APPLICATION FOR ENVIRONMENTAL CLEARANCE (FORM – I, FORM – IA & CONCEPTUAL PLAN) FOR THE PROPOSED CONSTRUCTION OF ADDITIONAL 432 SLUM TENEMENTS PROJECT AT S.F. NO. 166, 167/2, NARASINGANALLUR VILLAGE, TALUK,

TAMILNADU SLUM CLEARANCE BOARD NGO “B” COLONY EXTN, PERUMALPURAM, TIRUNELVELI – 627007.

Prepared by

JUNE 2015

INDEX

S. NO. CONTENTS PAGE NO I INDEX i

II FORM – 1 1

III FORM – 1A 14

IV CONCEPTUAL PLAN 26

1.0 INTRODUCTION 27 1.1 Background of the project 27 1.2 Objectives of Tamilnadu Slum Clearance Board 27 1.3 RAY Scheme 27 2.0 DESCRIPTION OF THE PROJECT 29 2.1 Project Location 29 2.2 Environmental Sensitivity of the project site 29 2.3 Site Connectivity 34 2.4 Topography & Drainage 34 3.0 PROJECT DESCRIPTION 37 3.1 Over view of the project 37 3.2 Population details 39 3.3 Project cost 39 3.4 Construction materials 39 3.5 Water requirement 41 3.6 Wastewater Generation, Treatment & Disposal 41 3.7 Solid Waste Generation, Collection, Transport and Disposal 46 3.8 Rainwater Harvesting & Storm Water Drain 47 3.9 Power details 49 3.10 Fire fighting system 49 3.11 Project Schedule 50 4.0 ENVIRONMENTAL MANAGEMENT PLAN 51 4.1 Disaster Management Plan 54 4.2 Energy Conservation Measures 55 4.3 Green Belt Development 56 4.4 Environmental Monitoring Plan 58 4.5 EMP Budget Provisions 59 4.6 Environmental Management Cell 59

i | P a g e

Form - I

Form – 1 to get Environmental Clearance for the proposed construction of Additional Slum Tenements at VOC Nagar, Narasinganallur village, ,Tirunelveli District by Slum Clearance Board.

FORM ‐ 1 I. Basic Information

S.No. Item Details 1 Name of the project/s Proposed construction of additional 432 slum tenements at VOC Nagar, Narasinganallur Village, Tirunelveli Taluk, Tirunelveli District under RAY Scheme by Tamilnadu Slum Clearance Board. 2 S.No. in the schedule 8(a) 3 Proposed capacity / area / length / Total Built up Area – 21,044.22 sq. m. tonnage to be handled / command area / lease area / number of wells to be drilled 4 New/Expansion/Modernization New

5 Existing Capacity/ Area etc. Existing ‐ 5223.42 sq. m. 6 Category of Project i.e. ‘A’ or ‘B’ Category B 7 Dose it attract the general No condition? If yes, please specify. 8 Dose it attract the specific No condition?If yes, please specify. 9 Location Plot/survey/ Khasra.No S.F. No.166,167/2 Village Narasinganallur Tehsil Tirunelveli District Tirunelveli State Tamil Nadu 10 Nearest railway station/airport Pettai Railway Station – 0.75 km, NE along with distance in Km. Tuticorin Airport – 42 km, E 11 Nearest Village, city, district Tirunelveli –5.7 km, NE headquarters along with distance in Km. 12 Village panchayats, Zillaparished, Tirunelveli Corporation, municipal corporation, local Tirunelveli Taluk, body(complete postal address with Tirunelveli dist ‐ 627006. telephone nos. to be given) Ph: 0462 ‐ 2336633 13 Name of the applicant Tamilnadu Slum Clearance Board 14 Registered address Tamil Nadu Slum Control Board, , NGO ‘B’ Colony Extension, P e r u m a l p u r a m , Tirunelveli ‐ 627 007.

June 2015

1 Form – 1 to get Environmental Clearance for the proposed construction of AdditionalSlumTenementsatVOCNagar,Narasinganallurvillage,Tirunelveli Taluk,TirunelveliDistrictbyTamilNaduSlumClearanceBoard.

@yahoo.co.in

June2015 2 Form – 1 to get Environmental Clearance for the proposed construction of AdditionalSlumTenementsatVOCNagar,Narasinganallurvillage,Tirunelveli Taluk,TirunelveliDistrictbyTamilNaduSlumClearanceBoard.

(II)Activity 1. Construction,operationordecommissioningoftheProjectinvolvingactions, which will cause physical changes in the locality (topography, land use, changesinwaterbodies,etc.) S.No. Information/Checklist Yes/ Detailsthereof withapproximate confirmation No quantities/rates,wherever possible)withsourceof informationdata Annexure–I. AnnexureII.

June2015 3 Form – 1 to get Environmental Clearance for the proposed construction of AdditionalSlumTenementsatVOCNagar,Narasinganallurvillage,Tirunelveli Taluk,TirunelveliDistrictbyTamilNaduSlumClearanceBoard.

June2015 4 Form – 1 to get Environmental Clearance for the proposed construction of AdditionalSlumTenementsatVOCNagar,Narasinganallurvillage,Tirunelveli Taluk,TirunelveliDistrictbyTamilNaduSlumClearanceBoard.

June2015 5 Form – 1 to get Environmental Clearance for the proposed construction of AdditionalSlumTenementsatVOCNagar,Narasinganallurvillage,Tirunelveli Taluk,TirunelveliDistrictbyTamilNaduSlumClearanceBoard.

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources whicharenonrenewableorinshortsupply). Detailsthereof(withapproximate Information/checklist quantities/rates,wherever S.No. Yes/No confirmation possible)withsourceof informationdata 15,820.8 Sq.m. Annexure–III. Annexure–IV /

June2015 6 Form – 1 to get Environmental Clearance for the proposed construction of AdditionalSlumTenementsatVOCNagar,Narasinganallurvillage,Tirunelveli Taluk,TirunelveliDistrictbyTamilNaduSlumClearanceBoard.

3. Use, storage, transport, handling or production of substances or materials,whichcouldbeharmfultohumanhealthortheenvironment orraiseconcernsaboutactualorperceivedriskstohumanhealth. Detailsthereof(with Information/Checklist approximatequantities/rates, S.No. Yes/No Confirmation whereverpossible)withsource ofinformationdata 4. Production of solid wastes during construction or operation ordecommissioning(MT/month) Details thereof(with Information/Checklist approximatequantities/rates, S.No. Yes/No confirmation whereverpossible)withsourceof informationdata

June2015 7 Form – 1 to get Environmental Clearance for the proposed construction of AdditionalSlumTenementsatVOCNagar,Narasinganallurvillage,Tirunelveli Taluk,TirunelveliDistrictbyTamilNaduSlumClearanceBoard.

5. Releaseofpollutantsoranyhazardous,toxicornoxioussubstancesto air(Kg/hr) Detailsthereof(with Information/Checklist approximatequantities/rates, S.No. Yes/No confirmation whereverpossible)withsource ofinformationdata

June2015 8 Form – 1 to get Environmental Clearance for the proposed construction of AdditionalSlumTenementsatVOCNagar,Narasinganallurvillage,Tirunelveli Taluk,TirunelveliDistrictbyTamilNaduSlumClearanceBoard.

6. GenerationofNoise,VibrationandEmissionsofLight&Heat Detailsthereof(with Information/Checklist approximatequantities/rates, S.No. Yes/No Confirmation whereverpossible)withsourceof informationdata

June2015 9 Form – 1 to get Environmental Clearance for the proposed construction of AdditionalSlumTenementsatVOCNagar,Narasinganallurvillage,Tirunelveli Taluk,TirunelveliDistrictbyTamilNaduSlumClearanceBoard.

7. Risks of contamination of land or water from releases of pollutants into the ground or intosewers, surface waters, groundwater, coastal watersorthesea. Detailsthereof(with Information/Checklist approximatequantities/rates, S.No. Yes/No confirmation whereverpossible)withsourceof informationdata 8. Risk of accidents during construction or operation of the Project, whichcouldaffecthumanhealthortheenvironment. Details thereof(with Information/Checklist approximatequantities/rates, S.No. Yes/No confirmation whereverpossible)withsourceof informationdata

June2015 10 Form – 1 to get Environmental Clearance for the proposed construction of AdditionalSlumTenementsatVOCNagar,Narasinganallurvillage,Tirunelveli Taluk,TirunelveliDistrictbyTamilNaduSlumClearanceBoard.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activitiesinthelocality Detailsthereof(with Information/Checklist S.No. Yes/No approximatequantities/rates, confirmation whereverpossible)withsourceof informationdata    

June2015 11 Form – 1 to get Environmental Clearance for the proposed construction of AdditionalSlumTenementsatVOCNagar,Narasinganallurvillage,Tirunelveli Taluk,TirunelveliDistrictbyTamilNaduSlumClearanceBoard.

(III) EnvironmentalSensitivity Aerialdistance S.No. Areas Name/Identity (within15km.) No

June2015 12 13

14 Form - IA

Form–1AtogetEnvironmentalClearancefortheproposedconstructionof Additional Slum Tenements at VOC Nagar, Narasinganallur village, TirunelveliTaluk,TirunelveliDistrictbyTamilNaduSlumClearanceBoard.

FORM1A

1. LandEnvironment S.No. Information DetailswithsourceofInformationdata Annexure–I AnnexureV Annexure– VI Annexure–VII ConceptualPlan

June2015 15 Form–1AtogetEnvironmentalClearancefortheproposedconstructionof Additional Slum Tenements at VOC Nagar, Narasinganallur village, TirunelveliTaluk,TirunelveliDistrictbyTamilNaduSlumClearanceBoard.

Annexure II. Annexure–VII.

June2015 16 Form–1AtogetEnvironmentalClearancefortheproposedconstructionof Additional Slum Tenements at VOC Nagar, Narasinganallur village, TirunelveliTaluk,TirunelveliDistrictbyTamilNaduSlumClearanceBoard.

2. WaterEnvironment S.No. Information DetailswithsourceofInformationdata Section–3.5&3.6Conceptual Plan.

June2015 17 Form–1AtogetEnvironmentalClearancefortheproposedconstructionof Additional Slum Tenements at VOC Nagar, Narasinganallur village, TirunelveliTaluk,TirunelveliDistrictbyTamilNaduSlumClearanceBoard.

Figure 3.1 Conceptual Plan. Section3.8ConceptualPlan

June2015 18 Form–1AtogetEnvironmentalClearancefortheproposedconstructionof Additional Slum Tenements at VOC Nagar, Narasinganallur village, TirunelveliTaluk,TirunelveliDistrictbyTamilNaduSlumClearanceBoard.

Section3.5 ConceptualPlan. 3. Vegetation S.No. Information DetailswithsourceofInformationdata Section – 4.3 Conceptual plan.

June2015 19 Form–1AtogetEnvironmentalClearancefortheproposedconstructionof Additional Slum Tenements at VOC Nagar, Narasinganallur village, TirunelveliTaluk,TirunelveliDistrictbyTamilNaduSlumClearanceBoard.

4. Fauna S.No. Information DetailswithsourceofInformationdata 5. AirEnvironment S.No. Information DetailswithsourceofInformationdata

June2015 20 Form–1AtogetEnvironmentalClearancefortheproposedconstructionof Additional Slum Tenements at VOC Nagar, Narasinganallur village, TirunelveliTaluk,TirunelveliDistrictbyTamilNaduSlumClearanceBoard.

6. Aesthetics S.No. Information DetailswithsourceofInformationdata

June2015 21 Form–1AtogetEnvironmentalClearancefortheproposedconstructionof Additional Slum Tenements at VOC Nagar, Narasinganallur village, TirunelveliTaluk,TirunelveliDistrictbyTamilNaduSlumClearanceBoard.

7. SocioEconomicAspects S.No. Information DetailswithsourceofInformationdata 8. BuildingMaterial S.No. Information DetailswithsourceofInformationdata

June2015 22 Form–1AtogetEnvironmentalClearancefortheproposedconstructionof Additional Slum Tenements at VOC Nagar, Narasinganallur village, TirunelveliTaluk,TirunelveliDistrictbyTamilNaduSlumClearanceBoard.

         Section–3.7ConceptualPlan. 9. EnergyConservation S.No. Information DetailswithsourceofInformationdata  

June2015 23 Form–1AtogetEnvironmentalClearancefortheproposedconstructionof Additional Slum Tenements at VOC Nagar, Narasinganallur village, TirunelveliTaluk,TirunelveliDistrictbyTamilNaduSlumClearanceBoard.

June2015 24 Form–1AtogetEnvironmentalClearancefortheproposedconstructionof Additional Slum Tenements at VOC Nagar, Narasinganallur village, TirunelveliTaluk,TirunelveliDistrictbyTamilNaduSlumClearanceBoard.

June2015 25 Form–1AtogetEnvironmentalClearancefortheproposedconstructionof Additional Slum Tenements at VOC Nagar, Narasinganallur village, TirunelveliTaluk,TirunelveliDistrictbyTamilNaduSlumClearanceBoard.

10. EnvironmentalManagementPlan S.No. Information DetailswithsourceofInformationdata Section4.0of ConceptualPlan.

June2015 26 Conceptual Plan

ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.

1.0 INTRODUCTION

1.1 Backgroundoftheproject

1.2 ObjectivesofTamilNaduSlumClearanceBoard









1.3 RAYScheme

June2015 27 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.

Objectives











34,650Sq.m. 21,044Sq.m.

June2015 28 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.

2.0 DescriptionoftheProjectSite 2.1. Location Figure 2.1 Figure2.2.

2.2. EnvironmentalSensitivityoftheprojectsite

AnnexureVI. Figure2.3. Table2.1. Annexure–I

June2015 29 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.

ProjectSite

FIGURE2.1:MAPSHOWINGTHELOCATIONOFTHEPROJECTSITE

June2015 30 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.

31

FIGURE2.2:GOOGLEIMAGEOFTHEPROJECTSITE

June2015 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard. 32

FIGURE2.3:TOPOMAPOFTHEPROJECTSITECOVERING10KMRADIUS

June2015 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard. 33

FIGURE2.4:LANDUSEMAPOFTHEPROJECTSITECOVERING10KMRADIUS

June2015 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.

TABLE2.1:ENVIRONMENTALSETTINGOFTHEPROJECTSITE S.No. Particulars Details 2.3. SiteConnectivity

Figure2.5.

33 June2015 34 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.

NH

NH

PettaiRailwaystation

Projectsite SH

Figure2.5MAPSHOWINGTHESITECONNECTIVITYOFTHEPROJECTSITE

2.4. Topography&Drainage AnnexureVII Figures2.6.

June2015 35 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard. 36

FIGURE2.6:DRAINAGEMAPOFTHEPROJECTSITECOVERING10KMRADIUS

June2015 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.

3.0 PROJECTDESCRIPTION

3.1. Overviewoftheproject AnnexureIII Annexure–VIII.

Table 3.1 & 3.2. Table3.3. AnnexureV. TABLE3.1:BREAKUPAREADETAILS

Areainsq.m. Description Percentage% Existing AfterExpansion

TotalPlotArea 34650 34650.0 100

June2015 37 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.

TABLE3.2:BuiltupareaBreakupdetails TypeofBuilding Nooftenements Total(inSq.m) A. ExistingBuildingdetails

Type1(PlinthArea/block=25.10sq.m) 36in1Block

TotalperBlock 36 903.6 Totalfor2Blocks(x2) 72 1807.2 24in1Block

TotalperBlock 24 602.4 Totalfor3Blocks(x3) 72 1807.2

Type2(PlinthArea/block=25.54sq.m) SingleTenements63Nos 63 1609.02 SubTotal 207 5223.42 GrandTotal 5223.42 B. ProposedBuildingdetails TypeOfBuilding Nooftenements Total(inSq. m)

Type1(PlinthArea/block=36.53)sq.m 32in1Block

TotalperBlock 32 1168.96 Totalof2blocks(x2) 64 2337.92

Type2(PlinthArea/block=37.36sq.m) 48in1Block

June2015 38 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.

TotalperBlock 48 1793.28 Totalof1blocks(x1) 48 1793.28

Type3(PlinthArea/block=36.53sq.m) 64in1block

TotalperBlock 64 2337.92 Totalof5blocks(x5) 320 11689.6 SubTotal 432 15820.8 GrandTotal(A+B) 207+432=639 21044.22

TABLE3.3:SALIENTFEATURESOFPROPOSEDPROJECT

DESCRIPTION EXISTING AFTEREXPANSION

June2015 39 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.

3.2 PopulationDetails

Table3.4 Table3.5 TABLE3.4MANPOWERREQUIREMENTDURINGCONSTRUCTIONPHASE S.No. Description

TABLE3.5:EXPECTEDPOPULATIONDETAILSDURINGOPERATIONALPHASE S.No. Description Existing Proposed AfterExpansion

TotalPopulation 1138 2176 3514

3.3 ProjectCost

3.4 ConstructionMaterials

Table3.6.

June2015 40 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.

TABLE3.6QUANTITYOFCONSTRUCTIONMATERIALSREQUIREDFOR PROPOSEDCONSTRUCTION

MaterialDescription UnitsofMeasurement ApproxQtyreqd.

3.5 WaterRequirement

AnnexureIV

3.6 WastewaterGeneration,Treatment&Disposal

Annexure–IX AnnexureX

June2015 41 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.

TABLE3.7WATERREQUIREMENTANDWASTEWATERGENERATIONCALCULATIONSEXISTING S.No. Description Noof No.ofPersons Total Waterrequirement Waterrequirement Wastewater dwelling /Dwellingunit Occupancy (lpcd) (lpd) Generation(lpd) units Domestic Flushing Domestic Flushing Domestic Flushing

SubTotal 94,185 47,093 75,348 47,093 GrandTotal 141,278141KLD 122,441122KLD

42 TABLE3.7WATERREQUIREMENTANDWASTEWATERGENERATIONCALCULATIONSPROPOSED S.No. Description Noof No.ofPersons Total Waterrequirement Waterrequirement Wastewater dwelling /Dwellingunit Occupancy (lpcd) (lpd) Generation(lpd) units Domestic Flushing Domestic Flushing Domestic Flushing SubTotal 196,560 98,280 157,248 98,280 GrandTotal 294,840295KLD 255,528256KLD

June2015 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.

TABLE3.7WATERREQUIREMENTANDWASTEWATERGENERATIONCALCULATIONS–AFTEREXPANSION S.No. Description Noof No.ofPersons Total Waterrequirement Waterrequirement Wastewater dwelling /Dwellingunit Occupancy (lpcd) (lpd) Generation(lpd) units Domestic Flushing Domestic Flushing Domestic Flushing SubTotal 290,745 145,373 232,596 145,373 GrandTotal 436,118436KLD 377,969378KLD 43

June2015 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.

FreshWaterRequirement 141KLD

DomesticWater Toilet Requirement Flushing SewageGeneration 122KLD

DisposedinSeptictank followedbythe DispersionTrench FIGURE3.1:WATERBALANCEEXISTING

June2015 44 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.

FreshWaterRequirement 436KLD

DomesticWater Toilet Requirement Flushing SewageGeneration Greenbelt 378KLD Development STP(400KLD) TreatmentLoss (19KLD) TreatedSewage (360KLD) Disposedto AdjacentDrain FIGURE3.1:WATERBALANCE–AFTEREXPANSION

June2015 45 Conceptual Plan to get Environmental Clearance for the proposed construction of additional Slum Tenements at Narasinganallur Village, Tirunelveli Taluk & District by Tamil Nadu Slum Clearance Board.

3.7 Solid Waste Generation, Collection, Transport and Disposal

The quantity of municipal solid waste generation and Solid waste management from the proposed residential tenements is estimated and tabulated in Table – 3.8 & Table – 3.9. TABLE ‐ 3.8: SOLID WASTE GENERATION

S. No. Description No. of Persons Quantity (kg/day)* EXISTING 1 Residential 1035 518 2 Floating Population 103 21 Total 539 AFTER EXPANSION 1 Residential 3195 1597.5 2 Floating Population 319 63.9 Total 1661.4 * The estimation of solid waste generation for Residential Buildings is taken as 0.5 kg/person/day and Visitors is taken as 0.2 kg/person/day.

TABLE 3.9: SOLID WASTE MANAGEMENT

S. Description Quantity Method of No. (kg/day) Treatment / Disposal 1 Biodegradable Waste (30%) 498.42 To be collected and handed 2 Non‐biodegradable Waste (60%) 996.84 over to Tirunelveli 3 Inert Waste (10%) 166 Corporation for disposal 4 STP Sludge 55 Used as manure in gardening & outside plantation

 Dust bin provision is provided for each Block.  The garbage will be collected and stored in garbage collection room and segregated as Bio‐degradable waste, Non‐biodegradable waste and inert waste using different color coded bins.  The organic waste/Biodegradable waste generated will be disposed to Tirunelveli Corporation for further treatment in its common composting facility the acknowledgement copy of the SW disposal request letter is enclosed as Annexure X.  The non biodegradable consists of mostly recyclable materials which will be sold to local vendors for recycling.

June 2015

46 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.

   

3.8 RainwaterHarvesting&StormWaterDrain

3.8.1 Needforrainwaterharvesting









3.8.2 RainwaterHarvestingNetwork

Figure3.2.

June2015 47 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.

Figure3.2SectionofRWHTrench

Table3.60(A)RAINWATERAVAILABLEFROMROOFTOPAREAS S.NO. ITEM AREA

Table3.10(B)RAINWATERFROMUNPAVEDAREA S.NO. ITEM AREA

June2015 48 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.

Table3.10(C)RAINWATERNAVAILABLEFROMPAVEDAREAS S.NO. ITEM AREA

TotalQuantityofwateravailableforHarvesting(A+B+C)=18737m3/Annum

3.9 PowerDetails

3.10 FireFightingSystem

AnnexureXI

June2015 49 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.

FireExtinguishers HoseReel DownComer ManuallyOperatedFireAlarmSystem TerraceTank PumpsnearTerracetank ExitSignage

3.11 ProjectSchedule

Annexure–XII

June2015 50 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.

4.0. ENVIRONMENTALMANAGEMENTPLAN Table4.1&4.2

TABLE4.1:ENVIRONMENTALMANAGEMENTPLAN–CONSTRUCTIONPHASE

Discipline Potential Probable MitigativeMeasures Remarks Negative Source Impacts

June2015 51 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.

Discipline Potential Probable MitigativeMeasures Remarks Negative Source Impacts e.g.

TABLE4.2:ENVIRONMENTALMANAGEMENTPLANOPERATIONPHASE

Discipline Potential Probable MitigativeMeasures Remarks Negative Source Impacts    

June2015 52 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.

Discipline Potential Probable MitigativeMeasures Remarks Negative Source Impacts

June2015 53 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.

Discipline Potential Probable MitigativeMeasures Remarks Negative Source Impacts

4.1 DisasterManagementPlan

PreventiveAction

ReportingProcedures





CommunicationSystem

June2015 54 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.

EmergencyActionCommittee

   



4.2 EnergyConservationMeasures







June2015 55 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.











4.3 GreenBeltDevelopment

Horticulture

June2015 56 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.

PlantationalongRoadsides

RecommendedPlants

Table 4.3 AnnexureXIV

June2015 57 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.

TABLE4.3:SUGGESTEDPLANTSFORGREENBELTDEVELOPMENT S.No. Botanicalname CommonName Annonasquamosa Borassusflabellifer Acaciachundra ArtocarpusheterophyllusLam Bambusaarundinace AcaciaplanifronsWight&Arn. Calotropisprocer Caricapapaya Cocosnucifera AzadirectaindicaA.Juss Albiziaamara(Roxb.)B.Boivin Anacardiumoccidentale Terminaliacatappa

4.4 EnvironmentalMonitoringPlan

Table4.4. TABLE4.4:ENVIRONMENTALMONITORINGSCHEDULE Important Monitoring Durationof S.No. Particulars Monitoring Frequency Sampling Parameters 1 AmbientAirQualityMonitoring 2 AmbientNoiseLevel

June2015 58 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.

Important Monitoring Durationof S.No. Particulars Monitoring Frequency Sampling Parameters 3 SewageSampleMonitoring

4 GroundWaterQualityMonitoring 5 SoilQuality 4.5 EMPBudgetProvisions Table4.5. TABLE4.5:BUDGETFORENVIRONMENTALMANAGEMENTPLAN

CapitalCost RecurringCostper S.No. Description (Lakhs) Annum(Lakhs)

Total 130.0 15.0

4.6 EnvironmentalManagementCell

June2015 59 ConceptualPlantogetEnvironmentalClearancefortheproposedconstruction ofadditionalSlumTenementsatNarasinganallurVillage,TirunelveliTaluk& DistrictbyTamilNaduSlumClearanceBoard.

       Figure4.1. EnvironmentalManagementCell

EnvironmentalEngineer Safety&HealthOfficer

Occupational SolidWaste SewageTreatment Health&Safety Management Plant Fire&Electrical safety Energy GreenBelt Management Development& Management FIGURE4.1:ENVIRONMENTALMANAGEMENTCELL

June2015 60