Appendix A: MTP Project List Connections 2040 MTP Project Listing by Project Type, Then Project Title Publicly Funded Projects (Federal, State & Local)

Total Page:16

File Type:pdf, Size:1020Kb

Appendix A: MTP Project List Connections 2040 MTP Project Listing by Project Type, Then Project Title Publicly Funded Projects (Federal, State & Local) Appendix A: MTP Project List Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local) Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040 City of Albuquerque‐ Late 845.0 10th St Bike Lanes Lead Ave Marquette Ave Implement Bike Lanes Bike/Ped $742,500 DMD Term Construct mult‐use trail. Project may be phased. Bern Co will utilize design funds as 96.3 2nd St SW (Valle de Oro) Trail Phase 2South diversion channel Prosperity Ave. Bike/Ped County of Bernalillo $1,156,790 Funded soft match for construction per 09/22/2017 letter from NMDOT. COMPLETED Construct mult‐use trail. Project may be 96.4 2nd St SW (Valle de Oro) Trail Phase 3 Prosperity Rio Bravo Bike/Ped County of Bernalillo $3,000,000 Funded phased. PROJECT UNDERWAY 24.0 Alameda Drain Trail Ph 1 Montano Osuna Construct a multi‐use trail. COMPLETED Bike/Ped County of Bernalillo $1,664,836 Funded Design and construct a paved multi‐use trail along the Alameda Drain. Project includes Alameda Drain/2nd Street Bike/Ped construction management for paving, 24.3 4th Street at Matthew Ave Montano Rd at 2nd St Bike/Ped City of Albuquerque‐P&R $1,025,000 Funded Trail Ph 3 striping, signage, landscaping, crossing treatments and other appurtenances as needed. UNDERWAY Construct a multi‐use trail which includes 24.2 Alameda DrainTrail Phase 2 Osuna Rd El Pueblo Rd landscaping, signing, striping and other Bike/Ped County of Bernalillo $2,900,000 Funded appurtenances as needed. DESIGN Continue design and construction of a paved multi‐use trail along the Alameda Drain. Project includes construction management for 24.4 Alameda DrainTrail Phase 4Paseo del Norte Alameda Blvd Bike/Ped County of Bernalillo $1,711,699 Funded paving, striping, signage, landscaping, crossing treatments and other appurtenances as needed. Add phase 5 Late 24.5 Alameda DrainTrail Phase 5Alameda Blvd Roy Ave Construct multi‐use trail. Bike/Ped County of Bernalillo $2,000,000 Term Construct a gap section of multi‐use trail with on‐street facilities, signage, markings, Albuquerque Multi Use Trail Existing Paseo del Norte intersection improvements & other City of Albuquerque‐ 150.1 Eagle Ranch/Coors Bike/Ped $875,988 Funded (Coors/Eagle Ranch Section) Trail appurtenances as needed. Project will utilize Planning Advance Construction & requests to use design funds as soft match for construction. City of Albuquerque‐ 812.0 Amole Arroyo del Norte Bike Trail Sage Road San Ygnacio Rd Construct Bike Trail COMPLETED Bike/Ped $330,000 Funded DMD Design & construction of new and current AMPA Wide ADA Enhancements (Early deficient pedestrian facilities at various Near 1103.0 AMPA Wide Bike/Ped Various/Joint Effort $1,000,000 Time Frame) locations to better comply with the Americans Term with Disabilities Act (ADA). Appendix A 1 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local) Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040 Design & construction of new and current AMPA Wide ADA Enhancements (Late deficient pedestrian facilities at various Late 1103.2 AMPA Wide Bike/Ped Various/Joint Effort $7,900,000 Time Frame) locations to better comply with the Americans Term with Disabilities Act (ADA). AMPA Wide Bicycle Facil. Prog & On‐going program to promote on‐street City of Albuquerque‐ Late 726.0 Albuquerque Metro Area Bike/Ped $3,000,000 Activities (Late Time Frame) bicycle facilities, activities and programs. DMD Term AMPA Wide Bicycle Facil. Prog. & Improvements to bicycle facilities, programs City of Albuquerque‐ 100.5 Albuquerque Metro Area Bike/Ped $175,562 Funded Activities and activities. DMD AMPA Wide Bicycle Facil. Prog. & Improvements to bicycle facilities, programs City of Albuquerque‐ 100.6 Albuquerque Metro Area Bike/Ped $175,562 Funded Activities and activities. DMD AMPA Wide Bicycle Facil. Prog. & On‐going program to promote on‐street City of Albuquerque‐ 141.2 Albuquerque Metro Area Bike/Ped $936,330 Funded Activities bicycle facilities, activities and programs. DMD AMPA Wide Bicycle Facil. Prog. & Improvements to bicycle facilities, programs City of Albuquerque‐ 100.8 Albuquerque Metro Area Bike/Ped $175,562 Funded Activities and activities. DMD AMPA Wide Bicycle Facil. Prog. & Improvements to bicycle facilities, programs City of Albuquerque‐ 100.9 Albuquerque Metro Area Bike/Ped $175,562 Funded Activities and activities. DMD AMPA Wide Bicycle Facil. Prog. & Improvements to bicycle facilities, programs City of Albuquerque‐ 141.0 Albuquerque Metro Area Bike/Ped $204,822 Funded Activities and activities. DMD AMPA Wide Bicycle Facil. Prog. & Improvements to bicycle facilities, programs City of Albuquerque‐ 141.1 Albuquerque Metro Area Bike/Ped $204,822 Funded Activities and activities. DMD Replace existing and install new bike share stations, including bicycles, signs, kiosks, fare 190.1 AMPA Wide Bike Share Program Various Locations payment, communications and other bike Bike/Ped Rio Metro Transit Dist $1,257,335 Funded share‐related appurtenances and technologies. Replace existing & install new bike share stations, including, bicycles, signs, kiosks, fare Various Locations AMPA 190.2 AMPA Wide Bike Share Program payment, communications and other bike Bike/Ped Rio Metro Transit Dist $1,755,618 Funded Wide share‐related appurtenances and technologies as needed. Install bike share kiosks and rental bikes in multiple locations throughout central city at 190.0 AMPA Wide Bike Share Program Various Locations locations to be determined. Note: local match Bike/Ped Rio Metro Transit Dist $600,725 Funded will be used for environmental and design. COMPLETED Appendix A 2 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local) Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040 Replace existing & install new bike share stations, including, bicycles, signs, kiosks, fare AMPA Wide Bike Share Program (Late Various Locations AMPA Late 190.3 payment, communications and other bike Bike/Ped Rio Metro Transit Dist $6,000,001 Time Frame) Wide Term share‐related appurtenances and technologies as needed. Increase youth safety in the AMPA through AMPA wide Bike/Ped Safety Education 101.7 AMPA Wide education on multi‐modal transportation and Bike/Ped City of Albuquerque‐P&R $514,981 Funded Program proper use of infrastructure. Construct minor pedestrian projects such as: AMPA Wide Pedestrian Projects (Late Late 1102.2 AMPA Wide ped. Crossings, kiosks, bulb‐outs, benches and Bike/Ped Various/Joint Effort $3,950,000 Time Frame) Term other amenities Bicycle & Pedestrian Safety Education AMPA Wide Youth Bicycle/Pedestrian Near 101.5 AMPA Wide Program. Separate CN will be issued later for Bike/Ped City of Albuquerque‐P&R $1,875,000 Safety Educ. Program Term each FY. Provide an AMPA wide Bike/Ped safety AMPA Wide Youth Bicycle/Pedestrian education program that will promote 101.6 AMPA Wide Bike/Ped City of Albuquerque‐P&R $230,673 Funded Safety Educ. Program alternative means of transportation.. Separate CN will be issued later for each FY. AMPA‐wide bicycle pedestian safety education program. Increase youth safety in AMPA Wide Youth Bicycle/Pedestrian 101.8 AMPA Wide the AMPA through education on multi‐modal Bike/Ped City of Albuquerque‐P&R $408,800 Funded Safety Education Program transportation and proper use of infrastructure. City of Albuquerque‐ Late 850.0 Avenida Cesar Chavez Bike Lanes Broadway Yale Blvd Build Bike Lanes Bike/Ped $2,310,000 DMD Term Design an ADA compliant pedestrian facility which will inclide sidewalks, curb ramps, drive Near 863.1 Baltic Ave ADA Sidewalk Improvements Southern Blvd Lisbon Ave pads. Design may also include retaining walls, Bike/Ped City of Rio Rancho $308,576 Term fire hydrant relocations and other appurtenances as needed. Sidewalk improvements for ADA compliance. Widen sidewalks to accommodate Southern Municipal Intersection of NM473 & 382.3 Bernalillo Main St Streetscape Phase 4 wheelchair, pedestrian and roadway lighting. Bike/Ped Town of Bernalillo $2,045,000 Funded Boundary NM313 Project includes ADA sloped curbs for entry from street level. Appendix A 3 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local) Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040 Sidewalk replacement for ADA compliance, pedestrian and roadway lighting and ADA 382.2 Bernalillo Main St Streetscape
Recommended publications
  • Ground-Water Geochemistry of the Albuquerque-Belen Basin, Central New Mexico
    GROUND-WA TER GEOCHEMISTRY OF THE ALBVQVERQVE-BELEN BASIN, CENTRAL NEW MEXICO By Scott K. Anderholm U.S. GEOLOGICAL SURVEY Water-Resources Investigations Report 86-4094 Albuquerque, New Mexico 1988 DEPARTMENT OF THE INTERIOR DONALD PAUL MODEL, Secretary U.S. GEOLOGICAL SURVEY Dallas L. Peck, Director For additional information Copies of this report can write to: be purchased from: District Chief U.S. Geological Survey U.S. Geological Survey Water Resources Division Books and Open-File Reports Pinetree Office Park Federal Center, Building 810 4501 Indian School Rd. NE, Suite 200 Box 25425 Albuquerque, New Mexico 87110 Denver, Colorado 80225 CONTENTS Page Abstract ............................................................. 1 Introduction ......................................................... 2 Acknowledgments ................................................. 4 Purpose and scope ............................................... 4 Location ........................................................ 4 Climate ......................................................... 6 Previous investigations ......................................... 6 Geology .................................................... 6 Hydrology .................................................. 6 Well-numbering system ........................................... 9 Geology .............................................................. 10 Precambrian rocks ............................................... 10 Paleozoic rocks ................................................. 10 Mesozoic
    [Show full text]
  • Rio Metro Regional Transit District Budget and Capital Plan FY2021 - FY2027
    Rio Metro Regional Transit District Budget and Capital Plan FY2021 - FY2027 May 2020 Table of Contents Introduction .................................................................................................................................................. 3 I.1 Plan Structure ...................................................................................................................................... 3 I.2 Relationship to the TAM Plan ............................................................................................................. 3 I.3 Key Issues for FY2021 .......................................................................................................................... 4 Section 1: FY2021 Budget and FY2022-FY2027 Projections ......................................................................... 5 1.1 New Mexico Rail Runner Express Budget .......................................................................................... 5 1.2 Transit Budget .................................................................................................................................... 7 1.3 Accomplishments and Goals ............................................................................................................ 10 Section 2: New Mexico Rail Runner Express Capital Plan ........................................................................... 13 2.1 Capital Maintenance Program ......................................................................................................... 14 2.2 Grade
    [Show full text]
  • December 2007 Bulletin.Pub
    TheNEW YORK DIVISION BULLETIN - DECEMBER, 2007 Bulletin New York Division, Electric Railroaders’ Association Vol. 50, No. 12 December, 2007 The Bulletin THE FIRST TROLLEY LINE Published by the New IN BROOKLYN AND QUEENS York Division, Electric IN BROOKLYN AND QUEENS Railroaders’ Association, The Jamaica Avenue trolley, which started tion was similar to the operation on the Incorporated, PO Box 3001, New York, New running 120 years ago, December 17, 1887, Culver and West End Lines, where trains ran York 10008-3001. was the first trolley line in Brooklyn and on the elevated structure and on the surface Queens. The trolley replaced the horse cars in city streets. Of course, all elevated cars that began operating on October 21, 1865. At were equipped with trolley poles in addition For general inquiries, first, the horse cars provided service from to third rail shoes. At Etna and Crescent contact us at nydiv@ th electricrailroaders.org Alabama Avenue to 78 Street, where pas- Streets, Conductors on Jamaica-bound trains or by phone at (212) sengers transferred to Jamaica-bound stage raised the poles that made contact with the 986-4482 (voice mail coaches. The horse car line was extended to trolley wire and adjusted the single-pole dou- available). ERA’s 168th Street, Jamaica on December 18, 1866. ble-throw switch to supply power from the website is Electric operation began on December 17, trolley wire. www.electricrailroaders. org. 1887 with cars using the Van Depoele sys- On May 30, 1903, Broadway elevated ser- tem. A short wooden dolly with two little pul- vice from Broadway Ferry was extended to Editorial Staff: leys at each end was pulled along the tops of Jamaica and trolley service east of Cypress Editor-in-Chief: the positive and negative trolley wire by two Hills was discontinued.
    [Show full text]
  • Tab 1 PUBLIC COMMENT FINAL ACTION ITEMS Accepting the Rio
    BOARD OF DIRECTORS MEETING Friday, May 17, 2019 12:00 p.m. 809 Copper Ave. N.W., Albuquerque, NM 87102 AGENDA Call to Order The presence of a quorum will be noted. Approval of the May 17, 2019 Agenda Tab 1 Approval of the March 15, 2019 Action Summary PUBLIC COMMENT Tab 2 Anyone who wishes to address the RMRTD Board must register with the Secretary of the Board FINAL ACTION ITEMS Tab 3 Accepting the Rio Metro Regional Transit District Fiscal Year 2017- R-19-01 RMRTD 2018 Audit Tab 4 Approving the RMRTD Short Range Plan FY 2020-2026 R-19-02 RMRTD Tab 5 Approving the RMRTD FY 2020 Budget R-19-03 RMRTD Tab 6 Approval of the Open Meetings Resolution & Establishment of the R-19-04 RMRTD Fiscal Year 2020 Meeting Schedule Tab 7 Amending the Rio Metro RTD Bylaws to Include Code of Conduct R-19-05 RMRTD DISCUSSION / INFORMATIONAL ITEMS Tab 8 PTC Update Tab 9 Staff Reports: -ABQ RIDE, NCRTD, Rio Metro RTD • Performance Report OTHER BUSINESS AND NOTES Next Meeting: Friday, June 21, 2019 at 12:00 p.m. Anyone requiring special accommodations is requested to notify Barbara Thomas at (505) 247-1750 or [email protected] at least three days prior to the meeting. Tab 1 RMRTD Board of Directors ACTION SUMMARY Friday, March 15, 2019 12:00 noon 809 Copper Ave. N.W. Albuquerque, NM 87102 Diane Gibson, Chair Wayne Ake, Vice Chair ORGANIZATION MEMBER ALTERNATE Bernalillo County X Debbie O’Malley, Ron Lopez Commissioner X Maggie Hart Stebbins, Julie Luna Commissioner Charlene Pyskoty, X Richard Meadows Commissioner Sandoval County X Michael Meek, Commissioner
    [Show full text]
  • A Sampler of Tour Subjects
    A Sampler of Tour Subjects The pages that follow derive from a series of articles from Desert Division publications, prepared during the buildup to the 65th National Convention. They are presented here to provide a general idea of the wonderful array of learning and enjoying opportunities that will be formalized for convention attendees. As details may change, please understand that more specific and final descriptions as to timing and content of such tours and other events will be available in the National Headquarters News and on the official convention website tcaconvention.org. In the meantime, get the feel of what’s in the offing! (Details subject to change.) - 11 - PICTURES FROM THE VLA- - Very Large Array Hard to get an idea of the size, but the antenna in One of the two transporters that work on the double “The Barn” is over 100’ tall and 85’ wide tracked “railroad” Just outside the main entrance is a small observation The double tracked system is over 66 miles configured view point, what a view. as a “Y”. This sectioned is being re-ballast. Also as part of the tour is the Harvey House Museum A view of the westbound four mainline crew change and in Belen, New Mexico refueling stop just over the back fence from the Harvey House. BNSF currently occupies the old Belen station - 6 - - 2926’s RETURN TO STEAM By Jon Spargo, TCA 05-59326 - Chief Safety Officer, NMSL&RHS It is mid-day in Los Angeles in the late 1940s it was like is alive and well in Albuquerque, New as you approach Union Station to board one of the Mexico.
    [Show full text]
  • Belén's Plaza Vieja and Colonial Church Site
    University of New Mexico UNM Digital Repository University Libraries & Learning Sciences Faculty and Staff Publications Scholarly Communication - Departments 12-12-2016 Belén’s Plaza Vieja and Colonial Church Site: Memory, Continuity and Recovery Samuel E. Sisneros [email protected] Follow this and additional works at: https://digitalrepository.unm.edu/ulls_fsp Part of the Archaeological Anthropology Commons, Architectural History and Criticism Commons, Biological and Physical Anthropology Commons, Folklore Commons, Historic Preservation and Conservation Commons, History of Art, Architecture, and Archaeology Commons, Landscape Architecture Commons, Race, Ethnicity and Post-Colonial Studies Commons, Scholarly Communication Commons, Social and Cultural Anthropology Commons, Spatial Science Commons, and the Urban Studies and Planning Commons Recommended Citation Sisneros, Samuel E.. "Belén’s Plaza Vieja and Colonial Church Site: Memory, Continuity and Recovery." (2016). https://digitalrepository.unm.edu/ulls_fsp/137 This Other is brought to you for free and open access by the Scholarly Communication - Departments at UNM Digital Repository. It has been accepted for inclusion in University Libraries & Learning Sciences Faculty and Staff Publications by an authorized administrator of UNM Digital Repository. For more information, please contact [email protected]. Belén’s Plaza Vieja and Colonial Church Site: Memory, Continuity and Recovery Samuel E. Sisneros Capstone Project, 12/15/2016 Historic Preservation and Regionalism Certification Program (Chair: Francisco Uviña-Contreras, HPR Director) School of Architecture and Planning University of New Mexico Belén’s Plaza Vieja and Colonial Church Site: Memory, Continuity and Recovery Samuel E. Sisneros December 2016 © Copyright December 2016 All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means without written permission from the author.
    [Show full text]
  • Passenger Guide Passenger Guide
    PASSENGER GUIDE MAY 2009 866-795-RAIL NMRAILRUNNER.COM A Letter from money, reduces congestion and road maintenance, and makes our roads safer by decreasing traffic accidents. And by riding Governor the Rail Runner, you can relax and enjoy a smooth, carefree ride Bill Richardson through some of the most beautiful scenery anywhere in the world. Beinvenidos! I consider the NMRX among the greatest accomplishments of Welcome aboard the my tenure as Governor. I urge you to ride the train often and New Mexico Rail Runner to visit each of the stops along the way. Explore the history, Express, the crown jewel of New Mexico’s multi-modal culture, and many attractions that this state has to offer. I am transportation system. hopeful that as New Mexico continues to grow and prosper, NMRX service will extend to other parts of the state and This is the future of transportation in New Mexico. The NMRX someday to our neighboring states as well. complements our excellent road network by offering a new option to people who can’t or don’t want to drive. It protects Muchas Gracias, our environment by cutting emissions, saves New Mexicans Governor Bill Richardson of our small towns to exciting nightlife Welcome Aboard! Riding NMRX in Albuquerque and Santa Fe. Welcome to the New Mexico Rail Runner Express–New Mexico’s NMRX is an innovative partnership award-winning new travel experience! Our cheerful, environ- between the Mid Region Council of mentally-friendly trains travel the 100-mile corridor between Belen Governments, Rio Metro Regional and Santa Fe, and our network of coordinated transit links can Transit District, the NM Department take you to hundreds of destinations throughout the region, from of Transportation, and the people of Socorro to Taos.
    [Show full text]
  • May 21, 2021 12:00 P.M
    BOARD OF DIRECTORS MEETING Friday, May 21, 2021 12:00 p.m. 809 Copper Ave. N.W., Albuquerque, NM 87102 (Meeting will be Virtual) Join from a PC, Mac, iPad, iPhone or Android device: Please click this URL to join. https://zoom.us/j/94841060513?pwd=d2ZNN2JkdGtlNC9YZEd4Q05UNWgxUT09 Passcode: 642610 Description: Rio Metro RTD May 2021 Regular Meeting of the Board of Directors Or join by phone: Dial(for higher quality, dial a number based on your current location): US: +1 346 248 7799 or +1 669 900 6833 or +1 253 215 8782 or +1 312 626 6799 or +1 929 436 2866 or +1 301 715 8592 Webinar ID: 948 4106 051 Passcode: 642610 AGENDA Call to Order The presence of a quorum will be noted. Approval of the May 21, 2021 Agenda Tab 1 Approval of the February 19, 2021 Action Summary PUBLIC COMMENT Tab 2 Anyone who wishes to address the RMRTD Board must register with the Secretary of the Board (via email to [email protected]) at least 24 hours prior to the meeting FINAL ACTION ITEMS Tab 3 Approving the RMRTD Budget and Capital Plan FY 2022-2028 R-21-02 RMRTD Tab 4 Approving the RMRTD FY 2022 Budget R-21-03 RMRTD Tab 5 Approval of the Open Meetings Resolution & Establishment of the R-21-04 RMRTD Fiscal Year 2022 Meeting Schedule DISCUSSION / INFORMATIONAL ITEMS Tab 6 NMRX Update OTHER BUSINESS AND NOTES Next Meeting: Friday, June 18, 2021 at 12:00 p.m. Anyone requiring special accommodations is requested to notify Barbara Thomas at (505) 247-1750 or [email protected] at least three days prior to the meeting.
    [Show full text]
  • November 2012 Callboard Working Copy Compressed Photos
    The Rocky Mountain Region’s CALLBOARDCALLBOARD Fall 2012 Edition JB& N A Labor of Love Inside BeBeBeBe len —The Hub City: B, 2013 Convention News, Division News, Photos, Articles and More! The NationalThe Rocky Mountain Model Region Callboard Railroad Newsletter 12/6/2012 Association Page Publication Information The Callboard is published quarterly by the Rocky Mountain Region of the National Model Railroad Association and is available online at: www.rmr-nmra.org/callboard.htm All materials, articles, and advertising must be submitted to the Editor and in an electronic format. Contact us for a copy of our submission guidelines. Official Publication of the Rocky Mountain Region Advertisers may contact the Editor to request guidelines and a rate card. of the National Model Railroad Association Editions are mailed to the address in the current NMRA membership list to FALL EDITION those without an email address, and the NOVEMBER 2012 list is updated monthly. Subscribers with an e-mail address will automatical- FEATURES ly receive the PDF version. New Mexico Railroad Heritage……………………….…….. 7 Address corrections can be made by Rails along the Rio Grande 2013 Convention ....................... 8 calling Jenny Hendricks at the NMRA: New Mexico area news……………………..……………… 11 (423) 892-2846 [email protected] 2013 Convention Guest Speaker ....................................... 12 Thank you for supporting the Callboard ! Belen – The Hub City ………...… .................................. 13 JB&N Railroad - A Labor of Love ..................................... 18 Publication Team Technical Corner ......................................................... 30 Scratch Building Corner ................................................. 33 Editor : Chris Fallis 1222 N. Cascade Ave Colorado Springs, CO 80903 (719) 475-2250 [email protected] REPORTS Graphic Artists: Jim Wanlass President ................................................................... 3 [email protected] Ken Berry Editor ......................................................................
    [Show full text]
  • White Paper Transit Operations And
    MEMORANDUM Project: RMRTD Visioning (Long-Term Strategic Vision and Implementation Services) Contract: 2014-01 Date: July 3rd, 2015 To: Tony Sylvester, Rio Metro Regional Transit District From: Holly Buck and Kelly Leadbetter, Felsburg Holt & Ullevig Subject: RMRTD Transit Operations and Organizational Options White Paper - FINAL Purpose of this White Paper Felsburg Holt & Ullevig (FHU) conducted a technical assessment of Rio Metro Regional Transit District (RMRTD) and ABQ RIDE to document existing transit operations and agency structures and identify preliminary opportunities for changes to better achieve the goals of the Long-Term Strategic Visioning project currently underway. RMRTD’s and ABQ RIDE’s boards, management/staff, transit riders, and other stakeholders (e.g. partner agencies and the business community) informed the development of this technical assessment by providing ongoing input to the consultant team throughout in the fall of 2014 and into 2015. In addition, a PowerPoint summary of the key findings and conclusions of an earlier draft of this white paper was delivered to the RMRTD Board at their 3/11/15 Visioning Workshop and to ABQ RIDE management and staff at their 4/14/15 workshop focused on ABQ RIDE. This version has subsequently been revised based on feedback at those meetings and from RMRTD staff. Ultimately, the findings from this white paper will inform the development of recommendations in the RMRTD’s Long-Term Strategic Vision Plan. What This White Paper Contains This white paper is consists of three parts: • Part 1: RMRTD Existing Conditions and Review of Partner Agencies/Service Providers. Part 1 includes a technical review of existing transit operations and agency structures for RMRTD and ABQ RIDE, including an assessment of agency leadership/management, transit services, public information, operating and capital budgets, and funding sources.
    [Show full text]
  • Rail & Bus Connections Guide
    Rail & Bus Connections Guide All our bus connections are FREE unless otherwise noted Santa Fe Depot Station Santa Fe County/NM 599 Station Los Lunas Santa Fe Pick Up - To the Santa Fe Plaza, Downtown Santa Fe, NM 599 Station Shuttle - Weekdays to Bisbee Court, Rio Metro Route 210 - Weekday service along NM 6 and NM 47, Los Canyon Road and Museum Hill. Operates daily. Turn left when exiting the New Mexican Plaza, VA* Clinic, Presbyterian Hospital, Lunas to Bosque Farms. Connects to Route 208, Route 209, and the Los the train to the shuttle and look for the red truck sign. and Santa Fe Place Mall. Lunas Rail Runner Station. Can deviate ¼ mile from the route by Buffalo Thunder Resort & Casino Shuttle - NCRTD Route 270 - Weekdays to the NM Department of reservation. For more information call 505-352-3595. Shuttle stops on Guadalupe right next to Tomasita’s Restaurant. Corrections, Oñate Complex (National Guard) and the Santa Fe Rio Metro Route 209 - Weekdays between Los Lunas Transportation Shuttle meets train daily. County Detention Center. Center and the UNM-Valencia Campus. Connects to Route 208 and 210. Tesuque Casino Shuttle - Santa Fe Trails Route 22 - Weekdays to Santa Fe Community Rio Metro Dial-A-Ride - Weekday curb-to-curb service in Valencia Shuttle stops on Guadalupe across from the Cowgirl Cafe. College, Rancho Viejo and IAIA. County. Rides must be requested by 12 NOON one business day prior. Shuttle meets train daily. NM Park & Ride Purple Route - Weekday direct connection Call 505-352-3595. $1 each way. Santa Fe Trails Route 2 (Cerrillos Road) - between the Rail Runner and Los* Alamos.
    [Show full text]
  • Belen to Santa Fe Commuter Rail Project Project Development History October 2009
    Belen to Santa Fe Commuter Rail Project Project Development History October 2009 New Mexico Rail Runner Express Train at Waldo Canyon Bridge Commuter Rail Project History Report Table of Contents Belen to Santa Fe Commuter Rail Overview ...................................................................... 3 Commuter Rail Defined .................................................................................................. 4 Regional Context ............................................................................................................ 6 Transportation Issues in the Middle Rio Grande Valley ................................................ 6 Transportation Issues in the Albuquerque to Santa Fe Corridor ................................... 16 Commuter Rail and the Belen to Santa Fe Corridor ..................................................... 19 Commuter Rail Project Status Phase I .............................................................................. 27 Branding and Naming ................................................................................................... 27 Station Development ..................................................................................................... 28 Rolling Stock Acquisition ............................................................................................. 37 Negotiations with the BNSF ......................................................................................... 42 Property Acquisition ................................................................................................
    [Show full text]