Houston Spaceport Industry Day June 24, 2021 Agenda

Total Page:16

File Type:pdf, Size:1020Kb

Houston Spaceport Industry Day June 24, 2021 Agenda Houston Spaceport Industry Day June 24, 2021 Agenda • Welcome • Collins Aerospace • Axiom Space • Intuitive Machines • Questions 2 Welcome Remarks 3 Collins Aerospace 4 COLLINS AEROSPACE HOUSTON SPACEPORT EXPANSION & MWBE OPPORTUNITIES JUNE 24, 2021 © 2021 Collins Aerospace This document does not include any export controlled technical data. ABOUT COLLINS AEROSPACE Collins Aerospace is a leader in technologically advanced, intelligent solutions that help redefine the aerospace and defense industry. We dedicate our capabilities, comprehensive portfolio and expertise to solving customers’ toughest challenges and meeting the demands of the global market. © 2021 Collins Aerospace This document does not contain any export controlled data. 6 BALANCED PORTFOLIO, GLOBAL FOOTPRINT BROAD AVIATION AND MILITARY GLOBAL PRESENCE ANNUAL REVENUE PORTFOLIO 68,000+ 36% employees $19 billion Military net sales 64% 15,000+ Commercial engineering INVESTED IN INNOVATION workforce 40% $3.7 billion Aftermarket 300+ research and sites globally development 60% * Original equipment investment * 2019, includes company- and customer-funded manufacturer © 2021 Collins Aerospace 7 This document does not include any export controlled technical data. COLLINS AEROSPACE CIVIL SPACE & SEA SYSTEMS 50+ YEARS OF SUPPORTING HUMAN SPACE FLIGHT WHAT WE DO Environmental Control & Life Support Systems Power, Orbit Control & Launch Systems © 2021 Collins Aerospace This document contains no export controlled technical data. 8 COLLINS AEROSPACE HOUSTON SPACEPORT DEVELOPMENT PROJECT • Collins Aerospace will plan, design and construct an estimated 116,000 square feet facility for office space and manufacturing laboratory space, including 10,000 square feet of accelerator space on approximately 8.37 acres. • Accelerator space will be subleased by Collins Aerospace to a/multiple third-party organization(s) that will bring Houston’s entrepreneurial, corporate and academic communities together in collaborative space to accelerate innovation and opportunities in the aerospace field tackling aerospace-related challenges, including. • Approximately 120 engineers/technicians/support employees will move into facility at completion • Job Expansion – With growth, facility will accommodate appx. 260 additional employees (380 total), including engineers and technicians. © 2021 Collins Aerospace 9 HOUSTON PROGRAMS OVERVIEW • EVA Systems Operations Contract (ESOC) • Space suit and support equipment logistics, sustaining engineering, servicing and processing, training and mission support. • Universal Waste Management System • Design & manufacture of human waste removal systems for various space platforms, including ISS, Orion, and potentially commercial platforms • Trash Compactor System • Design and manufacture of space-based trash compactor prototype with potential production for various platforms • Flight Releasable Attachment Mechanism Cargo Transfer Systems • Build and test of robotically actuated cargo transfer pallets for ISS use. © 2021 Collins Aerospace This document does not include any export controlled technical data. ARCHITECT’S FACILITY RENDERING © 2021 Collins Aerospace FACILITY LOCATION NASA NBL Ellington Field © 2021 Collins Aerospace 12 SITE PLAN Manufacturing Space Office © 2021 Collins Aerospace CONSTRUCTION PLAN • Construction – Estimated start Q3 2021, completion within 24 months. • MWBE Requirements – 24% of design costs and 30% of construction costs • Developer: Griffin Partners • Builder: Harvey Builders • MWBE opportunities are available through construction, but shall be awarded by builder © 2021 Collins Aerospace This document does not include any export controlled technical data. 14 FACILITY OUTFITTING OPPORTUNITIES • Office Furniture • Signage • Shop supplies • Shop tools • Clean Room Supplies • Material handling equipment • Janitorial Equipment • Moving Services © 2021 Collins Aerospace This document does not include any export controlled technical data. 15 MWBE OPPORTUNITIES UPON FACILITY OPENING • Kiosk Based Food Service • Contract Labor • Vending Services • Engineering Disciplines • Skilled Technicians • Landscape Maintenance • Quality Assurance • Janitorial Services • Financial Analysts • Shredding Services • Document scanning services © 2021 Collins Aerospace This document does not include any export controlled technical data. 16 For more about Collins Aerospace: https://www.collinsaerospace.com The Collins Aerospace Leadership Team: https://www.collinsaerospace.com/who-we-are/leadership Collins Aerospace News: https://www.collinsaerospace.com/newsroom © 2021 Collins Aerospace 17 Axiom Space 18 Humanity’s Next Chapter Small Business Industry Day -Space Port Houston 19 7 - JUL - 21 Our Vision A thriving home in space that benefits every human, everywhere. CONFIDENTIAL DOCUMENT NAME 20 7 - JUL - 21 Our Mission Improve life on earth and foster possibilities beyond it by building and operating the world’s first commercial space station. Introducing Axiom Station The First Private Space Station in the Universe Axiom – the LEADER in Human Spaceflight and On-orbit Research & Manufacturing. NASA awarded exclusive rights to Axiom to attach its own module to a docking port on the ISS; the first step to building the station of the future. We believe microgravity is the most promising environment for innovation since the Internet. Our mission is to make Low Earth Orbit accessible to governments, researchers, manufacturers and individuals. Axiom Station Supports Diverse Global Market Segments Human Spaceflight Commercial On-orbit Services Deep Space Exploration Unique access to the ISS, and later to Simple, fast, and cost-effective access A near-Earth platform for: Axiom Station for: to space for: • Integrated systems testing • Professional astronauts including • Research ISS partner nations • In-Space Manufacturing • Human performance studies • Private astronauts for 7-10 day • Brand and Media Partnerships • Sub-system technology missions demonstration and maturation Building the Future Phase One: Missions to the ISS Beginning in January 2022 • Private Astronaut • Professional • Research • As a credible NASA partner, Axiom is the only private company equipped to provide NASA- level astronaut training • Axiom offers professional astronauts 10-day, 30-60-day, and 90-180-day missions to the ISS Phase Two: Axiom Modules Attach to ISS Beginning in 2024, Axiom will launch its first module and attach to the ISS In 2025, Axiom will launch the second module, including the Earth Observatory and the Research and Manufacturing module Finally, the Axiom Power and Thermal Tower will be added in 2027 Phase Three: Axiom Station Beginning in 2028, Axiom Station will detach from ISS Building the Axiom Station: 2024-2028 09/2024 05/2025 09/2025 12/2027 First Module Second Module Lab Power Tower Future Axiom HQ – Houston Spaceport Highlights • Secured 20+ Acres for the HQ site with an additional 10 acres for growth • Awarded Jacobs Engineering a contract to complete conceptual design and site planning • Two Phased Approach • Phase I – Assembly, Integration, & Test Facility, Hazardous Laydown Facility, Aircraft Hanger, and Apron • Phase II – Flight hardware development labs, Office/Employee Amenities, Mission Operations, Training, and Private Astronaut Accommodations • Phase I & II will run in parallel • Phase 1- approx. 150k GSF • Phase 2- approx. 250k GSF • Total facility of 400k GSF with 870 -1000 employees Future Axiom HQ – Houston Spaceport Location Future Axiom HQ – Houston Spaceport Location Axiom Space Ellington Campus Future Axiom HQ – Conceptual Site Planning Future Axiom HQ – Timing & Next steps • Conceptual building and site design completed by July 15, 2021 • Currently moving into schematic design on both phases • Contractor partner evaluation and procurement by Oct/Nov 2021 • design and engineering documents to be released by as design progresses • Occupancy for Phase 1- ASAP in 2022 • Occupancy in Phase 2- Mid 2023 Thank You Intuitive Machines 35 Super BAB June 24, 2021 Intuitive Machines Who We Are Where We Are Key Industries and Markets We Serve SOLAR FARM WIND FARM NATURAL GAS PIPELINE SYSTEM NUCLEAR DATA CENTER POWER PLANT HYDROELECTRIC DAM AIRPORT WETLANDS SUBSTATION PETROCHEMICAL PLANT MILITARY BASE WATER MGP SITE RETAIL, OFFICE, TREATMENT MIXED USE URBAN BRIDGE PLANT WAREHOUSE FACILITIES FACILITY CLEAN COAL GAS PROCESSING EXPORT TERMINAL POWER PLANT PLANT RAIL TRANSMISSION LINE ELECTRIC POWER GENERATION FOOD PROCESSING PLANT HIGHWAY LAB REFINERY FACILITY Location Site Plan Floor Plan Concept Rendering Schedule Questions?.
Recommended publications
  • The Role and Training of NASA Astronauts in the Post-Shuttle Era
    The Role and Training of NASA Astronauts in the Post-Shuttle Era Aeronautics and Space Engineering Board ∙ Air Force Studies Board ∙ Division on Engineering & Physical Sciences ∙ September 2011 As the National Aeronautics and Space Administration (NASA) retires the Space Shuttle and shifts involvement in International Space Station (ISS) operations, changes in the role and requirements of NASA’s Astronaut Corps will take place. At the request of NASA, the National Research Council (NRC) addressed three main questions about these changes: What should be the role and size of Johnson Space Center’s (JSC) Flight Crew Operations Directorate (FCOD); what will be the requirements of astronaut training facilities; and is the Astronaut Corps’ fleet of training aircraft a cost-effective means of preparing astronauts for NASA’s spaceflight program? This report presents an assessment of several issues driven by these questions. This report does not address explicitly the future of human spaceflight. Background Corps—defined in this report as the number he United States has been launching as- of astronauts qualified to fly into space. As Ttronauts into space for more than five of May 2011, the Astronaut Corps consist- decades and, for a majority of those years, ed of 61 people, compared with a peak size astronauts have been selected and trained of nearly 150 people in 2000. NASA uses a through NASA’s Astronaut Corps. Since its model for projecting minimum ISS manifest inception in 1959, the Astronaut Corps— requirements. Using the model on the next which is based at the Lyndon B. Johnson page, NASA has projected that the Astronaut Space Center (JSC) in Houston, Texas—has Corps will need a minimum of 55-60 astro- experienced periodic fluctuations in size and nauts to meet ISS crew requirements through training emphasis based on various program 2016.
    [Show full text]
  • The SKYLON Spaceplane
    The SKYLON Spaceplane Borg K.⇤ and Matula E.⇤ University of Colorado, Boulder, CO, 80309, USA This report outlines the major technical aspects of the SKYLON spaceplane as a final project for the ASEN 5053 class. The SKYLON spaceplane is designed as a single stage to orbit vehicle capable of lifting 15 mT to LEO from a 5.5 km runway and returning to land at the same location. It is powered by a unique engine design that combines an air- breathing and rocket mode into a single engine. This is achieved through the use of a novel lightweight heat exchanger that has been demonstrated on a reduced scale. The program has received funding from the UK government and ESA to build a full scale prototype of the engine as it’s next step. The project is technically feasible but will need to overcome some manufacturing issues and high start-up costs. This report is not intended for publication or commercial use. Nomenclature SSTO Single Stage To Orbit REL Reaction Engines Ltd UK United Kingdom LEO Low Earth Orbit SABRE Synergetic Air-Breathing Rocket Engine SOMA SKYLON Orbital Maneuvering Assembly HOTOL Horizontal Take-O↵and Landing NASP National Aerospace Program GT OW Gross Take-O↵Weight MECO Main Engine Cut-O↵ LACE Liquid Air Cooled Engine RCS Reaction Control System MLI Multi-Layer Insulation mT Tonne I. Introduction The SKYLON spaceplane is a single stage to orbit concept vehicle being developed by Reaction Engines Ltd in the United Kingdom. It is designed to take o↵and land on a runway delivering 15 mT of payload into LEO, in the current D-1 configuration.
    [Show full text]
  • The Role and Training of NASA Astronauts In
    Co-chairs: Joe Rothenberg, Fred Gregory Briefing: October 18-19, 2011 Statement of Task An ad hoc committee will conduct a study and prepare a report on the activities of NASA’s human spaceflight crew office. In writing its report the committee will address the following questions: • How should the role and size of the activities managed by the Johnson Space Center Flight Crew Operations Directorate change after space shuttle retirement and completion of the assembly of the International Space Station (ISS)? • What are the requirements of crew-related ground-based facilities after the space shuttle program ends? • Is the fleet of aircraft used for the training the Astronaut Corps a cost-effective means of preparing astronauts to meet the requirements of NASA’s human spaceflight program? Are there more cost-effective means of meeting these training requirements? The NRC was not asked to consider whether or not the United States should continue human spaceflight, or whether there were better alternatives to achieving the nation’s goals without launching humans into space. Rather, the NRC’s charge was to assume that U.S. human spaceflight would continue. 2 Committee on Human Spaceflight Crew Operations • FREDERICK GREGORY, Lohfeld Consulting Group, Inc., Co-Chair • JOSEPH H. ROTHENBERG, Swedish Space Corporation, Co-Chair • MICHAEL J. CASSUTT, University of Southern California • RICHARD O. COVEY, United Space Alliance, LLC (retired) • DUANE DEAL, Stinger Ghaffarian Technologies, Inc. • BONNIE J. DUNBAR, President and CEO, Dunbar International, LLC • WILLIAM W. HOOVER, Independent Consultant • THOMAS D. JONES, Florida Institute of Human and Machine Cognition • FRANKLIN D. MARTIN, Martin Consulting, Inc.
    [Show full text]
  • Minotaur I User's Guide
    This page left intentionally blank. Minotaur I User’s Guide Revision Summary TM-14025, Rev. D REVISION SUMMARY VERSION DOCUMENT DATE CHANGE PAGE 1.0 TM-14025 Mar 2002 Initial Release All 2.0 TM-14025A Oct 2004 Changes throughout. Major updates include All · Performance plots · Environments · Payload accommodations · Added 61 inch fairing option 3.0 TM-14025B Mar 2014 Extensively Revised All 3.1 TM-14025C Sep 2015 Updated to current Orbital ATK naming. All 3.2 TM-14025D Sep 2018 Branding update to Northrop Grumman. All 3.3 TM-14025D Sep 2020 Branding update. All Updated contact information. Release 3.3 September 2020 i Minotaur I User’s Guide Revision Summary TM-14025, Rev. D This page left intentionally blank. Release 3.3 September 2020 ii Minotaur I User’s Guide Preface TM-14025, Rev. D PREFACE This Minotaur I User's Guide is intended to familiarize potential space launch vehicle users with the Mino- taur I launch system, its capabilities and its associated services. All data provided herein is for reference purposes only and should not be used for mission specific analyses. Detailed analyses will be performed based on the requirements and characteristics of each specific mission. The launch services described herein are available for US Government sponsored missions via the United States Air Force (USAF) Space and Missile Systems Center (SMC), Advanced Systems and Development Directorate (SMC/AD), Rocket Systems Launch Program (SMC/ADSL). For technical information and additional copies of this User’s Guide, contact: Northrop Grumman
    [Show full text]
  • Spaceport Infrastructure Cost Trends
    AIAA 2014-4397 SPACE Conferences & Exposition 4-7 August 2014, San Diego, CA AIAA SPACE 2014 Conference and Exposition Spaceport Infrastructure Cost Trends Brian S. Gulliver, PE1, and G. Wayne Finger, PhD, PE2 RS&H, Inc. The total cost of employing a new or revised space launch system is critical to understanding its business potential, analyzing its business case and funding its development. The design, construction and activation of a commercial launch complex or spaceport can represent a significant portion of the non-recurring costs for a new launch system. While the historical cost trends for traditional launch site infrastructure are fairly well understood, significant changes in the approach to commercial launch systems in recent years have required a reevaluation of the cost of ground infrastructure. By understanding the factors which drive these costs, informed decisions can be made early in a program to give the business case the best chance of economic success. The authors have designed several NASA, military, commercial and private launch complexes and supported the evaluation and licensing of commercial aerospaceports. Data from these designs has been used to identify the major factors which, on a broad scale, drive their non-recurring costs. Both vehicle specific and location specific factors play major roles in establishing costs. I. Introduction It is critical for launch vehicle operators and other stakeholders to understand the factors and trends that affect the non-recurring costs of launch site infrastructure. These costs are often an area of concern when planning for the development of a new launch vehicle program as they can represent a significant capital investment that must be recovered over the lifecycle of the program.
    [Show full text]
  • Mission Control and Data Systems (MCS) Space Operations and Astronaut Training Portfolio: MCS
    Space Operations and Astronaut Training Portfolio: MCS Mission Control and Data Systems (MCS) Space Operations and Astronaut Training Portfolio: MCS Page 2 2021-01-28_RB_SP_MCS_v01 Space Operations and Astronaut Training Portfolio: MCS 1. Introduction and Overview of MCS Mission Control and Data Systems (MCS) The Mission Control and Data Systems (MCS) Group designs, develops and supports software and software systems. Before a command can be received by the satellite, it is parameterised, tested and transmitted by our software. Telemetry data sent from the satellite is pro- cessed by our software and made available to the engineers. In order to fulfill our mission to provide customers with innova tive These systems consist mainly of software modules, which are and reliable satellite command and data systems, we have developed and maintained by us. The portfolio of the MCS Group excellent experience in advanced systems engineering methods. currently consists of 20 software tools of different complexity and Since the German Space Operations Center (GSOC, 1968) was size. The main tools among others are the following. founded, the MCS Group has built and maintained more than 30 different command and ground control systems for over 20 different satellite types, including geostationary communica­ tions satellites, low­flying Earth observation satellites, scientific Software modules prototypes and for human spaceflight. In order to meet our demand for sustainable, innovative and reliable products and • GECCOS services, our daily work includes looking outside the box at con- • Satmon ferences and other control centers, as well as participating in • ProToS standardization boards. Due to our proximity to the operating • Opsweb engineers and our active participation in the operation, we ensure • MOPS fast response and release times and receive direct feedback from • DORI our customers.
    [Show full text]
  • Satellite & Newspace Snapshot
    Global Recruitment & Executive Search Satellite & NewSpace Specialists MARCH 2021 Satellite & NewSpace Snapshot INDUSTRY INSIGHTS - LATEST NEWS No Let Up In February as NASA Lands on Mars In this issue: and Funding Free For All Omnispace Close $60m Funding Round Continues To Help Develop Satellite Network for 5G, IoT and Global Communications While it might be the shortest month of the year, February still managed to cram in a number of exciting developments and further innovation to keep up the strong start in 2021. In fact, so much has happened this February we SpaceX Announce Inspiration4 Mission and struggled to condense it into just a few articles! Offer The Chance to Win a Seat on a Falcon 9 This month we have seen NASA land its Perseverance rover on the surface of Mars, SpaceX launch more of it’s Starlink constellation and have a rare first stage landing failure, investment keeps rolling into the NewSpace Omnispace Lyteloop economy with a number of start-ups closing funding rounds and more established players like Telesat receive further funding as well exciting news SpaceX Axiom Space from Intelsat as they move closer to coming out of chapter 11. NASA Telesat As more and more positive development take place in the space industry we wait with baited breath to see what more 2021 has up its sleeves for us. Intelsat Osprey Technology BlackSky Acquisition www.neuco-group.co.uk [email protected] Market Insights Omnispace Close $60m Funding Intelsat Announce Agreement with Round To Help Develop Satellite Creditors to Reduce Debt By More Network for 5G, IoT and Global Than 50% Communications The world’s largest satellite operator, Intelsat, announced Omnispace announced this month they had closed a this month that they have come to an agreement with round of equity financing of $60m to keep the launch of their creditors to reduce its debt liabilities by over 50%.
    [Show full text]
  • Spaceport News America's Gateway to the Universe
    MissionUpdate Vol. 36, No. 17 August 29, 1997 Shuttle-Mir Spaceport News America's gateway to the universe. Leading the world in preparing and launching missions to Earth and beyond. John F. Kennedy Space Center Internal EVA conducted: Mir 24 cosmonauts Anatoly Solovyev and Pavel Vinogradov and U.S. astronaut Michael Foale continue the process of verifying restoration of electrical power to the Russian Busy week at Space Station Mir after an intravehicular activity Aug. 22. Troubleshooting of the oxygen- generating system also was under America’s way, and an extravehicular activity was tentatively set for the first week of September to conduct an spaceport inspection of leak sites on the damaged Spektr module. STS-86 ONE Shuttle rolled out to the launch pad Aug. 18 and another returned to KSC the following day. The Space Shuttle Atlantis (above) is now at Pad 39A, undergoing final preparations for launch Sept. 25 on the seventh Shuttle-Mir docking mission, STS-86. The Terminal Countdown Demonstration Test is scheduled for Sept. 9- Atlantis (20th flight OV-104) 10. At about 7:08 a.m., Aug. 19, Discovery (right) 87th Shuttle flight touched down on Runway 33 of KSC's Shuttle Landing Pad 39A Facility, bringing Mission STS-85 to a successful 7th Mir Docking conclusion. Researchers were delighted with the Launch: Sept. 25, 10:34 p.m. performance of the primary scientific instruments flown Crew: Wetherbee; Bloomfield; on the 86th Shuttle flight, the Cryogenic Infrared Parazynski; Titov; Chretien Spectrometers and Telescopes for the Atmosphere (France); Lawrence; Wolf. (CRISTA)-SPAS and the Middle Atmosphere High Commander Wetherbee flew on Resolution Spectrograph Investigation (MAHRSI), both of STS-63, the Shuttle flight that which performed flawlessly.
    [Show full text]
  • LEO Commercialization Using ISS to Stimulate Demand
    LEO Commercialization Using ISS to Stimulate Demand International Space Station Program Business & Economic Development Office NASA/JSC - Kevin Engelbert June 24, 2020 • Background • NASA Strategy for Low-Earth Orbit Commercialization 1. Establish ISS commercial use and pricing policy 2. Enable private astronaut missions to ISS 3. Initiate process for commercial development of LEO destinations 4. Seek out and pursue opportunities to stimulate sustainable demand 5. Quantify NASA’s long-term needs for activities in LEO • Demand Stimulation Approach • What Does Success Look Like? 2 Background: Future of Human Spaceflight in LEO It is the sense of Congress that “an orderly transition for United States human space flight activities in low- Earth orbit from the current regime, that relies heavily on NASA sponsorship, to a regime where NASA is one of many customers of a low-Earth orbit commercial human space flight enterprise may be necessary.” - P.L. 115-10, NASA Transition Authorization Act of 2017 1. A robust and competitive low-Earth orbit (LEO) economy is vital to U.S. national interests 2. NASA is committed to encouraging and facilitating the growth of the U.S. commercial sector 3. NASA has long-term needs for LEO services: • Crew training and proficiency as prep for deep space missions • Fundamental and applied research • Advanced system development and testing 4. The ISS can be an incubator for non-traditional capabilities and commercial business models 5. The ISS will be the last U.S. Government-led destination in LEO 3 NASA Strategy
    [Show full text]
  • SPACE VEHICLE OPERATORS CONCEPT of OPERATIONS a Vision to Transform Ground and Launch Operations
    SPACE VEHICLE OPERATORS CONCEPT OF OPERATIONS A Vision to Transform Ground and Launch Operations Future Interagency Range and Spaceport Technologies October 2004 Future Interagency Range and Spaceport Technologies (FIRST) FOREWORD The Future Interagency Range and Spaceport Technologies (FIRST) initiative is a partnership and interagency working group of NASA, the Department of Defense (Air Force Space Command and Office of the Secretary of Defense), and the Federal Aviation Administration. The partnership was established to guide transformation of U.S. ground and space launch operations toward a single, integrated national “system” of space transportation systems that enables low-cost, routine, safe access to space for a variety of applications and markets through technology infusion. This multi-agency consortium is formulating plans to create a national program office that will coordinate individual agency plans to produce an integrated national space transportation system infrastructure comprised of spaceports, ranges, and space and air traffic management systems. A set of concepts of operations, or CONOPS, has been produced to articulate a cohesive interagency vision for this future space transportation system in support of FIRST program formulation efforts. These concepts are intended to guide and support the coordinated development of technologies that allow multiple launch vehicle architectures and missions to be supported by the same ground and launch systems without significant modification. These documents reflect the interests of the partners in the working group, and are not intended to imply final approval or policy of any of the participating agencies. These visionary CONOPS documents have been built on the foundation that was established over the past two years by the Advanced Range Technology Working Group (ARTWG) and Advanced Spaceport Technology Working Group (ASTWG).
    [Show full text]
  • The World's Spaceport
    Strict security THE WORLD’S The French government, the CSG, and Arianespace follow strict security measures that meet the most rigorous international SPACEPORT and national agreements and requirements. Arianespace activities are characterized as highly security sensitive ones by the French governement and consequently very strict and rigorous measures are implemented with the Ideal location support of national authorities to satisfy both national and international requirements. They apply to the three launch The Guiana Space Center (CSG) offers ideal conditions for systems: Ariane 5, Soyuz, and Vega, and strictly limit access launching any payload to any orbit at any time. Located to spacecraft. at 5 degrees North latitude, its proximity to the equator provides an extra boost of energy due to the Earth’s Specifically, the security regime is compliant with requirements rotation – a slingshot effect that is greater here than at most governing the export of U.S. manufactured satellites or parts other launch sites. under the ITAR regulation. State-of-the-art facilities Safety mission TECHNICAL OVERVIEW The CSG provides modern Payload Preparation Facilities The CSG entities apply rigorous Safety Rules during each that are recognized for their high quality in the space launch campaign: this includes authorization of equipment industry. The facilities are capable of processing several use, operator certification, and permanent operation spacecrafts from different customers simultaneously, thanks monitoring. Any potentially dangerous activity is to be to vast clean-rooms and commodious infrastructure. reported to the CSG responsible, which in turn, makes certain Designed to support the rockets’ multiple launch capability that safety equipment and emergency response teams are SOYUZ and high launch tempo, the preparation facilities meet the poised to deal with any hazard.
    [Show full text]
  • Space Policy Luminary Mary Lynne Dittmar Joins Axiom Space As Executive Vice President, Government Affairs
    Space policy luminary Mary Lynne Dittmar joins Axiom Space as Executive Vice President, Government Affairs 26 April 2021 Axiom Space revealed Monday that Coalition for Deep Space Exploration founder and former President/CEO Dr. Mary Lynne Dittmar, known for her influential role in national policy toward human space exploration and commercial space development, has joined the Houston-based space infrastructure leader as Executive Vice President, Government Affairs. At Axiom, which is currently constructing the world’s-first commercial low-Earth orbit (LEO) destination that will succeed the International Space Station (ISS), she will direct the company’s policy objectives and strategic advocacy with local, state, and federal government authorities. “I am excited to be joining the team of experts I believe will accomplish the necessary next steps to ensure a permanent U.S. presence in low Earth orbit,” Dittmar said. “Axiom is leading the development of next-generation space infrastructure to meet the needs of industry, science, and the government. The opportunities it will create for a global user base are boundless.” An established thought leader in the space industry, she sits on the National Space Council Users’ Advisory Group, the Space Studies Board of the National Academies of Sciences, Engineering and Medicine, and the FAA’s Commercial Space Transportation Advisory Committee (COMSTAC). Through her work with the Coalition for Deep Space Exploration and her own consulting group, Dittmar Associates, she has served as one of the industry’s top representatives to the White House and Congress and been a senior adviser to multiple NASA mission directorates, the ISS Program, and various aerospace companies supporting the Federal Aviation Administration, Department of Defense, and NASA.
    [Show full text]