RGB Spaceport News

Total Page:16

File Type:pdf, Size:1020Kb

RGB Spaceport News April 12, 2001 Vol. 40, No. 8 Spaceport News America’s gateway to the universe. Leading the world in preparing and launching missions to Earth and beyond. http://www-pao.ksc.nasa.gov/kscpao/snews/snewstoc.htm John F. Kennedy Space Center First Shuttle launch anniversary – April 12, 2001 Team members look back 20 years When Columbia lifted off the pad the morning of April 12, 1981, becoming the first Space Shuttle to launch – thousands of Kennedy Space Center team members watched with fervent emotions. The launch of an orbiter strapped to an external tank and two solid rocket boosters was a spectacle that had never been seen before. KSC workers knew they had contributed to the success of a new vehicle that would transform the space program. The new Space Transportation System program had been under development for 10 years, and the launch was a tremendous payoff. This space vehicle was no “one (See LAUNCH, Page 8) Crew: John W. Young, Commander Rollout: Columbia rolled to Pad Landing: April 14, 1981, at 10:21 a.m. Robert L. Crippen, Pilot 39-A on Dec. 29, 1980. PST, Edwards Air Force Base,Calif. STS-1 Backup: Joseph H. Engle, Commander Launch: Columbia launched on Mission duration: 37 orbits, two days, six Richard H. Truly, Pilot April 12, 1981, at 7 a.m. EST hours, 20 minutes, 53 seconds Page 2 SPACEPORT NEWS April 12, 2001 KSC director led processing efforts Dick Smith was KSC’s director when Columbia rolled out to the pad for her first launch. One of the biggest chal- Of course, it was a big media event, and the reporters wanted a quote from the Center lenges of the workforce dur- Director. He gave them one, but Smith, origi- nally from Decatur, Ala., asserts that they got it ing Dick Smith’s tenure as wrong. “I said ‘Ain’t it purty,’ but they quoted me as saying ‘Ain’t it pretty.” director of Kennedy Space Center Director at KSC from September 1979 Center was developing to August 1986, Smith first arrived just shortly after Columbia was delivered to KSC. Smith had ground processing routines been deputy director of the Marshall Space Flight Center, but was serving as the deputy and procedures for the or- associate administrator for Space Transporta- Former KSC Director Dick Smith is pictured in biters that have become so tion Systems at NASA Headquarters before he the Vehicle Assembly Building during the processing of Columbia for STS-1. arrived at KSC. streamlined today. It was a He was in much better condition than Colum- One of the biggest challenges of the bia, though, which still needed a lot of process- workforce during Smith’s tenure as director was slow, painful process. ing before its first launch. developing the ground processing routines and Smith remembers talking to one KSC em- procedures for the orbiters that have become so ployee, a grandfather, who fondly recounted streamlined today. It was a slow, painful because they forget the trivial things,” Smith bringing his young grandson out to the Shuttle process. observed. “KSC is unique in that a launch is Landing Facility to witness history unfolding: Every procedure was being done for the first like a crisis, a scheduled crisis. If you watch the Columbia perched atop the Shuttle Carrier time. Every step was like pulling a tooth. “We team closely, you see petty quarrels and Aircraft before its move into the Orbiter Pro- had a lot of toothaches,” Smith laughed. Then, squabbling fade away as the team heads into a cessing Facility. as now, KSC was very fortunate to have the launch. The team pulls together to handle the His grandson was unimpressed, however, and quality and dedication of the employees. crisis.” observed “that airplane sitting on top is sick.” “What brings people together is a crisis – Kay Grinter Launch director kept team ‘keyed up’ Despite the computer trouble that scrubbed the first launch attempt of Columbia on STS-1, “(STS-1) was the most George Page said the Kennedy Space Center team still felt fully prepared. satisfying program I ever “I felt a tremendous relief when Columbia did launch on the second attempt. We had worked worked on. To see it go and very hard, and I spent most of my awake time out here. To see it go so well was very satisfy- know it was safely on orbit, ing,” said Page, who served as launch director and then see it come back for the first three flights of the Shuttle program, starting with STS-1 in April 1981. to Earth – incredible.” Page had already worked for NASA for 18 years, as a spacecraft test conductor on the George Page Gemini Program; chief spacecraft test conductor STS-1 Launch Director George Page speaks to Launch Director, STS-1 for Gemini and Apollo launch operations; chief the media after the first Space Shuttle launch. of Spacecraft Operations Division for Apollo, was a challenging time. Everyone involved Skylab and ASTP launch operations; director of deserves a lot of credit.” That interest must be an inherited trait since, Cargo Operations; and director of Shuttle The distant future wasn’t a concern for those said Page, “my son works on the Shuttle Operation working to launch the first Shuttle. “Most of us program for NASA in California and my grand- The biggest challenge to make that first then were so wrapped up doing the job we son works on launches from the firing room at launch “was keeping everyone keyed up and didn’t think much into the future,” said Page. KSC.” ready to go,” Page said. “The schedule had “We didn’t think, though, that we would still be When asked for any final thoughts about dragged out – the original schedule was very flying Shuttle. We thought it would have launching STS-1, Page stated, “It was the most optimistic and we worked under a lot of pressure progressed to other vehicles.” satisfying program I ever worked on. To see it to meet it. We had trouble installing tile on the Page retired from NASA in 1984. He remains go and know it was safely on orbit, and then see vehicle, the solids of that size were new to us, on the Space Coast with continued interest in it come back to Earth – incredible.” there were new hardware and new systems. It the Shuttle launches and evolving program. – Anita Barrett April 12, 2001 SPACEPORT NEWS Page 3 Reyes’ team met tile challenges Ernie Reyes was enjoying his job in payload planning in 1979, working with both expendable “Not near enough credit has ever vehicles and to transition been given to all the people at the deployable payloads to the Space Shuttle program. end of the rope. We had strong His goal was to develop a technicians doing the job and a ground support system to meet the customer need for payloads to strong shop to support them.” arrive at the pad as close to launch as possible. Columbia, however, was to draw Ernie Reyes, Reyes away from that task after a Thermal Protection System Lead for STS-1 call from George Page, the Space Shuttle launch director. The installation of the thermal protec- tion tiles had run into difficulty and was behind schedule. A view of Columbia in an Orbital Making good progress on the Processing Facility at Kennedy payload ground support system, Space Center before the first Reyes was reluctant to change Shuttle launch. The orbital’s exterior assignments. But Page wanted looks damaged because it had lost Reyes to become the Kennedy many of its Thermal Protection Space Center “tile czar.” System tiles during a test flight “We don’t need any payloads if aboard its carrier aircraft at Edwards Air Force Base. the Space Shuttle doesn’t work,” launch director Page reminded The tile work for STS-1 was a Reyes. tremendous undertaking. At that Good point, and Reyes became time there were no computers to the NASA-KSC Thermal Protection help with the job. It was all done System lead. His job description with books of drawings, pencil, Jeff Andress, now a Thermal Protection System manager with was simply to get all the tiles in- paper and colored crayons. Tags United Space Alliance, was one of the first tile technicians hired. stalled on Columbia before launch. were affixed to tiles indicating Above, he takes a look at Columbia’s modern tile system. Initially the tiles were not some stage of repair or the status passing a required “pull test,” a of other work in progress. Tile technicians had hands full rigorous test to assure the tiles The technicians became proud of would not fall off Columbia during working on what looked like a huge Processing Columbia for the first Shuttle launch was a steep its first launch. jigsaw puzzle, wearing shirts that learning curve for everyone, especially those in tile installation. “Because the tiles had the read “Power to the Puzzle People.” “Tile installation was the most demanding, tedious process at consistency of Styrofoam, we were “Not near enough credit has ever KSC, “ recalled Dick Smith, director of the Kennedy Space Center popping them right off,” recalled been given to all the people at the when Columbia was being prepared for launch for the first time. Reyes. end of the rope. We had strong A 15-minute test flight of the orbiter-Shuttle Carrier Aircraft He joined the Thermal Protection technicians doing the job and a combination at Edwards Air Force Base resulted in extensive System team, NASA and Rockwell strong shop to support them.
Recommended publications
  • To All the Craft We've Known Before
    400,000 Visitors to Mars…and Counting Liftoff! A Fly’s-Eye View “Spacers”Are Doing it for Themselves September/October/November 2003 $4.95 to all the craft we’ve known before... 23rd International Space Development Conference ISDC 2004 “Settling the Space Frontier” Presented by the National Space Society May 27-31, 2004 Oklahoma City, Oklahoma Location: Clarion Meridian Hotel & Convention Center 737 S. Meridian, Oklahoma City, OK 73108 (405) 942-8511 Room rate: $65 + tax, 1-4 people Planned Programming Tracks Include: Spaceport Issues Symposium • Space Education Symposium • “Space 101” Advanced Propulsion & Technology • Space Health & Biology • Commercial Space/Financing Space Space & National Defense • Frontier America & the Space Frontier • Solar System Resources Space Advocacy & Chapter Projects • Space Law and Policy Planned Tours include: Cosmosphere Space Museum, Hutchinson, KS (all day Thursday, May 27), with Max Ary Oklahoma Spaceport, courtesy of Oklahoma Space Industry Development Authority Oklahoma City National Memorial (Murrah Building bombing memorial) Omniplex Museum Complex (includes planetarium, space & science museums) Look for updates on line at www.nss.org or www.nsschapters.org starting in the fall of 2003. detach here ISDC 2004 Advance Registration Form Return this form with your payment to: National Space Society-ISDC 2004, 600 Pennsylvania Ave. S.E., Suite 201, Washington DC 20003 Adults: #______ x $______.___ Seniors/Students: #______ x $______.___ Voluntary contribution to help fund 2004 awards $______.___ Adult rates (one banquet included): $90 by 12/31/03; $125 by 5/1/04; $150 at the door. Seniors(65+)/Students (one banquet included): $80 by 12/31/03; $100 by 5/1/04; $125 at the door.
    [Show full text]
  • Forever Remembered
    July 2015 Vol. 2 No. 7 National Aeronautics and Space Administration KENNEDY SPACE CENTER’S magazine FOREVER REMEMBERED Earth Solar Aeronautics Mars Technology Right ISS System & Research Now Beyond NASA’S National Aeronautics and Space Administration LAUNCH KENNEDY SPACE CENTER’S SCHEDULE SPACEPORT MAGAZINE Date: July 3, 12:55 a.m. EDT Mission: Progress 60P Cargo Craft CONTENTS Description: In early July, the Progress 60P resupply vehicle — 4 �������������������Solemn shuttle exhibit shares enduring lessons an automated, unpiloted version of the Soyuz spacecraft that is used to ����������������Flyby will provide best ever view of Pluto 10 bring supplies and fuel — launches 14 ����������������New Horizons spacecraft hones in on Pluto to the International Space Station. http://go.nasa.gov/1HUAYbO 24 ����������������Firing Room 4 used for RESOLVE mission simulation Date: July 22, 5:02 p.m. EDT 28 ����������������SpaceX, NASA will rebound from CRS-7 loss Mission: Expedition 44 Launch to 29 ����������������Backup docking adapter to replace lost IDA-1 the ISS Description: In late July, Kjell SHUN FUJIMURA 31 ����������������Thermal Protection System Facility keeping up Lindgren of NASA, Kimiya Yui of JAXA and Oleg Kononenko of am an education specialist in the Education Projects and 35 ����������������New crew access tower takes shape at Cape Roscosmos launch aboard a Soyuz I Youth Engagement Office. I work to inspire students to pursue science, technology, engineering, mathematics, or 36 ����������������Innovative thinking converts repair site into garden spacecraft from the Baikonur Cosmodrome, Kazakhstan to the STEM, careers and with teachers to better integrate STEM 38 ����������������Proposals in for new class of launch services space station.
    [Show full text]
  • Space Reporter's Handbook Mission Supplement Shuttle Mission STS
    CBS News Space Reporter's Handbook - Mission Supplement! Page 1 The CBS News Space Reporter's Handbook Mission Supplement Shuttle Mission STS-134/ISS-ULF6: International Space Station Assembly and Resupply Written and Produced By William G. Harwood CBS News Space Analyst [email protected] CBS News!!! 4/26/11 Page 2 ! CBS News Space Reporter's Handbook - Mission Supplement Revision History Editor's Note Mission-specific sections of the Space Reporter's Handbook are posted as flight data becomes available. Readers should check the CBS News "Space Place" web site in the weeks before a launch to download the latest edition: http://www.cbsnews.com/network/news/space/current.html DATE RELEASE NOTES 03/18/11 Initial STS-134 release 04/27/11 Updating throughout Introduction This document is an outgrowth of my original UPI Space Reporter's Handbook, prepared prior to STS-26 for United Press International and updated for several flights thereafter due to popular demand. The current version is prepared for CBS News. As with the original, the goal here is to provide useful information on U.S. and Russian space flights so reporters and producers will not be forced to rely on government or industry public affairs officers at times when it might be difficult to get timely responses. All of these data are available elsewhere, of course, but not necessarily in one place. The STS-134 version of the CBS News Space Reporter's Handbook was compiled from NASA news releases, JSC flight plans, the Shuttle Flight Data and In-Flight Anomaly List, NASA Public Affairs and the Flight Dynamics office (abort boundaries) at the Johnson Space Center in Houston.
    [Show full text]
  • 1996 Spaceport News Summary Final
    1996 Spaceport News Summary There was one banner used in 1996; see above, with Mission updates on the left. And a little color is introduced into the Spaceport News! NOTE: There is an update from the 1995 Spaceport News Summary at the end of this Summary. Introduction The first issue of the Spaceport News was December 13, 1962. The 1963, 1964 and 1965 Spaceport News were issued weekly. The Spaceport News was issued every two weeks, starting July 7, 1966, until the last issue on February 24, 2014. Spaceport Magazine, a monthly issue, superseded the Spaceport News in April 2014, until the final issue, Jan./Feb. 2020. The two 1962 Spaceport News issues and the issues from 1996 until the final Spaceport Magazine issue, are available for viewing at this website. The Spaceport News issues from 1963 through 1995 are currently not available online. In this Summary, black font is original Spaceport News text, blue font is something I added or someone else/some other source provided, and purple font is a hot link. All links were working at the time I completed this Spaceport News Summary. The Spaceport News writer is acknowledged, if noted in the Spaceport News article. Page 1 From the January 19, 1996, Spaceport News Summary On page 1, in addtion to the Delta II-XTE Mision udpate shown on the previous page, there is an update for STS-75, as follows. And the mission patch is in color, in the Spaceport News! “Mission: STS-75 on Columbia. Launch date, time: Feb. 22, 3:08 p.m.
    [Show full text]
  • STS-132 Press Kit Cover.Indd
    National Aeronautics and Space Administration SPACE SHUTTLE MISSION STS-132 Finishing Touches PRESS KIT/May 2010 www.nasa.gov CONTENTS Section Page STS-132/ULF4 MISSION OVERVIEW ...................................................................................... 1 STS-132 TIMELINE OVERVIEW ............................................................................................... 13 MISSION PROFILE ................................................................................................................... 17 MISSION OBJECTIVES ............................................................................................................ 19 MISSION PERSONNEL ............................................................................................................. 23 STS-132 CREW ....................................................................................................................... 25 PAYLOAD OVERVIEW .............................................................................................................. 33 INTEGRATED CARGO CARRIER VERTICAL LIGHT DEPLOY (ICC-VLD) ................................................... 33 MINI-RESEARCH MODULE-1................................................................................................................. 36 RENDEZVOUS & DOCKING ....................................................................................................... 39 UNDOCKING, SEPARATION AND DEPARTURE ....................................................................................... 40
    [Show full text]
  • STS-135: the Final Mission Dedicated to the Courageous Men and Women Who Have Devoted Their Lives to the Space Shuttle Program and the Pursuit of Space Exploration
    National Aeronautics and Space Administration STS-135: The Final Mission Dedicated to the courageous men and women who have devoted their lives to the Space Shuttle Program and the pursuit of space exploration PRESS KIT/JULY 2011 www.nasa.gov 2 011 2009 2008 2007 2003 2002 2001 1999 1998 1996 1994 1992 1991 1990 1989 STS-1: The First Mission 1985 1981 CONTENTS Section Page SPACE SHUTTLE HISTORY ...................................................................................................... 1 INTRODUCTION ................................................................................................................................... 1 SPACE SHUTTLE CONCEPT AND DEVELOPMENT ................................................................................... 2 THE SPACE SHUTTLE ERA BEGINS ....................................................................................................... 7 NASA REBOUNDS INTO SPACE ............................................................................................................ 14 FROM MIR TO THE INTERNATIONAL SPACE STATION .......................................................................... 20 STATION ASSEMBLY COMPLETED AFTER COLUMBIA ........................................................................... 25 MISSION CONTROL ROSES EXPRESS THANKS, SUPPORT .................................................................... 30 SPACE SHUTTLE PROGRAM’S KEY STATISTICS (THRU STS-134) ........................................................ 32 THE ORBITER FLEET ............................................................................................................................
    [Show full text]
  • Gravity Probe B Experiment “Testing Einstein’S Universe”
    NATIONAL AERONAUTICS AND SPACE ADMINISTRATION Gravity Probe B Experiment “Testing Einstein’s Universe” Press Kit April 2004 2- Media Contacts Donald Savage Policy/Program Management 202/358-1547 Headquarters [email protected] Washington, D.C. Steve Roy Program Management/Science 256/544-6535 Marshall Space Flight Center steve.roy @msfc.nasa.gov Huntsville, AL Bob Kahn Science/Technology & Mission 650/723-2540 Stanford University Operations [email protected] Stanford, CA Tom Langenstein Science/Technology & Mission 650/725-4108 Stanford University Operations [email protected] Stanford, CA Buddy Nelson Space Vehicle & Payload 510/797-0349 Lockheed Martin [email protected] Palo Alto, CA George Diller Launch Operations 321/867-2468 Kennedy Space Center [email protected] Cape Canaveral, FL Contents GENERAL RELEASE & MEDIA SERVICES INFORMATION ............................ 5 GRAVITY PROBE B IN A NUTSHELL................................................................ 9 GENERAL RELATIVITY — A BRIEF INTRODUCTION.................................... 17 THE GP-B EXPERIMENT.................................................................................. 27 THE SPACE VEHICLE ...................................................................................... 31 THE MISSION.................................................................................................... 39 THE AMAZING TECHNOLOGY OF GP-B ........................................................ 49 SEVEN NEAR ZEROES ...................................................................................
    [Show full text]
  • The Daily Egyptian, April 16, 1990
    Southern Illinois University Carbondale OpenSIUC April 1990 Daily Egyptian 1990 4-16-1990 The aiD ly Egyptian, April 16, 1990 Daily Egyptian Staff Follow this and additional works at: https://opensiuc.lib.siu.edu/de_April1990 Volume 75, Issue 136 This Article is brought to you for free and open access by the Daily Egyptian 1990 at OpenSIUC. It has been accepted for inclusion in April 1990 by an authorized administrator of OpenSIUC. For more information, please contact [email protected]. Daily Egyptian Southern Illinois Universitv at Carbondale Monday, April 16, 1990, Vol. 75, No. 136,20 Pages Counter-accusations filed by Trojans By Tony Mancuso . and Richard Hund "(Initially) we didn't press Contile said. ~IS Progress Party of four viola- is never ratified by the USG sen- Staff Writors charges against anybody. We felt The election commission, uons:. ate. we had the suppon of the student which met after the election - HIldebrand has no proof _ Craig Jackson, student UUStee The Undorgraduate Student body," Mike Contile, presidential Wednesday, found members of Conule p l~ n ted the note and candidate, was seen wearing Government elections are over, candidate for the Trojan Pany, the Trojan Pany guilty of cam- chased hIm. Fur ~h Mmo re, Progress Party buttons in the but controversy surrounding the said adding that tbe Progress paigning within 100 feet of the H'lIdeb~~ openly admitted 10 the Student Ce nter on Election election continues. pany f1fSl brought ""_ sation$. polling site in Grinnell Hall. commISS Ion he cb ased a car DaY-<l campaign violation.
    [Show full text]
  • Spacex CRS-6 Mission Press Kit
    SpaceX CRS-6 Mission Press Kit CONTENTS 3 Mission Overview 7 Mission Timeline 9 Graphics – Rendezvous, Grapple and Berthing, Departure and Re-Entry 11 International Space Station Overview 14 CASIS Payloads 16 Falcon 9 Overview 19 Dragon Overview 21 SpaceX Facilities 23 SpaceX Overview 25 SpaceX Leadership SPACEX MEDIA CONTACT John Taylor Director of Communications 310-363-6703 [email protected] NASA PUBLIC AFFAIRS CONTACTS Stephanie Schierholz Michael Curie Dan Huot Public Affairs Officer News Chief Public Affairs Officer Human Exploration and Operations Launch Operations International Space Station NASA Headquarters NASA Kennedy Space Center NASA Johnson Space Center 202-358-1100 321-867-2468 281-483-5111 Kathryn Hambleton George Diller Public Affairs Officer Public Affairs Officer Human Exploration and Operations Launch Operations NASA Headquarters NASA Kennedy Space Center 202-358-1100 321-867-2468 1 HIGH RESOLUTION PHOTOS AND VIDEO SpaceX will post photos and video throughout the mission. High-resolution photographs can be downloaded from spacex.com/media and flickr.com/spacexphotos. Video can be viewed at youtube.com/spacex. MORE RESOURCES ON THE WEB For SpaceX coverage, visit: For NASA coverage, visit: spacex.com nasa.gov/station twitter.com/elonmusk nasa.gov/nasatv twitter.com/spacex twitter.com/nasa facebook.com/spacex facebook.com/ISS plus.google.com/+SpaceX plus.google.com/+NASA youtube.com/spacex youtube.com/nasatelevision vine.co/spacex twitter.com/space_station flickr.com/spacexphotos flickr.com/nasa2explore WEBCAST INFORMATION The launch will be webcast live, with commentary from SpaceX corporate headquarters in Hawthorne, CA, at spacex.com/webcast and NASA’s Kennedy Space Center at www.nasa.gov/nasatv.
    [Show full text]
  • Spacex CRS-2 Mission Cargo Resupply Services Mission
    National Aeronautics and Space Administration PRESS KIT/MarcH 2013 SPACEX CRS-2 MIssION Cargo Resupply Services Mission www.nasa.gov SpaceX CRS-2 Mission Press Kit CONTENTS 3 Mission Overview 7 Mission Timeline 9 Graphics – Rendezvous, Grapple and Berthing, Departure and Re-Entry 11 International Space Station Overview 13 SpaceX Overview 15 SpaceX Leadership 17 SpaceX Facilities 19 Falcon 9 Overview 22 Dragon Overview 24 45th Space Wing Fact Sheet SPACEX MEDIA CONTACT Emily Shanklin Director, Marketing & Communications 310-363-6733 [email protected] NASA PUBLIC AFFAIRS CONTACTS Trent Perrotto Josh Byerly Public Affairs Officer Public Affairs Officer Human Exploration and Operations International Space Station NASA Headquarters NASA Johnson Space Center 202-358-1100 281-483-5111 Jenny Knotts George Diller Public Affairs Officer Public Affairs Officer International Space Station Launch Operations NASA Johnson Space Center NASA Kennedy Space Center 281-483-5111 321-867-2468 1 HIGH-RESOLUTION PHOTOS AND VIDEO SpaceX will post photos and video throughout the mission. High-resolution photographs can be downloaded from: spacexlaunch.zenfolio.com Broadcast-quality video can be downloaded from: vimeo.com/spacexlaunch/ MORE RESOURCES ON THE WEB For SpaceX coverage, visit: For NASA coverage, visit: spacex.com www.nasa.gov/station twitter.com/elonmusk www.nasa.gov/nasatv twitter.com/spacex twitter.com/nasa facebook.com/spacex facebook.com/ISS google.com/+SpaceX google.com/+NASA youtube.com/spacex youtube.com/nasatelevision WEBCAST INFORMATION The launch will be webcast live, with commentary from SpaceX corporate headquarters in Hawthorne, California, at spacex.com/webcast, and NASA's Kennedy Space Center at www.nasa.gov/nasatv.
    [Show full text]
  • Landsat Data Continuity Mission Table of Contents
    LDCM Press Kit February 2013 Landsat Data Continuity Mission Table of Contents LDCM Media Contacts. 2 Media Services Information . 3 LDCM Press Release . 5 LDCM Quick Facts . 6 LDCM Mission Overview . 7 The Landsat Program . 8 In Summary: What Will Landsat Do? . 9 LDCM Instruments . 10 Instrument: Operational Land Imager (OLI) . 11 Instrument: Thermal Infrared Sensor (TIRS ) . 12 Ground System. 13 LDCM Spacecraft . 14 Launch Services Program . 15 1 Media Contacts NASA LDCM Contractors NASA Headquarters Jessica Rye Stephen Cole Atlas V Launch Vehicle NASA Headquarters, Washington Cape Canaveral, FL Office of Communications (321) 730-5646 (202) 358-0918 (321) 693-6250 [email protected] [email protected] NASA Goddard Space Flight Center Barron Beneski Rani Gran VP, Corporate Communications NASA GSFC, Greenbelt, Md. Orbital Sciences Corporation Landsat Data Continuity Mission (703) 406-5528 w (301) 286-2483 (office) (703) 447-4259 c [email protected] [email protected] NASA Kennedy Space Center, Fla Melissa Carpenter George Diller Strategic Communications Launch Operations Orbital Sciences Corporation (321) 867-2468 (703) 406-5769 w [email protected] (318) 288-9543 c [email protected] USGS Roz Brown Jon Campbell Media Relations Manager USGS Headquarters, Reston, Va. Ball Aerospace & Technologies Corp. Policy/Program Management (303) 533-6059 [email protected] (720) 581-3135 [email protected] Jan Nelson Communications and Outreach USGS Earth Resources Observation and Science Center (EROS) (605) 594-6173 w (605) 321-1947 c [email protected] 2 Media Services The NASA Newsroom in the NASA Resident Office at Vandenberg Air Force Base News Center/ (VAFB) will be the center of public affairs and news media operations from L-5 Status Reports days through launch until approximately five hours after a successful launch.
    [Show full text]
  • Mars Science Laboratory Launch
    PRESS KIT/NOVEMBER 2011 Mars Science Laboratory Launch Media Contacts Dwayne Brown NASA’s Mars 202-358-1726 Trent Perrotto Program 202-358-0321 Headquarters [email protected] Washington [email protected] Guy Webster Mars Science Laboratory 818-354-5011 Jet Propulsion Laboratory Mission [email protected] Pasadena, Calif. George Diller Launch 321-867-2468 Kennedy Space Center, Fla. [email protected] Jessica Rye Launch Vehicle 321-730-5646 United Launch Alliance and Operations [email protected] Cape Canaveral, Fla. Science Payload Investigations Alpha Particle X-ray Spectrometer: Ruth Ann Chicoine, Canadian Space Agency, Saint-Hubert, Québec, Canada; 450-926-4451; [email protected] Chemistry and Camera: Nancy Ambrosiano, Los Alamos National Laboratory, Los Alamos, N.M.; 505-667-0471; [email protected] Chemistry and Mineralogy: Cathy Weselby, NASA Ames Research Center, Moffett Field, Calif.; 650-604-4789; [email protected] Dynamic Albedo of Neutrons: Igor Mitrofanov, Space Research Institute, Moscow, Russia; 011-7-495-333-3489; [email protected] Mars Descent Imager, Mars Hand Lens Imager, Mast Camera: Michael Ravine, Malin Space Science Systems, San Diego; 858-552-2650 extension 591; [email protected] Radiation Assessment Detector: Donald Hassler, Southwest Research Institute; Boulder, Colo.; 303-546-0683; [email protected] Rover Environmental Monitoring Station: Luis Cuesta, Centro de Astrobiología, Madrid, Spain; 011-34-620-265557; [email protected] Sample Analysis at Mars: Nancy Neal Jones, NASA Goddard Space Flight Center, Greenbelt, Md.; 301-286-0039; [email protected] Engineering Investigation MSL Entry, Descent and Landing Instrument Suite: Kathy Barnstorff, NASA Langley Research Center, Hampton, Va.; 757-864-9886; [email protected] Contents Media Services Information.
    [Show full text]