<<

Bicycle & Pedestrian RegionalRegional PathwaysPathways PlanPlan Central Midlands Pathways Plan

Central Midlands Bicycle & Pedestrian Regional Pathways Plan:

A Vision for Non-motorized Travel throughout the Midlands

Adopted by the Central Midlands Council of Governments Board of Directors on March 25, 2010.

1

Central Midlands Pathways Plan

OVERVIEW

The Central Midlands Bicycle & Pedestrian Regional Pathways Plan (a.k.a. “Central Midlands Pathways Plan”) is a culmination of greenways, sidewalks, on-street bicycle facilities and off- street recreational trails that link together to form a system of “pathway opportunities” for the sole purpose of creating more connectivity for non-motorized travel throughout the Greater Columbia metropolitan. This plan takes a comprehensive view at helping residents travel to key destinations across the Midlands without necessarily having to drive by automobile to do so. Examples of regional destinations include the employment centers and attractions of Downtown Columbia (such as the Innovista, State Capitol, and University of ) as well as popular tourist and recreational attractions (like the Lake Murray, Riverbanks Zoo, Sesquicentennial Park, , and Fort Jackson).

The Pathways Plan highlights existing and proposed greenway, bikeway, and sidewalk locations in proximity of not only those regional attractions noted above but also the many schools, parks, churches, and shopping centers in between. In addition, the plan will recommend short and long term projects that local entities can easily identify and incorporate into their respective planning policies, thus encouraging all new subdivisions to connect with these facilities. Altogether, the Pathways Plan identifies 29 corridors throughout the metro area that could be developed over the next 30 years.

Vision:

The Central Midlands Pathways Plan is a comprehensive interconnected system of bicycle and pedestrian paths within three miles of every residence in an effort to provide non-motorized transportation and recreational opportunities to residents across the Midlands region.

Why have a Plan? The purpose for the Central Midlands Pathways Plan is not to replace and/or revise the 2006 COATS Bike and Pedestrian Pathways Plan. Rather, this document was developed in order to supplement (and serve as an appendix to) the 2006 Plan.

The underlying theme of the Pathways Plan is regionalized non-motorized connectivity. Whereas that 2006 Plan provided some general recommendations for regional bicycling and pedestrian opportunities, CMCOG wanted to go a step further in identifying opportunities for non-motorized travel on a more localized level. The Plan attempts to address the “gaps” that exist between the current and planned recommendations.

Currently, there are over 16 miles of developed greenway trails as well as 32 miles of existing bike lanes and plenty of miles of sidewalks throughout the region. However, there are no clear plans/proposals for connecting these facilities. The Central Midlands Pathways Plan shows a way to connect these facilities,

2

Central Midlands Pathways Plan

ultimately linking popular destinations such as Lake Murray Dam Boardwalk to the Riverbanks Zoo and Downtown Columbia area and then on out to Fort Jackson and the Congaree National Park. Currently, there are 16 In short, this plan is a set of corridors that are deemed important. miles of developed It is recommended that local jurisdictions incorporate this vision greenways and 185 miles plan as part of their comprehensive plan in an effort to support it, of undeveloped build it, and, even, further expand it. greenways as well as 32 miles of existing

bikeways and 785 miles What are the key features of the Pathways Plan? of proposed bikeways in The Plan highlights existing and proposed greenway, bikeway, and the Pathways Plan. sidewalk locations in proximity of not only those regional attractions noted above but also the many schools, parks, churches, and shopping centers in between. In addition, the plan recommends short and long term projects that local entities can easily identify and incorporate into their respective planning policies, thus encouraging all new subdivisions to connect with these facilities. Refer to the map on the next page for a composite of all existing and proposed greenway and bikeway routes throughout the region.

What is a “greenway”; what is a “bikeway”? Greenways are corridors that flow mainly along creeks or rivers. They are vegetated natural buffers that improve water quality, reduce the impacts of flooding, and provide wildlife habitat—and in this instance with the plan—contain a walking/biking trail. This multiuse off-road trail (also known as a “shared use path”) within the greenway corridor helps to provide recreation, transportation, fitness, and economic benefits for all to enjoy. Example: Three Rivers Greenway

Bikeways are corridors that follow the existing road network. They are intended to provide linkages between various off-road greenways and allow greater access to the overall regional pathways system. These bikeways can include bicycle lanes, shared lanes, wide shoulders, and wide outside lanes. Bikeways can be retrofitted onto existing streets and roads without construction by making reasonable changes with signs, striping, lighting, traffic signals, operation, and maintenance. Existing roadways that are not being reconstructed provide many opportunities to improve safety for bicyclists and other users. Bikeways should be considered in all projects, including pavement surface overlay projects, signal replacement, re-striping or pavement maintenance. Example: Bikeway along SC 6 (Lexington)

3

Regional SHADY GROVE

K E AH N M N D TA OL E R L Y Bikeways & Greenways

N SO EM Y CL E L K IC B N M KILLIA O N T 176 IC £ E ¤ R E L L L ^_ G O O 76 O ¤£ C YARD 77 BRICK LE ¨¦§ BOY ARD DUB ^_ Key Destination 1 HARD 555 £ S ¤ CR ABBLE

I N 26 Existing Bikeway

R ¨¦§ I C

H

L

A

N D 21

C ¤£ O Proposed Bikeway U 321 N ¤£ T Y L Y L L L HI R O ET

E L S AL

N T M

N C

E R

K

E

E Existing Greenway IR K MO Proposed Greenway C 215 W O O _ L ^ U R M R ^_ A B F 60 I A N A A L P IN 20 Palmetto Trail E ¨¦§

P I N 176 E £ N ¤ O Y IS B W L R A HA O IV O C Major Highway R D E S P Local Road S BU LE 12 S P H E R E IV P ER O

L

L

E

C

I BR T ICK N mn Y O Park A RD Lake Murray ^_ M Protected land

T A C D CO IL RLE Y M W ILL Ft Jackson R I 7 V 7 E 2 Municipal boundary R

7

7

2 H

A R

D

E N F OR M E ST A I N BE LT ^_ L IN ¨¦§126 E

DS OO HW EC O BE L 378 D ¤£ C H A P IN SEMMES N MA AP KL S C VI A R L JA ^_ K S F E EW R ON E R A KS L S AC L Y 378 RT J S FO ¤£ E M

H B E U L OD T Y O G W A OSE

T R A E

T S AUGUS R 262 F

F G BUR U S LEE L D B O O 1 TT £ BO W ¤ M AB E LHA X S PE AUG NO USTA K O R

S H O E P N _ I ^ L Y T 1 B L K E £ N N ¤ B I A R F R N G B E LU W F P F I S T S G R O T A A P T H R I E

C A

H

U

R

C

H Y

R

R

E S F M

I S T

K H

L P

A O

C N D 0 1 2 4 Miles 76 1

2 ¤£

T H 378

S ¤£

T

R

E

E

T 20 ¨¦§ 602

S G H IN TC R NO P O S TW Y D D 77 U ¨¦§ M Y C R E H H A

C R T A L H E H S S I T 302 F O 6 N

H T PI E NE R R IDG A E Z A N

C

A

L

K

S

F

E

R

R

Y

M C C A R T H A ® S E G IR IN W R P LD S G O L N T ENN T O A L T P S

E

L

R

A

H

C

BOILING SPRINGS ¤£321

¤£176 ¨¦§26

Central Midlands Council of Government disclaims responsibility for damage or liability associated with the use of this information. All reasonable ^_ efforts have been made to ensure accuracy.

G:\Aaron\Bike_Ped\BikePedPlotter_ab.mxd May 2009 Central Midlands Pathways Plan

Regardless of which facility a person uses, greenways and bikeways provide safe movement for pedestrian travel as well. For a visual description of bikeways and greenways, please refer to the cross sections at the end of this document.

How were the Pathways chosen? Most of the Pathway Corridors originated from some existing plan and/or project concept that went through its own set of public meetings and adoption process. The selected corridors are a culmination of ideas, SCDOT projects, and recommended bikeway routes. Groups who participated as part of this ongoing public input process include, but not limited to: land use planners, transportation planners, transportation engineers, bicycling and pedestrian advocates, greenway/environmental advocates, and the general public.

More specifically, the Pathways were derived from the long range plans of the following entities: • SCDOT (existing bike lanes) • City of Columbia (BikeColumbia routes) • River Alliance (Three Rivers Greenway) • Palmetto Conservation Foundation (Palmetto Trail) • CMCOG Bike & Pedestrian Pathways Plan • Richland County Conservation Commission (Richland County Trail System) • Richland County Recreation Commission • Lexington County Greenway Alliance (Lexington Greenways) • Irmo-Chapin Recreation Commission • CMCOG traffic-volume data to identify low-volume streets • Parcel information (Richland & Lexington Counties) to identify public-owned ROW along/near water areas (e.g. creeks, lakes, etc)

The following framework of steps was used to identify pathway connections: 1. Existing Bike Lanes 2. Existing Greenway Paths 3. Existing Attractions/Destinations (parks, hospitals, libraries, schools, churches, major shopping centers) 4. Planned Bikeways—per Long Range Plans 5. Planned Greenway Paths—per Long Range Plans 6. Identify “connection opportunities” via street network or public-owned ROW along creeks—so as to form an Interconnecting Comprehensive Pathways System

5

Central Midlands Pathways Plan

What does the rest of this report show? Not only does this report present a graphic overview of the Regional Pathways Vision, but in the pages following are brief presentations highlighting each of the recommended pathway corridors.

It is important to note that the pathways identified as part of this plan are to be viewed only as a “regional conceptual vision”. As with all concept studies, further study and engineering are needed in order to properly assess the feasibility of these corridors. As noted earlier, this Pathways Plan is intended to provide an overarching vision for building a regional bicycle and pedestrian system.

What is the timetable for the Regional Pathways Plan to be completed? The Pathways Plan is an ongoing analysis of bike-pedestrian opportunities. The Plan will be conducted in primarily three phases. • Phase I is a composite of existing conditions and recommendations from various recent transportation and bike-pedestrian studies. Each of these studies underwent its own public involvement process and the routes recommended were taken directly from those studies. The end goal of this first stage therefore is to identify possible gaps and lay the foundation for a regional pathways network. Completed and adopted by CMCOG Board (March 2010). • Phase II will involve a more detailed analysis of this proposed network, analyzing existing and proposed facility segments and their proximity to major and local destinations. Anticipated Completion—Fall 2011. • Phase III will identify segments or projects that are likely to be short term and long term as well as recommending funding and implementation strategies. Anticipated Completion—Summer 2012.

How can you participate as part of the Plan development process? Public participation is paramount to the success of any good vision plan. Everyone is encouraged to view the maps and tables and provide feedback. Comments regarding the identification and location of destinations as well as feedback on where the pathway links are located are most appreciated.

If you need further information, feel free to contact Aaron Bell, CMCOG Transportation, at 803-376- 5390 or at [email protected].

rev_9/28/2011

6

v® T

# #T T

# T T

T

# T

# T # T #

T 21 # # h 215 ¤£ T

r Providence Hospital

e e T 555 T #

FORES OD 76 v® O £ 269 R ¤

W #ELM Benedict College i T

MO v

76 NTI M ¤£ C e I EL n L L L O T

r W # T R

s 21 LO n O y Y

¤£ t TA Allen University O i r

E 126 C D T al a # a ¨¦§ t T Blythewood pi i 12

a l s C

B # t V G®

v PalmUetto Health Baptist y

T # L i r d G H

s L a

e A o a

t S R R r T AI e V D e a ER T lm # G E 1 n o

N w / h

e y

O n

T w e n 1 a r

R # T n ¤£ # T

O w N u a w y B O a

e PT n y

S w a M The Vista n

A n e

N H k # e i

e y USC Main Campus B

N ! D

e EVINE

I

e 21 r

A IN T

£ T l ¤ A r

W ! S M

G S n G G T Colonial Center E 378 M NG r ¤£ TI H # E B # E U e M L G k Y Elgin

# e ch E n

R n a e ! r F Chapin 1 B Five Points T

A w y ¤£ T k

e R ! c o 176 h

R a r R

¤£ T / O #

r y ith

W e !

B C m T M

R 215 SO S

e S O # BLO

T ! T A

D y R

R # TT T

O 1

e i B

IV T AB

X v

E l # #

KNO R e T

T 16 s T # r D

# T OO

s W

a E

OS

R #

# W # T

e T # B T

e l T

B C u

s o # f T T B f # #

t n i R #

k g 48

G Bo e a L T

# U State # N r a PI w r F

N e F S T A e d Fairgrounds H EMSON a H

C 76 O CL e / O £ e ¤ P S y # L T P I n a ! # W

w r

Northeast Green#way k ! Williams-Brice a

Stadium T y q® T ! 1 ! # ¤£ 20

The Village at # ¨¦§ ¤£321 Sandhills T INSET

C

L EM# 176 T ¤£ SO Downtown Columbia 12 N # ¤£21 H TC NO O TW

y Webster University a B w ¤£1 r e o ik a Midlands South B d Technical University Southern Wesleyan Irmo University d College R a University of Phoenix o i v R e h S r c C 6 Harbison State Forest t 0 B G o ike r w 7 N a e 7 y W 2 o Midlands e O 26 60 Technical n R w ¨¦§ R Y Sesquicentennial A College w A T q® 12 R F UR M Columbiana Mall E S a y M State Park K L LA A I y a O N H T N w A 176 E N ¤£ n R N T D O Columbia R IS International e 20 E RB W A e ¨¦§ H University S r G L Columbia Place Mall I-20 A B IV R C O k R E A e P D 1 e £ R ¤ I r Limestone College E V Lake V E C R O R e G

Murray Lake Murray Dam Y n E a IN P r

C M 555 O Arcadia Lakes 176 N ¤£ T I C H E C T L Columbia College O L N O IN 20 A 7 O 7 W Strayer University § M 2 ¨¦ T 7

7 y 2

a 21 S ¤£ w Fort Jackson a ITT Technical Institute lud Dutch Square e Columbia y a Ri k v i a er G re B w

e nw T ¤£176 Palmetto Health Richland e ay h )

y t k a r i 16 Forest Acres

w a n e

e c B e

e y r Fort Jackson Colleges-Troy H Fort Jackson Colleges-USC G d A a Midlands Technical College h R Richland Fashion Mall l k B R

i t e U D Fort Jackson Colleges-WebsterFort Jackson Colleges-Coker

e i E L w r r v Providence Hospital C 12 L N 6 W

e T e o le FORES

i ( r k

M N Lexington s i 4 378 126 Benedict College

1 ¤£ § n Medical ¨¦ B 6 E Allen University Center a Palmetto Health Baptist Trenholm Road o y 77 a s y C s B M ¨¦§ a U ILL w w W k e t L ik S OR O B n YL L OD oad G TA c h R e RVAIS rc e GE a Chu r r The Vista University of

J G im Ne ESBUR r A South Carolina E ilg G M H A L -P P e U S L e 378 A e t e L S ok k K n G e r Lexington S E r he e VI G E sb M C N R ld e AR ETI w u

J o O r ME B rg L - Y C F F 26 Coloniaal Center o 262 e y Five Points rt l ¨¦§ West Columbia Ja i M c M SSO Midlands Technical College ks BLO on 2 y G 1 TT T OD r O a e O S Woodhill N B EW e B T h S O A O n A R w T X O T r w a S N K E USC Medical College y E e L n 1 Virginia Hylton Park R e ¤£ A e H E

C e R N I

L r i State Fairgrounds Williams-Brice Stadium T v L Owens Field E G e B K S k IN r H R s O Southern F P e

Gibson Pond Wesleyan W e

University r Springdale y e C

a s

s t y l

w l a

G i y e

r w a G k Cayce e i e

w e B k e n 76 i E ¤£ K W y E k w I B A Midlands Technical College V 378 L i ¤£ r E IN CO r a P RY d N B G S FER A NER e y R GAR n EE h F a t Columbia Metropolitan Airport l s u 764 602 y h k a o w c l n C e i 20 S re u G e ¨¦§ k R a e 6 re d

C 12,000 Year r C e McEntire Joint re Historical Park a C ga e n r S o National Guard Base C B w l C u o Gilbert 6 f r f L R e McEntire JANG o e a k d / C B G o LU 302 n FF r e CO g NG AR a e E r E e n e w eway Pine Ridge P k a a gs Bi r Sprin k y Platt South Congaree B i C k O e N w G A R a E y E

S G IN R P S T T A L P T R O P IR A

O

L D

S

T A T

E B LUFF

H 48 C C R on Falcon U g H a C r D ee N R U iv M e D r E Gr 321 ee ¤£ nw Darden ay Bicycle and Pedestrian Pathways - Central M idlands, South Carolina

O L D

26 S CENTRAL T Legend ¨¦§ A T E MIDLANDS E N I Council of Governments Places of Interest Pathways ¨¦§26 Interstates P n Post Secondary Schools 19 US Highways Gaston ! Key Destinations ¤£ Central Midlands Council of Governments ! SC Highways 236 Stoneridge Drive 176 q® Airports 1 ¤£ Columbia, SC6 29210 302 Phone: (803)376-5390 Mall Municipal Boundaries Local Roads Congaree National Park

•' www.centralmidlands.org T Water Railroad 6 # Parks 0 0.3750.75 1.5 Protected Land County Boundary v® Hospitals Pelion Miles ® 21 Pelion Pelion Swansea ¤£ Disclaimer: Central Midlands Council of Governments disclaims responsibility for damages or liability that may arise from the use of this information. All reasonable efforts have been made to ensure accuracy.

Regional Pathway Index Pathway Name Description #miles 1 Three Rivers Greenway East Bank Smith Branch – Downtown Columbia Innovista 4.33 2 Three Rivers Greenway West Bank SC 12 Bridge– Centennial Park (Cayce) 5.82 3 Greenway Lake Murray – Interstate 26 7.61 4 SC 60 Bikeway Lake Murray – Harbison State Forest 7.83 5 Smith/Rocky Branch Greenway Congaree River – 7.79 6 Gills Creek Greenway Congaree River - Lake Katherine 12.46 7 SC 6 North Bikeway Lake Murray - Lexington Town (I-20) - 7.72 8 SC 6 South Bikeway Lexington Town (I-20) - White Knoll 3.76 9 Crane Creek Greenway Broad River – Rice Creek 9.70 10 Bluff Road/Congaree Park Bikeway USC Stadium - Congaree Swamp 14.16 11 Lower Richland Bikeway Bluff Road - Fort Jackson 8.72 12 Fort Jackson (Wildcat) Bikeway Percival Road – Leesburg Road 7.28 13 Two Notch Road Bikeway Columbia Mall - Sandhills Mall 6.55 Downtown Columbia (Smith Branch - Blossom 14 Vista/Tunnel Greenway Street) 4.46 15 Congaree Creek Greenway Platt Springs Road - Congaree River 9.60 16 Beasley Creek Greenway Crane Creek - Blythewood 7.98 USC - Sesqui. St. Park via Trenholm Rd/Forest 17 Trenholm Road Bikeway Acres 7.38 18 Congaree River Greenway Downtown - Congaree Swamp 22.79 19 Platt Springs Bikeway White Knoll – Springdale/West Columbia 17.17 20 Broad River West Bank Greenway Northwest Richland County to Interstate 20 20.61 21 Twelve Mile Creek Greenway Gibson Pond - Saluda River 9.58 22 Broad River Greenway Northwest Richland County to 3 River Greenway 22.13 23 Caulks Ferry Bikeway US 378 –Platt Springs Road 11.60 24 Old Cherokee Bikeway US 378 – Pilgrim Church Road/SC 6 8.09 25 Northeast Greenway Crane Creek – Fort Jackson 11.19 26 Cedar Creek Greenway Fort Jackson/McEntire - Congaree Swamp 13.83 27 Leesburg-Fort Jackson Greenway Gills Creek- Cedar Creek 12.13 28 Capital City Trail Greenway aka Palmetto Trail 9.16 29 Fourteen Mile Creek Greenway SC 6 - 12 Mile Creek Greenway 4.46

8

• Length: 4.3 miles Location: Columbia (Richland County) • Existing Segments: ½ mile beyond Broad River Rd – Gervais St • Possible Implementation Entities: River Alliance • Key Destinations: Innovista, Downtown Columbia • Connections to Pathways: Saluda River Greenway, Smith/Rocky Branch GW

9

• Length: 5.8 miles Location: West Columbia, Cayce (Lexington County) • Existing Segments: Jarvis Klapman Blvd (W Columbia) – Old State Rd (Cayce) • Possible Implementation Entities: River Alliance • Key Destinations: Centennial Park, Downtown Columbia • Connections to Pathways: Congaree Greenway, Platt Springs Bikeway

10

• Length: 7.60 miles Location: Columbia (Lexington County) • Existing Segments: proximity in/around Saluda Shoals Park • Possible Implementation Entities: Irmo-Chapin Recreation Commission • Key Destinations: Lake Murray Dam, Saluda Shoals Park • Connections to Pathways: Three Rivers Greenway West, Saluda Greenway, SC 6 Bikeway

11

• Length: 7.83 miles Location: Lake Murray Blvd, Irmo (Lexington County) • Existing Segments: Old Bush River Rd – Irmo Drive • Possible Implementation Entities: SCDOT & Town of Irmo • Key Destinations: Lake Murray Dam, Harbison Trail System, Harbison Forest • Connections to other Pathways: Saluda Greenway, SC 6 Bikeway North

12

• Length: 7.83 miles Location: Lake Murray Blvd, Irmo (Lexington County) • Existing Segments: Old Bush River Rd – Irmo Drive • Possible Implementation Entities: SCDOT & Town of Irmo • Key Destinations: Lake Murray Dam, Harbison Trail System, Harbison Forest • Connections to other Pathways: Saluda Greenway, SC 6 Bikeway North

13

• Length: 12.46 miles Location: Southeast Columbia (Richland County) • Existing Segments: none • Possible Implementation Entities: Columbia, Gills Creek Watershed, Richland County Conservation • Key Destinations: Congaree River, Lake Katherine, Fort Jackson • Connections to Pathways: Congaree River Greenway, Bluff Road Bikeway, Ft Jackson Greenway

14

• Length: 7.72 miles Location: Town of Lexington (Lexington County) • Existing Segments: I-20 to Lake Murray • Possible Implementation Entities: SCDOT • Key Destinations: Gibson Pond, Virginia Hylton Park, Lexington Town Hall, Lexington County Government Center, Lexington Elementary/Middle Schools, Lake Murray Dam • Connections to Pathways: SC 60 Bikeway, Saluda River Greenway, Pilgrim Church Road Bikeway 15

• Length: 3.76 miles Location: South Lexington County (White Knoll) • Existing Segments: I-20 – Platt Springs Road • Possible Implementation Entities: SCDOT • Key Destinations: White Knoll High School • Connections to other Pathways: SC 6 Bikeway (North), Platt Springs Bikeway

16

• Length: 9.70 miles Location: North Columbia (Richland County) • Existing Segments: none • Possible Implementation Entities: City of Columbia, Richland County Conservation • Key Destinations: Broad River • Connections to other Pathways: Broad River Greenway, Beaseley Creek

17

• Greenway, Rice Creek Greenway

• Length: 14.15 miles Location: Southeast Columbia (Richland County) • Existing Segments: none • Possible Implementation Entities: City of Columbia, Richland County (Conservation), SCDOT • Key Destinations: USC Football Stadium, Congaree Nat’l Park • Connections to Pathways: Gills Creek Greenway, Smith Creek Greenway, Lower Richland Bikeway, Cedar Creek Greenway

18

• Length: 8.71 miles Location: Southeast Richland County • Existing Segments: none • Possible Implementation Entities: SCDOT, Richland County Conservation, Richland County Parks & Recreation • Key Destinations: Congaree Nat’l Park, Hopkins Park, Lower Richland High School, Fort Jackson • Connections to Pathways: Fort Jackson Bikeway, Leesburg-Ft Jackson Greenway, Bluff Road Bikeway

19

• Length: 7.27 miles Location: Fort Jackson (Richland County) • Existing Segments: none • Possible Implementation Entities: Fort Jackson, SCDOT, Richland County • Key Destinations: Leesburg-Ft Jackson Greenway (aka “Palmetto Trail”) • Connections to Pathways: Leesburg-Ft Jackson Greenway, Northeast Greenway, Lower Richland Bikeway 20

• Length: 6.54 miles Location: Northeast Columbia (Richland County) • Existing Segments: none • Possible Implementation Entities: City of Columbia, SCDOT • Key Destinations: Columbia Mall, Sesquicentennial State Park, Village at Sandhills • Connections to Pathways: Trenholm Road Bikeway, Northeast Greenway

21

• Length: 4.46 miles • Location: vicinity of Smith Branch to Blossom Street (Columbia, Richland County) • Existing Segments: none • Possible Implementation Entities: City of Columbia • Key Destinations: Earlewood Park, Finley Park, Downtown Columbia • Connections to Pathways: Platt Springs Bikeway, Smith-Rocky Branch Greenway 22

• Length: 9.60 miles Location: Lower Lexington County (near Cayce) • Existing Segments: none • Possible Implementation Entities: Lexington County • Key Destinations: Three Rivers West Greenway, 12,000 Year Historic Park • Connections to Pathways: Platt Springs Bikeway, Three Rivers West Greenway

23

• Length: 7.98 miles Location: Blythewood, northeast Richland County • Existing Segments: none • Possible Implementation Entities: Richland County Conservation • Key Destinations: none • Connections to Pathways: Crane Creek Greenway

24

• Length: 7.37 Location: Northeast Columbia (Richland County) • Existing Segments: Beltline Road – Two Notch Road • Possible Implementation Entities: City of Columbia, SCDOT, Arcadia Lakes • Key Destinations: Columbia Mall, Dent Middle School, Forest Acres City Hall, Library Branch, Cardinal- Newman High School, Lake Katherine • Connections to Pathways: Two Notch Road Bikeway, Gills Creek Greenway 25

• Length: 22.78 miles Location: Lower Richland County • Existing Segments: none • Possible Implementation Entities: River Alliance, Richland County Conservation • Key Destinations: Three Rivers Greenways, Congaree Nat’l Park • Connections to Pathways: Three Rivers Greenway East

26

• Total Length: 17.16 miles • Location: Lower Lexington County (White Knoll) • Existing Segments: none • Possible Implementation Entities: SCDOT • Key Destinations: White Knoll High School, Indian River Golf Club • Connections to Pathways: Caulks Ferry Bikeway, Congaree Creek Greenway 27

• Total Length: 17.16 miles • Location: Lower Lexington County (Springdale, West Columbia) • Existing Segments: Emanuel Church Road – Charleston Highway • Possible Implementation Entities: SCDOT • Key Destinations: Midlands Tech, Springdale Town Hall, Pair Elementary School • Connections to Pathways: Three Rivers West Greenway 28

• Length: 20.6 miles Location: Northwest Richland County • Existing Segments: none • Possible Implementation Entities: River Alliance, Richland County • Key Destinations: Chapin, Broad River, Downtown Columbia • Connections to Pathways: Three Rivers West Greenway

29

• Length: 9.57 miles Location: Town of Lexington (Lexington County) • Existing Segments: none • Possible Implementation Entities: Town of Lexington, Lexington County • Key Destinations: Gibson Pond, neighborhoods in vicinity, new RiverBluff High School • Connections to Pathways: SC 6 Bikeway (North), Fourteen Mile Creek Greenway

30

*Note: Broad River Greenway is a potential segment of the SC Palmetto Trail System • Length: 22.12 miles Location: Northwest Richland County • Existing Segments: none • Possible Implementation Entities: Palmetto Conservation Foundation, Richland County Conversation • Key Destinations: SC Palmetto Trail (Peak, SC), Broad River, Downtown Columbia • Connections to other Pathways: Capital City Trail Greenway

31

• Length: 11.59 miles Location: western Lexington County • Existing Segments: none • Possible Implementation Entities: SCDOT • Key Destinations: Lake Murray, rural countryside • Connections to other Pathways: Platt Springs Bikeway, Old Cherokee Bikeway

32

• Length: 8.09 miles Location: Town of Lexington (Lexington County) • Existing Segments: none • Possible Implementation Entities: SCDOT • Key Destinations: forms the south leg of the unofficial “Lake Murray Bike Route” • Connections to other Pathways: SC 6 Bikeway (North), Caulks Ferry Bikeway

33

• Length: 11.18 miles Location: Northeast Richland County • Existing Segments: bikeway from Two Notch Road – Valhalla Drive • Possible Implementation Entities: City of Columbia, Richland County Conservation, SCDOT • Key Destinations: Village at Sandhills, The Summit Neighborhoods • Connections to other Pathways: Crane Creek Greenway, Two Notch Road Bikeway

34

• Length: 13.83 miles Location: Southeast Richland County • Existing Segments: none • Possible Implementation Entities: Richland County Conservation • Key Destinations: Congaree Nat’l Park • Connections to other Pathways: Leesburg-Ft Jackson Greenway, Bluff Road Bikeway

35

*Note: Leesburg-Ft Jackson Greenway is an existing segment of the South Carolina Palmetto Trail System • Length: 12.12 miles Location: Columbia east, Richland County • Existing Segments: Lake Katherine – Fort Jackson east boundary • Possible Implementation Entities: Richland County Conservation • Key Destinations: Congaree Nat’l Park • Connections to Pathways: Leesburg-Ft Jackson Greenway, Bluff Road Bikeway

36

*Note: Capital City Greenway is an existing segment of the SC Palmetto Trail System • Length: 9.16 miles Location: City of Columbia (Richland County) • Existing Segments: Blossom Street to Laurel Drive • Possible Implementation Entities: Columbia, Palmetto Conservation Foundation, Richland County Conservation, SCDOT • Key Destinations: Broad River, InnoVista (Downtown Columbia), USC, Baptist Hospital • Connections to Pathways: Vista Greenway, Smith Branch Greenway 37

• Length: 4.46 miles Location: Town of Lexington (Lexington County) • Existing Segments: none • Possible Implementation Entities: Town of Lexington, Lexington County • Key Destinations: neighborhoods in vicinity • Connections to other Pathways: SC 6 Bikeway (North), Twelve Mile Creek Greenway

38

Central Midlands Pathways Plan

Appendix:

Sample Pathway Cross Sections

39

Central Midlands Pathways Plan

40

Central Midlands Pathways Plan

41

Central Midlands Pathways Plan

42

Central Midlands Pathways Plan

43