Procedure ...... 83 6.29 Construction of Contract ...... 83 6.30 Notices ...... 83 6.31 Risk Purchase ...... 84 6.32 Confidential Information ...... 84 6.33 Limitation of Liability (LLP) ...... 85 7 Special Terms & Conditions/ Special Conditions of Contract (SCC) ...... 86 7.1 Definition...... 86

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 5 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

7.2 Location of Site...... 86 7.3 Scope of Service ...... 86 7.4 Mode of Execution ...... 86 7.5 Units & Standards/Codes/Regulation ...... 86 7.6 Programme of Work ...... 87 7.7 Starting of Work ...... 87 7.8 Completion Schedule ...... 87 7.9 Site Inspection & Basis of Bid ...... 87 7.10 Price Escalation ...... 87 7.11 Taxes and Duties ...... 88 7.12 Labour Engagement ...... 88 7.13 Termination on the death of Contractor ...... 89 7.14 Retired Government servants taking to Contract ...... 89 7.15 Miscellaneous ...... 89 Appendix-1: Format for covering Letter ...... 90 Appendix-2 Details of Bidder ...... 91 Appendix-3 Format of details of similar Technical experience ...... 92 Appendix-4 Details of Qualified Technical Staff ...... 93 Appendix-5 Declaration of Compliance ...... 94 Appendix- 6 No Deviation Certificate ...... 95 Appendix- 7 Declaration on Bidder‘s relation to Directors ...... 96 Appendix- 8 Format of Power of Attorney as Authorized Signatory ...... 97 Appendix- 9 Format of Summary of Audited Financial statements ...... 99 Appendix- 10 (a) Format of Bank Guarantee for EMD ...... 101 Appendix- 10 (b) Format of Bank Guarantee for Security deposit /Performance Bank Guarantee ...... 103 Appendix- 11 List of Banks (for Bank Guarantee) ...... 105 Appendix- 12 Form of declaration of eligibility ...... 106 Appendix- 13 Format Schedule of Quantities for Geotechnical Investigation Including Laboratory Testing...... 107 Appendix- 14 Format Schedule of Quantities for Contour and Topographic Survey and Total Contract value ...... 111 Appendix- 15: Format for Advance Payment Guarantee ...... 114

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 6 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

SECTION-1: NOTICE INVITING TENDER (NIT)

GUJARAT INDUSTRIES POWER COMPANY LIMITED

P.O Petrochemicals, Dist.: Vadodara-391346, Gujarat, . Tel.:+91-265-2230185 / +91-265-2232768/2213 Fax: +91-265-2230029 Cell: +91-9909035311 E-mail: [email protected] , [email protected]

SECTION-1

NOTICE INVITING TENDER (NIT)

“Bid for detailed Geotechnical Investigation, Contour and Topographical survey of proposed Solar/ Wind/ Hybrid Projects at Great Rann of Kutch area, in the state of Gujarat”.

Gujarat Industries Power Company Limited (GIPCL) invites interested parties to participate in this Request for Proposal (this “RFP or the “Tender Documents” or the “Tender”) for bidding and selection process for the appointment of Contractor for detailed Geotechnical Investigation and Topographical Survey for proposed Solar/ Wind/Hybrid Projects at Great Rann of Kutch area, in the State of Gujarat (the “Project”).

Tender Documents may be downloaded from Web site https://www.nprocure.com or https://gipcl.nprocure.com (For view, download and on-line submission) and GIPCL website htpp://www.gipcl.com (For view & download only.) Tender fee & EMD shall be paid along with submission of Tender Documents. All the relevant documents of Tender shall be submitted physically by Registered Post A.D. or Speed Post or by Hand Delivery addressed to: Shri S N Purohit, Chief General Manager (RE & BO), Gujarat Industries Power Company Limited, PO:Petrochemicals-391346, Dist.: Vadodara, Gujarat, super scribing the envelope with Tender No. and Due Date. ―NO COURIER SERVICE‖ shall be considered for submission of Tender.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 7 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

Table A: Important Dates

Sr. Event Date( and time) No. Date and upload of original tender (Document No. i. GIPCL/Geotechnical investigation & topographical 13th Aug,2020 survey/2020 Online (e-tendering) Tender/Offer submission last ii. 03rd Sep, 2020 date {This is mandatory} Venue: GIPCL Corporate Physical receipt of Bid with all the relevant Office, PO: iii. documents last date (By RPAD or Speed Post or Petrochemicals - 391 By Personal Messenger) {This is mandatory} 346, Dist. Vadodara. Offers shall be valid for a period of One Hundred iv. Bid Validity and Twenty (180) days from bid submission due date. Date of opening of Tender Fee, EMD Cover, Internal opening by v. Vendor Registration and Technical Bid Physical GIPCL as well as Online opening a) Will be decided by GIPCL a) Opening of Financial Bid vi. b) Will be informed by b) e-Reverse Auction starts from GIPCL to all qualified Bidders. 11 weeks from the date vii. Completion schedule of Loi viii. EMD Validity 180 days

Note: The abovementioned dates are subject to amendment, in which case the amendments shall be publically intimated.

Table B: Important Amounts Sr. Event Amount (Rs.) No. Tender Fees (non-refundable) in the form of DD i. Rs. 2,500 /- only. Earnest Money Deposit (EMD) in the form of Bank ii. Rs. 25,000/- Guarantee/DD iii. Security Deposit cum Performance Bank Guarantee 10% of Contract Value

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 8 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

IMPORTANT NOTE TO BIDDERS:

Timely submission of offer to GIPCL: In addition to bid submitted online, all the relevant documents as per requirement of the Tender shall also be submitted physically along with the proof of Tender Fee and EMD in sealed cover so that the same is received in this office on or before the due date and time. All such documents should be strictly submitted by RPAD / speed post/ in person in sealed cover only. Otherwise the offer will not be considered and no any further communication in the matter will be entertained. Please note that Price Bid is not to be submitted in physical form.

No Tender shall be accepted in any case after due date and time of receipt of the Tender, irrespective of delay due to postal services or any other reasons and GIPCL does not assume any responsibility for late receipt of the Tender.

1. All interested parties are requested to understand this Tender in detail in order to comply with GIPCL‘s requirements including but not limited to the fees and deadlines, selection criteria, selection methodology, scope of work, and minimum technical standards. They shall strictly abide by ALL terms prescribed in this Tender and provide accurate information to the best of their knowledge without misleading the Owner to be considered for participation in this Project. 2. It is mandatory for all the Bidders to submit their Financial Bid ONLINE only via e-tendering portal. 3. Technical Bid (Techno-commercial Bid) to be submitted both in physical as well as soft copy (online). It is mandatory for all the bidders to submit their Technical Bid (Techno-commercial Bid) documents in both forms i.e. online (e- tendering) as well as in hard copy in scheduled time. Technical bid in any one form i.e. either in soft copy (online) or in hard copy (physical form), shall not be considered. Technical Bid (Techno-commercial Bid) shall be sent in Sealed Envelopes. Technical Bid (Techno-commercial Bid) envelop shall be super scribed as: “GIPCL/Geotechnical investigation & Topographical survey/2020 Technical Bid for detailed Geotechnical Investigation and topographical survey of proposed Solar/ Wind/ Hybrid Projects at Great Rann of Kutch, in the state of Gujarat.”

4. All the envelopes shall be addressed to: Shri S N Purohit, Chief General Manager (RE & BO), Gujarat Industries Power Company Limited, PO: Petrochemicals-391346, Dist.: Vadodara, Gujarat. Complete postal address of the Bidder shall appear on all the envelopes so that it is possible to find out whose Bid it is without opening the envelope. 5. Tender Fee and EMD shall be submitted in two separate envelopes. 6. Tender fee (non-refundable) will be accepted by DD drawn in favour of the Gujarat Industries Power Company Limited payable at Vadodara. Tenders

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 9 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

submitted without Tender Fee shall not be accepted. The envelope for Tender Fee should be superscribed as ―Tender Fee‖. Cheques are not acceptable. 7. Bidder(s) have to pay total EMD of as per Clause No. ii of Table B (Important Amounts) above. EMD shall be in the form of Bank Guarantee in favour of ―Gujarat Industries Power Company Limited‖ payable at Vadodara. The envelope for EMD should be super scribed as ―EMD‖. Cheques are not acceptable. 8. It is mandatory for all Bidders to submit their Price Bid (Appendix- 14 & 15) only through on-line (e-tendering) mode. Price Bids submitted in physical form shall not be considered for its opening and only on-line submitted price bid will be considered for evaluation. Bidders to note that Price Bid (Appendix- 14 & 15) of only those Bidders shall be opened (On-line-tendering) who are found technically qualified and are found reasonably responsive to GIPCL‘s Tender terms and conditions and Scope of Work. 9. Any technical/commercial query pertaining to this Tender should be referred to:

Shri S. N. Purohit Chief General Manager (RE & BO) Gujarat Industries Power Company Limited PO: Petrochemical-391346, Dist.: Vadodara, Gujarat, India Tel.:+91-265-2230185/2232768/2213 Fax:+91-265-2230029 Email: [email protected], [email protected]

10. Bidders who wish to participate in this tender will have to procure or should have legally valid Digital Certificate (Class III) as per Information Technology Act-2000, using which they can sign their electronic bids. Bidders can procure the same from any of the license certifying Authority of India or can contact (n) code solutions-a division of GNFC Limited, who are licensed Certifying Authority by Government of India at address mentioned below. Bidder may go through the e-tendering instruction for online Bid participation through n-procure platform for further details and guidance for participation in the tendering process through e-tendering.

In case of any further information regarding online bidding or if a Bidder needs any assistance in accessing/ submission of online bid/ clarification or if training is required for participating in online e-reverse bidding, then the Bidder can contact the following office for assistance or training: (n) Procure Cell, (n) code solutions-A division of GNFC Ltd., 403, GNFC Info tower, S.G. Road, Bodakdev Ahmedabad – 380054 (Gujarat) Toll Free: 1-800-419-4632 / 1-800-233-1010, Phone No. 079-26857315 / 316 / 317,

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 10 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

Fax: 079-26857321 / 40007533, Email: [email protected]

Bidder may visit https://www.nprocure.com/html/faq.asp for information regarding e-tendering registration process. To participate in e-Reverse Auction, bidders have to create e-Auction USER ID on https://e-auction.nprocure.com/ and it is mandatory to submit the same along with physical Technical bid (In EMD cover); so that the bidder shall be allowed to participate the e-Reverse Auction. 11. Tender Documents (PDF Format) can be downloaded from Web site https://www.nprocure.com, https://gipcl.nprocure.com or htpp://www.gipcl.com. 12. GIPCL reserve the rights to accept/reject any or all Tenders without assigning any reasons thereof. Bidders are requested to be in touch with above-mentioned websites till opening of the Price Bid to know the latest status.

Yours faithfully,

For and behalf of Gujarat Industries Power Company Limited.

(S. N Purohit) Gujarat Industries Power Company Limited PO: Petrochemicals-391346, Dist.: Vadodara, Gujarat, India --- End of Section ---

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 11 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

DOCUMENTS CHECKLIST: [Note: Document Checklist shall be attached with Appendix 1 of the Technical Bid]

Sr. Attached For Official Document No. use Yes/No 1 Complete sets of Bids (original)

2 Signed Tender Documents in Cover-I 3 Demand Draft of Tender Fees Enclosures of the Bid including the Covering Letter as per the 4 format prescribed in Appendix 1: Format for Covering Letter 5 Details of Bidder as specified in Appendix 2

6 Details of Similar Technical Experience as per Appendix 3 7 Details of qualified technical staff as per the format in Appendix 4

Declaration of compliance as per format prescribed in Appendix 5 8

No Deviation Certificate as per format prescribed in Appendix 6. 9

Declaration of Bidder‘s relation to Directors of the Company as per 10 format prescribed in Appendix 7. Format of Power of Attorney as Authorized Signatory as per format 11 prescribed in Appendix 8

Format of Summary of audited financial statements as per format 12 prescribed in Appendix 9.

EMD in the form of Bank Guarantee as 13 per format prescribed in Appendix10 (a): Format of Bank Guarantee for EMD Format of declaration of eligibility as per format prescribed in 14 Appendix 12. Attested copy of Service Tax Registration Certificate of 15 Bidder.

16 Attested copy of Provident Fund Code of Bidder.

17 Attested copy of PAN Card for Bidder. 18 Signed copy of Schedule of Quantities (Unpriced) 19 Copy of this RFP with sign and official seal on every page

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 12 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

DISCLAIMER:

A) The information contained in this Request for Proposal (―RFP‖) or subsequently provided to Bidder(s), in documentary or in any other form, by or on behalf of GIPCL, any of their employees or advisors, is provided to Bidder(s) on the terms and conditions set out in this RFP and such other terms and conditions subject to which such information is provided. B) This RFP is not an agreement and is neither an offer nor invitation by GIPCL to the prospective Bidders or any other person. The purpose of this RFP is to provide interested parties with information that may be useful to them in the formulation of their Bid for qualification pursuant to this RFP. This RFP includes statements, which reflect various assumptions and assessments arrived at by GIPCL or their advisors or employees or agents, in relation to the Project. Such assumptions, assessments and statements do not purport to contain all the information that each Bidder may require. This RFP may not be appropriate for all persons, and it is not possible for GIPCL, their employees or advisors to consider the investment objectives, financial situation and particular needs of each party who reads or uses this RFP. C. The assumptions, assessments, statements and information contained in this RFP may not be complete, accurate, adequate or correct. Each Bidder should therefore, conduct its own investigations and analysis and should check the accuracy, adequacy, correctness, reliability and completeness of the assumptions, assessments, statements and information contained in this RFP and obtain independent advice from appropriate sources. D. Information provided in this RFP to the Bidder(s) is on a wide range of matters, some of which depends upon interpretation of law. The information given is not an exhaustive account of statutory requirements and should not be regarded as a complete or authoritative statement of law. GIPCL would not have any responsibility for the accuracy or otherwise for any interpretation or opinion on law expressed herein. E. GIPCL, their employees and advisors make no representation or warranty and shall have no liability to any person, including any Bidder or Bidder(s), under any law, statute, rules or regulations or tort, principles of restitution or unjust enrichment or otherwise for any loss, damages, cost or expense which may arise from or be incurred or suffered on account of anything contained in this Bid or otherwise, including the accuracy, adequacy, correctness, completeness or reliability of the RFP and any assessment, assumption, statement or information contained therein or deemed to form part of this RFP or arising in any way with prequalification of Bidders for participation in the Bidding process. F. GIPCL also accept no liability of any nature whether resulting from negligence or otherwise howsoever caused arising from reliance of any Bidder upon the statements contained in this RFP. GIPCL may, in their respective absolute

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 13 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

discretion but without being under any obligation to do so, update, amend or supplement the information, assessment or assumptions contained in this RFP. G. The issuance of this RFP does not imply that GIPCL is bound to select and short- list prequalified Bids for Bid Stage (the ―Bid Stage‖) or to appoint the selected Bidder, as the case may be, for the Project[s] and GIPCL reserves the right to reject all or any of the Bid or Bids without assigning any reasons whatsoever. H. The Bidder shall bear all its costs associated with or relating to the preparation and submission of its Bid including but not limited to preparation, copying, postage, delivery fees, expenses associated with any demonstrations or presentations which may be required by the GIPCL or any other costs incurred in connection with or relating to its Bid proposal. All such costs and expenses will remain with the Bidder and the GIPCL shall not be liable in any manner whatsoever for the same or for any other costs or other expenses incurred by a Bidder in preparation or submission of the Bid proposal regardless of the conduct or outcome of the Bidding process.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 14 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

1 Definition and Interpretation 1.1 Definitions The following words and expressions shall have the meanings hereby assigned to them: 1.1.1 ―Adjudicator‖ means the person, who shall be an engineer or a firm of engineers who is appointed by the Company to act as the adjudicator to make a decision on or to settle any dispute or difference between the Company and the Contractor referred to it or her by the parties pursuant to RFP (Adjudicator) hereof. 1.1.2 ―Applicable Law‖ means any statute, law, regulation, ordinance, notification, rule, regulation, judgment, order, decree, bye-law, approval, directive, guideline, policy, requirement or other governmental restriction or any similar form of decision of, or determination by, or any interpretation or administration having the force of law in the Republic of India and the State Government, by any Government Authority or instrumentality thereof, whether in effect as of the date of this Contract or thereafter. 1.1.3 ―Bid‖ shall mean the bid submitted by the Bidder in response to the RFP/Tender Document No ―GIPCL/ Geotechnical investigation & Topographical survey/2020 ‖ issued by the Company. 1.1.4 ―Bidder‖ shall mean Bidding Company or a Bidding Individual submitting the Bid. Any reference to the Bidder includes Bidding Company / Bidding Individual including its successors, executors and permitted assigns severally, as the context may require; 1.1.5 ―Completion‖ means that the entire works have been completed as per the Scope of Work. 1.1.6 ―Contractor‖ means the person(s) whose bid to perform the Contract has been accepted by the Company and is named as such the Contract Agreement, and includes the legal successors or permitted assigns of the Contractor. 1.1.7 ―Contractor‘s Equipment‖ means all plant, facilities, equipment, machinery, tools, apparatus, appliances or things of every kind required in or for execution of work that are to be provided by the Contractor. 1.1.8 ―Chartered Accountant‖ shall mean a person practicing in India or a firm whereof all the partners practicing in India as a Chartered Accountant(s) within the meaning of the Chartered Accountants Act, 1949. 1.1.9 ―Day‖ means calendar day of the Gregorian calendar. 1.1.10 “Effective Date‖ for this Contract shall mean the date of issuance of Letter of Intent by the Company. 1.1.11 ―GCC‖ means the General Conditions of Contract hereof. 1.1.12 ―Government Authority‖ means Government of India, any state government or any governmental department, commission, board, body, bureau, agency, authority, undertaking, court or other judicial or administrative body or any sub-division or instrumentality thereof, central, state, or local, having jurisdiction over the Contractor, the Facility, or the performance of all or any of the services, obligations

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 15 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

or covenants of Contractor under or pursuant to this Contract or any portion thereof. 1.1.13 ―GIPCL‖ means Gujarat Industries Power Company Limited 1.1.14 ―Month‖ means calendar month of the Gregorian calendar. 1.1.15 ―Owner‖ means Gujarat Industries Power Company Limited (GIPCL) 1.1.16 ―Engineer/Project Manager‖ means the person appointed by the Company in the manner provided in the RFP (Project Manager) hereof and named to perform the duties delegated by the Company. 1.1.17 ―Prudent Practices‖ means those practices, methods, techniques and standards, that are generally accepted for use in Geotechnical investigation & topographical survey taking into account conditions in India. 1.1.18 ―RFP document‖ shall mean the bidding document issued by the Company including all attachments vide RFP No. GIPCL/ Geotechnical investigation & Topographical survey/2020 1.1.19 ―Site‖ means the land and other places upon which the works are to be carried out, and such other land or places as may be specified in the Contract as forming part of the Site. 1.1.20 ―Subcontractor‖, including vendors, means any person to whom execution of any part of the work, is sub-contracted directly or indirectly by the Contractor, and includes its legal successors or permitted assigns. 1.1.21 ―Successful Bidder‖ means the bidder who has been awarded the Contract and described as Contractor for the ―Project‖. 1.1.22 ―Time for Completion‖ shall be the date on or before which the complete Geotechnical investigation and topography survey (Field & laboratory work, analysis of sample) with final report shall be submitted by the Contractor to the satisfaction of the Owner and such date is specified in NIT. 1.2 Interpretations

1.2.1 Language: Unless otherwise agreed by the parties in writing, the parties shall use the English language and the Contract and the other Bid documents, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be written in English, and the Contract shall be construed and interpreted in accordance with that language. If any of the Contract Documents, correspondence or communications are prepared in any language other than English, the English translation of such documents, correspondence or communications shall prevail in matters of interpretation. 1.2.2 Singular and Plural: The singular shall include the plural and the plural the singular, except where the context otherwise requires. 1.2.3 Headings: The headings and marginal notes in the General Conditions of Contract are included for ease of reference, and shall neither constitute a part of the Contract nor affect its interpretation. 1.2.4 Persons: Words importing persons or parties shall include firms, corporations and government entities.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 16 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

1.2.5 Men: The word ‗Men‘ in this RFP shall mean all genders i.e. male, female and others. 1.2.6 Entire Agreement: The Contract constitutes the entire agreement between the Company and Contractor with respect to the subject matter of Contract and supersedes all communications, negotiations and agreements (whether written or oral) of parties with respect thereto made prior to the date of Contract. The various documents forming the Contract are to be taken as mutually explanatory. Should there be any discrepancy, inconsistency, error or omission in the Contract documents, the matter may be referred to the Adjudicator and the Contractor shall carry out work in accordance with the decision of the Adjudicator. 1.2.7 Amendment: No amendment or other variation of the Contract shall be effective unless it is in writing, is dated, expressly refers to the Contract, and is signed by a duly authorized representative of each party hereto. 1.2.8 Independent Contractor: Subject to the provisions of the Contract, the Contractor shall be solely responsible for the manner in which the Contract is performed. i. All employees, representatives or Subcontractors engaged by the Contractor in connection with the performance of the Contract shall be under the complete control of the Contractor and shall not be deemed to be employees of the Company and nothing contained in the Contract or in any subcontract awarded by the Contractor shall be construed to create any contractual relationship between any such employees, representatives or Subcontractors and the Company. ii. Not in any case the sub-contractor shall claim or shall put any binding to the Company and the sub-contractor must be handled by the Contractor and the Company shall not be responsible for any claims at any time by the Contractor in relation to the sub-contractor. 1.2.9 Non-Waiver i. Subject to Clause 1.2.9 (ii) below, no relaxation, forbearance, delay or indulgence by either party in enforcing any of the terms and conditions of the Contract or the granting of time by either party to the other shall prejudice, affect or restrict the rights of that party under the Contract, nor shall any waiver by either party of any breach of Contract operate as waiver of any subsequent or continuing breach of Contract. ii. Any waiver of a party‘s rights, powers or remedies under the Contract must be in writing, must be dated and signed by an authorized representative of the party granting such waiver, and must specify the right and the extent to which it is being waived. 1.2.10 Severability: If any provision or condition of the Contract is prohibited or rendered invalid or unenforceable, such prohibition, invalidity or unenforceability shall not affect the validity or enforceability of any other provisions and conditions of the Contract.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 17 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

2 Introduction

2.1 About GIPCL GIPCL (the ―Company‖) was incorporated in 1985 as Public Limited Company and engaged in business of Electrical Power Generation. The total present capacity of Vadodara (310 MW Gas based + 1 MW Solar+112.4 MW Wind), Mangrol (500 MW Lignite based + 5 MW Solar + 1 MW Solar) and Gujarat Solar Park (80 + 75 MW Solar) plants is 1084.4 MW. The company is having its registered office at P.O. Petrochemical, Vadodara, Gujarat.

The Company commissioned first power project; a 145 MW gas based Combined Cycle Power Plant in February, 1992 at Vadodara. The Company expanded its capacity and commissioned 165 MW Naphtha & Gas based Combined Cycle Power Plant at Vadodara in November, 1997 as Independent Power Producer (IPP) with Power Purchase Agreement (PPA) with GUVNL.

GIPCL commissioned 250 MW (SLPP Phase-I : 2x125 MW) Lignite based Power Plant at Nani Naroli, District Surat in November, 1999 as Independent Power Producer (IPP) with Power Purchase Agreement (PPA) with GUVNL. The Company also has its own Captive Lignite Mines at Vastan, Mangrol &Valia for Surat Lignite Power Plant. Further, SLPP Phase-II: 2 x 125 MW has been commissioned in April 2010.

GIPCL commissioned 112.4 MW Wind Power Project in the State of Gujarat.

GIPCL is in the business of solar power since 2012 and 5 MW photovoltaic Grid connected Solar Power Plant commissioned at Vastan Mines of Surat Lignite Power Station in January 2012.GIPCL has also commissioned 1 MW Distributed Solar Pilot Project at two locations, (i) Village: Amrol, Anand and (ii) Village: Vastan, Taluka: Mangrol in month of April-2016.

GIPCL has commissioned 2x40 MW (AC) Solar PV Project in the month of August-2017 and 75 MW (AC) Solar PV Power Project in the month of June- 2019 at Gujarat Solar Park, Charanka. Further another 100 MW (AC) Solar Project is under execution at Ultra Mega Solar Park, Village Raghanesda, Dist Banaskantha, Gujarat.

For detailed profile of company and past financial results, bidders may visit our website: www.gipcl.com.

2.1 About Wind/Solar/Hybrid Park: GIPCL is planning to develop up to 2500MW of Wind/Solar/Hybrid Park in Great Rann of Kutch in the state of Gujarat.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 18 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

3 Instruction to Bidders

3.1 General Instructions:

1) The current document is the request for proposal, which is issued to all the potential Bidders, requesting a proposal for detailed Geotechnical investigation and Topographical survey to be carried out at Great Rann of Kutch area for proposed Solar/Wind/Hybrid projects on a fixed price basis. The exact site location shall be intimated to successful Bidder. The Contractor would be selected through competitive bidding process for execution of the Project.

2) The Owner expects Bidders to confirm compliance to RFP terms, conditions and specifications at the time of submission of Bids, failing which the Bids are liable to be rejected. Hence, the Bidders in their own interest are advised to submit their Bids complete in all respects conforming to all terms and conditions of this RFP.

3) Before submitting the Tender, the instructions may be read carefully regarding submission of Tender. If any bidder finds discrepancies or omissions in the Tender documents or is in doubt as to the true meaning of any part, he shall clarify same from the Tender Issuing Authority in writing before the due date of submission of the queries.

4) Bids shall be evaluated based on the information/documents available in the Bid. Hence, Bidders are advised to ensure that they submit appropriate and relevant supporting documents along with their proposal in the first instance itself. Bids not complying with the requirements of this RFP are liable to be rejected without any further opportunity.

5) Bidders need to ensure that in the event the work is awarded to it, and during execution of the work, it shall not seek to alter any agreed contractual terms, conditions and specifications.

6) All Bids must be accompanied by a Tender fee and EMD of value as specified in the NIT in the form and manner as specified in the RFP document and must be delivered along with Bids.

7) The specification provided with this RFP outlines the functional requirement.

8) This ‗Instructions to Bidders‘, in original, issued along with RFP document, shall be submitted by the Bidder along with Bid duly signed by the Bidder as the token

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 19 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

of acceptance. Bid sent without having the prescribed RFP documents and without complying with the terms and conditions of RFP shall be ignored.

9) Issuance of this RFP does not construe that the Bidder has been short-listed or qualified.

10) The Owner reserves the right, to accept or reject any Bid and to annul the bidding process and reject all Bids at any time prior to award of the Contract, without assigning any reason thereof and without thereby incurring any liability to the affected Bidder(s).

11) The Owner reserves the right to reject any Bid submitted with deviations beyond the one that is specified and mentioned in the RFP and no time shall be given in any circumstance after opening of Financial Proposal for submission of documents which are missing with Bid.

12) Tender Issuing Authority reserves the right to cancel the NIT or to change qualifying requirement or to reject any or all the tenders so received without assigning any reason.

13) The entire site for the work shall be made available along with LoI.

14) Canvassing in connection with Tender is strictly prohibited and the Tender submitted by the Bidders who resort to canvassing will be liable to rejection straight way.

15) All rates shall be quoted in the proper form i.e. price bid supplied as part of the Tender documents on e-tender portal by the Department.

16) The Gujarat Industries Power Company Limited (GIPCL) does not bind itself to accept the lowest Bid and reserves to itself the right to accept the whole or any part of the Tender and the Bidder shall be bound to perform the same at the rate quoted in this Tender.

3.2 Pre-Qualifying Requirements (PQRs)/ Eligibility Conditions:

3.2.1 Technical Criteria: a) The Bidder should have executed within the preceding seven(7) years reckoned as on last date of notified for receipt of bid, geotechnical investigation works achieving therein the following progress of work. (i) Boring of at least 250m in soil in any one(1) month in one(1) or more concurrently running contracts AND

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 20 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

(ii) Drilling of at least 50m in rock in any one(1) month in one(1) or more concurrently running contracts. b) The Bidder should have the following manpower on its regular payroll for minimum one year period reckoned as last date of notified for receipt of bid. (i) At least one (1) qualified geotechnical engineer with PhD/ M. Tech/ M.S. degree in Geotechnical Engineering and having minimum Five(5) years‘ work experience in the area of geotechnical investigation and one(1) qualified engineering geologist with M.S./ M.Sc. degree in Geology/Engineering Geology or Civil Engineer with experience in geotechnical engineering with BE/B.Tech./A.M.I.E/Diploma, having minimum two(2) years‘ work experience in the area of geotechnical investigation. c) The Bidder should have completed minimum 1 project in similar terrain like great ran of Kutch and having liquefaction zone. d) The Bidder should own the following equipment/test setup/facility: (i) Rotary boring rigs- One (1) Nos. (ii) Electrical Resistivity Test setup- One(1) No. (iii) Laboratory set up equipped for testing the physical, engineering and chemical properties of soil and rock.

3.2.2 Financial Criteria: a) The average annual turnover of the Bidder in the preceding three(3) financial years as on the last date notified for receipt of bid, should not be less than Rs. 16 Lacs. b) Notwithstanding anything stated above, the Owner reserves the right to assess the capabilities and capacity of the Bidder to perform the contract, should be circumstances warrant such assessment in the overall interest of the Owner. c) Net worth should be at least 10% of average turnover of previous 3 years d) Bidder shall submit documentary evidence like IT Returns/account statement/annual reports duly certified by qualified CA/CMA or annual reports for FYs 2017-18, 2018-19 and 2019-20

Notes to Sr. No. 3.2.1 (a) above, (1) If the qualifying work is completed in the last seven(7) years period specified above, and even if it has started earlier, the same will also be considered as meeting the qualifying requirements. (2) The word ―executed‖ means the Bidder should have achieved the progress specified in the PQR even if the contract is not completed/closed. (3) For concurrent works the same month shall be considered. (4) Cumulative depth of Boring/Drilling in soil/rock in multiple/single boreholes shall be considered. Notes to Sr. No. 3.2.1 (d) above,

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 21 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

(1) In case the Bidder does not own Electrical Resistivity test set up, then tie up with a reputed institution shall be permitted. Bidder shall submit the agreement document in the form of joint agreement or MOU in appropriate legally enforceable form along with the bid.

3.2.3 Other Criteria for Qualification: i. The Tender of only those Bidders will be considered who will produce documentary proofs, self-attested to meet the following requirements:

ii. The Bidders should have GST No., valid Proof of Permanent EPF account No. and ESI registration No. ( if applicable ).

iii. The agency should have valid licenses under The Contract Labour (Regulation & Abolition) Act, 1970 & The Contract Labour (P & R) (Gujarat) Rules 1972 and amendment from time to time or should give an undertaking that he will get himself registered within one month if work is awarded to him and if applicable as per prevailing labour laws.

iv. A self-attested certificate from the Bidder to the effect that the Bidder is not blacklisted from any Public Sector undertakings of Central Govt./ State Govt. /SEBs / Corporations/ GIPCL/ GUVNL / GETCO etc. v. The experience list shall include only works executed by Bidder himself as a turnkey contractor which shall include entire work of Topography/Contour survey, Geotechnical Investigations and deatiled reports with foundation designs and recommendations as per the site conditions and not as a Sub- contractor. vi. The Bidder shall ensure that all the information, facts & figures, data provided in the bid are accurate and correct. GIPCL reserves the right to confirm / verify any data or information through their own sources. vii. The Bidder shall furnish documentary evidence by way of copies of Contract / Purchase Order or any other equivalent document, Audited Balance Sheet and Profit & Loss Account etc., along with the Bid to establish experience / track record and financial capabilities meeting Bid Evaluation Criteria. viii. The Bidder or its Proprietor / Partner(s) / Director(s) of the Firm should not have been convicted by a Court of Law for an offence involving moral turpitude in relation to business dealings during the past seven (7) years. ix. GIPCL shall also take into account past experience of work execution by Bidder for GIPCL or other PSUs/reputed developers while carrying out overall due diligence of the proposal and evaluating Bidder in totality to take final call on his selection on following criteria. GIPCL‘s decision regarding the same shall be final &binding to the bidder.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 22 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

x. GIPCL also reserves right to reject or disqualify any bidder at any stage considering its overall performance in past project (s) executed for GIPCL based on reasonable grounds/ reasons for such rejection/disqualification. GIPCL shall be under no obligation to inform the affected Applicants of the rejection and / or ground for rejection.

The Bidder should meet all the above eligibility criteria as on the bid due date. The bids of only those bidders, who meet the Bidder's Eligibility Criteria, will be considered for further evaluation. Notwithstanding anything stated above GIPCL reserves the right to verify all statements/information submitted to confirm the Bidders claim on experience and to assess the Bidders capability and capacity to perform the contract should the circumstances warrant such an assessment in the overall interest of the project. GIPCL will do performance evaluation and necessary due diligence of the Bidders, based on feedback including Owner/user feedback, site visits of completed Projects & ongoing Projects to ascertain capacity and capability of the Bidder. GIPCL‘s decision in this regard shall be final and binding to the Bidder without any demur. Further, notwithstanding the above, GIPCL reserves the right to accept or reject any BID and to annul the process of submission of BID and reject all or any BID, at any time without assigning any reason thereof. GIPCL shall not in any way be responsible or liable for any loss, damage or inconvenience caused to the bidders on account of the rejected bids. GIPCL shall be under no obligation to inform the respective bidder(s) of the rejection and / or ground for rejection

3.3 Local Conditions:

1) The Bidder is advised to visit and examine the site conditions, location, surroundings, climate, availability of local labour, local working conditions, accommodation, availability of power, water and other utilities for performance of work, access to site, communication, transport, right of way, handling and storage of materials, weather data, applicable laws and regulations, and obtain for itself on its own responsibility all information that may be necessary for preparing the Bid and entering into the Contract . The costs of visiting the Site shall be at Bidder's own expense. 2) The Bidder and any of its personnel or agents shall be granted permission by the Owner to enter upon its premises and lands for the purpose of such inspection, but only upon the express condition that the Bidder, its personnel or agents, shall release and indemnify the Owner and its personnel and agents from and against all liability in respect thereof and shall be responsible for personal injury (whether fatal or otherwise), loss of or damage to property and any other loss, damage, costs and expenses however caused, which, but for the exercise of such permission would not have arisen.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 23 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

3) Failure to visit the Site or failure to study the RFP document shall in no way relieve the successful Bidder from furnishing any material or performing any work in accordance with the RFP document. 4) In no case the date of Time for Completion of the project shall be extended, due to the failure of the Bidder to visit the site and it shall be in line with the timeline of Gujarat Industries Power Company Limited (GIPCL) under the Scheme. 5) The Bidder must conduct its own inspection of the proposed project site, access to the Project Site and surroundings at its own cost in order to make a proper estimate of the works to be performed under consideration of site-specific constraints. 6) It shall be deemed that by submitting a Bid, the Bidder has: a) made a complete and careful examination of the RFP document; b) received all relevant information requested from the Owner; c) Acknowledged and accepted the risk of inadequacy, error or mistake in the information provided in the RFP documents or furnished by or on behalf of the Company relating to any of the matters referred to in NIT. d) Already visit the site and acquainted himself to submit the bid documents accordingly. e) satisfied itself about all matters, things and information including matters referred to in the Bid Info at a glance, necessary and required for submitting an informed Bid, execution of the work in accordance with the RFP document and performance of all of its obligations there under; f) acknowledged and agreed that inadequacy, lack of completeness or incorrectness of information provided in the RFP document or ignorance of any of the matters referred to in the RFP herein shall not be a basis for any claim for compensation, damages, extension of time for performance of its obligations, loss of profits etc. from the Company, or a ground for termination of the Contract Agreement; and g) Agreed to be bound by the undertakings provided by it under and in terms hereof. 7) The Company shall not be liable for any omission, mistake or error on the part of the Bidder in respect of any of the above or on account of any matter or thing arising out of or concerning or relating to the RFP document or the Bidding Process, including any error or mistake therein or in any information or data given by the Company.

3.4 Local Regulatory Frame Work: 1) It shall be imperative for each Bidder to fully inform itself of all local conditions, laws and factors which may have any effect on the execution of the Contract as described in the Bidding Documents. The Owner shall not entertain any request for clarification from the Bidder, regarding such local conditions. 2) It is the responsibility of the Bidder that such factors have properly been investigated and considered while submitting the Bid proposals and that no claim

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 24 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

whatsoever including those for financial adjustment to the Contract awarded under the RFP document shall be entertained by the Owner and that neither any change in the time schedule of the Contract nor any financial adjustments arising thereof shall be permitted by the Owner.

3.5 Clarifications to Tender Document: A Bidder requiring any clarification of the Tender documents may notify GIPCL in writing or by facsimile or by e-mail to GIPCL‘s contact as mentioned in Table-A of NIT:

Shri S. N. Purohit P.O Petrochemical-391346, Dist.: Vadodara, Gujarat, India. Tel.:+91-265-2230185 / +91-265-2232768/2213 Fax: +91-265-2230029 Cell: +91-9909035311 E-mail: [email protected], [email protected]

3.6 Amendments to Tender Document: 1) GIPCL may, for any reason, whether at his own initiative or in response to a clarification requested by a prospective Bidder, modify the Tender Documents. 2) The amendments will be notified on website as mentioned in Notice Inviting e- Tender of this Tender. 3) In order to allow the prospective Bidder(s), reasonable time in which to take the amendment into account in preparing their Bids, GIPCL at its discretion, may extend the deadline for the submission of Bids.

3.7 Acceptance of Bids: GIPCL neither bind itself neither to accept the lowest nor to assign any reason for the rejection of any Bid. It is also not binding on GIPCL to disclose any analysis report.

3.8 Withdrawal of Invitation to Bid: While GIPCL has floated this Tender and has requested Bidders to submit their proposals, GIPCL shall always be at the liberty to withdraw this invitation to bid at any time before the acceptance of bid offer.

3.9 Representative/ Agent of Bidder: All the Bidders are requested to mention the name of their authorized representative/ agent, if any, with full address in the Bid. In case the representative is changed during the bidding process such changes shall be notified by the Bidder, failing which, GIPCL shall not accept any responsibility.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 25 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

3.10 Financial Proposal and Currencies: The Bidders shall quote the prices inclusive of all the taxes, while also providing the breakup of taxes as mentioned in Appendix- 14 & 15 the similar format will be present in the e-tender for online submission. The Bidder shall indicate the price in Financial Proposal in Indian National Rupee only.

3.11 Bank Guarantees & EMD 1) EMD shall be in the form of Bank Guarantee. 2) The validity of EMD shall be as mentioned in NIT. 3) The EMD shall specifically bind the Bidder to keep its Bid valid for acceptance and to abide by all the conditions of the Tender Documents in the event of GIPCL desiring to award the work to the said Bidder. GIPCL shall have an unqualified discretion to forfeit the EMD in the event: (i) Bidder fails to keep the Bid valid up to the date specified/ required; or (ii) refuses to unconditionally accept Letter of Intent and carry out the work in accordance with the Bid in the event such Bidder is chosen as the Successful Bidder 4) The Owner shall, however, arrange to release the EMD in respect of unsuccessful Bidders, without any interest, after the acceptance of LOI along with the submission of Security Deposit by successful Bidder.  The EMD shall be released to bidders in the following manner. The EMD of the Successful Bidder shall be returned after submission of the performance bank guarantee.  EMD of the unsuccessful bidders shall be released after releasing the EMD of the Successful Bidder.

5) The EMD shall be forfeited and appropriated by GIPCL as per the discretion of GIPCL as genuine, pre-estimated compensation and damages payable to GIPCL for, inter alia, time, cost and effort of GIPCL without prejudice to any other right or remedy that may be available to GIPCL hereunder or otherwise, under the following conditions:

a. If a Bidder engages in a corrupt practice, fraudulent practice, coercive practice, or restrictive practice; b. In the case of Successful Bidder, if it fails within 7 days from the issue of LoI – (a) to accept the LOI and/ or (b) to furnish the Security Deposit cum Performance Bank Guarantee within the period prescribed. c. In case the Successful Bidder, having signed the Contract / accept the LOI, commits any breach thereof prior to furnishing the Security Deposit cum Performance Bank Guarantee. d. If found blacklisted during the process. 6) The Successful Bidder shall furnish the following Bank Guarantees: Security Deposit cum Performance Bank Guarantee (SD/PBG) as per the format given in Appendix 10 (b): Format of Bank Guarantee for Security Deposit/ Performance Bank Guarantee shall be furnished in favour of Gujarat Industries

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 26 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

Power Company Limited (GIPCL). The Successful Bidder shall submit Security Deposit cum Performance Bank Guarantee of 10% of Total Contract Price, within two weeks after issuance of LOI. The validity period of PBG should be for a total period up to Six (06) months from the date of LoI.

3.12 Right to Accept or Reject any or all Bids 1) Notwithstanding anything contained in this Tender, the Owner reserves the right to accept or reject any Bid and to annul the bidding process and reject all Bids at any time without any liability or any obligation for such acceptance, rejection or annulment, and without assigning any reasons thereof.

2) The Owner reserves the right to reject any Bid and appropriate the EMD if: a. at any time, a material misrepresentation is made or uncovered, or b. the Bidder does not provide, within the time specified by the Company, the supplemental information sought by Company for evaluation of the Bid.

3) Such misrepresentation/ improper response shall lead to the disqualification of the Bidder. If such disqualification / rejection occur after the Bids have been opened and the Successful Bidder gets disqualified / rejected, then the Owner reserves the right to:

a. select the next Bidder with the Lowest Bid Value as the Successful Bidder; b. Take any such measure as may be deemed fit in the sole discretion of the Owner, including annulment of the bidding process. 4) In case it is found during the evaluation or at any time before signing of the Contract or after its execution and during the period of subsistence thereof, that one or more of the pre-qualification conditions have not been met by the Bidder or the Bidder has made material misrepresentation or has given any materially incorrect or false information, the Bidder shall be disqualified forthwith, if not yet appointed as the Contractor either by issue of the LoI or entering into of the Contract Agreement, and if the Successful Bidder has already been issued the LoI or has entered into the Contract Agreement, as the case may be, the same shall, notwithstanding anything to the contrary contained therein or in this Tender, be liable to be terminated, by a communication in writing by the Owner to the Contractor, without the Owner being liable in any manner whatsoever to the Bidder or Contractor, as the case may be. In such an event, the Owner shall forfeit and appropriate the bank guarantees without prejudice to any other right or remedy that may be available to the Owner.

5) The Owner reserves the right to verify all statements, information and documents submitted by the Bidder in response to the Tender Documents. Failure of the Owner to undertake such verification shall not relieve the Bidder of its obligations or liabilities hereunder nor will it affect any rights of the Owner there under.

--- End of Section ---

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 27 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

4. Submission of Bid

4.1 General terms 1) A Bidder is eligible to submit only one Bid for this RFP. A Bidder shall not be entitled to submit another Bid either individually or in a Consortium, as the case may be. 2) Notwithstanding anything to the contrary contained in this RFP, the detailed terms specified in the draft Contract Agreement shall have overriding effect; provided, however, that any conditions or obligations imposed on the Bidder hereunder shall continue to have effect in addition to its obligations under the Contract Agreement. 3) The Bid should be furnished in the formats mentioned in the RFP document which shall be duly signed by the Bidder‘s authorized signatory, provided that the Financial Proposal will be submitted in separate envelop. 4) The Bidder shall submit a power of attorney as per the format at ―Appendix 8: Format of Power of Attorney as Authorized Signatory‖ authorizing the signatory of the Bidder to commit to the Bid or as per their Company‘s format. 5) Any condition or qualification or any other stipulation contained in the Bid shall render the Bid liable to rejection as a non-responsive Bid. The complete Bid shall be without alterations, interlineations or erasures, except those to accord with instructions issued by the Owner, or as necessary to correct errors made by the Bidder, in which case such corrections shall be initialed by the person or persons signing the Bid. 6) The RFP documents and all attached documents are and shall remain the property of the Company and are transmitted to the Bidders solely for the purpose of preparation and the submission of a Bid in accordance herewith. Bidders are to treat all information as strictly confidential and shall not use it for any purpose other than for preparation and submission of their Bid. The Company will not return any Bid or any information provided along therewith. 7) Bidder shall note that the Price Bid of only those Bidders shall be opened who are found technically qualified and responsive to GIPCL‘s Tender terms and conditions including but not limited to Scope of Works.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 28 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

4.2 Format and Signing of Bid 1) The Bidder shall provide all the information sought under this RFP. The Owner will evaluate only those Bids that are received in the required formats and complete in all respects. 2) The Bid shall be typed or written in indelible ink and signed by the authorized signatory of the Bidder who shall also initial each page, in blue ink. All the alterations, omissions, additions or any other amendments made to the Bid shall be initialled by the person(s) signing the Bid.

4.3 Sealing and Marking of Bid

1) The Bid of the Bidder shall be contained in one (1) single ―Main‖ Envelope. 2) The Main Envelope shall contain two (2) Envelopes as follows: “Original” Envelope; “CD/Pendrive” Envelope.

3) The ―Original,‖ Envelopes shall contain the following Envelopes: Cover-I: Signed Copy of the Tender Document(s) Cover-II: Enclosures of the Bid Cover-III: Proof of EMD; and Tender Fee Cover-IV: Financial Proposal unpriced and duly signed and stamped

4) The ―CD/Pendrive‖ Envelope shall contain one (1) no. of CD/Pendrive containing the following folders with the same information submitted in the Original Envelope: Cover-I: Signed Copy of the Tender Document(s) Cover-II: Enclosures of the Bid Cover-III: Proof of EMD and Tender Fee Cover-IV: Financial Proposal unpriced and duly signed and stamped

5) All original attested Tender Documents, Bid Enclosures, EMD and Tender Fee, and Financial Proposal (unpriced) shall be contained in the ―Original‖ Envelope.

6) All soft/ scanned copies of the original attested Tender Documents, Bid Enclosures, EMD and Tender Fee shall be contained in the CD/Pendrive in an appropriately organized manner as in the physical copies, and enclosed in the ―CD/Pendrive‖ Envelope.

7) IMPORTANT: THE COPY OF THE FINANCIAL BID SHALL NOT BE INCLUDED IN THE CDS/PENDRIVE. 8) Envelopes shall be clearly marked as ―Original,‖ and ―CD/Pendrive‖. 9) The content of documents uploaded on eProcurement portal and hard copies submitted should be same and in case of any discrepancy all documents uploaded on eProcurement portal shall stay valid.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 29 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

4.4 Enclosures of the Bid

1) Cover-I shall be duly marked as ―Signed copy of the Tender Document(s)‖ and shall include the duly signed and sealed Tender Document including its annexure, appendices, attachments, amendments and any other documents as added or modified by GIPCL as per the provisions in this Tender. 2) The documents accompanying the Bid other than the attested Tender Document(s), and Proof of Tender Fee and EMD shall be placed in Cover-II and marked as ―Enclosures of the Bid‖. These documents shall include:

a. The Covering Letter as per the format prescribed in Appendix 1: Format for Covering Letter. b. Details of the Bidder as per format prescribed in Appendix 2: Details of Bidder. Attested copy of Service Tax Registration Certificate of Bidder. c. Attested copy of PAN Card for Bidder. d. Attested copy of Provident Fund Code of Bidder. e. Details of similar technical experience of the Bidder as per format prescribed in Appendix 3: Format of Details of Similar Technical Experience. f. Details of qualified technical staff as per format prescribed in Appendix 4: Details of qualified technical staff g. Declaration of compliance as per format prescribed in Appendix 5 h. No Deviation Certificate as per format prescribed in Appendix 6. i. Declaration of Bidder‘s relation to Directors of the Company as per format prescribed in Appendix 7. j. Format of Power of Attorney as Authorized Signatory as per format prescribed in Appendix 8 k. Format of Summary of audited financial statements as per format prescribed in Appendix 9. l. Format of declaration of eligibility as per format prescribed in Appendix 12. 3) Cover–III shall be duly marked as ―copy of Proof of EMD and Tender Fee‖ and shall contain the copy of proof of Tender Fee and EMD. 4) Cover-IV shall be duly marked as ―Financial Proposal unpriced duly signed and stamped‖ and shall contain the Financial Proposal (unpriced duly signed and stamped) as per the format prescribed in Appendix 15: Format of Financial Proposal. 5) All Bid documents shall be placed in hard binding and the pages shall be numbered serially. Each page thereof shall be initialled in blue ink by the authorized signatory. 6) All envelopes in the Bid Documents shall be sealed. The outer envelope shall clearly bear the following identification:

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 30 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

Outer Envelope ―Tender Bid Document‘ for detailed Geotechnical Investigations and Topographical survey of proposed Solar/ Wind/ Hybrid Projects at Great Rann of Kutch area, in the state of Gujarat‖. Cover-I shall bear the following identification: ―Cover-I: Signed RFP Document for detailed Geotechnical Investigations and Topographical survey of proposed Solar/ Wind/ Hybrid Projects at Great Rann of Kutch area, in the state of Gujarat‖.

Cover -II shall bear the following identification: ―Cover-II: Enclosures of the Bid for detailed Geotechnical Investigations and Topographical survey of proposed Solar/ Wind/ Hybrid Projects at Great Rann of Kutch area, in the state of Gujarat‖.

Cover -III shall bear the following identification: ―Cover-III: EMD and Tender fees of the Bid for detailed Geotechnical Investigations and Topographical survey of proposed Solar/ Wind/ Hybrid Projects at Great Rann of Kutch area, in the state of Gujarat‖.

Cover -IV shall bear the following identification: ―Cover-IV: Financial Proposal (unpriced but duly signed and stamped) for the Bid for detailed Geotechnical Investigations and Topographical survey of proposed Solar/ Wind/ Hybrid Projects at Great Rann of Kutch area, in the state of Gujarat‖.

7) Each of the envelopes shall clearly indicate the name and address of the Bidder. In addition, the Bid Due Date should be indicated on the right hand top corner of each envelope. 8) Each of the envelopes shall be addressed to:

ATTN: Shri S. N. Purohit Chief General Manager (RE & BO) Gujarat Industries Power Company Limited PO: Petrochemical-391346, Dist.: Vadodara, Gujarat, India Tel.:+91-265-2230185/2232768/2213 Fax:+91-265-2230029 Email: [email protected], [email protected]

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 31 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

9) If the envelopes are not sealed and marked as instructed above, the Company assumes no responsibility for the misplacement or premature opening of the contents of the Bid submitted. 10) Bids submitted by fax, telex, telegram, e-mail/courier shall not be entertained and shall be rejected. 4.5 Bid Due Date 1) Bids should be submitted before the Deadline for Submission of Bid as specified in NIT. 2) GIPCL may, in its sole discretion, extend the Bid due date by issuing an Amendment/ Addendum in accordance with Clause No. 3.6 uniformly for all Bidders. 4.6 Late Bids Bids received by the Owner after the specified time on the bid due date shall not be eligible for consideration and shall be summarily rejected. In case of the unscheduled holiday being declared on the prescribed closing/opening day of the Bid, the next working day shall be treated as the scheduled prescribed day of closing/opening of the Bid. 4.7 Confidentiality Information relating to the examination, clarification, evaluation and recommendation for the Bidders shall not be disclosed to any person who is not officially concerned with the process or is not a retained professional advisor advising the Company in relation to or matters arising out of, or concerning the bidding process. The Company will treat all information, submitted as part of the Bid, in confidence and will require all those who have access to such material to treat the same in confidence. The Company may not divulge any such information unless it is directed to do so by any statutory entity that has the power under law to require its disclosure or is to enforce or assert any right or privilege of the statutory entity and/ or the Company. 4.8 Correspondence with the Bidder The Owner shall not entertain any correspondence with any Bidder in relation to acceptance or rejection of any Bid. 4.9 Bid Opening and Evaluation 1) The Owner shall open, examine and evaluate the Bids in accordance with the provisions set out in this RFP document. 2) To facilitate evaluation of Bids, the Owner may, at its sole discretion, seek clarifications in writing from any Bidder regarding its Bid.

4.10 Tests of Responsiveness 1) Prior to evaluation of Bids, the Owner shall determine whether each Bid is responsive to the requirements of the RFP. A Bid shall be considered responsive only if:

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 32 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

a. it is received in the manner prescribed in this RFP b. it is accompanied by the requisite Tender Fee and EMD; c. it is received with all the Enclosures of the Bid as prescribed in the Clause 4.4 d. its Enclosures are received as per the formats specified in Appendices as well as the Tender; e. it contains all the information (complete in all respects) as requested in this Tender (in the same formats as specified); f. it complies will all the terms, conditions and provisions specified in this Tender; and it does not contain any conditions or deviations

2) The Owner reserves the right to reject any Bid which is non-responsive and no request for alteration, modification, substitution or withdrawal shall be entertained by the Owner in respect of such Bid.

4.11 Modification and Withdrawal of Bids 1) In case any clarifications are sought by the Owner after opening of Bids then the replies of the Bidder should be restricted to the clarifications sought. Any Bidder who modifies its Bid (including a modification which has the effect of altering the value of its Financial Proposal) after opening of Bid without specific reference by the Company, shall render the Bid liable to be rejected without notice and without further reference to the Bidder and its EMD shall be forfeited. 2) No Bid may be withdrawn in the interval between the bid due date and the expiration of the validity period of the Bid. Withdrawal or unsolicited modification of a Bid during this interval shall result in the Bidder's forfeiture of its Bid Security.

4.12 Evaluation of Bid and selection of Bidder 1) GIPCL will examine the Bid to determine whether they are complete, whether any computational errors have been made, whether required sureties have been furnished, whether the documents have been properly signed, and whether the Bid is generally in order. 2) Prior to the detailed evaluation, GIPCL will determine the substantial responsiveness of each Bid. A substantially responsive Bid is one which conforms to all the terms and conditions of the Tender Documents without material deviations. Deviations from or objections or reservations to critical provisions such as those concerning EMD, Applicable Law and Taxes and Duties will be deemed to be a material deviation. GIPCL‘s determination of a Bid‘s

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 33 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

responsiveness is to be based on the contents of the Bid itself without recourse to extrinsic evidence. 3) If the Bid is not substantially responsive, it will be rejected by GIPCL and may not subsequently be made responsive by the Bidder by correction of the nonconformity. 4) GIPCL will evaluate and compare Bids which have been determined to be substantially responsive. 5) In no case, a Bidder shall have the right to claim to be the Successful Bidder for its Bid. 6) Evaluation of both Techno-Commercial (un-priced) bids and priced bids shall be done separately. 7) Price Bids of only techno-commercial acceptable bids shall be considered for further evaluation. 8) Selection of successful bidder shall be done as below: 9) Total cost for the entire work (cost for Geotechnical investigation + Contour survey) shall be ranked from the lowest to the highest 10) Lowest six (6) eligible bidders or 50% out of the total eligible Bidders (rounded to the next higher whole number), whichever is higher shall be invited for participation in e Reverse Auction. 11) Decrement value and duration for the e-Reverse Auction shall be informed to the qualified bidders before start of e-Reverse Auction. The L1 price shall be put up for starting e-Reverse Auction. e-Reverse auction shall be for reducing the total price and the bidders have to reduce their Price in decrement of value as decided before start of e-Reverse Auction. 12) The L1 bidder(s) after e-Reverse Auction shall have to submit break-up in line with their quoted price bid within three (3) days ie. Equally % reduction in each item rate.

4.13 Contacts during Bid Evaluation Bids shall be deemed to be under consideration immediately after they are opened and until such time the Owner makes official intimation of award/ rejection to the Bidders. While the Bids are under consideration, Bidders and/ or their representatives or other interested parties are advised to refrain from

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 34 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

contacting by any means, the Owner and/ or their employees/ representatives on matters related to the Bids under consideration.

4.14 Employment of Officials/ Ex-Official of the Owner Bidders are advised not to employ serving the Owner. It is also advised not to employ ex-personnel of the Owner within the initial two years period after their retirement/ resignation/severance from the service without specific permission of the Owner. The Owner may decide not to deal with such firm(s) who fails to comply with the above advice.

4.15 Declaration on Bidder's Relation to Directors The Bidders are required to certify in prescribed format Appendix 7: Declaration of Compliance, whether he/they is/are related to any of the Directors/Senior Personnel of the Company in any of the ways mentioned in the Certificate. It is clarified that any such affirmative certificate shall not, by itself, prejudice consideration of the Bid. This certificate must accompany the Bid.

4.16 Letter of Intent (“LOI”) and Notification to Proceed 1) After selection of the Successful Bidder, a Letter of Intent (the ―LoI‖) shall be issued, in duplicate, to the Successful Bidder. The Successful Bidder shall not be entitled to seek any deviation from the Contract, as may have been amended by GIPCL prior to the bid submission date. 2) The Successful Bidder shall acknowledge the LOI and return duplicate copy with signature of the authorized signatory of the Successful Bidder to GIPCL within Ten (10) days of issue of LOI 3) On issue of the LoI by the Company, Authorised representative of the Successful Bidder shall submit the performance Bank Guarantee within the stipulated time.

4.17 Security Deposit 1) Security Deposit in the form of Bank Guarantee (SD) as per the format given in Appendix 11 (b): Format of Bank Guarantee for Security Deposit Bank Guarantee shall be furnished in favour of Gujarat Industries Power Company Limited. The Successful Bidder shall submit Security Deposit cum Performance Bank Guarantee of 10% of the total Contract Price, within two weeks after issue of date of LOI, initially validity period of PBG should be for a total period up to six

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 35 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

(06) months from the date of LOI. PBG shall be returned only after successful completion of entire work (as specified in the scope of work) to the satisfaction of the Owner. No interest is payable on PBG amount. 2) The bank guarantee by the Contractor will be given from bank specified in Appendix 11: List of Banks (for Bank Guarantee) only. BG of any other Bank will not be treated as valid BG. 3) The PBGs shall be liable to be encashed wholly or partly at the sole discretion of the Owner, should the Contractor either fail to execute the work within the stipulated period or fail to fulfil the contractual obligations or fail to settle in full his dues to the Owner. In case of premature termination of the contract, the PBG will be encashed and the Owner will be at liberty to recover the loss suffered by it from the Contractor. 4) The Owner is empowered to recover from the PBG through invocation of PBG for any sum due and for any other sum that may be fixed by the Owner as being the amount or loss or losses or damages suffered by it due to delay in Performance and/or non-performance and / or partial performance of any of the conditions of the contract and / or non-performance of guarantee obligations.

4.18 Fraudulent Practices 1) The Bidders may please note that the Owner shall not entertain any correspondence or queries on the status of the Bids received against this RFP. Bidders are advised not to depute any of their personnel or agents to visit the Owner‘s office for making such inquiries. 2) Any effort by a Bidder to influence the Owner on the Bid evaluation, Bid comparison or Contract award decision may result in the rejection of the Bidder's Bid.

--- End of Section ---

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 36 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

5 Standard Technical Specifications and Scope of Work

5.1 Introduction: The Owner desires that Geotechnical investigation to be carried out onshore and preparation of a detailed report to provide the designer with sufficiently accurate information, both general and specific, about the substrata profile and relevant soil and rock parameters at site on the basis of which the foundations for various structures and equipments of the Solar and Wind Power Projects can be designed rationally. The above list is indicative and not exhaustive.

5.2 Scope of Work for Contour and Topographic Survey: The scope of this specification covers the Topographical field survey of land for the GIPCL‘s Proposed SOLAR/WIND/HYBRID Park at Great Ran of Kutch area, Gujarat. Contour and Topography survey may include indicative and not exhaustive following deliverables. 1. The survey of the Project area shall include the following: a) Mobilize survey team & all equipments such as Total station, DGPS or highly accurate GPS, Echo Sounder (as may be required) etc. and qualified & experience survey team to carryout Survey and other given scope of works as per instruction of OWNER. It is necessary that the contractor have to maintain at site an experienced supervisor all the time who shall have adequate experience. b) Surface plan covering features like houses and other temporary construction, permanent structures, roads, power lines, telephone lines, Reservoirs, natural nullahs, drains, water courses, access road etc are to be surveyed based at Grid intervals of 50mx50m. or closer interval where sudden change in ground profile. c) Plotting the levels at all grid points and plotting of contour mapping at 0.5M interval. Contour generation should be done with computer. Grid and projection in the Universal Transverse Mercator (UTM-WGS 84) coordinates based on the transverse Mercator projection system for the whole project area; d) Topographical survey for the entire proposed site at a grid interval of 500.0 mtr in both directions shall be carried out.. e) Providing Permanent Benchmark Pillars (PBM), grid pillar, boundary pillar with 150 mm dia. Hume Pipes 1500 mm long embedded at least 1000 mm into the Virgin ground and encased with PCC 1:3:6 using 40mm aggregate and including fixing a 120mm x 120mm x 10mm thick mild steel plate etc. complete including all material, labour, excavation, backfilling, painting and, permanent marking of level & co-ordinate etc. complete. f) Temporary Bench Marks shall be established at suitable intervals on available permanent structures within the survey boundary area or by providing Pillar

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 37 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

as specified above. The reference point / bench mark has to be taken from the existing permanent benchmark in consultation with the Officials in near by area g) All the existing topographical features falling within the survey area like canals, streams, roads, culverts, buildings, structures, sheds, power lines, telephone lines, prominent trees, hillocks, rock outcrops, pipelines, dug wells, ditches/low lying areas etc., shall be clearly marked in the survey drawings. h) For water logged area/water body area, if encountered, complete information (viz.) depth of body at various points with Cross section and Longitudinal section is necessary and this is a part of deliverable and no extra charges will be paid whatsoever. i) The reference point / bench mark has to be taken from the existing permanent benchmark in consultation with the Officials. j) The above data shall be prepared on computer using software of AutoCAD to scale 1:1 (i.e. 1 Unit = 1 M.) & required scale for plotting can be obtained by giving the requisite scale factor in ‗PLOT‘ command. k) The final plotted sheets shall be in scale of RF 1:2500 for details, in case no. of sheets are more than one in scale RF 1:2500 then shall be prepare an Index plan to a suitable scale to fit entire area in A1 or A0 size sheet on co- ordinates basis. The detail sheet shall depict levels as taken, contours at requisite interval, all details of various features, survey boundary & corners pillars etc. An Index plan will depict all the above details except spot levels. l) Combination of DGPS (duel frequency, real time) & Total station survey equipments are for maintain the standard of greatest accuracy. m) Enclosing field work photographs & PBM details is compulsory. n) Site Location plan drawn to a scale of 1:10000. o) Present use of site and important aspects such as vegetation, etc. existing drainage pattern of site, possibility of water logging and high flood level of area shall also be captured in the document. p) Drawing must clearly show all water bodies, if any within footprint including channels, their depth and cross section with levels etc. q) Contour map drawn to a scale of 1:250 with a contour interval of 0.5 m or 500 mm. The Contour drawing shall be drawn in 3-Dimensions such that all the spot levels at 5m spacing and indicated on drawing bear all the coordinates (i.e.) X, Y and Z. r) All levels shall be referenced to authentic MSL or Plant Bench Mark and nearest Benchmarks established by Survey of India for example GTS. In case nearest railway station exists close to site, its approximate distance to Project site & Platform MSL shall also be noted down. s) All coordinates shall be in UTM and should be compatible to hand held GPS. t) Longitudinal profile of pipelines, cables, all surface /overhead utilities, pipeline markers etc drawn to a horizontal scale of 1:2000 and vertical scale of

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 38 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

1:10.Plan shall be drawn along the profile with scale normal to alignment at 1:1000. u) Presence of vegetation, trees including their height, girth etc. v) In case of any structures seen within vicinity of project site such as Culverts, Drainage Nalas, complete information such as linear dimensions (L, B, and D), linear water way, number of spans, HFL shall be furnished. w) Final Drawings should be submitted in both soft (pdf and Autocad) as well as hard copies, good quality color prints. x) Any additional areas to be surveyed as identified by the OWNER shall be carried out on QRO basis.

5.3 Scope of Work for Geotechnical Investigations:

5.3.1 Purpose The purpose, in brief, of the proposed geotechnical investigations is: a. To determine type of substrata and their characteristics upto the specified depths to assess the general suitability of the site for the proposed works; b. To enable an adequate and economic design to be prepared, including the design of temporary works; c. To plan the best method of construction; to foresee and provide against difficulties and delays that may arise during construction due to ground and other local conditions. In case of off-shore investigation it is also required to ascertain suitable method of dredging and other requirements during construction and functioning of structures proposed; d. To determine the changes that may arise in the ground and environmental conditions, either naturally or as a result of the proposed works, and the effect of such changes on adjacent works and on the environment in general; e. To explore sources of indigenous materials for use in construction; All the tests that are considered necessary for this purpose, in the opinion of the OWNER, shall be conducted. Any additional tests/works, change in the number and type of specified tests, revision in the diameter and/or depth of boreholes, samples to be collected, etc. shall be carried out as directed by the OWNER.

5.3.2 Scope of Work

This Scope of work covers the technical requirements for a Geotechnical investigation to be carried out at Great Ran of Kutch area for proposed 2.5 GW Solar Wind Hybrid projects and submission of Geotechnical investigation report. The work shall include mobilization of all necessary equipments (Annexure-A), transportation & shifting of equipments, preparation of temporary access to site/working area, providing necessary engineering supervision and technical personnel, skilled and unskilled labour, accommodation, storage, safety and securities of manpower & equipments, arrangement of construction power & water, liasoning with local/government authorities etc., as required to carry out

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 39 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

the entire field as well as laboratory investigation, analysis and interpretation of data collected and preparation of a Geotechnical report. The entire field as well as laboratory investigation work shall be supervised by a post-graduate in Geotechnical Engineering with at least 5 years of experience in Geotechnical Investigation work. A Geologist shall also be deputed at site during investigation whenever rock drilling is undertaken. The scheduling of laboratory tests, analysis and interpretation of test results and drafting of report shall be carried out by a post graduate in Geotechnical Engineering with at least 5 years of experience.

(i) The Contractor shall make his own arrangements for locating the coordinates and positions of bore holes, trial pits, dynamic cone penetration tests and other field tests as per the drawings/sketches/co-ordinates supplied to him and for determining the reduced levels (R.L.‘s) at these locations with respect to the single bench mark indicated by the Owner. Two established reference lines shall be indicated to him. The Contractor has to provide at the site all the required survey instruments to the satisfaction of Owner so that the work shall be carried out accurately according to the specifications and drawings.

All the field and laboratory data shall be recorded in the proforma recommended in Indian Standard Codes. All the field records shall be countersigned by Owner/ Owners representative, soon after the completion of each bore hole/test. The Contractor shall submit to the Owner two copies of field bore logs. All the investigations are to be carried out by the agency as per the priority requirements of the Owner. (ii) The Contractor shall intimate the Owner, giving reasons, if any additional specific tests required necessary to be carried out duly considering local soil conditions before starting of such tests. (iii) The Contractor shall carry out all work meant within parameters of this specification even if not explicitly mentioned under the scope. All works shall be executed to the satisfaction of the OWNER. (iv) Whenever the Contractor is unable to extract undisturbed samples he should immediately inform the Owner, and in such a case payment for boring charges shall be subject to the Owner being satisfied that adequate effort has been made to extract undisturbed samples. (v) All the laboratory test data shall be recorded in the proforma recommended in the Indian Standard Codes and a copy of these shall be sent to the Owner every week during the progress of laboratory testing. Whenever desired during the progress of the work the Owner may be present at the laboratory where the Contractor is arranging for execution of the laboratory tests. (vi) The contractor shall interact with the Owner to get acquainted with the different types of structures envisaged and in assessing the load intensities on the foundations for the various structures of the Power project to enable him to calculate the allowable bearing pressure.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 40 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

(vii) After the review of the draft report, the Owner may call for discussions in order to explain to the Contractor the Owner‘s observation on the report. Within one week of such a request, the Contractor‘s technically qualified Geotechnical Engineer shall be available at the Owner‘s Corporate Office at Vadodara for a discussion. Any expenditure on account of redrafting, finalizing the report including cost of visits to Owner Corporate Office shall be deemed to have been included in the quoted rates. (viii) The Contractor shall carry out all the work of this Specification even if not explicitly mentioned under the Scope. All work shall be executed to the satisfaction of the Owner.

5.3.3 General Requirements: (i) In areas which have already been developed, the Contractor shall take advantage of existing local knowledge, records of trial pits, bore holes, etc., in the vicinity and the type of foundations adopted and behaviour of existing structures, particularly those of similar nature to the ones proposed for this project. (ii) The Contractor shall make use of information gathered from quarries, unlined wells, cuttings from nearby areas, etc. The general topography of the nearby areas will often give some indication about the variation of the soil conditions which are likely to exist. (iii) The Contractor shall gather data regarding the removal of overburden by excavation, erosion or landslides, etc. in the areas. Similarly, data regarding recent fills shall also be studied to determine the characteristics of the fill as well as the original strata. (iv) The water level in streams and water courses, if any, in the neighborhood shall be noted. Reliable information regarding ground water level shall also be gathered from water level in the wells nearby. (v) The Contractor shall make enquiry and verify regarding earlier use of the site which can have important bearing on its suitability for the proposed structures. This is important, particularly in areas where there have been underground works e.g. worked out ballast pits, quarries, old brick fields, mines, mineral workings, etc. The possibility of damage to the structures, sewers, conduits and drainage system by subsidence shall also be investigated. (vi) It is essential that the equipments/ instruments are properly calibrated at the time of commencement of the work so that they represent true values and submit the test reports to Owner. If the Owner so desires, the Contractor shall arrange for having the instruments tested in presence of the Owner at a Govt. approved laboratory, the cost for calibration of instruments shall be in the scope of Contractor. (vii) No claim whatsoever shall be entertained for differences between the extent, location, depth, etc. of soil test indicated on the construction drawings and those shown on the tender drawings, if any.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 41 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

(viii) When blasting with explosives is involved, agency/contractor shall arrange statutory clearance and also the portable magazine for storing /carrying the explosives. Only licensee shall handle these explosives.

5.3.4 CODES AND STANDARDS: (i) All standards, specifications and codes of practice referred to herein shall be the latest editions including all applicable official amendments and revisions. (ii) In case of conflict between this specification and those (IS codes, Standards etc.) referred to herein, the former shall prevail. (iii) All work shall be carried out as per the following Indian Standards and Codes:

Code of practice for design and construction of simple spread IS:1080 foundations. Classification and Identification of Soils for general Engineering IS:1498 Purposes. IS:1888 Method of Load test on Soils. IS:1892 Code of practice for Subsurface Investigation for Foundation. Code of practice for design and construction of foundations in IS:1904 Soils: General Requirements. IS:2131 Method of Standard Penetration Test for Soils. IS:2132 Code of practice for Thin walled Tube Sampling of Soils. IS:2470 Code of practice for design and construction of Septic Tanks. (Part-I) IS:2720 Method of Test for Soils (Relevant Parts). IS:2809 Glossary of terms and symbols relating to Soil Engineering. IS:2810 Glossary of terms relating to Soil Dynamics. Code of practice for designs and construction of Pile IS:2911 foundations (Relevant Parts). IS:2950 Code of practice for designs and construction of Raft foundation. (Part-I) Methods of Sampling and Testing (Physical and Chemical) for IS:3025 Water used in Industry. IS:3043 Code of practice for Earthing. IS:4078 Code of practice for Indexing and Storage of Drill Cores. IS:4434 Code of practice for In-situ Vane Shear Test for Soils. Code of practice for Exploration by pits, Trenches, Drifts and IS:4453 Shafts. Code of practice for presentation of Drilling information and Core IS:4464 description of Foundation investigation. IS:4968 Method for subsurface Sounding for Soils – Dynamic method (Part-II) using Cone and Bentonite slurry. IS:4968 Method for subsurface Sounding for Soils- Static Cone

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 42 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

(Part-III) Penetration Test. IS : 5313 Guide for Core Drilling Observations. IS : 5529 Code of practice for in-situ permeability Test-Test in Over burden. (Part-I) IS : 5529 Code of practice for in-situ permeability Test- Test in Bed rock. (Part-II) Recommendation for the preparation of Geological and IS : 6065 Geotechnical maps for River Valley Project. Code of practice for determination of Allowable Bearing IS : 6403 Pressure on Shallow foundation. Code of practice for Diamond core Drilling for Site Investigation IS : 6926 for River Valley Projects. IS : 6935 Method of determination of Water level in a Bore-Hole. Code of practice of subsurface exploration for Earth and Rockfill IS : 6955 dams. Symbols and Abbreviations for use in Geological maps, IS : 7422 sections and subsurface exploratory logs (Relevant parts). Code of practice for calculation of settlement of foundation IS: 8009 subjected to symmetrical vertical loads (Part –I) – Shallow foundations (Part – II) — Deep foundations. IS : 8763 Guide for Undisturbed Sampling of Sands. IS : 8764 Method for determination of point load strength index of Rocks. Method for the determination of unconfined compressive IS : 9143 strength of Rock Materials. IS : 9179 Method for preparation of Rock Specimen for Laboratory testing. IS : 9198 Compaction Rammer for Soil Testing. IS : 9214 Determination of Modulus of subgrade reaction in field. IS : 9259 Specification for Liquid Limit apparatus. IS : 9640 Specification for Split Spoon Sampler. IS : 9669 Specification for CBR Mould and its accessories. IS : 10050 Method for determination of Slake Durability Index of Rocks. Code of practice for subsurface investigations for Power IS : 10060 House Sites. Specification for compaction mould assembly for Light and Heavy IS : 10074 Compaction. Code of practice for sampling by thin wall sampler with IS : 10108 Stationary piston. IS : 10589 Equipment for determination of subsurface sounding of Soils. Specification of moulds for determination of Relative density and IS : 10837 its accessories.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 43 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

IS : 11229 Specification for Shear Box testing of soils. IS : 11315 Description of Discontinuities in Rock Mass – Core (Part-II) Recovery and Rock Quality. Code of practice for design and construction of shallow IS : 12070 foundations on rocks. IS: 13372 Part-I & II: Code of Practice - Seismic Testing of Rock Mass

5.3.5 CALIBRATION OF EQUIPMENT

The CONTRACTOR shall ensure that all the equipment‘s/instruments are properly calibrated at the start of the work to reflect factual values. If demanded by the OWNER, the CONTRACTOR shall have the instruments tested at an approved laboratory at his cost and the test reports shall be submitted at the earliest to OWNER. If the OWNER desires to witness such tests, the CONTRACTOR shall arrange for the same

5.3.6 PERSONNEL FOR GEOTECHNICAL INVESTIGATION AND REPORT

a) It is essential that personnel involved in the work of geotechnical investigation and report should have appropriate specialized knowledge and experience. b) Field work shall be supervised on full time basis by a suitably qualified and experienced civil/geotechnical engineer and/ or engineering geologist. c) All field works shall further be supervised and executed by suitably trained foremen and personnel. d) The laboratory work shall be under the direct control of suitably qualified and experienced engineer/supervisor. Laboratory technicians should have received training and have skill and experience in the type of tests they are carrying out. e) The report shall be prepared by a suitably qualified and experienced geotechnical engineer. Except where geology is simple, aspects shall be reviewed by a suitably qualified and experienced geologist. f) The Bidder shall submit with his bid the list of personnel, with relevant details about their qualifications and experiences, who will be involved in this work if the work is awarded to them.

5.3.7 FIELD INVESTIGATIONS IN SOIL: (i) GENERAL

The CONTRACTOR shall have on site all required survey instruments to carry out the work accurately according to specifications and drawings. All the specified locations for boreholes and field tests shall be set out at site by the CONTRACTOR from two established reference grid lines which will be shown to him by the OWNER, or as indicated in the drawing. If required, the CONTRACTOR shall set out the base lines and the locations of boreholes and

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 44 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

field tests with reference to the property line as indicated by the OWNER or as indicated on the drawing. At each location of boreholes, plate load tests and other field tests, the CONTRACTOR shall establish the ground prior to commencing of the operations. The ground level shall be related to an established bench mark or to a GTS bench mark or as directed by the OWNER or indicated on the Drawing.

I f the area, where the field tests are located, is likely to be inundated by tidal waters, the field work shall include provision for temporary fill, erection and removal of platforms, making good the ground, access, etc., as necessary for carrying out the work in this area and no extra claims will be entertained on this account.

The CONTRACTOR shall submit with his bid the list of equipment/apparatus he would mobilise to site, if work is awarded to him. If necessary, to complete the work within the stipulated time, the CONTRACTOR shall mobilise additional equipment without additional cost to the OWNER unless specifically agreed earlier.

(ii) Boring: General requirements: a) Bore holes shall be taken at specified locations to obtain information about the sub-soil profile, its nature and strength and to collect soil samples for strata identification and conducting laboratory tests. The diameter of the borehole shall be such as to permit collection of undisturbed sample of 90 mm to 100 mm diameter. However, the diameter shall be 150mm as per relevant IS code. The minimum diameter of the bore shall be 150 mm and boring shall be carried out in accordance with the provisions of IS : 1892 as per this specification. b) All bore holes shall be extend upto depths shown on the construction drawings or as directed by the Owner. If the strata with Standard Penetration Test (SPT) ‗N‘ value greater than 100 with characteristics of rock is met with, prior to the specified depth, the bore hole shall be advanced further by chiselling. Chiselling shall be continued for a maximum depth of 20 cms or upto 2 hours whichever is earlier. During chiselling rock fragments shall be collected. Identification of rock strata shall be on the basis of visual examination of SPT sample and rock fragments. After it is established that rock is met with, borehole shall be advanced further by drilling in rock as specified in tender clause and core shall be collected. When the bore hole is terminated in soil strata, an additional Standard Penetration Test shall be carried out at the termination depth. c) Casing pipe shall be used in the bore hole to support its sides when a side fall is suspected to occur inside the bore hole. When casing pipe is used, it shall be ensured that its bottom end is at all times less than 15 cms above the

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 45 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

bottom of the bore hole and not below the level at which the test has to be conducted or sampling has to be done. In case of cohesionless soils the advancement of the casing pipe shall be such that it does not disturb the soil to be tested or sampled. The casing shall be advanced by slowly turning the casing pipe and not by driving.

d) If any obstruction to normal boring is encountered in any borehole, this obstruction shall be overcome by drilling and/or by chiselling. Chiselling will normally be paid at the contract rate for boring in soil at appropriate depths, unless a separate rate has been provided for in the contract.

e) In-situ tests shall be conducted or undisturbed samples (UDS) shall be collected in the bore holes at regular intervals and at change of strata or as decided by the Engineer. Representative disturbed samples shall be preserved for conducting various identification tests in the laboratory. Water table in the bore hole shall be carefully recorded and reported. No water/drilling mud shall be added while boring above ground water table. For cohesionless soil below water table, the water level in the bore hole shall at all times be maintained slightly above the water table. f) The bore hole shall be cleaned using suitable tools up to the depth of testing or sampling, ensuring that there is minimum disturbance of the soil at the bottom of the bore hole. The process of jetting through an open tube sampler shall not be permitted. In cohesive soils, the bore hole may be cleaned using a bailer with a flap valve. Gentle circulation of drilling fluid shall be done when rotary mud circulation boring is adopted. g) On completion of the bore hole, including the borehole in which special tests are conducted, the Contractor shall backfill all the bore hole as directed by the Owner.

(iii) Auger Boring: Auger boring can be adopted in soft to stiff cohesive soils above water table. Augers shall be of helical or post hole type which may be manually or power operated. While boring, care shall be taken to minimise the disturbance to the deposits below the bottom of the bore hole. The cuttings brought up by the auger shall be carefully examined in the field and the description of all the strata shall be duly recorded. No water shall be introduced from the top while conducting Auger boring.

(iv) Shell and Auger Boring: Shell and Auger boring can be used in all types of soil free from boulders. For cohesion less soil below ground water table, the water level in the bore hole shall always be maintained at or above the ground water level. The use of chisel bit shall be permitted in hard strata with SPT-N value greater than 100. Chisel bits may also be used to extend the bore hole through local obstruction, such as old

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 46 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

construction, boulders, etc. All other requirements in clause (iii) as above shall apply for this type of boring also.

(v) Percussion boring (Chiselling): This method can be adopted in soil with gravel and boulders when the boring has to be done at a fast rate. This method consists of breaking of the strata by repeated blows from a chisel or drilling bit and bailing out the debris at intervals by adding water into the bore hole. This method is not permitted unless otherwise specified.

(vi) Rotary Mud Circulation Boring: This method can be used in all types of soil below water table. In this method boring shall be done by rotating the bit fixed at the bottom of the drill rod. Proper care shall be taken to keep firm contact between the bit and the bottom of the bore hole. Bentonite mud shall be used as the drilling fluid to prevent caving in of the bore hole sides. Use of percussion tool shall be permitted in hard clays and dense sandy deposits.

(vii) Standard Penetration Test (SPT): This test shall be conducted in all types of soil deposits met within a bore hole, to find the variation in the soil stratification by correlating with the number of blows required for unit penetration of standard penetrometer. This test shall be conducted at 3.0 m intervals and every change of strata to the satisfaction of the Owner. The starting depth of performing SPT shall be between 0.5 M depth below ground level. This depth shall be staggered in alternate boreholes. The depth interval between the top levels of Standard penetration test and next undisturbed sampling shall not be less than 1.0 m. The specifications for the equipments and other accessories, procedure for conducting the test, presentation of test results and collection of the disturbed soil samples shall conform to IS : 2131.

For conducting the test, the bottom of borehole shall be cleaned properly and the spoon shall be properly and centrally seated in position in the borehole.It is necessary to ensure that drive hammer is of specified weight and has a specified free fall. It shall be ensured that energy of the falling weight is not reduced by friction between the drive weight and guides or between rope and winch drum.Only BIS recommended standard connecting rods shall be used for the test.

This test shall be carried out by driving a standard split spoon sampler in the bore hole by means of a 650 N hammer having a free tall of 0.75 m. The sampler shall be driven using the hammer and for 450 mm. While driving the number of blows for every 150 mm penetration and the penetration for every 50 blows shall be recorded. The number of blows for the last 300 mm drive shall be reported as N value. This test shall be discontinued when the blow count is equal to 100 and

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 47 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

the penetration shall be recorded. Refusal shall be considered to be met with when the blow count is equal to or greater than 100. At the location where the test is discontinued the penetration and the number of blows shall also be reported. Sufficient quantity of disturbed soil samples shall be collected from the split spoon sampler for identification and laboratory testing. The sample shall be visually classified and recorded at the site and shall be properly preserved and labeled for future identification.

5.3.8 Sampling:

i. General a) Sufficient number of soil samples shall be collected for reliable estimation of soil properties. The samples collected shall be either disturbed or undisturbed. Disturbed soil samples shall be collected for field identification and conducting tests such as sieve analysis, index properties, specific gravity, chemical analysis, etc. Undisturbed samples shall be collected to estimate the strength and settlement properties of the soil. b) All the accessories required for sampling and the method of sampling shall conform to IS: 2132. All the disturbed and undisturbed samples collected in the field shall be classified at the site as per IS : 1498. c) All the samples shall be identified with date, bore hole or trial pit number, depth of sampling, etc. It is also essential to mark an arrow pointing towards the top surface of the sample. Care shall be taken to keep the undisturbed soil samples and box samples vertically with the arrow directing upwards. The tube samples shall be properly trimmed at both ends and sealed with molten paraffin wax at both ends immediately after extracting the samples from the bore hole and suitably capped on both sides. d) When the Contractor fails to collect the undisturbed soil sample at a specified depth the reason for the same shall be indicated in the borelog and the bore hole shall be advanced by 0.5 M. Subsequently, for cohesionless soil Standard Penetration Test shall be performed and for very soft cohesive soil field vane shear test shall be performed. e) Precaution shall be taken to ensure that there shall not be any change in moisture content and disturbance of the soil samples and they shall be placed in a temporary store at the end of the day‘s work. All the samples shall be kept over a bed of sand, jute bags, saw dust, etc. and covered over on top with similar material. The bed and top cover shall be kept moist till they are properly packed in wooden boxes. The Contractor shall be responsible for packing and transporting of all the samples from site to the laboratory within seven days after sampling with proper protection against loss and damage. f) The CONTRACTOR shall properly store all the samples at site till they are transported to his laboratory for testing. Sampling tubes containing undisturbed soil samples shall not be exposed to direct sun and shall be kept

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 48 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

in a shade covered with wet gunny bags All the samples shall be packed in wooden boxes using sand, saw dust etc. all around the samples before transportation to laboratory for testing. g) The rock cores obtained by drilling shall be carefully removed from the core barrel and placed in a properly constructed wooden core boxes with hinged wooden covers as specified above. The cores shall be placed in the boxes in the correct sequence and with each run segregated accurately by labelled wooden blocks 25 mm thick. No box shall contain more than 6 M of core. Depths of all runs shall be marked on the portions with paint. h) The CONTRACTOR shall transport all samples to his testing laboratory as quickly as possible and test the samples.

ii. Disturbed sample: a) Disturbed soil samples shall be collected in bore holes at regular intervals to provide complete description of soil profile and its variation. Jar samples weighing approximately 10 N shall be collected in bore holes at 0.5 m intervals starting from a depth of 0.5 m below ground level and at every identifiable change of strata to supplement the boring records. Samples shall be immediately stored in air tight jars or polythene bags and labelled with bore hole number and depth. b) In elevated areas, if superficial material is available in plenty, then bulk samples from a depth of about 0.5 m below ground level shall be collected to establish all the required properties to use it as a fill material. Disturbed samples weighing about 250 N shall be collected at shallow depths and immediately stored in polythene bags as per IS : 1892. The bags shall be sealed properly and they shall be kept in wooden boxes.

iii. Undisturbed Samples: In each bore hole undisturbed sample shall be collected at every change of strata and at regular intervals of 3.0 m and as directed by the Owner. The starting depth of collection of UDS shall be between ground level and 1.0 m below ground level and as decided by the Owner. The starting depth shall be staggered in alternate boreholes. In cohesive soils collection of UDS shall be preferred in place of SPT. The depth interval between the top level of undisturbed sampling and standard penetration test shall be at least 0.5m. Undisturbed samples shall be 100 mm dia and 450 mm length. Samples shall be collected in such a manner that the structure of the soil and its moisture content do not get altered. The specifications for the accessories required for sampling and the sampling procedure shall conform to IS : 1892 and IS : 2132. Undisturbed sampling in sand shall be done using compressed air technique mentioned in IS : 8763. Thin walled sampler shall be used to collect undisturbed samples by pushing the tube into the soil. The sampling tube shall have a smooth finish on both surfaces and minimum effective length of 450 mm. The area ratio of sampling tubes shall be

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 49 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

less than 12.5%. However, in case of very stiff soils, area ratio upto 20% shall be permitted.

a) Undisturbed Sampling in cohesive soil: Undisturbed samples in soft to stiff cohesive soils shall be obtained using a thin walled sampler. In order to reduce the wall friction, suitable precautions such as oiling the surfaces shall be taken. The bore hole shall be cleaned and the depth of sampling below the ground level shall be noted. The sampler shall then be attached to the bottom of the boring rods and lowered into the bore hole. The sampler shall be pushed into the clay layer by hand or by jacking and soil sample of specified length shall be collected without disturbing the soil. The distance by which the sampler penetrates into the soil strata shall be checked. Care being taken to ensure that the sampler is not driven too far as this will compress the soil. The sampler shall be rotated to break the core at the bottom of the sampler and then steadily drawn up.

b) Undisturbed sampling using Piston sampler: Undisturbed samples in very loose saturated sandy and silty soils and very soft clays shall be obtained by using a piston sampler consisting of a sampling cylinder and piston system. In soft clays and silty clays, with water standing in the casing pipe, piston sampler shall be used to collect undisturbed samples. During this method of sampling expert supervision is called for. The interior surface of the sampler shall be smooth, clean and corrosion resistant. Its cutting edge and the ring seals shall be inspected for wear and rejected if worn. Check shall be done to ensure that the moving parts of the sampler function freely before the sampler is lowered into the bore hole. While pushing the system into the soil and till the beginning of the sampling operations, the bottom of the piston shall be flush with the cutting edge of the sampler. At the depth of sampling, the piston should be fixed relative to the ground and the sampler cylinder shall be independently pressed down smoothly and continuously into the ground. If an obstruction is met, the sampler shall be withdrawn and another sample taken after the obstruction is removed.

Accurate measurements of the depth of sampling, height of sampler, stroke and length of sample recovery shall be recorded. After the sampler is pushed to the required depth, both the sampler cylinder and piston system shall be drawn up together ensuring that there shall not be any disturbance to the sample which shall then be protected from changes in moisture content.

c) Undisturbed sampling in Cohesion less Soils: Undisturbed samples in cohesionless soils shall be obtained as per the procedure given in IS : 8763. Compressed air sampler shall be used to take

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 50 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

samples of cohesionless soil below water table. Precautions shall be taken to clear the borehole before sampling. Thin walled tube samplers of 60 mm internal diameter shall be used. The height and other dimensions of the sampler shall be recorded before use. Proper care shall be taken to maintain the water level slightly above the ground water table before and during sampling operations. Immediately after the sample is obtained, the ends of the sample shall be waxed and capped to avoid moisture content changes.

iv. Relaxation During Sampling: a) The Sampler shall be pushed into the soil and driving of sampler shall be resorted to only when it cannot be pushed into the soil. This shall be done only with the permission of the Engineer and all the details about the same shall be recorded into the bore logs. b) In clays when N value is above 50, undisturbed samples may be replaced by standard penetration test.

(iv) Ground Water: 1. One of the following methods shall be adopted for determining the ground water table in bore holes as per IS:6935 and as per the instructions of the Owner.

a) In permeable soils, the water level in the bore hole shall be allowed to stabilize after lowering it adequately by bailing. When the water level inside the bore hole is found to be stable, the depth of water level below ground level shall be measured. Stability of sides and bottom of the bore hole shall be ensured at all times. b) For both permeable and impermeable soils, the following method shall be suitable. The bore hole shall be filled with water and then bailed out to various depths. Observations on the rise or fall of water level shall be made at each depth. The level at which neither a fall nor a rise is observed shall be considered as the water table elevation. This shall be established by three successive readings of water level taken at an interval of two hours.

2. In case any variation in the ground water level is observed in any specific boreholes, then the water level in these bore holes shall be recorded daily during the course of the field investigation. Levels in nearby wells, streams, etc. if any, shall be noted whenever these readings are taken.

3. If so called for, observation wells shall be drilled for the purpose of long term studies of the fluctuation in ground water levels and pressure. Either a Stand pipe or Piezometer shall be installed in selected previously drilled or specially drilled bore holes covering the complete site area. These shall be at specified depths as per the specifications and instructions of the Engineer. Daily water level readings shall be recorded immediately following the installation upto the time of leaving the site. At the end of field work, these installations shall be

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 51 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

handed over in satisfactory working condition to the Engineer without disturbing their position so that the owner can continue further observations. It is important to install some Stand pipes and Piezometers prior to the coming monsoon, in order to record the local effects and variations in the ground water level during the period. 4. Stand pipes and Piezometers shall consist of 19 mm internal diameter rigid unplasticised (UPVC) tubing. All the joints in the tubing shall be made of coupling sleeves. The top of UPVC tubing shall be enclosed in a 75mm diameter galvanized steel pipe of 1.5m length having a galvanized steel screw cap with well-greased threads and the caps shall be tightened such that it would be impossible to loosen by hand. The lower end of the pipe shall have four legs of 6mm thick and 100mm long and welded to have projection of 25mm. The pipe shall be sealed into the ground with cement grout so that it does not rotate. The top end of the pipe shall project about 300 mm above ground level unless otherwise specified by the Owner 5. The perforated tubing for the porous element shall be surrounded by a response zone of well graded sand from 500 mm below to 150 mm above the lower end of the Stand pipe or Piezometer, and the bore hole above the response zone shall be back filled with natural soil or well graded sand. The latter shall compose of particles that vary in amount according to the size in such a manner that the void space formed by the larger particles can be filled by smaller size particles.

a) Stand pipe: Stand pipes shall be installed to measure the water level in soils with high permeability such as sand and gravel. The stand pipe shall consist of a perforated tubing attached to the bottom of the UPVC tubing. The perforated tube shall be 150 mm long having perforation of diameter not greater than 1 mm.

b) Piezometers: Piezometers shall be installed to measure the pore pressures in soil with medium to low permeability. Piezometers shall consist of a porous filter attached to the bottom of the UPVC tubing. The filter shall be 300 mm length and shall be placed in the bore hole and sealed at top and bottom by grouting. Hydraulic Piezometers with double line to be used to remove the air trapped in the system.

6. Sub-soil Water Samples:

a) Sub-soil water samples shall be collected for carrying out chemical analysis. Representative samples of ground water shall be collected when it is first encountered in bore holes before the addition of water to aid boring or drilling. Water samples shall not be collected when bentonite slurry or mud has been

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 52 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

used for drilling operations. If water has been added for drilling purpose or if ground water has been diluted by surface rain water, then the bore hole shall be dewatered and water allowed to rise from which the sample may be taken.

b) The sampling apparatus shall be such that the water at the desired depth can be collected directly without any disturbance and any change in the concentration of the constituents like dissolved gases, etc. Undue agitation shall be avoided. An ordinary suction pump with its suction end inserted upto the required depth in the bore hole shall be used for this purpose. c) The sample shall be collected in a clean vessel and allowed to settle so that the supernatural liquid can be poured into a clean well rinsed glass or polythene bottle. Sufficient quantity and number of samples shall be collected to carry out the chemical analysis and sent to a laboratory in airtight bottles with proper labelling. Chemical analysis of water samples shall include determination of pH value; turbidity; sulphate, carbonate, nitrate and chloride; presence of organic matter and suspended solids. d) In some cases constituents may be mixed and analysed later as specified in the specific test methods. Chemical preservatives may be added to the sample for cases as specifield in the test method/IS codes. This shall only be done if analysis cannot be conducted within an hour of collection and shall have the prior written permission and approval of the Owner.

(v) In-situ Permeability Test: 1. In-situ permeability test shall be conducted to determine the water percolation capacity of overburden soil. This test shall be performed inside the bore hole/trial pit at specified depths or in each layer or as per the directions of the Engineer. The type of test shall be either pump-in or pump-out test depending on the subsoil and ground water conditions. Pump-in test shall be conducted whether ground water in bore hole exists or not. Pump-out test shall be conducted to obtain data for dewatering purposes when ground water is met in the bore hole. The specifications for the equipments required for the test and the procedure of testing shall be in accordance with IS : 5529, Part-I. When it is required to carry out the permeability test for a particular section of the soil strata above the ground water table, bentonite slurry shall not be used while boring.

2. Pump-in Test: Pump-in test shall be conducted in the bore hole/trial pit by allowing water to percolate into the soil. Choice of the method of testing shall depend on the soil permeability and prevailing ground water level. Only clear water shall be used for conducting the test. Before conducting the test, the bore hole shall be cleaned as specified General Requirement. Water shall be allowed to percolate through the test section for sufficient period of time to saturate the soil before starting the observation.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 53 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

a) Constant Head Method (in bore hole): This test shall be conducted in bore holes where soil has a high permeability. Water shall be allowed into the bore hole through a metering system ensuring gravity flow at constant head so as to maintain a steady water level in the bore hole. A reference mark shall be made at a convenient level which can be easily seen in the casing pipe to note down the fluctuations of water level. The fluctuations shall be counteracted by varying the quantity of water flowing into the bore hole. The elevation of water shall be observed at every 5 minute interval. When three consecutive readings show constant value, the necessary observations such as flow rate, elevation of water surface above test depth, diameter of casing pipe, etc. shall be made and recorded as per the proforma recommended in IS : 5529, Part-I, Appendix-A.

b) Falling Head Method (in bore hole): This method shall be adopted for soils of low permeability and which can stand without casing. The test section shall be sealed by the bottom of the bore hole and a packer at the top of the test section. If the test has to be conducted at an intermediate section of a prebored hole then, double packers shall be used. Access to the test section through the packer shall be by means of a pipe which shall extend to above the ground level. Water shall be filled into the pipe upto the level marked just below the top of the pipe and water allowed to drain into the test section. The water level in the pipe shall be recorded at regular intervals as mentioned in IS: 5529, Part-I, Appendix-B. The test shall be repeated till constant records of water level are achieved.

c) Percolation Test (in trial pit): Percolation test shall be conducted in the trial pit in areas where water/effluent is stored/discharged in ground level tanks. The loss of water due to percolation into the soil shall be estimated by the soil absorption capacity. This test shall be conducted in trial pits as per the procedure given in IS : 2470-Part-I, Appendix-A.

3. Pump-out Test This test shall be carried out to determine accurate values of permeability of soil below water table. This test shall be conducted by continuous pumping out water from a well so as to maintain a steady water level at the desired depth in the well. The fluctuations in water level shall be counteracted by varying the quantity of water pumped out of the well. The specifications for the equipment and accessories required for performing the test, test procedure, field observations and reporting of results shall conform to IS : 5529, Part-I. The well shall be 400 dia perforated G.I./M.S. pipe to be installed in the well of 250 mm dia and observation pipes of 50 mm dia shall be installed at regular intervals along three radial lines extending from the well at

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 54 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

120 degrees to each other. Length of these pipes shall depend upon the ground level, estimated lowering of ground water table and the distance from the well.

Sufficient number of observation pipes shall be installed along each of the radial lines so as to assess the zones of influence due to dewatering. Draw down depth in the well as specified in the drawings.

(vi) Trial Pit: 1. Trial pits shall be of minimum 2m x 2m size at the bottom so as to permit easy access for visual examination of walls of the pit and to facilitate sampling and in- situ testing operations. Pits shall be upto 4.0m depth in all types of soils or at least 1.0 m into rock or as per the directions of the engineer. Precautions shall be taken to ensure the stability of pit walls including provision of shoring, if necessary, as per IS: 4453. Precautions shall be taken to prevent surface water draining into the pit. Arrangements shall be made for dewatering if the pit is extended below water table. Trial pits shall be kept dry and a ladder shall be provided for easy access to the bottom of the pit. In-situ tests shall be conducted and undisturbed samples shall be collected immediately on reaching the specified depth so as to avoid substantial changes in moisture content of the subsoil. Arrangements shall be made for barriers, protective measures and lighting necessary for the period the pits remain open.

The contractor shall ascertain for himself the nature of materials to be excavated and the difficulties, if any, likely to be encountered in executing this work. Wherever ground water table is met with during excavation, the contractor shall make suitable dewatering arrangement to maintain dry working conditions by maintaining the water table below the bottom of the excavation level.

2. A note on the visual examination of soil and rock strata shall be prepared. This should include the nature, colour, consistency and visual classification of the soil, thickness of soil strata, thickness of expansive soil, ground water table, if any, etc. 3. Undisturbed samples shall be collected at 1.0, 2.0, 3.0 m depth and at the termination depth in all the pits.

a) Chunk Samples In cohesive soils, weathered rock undisturbed samples of regular shapes shall be collected. The samples shall be cut and trimmed to a suitable size (0.3 x 0.3 x 0.3 m). A square area (0.35 x 0.35m) shall be marked at the centre of the levelled surface at the bottom of the pit. Without disturbing the soil inside the marked area, the soil around this marking shall be carefully removed upto a depth of 0.35 m. The four vertical faces of the soil block

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 55 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

protruding at the centre shall be trimmed slowly so that its size reduces to 0.3m x 0.3m. Wax paper cut to suitable size shall be wrapped uniformly and covered with two layers of thin cloth over all the 5 exposed surfaces of the soil block and sealed properly using molten wax. A firmly constructed wooden box of size 0.35 x 0.35 x 0.35m (internal dimensions) with the top and bottom open shall be placed around the soil block and held such that its top edge protrudes just above the surface of the block. The space between the soil block and the box shall be filled uniformly and tightly with moist saw dust. The top surface shall also be covered with saw dust before nailing the wooden lid to cover the box firmly taking care that the soil block is not disturbed. The area of contact between the bottom portion of the block and the ground shall be reduced slowly by removing soil in small quantities using small rods, so that the block can be separated from the ground slowly without disturbance. After inverting the wooden box along with soil block, the bottom portion shall be trimmed and covered with wax paper, cloth and sealed with molten wax. A wooden lid shall be nailed to the box after providing proper saw dust cushion below it. An arrow mark shall be made on the vertical face of the wooden box to indicate the top surface of the sample along with the coordinates, date and depth of sampling.

b) Tube Samples Undisturbed tube samples may also be obtained by means of a 100 mm diameter sampling tube with a cutting edge. The sampler shall be slightly oiled or greased inside and outside to reduce friction. The sampler shall be pushed into the soil and while doing so, soil around the tube shall be carefully removed. In case it is not possible to push the sample, it may be driven by light blows from a ―monkey‖.

4. After the completion of the test, sampling and visual examination, the pit shall be suitably backfilled as directed by the Engineer. Unless otherwise specified, excavated soil shall be used for this purpose. 5. In case it is not possible to collect undisturbed samples in the trial pit, in-situ density of soil shall be determined by the sand replacement method. The specifications, equipments, accessories required for the test and test procedure shall be as per IS : 2720, Part-XXVIII. No separate payment shall be made for this test.

(vii) Static Cone Penetration Test: Static cone penetration test shall be conducted to know the soil stratification and to estimate the various physical and engineering soil properties. The cone penetrometer shall be advanced by pushing and the static force required for unit penetration shall be determined. The test shall be conducted using a 200 KN capacity mechanically operated equipment upto the specified depth or refusal whichever is earlier. For this test, ‗refusal‘ means meeting a very hard strata

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 56 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

which cannot be penetrated at the rate of at least 0.3cm/sec even when the equipment is loaded to its full capacity. The specifications for the equipment and accessories required for performing the test procedure, field observations and reporting of results shall conform to IS : 4968, Part-III. At the ground level, preboring upto 0.5m depth shall be permitted if the overlying strata is hard. No extra payment shall be made for boring. Continuous record of the penetration resistance shall be maintained. On completion of the test, the results shall be reported in an approved proforma as in IS : 4968, Part-III, Appendix-A.

(viii) Dynamic Cone Penetration Test: Dynamic cone penetration test shall be conducted using bentonite slurry by driving a standard size cone attached to the bottom of a string of drill rods. The test shall be conducted upto the specified depth or refusal whichever is earlier. Refusal shall be considered when the blow count exceeds 150 for 300 mm penetration. The specification for the equipment and accessories required for performing this test, procedure, field observations and reporting of results shall conform to IS : 4968, Part-II. The driving system shall comprise of a 650 N weight having a free fall of 0.75 m. The cone shall be 65 mm diameter provided with vents for continuous flow of bentonite slurry through the cone and rods in order to avoid friction between the rods and soil. On completion of the test, the results shall be presented as a continuous record of the number of blows required for every 300 mm penetration of the cone into the soil in a suitable chart supplemented by a graphical plot of blow count for 300 mm penetration vs depth.

(ix) Vane Shear Test: Field vane shear test shall be performed inside the bore hole to determine the shear strength of cohesive soils, especially of soft and sensitive clays, which are highly susceptible to sampling disturbance. This test shall be conducted by advancing a four winged vane of suitable size ( 75 mm or 100 mm diameter as per the soil condition) into the soil upto the desired depth and measuring the torque required to rotate the vane. The specification for the equipments and accessories required for conducting the test, the test procedure and field observations shall correspond to IS : 4434. Test may also be conducted by direct penetration from ground surface. If the cuttings at the test depth in the bore hole show any presence of gravel, sand, shells, decomposed wood, etc., which are likely to influence the test results substantially, the test at that particular depth may be omitted with the permission of the Engineer. However, the test shall be conducted at a depth where these obstructions cease to occur. On completion of the test the results shall be reported in an approved proforma as specified in IS : 4434, Appendix-A.

(x) Plate Load Test

1. Plate load test shall be conducted to determine the bearing capacity and load/settlement characteristics of soil / rock at shallow depth by loading a plane

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 57 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

and level steel plate kept at the desired depth and measuring the settlement under different loads, until a desired settlement takes place or failure occurs. The specifications for the equipment and accessories required for conducting the test, the test procedure, field observations and reporting of results shall conform to IS:1888. The location and depth of the test shall be as given in the drawing or as indicated by the Owner. Undisturbed tube samples as specified in para (vi) 3 (b) shall be collected at 1.0 m and 2.5 m depths from the natural ground level for carrying out laboratory tests. 2. The size of the pit shall not be less than five times the plate size and shall be taken upto the specified depth. All provisions regarding excavation and visual examination of pit under para (vi) (1) and (vi)(2) shall apply here also. 3. If the ground water table is at a depth higher than the specified test depth, the ground water table shall be lowered and maintained at the test depth for the entire duration of the test. Dewatering shall be at the cost of the Contractor. 4. Unless otherwise specified the reaction method of loading shall be adopted. Settlement shall be recorded from dial gages placed at four diametrically opposite ends of the test plate. The test plate shall be 600 x 600 mm size and at least 25 mm thick. The bottom of the pit shall be levelled before placing the plate in position for conducting the test. 5. A seating load of 7 kN/m2 shall be applied and after the dial gauge readings are stabilized, the load shall be released and the initial readings of the dial gauges recorded after they indicate constant reading. The load shall be increased in stages. These stages shall be 20,40,70,100, 150, 200, 250, 300, 400, 500, 600 and 800 kN/m2 or as directed by the Engineer, Under each loading, record of Time vs Settlement shall be kept as specified in IS: 1888.

In case of cohesive soils each load increment shall be maintained until the settlement is less than 0.02 mm/min or 6 hours whichever is later. Dial gauge readings for settlement shall generally be taken at 1, 2.25, 4, 6.25, 9, 16, 25, 60, 90 and 120 minutes from the start of each stage of loading. Thereafter the readings shall be taken at hourly interval upto a further 4 hours and at two hours interval thereafter for another 6 hours.

Other than cohesive soils, each stage of loading shall be maintained for a minimum duration of one hour or till the settlement rate reduces to 0.02 mm/min. whichever is later. No extrapolation of settlement rate from periods less than one hour shall be permitted. The final loading shall be maintained for 24 hours. During unloading reading of dial gauge reading shall be recorded for each stage of unloading.

6. Loading shall be carried out in stages as specified above till one of the following conditions occurs. a) Failure of the soil under the plate i.e. the settlement of the plate at constant load becomes progressive and reaches a value of 40 mm or more.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 58 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

b) Load intensity of 800 kN/m2 is reached without failure of the soil.

7. Backfilling of the pit shall be carried out as per the directions of the Owner. Unless otherwise specified the excavated soil shall be used for this purpose.

Unless specified/directed otherwise, the CONTRACTOR shall backfill the boreholes and pits. Borehole shall be backfilled by bentonite-cement grout. The cement and bentonite for the grout shall be in the ratio 1 to 1 by weight, and shall be made into a slurry with no more water than is necessary for placing the slurry in the borehole .If there is standing water in the borehole, the borehole shall be dewatered first before placing the mix. The pits shall be backfilled with proper ramming using the excavated material

(xi) Cyclic Plate Load Test: This test shall be carried out to determine the dynamic soil properties required for the analysis of foundation subjected to dyanmic loads. This test shall be conducted on similar lines as the ordinary plate load test. In additions, unloading shall also be done before such stage of loading. Test set up, load increment, maximum load intensity, recording of field data, etc.,shall be as per para given in plat load test.

1. After each stage of loading, the load shall be removed in a minimum of two stages and as directed by the Engineer. After each stage of reduction of load, dial gauge readings and settlements shall be taken for atleast one hour until the readings stabilize. Thereafter the next loading stage shall commence. Analysis of test data shall be reported as per IS : 5249.

(xii) Field California Bearing Ratio Test: This test shall be carried out to obtain the properties of soil required for the construction of roads. The equipments and accessories required for carrying out the test procedure, recording of observations and presentation of results shall conform to IS : 2720 part XXXI. The test locations and depth shall be as specified in the drawings or as directed by the Owner.

(xiii) Electrical Resistivity Test (ERT): This test shall be conducted to determine the Electrical resistivity of soil required for designing safety grounding system for the entire power plant area. The specifications for the equipments and other accessories required for performing electrical resistivity test, the test procedure, and reporting of field observations shall conforms to IS : 3043. The test shall be conducted using Wanner‘s four electrode method as specified in IS : 1892, Appendix-B2. Unless otherwise specified, at each test location, the test shall be conducted along two perpendicular lines parallel to the coordinate axes. On each line a minimum of 8

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 59 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

to 10 readings shall be taken by changing the spacing of the electrodes from an initial small value of 0.5 m upto a distance of 10.0 m.

(xiv) Seismic Refraction Test: 1. This test shall be carried out to establish the rock and soil profiles of varying density. The dynamic shear modulus of the soils shall also be obtained from the results of this test. The specification for the equipments and other accessories, procedure for carrying out the test, recording and analysis of results and their presentation shall conform to IS : 1892. 2. This test shall be carried out by inducing shock waves into the soil, at ground level or at a certain depth below by striking a plate, placed on the ground surface with a hammer or by expolding small charges in the soil. The shock waves shall be picked up through geophones placed on the ground surface at regular intervals in line with the plate along a straight line. The time elapsed before the waves reach the geophones shall be recorded to an accuracy of one milli second or better. 3. The distance between the shock point and the geo-phones shall be increased to cover a wider area. Alternatively, multiple geo-phones shall be used simultaneously using multiple channel seismograph to record the arrival time and intensity of the waves reaching the geophones. The spacing of the geo-phones shall be 5 m. As the distance between the geophones and the shocks producing point are increased, the time lapse for the waves passing through different underlying strata and reaching the geophone shall be recorded. The wave forms shall be recorded for each test using multi-channel seismograph. 4. The test shall be conducted along traverses in two orthogonal directions as per the drawing or the instructions of the Engineer. During testing, proper care shall be taken to avoid disturbance caused due to the movement of vehicles or other working operations around the test location. The type of wave (compression or shear) shall be analysed properly using the data recorded during the test.

(xv) Cross hole shear test: This test shall be carried out generally in accordance with IS: 13372-1992 to establish the dynamic elastic properties of soil and rock.

In cross-hole shear test, the seismic waves should be generated inside one bore hole (shot hole) and seismic waves are to be picked up in two adjacent receiver bore holes. The number and spacing of the boreholes shall be determined by the nature of the project so as to obtain good results. The boreholes shall be uncased in the portion carrying the geophones. However, it should be kept filled with water or drilling mud in order to ensure perfect contact between the borehole wall and the geophone. In case of cased hole preferably a low velocity material such as a high impact PVC should be used for casing and it is essential that it should be well grouted behind in order to make an intimate contact with wall

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 60 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

material. The charge shall be installed within the borehole at depth as specified and the waves shall be picked up from the geophones installed at required depths in receiver boreholes. Knowing the travel time from shot-hole to receiver hole, and corresponding distance, the velocity of the waves is determined which enables to estimate dynamic elastic modulus, shear modulus and Poisson‘s ratio.

In each receiver borehole, multiple geophones shall be provided at 3.0m interval to cover the depth and various strata as specified and intensity of the waves shall be recorded by multiple channel seismograph.

(xvi) Pressure meter Test: 1. This test shall be conducted in bore holes at desired depth, to obtain the in-situ stress strain characteristics and strength parameters of soil/rock layer by measuring the deformation of the probe at different pressures of the volume meter. The size of the borehole shall be compatible to the size of the pressure meter probe. The location and depth of the test shall be as given in the drawing or as per the directions of the Engineer. 2. All precautions shall be taken to ensure a smooth bore hole of required diameter with minimum disturbance to the surrounding soil. In soft, loose and sensitive soils, the bore hole shall be predrilled deeper than the testing depth far enough so that the cuttings settling at the bottom of the bore hole shall not interfere with the test. 3. The equipment shall be calibrated for pressure losses (membrane correction/air calibration) and volume or radius changes (line calibration/thick wall rigid steel cylinder test) before starting of test and at regular intervals as per the manufacturer‘s specification. 4. Maximum value of pressure correction shall not be more than 50% of limit pressure. The total volume losses in the system shall not exceed 0.5% of the static probe volume per 100 kPa. Volume correction may be neglected in soil if it is less than 0.1 % of probe volume per 100 kPa. 5. The test shall be performed by expanding a cylindrical probe to obtain a pressure vs volume curve as specified in IS : 1892. The probe may be of Ax, Bx or Nx size. However, the size of the borehole shall be compatible to the size of the pressure meter probe. Hose pipe connecting the probe with the surface unit shall be of flexible tubing of single or coaxial type. The equipment should be able to reach a maximum pressure of 5000 kPa for testing in soil and 8000 kPa for testing in rock. The accuracy of measuring device shall be such that a change 0.2% of static probe volume or 0.1% of probe radius is measurable as specified in IS: 1892. 6. The probe shall be lowered down to the required depth as soon as the boring is completed so as to limit the expansion of soil due to release of stresses. The probe shall be held by a clamping device ensuring that it is not located at the interface of two different soil/rock layers.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 61 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

7. The pressure shall be increased in atleast 20 equal stages as directed by the Engineer. At each stage the pressure shall be maintained for a period of atleast 60 secs. and volume reading shall be taken for 7 to 14 minutes. The volume of water sent into the probe during this period shall be measured upto an accuracy of 0.01 cu.cm. In case the water level in the volumeter drops rapidly, it is necessary to close the volumeter valve quickly so that the reservoir does not empty and allow air or gas into the tubing. 8. The test shall be carried out in stages till one of the following conditions occurs: a) The volume of the probe is doubled b) Ultimate failure of soil/rock occurs c) Load intensity of 5000 kPa for soil and 8000 kPa for rock is reached without failure. 9. If the shape of the uncorrected pressure vs. volume curve drastically varies from the ideal test curve, the test shall be repeated at no extra cost to the owner at a different depth as decided by the Engineer. 10. On completion of the test all the results mentioned in clause 8.2 shall be reported.

5.3.9 FIELD INVESTIGATION – ROCK

(i) Rock Drilling

1. General Requirements: Drilling in rock shall be done at specified location or as per the directions of the Engineer. Before commencing drilling, it shall be proved that characteristics of rock has been met with as mentioned in clause of General Requirement of Boring . The starting depth of drilling in rock, as mentioned in clause of General Requirement of Boring, shall be certified by the Engineer. The portion drilled in rock shall be backfilled with cement and sand (1:3) grout. The drilling information shall be recorded in pro-forma as given in Table-C.

2. Equipment:

a) Core drilling shall be done by rotary motion using diamond bit. The feed or thrust to the drilling bit shall be actuated by hydraulic type. The equipment or set up shall be capable of recovering 75% of the drilled volume. The rotary core drilling equipment and procedure for drilling shall conform to IS : 6926. The equipment shall be provided with necessary facilities to regulate the spindle speed, bit pressure and water pressure during core drilling to get good core recovery.

b) Drilling shall be carried out with NX size diamond tipped drill bits or impregnated diamond bit depending on the type of rock encountered. Double

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 62 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

tube swivel core barrel of Type B conforming to IS : 6926 shall be used to ensure good core recovery and to pick up cores from all layers of rock. Suitable core catchers shall be used to ensure continuous and good core recovery.

3. Procedure: a) The drilling fluid shall be clean water. Circulation of the drilling fluid shall be started before the core barrel reaches the bottom of the hole to prevent cuttings or sludge from entering the core barrel at the start of coring. Drilling fluid shall be circulated continuously down the hollow rods and the sludge conveying the rock cuttings to the surface shall be collected. b) When drilling through soft/weathered/fractured rock water circulation must be reduced so as to avoid shattering/breaking the core. c) The rotational speed of the bit (spindle speed) the amount of downward pressure applied on the bit (bit pressure) and water pressure shall be suitably adjusted and properly monitored so that the core is collected with least disturbance and avoid shearing of the Core from its base. Bit speed, bit pressure, water pressure for the type of bit for various rocks type shall be as given in Appendix A of IS : 6926. d) No drilling run shall exceed 0.75 m in length. This can be increased to 1.5 m provided the core recovery is observed more than 80% in two successive 0.75 m drill runs and on approval from Engineer. If the core recovery is less than 20% then SPT shall be performed before commencing the next drill run as explained in clause of Standard Penetration Test below. d) If at any time a blocking of the bit or grinding of the core is indicated, the core barrel shall be immediately withdrawn from the bore hole regardless of the length of drill run completed.

4. Observations:

a) The colour of return water at regular intervals, the depth at which any change of colour of return water is observed, the depth of occurrence and amount of flow of hot water, if encountered, shall be recorded. b) The depths through which a uniform rate of penetration was maintained, the depth at which marked change in rate of penetration or sudden fall of drill rod occurs, the depth at which any blockage of drill bit causing core loss, if any, shall be recorded. c) Any heavy vibration or torque noticed during drilling should be recorded together with the depth of occurrence. d) Special conditions like the depth at which grouting was done during drilling, presence of artesian conditions, loss of drilling fluid, observation of gas discharge with return water etc., shall also be observed and recorded. e) During drilling operation, observation on return water, rate of penetration etc. shall be recorded on a pro-forma as given in IS : 5313, Appendix-A.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 63 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

5. Core Samples: a) Core samples shall be extracted by the application of a continuous pressure at one end of the core with the barrel held horizontally without vibration. Friable cores shall be extracted from the barrel directly into a suitable sized half round plastic channel section. Care shall be taken to maintain the direction of extrusion of sample same as that while coring to avoid stress reversal. b) Immediately after withdrawl from the core barrel, the cores shall be placed in a tray and transferred into boxes specially prepared for the purpose. The boxes shall be made from seasoned timber or any other durable material and shall be indexed on top of the lid as per IS : 4078. The cores shall be numbered serially and arranged in the boxes in a sequential order. The description of the core samples shall be recorded as per IS : 4464. Where no core is recovered, it shall be recorded as specified in the continuous record of core recovery and RQD to be mentioned in the corelog as per IS : 11315 Part-II. c) The basic information for the description of rocks shall cover a) degree of weathering b) discontinuity spacing c) strength d) colour e) grain size f) structural condition, the mineralogy of the grains and cementing material g) rock name special features like major joint planes‘s features/laminations, faults, etc. shall also be indicated.

(ii) Permeability Test: Permeability test shall be conducted in bedrock inside the drilled hole by pumping in water under pressure to determine the percolation capacity of the rock strata. This test shall be conducted in encased and ungrouted sections of the drill hole and the use of bentonite slurry drilling is strictly prohibited. Clear and clean water shall be used for the purpose of both drilling and testing. The equipments required and the procedure to be followed for conducting the test shall conform to IS : 5529, Part-II. The length of the test section shall be either 1.5m or 3.0m as per field conditions and the directions of the Engineer. The levels of water table, if any, in the drill hole shall be recorded and the drill hole shall be cleaned before starting the test. Depending upon the depth of the test section, single packer or double packer method shall be adopted. Care shall be taken to see that all joints and connections are watertight during the test.

a) Single Packer Method This method shall be adopted when the bottom elevation of the test section is the same as the bottom of the drill hole and where it is considered necessary to know the permeability value during drilling itself. This test shall be useful where the full length of the hole cannot stand encased or ungrouted. The packer shall be fixed at the top level of test section such that only the test section lies below the packer. Water shall then be pumped through a pipe into

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 64 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

the test section under a required pressure and maintaining it till a constant quantity of water intake is observed. The amount of water percolating through the hole shall be recorded at every 5 minutes intervals. The test shall be repeated by increasing the pressure at regular intervals upto a pressure limit as specified in IS : 5529, Part-II. The details and observations during the test shall be suitably recorded in a proforma recommended in IS : 5529, Part-II, Appendix-B.

b) Double Packer Method: This method shall be used when the permeability of an isolated section inside a drill hole is to be determined. Packers shall be fixed both at the top and bottom of the test section such that their spacing is exactly equal to the length of the test section. The test shall then be conducted as specified in clause.

(iii) Standard Penetration Test: The relevant hardness of rocks shall be tested in boreholes and after every drill run of 0.75 m in rock if core recovery is observed less than 20% or as directed by Engineer. The test equipment and arrangement shall be conforming to IS : 2131. An initial seating of the blows shall be given and the number of blows for each 7.5 cm penetration to a total penetration of 45 cm shall be recorded. Penetration shall be recorded (to mm) for every 50 blows and test shall be stopped at total of 100 blows.

(iv) Plate Load test: The test shall be conducted as described under clause (x) of plat load test for soil subject to the following changes. The test plate on the surface of the rock shall be of size 45 cm x 45 cm and at least 25 mm thick. The maximum load shall be 2500 kN per sq.m applied in stages for 25, 50, 100, 150, 200, 300, 400, 600, 800, 1000, 1500, 2000 and 2500 kN per sq.m under each load the time vs settlement shall be recorded and plotted.

(v) Pressure meter test: This test shall be conducted as described under clause (xvi) of pressure meter test for soil, subject to the following changes. The test shall be carried out till one for the following condition occurs:

a) The volume of the probe is doubled b) Ultimate failure of rock c) Load intensity of 8000 kN/m2 is reached without failure.

5.3.10 LABORATORY TESTING: (i) Essential Requirements a) All laboratory tests shall be conducted in an approved laboratory using approved apparatus complying with the requirements and specification of Indian Standrads or other approved standards for this class of work. It shall

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 65 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

be checked that the apparatus are in good working condition before starting the laboratory tests. Calibration of all the instruments and their accessories shall be done carefully and precisely. b) Depending on the type of sub strata encountered, appropriate laboratory tests shall be conducted on soil and rock samples collected in the field. Laboratory tests shall be scheduled and performed by qualified and experienced personnel who are thoroughly conversant with the work. Tests indicated in the schedule of items shall be performed on soil, water and rock samples as per relevant IS Codes indicated in para 4.0. One copy of all the laboratory test data records shall be submitted to the Owner progressively every week. Laboratory tests shall be carried out concurrently with field investigation since initial laboratory test results could be useful in planning the later part of field work. A schedule of laboratory tests shall be established by the Contractor and the same shall be submitted and got approved by the Engineer before starting of laboratory tests. c) All samples, whether undisturbed or disturbed, shall be extracted, prepared and examined by competent personnel, properly trained and experienced in soil sampling, examination, testing and in using the apparatus as per the specified standards. d) Undisturbed soil samples retained in liners or seamless tube samplers shall be taken out without causing any disturbance to the samples using suitably designed extruder just prior to actual testing. If the extruder is horizontal, proper support shall be provided to prevent the sample from breaking. For screw type extrudes, the pushing head shall be free from the screw shaft so that no torque is applied to the soil sample in contact with the pushing head. For soft clay samples, the sample from tube shall be cut by means of a high speed hacksaw to specified test length and placed over the mould before pushing the sample into it with a suitable piston. e) While extracting a sample from a liner or tube, care shall be taken to see that its direction of movement is the same as that during sampling to avoid stress reversal. f) On all undisturbed soil samples tested for bulk density, water content, grain size distribution, liquid limit and plastic limit tests shall also be performed. g) On all rock samples tested for unconfined compression test, bulk density, water absorption, point load index tests shall also be performed.

(ii) Tests: Tests as indicated in this specification and as called for by the Engineer shall be conducted. These tests shall include the following:

a) Tests on Undisturbed and Disturbed Samples - Visual and Engineering Classification - Sieve Analysis and Hydrometer Analysis

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 66 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

- Liquid, Plastic, and Shrinkage limits - Specific Gravity - Chemical Analysis - Swell pressure and Free Swell index determination - Proctor Compaction test - California Bearing Ratio b) Test on Undisturbed Samples - Bulk Density and Moisture Content - Relative Density (for sand) - Unconfined Compression Test - Box Shear Test (in case of cohesionless and c- soil) - Triaxial Shear Tests: (depending on the type of soil and field conditions on undisturbed or remoulded samples) i) Unconsolidated undrained. ii) Consolidated Undrained Test with the Measurement of Pore Water Pressure. iii) Consolidated Drained. - Consolidation test. - Laboratory Permeability Test c) Test on Rock Samples - Visual classification - Water Absorption, Porosity and Density - Specific gravity - Hardness - Slake durability - Unconfined compression test (both saturated and at insitu water content) - Point load strength index - Deformability test (both saturated and dry samples). d) Chemical Analysis of Subsoil and Ground Water

(iii) Salient Test Requirements: a) Remolded soil specimen, whenever desired, shall be fully reworked at field density and moisture content. For conducting CBR test and triaxial test for dyke/road material the sample shall be remoulded to 95% of standard proctor density. b) Triaxial shear test shall be conducted on undisturbed soil samples, saturated by the application of back pressure. Only if the water table is at sufficient depth such that chances of its rising to the base of the footing are meagre or nil, the triaxial tests shall be performed on specimens at natural moisture content. Each test shall be carried out on a set of three test specimens from one sample at cell pressures equals to 100, 200 and 300 kN/Sq.m or as required depending on the soil conditions.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 67 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

c) Effective stress triaxial shear test could be either consolidated drained or consolidated undrained with pore water pressure measurement. The test shall be conducted at cell pressures of 100, 200 and 300 kN/Sq.m ensuring complete consolidation at each stage. d) Direct shear test shall be conducted on undisturbed soil samples. The three normal vertical stresses for each test shall be 100, 200 and 300 kN/Sq.m or as required as per the soil conditions. e) Consolidation test shall have loading stages of 10, 25, 50, 75, 100, 200, 400 and 800 kN/Sq.m. Rebound curve shall be recorded for all the samples by unloading the specimen at the in-situ stress of the specimen. Additional rebound curves shall also be recorded whenever desired by the Engineer. f) Chemical analysis of sub-soil shall include determination of pH value; carbonate, sulphate (both SO3 and SO4), chloride and nitrate contents; organic matter, chemicals salinity and any other chemicals harmful to the foundation material. The contents in soil shall be indicated as percentage (%). g) Chemical analysis of sub-soil water sample shall include the determination of the properties such as colour, odour, turbidity, pH value and Specific conductivity, both at 25 deg. C and chemical contents such as Carbonates, Sulfates (both SO3 and SO4), Chlorides, Nitrates, Organic matter and any other chemical harmful to the foundation material. The contents such as Sulphates, etc. shall be indicated as ppm by weight. h) The lab CBR test shall be performed on undisturbed and remoulded sample for soaked and unsoaked condition. i) The lab permeability test shall be performed on undisturbed and remoulded (blended with bentonite) samples as approved by the engineer. The percentage of bentonite shall be varied to achieve permeability less than 1x10-6 cm/sec.

5.3.11 REPORT:

(i) General a) On completion of all the field and laboratory work, the Contractor shall submit a draft/Interim report containing Geological information of the region, procedure adopted for investigation, field observations, summarised test data, statistical average parameters for each identified layer. The report shall include detailed borelogs, subsoil sections, field test results, laboratory observations and test results both in tabular as well as graphical form, practical and theoretical considerations for the interpretation of test results, the supporting calculations/ documents for the conclusions drawn, etc. Initially, the Contractor shall submit three copies of the report in draft form for the Owner‘s review. The abstract of the sub-soil stratification of the project shall also be included in the report.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 68 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

b) The Contractor‘s qualified Geotechnical engineer shall visit the Owner‘s Corporate Office for a detailed discussion on the draft report based on the comments of the Owner. Before submission of draft report, the Contractor's qualified Geotechnical Engineer shall give the presentation on the site investigation work completed, contents of draft report, discussion on soil strata/foundation system etc. at Owner's Engineering Office, Vadodara. During the discussions, it shall be decided as to the modifications that need to be done in the draft report. Thereafter the Contractor shall incorporate in the report the agreed modifications as suggested by the Owner and submit the revised draft report for Owner‘s approval. Upon Owner‘s approval, the final report shall be submitted in five hard copies. The approved report shall also be submitted on three computer compatible compact discs (CDs). c) The detailed final report based on field observations, in - situ and laboratory tests shall encompass theoretical as well as practical considerations to arrive at foundations of different types of structures envisaged in the area under investigation. The Contractor shall acquaint himself about the type of structures, foundation loads and other information required from the Owner.

(ii) Data to be furnished The report shall also include but not be limited to the following :

a) A plot plan showing the locations and reduced levels of all field tests e.g. bore holes, trial pits, static cone penetration tests, dynamic cone penetration tests, plate load tests, etc., properly drawn to scale and dimensioned with reference to the established grid lines. b) Geological information of the area such as geomorphology, geological structure, lighology, stratigraphy and tectonics faults, seismicity of the region and site, core recovery and rock quality designation, etc. c) Past observations and historical data, if available, for the area or for other areas with similar soil profile with similar structures in the surrounding areas. d) A true cross section of all individual boreholes and trial pits with reduced levels and coordinates showing the classification and thickness of individual stratum, position of ground water table, various in-situ tests conducted and samples collected at different depths and the rock stratum, if met with. All soil profiles shall be presented using any latest software package. e) A set of longitudinal and transverse soil/rock profiles vertical scale 1:200, horizontal scale 1:2000 connecting various bore holes in order to give a clear picture of the various of the subsoil strata as per IS: 6065. f) Water level contours and Rock level contours shall be presented in any latest software package. g) Plot of Standard Penetration Test (N values both uncorrected and corrected) with depth for identified areas.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 69 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

h) Results of all laboratory tests summarised (i) for each sample (as per Table-1 and Table 2 for soil and rock respectively) as well as (ii) a consolidated table giving the layer wise soil and rock properties in a format similar to Table 1 and 2. All the relevant charts, tables, graphs, figures, supporting calculations, conclusions and photographs of representative rock cores and trial pits shall be furnished. i) For all triaxial shear tests, stress v/s strain diagrams as well as Mohr‘s circle envelopes shall be furnished. If back pressure is applied for saturation, the magnitude of the same shall be indicated. The value of modulus of elasticity, E shall be furnished for all tests along with relevant calculations. j) For all consolidation test, the following curves shall be furnished:

Void ratio VS pressure (plotted on log scale) Void ratio VS pressure and Compression VS time (plotted on log scale) or Compression VS square root of time (depending upon the shape of the plot for proper determination of coefficient of consolidation) The point showing the initial condition (eo, Po) of the soil shall be marked on the curves.

k) Values of compression index, coefficient of volume compressibility shall be furnished. The procedure adopted for calculating the compression index from the field curve and settlement of soil strata shall be clearly specified. The time required for 50% and 90% primary consolidation along with secondary settlement, if significant, shall also be calculated. l) Pressure meter tests, the following shall be furnished: Calibration Record including: Description of membrane and sheath on probes, Dimensions of thick walled cylinder, Length of flexible tubing, Calibration curves, Temperature.

Drilling Record including:

Borehole number, Method of making borehole, log of soil type and condition, Depth of water in borehole, weather and temperature.

Test Record:

Type of test, Date and time, Depth of Center Point of probe, Volume readings at 30 and 60 second elapsed time and corresponding pressure readings. Notes on any deviation from standard test procedure.

Field Pressure meter, creep and air calibration curves indicating Po, Pf and Pl. Corrected pressuremeter and creep curves indicating P0, Pf, Pl, along with calculation for the corrections.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 70 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

m) Values of cohesion, angle of internal friction, pressure meter modulus, shear modulus and coefficient of sub-grade reaction along with sample calculation. Calculation for allowable bearing pressures and corresponding total settlements, for shallow foundations mentioned in para 8.3 (b) and load capacity calculation of piles in various modes.

(iii) RECOMMENDATION

a. The recommendations shall be based on observations and test results and shall encompass theoretical as well as practical considerations for foundations for type of structures envisaged and other relevant systems as indicated by the ENGINEER, in the area under investigation. The CONTRACTOR shall be acquainted with, with the help of the OWNER, about type of structures proposed and their functions. b. Geological description of the site including that of faults, folds, etc. if any, based on published literature and investigation carried out. c. Seismic history of site including brief description of previous earthquakes, if any, giving time, period, duration, magnitude, epicentre location, damage done, maximum ground acceleration produced etc. and relevant details about design earthquake. d. Special considerations, if any, adopted in design of previous structures of the region because of seismicity, faults, folds etc. e. Recommended types of foundations. f. Allowable or safe bearing capacities in different strata for shallow foundations indicating relevant design criteria adopted, methods of analysis adopted and weightage assigned to different methods. g. For pile foundations, type of piles recommended with reasons for the same; length, diameter, allowable capacity (both lateral and vertical) of individual and groups of piles. h. Recommendations for values for Modulus of Subgrade reaction for foundation design by elastic method. i. Estimate of magnitude and rate of settlement of the proposed foundations. j. Behavior of proposed foundations under seismic conditions including analysis for possibility of liquefaction and expected settlement under earthquake. k. Negative skin friction, if any; magnitude of estimated negative skin friction. Methods to minimize or eliminate negative skin friction. l. Analysis and recommendations for machine foundations and other foundations subject to vibratory actions. m. Comments on chemical nature of subsoil and groundwater with due regards to potential deleterious effects on concrete, steel and other

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 71 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

substructure materials and recommended measures to overcome deleterious effects, if any. n. Recommendations for subsoil treatment such as sand drains or stone columns, if any needed, giving reasons for such treatment, available and recommended method(s) of treatment. Mention shall be made of studies/trials to be carried out, if any, prior to selection of a method/methods of treatment. o. Recommendations in regard to use of subsurface material for various construction activities and methods for quarrying the same. p. Topographical details of site and recommendations related to site preparation including classification, source, placement and compaction of fill materials required to bring the general site levels to final grade level, if so warranted; recommendations regarding excavation, stable slopes for excavation, dewatering etc q. Recommendation regarding design and construction of roads and other paved area r. Recommendation regarding site drainage. s. Recommendations regarding any special construction procedure/precaution to be adopted/taken, method of dewatering, if any required, etc. t. Recommendations regarding construction of soak pits, lagoons and reservoirs including comments on water retaining characteristics and recommendations for linings, etc. and other treatment if required. u. Recommended side slopes for cutting and embankment, if any. v. Recommendations on lateral earth pressures as relevant. w. Past observations and historical data, if available, for structures resting in the area under consideration or for other areas with similar profiles. x. Precautions to be taken such that relevant construction activities do no cause damage in any way to adjoining structures, in relation to subsurface characteristics. y. Recommendations for additional investigation, beyond the scope of the present work, if the CONTRACTOR considers such investigation is necessary

(iv) Analysis and Discussion of Results The following shall be furnished in the report.

a) Analysis of results, comparison of field and laboratory data, discussion of results, statistical average of soil parameters, viz. engineering and physical, for each identified layer. b) For shallow foundations necessary information shall be provided to arrive at the following:

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 72 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

i) Net safe allowable bearing pressure for isolated square footings and continuous strip footings of sizes 1.0 to 5.0m at different founding depths of 1.0 to 5.0m, below ground level considering both shear failure and settlement criteria.

ii) Net safe allowable bearing pressure for raft foundations of widths greater than 6 m at 2.0, 3.0, 4.0 and 5.0m depth below ground level considering both shear failure and settlement criteria. iii) Modulus of subgrade reaction, modulus of elasticity from plate load test results along with time settlement curves and load settlement curve in both natural and log-log graph. c) For piling necessary information shall be provided to arrive at the following: i) Type of pile. ii) Suitable founding strata for the pile. iii) Estimated length of pile for 500 kN (400 mm dia), 750 kN (450 mm dia), 1000 kN (500 mm dia) 1400 kN (600 mm dia), 2500 kN (760 mm dia) and 4500 kN (1070 mm dia) capacities along with relevant sample calculation. iv) Magnitude of negative skin friction, if any.

d) Coefficient of permeability of various sub soil and rock strata based on in-situ permeability tests. e) Cone resistance, frictional resistance, total resistance and settlement analysis for different sizes of foundation as specified in para b (i) above based on static cone penetration test. f) Electrical resistivity of sub-soil based on electrical resistance tests including electrode spacing vs commutative resistivity curve. g) Dynamic soil properties such as dynamic shear modulus, Poisson‘s ratio based on cross-hole shear and seismic refraction test data. h) Suitability of the soil for construction of roads and pavements, their stable slopes for shallow and deep excavations, active and passive earth pressures at rest and modulus of elasticity as a function of depths for use in the design of underground structures. i) Suitability of locally available soils at site for filling and back filling purposes. j) If expansive soil is met with removal/retainment of the same under the structures/roads etc. shall be given. In the latter case, detailed specifications of any special treatment required including specifications for materials to be used, construction method, equipments to be deployed, etc. shall be furnished. k) Chemical nature of soil and ground water with due regard to potential deleterious effects on concrete, steel and other building materials, etc. shall be dealt in detail.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 73 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

l) Susceptibility of sub soil strata to liquefaction, if any, in the event of an earthquake.( Liquefaction Analysis) m) Any other information of special significance like dewatering schemes, etc. n) Additional soil investigation beyond the scope of the present work if the Contractor considers such investigation is necessary.

5.3.12 RATES AND MEASUREMENTS: The clauses below shall apply for item rate contracts only. They shall not be applicable to turn key and lumpsum contracts, except for work beyond the scope of such contracts.

(v) Rates

a) The item of work in the Schedule of Quantities describes the work very briefly. The various items of the Schedule of Quantities shall be read in conjunction with the corresponding sections in the technical specifications including amendments and additions, if any. For each item in the Schedule of Quantities the bidder‘s rates shall include for the activities covered in the description of the items as well as for all necessary operations in details described in this technical specification. b) No claims shall be entertained if the details shown on the released for construction drawings differ in any way (e. g. location and depth for tests, number of tests, etc.) from shown on the tender drawings, if any. c) The unit rates quoted shall include minor details which are obviously and fairly intended, and which may not have been included in these documents but are essential for the satisfactory completion of the work. d) The bidders quoted rates shall be inclusive of providing all plant equipments, men, materials, skilled and unskilled labour; making observations, mobilisation of men and materials, establishing the ground level and coordinates at location of each bore hole, test pit, etc., by carrying levels from one established bench mark and distances from one set of grid lines furnished by the Owner. Also, no extra payments shall be made for conducting the Standard Penetration Test; Collecting, packing, transporting of all samples and cores; recording of all results and submitting them in approved formats. e) The quoted rates for pits/plate load test shall be inclusive of shoring / strutting, dewatering and backfilling. f) Rates quoted for pump out test shall be inclusive of boring of well of 400 mm dia, providing and installation of perforated GI pipe and observation pipes etc. for draw down depth as specified in the drawings, and as per specification. g) Rates quoted for conducting cross hole shear test shall be inclusive of boring providing PVC pipes, preparation of bore including shot hole and receiver holes, providing geo-phones, measurement through seismograph, etc. upto the depth specified and as per specification.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 74 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

h) The quoted rates for drilling in rock, shall satisfy the requirements as given in the scope of work j) The rates quoted by the bidder for laboratory tests shall include preparation of sample, performing tests, recording and analysis of data and submission of one set of the above information to Owner‘s Corporate Office, every week after completion of tests. k) The rates quoted by the bidder geotechnical investigation report soft copy as well as 03 sets of hard copy of detail geotechnical report along with recommendation and analysis as per Specifications. l) Toposurvey drawing should be submitted in both hard copy (one copy in tracing, 2 sets of good quality colour prints Minimum A2 size) as well as Soft copy (editable- ACAD , kml format) and non-editable (PDF) m) The quoted rates shall be firm for entire contract period and shall not be subject to any escalation in price, idle charges for labour, machinery, overhead expanses etc.

(vi) Measurements: a) All measurement shall be in Sl units. b) Length shall be measured in meters (m) correct to two places of decimals. Areas shall be worked out in square meters (Sq.m.) and volume in cubic meters (Cu.m), rounded off to two decimals. c) Certain tests have to be conducted in bore holes, trial pits, etc. Such bore holes, trial pits, etc., shall be measured only once and not again just because tests are conducted therein. d) The depth of penetration due to SPT at the bottom of bore hole shall not be considered for the measurement of bore hole depth. e) Measurement for the item of pumpout test shall be done in numbers. f) Pits shall be measured in Cu.m. The lateral dimension for measurement purposes shall be the least of the following :

1) actual excavation outline 2) 0.3 m on all sides beyond the pit size of 2 m x 2m for depths upto 1.0 below existing grade and 1.0 m on all sides beyond the pit size of 2 m x 2 m at the bottom for depth more than 1.0 m below existing grade.

For measurement purposes the sides shall be considered vertical with the lateral dimension indicated above. Northing extra would be payable for slope etc. irrespective of whatever is provided.

g) Preboring done for carrying out Static Cone Penetration Test shall not be measured. h) Coring in rock with diamond bit shall be measured in length in metres (m) correct to two places of decimal for the actual cored length satisfying the criteria of clause mentioned in the tender.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 75 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

5.3.13 DELIVERABLES The final report in three hard copies and in two soft copies in separate Pen drives including site photographs before during and after the Geotechnical Investigation for each bore hole.

5.3.14 Annexure-A: List of Equipments to be Mobilised to Site for Topography survey and Geotechnical Investigation (Suggested Minimum) Sr. No. Description Quantity 1. Shell and auger boring set 03 2. Dynamic cone penetration test equipment 01 3. Rotary core drilling unit (Hydraulic feed) 01(If Required) 4. Field permeability test set up 01 5. Electrical Resistivity test (ERT) set up 01 6. Field Vane Shear Test 01 7. Total station 01 8. DGPS or highly accurate GPS 01 9. Echo Sounder 01

Note: Additional equipment shall be mobilized, if required, as per directions of the Engineer to match the work completion schedule.

5.3.15 Annexure-B Suggested Minimum Staff to be Deployed

Sr. No Description Nos. of Person 1. Geotechnical Engineer 01 2. Engineering Geologist 01 3. Supervisors 01+01 4. Qualified Surveyor 01 5. Rig Operators 01/ Rig 6. Mechanic 1 7. Skilled/Unskilled labour As required

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 76 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

6 General Terms & Conditions/General Conditions of Contract (GCC)

6.1 Use of Contract Documents & Information

6.1.1 The Contractor shall not, without GIPCL‘s prior written consent, disclose the Contract or any provision thereof or any specification, plan, drawing, pattern therewith to any person other than person employed by the Contractor in performance of the Contract. Disclosure to any such employed person shall be made in confidence and shall extend strictly for purpose of performance only. 6.1.2 The Contractor shall not, without GIPCL‘s prior written consent, make use of any document or information except for purpose of performing the Contract. 6.1.3 Any document other than the Contract itself shall remain the property of GIPCL.

6.2 Patent Rights The Contractor shall indemnify GIPCL against third party claims of infringement of patent, trademark or rights arising from use of goods/design or any part thereof.

6.3 Statutory Responsibility The Contractor shall comply with all applicable laws, by laws, rules, and regulations and shall procure and maintain their validity all necessary Municipal, Panchayat and Government permits & licenses etc. at its own cost.

6.4 Insolvency and Breach of Contract GIPCL may at any time by notice in writing summarily terminate the Contract without compensation to the Contractor in any of the following events:

If the Contractor at any time, is adjudged insolvent or have a receiving order or order from administration of its state made against it or shall take any proceeding for compensation under any Insolvency Act for the time being in force or make any conveyance or assignment with its creditors or suspend payment. If the Contractor being a company is wound up voluntarily or by the order of a court or a Receiver, Liquidator or manager on behalf of the Debenture holder is appointed or circumstances have arisen which entitle the Court or debenture holder to appoint a Receiver, Liquidator or Manager.

6.5 Deleted

6.6 Deleted

6.7 Delay in Execution or Failure to complete the Contract i. Any delay in completion of the work shall attract liquidated damage/ penalty for late completion as per Liquidated Damage (Clause 6.8) of this Tender.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 77 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

ii. If the Contractor fails to complete the entire work ( as specified in scope of work) or fails to start the work within specified time frame after issue of LoI or fails to carry out the work as per agreed schedule or leaves the work site after partial execution of the work, GIPCL shall have the right to get the work done through any other agency at the risk and cost of the Contractor. Further to this, GIPCL may, without prejudice to the right of the Contractor to recover damages for breach of trust of the Contract, may impose penalties. iii. Notwithstanding anything contained in this tender document, bidders to note that Completion time of all work as per the prescribed timeline/schedule is the essence of the Contract. It is envisaged that Contractor shall plan and achieve progress of the work on or before the prescribed timeline/schedule without fail. iv. If, at any time, the CONTRACTOR‘s actual progress falls behind or is likely to fall behind the agreed schedule of the break-up/detailed activities, the CONTRACTOR shall submit to the OWNER, a revised programme with catch up schedule, taking into account the prevailing circumstances and delay in the respective activities / milestones. The CONTRACTOR shall, at the same time/forthwith notify promptly to GIPCL of the steps being taken to expedite progress of the activities, so as to achieve completion of such activities within the agreed Time schedule for Completion. The Contractor shall in order to overcome the situation, forthwith mobilise required additional resources like manpower, materials, machineries etc. to achieve the prescribed timeline/schedule at his risk and cost. v. In case further slippage is observed in the progress of activities, as per agreed time schedule or failure by Contractor, at any stage of the Contract, to perform the Contract diligently to fulfil his obligations as per the Contract, GIPCL reserves the right to engage any other Contractor(s)/sub-contractor(s) at any time, at the risk and cost of the Contractor to ensure completion of the work in line with the agreed time schedule. Further, GIPCL will also deduct Liquidated Damages (LD) arising out of any such delay, if any, as per the terms of this tender document or recover the costs, expenses, losses, damages incurred or suffered by GIPCL as per the recourse available under this tender document or any other law for the time being in force.

6.8 Liquidated Damages for Delay i. For any delays attributable to the Contractor beyond the scheduled period of completion of the entire work as per the agreed completion schedule, the Contractor shall pay to Owner liquidated damages at the rate of 1% of contract value per week. ii. Maximum applicable Liquidated Damages: The upper ceiling for total liquidated damages for delay shall be maximum 10% of the Contract Price. iii. The said right of the GIPCL to levy damages on account of delay shall be without prejudice to and in addition to the right of the Company to get the

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 78 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

concerned work done from a third party at the complete risk and cost of the Contractor. iv. Any strike / lockouts at works or site of the Contractor or his sub-supplier/sub- contractor shall not be considered as force majeure condition. v. For calculation of LD, date of issue of LOI shall be the reference date.

6.9 Termination for Default i. The Owner may, without prejudice to any other remedy for breach of Contract, by written notice of default sent to the Contractor, terminate the Contract in whole or in part if the Contractor fails to deliver or execute any or all of the works within the time period(s) under the Contract or any extension thereof granted by GIPCL pursuant to the clause for Delay in Execution or Failure to Supply or, If the Contractor fails to perform any other obligations(s) under the Contract. ii. In the event the Owner terminates the Contract in whole or in part, pursuant to above, the Owner may procure, upon such terms and in such manner as it deems appropriate, goods similar to those undelivered, the Contractor shall be liable to the Owner for any excess costs for such similar goods. However, the Contractor shall continue the performance of the Contract to the extent not terminated. iii. In case termination of the Contract due to default, the Contractor may be blacklisted by GIPCL, GUVNL, GERMI and its associate companies, etc. for future work.

6.10 Breach and Cancellation of the Contract i. In case of non-performance in any form or change of the covenant and conditions of the Contract by the Contractor, the Owner shall have the power to annul, rescind, cancel or terminate the order and upon its notifying in writing to the Contractor that it has so done, this Contract shall absolutely determine. The decision of the Owner in this regard shall be final and binding. ii. The Owner may cancel the order or a portion thereof, and if so purchase or authorize purchase of the Services not so delivered or order assignments or services of similar description (opinion of the Owner shall be final) at the risk and cost of the Contractor.

6.11 Force Majeure i. In the event of either party being rendered unable by Force Majeure to perform any obligation required to be performed by them under this Contract, relative obligation of the party affected by such Force Majeure shall be treated as suspended during which the Force Majeure Clause lasts. ii. The term ―Force Majeure‖ shall have herein mean riots (other than among the Contractor‘s employee), Civil commotion, War (whether declared or not), invasion, act of foreign enemies hostilities, civil war, rebellion, revolution, insurrection, military coup, damage from aircraft, nuclear fission, embargoes, quarantines, acts of god such as earthquake (above 7.0 magnitude on Richter GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 79 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

scales), lightning, unprecedented floods, fires not caused by the Contractors negligence and other causes which the Contractor has no control and accepted as such by GIPCL whose decision shall be final and binding. Normal rainy season and monsoons are not Force Majeure. iii. Upon occurrence of such causes and upon its termination, the party alleging that it has been rendered unable as aforesaid, thereby, shall notify the other party in writing by registered notice within 24 (twenty four) hours of the alleged beginning and ending thereof giving full particulars and satisfactory evidence in support of its claim. iv. Time for performance of the relative obligation suspended by the Force Majeure shall stand extended by the period for which such clause lasts. v. If works are suspended by Force Majeure conditions lasting for more than two (2) months, GIPCL shall have the option of cancelling this Contract in whole or part thereof, at its discretion. vi. The Contractor shall not claim any compensation for Force Majeure conditions and shall take appropriate steps to insure men and materials utilized by it under the Contract well in advance.

6.12 Progress Report of Work i. The Contractor shall submit a weekly progress report on execution of works conforming to bar/ PERT Chart and format provided by GIPCL. In case of any slippage(s) or delay in execution of work reasons for such delay along with details of hindrances will be submitted by the Contractor along with modified Bar/ PERT Chart mentioning the action plan being taken to keep the due date of completion of work unchanged. If required, the Contractor shall use additional manpower to keep the due date of completion of entire work unchanged. ii. The authorized representative of the Contractor shall review the progress of the work every fortnight on a prefixed day at site with GIPCL or its representative as per the network and record the minutes. iii. The contractor shall maintain a record of the daily progress indicating number of various field tests completed and those in progress, types and number of equipments working, manpower deployed, field borelogs and relevant information and records for various tests. These should be open for checking by the Owner at any time of the work.

6.13 Insurance i. During the Contract period, all insurance shall be taken by the contractor and related expenses shall be borne by the Contractor. The Owner shall not incur any financial loss. ii. In case of any loss or damage or pilferage or theft or fire accident or combination of the said incidents etc. under the coverage of insurance, the Contractor shall lodge the claim as per rules of insurance. Any FIR required to be lodged to local Police Station shall be the responsibility of the Contractor.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 80 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

iii. The Contractor shall arrange for providing insurance coverage to its workmen under Workmen‘s Compensation Act or similar Rules and Acts as applicable during execution of work for covering risk against any mishap to its workmen. The Contractor shall also undertake a Third Party Insurance. The Owner shall not be responsible for any such loss or mishap.

6.14 Tools and Tackles The Contractor shall provide technically suitable tools and tackles, equipments, Machineries etc. conforming to relevant BIS safety and technical standards for proper execution of work. The Owner, in no way, shall be responsible for supply of any tools and tackles, equipments, Machineries etc for execution of the work.

6.15 Construction Water and Power The responsibility of arrangement for construction water and power is in the scope of Contractor for execution of the job.

6.16 Safety Measures The Contractor shall have to provide necessary and adequate safety measures including personal protective equipment and precautions to avoid any accident, which may cause damage to any equipment/ material or injury to workmen. The Owner shall not be responsible for any such accidents.

6.17 Hazardous Material Any hazardous material used during work at site or used as part of the work has to be taken back by the Contractor for recycling or dumping purpose after its operating/ working life, so that it may not affect the environment or any living being. The Contractor shall comply with the State Pollution Board regulation.

6.18 Stoppage of Work The Owner shall not be responsible and not liable to pay any compensation due to stoppage of work as a reaction from local public due to any undue action on the part of the Contractor causing annoyance to local people.

6.19 Responsibility of the Contractor The Contractor shall provide guarantee and be entirely responsible for the execution of the Contract in accordance with this tender including but not limited to its specification, schedules, and annexure.

6.20 Governing Language The Contract shall be written in English Language. All correspondence and documents pertaining to the Contract, which are exchanged by the Owner and Contractor, shall be written in English.

6.21 Order Amendments No variation in or modification of the terms of the contract shall be made except by written amendments issued by the Owner.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 81 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

6.22 Assignments or Subletting of Contract The Contractor shall not, without the prior consent in writing of the Owner, assign or sublet or transfer its Contract in whole or in part, its obligations to perform under the Contract or a substantial part thereof, or for any part of the work of which makers are named in the Contract, provided that any such consent shall not relieve the Contractor from any obligation, duty or responsibility under the Contract.

6.23 Subcontracts (i) The Contractor shall notify the Owner in writing of all subcontracts awarded under the Contract if not already specified in his Bid. Such notification in its original Bid or later shall not relieve the Contractor from any liability or obligation under the Contract. (ii) Subcontracting a work shall not, under any circumstances, relieve the Contractor from its obligations towards the Project and the Owner. (iii) In case, the Contractor engages any Subcontractor to carry out a part of the work, the Subcontractor should have requisite Government License/permits for carrying out such part of the work.

6.24 Terms of Payment

Terms of payment

Sr. No. Milestone for Works Amount Advance Payment against (i) Acceptance of LOI and Mobilization of sufficient resources to complete the work 1 (ii) Submission of Advance Bank Guarantee of 10% of the total equivalent amount cost (iii) Submission of Performance Bank Guarantee 10% of the total Contract Price Completion of the identified work and certification by the 50 % of the total 2 Engineer. cost on submission of draft report to the Engineer and 25 % of the total 3 presentation at GIPCL Vadodara cost 15 % of the total 4 on acceptance of the final report by the Engineer cost

6.25 Payments Procedure Subject to any deduction which the Owner may be authorized to make under this Contract, and or to any additions or deductions provided for in this Contract, the Contractor shall be entitled to payment as follows

a. All payments shall be made in Indian Rupees (INR), unless otherwise specified in the LoI/Contract Agreement. All payment shall be made on the basis of actual measurement for the quantified items as per schedule of works.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 82 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

b. The Contractor shall submit the bill for claim in three copies with all supporting documents as per the Contract condition to GIPCL. After due verification and recommendation, GIPCL shall process verified bills for release of payment. Payments shall be released in 30 (Thirty) days by A/c payee cheque / RTGS/ NEFT from date of submission of clear invoice. c. The Contractor shall submit the bill / invoice for the work executed showing separately GST and any other statutory levies in the bill / invoice. d. All taxes and deductions shall be applicable as per prevailing income tax and other statutory rules and provisions in force. e. In case Contractor fails to submit the invoice with all the required documents to process payments, GIPCL reserves the right to hold the payment of the Contractor against such bills.

6.26 Arbitration i. All matters, questions, disputes, differences and / or claims arising out of and / or concerning, and /or in connection with, and /or in consequence of, and /or relating to this contract which may arise between the parties in connection with the Contract or any matter arising out of or in relation thereto shall be reported to Gujarat Public Work Contract Dispute Arbitration Tribunal and provision of Gujarat Public Work Contract Disputes Arbitration and Tribunal Act 1996 shall be applied as updates time to time. ii. The Arbitrator may, from time to time, with the consent of the parties to the contract enlarge the time for making the award. The venue of the arbitration shall be the place from which the acceptance of offer is issued or such other place as the Arbitrator, in his discretion, may determine.

6.27 Court of Competent Jurisdiction The Courts of Vadodara for GIPCL shall have exclusive jurisdiction in all matters arising under the Contract.

6.28 Law and Procedure i. The law which is to apply to the Contract and under which the Contract is to be construed shall be Indian Law. ii. The law governing the procedure and administration of any arbitration instituted under the clause for arbitration shall be the Indian law.

6.29 Construction of Contract The Contract shall in all respect be construed and operated, as a Contract as defined in the Indian Contracts Act, 1872, and all the payments there under shall be made in Indian Rupees unless otherwise specified.

6.30 Notices i. For all purpose of the Contract, including arbitration there under, the address of the Contractor mentioned in the Bid shall be the address to which all

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 83 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

communications addressed to the Contractor shall be sent, unless the Contractor has notified a change by a separate letter containing no other communication and sent by registered post with acknowledgement due to GIPCL. The Contractor shall be solely responsible for the consequence of an omission to notify change of address in the manner aforesaid. ii. Any communication or notice on behalf of the Owner in relation to the Contract Agreement may be issued to the Contractor by the Owner and all such communication and notice may be served on the Contractor either by registered post or under certificate of posting or by ordinary post or by hand delivery at the option of the officer. iii. Instructions or notices to the Contractor and notices from the Contractor to GIPCL recorded in a minute signed by the authorized representatives of both GIPCL and the Contractor. Such notice or instruction shall be valid notice of instruction for the purpose of the Contract.

6.31 Risk Purchase If the Contractor fails, on receipt of the LoI, to take up the work within a reasonable period or leave the work Site after partial execution of the work, GIPCL shall have the liberty to get the work done through other agency at the Contractor‘s own risk and additional cost if any. If the situation, so warrants, to compel GIPCL to cancel the LoI placed on the Contractor, it shall be liable to compensate the loss or damage, which GIPCL may sustain due to reasons of failure on Contractor‘s part to execute the work in time.

6.32 Confidential Information i. GIPCL and the Contractor shall keep confidential and shall not, without the written consent of the other Party hereto, divulge to any third party any documents, data or other information furnished directly or indirectly by the other Party hereto in connection with the Contract, whether such information has been furnished prior to, during or following termination of the Contract. Notwithstanding the above, the Contractor may furnish to its Subcontractor(s) such documents, data and other information it receives from GIPCL to the extent required for the Subcontractor(s) to perform its work under the Contract, in which event the Contractor shall obtain from such Subcontractor(s) an undertaking of confidentiality similar to that imposed on the Contractor ii. Notwithstanding the generality of the foregoing Clause 6.30.1 all maps, plans, drawings, specifications, schemes and the subject matter contained therein and all other information given to the Contractor, by the Company in connection with the performance of the Contract shall be held confidential by the Contractor and shall remain the property of the Company and shall not be used or disclosed to third parties by the Contractor for any purpose other than for which they have been supplied or prepared. The Contractor may disclose to third parties, upon execution of secrecy agreements satisfactory to the Company, such part of the

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 84 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

drawings, specifications or information if such disclosure is necessary for the performance of the Contract under this Clause of 6.30. iii. Maps, layouts and photographs of the unit/integrated plant including its surrounding region's showing vital installation for national security shall not be published or disclosed to the third parties or taken out of the country without prior written approval of the Company and upon execution of secrecy agreements satisfactory to the Company with such third parties prior to disclosure. iv. Title to secret processes, if any, developed by the Contractor on an exclusive basis and employed in the design of the unit shall remain with the Contractor. The Company shall hold in confidence such process and shall not disclose such processes to the third parties without prior approval of the Contractor and execution by such third parties of secrecy agreements satisfactory to the Contractor prior to disclosure. v. Technical specifications, drawings, flow sheets, norms, calculations, diagrams, interpretations of the test results, schematics, layouts and such other information which the Contractor has supplied to the Company under the Contract shall be passed on to the Company. The Company shall have the right to use these for construction erection, start-up, commissioning, operation, maintenance, modifications and/ or expansion of the unit including for the manufacture of spare parts. vi. The obligation of a party under this Clause 6.31, however, shall not apply to that information which: a. now or hereafter enters the public domain through no fault of that Party b. can be proven to have been possessed by that Party at the time of disclosure and which was not previously obtained, directly or indirectly, from the other Party hereto, or c. Otherwise lawfully becomes available to that Party from a third party that has no obligation of Confidentiality vii. The above provisions of this Clause 6.31 shall not in any way modify any undertaking of Confidentiality given by either of the Parties hereto prior to the date of the Contract in respect of the Facilities or any part thereof. viii. The provisions of this Clause 6.31 shall survive Termination, for whatever reason, of the Contract.

6.33 Limitation of Liability (LLP) i. The total liability of the Contractor under or in connection with this Tender and the consequent Contract shall not exceed the full Contract Price inclusive of taxes and duties. ii. This sub-Clause shall not limit the liability in case of fraud, deliberate default/ negligence, reckless misconduct or illegal or unlawful acts by the Contractor.

--- End of Section ---

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 85 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

7 Special Terms & Conditions/ Special Conditions of Contract (SCC)

7.1 Definition i. The General Terms and Conditions as well as the Special Terms and Conditions of the Tender are complementary to each other, and wherever there is a conflict, the Special Terms and Conditions shall prevail. ii. Objective of the Work/Assignment: The main objective of this work is ―Bid for detailed Geotechnical Investigation and Topographical Survey for proposed Solar/ Wind/Hybrid Projects at Great Rann of Kutch area, in the State of Gujarat.

7.2 Location of Site The work is to be carried out at Great Rann of Kutch area, in the state of Gujarat. Details of the site location along with coordinate will be provided at the time of issue of LoI

7.3 Scope of Service The item of work to be performed for proposed Solar/Wind/Hybrid projects at Great Rann of Kutch area, in the state of Gujarat and shall include but not limited to the following: a. Transportation of men and material, unloading receiving and storage at site. b. Complete field work related to Geotechnical investigation and topographical survey c. Laboratory work and analysis of samples, preparation and submission of final reports.

7.4 Mode of Execution All the work shall be executed strictly in conformity with the provisions of the Contract documents, specifications and instructions by the Engineer-in-Charge whether mentioned in the contract or not. The contractor shall be responsible for ensuring that works are executed in the most substantial, proper and workman like manner using the quality materials/equipments and labour throughout the job/assignment completion in strict accordance with the specifications and relevant IS standards and to the entire satisfaction of the Owner.

7.5 Units & Standards/Codes/Regulation The International System of Units (SI) shall be used for carrying out the services mentioned in the specification. Indian Standards, Codes and Regulations, wherever applicable shall be adopted and adhered to by the Contractor. In case of such Indian Standards/Codes/Regulations being not available in particular areas, applicable and acceptable international standards shall be followed. The Contractor shall also comply with any changes / modifications in the Standards while undertaking the above studies and preparation of various reports.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 86 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

7.6 Programme of Work The Contractor shall submit the programme of work within 07 days from the date of receipt of Letter of Intent. The programme shall include a Bar Chart indicating there in the starting position and completion date of each of the major items of work.

7.7 Starting of Work The Contractor shall be required to start the work within 07 (Seven) days from the date of issue of Letter of Intent and shall thereof, report to GIPCL accordingly.

7.8 Completion Schedule Complete fieldwork with Site mobilization, collection of Samples, Laboratory work and analysis of samples, preparation and Submission of draft and final reports shall be completed within 11 weeks from the date of issue of LoI. The detailed schedule is as follows. TIME SCHEDULE completion period in Weeks Sr. No. Description W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 Mobilisation and 1 Commencement of field work 2 Field Work 3 Laboratory Test Preparation of Report (A) Intrim, 4 (B) Draft (C)Final

7.9 Site Inspection & Basis of Bid The volume and quantity of work indicated in schedule of works may vary. The Bidders are advised to inspect the site of work and its environments and be well acquainted with the actual working and other prevailing conditions, position of material and labour. The Bidder should be specially note that it is Bidder responsibility to provide any items which is not specifically mentioned in the specifications and scope, but which is necessary to complete the work and Bidder shall make his own arrangements for the transport of personnel and equipment to the site and for the stay and boarding facilities of their team during the work. No extra claim will be entertained at post bidding stage.

7.10 Price Escalation The rate(s) quoted against the work shall remain firm during the entire Contract period.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 87 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

7.11 Taxes and Duties i. The price quoted shall be inclusive of all applicable taxes, duties, levies as applicable (as per the format of the Financial Proposal), which shall be paid on production of documentary evidences for the same. ii. Bidders shall quote the rates as well as all taxes and duties based on the concessional exemption that can be availed by the Bidder. iii. Statutory variations in the tax shall be permitted as under: (A) Statutory variations during original contractual completion period :  If any increase takes place in taxes and duties due to statutory variation, then GIPCL shall admit the same on production of documentary evidences.  If any decrease takes place in taxes and duties due to statutory variation, the same shall be passed on to GIPCL or GIPCL shall admit the decreased rate of taxes and duties while making the payment.

(B) Statutory variations beyond original contractual completion period: (i) If reasons for extension of contractual completion period is attributable solely to GIPCL, the provisions of (A) above shall apply. (ii) If reasons for extension of contractual completion period is attributable to Bidder, then: (a) If any increase takes place in taxes and duties due to statutory variation, then GIPCL shall not admit the same; however GIPCL shall admit the taxes and duties at the rate prevailing during payment of last invoice raised during original contract completion period. (b) If any decrease takes place in taxes and duties due to statutory variation, the same shall be passed on to GIPCL or GIPCL shall admit the decreased rate of taxes and duties while making the payment. iv. Variation on account of exchange rate will not be payable.

7.12 Labour Engagement i. The Contractor shall be responsible to provide all wages and allied benefits to its labours engaged for execution of the work. The Contractor shall remain liable to the authorities concerned for compliance of the respective existing rules and applicable regulations of the government for this purpose and shall remain liable for any contravention thereof. ii. Strict adherence of various applicable labour laws like the Factories Act, Minimum Wages Act, ESI Act, Payment of Wages Act, the Workman‘s Compensation Act, EPF Act, Contractor labour (Regulation & Abolition) Act,1970 and all other statutory requirements as amended from time to time to the entire satisfaction of Central/State Govt. Authorities, shall be the responsibility of the Contractor and he shall have to make good loss, if any, suffered by GIPCL on account of default in this regard by the Contractor.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 88 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

iii. The contractor is encouraged to use local manpower as per the local statutory (labour) requirement, if any. iv. The successful Bidder shall obtain license under Contract Labour (Regulation & Abolition) Act 1970 (if applicable), read with rules framed there under and furnish the same to the Company within 15 days of the issue of Detailed order of Contract failing which the detailed order of contract shall be cancelled/terminated without any further notice and its EMD and/ or performance guarantee shall be forfeited.

7.13 Termination on the death of Contractor Without prejudice to any of the rights or remedies under this contract, if the Contractor dies, the Engineer-in-Charge on behalf of GIPCL shall have the option of terminating the Contract without compensation to the contractor.

7.14 Retired Government servants taking to Contract No engineer of gazette rank or other gazette officer employed in engineering or administrative duties in the Engineering Department of the Company is allowed to work as contractor for a period of two years of his retirement from Company's service without the previous permission of the Company. This contract is liable to be cancelled if either the contractor or any of his employees is found at any time to be a person who had not obtained the permission of the Company as aforesaid before submission of the tender or engagement in the contractor's service as the case may be.

7.15 Miscellaneous i. MACHINERY: The Contractor shall at his own expense, supply all tools, plant and equipments required for execution of work, as specified in the tender document. ii. On completion of work, the site shall be cleaned by the contractor of all materials, temporary debris, rubbish and equipment‘s, belonging to the contractor at no extra cost. The site and surroundings shall be handed over in a neat and clean condition. In case of any failure by the contractor, GIPCL will get inside cleared at risk and cost of the Contractor. iii. The proposed site for work comes under the control of BSF, Permission from BSF is required to work in that area. The Contractor shall take care of all statutory, local clearance, approvals, permissions etc. iv. Electric power and Water supply shall be in the scope of Contractor v. There is no habitation in the nearby area.The habitation is only before India bridge, near Khavda towards area.

--- End of Section ---

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 89 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

Appendix-1: Format for covering Letter

To, Shri S N Purohit Chief General Manager (RE & BO), Gujarat Industries Power Company Ltd PO: Petrochemicals -391346 Dist. Vadodara, Gujarat, India

Bid No:

From :

To, Gujarat Industries Power Company Ltd, P.O petrochemicals, Dist Vadodara Gujarat 391 346

I/We, the undersigned have carefully examined and understood the tender document. I /we hereby agree to carry out work & provide services as described in scope of work & other parts of tender.

In case of award of work, we shall complete the work as per the prescribed schedule in the tender

Authorised signatory Name & designation with seal

Date :

Place

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 90 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

Appendix-2 Details of Bidder

To, Shri S N Purohit Chief General Manager (RE & BO), Gujarat Industries Power Company Ltd PO: Petrochemicals -391346 Dist. Vadodara, Gujarat, India

Sub: Submission of the RFP Document No. GIPCL/Geotechnical investigation & Topographical survey/2020 dated ____

1 (a) Name of the Bidder: (b) Registered Office Address: (c ) Telephone No. & Fax No. (d) E-mail ID & Website : (e) GST No. (Copy Attached: Yes/No): (f) Income Tax Permanent Account No (Copy of PAN Attached: Yes /No):

2 Details of individual(s) who will serve as the point of contact/ communication for company: (a) Name: (b) Designation: (c) Company: (d) Address: (e) Telephone Number: (f) E-mail address:

3 Particulars of the Authorised Signatory of the Bidder: (a) Name: (b) Designation: (c) Address: (d) Telephone Number: (e) E-mail address:

Company Seal Signature of Bidder

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 91 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

Appendix-3 Format of details of similar Technical experience

INSTRUCTIONS:

a) The Bidder shall indicate similar experience of Geotechnical investigation and Topographical survey work herein. b) The Bidder shall duly attach the Letter of Award (LOA) and Certificate of Satisfactory Completion of Work from the Client.

1 Details of similar work executed during last 3 years: Total Sr. Project Site Year of No. of orders in Area(Ha) of No. details completion hand Survey 1 2 3

2 Financial Information‘s: Financial data for last three audited Financial Year Sr. Description FY2017-18 FY2018-19 FY2019-20 No. 1 Current Assets 2 Current Liabilities 3 Working Capital(1-2) 4 Annual Turnover 5 Paid Up Share capital Free Reserves and 6 Surplus 7 Networth of Bidder Funds 8 Profits before Taxes 9 Return on Equity Attached are copies of the last three audited balance sheets, including all related notes, and income statements as indicated above, complying with the following:

i) All such documents reflecting the financial situation of the Bidder. ii) Historic financial statements must be audited by a certified Chartered Accountant and must be complete, including all notes to the financial statements. iii) Historic financial statements must correspond to accounting periods already completed and audited (no statement for partial periods shall be accepted). iv) Filling up of all information is mandatory. Not providing any information or not in line with audited reports accompanied shall make Bid liable for rejection.

Company Seal Signature of Bidder

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 92 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

Appendix-4 Details of Qualified Technical Staff

Total years of Sr. Relevant Additional Name relevant Remarks No. Qualification Certifications Experience 1 2 3 4 5 6

Note:

Kindly submit copies of resumes and appropriate certifications with this sheet. Additional sheets may be used to provide accurate information.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 93 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

Appendix-5 Declaration of Compliance

To, Shri S N Purohit Chief General Manager (RE & BO), Gujarat Industries Power Company Ltd PO: Petrochemicals -391346 Dist. Vadodara, Gujarat, India

Sub: Declaration of compliance for the Bid for detailed Geotechnical Investigation and Topographical survey of proposed Solar/ Wind/ Hybrid Projects at Great Rann of Kutch area, in the state of Gujarat.

Dear Sir,

This is to certify that I, ______, am the duly authorized signatory appointed on behalf of my organization to submit this Bid. The authorization letter is attached herewith.

I agree to all the terms and conditions set forth in this RFP Document.

If awarded the job, the job work shall also conform to the terms and conditions, as well as specifications indicated in the RFP documents and as finally indicated by the Evaluation Committee.

I further certify that all the information provided in this document is accurate to the best of my knowledge.

Signature: ______Designation: ______

Name: ______Organization: ______

Address: ______Phone: ______

Email: ______

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 94 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

Appendix- 6 No Deviation Certificate

To, Shri S N Purohit Chief General Manager (RE & BO), Gujarat Industries Power Company Ltd PO: Petrochemicals -391346 Dist. Vadodara, Gujarat, India

Sub: No deviation certificate regarding Bid for detailed Geotechnical Investigation and Topographical survey of proposed Solar/ Wind/ Hybrid Projects at Great Rann of Kutch area, in the state of Gujarat.

Dear Sir,

We______

(Bidder‘s name), confirm our acceptance to all terms and conditions mentioned in the RFP Document, and all subsequent clarifications, in totality and withdraw all deviations raised by us, if any.

______

SEAL AND SIGNATURE OF BIDDER

Date: ______

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 95 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

Appendix- 7 Declaration on Bidder‟s relation to Directors

To, Shri S N Purohit Chief General Manager (RE & BO), Gujarat Industries Power Company Ltd PO: Petrochemicals -391346 Dist. Vadodara, Gujarat, India

Sub: Declaration of relationship with Directors/any other employee/associates. Dear Sir,

This has reference to our proposed Contract regarding Bid for detailed Geotechnical Investigation and Topographical survey of proposed Solar/ Wind/ Hybrid Projects at Great Rann of Kutch area, in the state of Gujarat to be entered into Agreement with Gujarat Industries Power Company Limited

For the purpose of Section 297/299 of the Companies Act, 1956 we certify that to the best of my/our knowledge;

1) I am not a relative of any Director of GIPCL;

2) We are not a firm in which a Director of GIPCL or its relative is a partner;

3) I am not a partner in a firm in which a Director of GIPCL, or its relative is a partner;

4) We are not a private company in which a Director of GIPCL is a member or director;

5) We are not a company in which Directors of GIPCL hold more than 2% of the paid-up share capital of our company or vice-versa.

______Authorised Signatory of the Contracting Party

Place:

Date:

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 96 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

Appendix- 8 Format of Power of Attorney as Authorized Signatory

(On a non-judicial stamp paper of appropriate value) Know all men by these presents, We … (name of the firm and address of the registered office) do hereby irrevocably constitute, nominate, appoint and authorise Mr. / Ms (Name),son/daughter/wife of ……………………………… and presently residing at…………………………………..,who is presently employed with us and holding the position of ………………………….., as our true and lawful attorney (hereinafter referred to as the ―Attorney‖) to do in our name and on our behalf, all such acts, deeds and things as are necessary or required in connection with or incidental to submission of our Bid for detailed Geotechnical Investigation and Topographical survey of proposed Solar/ Wind/ Hybrid Projects at Great Rann of Kutch area, in the state of Gujarat, pursuant to the RFP document no. ______issued by Gujarat Industries Power Company Limited (―GIPCL‖) including but not limited to signing and submission of all applications, Bids and other documents and writings, participate in Bidders‘ and other conferences and providing information / responses to the Company, representing us in all matters before the Company, signing and execution of all contracts including the Contract Agreement and undertakings consequent to acceptance of our Bid, and generally dealing with the Company in all matters in connection with or relating to or arising out of our Bid for the said Project and/or upon award thereof to us and/or till the entering into of the Contract Agreement with GIPCL.

AND we hereby agree to ratify and confirm and do hereby ratify and confirm all acts, deeds and things done or caused to be done by our said Attorney pursuant to and in exercise of the powers conferred by this Power of Attorney and that all acts, deeds and things done by our said Attorney in exercise of the powers hereby conferred shall and shall always be deemed to have been done by us.

IN WITNESS WHEREOF WE, ………………………….., THE ABOVE NAMED

PRINCIPAL HAVE EXECUTED THIS POWER OF ATTORNEY ON THIS

……………………… DAY OF…………………….., 20.….. For……………………………..

(Signature, name, designation and address)

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 97 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

Witnesses:

1.

2.

Accepted Notarised

(Signature, name, designation and address of the Attorney)

Notes: 1. The mode of execution of the Power of Attorney should be in accordance with the procedure, if any, laid down by the applicable law and the charter documents of the executant(s) and when it is so required, the same should be under common seal affixed in accordance with the required procedure.

2. Wherever required, the Bidder should submit for verification the extract of the charter documents and documents such as a board or shareholders resolution/ power of attorney in favour of the person executing this Power of Attorney for the delegation of power hereunder on behalf of the Bidder. 3. For a Power of Attorney executed and issued overseas, the document will also have to be legalised by the Indian Embassy and notarised in the jurisdiction where the Power of Attorney is being issued. However, the Power of Attorney provided by Bidders from countries that have signed the Hague Legislation Convention, 1961 are not required to be legalised by the Indian Embassy if it carries a conforming Apostle certificate. 4. This format for Power of Attorney is for reference and in case a Bidder has a different format approved by their management then the same can submitted.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 98 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

Appendix- 9 Format of Summary of Audited Financial statements

To, Shri S N Purohit Chief General Manager (RE & BO), Gujarat Industries Power Company Ltd PO: Petrochemicals -391346 Dist. Vadodara, Gujarat, India Sub: Summary of Financial Statement

Ref: Request for Proposal for Bid for detailed Geotechnical Investigation and Topographical survey of proposed Solar/ Wind/ Hybrid Projects at Great Rann of Kutch area, in the state of Gujarat

Dear Sir,

This is to certify that...... [Insert name of Bidder] (The ―Bidder‖) ‖ having its Registered Office at...... [Insert Registered Address of the Bidder] with PAN No...... [Insert PAN No. of the Bidder] is in the business of...... [Insert briefly the nature of the business], has recorded the following turnovers and net worth:

For official use Financial Year Turnover (in INR) Net worth ( in INR) Audited Statement attached 2017-18 Yes/ No 2018-19 Yes/ No 2019-20 Yes/ No

All figures indicated herein are arrived from the Audit Reports of the Bidder duly submitted to the Income Tax Department.

Sincerely yours,

[Official seal of the Chartered Accountant] ......

[Insert Name of the Chartered Accountant]

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 99 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

Date: [Insert address and contact information of the Chartered Accountant]

Place:

All figures indicated herein are calculated as per the guidelines mentioned in the Tender. NOTES: A. If the Bidder is seeking financial qualification based on the financial standing of the Parent Company, then a similar certificate summarizing the financial statement of the Parent Company shall be attached by the Bidder as a part of the Bid. B. All audited statements to be attached by the Bidder as a part of the Bid.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 100 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

Appendix- 10 (a) Format of Bank Guarantee for EMD

[To be on non-judicial stamp paper of Rupees One Hundred Only (INR 100/-) or appropriate value as per Stamp Act relevant to place of execution, duly signed on each page. Foreign entities submitting Bid are required to follow the applicable law in their country]

Reference No. …………….Bank Guarantee No. ……………. Dated: …………….

EMD BANK GUARANTEE FORMAT FOR TENDER /RFP No.______(BANK GUARANTEE ON NON-JUDICIAL STAMP PAPER OF Rs.100) WHEREAS M/s. ______(Name and Address of the Firm) having their registered Office at ______(Address of the Firm‘s registered Office) (hereinafter called the Tenderer) wish to participate in the Tender No.______for ______of (supply / Erection / Supply & Erection / Work) of ______(Name of the material / equipment / work) for ______Gujarat Industries Power Company Limited and WHEREAS a Bank Guarantee for (hereinafter called the ―Beneficiary‖) Rs. ______(Amount of EMD) valid till ______(mention here date of validity of this Guarantee) which is required to be submitted by the Tenderer along with the Tender.

We, ______(Name of the Bank and address of the Branch giving the Bank Guarantee) having our registered Office at ______(Address of Bank‘s registered Office) hereby gives this Bank Guarantee No. ______dated ______and hereby agree unequivocally and unconditionally to pay immediately on demand in writing from the Gujarat Industries Power Company Limited or any Officer authorized by it in this behalf any amount not exceeding Rs.______(amount of EMD) ( Rupees ______) (in words) to the said Gujarat Industries Power Company Limited on behalf of the Tenderer.

We, ______(Name of the Bank) also agree that withdrawal of the Tender or part thereof by the Tenderer within its validity or non-submission of Security Deposit by the Tenderer within one month from the date of Tender or a part thereof has been accepted by the Gujarat Industries Power Company Limited would constitute a default on the part of the Tenderer and that this Bank Guarantee is liable to be invoked and encashed within its validity by the Beneficiary in case of any occurrence of a default on the part of the Tenderer and that the encashed amount is liable to be forfeited by the Beneficiary. This agreement shall be valid and binding on this Bank upto and inclusive of ______(mention here the date of validity of Bank Guarantee) and shall not be terminated by notice or by Guarantor change in the constitution of the Bank or the Firm of Tenderer or by any reason whatsoever and our liability hereunder shall not be impaired or discharged by any extension of time or variations or alterations

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 101 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

made, given, conceded with or without our knowledge or consent by or between the Tenderer and the Gujarat Industries Power Company Limited. ―Notwithstanding anything contrary contained in any law for the time being in force or banking practice, this Guarantee shall not be assignable, transferable by the beneficiary (i.e. GIPCL). Notice or invocation by any person such as assignee, transferee or agent of beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee can be made only by the beneficiary directly.‖ NOT WITHSTANDING anything contained hereinbefore our liability under this Guarantee is restricted to Rs. ______(amount of EMD) (Rupees______(in words). Our Guarantee shall remain in force till ______(date of validity of the Guarantee). Unless demands or claims under this Bank Guarantee are made to us in writing on or before ______(date should be 1 month after the above validity period of BG), all rights of Beneficiary under this Bank Guarantee shall be forfeited and we shall be released and discharged from all liabilities there under.

Place: Date: (Please mention here complete Postal Address of Bank with Branch Code, Signature of the Bank‘s authorized Signatory Telephone and Fax Nos) with official seal.

______

INSTRUCTIONS FOR FURNISHING BANK GUARANTEE i) The Bank Guarantee validity should be 180 days from last date of Bid submission ii) The Bank Guarantee by Bidders will be given on non-judicial stamp paper as per stamp duty applicable at the place where the Tender has emanated. The non-judicial stamp paper should be in name of the issuing bank. iii) The Bank Guarantee by Bidder will be given from Nationalized/Scheduled bank as per Appendix-11. iv) This bank guarantee/ all further communication relating to the bank guarantee should be forwarded to Gujarat Industries Power Company Limited, PO:Petrochemical-391346, Dist.: Vadodara, Gujarat only. v) The full address along with the Telex/Fax No. and email address of the issuing bank to be mentioned.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 102 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

Appendix- 10 (b) Format of Bank Guarantee for Security deposit /Performance Bank Guarantee

[To be on non-judicial stamp paper of Rupees One Hundred Only (INR 100/-) or appropriate value as per Stamp Act relevant to place of execution, duly signed on each page. Foreign entities submitting Bid are required to follow the applicable law in their country]

Reference No. …………….Bank Guarantee No. ……………. Dated: …………….

(On stamp paper of Rs.100/-) FORMAT OF BANK GUARANTEE FOR SECURITY DEPOSIT/ PERFORMANCE BANK GUARANTEE. We, Bank of ______here by agree unequivocally and unconditionally to pay immediately on demand in writing from the Gujarat Industries Power Company Limited or any Officer authorized by it in this behalf any amount up to and not exceeding Rs.______(in words) Rupees to the said Gujarat Industries Power Company Limited on behalf of M/s.______who have entered into a contract for the supply/works specified below: L.O.I. No. ______dated

This agreement shall be valid and binding on this Bank upto and inclusive of ______and shall not be terminable by notice or by change in the constitution of the Bank or the firm of Contractors / Suppliers or by any other reasons whatsoever and our liability hereunder shall not be impaired or discharged by any extension of time or variations or alterations made, given conceded or agreed, with or without our knowledge or consent, by or between parties to the said within written contract.

―Notwithstanding anything contrary contained in any law for the time being in force or banking practice, this Guarantee shall not be assignable, transferable by the beneficiary (i.e. GIPCL). Notice or invocation by any person such as assignee, transferee or agent of beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee can be made only by the beneficiary directly.‖

―NOTWITHSTANDING‖ anything contained herein before, our liability under this guarantee is restricted to Rs.______(Rupees ______only). Our guarantee shall remain in force until ____(Date of validity of the Guarantee). Unless demands or claims under this Bank Guarantee are made to us in writing on or before_____ (Date of validity of the Guarantee), all rights of Beneficiary under this Bank Guarantee shall be forfeited and we shall be released and discharged from all liabilities there under;

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 103 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

Place: Date: INSTRUCTIONS FOR FURNISHING PERFORMANCE BANK GUARANTEE

 The Bank Guarantee by Bidders will be given on non-judicial stamp paper as per stamp duty applicable at the place where the Tender has emanated. The non-judicial stamp paper should be in name of the issuing bank.  The Bank Guarantee by Bidder will be given from bank as per Appendix-11 only.  This Bank Guarantee/ all further communication relating to the bank guarantee should be forwarded to Gujarat Industries Power Company Limited, PO:Petrochemical-391346, Dist.: Vadodara, Gujarat.  The full address along with the Tele/Fax No. and email address of the issuing bank to be mentioned.  The Bank Guarantee validity should be 06 months from the date of issue of LOI.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 104 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

Appendix- 11 List of Banks (for Bank Guarantee)

Bank Guarantee from the following Banks will be acceptable for GIPCL

SCHEDULED PUBLIC SECTOR SCHEDULED FOREIGN BANKS BANKS (INDIAN) 1. American Express Bank Ltd. 1. State Bank of India. 2. Bank of American NT & SA 2. State Bank of Bikaner and Jaipur 3. Bank of Tokyo Ltd. 3. State Bank of Hyderabad 4. BNP Paribas 4. State Bank of Mysore. 5. Barclays Bank Plc 5. State Bank of Patialia. 6. Citi Bank NA. 6. State Bank of Travancore. 7. Deutsche Bank A.G. 7. Allahabad Bank 8. Hongkong & Shanghai Banking 8. Andhra Bank Corpn. 9. Bank of Boroda 9. Standard Chartered Bank 10. Bank of India 10. JP Morgan Chase Bank NA 11. Bank of Maharashtra 12. Canara Bank 13. Central Bank of India 14. Corporation Bank 15. Dena Bank 16. Indian Bank 17. Oriental Bank of Commerce 18. Punjab National Bank 19. Punjab and Sind Bank 20. Syndicate Bank 21. Union Bank of India 22. UCO Bank 23. Vijaya Bank. 24. IDBI Bank SCHEDULED PRIVATESECTOR BANKS (INDIAN)

1. ING Vysya Bank 2. Axis Bank Ltd. 3. ICICI Bank 4.HDFC Bank 5. IndusIand bank 6. Kotak Mahindra Bank

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 105 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

Appendix- 12 Form of declaration of eligibility

(On the letter head of Company)

Ref. No.: Date:

I/ We, M/s ………………………………… hereby certify that I/we have not been declared blacklisted/banned/de-listed/debarred from similar business by State/Central Govt. departments or Government Under takings in accordance with Clause No. 3.2.3 (iii) of RFP document No. GIPCL/Geotechnical investigation & topographical survey/2020 on Banning of Business Dealings.

(Seal & Signature of the Bidder)

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 106 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

Appendix- 13 Format Schedule of Quantities for Geotechnical Investigation Including Laboratory Testing.

Important Note:

1. The Bidders specific attention is drawn to Clause of (RATES AND MEASUREMENTS) of the specification. It will be understood that the bidder has fully studied the specification particular prior to quoting his rates below. 2. All quantities given below are tentative and subject to change. Payment shall be made at quoted rates for actual quantities of work executed as approved by the Engineer. 3. The area spread is approximately 5000 hectare and the total no of borehole locations will be in the range of 20 to 30. 4. The area becomes marshy/swampy in the monsoon season, therefore the investigation will be done after the monsoon only in dry conditions. 5. The proposed area is at Great Rann of Kutch. The area is located on both sides of GJ SH 45 after the India bridge towards Indo-Pak border. Permission of BSF is required to work in that area. Permission to work in this area shall be in the scope of Contractor. 6. The area comes in the control of BSF; therefore there is no habitation in the nearby area. The habitation is available near Khavda area or near Bhuj. 7. Bidder has to strictly submit the price only on nprocure portal.

Schedule of Quantities for Geotechnical Investigation

Total Sr. Rate Description of Item Unit Qty. Amount No. (in Rs.) (In Rs) Mobilization of necessary boring equipment‘s, other in situ test equipments, men and materials to the project site for carrying out the geotechnical investigation and demobilization of the same after completion of all the field works Lump 1. Sum 1 etc all complete as per specification, drawing and as directed by the engineer. .

Setting up boring rig at each bore hole location as directed by Engineer in chage including Shifting of rig from one borehole to other 2. excluding first borehole on LAND. First setting Nos. 30 of each rig deployed will not be paid as it is a paid under 1 Note: Setting up boring rig at each borehole

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 107 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

location as decided by Engineer. (Any crisscross or back and forth movement of boring rig can take place. No additional compensation will be payable by the owner for such movements). (The arrangement shall include formation of local mound for creation of platform for borehole drilling in the event of any inundation in the area).boreholes covering 5000 Hectare land Making 150 mm nominal diameter boreholes at

various locations in all types of soil/sand/ash including hardened laterite, weathered rock and soft rock (RQD<25%) using suitable approved method of boring including chiselling, cleaning, providing casing pipe as required or as directed; performing Standard Penetration Test at every

1.5 m interval and at change of strata. The starting depth of performing SPT shall be 0.5m

below ground level. Collection of water samples

and disturbed samples, observation such as

ground water, etc., collection of undisturbed

3. soil/ash samples at every 1.5 m interval and at change of strata and sealing the container; transportation of all the collected samples to the laboratory and back filling of boreholes with bentonite-cement grout on completion of the same, complete as per specification and instructions of the Engineer, for depths below

natural ground level as given below: On Ground

a) From natural ground level to 15.0 m depth 450 m b) Below 15.0m to 30.0 m depth m 450 c) Below 30.0m to 50.0 m depth 600 m

Boring through boulders and rock strata using NX size Tungsten carbide bit or diamond bit and 4. m 60 collecting the rock core in wooden boxes in a proper sequence. Excavating trial pits at various locations of size specified by Engineer up to 4.0 m depth in all types of soils and 1.0m depth in weathered rock which can be excavated with pick axe/crow bar, including sheeting or shoring the sides for the purpose of stability, dewatering and maintaining 5. the pit dry at all times, handling, transporting and Cu.m. 125 stacking of excavated material upto a lead of at least 50.0 m, collecting disturbed/undisturbed samples at 1.0 m intervals and conducting in-situ density tests at every 1.0 m intervals and at final depth, collecting water samples and transporting all soil and water samples to the laboratory,

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 108 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

backfilling of the pit as per the directions of the Engineer, complete as per specification. Conducting field permeability test at various locations in bore holes or pits at various depths including providing packers as required, etc. as per specification and directions of the Engineer. Cost of borehole and cost of pits, maintaining 6. Each 30 them dry and back-filling shall be paid for separately as per Item Nos. 3 and 5.

a) Pump in test in borehole by constant head or falling head method. Conducting Field vane shear test at various locations and at specified depths including 7. collection of disturbed soil samples at the test Each 30 depth all complete as per specification and instructions of the Engineer. Conducting field CBR tests (in saturated condition) at various locations, and depth, all 8. Each 15 complete including saturation as per specification and directions of the Engineer Conducting Electrical resistivity tests at various 9. locations all complete as per specification and Each 15 directions of the Engineer. Conducting various laboratory tests on soil samples at an approved laboratory including preparation of soil samples to determine the 10. following properties of soil, preparation & submission of report of geotechnical investigation and foundation recommendation etc. all complete as per specification. a) Natural Moisture content, bulk and dry Each 50 density for UDS Samples b) Sieve Analysis Each 150 c) Hydrometer or Pipette Analysis Each 100 d) Liquid Limit and Plastic Limit (Atterberg‘s Each 150 Limits and plasticity index (LL, PL and PI) e) Shrinkage Limit and shrinkage ratio Each 20 f) Specific gravity Each 60 g) Standard proctor compaction test Each 30 h) Swell Pressure Each 30 i) Free Swell Index Each 30 j) Unconfined Compressive strength test on undisturbed soil samples or soil Each 30 samples compacted to specified density. k) Direct Shear Test Each 30 l) Triaxial Compressive strength including unconsolidated undrained test, Each 30 Consolidated undrained test, Consolidated drained test m) One Dimensional consolidation test wilh Each 30

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 109 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

all relevant information n) Chemical Analysis of soil including Each 30 sulphates, chlorides, ph value etc. o) Crushing strength of rock on specimens 5 of NX size. Conducting chemical tests on water samples to determine the Carbonate, Sulphate, chloride, and Nitrate contents, pH value, turbidity, organic 11. Each 10 matter and any other chemicals harmful to foundation material, all complete as per specification. 12. Total Price without Taxes duties in Rs. 13. Taxes & duties in Rs. 14. Total Price inclusive of taxes and duties in Rs. (A)

Separate item for Report is not included. But the Contractor is to submit the geotechnical investigation report soft copy as well as 03 sets of hard copy of detail geotechnical report along with recommendation and analysis as per Specifications. The above rate quoted by the bidders shall be including preparation and submission of report.

1. Individual quantities can vary to any extent 2. Billing will be as per actual measurement /executed & certified by ENGINEER 3. Report shall be submitted as per given in Report section

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 110 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

Appendix- 14 Format Schedule of Quantities for Contour and Topographic Survey and Total Contract value

Important Note:

1. All quantities given below are tentative and subject to change. Payment shall be made at quoted rates for actual quantities of work executed as approved by the Engineer. 2. The area spread is approximately 5000 hectare 3. The area becomes marshy/swampy in the monsoon season, therefore the investigation will be done after the monsoon only in dry conditions. 4. The proposed area is at Great Rann of Kutch. The area is located on both sides of GJ SH 45 after the India bridge towards Indo-Pak border. Permission of BSF is required to work in that area. Permission to work in this area shall be in the scope of Contractor. 5. The area comes in the control of BSF, therefore there is no habitation in the nearby area. The habitation is available near Khavda area or near Bhuj. 6. Bidder has to strictly submit the price only on nprocure portal.

Description Qty Unit Unit Total Sr. Rate Amount No. (Rs) (Rs) TOPOGRAPHIC AND CONTOUR SURVEY Mobilisation of all instruments including DGPS (duel frequency, real time) & Total station survey equipments, drawings, office material, personnel etc. to site and demobilisation of the 1. 1 LS same after completion of all field work etc. complete. Agency to note that scope of work including drawing /deliverable is completed within 15 days from date of mobilization Executing all field survey work on dry, wet and water logged land, including determination of Latitude and Longitude at specified points (UTM System as well as degrees), as decided by the OWNER/CONSULTANT, within the area to be surveyed, preparation of surface plan covering features like houses and other construction, 2. per manent structures, roads, power lines, 5000 Ha telephone lines, Reservoirs, natural nullahs, drains, water courses, access road etc are to be surveyed based at Grid intervals of 50mx50m. or closer interval where sudden change in ground profile. Plotting the levels at all grid points and plotting of contour mapping at 0.5M interval. Contour generation should be

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 111 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

done with computer. Grid and projection in the Universal Transverse Mercator (UTM-WGS 84) coordinates based on the transverse Mercator projection system as well as Lat-long for the whole project area as per specifications and drawings etc. complete, Painting at all such above locations shown by OWNER / CONSULTANT at site etc., all as per the specifications etc. complete. All coordinates to be in UTM and compatible to world GPS and all levels to be referenced /connected to nearest Authentic Survey of India /GTS Bench mark as per IS:5497 /applicable IS for survey works. Construction of Permanent Benchmark Pillars (PBM), grid pillar, boundary pillar with 150 mm dia. Hume Pipes 1500 mm long embedded atleast 1000 mm into the Virgin ground and encased with PCC 1:3:6 using 40mm aggregate and including fixing a 120mm x 120mm x 10mm thick mild steel plate etc. complete including all 3. material, labour, excavation, backfilling, painting 100 Nos

and, permanent marking of level & co-ordinate etc. complete. all as per the Specifications inscribed on the plate, etc. complete. Locations to be decided at site in consultation with OWNER. (Note: The same shall be constructed at site as directed by the OWNER/CONSULTANT). Preparation of computer using software of AutoCAD to scale 1:1 (i.e. 1 Unit = 1 M.) & required scale for plotting can be obtained by giving the requisite scale factor in „PLOT‟ command. The final plotted sheets shall be in scale of RF 1:2500 for details, in case no. of sheets are more than one in scale RF 1:2500 then shall be prepare an Index plan to a 4. 1 LS suitable scale to fit entire area in A1 or A0 size sheet on co-ordinates basis. The detail sheet shall depict levels as taken, contours at requisite interval, all details of various features, survey boundary & corners pillars etc. An Index plan will depict all the above details except spot levels. The scope of work also including preparation of contour plan showing

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 112 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

all spot level at grid interval 50 mtrX50 mtrs and plotting contour maping at 0.50 mtr. Interval incorporating established co-ordinate System, showing existing facilities in and around the proposed plot and approach road, HFL etc Furnishing editable soft copies of all Drawings and documents as well as hard copies, CD containing all the drawings, calculations and documents all as per OWNER requirements. Additional areas to be surveyed as identified by Rate Per 5. the OWNER. only Ha. 6. TOTAL in Rs.

7. GST at 18% as per GoI Regulations in Rs. 8. Any other taxes duties if any in Rs.

9. GRAND TOTAL in Rs. (B)

NOTE

4. Individual quantities can vary to any extent 5. Billing will be as per actual measurement /executed & certified by ENGINEER 6. Toposurvey drawing should be submitted in both hard copy (one copy in tracing , 2 sets of good quality colour prints Minimum A2 size) as well as Soft copy (editable- ACAD , kml format) and non-editable (PDF) 7. Drawing should be both in UTM (m) as well as lat-long (degrees) with Northing - Easting grids marked

Total Contract Value: Sr. Particular Amount in Rs. No. 1 Total Price for Geotechnical Investigation in Rs. (A) 2 Total Price for Contour and Topographic Survey (B) Total contract value in Rs.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 113 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

Appendix- 15: Format for Advance Payment Guarantee

(To be submitted by Bidder on a Non-Judicial Stamp Paper of Appropriate Value) Date: To,

Gujarat Industries Power Company Limited

PO:Petrochemicals-391346,

Dist.: Vadodara, Gujarat, India

Subject: Bank Guarantee No. ______

Whereas ______, a incorporated under ______having its registered office at ______(hereinafter referred to as the “Contractor/Consultant ” which expression shall, unless repugnant to the context or meaning thereof, include its successors and permitted assigns) have entered into Agreement for the______LoI No.______, dated ______with Gujarat Industries Power Company Limited (GIPCL), having its registered office at (Insert address of respective company

Whereas, under the Agreement a payment of 10 % (ten percent) of the Contract Value is payable in advance to the Contractor/Consultant, as a security for which the Consultant is required to furnish to GIPCL an irrevocable, unconditional, first demand bank guarantee issued for a sum equal to 10% (ten percent) of the Contract Value.

And whereas, ______(Insert Bank name) having its registered office at ______and a branch office at ______, India, hereinafter referred to as the “Bank” (which expression shall, unless repugnant to context or meaning, be deemed to mean and include its successors), being a Nationalised bank of India and acceptable to GIPCL, has at the request of the Contractor agreed to issue this advance re payment bank guarantee in favour of GIPCL.

Now therefore this Bank Guarantee witnessed as follows:

1. The Bank hereby undertakes the pecuniary responsibility of the Contractor to GIPCL for the repayment of the Work Advance by the Contractor to GIPCL and hereby issues in favour of GIPCL this irrevocable and unconditional work advance payment bank guarantee GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 114 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

(hereinafter referred to as the “Guarantee”) on behalf of the Contractor in the amount of ______Indian Rupees (insert an amount equal to ten percent (10 %) of the Contract Value).

2. The Bank for the purpose hereof unconditionally and irrevocably undertakes to pay to GIPCL without any demur, reservation, cavil, protest or recourse, immediately on receipt of first written demand from GIPCL, any sum or sums (by way of one or more claims) not exceeding in the aggregate the amount of ______(insert an amount equal to ten percent (10 %) of the Contract Value) without GIPCL needing to prove or to show to the Bank grounds or reasons for such demand for the sum specified therein and notwithstanding any dispute or difference between GIPCL and the Contractor in respect of the performance of the Agreement or moneys payable by Contractor to GIPCL or any matter whatsoever related thereto.

3. The Bank acknowledges that any such demand by GIPCL of the amounts payable by the Bank to GIPCL shall be final, binding and conclusive evidence in respect of the amount payable by the Contractor/consultant to GIPCL.

4. The Bank hereby waives the necessity for GIPCL from demanding the aforesaid amount or any part thereof from the Contractor and also waives any right that the Bank may have of first requiring GIPCL to pursue its legal remedies against the Contractor, before presenting any written demand to the Bank for payment under this Guarantee.

5. The Bank further unconditionally agrees with GIPCL that GIPCL shall be at liberty, without the Bank’s consent and without affecting in any manner the Bank’s obligation under this Guarantee, from time to time, to:

a. Vary and / or modify any of the terms and conditions of the Agreement. b. Extend and / or postpone the time for performance of the obligations of the Contractor under the Agreement. c. Forbear or enforce any of the rights exercisable by GIPCL against the Contractor under the terms and conditions of the Agreement.

and the Bank shall not be relieved from its liability by reason of any such act or omission on the part of GIPCL or any indulgence by GIPCL to the Contractor or other thing whatsoever which under the law relating to sureties, but for this provision, would have the effect of relieving the Bank of its obligations under this Guarantee 6. The Bank’s obligations under this Guarantee shall not be reduced by reason of any partial performance of the Agreement. The Bank’s obligations shall not be reduced by any failure by GIPCL to timely pay or perform any of its obligations under the Agreement.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 115 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

7. Any payment made hereunder shall be made free and clear of and without for, or on account of, any present or future taxes, levies, imposts, duties, charges, fees, commissions, deductions or withholdings of any nature whatsoever and by whomsoever imposed, and where any withholding on a payment is required by law, the Bank shall comply with such withholding obligations and shall pay such additional amount in respect of such payment such that GIPCL receives the full amount due hereunder as if no such withholding had occurred.

8. This Guarantee shall be a continuing bank guarantee and shall not be discharged by the change in constitution of any member of the Contractor and the Guarantee shall not be affected or discharged by the liquidation, winding up, bankruptcy, re organisation, dissolution or insolvency of any member of the Contractor or any other circumstances whatsoever.

9. This guarantee shall be in addition to and not in substitution or in derogation of any other security held by GIPCL to secure the performance of the obligations of the Contractor under the Agreement.

10. The Bank agrees that GIPCL at its option shall be entitled to enforce this Guarantee against the surety, as a principal debtor in the first instance without proceeding at the first instance against the Contractor.

11. Without prejudice to any continuing liability to perform obligations under this Guarantee which have arisen prior thereto, the Bank shall be released from any further obligations arising hereunder after ______(insert the scheduled date of completion) unless this Guarantee is otherwise extended on account of failure to recover the entire Work Advance from the Contractor by the said date.

12. GIPCL may assign this Guarantee to any person and in such case GIPCL shall inform the Bank in writing. This Guarantee shall not be assigned or transferred by the Bank.

13. This Guarantee shall be construed and interpreted in accordance with and governed by the laws of India, and subject to Clause 13 above, the courts at Ahmedabad, Gujarat, India shall have jurisdiction over all matters arising out of or relating to this Guarantee.

14. The Bank has the power to issue this Guarantee in favour of GIPCL. The aggregate liability of the Bank under this Guarantee shall not under any circumstance exceed ______Indian Rupees (insert an amount equal to ten percent (10%) of the Contract Value).

15. Notwithstanding anything contained herein, this Guarantee shall be valid up to __/__/____. A written claim or demand shall be served upon us on or before the said date, after which this Guarantee shall become null and void.

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 116 of 117 survey/ 2020

BID FOR DETAILED GEOTECHNICAL INVESTIGATIONS, CONTOUR AND TOPOGRAPHICAL SURVEY OF PROPOSED SOLAR/WIND/HYBRID PARK AT GREAT RANN OF KUTCH AREA, GUJARAT

16. No action, event or condition, which by any Applicable Law should operate to discharge the Bank from liability hereunder, shall have any effect and the Bank hereby waives any right it may have to apply such law, so that in all respects its liability hereunder shall be irrevocable and, except as stated herein, unconditional in all respects.

17. Capitalised terms not otherwise defined herein shall have their respective meanings given such terms set forth in the Agreement.

In witness whereof, the bank, through its authorized officer, has set its hand and stamp on this ______day of ______20__.

SEAL AND SIGNATURE OF BANK REPRESENTATIVE

GIPCL/Geotechnical investigation & Topographical (Sign and Seal of Bidder) Page 117 of 117 survey/ 2020