Appendix A: MTP Project List Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

City of Albuquerque‐ Late 845.0 10th St Bike Lanes Lead Ave Marquette Ave Implement Bike Lanes Bike/Ped $742,500 DMD Term Construct mult‐use trail. Project may be phased. Bern Co will utilize design funds as 96.3 2nd St SW (Valle de Oro) Trail Phase 2South diversion channel Prosperity Ave. Bike/Ped County of Bernalillo $1,156,790 Funded soft match for construction per 09/22/2017 letter from NMDOT. COMPLETED Construct mult‐use trail. Project may be 96.4 2nd St SW (Valle de Oro) Trail Phase 3 Prosperity Rio Bravo Bike/Ped County of Bernalillo $3,000,000 Funded phased. PROJECT UNDERWAY 24.0 Alameda Drain Trail Ph 1 Montano Osuna Construct a multi‐use trail. COMPLETED Bike/Ped County of Bernalillo $1,664,836 Funded Design and construct a paved multi‐use trail along the Alameda Drain. Project includes Alameda Drain/2nd Street Bike/Ped construction management for paving, 24.3 4th Street at Matthew Ave Montano Rd at 2nd St Bike/Ped City of Albuquerque‐P&R $1,025,000 Funded Trail Ph 3 striping, signage, landscaping, crossing treatments and other appurtenances as needed. UNDERWAY Construct a multi‐use trail which includes 24.2 Alameda DrainTrail Phase 2 Osuna Rd El Pueblo Rd landscaping, signing, striping and other Bike/Ped County of Bernalillo $2,900,000 Funded appurtenances as needed. DESIGN

Continue design and construction of a paved multi‐use trail along the Alameda Drain. Project includes construction management for 24.4 Alameda DrainTrail Phase 4Paseo del Norte Alameda Blvd Bike/Ped County of Bernalillo $1,711,699 Funded paving, striping, signage, landscaping, crossing treatments and other appurtenances as needed. Add phase 5 Late 24.5 Alameda DrainTrail Phase 5Alameda Blvd Roy Ave Construct multi‐use trail. Bike/Ped County of Bernalillo $2,000,000 Term Construct a gap section of multi‐use trail with on‐street facilities, signage, markings, Albuquerque Multi Use Trail Existing Paseo del Norte intersection improvements & other City of Albuquerque‐ 150.1 Eagle Ranch/Coors Bike/Ped $875,988 Funded (Coors/Eagle Ranch Section) Trail appurtenances as needed. Project will utilize Planning Advance Construction & requests to use design funds as soft match for construction. City of Albuquerque‐ 812.0 Amole Arroyo del Norte Bike Trail Sage Road San Ygnacio Rd Construct Bike Trail COMPLETED Bike/Ped $330,000 Funded DMD Design & construction of new and current AMPA Wide ADA Enhancements (Early deficient pedestrian facilities at various Near 1103.0 AMPA Wide Bike/Ped Various/Joint Effort $1,000,000 Time Frame) locations to better comply with the Americans Term with Disabilities Act (ADA).

Appendix A 1 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Design & construction of new and current AMPA Wide ADA Enhancements (Late deficient pedestrian facilities at various Late 1103.2 AMPA Wide Bike/Ped Various/Joint Effort $7,900,000 Time Frame) locations to better comply with the Americans Term with Disabilities Act (ADA).

AMPA Wide Bicycle Facil. Prog & On‐going program to promote on‐street City of Albuquerque‐ Late 726.0 Albuquerque Metro Area Bike/Ped $3,000,000 Activities (Late Time Frame) bicycle facilities, activities and programs. DMD Term AMPA Wide Bicycle Facil. Prog. & Improvements to bicycle facilities, programs City of Albuquerque‐ 100.5 Albuquerque Metro Area Bike/Ped $175,562 Funded Activities and activities. DMD AMPA Wide Bicycle Facil. Prog. & Improvements to bicycle facilities, programs City of Albuquerque‐ 100.6 Albuquerque Metro Area Bike/Ped $175,562 Funded Activities and activities. DMD AMPA Wide Bicycle Facil. Prog. & On‐going program to promote on‐street City of Albuquerque‐ 141.2 Albuquerque Metro Area Bike/Ped $936,330 Funded Activities bicycle facilities, activities and programs. DMD AMPA Wide Bicycle Facil. Prog. & Improvements to bicycle facilities, programs City of Albuquerque‐ 100.8 Albuquerque Metro Area Bike/Ped $175,562 Funded Activities and activities. DMD AMPA Wide Bicycle Facil. Prog. & Improvements to bicycle facilities, programs City of Albuquerque‐ 100.9 Albuquerque Metro Area Bike/Ped $175,562 Funded Activities and activities. DMD AMPA Wide Bicycle Facil. Prog. & Improvements to bicycle facilities, programs City of Albuquerque‐ 141.0 Albuquerque Metro Area Bike/Ped $204,822 Funded Activities and activities. DMD AMPA Wide Bicycle Facil. Prog. & Improvements to bicycle facilities, programs City of Albuquerque‐ 141.1 Albuquerque Metro Area Bike/Ped $204,822 Funded Activities and activities. DMD Replace existing and install new bike share stations, including bicycles, signs, kiosks, fare 190.1 AMPA Wide Bike Share Program Various Locations payment, communications and other bike Bike/Ped Rio Metro Transit Dist $1,257,335 Funded share‐related appurtenances and technologies. Replace existing & install new bike share stations, including, bicycles, signs, kiosks, fare Various Locations AMPA 190.2 AMPA Wide Bike Share Program payment, communications and other bike Bike/Ped Rio Metro Transit Dist $1,755,618 Funded Wide share‐related appurtenances and technologies as needed. Install bike share kiosks and rental bikes in multiple locations throughout central city at 190.0 AMPA Wide Bike Share Program Various Locations locations to be determined. Note: local match Bike/Ped Rio Metro Transit Dist $600,725 Funded will be used for environmental and design. COMPLETED

Appendix A 2 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Replace existing & install new bike share stations, including, bicycles, signs, kiosks, fare AMPA Wide Bike Share Program (Late Various Locations AMPA Late 190.3 payment, communications and other bike Bike/Ped Rio Metro Transit Dist $6,000,001 Time Frame) Wide Term share‐related appurtenances and technologies as needed.

Increase youth safety in the AMPA through AMPA wide Bike/Ped Safety Education 101.7 AMPA Wide education on multi‐modal transportation and Bike/Ped City of Albuquerque‐P&R $514,981 Funded Program proper use of infrastructure. Construct minor pedestrian projects such as: AMPA Wide Pedestrian Projects (Late Late 1102.2 AMPA Wide ped. Crossings, kiosks, bulb‐outs, benches and Bike/Ped Various/Joint Effort $3,950,000 Time Frame) Term other amenities Bicycle & Pedestrian Safety Education AMPA Wide Youth Bicycle/Pedestrian Near 101.5 AMPA Wide Program. Separate CN will be issued later for Bike/Ped City of Albuquerque‐P&R $1,875,000 Safety Educ. Program Term each FY. Provide an AMPA wide Bike/Ped safety AMPA Wide Youth Bicycle/Pedestrian education program that will promote 101.6 AMPA Wide Bike/Ped City of Albuquerque‐P&R $230,673 Funded Safety Educ. Program alternative means of transportation.. Separate CN will be issued later for each FY. AMPA‐wide bicycle pedestian safety education program. Increase youth safety in AMPA Wide Youth Bicycle/Pedestrian 101.8 AMPA Wide the AMPA through education on multi‐modal Bike/Ped City of Albuquerque‐P&R $408,800 Funded Safety Education Program transportation and proper use of infrastructure. City of Albuquerque‐ Late 850.0 Avenida Cesar Chavez Bike Lanes Broadway Yale Blvd Build Bike Lanes Bike/Ped $2,310,000 DMD Term Design an ADA compliant pedestrian facility which will inclide sidewalks, curb ramps, drive Near 863.1 Baltic Ave ADA Sidewalk Improvements Southern Blvd Lisbon Ave pads. Design may also include retaining walls, Bike/Ped City of Rio Rancho $308,576 Term fire hydrant relocations and other appurtenances as needed.

Sidewalk improvements for ADA compliance. Widen sidewalks to accommodate Southern Municipal Intersection of NM473 & 382.3 Bernalillo Main St Streetscape Phase 4 wheelchair, pedestrian and roadway lighting. Bike/Ped Town of Bernalillo $2,045,000 Funded Boundary NM313 Project includes ADA sloped curbs for entry from street level.

Appendix A 3 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Sidewalk replacement for ADA compliance, pedestrian and roadway lighting and ADA 382.2 Bernalillo Main St Streetscape Phase III Calle Presidente Calle del Norte Bike/Ped Town of Bernalillo $1,297,178 Funded compliant crosswalks. Phases I & II under CN 3450. City of Albuquerque‐ Late 555.1 Bluewater Rd Bike Lanes 98th St 90th St Build Bike Lanes Bike/Ped $825,000 DMD Term Bosque Trail South Diversion Channel Plan, and design a trail bridge and approaches Near 871.1 South Diversion Channel Bike/Ped County of Bernalillo $584,036 Crossing Design over the South Diversion Channel. Term

Plan, design, and construst a trail bridge and Bosque Trail South Diversion Channel Near 871.2 South Diversion Channel approaches over the South Diversion Bike/Ped County of Bernalillo $1,100,000 Crossing/Trail Improvements Term Channel.Project includes trail improvements. Implement priorities identified in the CABQ CABQ ADA Transition Plan ADA Transition Plan, to improve sidewalks in City of Albuquerque‐ Late 243.0 AMPA Wide Bike/Ped $30,000,000 Implementation compliance with federal ADA and PROWAG DMD Term requirements. Late 861.0 Calabacillas Arroyo Bike Trail Golf Course Rd Rio Grande Construct Bike Trail Bike/Ped City of Albuquerque‐P&R $1,526,250 Term Construct bicycle/pedestrain facilities. LEAD Atrisco Vista Blvd (Double Late 861.1 Calabcillas Arroyo Trail Rainbow Blvd AGENCY CHANGE TO CABQ‐DMD PER BERN Bike/Ped City of Albuquerque‐P&R $2,000,000 Eagle II Rd) Term CO City of Albuquerque‐ Late 809.0 Candelaria Rd Bike Lanes Rio Grande Blvd I‐25 Construct Bike Lanes Bike/Ped $4,620,000 DMD Term Late 829.0 Castillo St Bike Lanes Los Lentes Rd Carson Dr Build Bike Lanes Bike/Ped Village of Los Lunas $231,000 Term Plan, design and construct ADA compliant 182.1 Coors Blvd. ADA Improvements Montano Rd Irving Blvd Bike/Ped NMDOT D‐3 $750,000 Funded curb ramps within the corridor.

Plan, design and construct ADA compliant curb ramps within the corridor. Project is 182.0 Coors Blvd. ADA Improvements Montano Irving Bike/Ped NMDOT D‐3 $550,000 Funded being developed as a companion project to A300016. COMPLETED Late 862.0 Corrales Rd Bike & Ped Pathway Meadowlark Lane Old Church Rd Construct Bicycle & Pedestrian Pathway Bike/Ped Village of Corrales $990,000 Term County Wide District Bike Lanes, Develop bike lanes, improved shoulders and Late 192.0 Bike/Ped County of Bernalillo $47,000,000 Improved Shoulders and Trails or trails by Comm. District. Term Install ADA compliant sidewalks by Comm County Wide Dsitrict Sidewalks and ADA Late 193.0 District per the Bikeways and Pedestrian Bike/Ped County of Bernalillo $27,000,000 Improvements Term Action Plan. Late 857.0 Edith Blvd Bike/Ped Facilities Osuna Rd Alameda Blvd Construct bicycle/pedestrain facilities Bike/Ped County of Bernalillo $1,625,000 Term

Appendix A 4 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Eubank Blvd Bear Arroyo Trail Eubank Blvd at Bear Arroyo City of Albuquerque‐ Late 584.1 Construct Overcrossing for Trail Bike/Ped $3,000,000 Overcrossing PHASE 2 Trail DMD Term City of Albuquerque‐ Late 807.0 Eubank Blvd Bike Lanes Southern Blvd Central Ave Implement bike lanes Bike/Ped $561,000 DMD Term City of Albuquerque‐ 852.0 Eubank Blvd Bike Lanes (NE) Osuna Rd Academy Blvd Build Bike Lanes COMPLETED Bike/Ped $2,310,000 Funded DMD City of Albuquerque‐ Late 860.0 Fortuna Rd Bike Lanes/Trail NM 345, Unser Blvd NM 45, Coors Blvd Build Bike Lanes/Trail Bike/Ped $2,326,500 DMD Term Pave and improve shoulders for motorist, 836.2 Frost Rd Shoulder Improvements Vallecitos Dr Mountain Valley Rd bicycle and pedestrian safety. UNDER Bike/Ped County of Bernalillo $350,000 Funded CONSTRUCTION Reconstruct Frost Rd Trail from NM 14 to 836.3 Frost Rd Trail Extension NM 14 Vallecitos Rd Camino Alto and extend trail to Vallecitos Rd. Bike/Ped County of Bernalillo $1,150,000 Funded UNDER CONSTRUCTION Implement recommended bicyle GAP Closure for On‐Street Bicycle City of Albuquerque‐ 802.1 AMPA Wide improvements form the updated Bikeways Bike/Ped $1,141,152 Funded Facilities DMD and Trails Facility Plan. City of Albuquerque‐ Late 476.3 Gibson Blvd West Bike Trail 98th St Unser Blvd Construct bike/multi‐purpose trail Bike/Ped $700,000 DMD Term City of Albuquerque‐ 855.0 Golf Course Rd Bike Lanes, Stage ITaylor Ranch Rd Paseo del Norte Build Bike Lanes COMPLETED Bike/Ped $2,640,000 Funded DMD City of Albuquerque‐ Late 855.1 Golf Course Rd Bike Lanes, Stage II Paseo del Norte Paradise Blvd Build Bike Lanes Bike/Ped $1,204,500 DMD Term Late 830.0 Huning Lateral Multi‐Use Trail Southern Village Bdry Northern Village Bdry Construct Unpaved Trail Bike/Ped Village of Los Lunas $3,300,000 Term Analysis of existing bicycle network and potential connections throughout the I‐25 North and Tramway Bike Network corridor. Study to include a listing of preferred City of Albuquerque‐ 199.0 I‐40 Tramway Blvd./Roy Ave. Bike/Ped $500,000 Funded Study imrprovements which include construction DMD phasing and estimated costs per phase. COMPLETED Environmental documentation and I‐40 Bike Trail Connection Through the preliminary design to determine the feasibility Late 17.0 6th St University Ave Bike/Ped City of Albuquerque‐P&R $702,247 Big "I" Feasibility Study of providing a multi‐use trail within this Term corridor. Plan, design acquire ROW, construct and Innovation Trail: Rail Yards to Albuquerque Convention improve multi‐modal facilities to connect the City of Albuquerque‐ Late 179.0 Rail Yards Bike/Ped $2,000,000 Convention Center Center Rail Yards to the Convention Center to include DMD Term but not limited to landscaping and sidewalks. Construct bicycle/pedestrain facilities. Late 803.0 Isleta Drain Trail I‐25 Bridge Blvd Bike/Ped County of Bernalillo $5,000,000 Constructed in phases. Term

Appendix A 5 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Juan Tabo Blvd Bear Arroyo Trail Juan Tabo Blvd at Bear City of Albuquerque‐ Late 847.0 Construct Overcrossing for Trail Bike/Ped $4,500,000 Overcrossing Arroyo Trail DMD Term Late 821.0 La Cueva Trail Eubank Blvd Tramway Blvd Construct bicycle/pedestrain facilities. Bike/Ped County of Bernalillo $1,000,000 Term City of Albuquerque‐ Near 858.0 Ladera Drive Bike Lanes Unser Blvd Ouray Rd Build Bike Lanes Bike/Ped $1,732,500 DMD Term Design an ADA compliant pedestrian facility which will inclide sidewalks, curb ramps, drive Near 240.0 Lema Rd ADA Sidewalk Improvements Nicklaus Dr. Chessman Dr. pads. Design may also include retaining walls, Bike/Ped City of Rio Rancho $432,006 Term fire hydrant relocations and other appurtenances as needed.

Install approximately 0.8 miles of pedestrian trail along Lisbon Channel in Rio Rancho. Approx. 500 feet north of 712.0 Lisbon Channel Trail Improvements Tarpon Ave. Design funds $147,333.00) will be utilized as Bike/Ped SSCAFCA $734,559 Funded Southern Blvd. soft match for construction per NMDOT and SSCAFCA agreement. Late 828.0 Los Lentes Rd Bike Lanes Morris Rd Castillo St Buiild Bike Lanes Bike/Ped Village of Los Lunas $412,500 Term Manzanita Mountains, Rehabilitation, relocation, and addition of Manzanita Mountains Motorized Trail 254.0 Cibola National Forest, motorized, multiuse trails on the Sandia Bike/Ped US Forest Service $50,344 Funded System Improvements Sandia Ranger District Ranger District. City of Albuquerque‐ Late 859.0 Morris St Bike Lanes Lomas Blvd Constitution Ave Build Bike Lanes Bike/Ped $2,475,000 DMD Term Mountain Rd Pedestrian Lighting & Construct pedestrian and lighting City of Albuquerque‐ Near 880.0 6th I‐25 Bike/Ped $2,500,000 Streetscape Improvements improvements DMD Term Improve & Widen Shoulders to accommodate Mountain Valley Rd Shoulder section with existing 837.0 I‐40 bicycles and improve safety. Construct in Bike/Ped County of Bernalillo $3,000,000 Funded Improvements phase 1 shoulders phases. UNDER CONSTRUCTION Install pedestrian facilities to provide additional connectivity to the MLK Elementary 242.0 Nicklaus Dr Pedestrian Improvements Chianti Rd. Southern Blvd. school. This project fills a gap in the safe Bike/Ped City of Rio Rancho $422,641 Funded pedestrian facilities for this school. UNDERWAY Design and construction of a multipurpose path on the eastside of NM314 and sidewalk NM 314 Bike & Pedestrian construction with access management on the 825.2 NM 6 Ellen Dr. Bike/Ped Village of Los Lunas $2,486,454 Funded Improvements‐Northside of Village west side of NM314. Project includes lighting, guardrail, landscaping and railroad fencing within the corridor.

Appendix A 6 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Construct bike/ped facilities on the south side of NM333. Project includes curb and gutter NM 333 Pedestrian Improvements 7.3 NM 337 NM 14 installation, guardrail adjustments, storm Bike/Ped Village of Tijeras $600,000 Funded Phase II drain mitigation and access management and other appurtenances as needed.

Construction of new sidewalks, bike facilities, 7.0 NM 333 Pedestrian/Bike Enhancements NM 333 Mile Marker 6.45 NM 333 Mile Marker 7.25 median landscaping, and ADA upgrades along Bike/Ped Village of Tijeras $1,350,000 Funded NM 333 frontage. PROJECT DELETED R‐13‐14.

NM 556, Tramway Blvd. Trail Overpass Pedestrian and bicycle facility rehabilitation 113.1 Copper Ave. Comanche Rd. Bike/Ped NMDOT D‐3 $1,650,000 Funded Improvements and other appurtenances as needed.

Construct new 2 lane roadway with bike lanes North Diversion Channel Road City of Albuquerque‐ Late 581.1 Osuna El Pueblo (East‐West connection under A300170). Bike/Ped $14,874,251 Construction North‐South Connector DMD Term Contsruct undercrossing for trail at Osuna Rd. City of Albuquerque‐ Late 870.0 North Diversion Channel Trail Balloon Fiesta Park 4th St Construct bicycle/pedestrain facilities. Bike/Ped $1,260,000 Planning Term Rehabilitation of appro. 8 mille multi‐use trail, North Diversion Channel Trail including resurfacing, restriping, signage 870.2 Tucker Ave Balloon Fiesta Park Bike/Ped City of Albuquerque‐P&R $4,000,000 Funded Rehabilitation upgrades, selective widenings, safety features and other appurtenances as needed. Design and construct an undercrossing of the North Diversion Channel City of Albuquerque‐ 870.1 North Diversion Channel Undercrossing NDC trail. CABQ will be utilizing AC for this Bike/Ped $2,811,564 Funded and Indian School DMD project. Preliminary design & construction of sidewalks, curb & gutter and access management on the west side of NM 314. North NM 314 Bike and Pedestrian 825.3 Project includes a multi‐use path, railroad Bike/Ped Village of Los Lunas $2,340,824 Funded Improvements fencing, applicable guard rail & pedestrian lighting & landscaping, minor drainage appurtenances. City of Albuquerque‐ Late 849.0 Osuna Rd Bike Lanes/Trail 2nd St Edith Blvd Build Bike Lanes/Trail. Bike/Ped $3,069,000 DMD Term Late 542.0 Pajarito Rd Bike Trail/Lanes 118th St Isleta Drainage Channel Construct Bike Trail/Lanes Bike/Ped County of Bernalillo $5,346,000 Term Renovation and rehabilitation of the Paseo del Bosque Trail at Alameda Bosque Trail including re‐paving, re‐striping, Late 241.0 Paseo del Bosque Trail Renovation Bosque Trail at Bridge Blvd. Bike/Ped City of Albuquerque‐P&R $3,000,000 Blvd. signage improvemnts and other Term appurtenances as needed.

Appendix A 7 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Construct bike lanes and trail between Golf Course Rd & Eagle Ranch Rd. Construct a Paseo del Norte Corridor Bikeways Paseo del Norte Trail grade separated crossing between Eagle Late 16.0 Golf Course Rd Bike/Ped City of Albuquerque‐P&R $1,000,000 Stage I (west of the Rio Grande) Ranch Rd to the western terminus of the Term existing Paseo del Norte Trail (west of the Rio Grande). Project will be built in stages.

Design an ADA compliant pedestrian facility which will inclide sidewalks, curb ramps, drive Near 11.1 Pecos Loop Sidewalks (Rio Rancho) Rainbow Blvd Southern Blvd pads. Design may also include retaining walls, Bike/Ped City of Rio Rancho $321,845 Term fire hydrant relocations and other appurtenances as needed. Late 856.0 Piedras Marcadas Arroyo Bike Trail Paseo del Norte Dam Construct Bike Trail Bike/Ped City of Albuquerque‐P&R $511,500 Term Primera Agua Pedestrain Tijeras Village Line (2,500' S Install lighting, improve pedestrain access, Near 875.1 Improvements/Trail Enhancements NM 333 (Rt 66) Bike/Ped Village of Tijeras $170,000 of NM 333) ADA compliance. Term Phase 2 Increase bicycling and pedestrian safety Region Wide Bicycle/Pedestrian Safety Benalillo, Sandoval and Late 1101.1 awareness and promote shift to alternate Bike/Ped Various/Joint Effort $1,580,000 Educ (Late Time Frame) Valencia Counties Term modes of travel. Plan, design, improve and construct bicycle accomodations. Project may include revisions City of Albuquerque‐ 816.4 Rio Grande Blvd Bike Lanes I‐40 Matthew Bike/Ped $80,500 Funded tp roadway typical section to improve bicycle DMD accomodations. COMPLETED Construct bicycle/pedestrain facilities. Project 816.3 Rio Grande Blvd Bike Lanes & Sidewalks Los Santos Rd. Alameda Blvd will utilize design funds as soft match for Bike/Ped County of Bernalillo $608,614 Funded construction. COMPLETED Sandia Mountains Cibola Trail maintenance and improvements on trails 254.1 Sandia Trail Improvements National Forest, Sandia Bike/Ped US Forest Service $221,497 Funded in the Sandia Ranger District. Ranger District Construct a multi‐use trail. Project includes Santo Domingo Multi‐Use Trail Segment Cattle grd E. of Mateo Station 68+93.91 (Trading lighting improvements, signage and markings 94.0 Bike/Ped Pueblo of Santo Domingo $1,600,000 Funded 1 Overpass Post) & other appurtenances as needed. (TTP funds used for required match.) Construct a multi‐use trail to include earthwork, drainage Santo Domingo Multi‐Use Trail Segment Access road to baseball End of Santo Domingo 94.4 improvements/extensions, stabilized crusher Bike/Ped Pueblo of Santo Domingo $1,372,104 Funded 2 fields Multi‐Use Tral Seg. 1 fines over compacted base course, signage and trail lighting.

Appendix A 8 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Design segment 2 of the multi‐use trail. Project includes signage, markings, rail Santo Domingo Multi‐Use Trail Segment Access road to baseball End of Santo Domingo 94.1 crossing improvements, intersection Bike/Ped Pueblo of Santo Domingo $126,500 Funded 2 fields Multi‐Use Trail Seg. 1 improvements, and other appurtenances as needed. Construct a multi‐use trail to connect baseball fields to new huousing devlopment,trading post & the end of Santo Domingo Multi‐Use Trail Segment Access road to baseball End of Santo Domingo 94.3 segment 1. Proj. includes signage, markings, Bike/Ped Pueblo of Santo Domingo $1,000,000 Funded 2a fields Multi‐Use Tral Seg. 1 rail crossing improv.,intersection. improvements., & other appurtenances as needed. Design ,plan & constr. a pedestrian walkway through existing concrete box culvert and Santo Domingo Pedestrian Trail through (SP88) West of Mateo (SP88) Cattle Guard E of 94.2 other appurtenances as needed. Project Bike/Ped Pueblo of Santo Domingo $181,000 Funded Concrete Box Culvert (SR22) Overpass Mateo Overpass includes State Local Gov. Road Funds ($75,000 + $25,000 Match in FFY 2016) Design and reconstruction of existing culvert ditch crossing on multi‐use path. Project 252.0 South Bosque Loop Ditch Crossing South Bosque Loop West Bosque Loop Bike/Ped Village of Bosque Farms $130,000 Funded includes guard rail/fencing and other appurtenances as needed. Construct bicycle/pedestrian facilities from the proposed Bosque Trail adjacent to the Rio Late 714.0 South Boundary Trail Rio Grande Broadway Bike/Ped County of Bernalillo $1,500,000 Grande to Broadway Blvd along the proposed Term AMAFCA channel adjacent to I‐25. Late 864.0 South Diversion Channel Trail Rio Bravo Blvd Gibson Blvd Construct bicycle/pedestrain facilities. Bike/Ped County of Bernalillo $10,200,000 Term Design and construct multi‐use trail along NM6 between Sun Ranch Village Road & 109.0 Sun Ranch and Jubilee Multi‐Use Trail Jubilee Sun Ranch Village Road Bike/Ped Village of Los Lunas $1,010,000 Funded Jubilee Blvd. to include signage, striping, drainage, landscaping & lighting. Late 831.0 Sun Ranch Village Rd Bike Lanes Bachelors Street NM 6 Build Bike Lanes Bike/Ped Village of Los Lunas $1,254,000 Term Const. missing bike facilities & improve existing roadway segments as needed, University Blvd Multimodal City of Albuquerque‐ 854.1 George Rd Gibson Blvd. construction management services. Proj. will Bike/Ped $3,219,288 Funded Improvements Phase II DMD be Constructed in phases. Env. clearance will be requested for both phases. COMPLETED

Appendix A 9 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Construct bicycle/pedestrian facilities from the proposed Bosque Trail adjacent to the Rio Late 96.1 Valle De Oro Connections Rio Grande 2nd Street Bike/Ped County of Bernalillo $1,250,000 Grande along Sandia Salida corridor and the Term Barr Drain corridor. Pave ped/bike trails on both sides of West Meadowlark Lane between Loma Larga and Municipal Boundary (Rio 874.2 West Meadowlark Bike/Ped Trail Loma Larga the municipal boundary with Rio Rancho, Bike/Ped Village of Corrales $606,392 Funded Rancho) connecting to the existing paved trails west of Corrales. Design and construct an ADA compliant multi‐ use path along with curb ramps. Project to Rio Rancho/City of 508.3 Westside Blvd Bike/Ped Path Unser Blvd include retaining walls, fire hydrant Bike/Ped City of Rio Rancho $778,866 Funded Albuquerque City Limits relocations and other appurtenances as needed. In accordance with the COA ADA Transition Plan, funds are to be used for the design and implementation of ADA related City of Albuquerque‐ 636.1 Zuni Road ADA Improvements Washington St. Central Ave. Bike/Ped $800,000 Funded improvements to sidewalks/ramps. DMD Intersection legs at Wyoming and Zuni already in design. Category Totals Total Public Funded Bike/Ped Projects $287,165,356 106th St Extension & I‐40 Bridge Construct new 2 lane road and crossing over I‐ City of Albuquerque‐ Late 575.0 Eucariz Ave Ladera Dr Capacity Proj $1,368,500 Crossing 40; includes bike lanes. DMD Term Widen to 4 lanes lanes ; includes bike lanes & City of Albuquerque‐ Near 526.0 118th Street (Lower Section) Sen Dennis Chavez Blvd Amole Arroyo Capacity Proj $8,130,000 trail. DMD Term Construct 4‐Lane arterial with sidewalks, bike Late 526.8 118th Street (Southern Section A) Gun Club Rd Borrego Channel Capacity Proj County of Bernalillo $2,000,000 lanes, and multi‐use trail. Term Construct new roadway with bike lanes. With Near 526.4 118th Street (Upper Section) Eucariz Ave I‐40 Capacity Proj County of Bernalillo $6,625,000 sidewalks and trail. Term Reconstruct as 4 lane divided facility between Paseo del Norte and Alameda Blvd and as a 2 lane with center turn lane facility between Late 23.0 2nd Street NW Reconstruction Paseo del Norte Roy Capacity Proj County of Bernalillo $11,500,000 Alameda and 4th St. Includes new signals, Term bike lanes, sidewalks, and landscaping. Includes Alameda drain trail phase 5 Design and Construct new 2 lane roadway. Late 34.0 34th Ave/Campus Ave Construction Unser Blvd Center Blvd Capacity Proj City of Rio Rancho $2,989,346 Full build out Term Late 34.1 34th Ave/Campus Ave Construction Center Blvd Broadmoor Blvd Design and Construct new 2 lane roadway. Capacity Proj City of Rio Rancho $3,000,000 Term

Appendix A 10 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Reconstruct 4th St from 4 to 3 lanes with a center turn lane, LED drainage, transit 4th St Improvements(ED, PE, Design, amenities, variable width sidewalks (4 to 6 Village of Los Ranchos de Near 4.3 Pueblo Solano Ortega Road Capacity Proj $9,000,000 Construction) foot widths), acuated crosswalks, pedestrian Albuquerque Term lighting, ADA compliance, and landscaping. PE FUNDED Restore/construct street connection across I‐ City of Albuquerque‐ Late 527.1 90th St Crossing of I‐40 90th St over I‐40 Capacity Proj $5,000,000 40 without access to expressway. DMD Term Preliminary engineering, ROW acquisition, Late 226.0 Arena Dr Widening Unser Blvd HP Way final design, and construction of a 4‐lane Capacity Proj City of Rio Rancho $2,500,000 Term roadway. Broadmoor Blvd Extension (30th St) ‐ Construct New 2 lane Roadway with bicycle Near 490.1 Paseo del Volcan College Capacity Proj City of Rio Rancho $2,000,000 Middle Section, Phase 1 facilities. Term Corridor study, alignment study, preliminary Broadmoor Blvd Extension (30th St) ‐ engineering, right‐of‐way mapping and Late 490.2 College Blvd Unser Blvd Capacity Proj City of Rio Rancho $15,000,000 Middle Section, Phase II acquisition, final design, and construction of a Term 2 lane roadway. Right‐of‐way acquisition for future 4 lane Broadmoor Blvd Phase 2B ROW Land NM 347 (Paseo del Near 332.1 Northern roadway. (Initial phase will construct 2 lane Capacity Proj City of Rio Rancho $3,871,901 Acquisition Volcan) Term roadway with shoulders.) Preliminary engineering, right‐of‐way Broadmoor Blvd Widening (30th St) ‐ Late 332.2 Northern Paseo del Volcan aqusition, final design, and construction of a 4‐ Capacity Proj City of Rio Rancho $16,834,630 Southern Section Term lane roadway. Preliminary engineering, ROW acquisition, Broadmoor Blvd Widening ‐Northern Late 332.3 Paseo Del Volcan Unser Blvd. final design, and construction of a 4 lane Capacity Proj City of Rio Rancho $25,000,000 Section Term roadway. Construct roadway extension with a ditch end of existing Camelot crossing including paved shoulders, lighting 932.0 Camelot Blvd Extension Sichler Rd Capacity Proj Village of Los Lunas $1,638,436 Funded Blvd improvements, drainage features and other appurtenances as necessary. Develop new Collector Rd for anticipated development area. Reconstruct exiting Late 724.0 Camino del Llano Extension Prairie Dog Ln Mesa Rd Capacity Proj City of Belen $2,000,000 corridor, add lanes, bike/ped and related Term facilities. Preliminary engineering, ROW acquisition, Near 225.0 College Blvd Extension/Widening King Blvd Broadmoor Blvd final design, and construction of a 4‐lane Capacity Proj City of Rio Rancho $4,500,000 Term roadway.

Appendix A 11 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Rehabilitate Coyote Road/ Ball Park Road to provide a new surface with wider roadway, Coyote Road / Ball Park Road (SP300) Near 703.0 Cochiti Street Roadrunner Road improved storm drainage, traffic calming, Capacity Proj Pueblo of Cochiti $177,000 Improvements Term parking areas, curb and gutter, sidewalks, and fencing. Add 3rd northbound through lane, modify Eubank Blvd & Montgomery Blvd median access, add additional turning City of Albuquerque‐ 584.2 Eubank Blvd Montgomery Blvd Capacity Proj $1,000,000 Funded Intersection Improvements movement capacity and improve pedestrian DMD accessibility. COMPLETED Reconstruct 4th Street from four to three lanes with center turn lane, LED drainage, Village of Los Ranchos de 258.0 Fourth Street Improvements Phase 1 Schulte Rd. Pueblo Solano Rd. Variable width sidewalks (4 to 6 foot widths), Capacity Proj $6,831,614 Funded Albuquerque actuated crosswalks, pedestrian lighting, and landscaping. COMPLETED Reconstruct interchange with bridge I‐25 / Gibson Blvd. Interchange 91.2 replacement and auxiliary lanes. Capacity Proj NMDOT CRDC $75,000,000 Funded Reconstruction CONSTRUCTION Widen I‐25 to inlude a 4th lane as part of a 448.7 I‐25 NB Widening Rio Bravo Sunport commitment project from the Rio Bravo Capacity Proj NMDOT D‐3 $3,000,000 Funded Interchange improvements (A300280). I‐25 Rio Bravo Interchange NM 500, Rio Bravo Blvd Exit University to approx 500' Reconstruct interchange with possible 448.6 Capacity Proj NMDOT CRDC $53,891,234 Funded Reconstruction #220 west of Broadway changes in configuration. COMPLETED Bridge widening I‐25 at San Mateo to accommodate a fourth SB lane from Jefferson 442.6 I‐25 Widening Jefferson St San Antonio Capacity Proj NMDOT CRDC $9,151,997 Funded to San Antonio and NB auxillary lane at San Mateo. Adding one lane in each direction, pavement rehabilitation and/or reconstruction as 485.0 I‐25 Widening PHASE II MP 215.8 MP 217.4 needed. Project includes PE, Design, ROW Capacity Proj NMDOT D‐3 $12,137,927 Funded and other appurtenances as necessary. UNDERWAY Construct 2 lane roadway. Intersection Lincoln Ave Construction (Interim 2 improvements at NM 347. 2016 State Capital 376.0 NM347 Paseo del Volcan Adams Lane Capacity Proj City of Rio Rancho $5,116,056 Funded Lane) Outlay funds to be used as soft match. UNDERWAY Preliminary engineering, final design, and Late 376.2 Lincoln Ave Widening Paseo del Volcan (NM 347) Adams Ln NE Capacity Proj City of Rio Rancho $5,000,000 construction of a 4‐lane roadway Term Preliminary engineering, ROW acquisition, Late 540.3 Loma Colorado Blvd Widening Northern Blvd Pase del Volcan final design, and construction of a 4‐lane Capacity Proj City of Rio Rancho $8,000,000 Term roadway.

Appendix A 12 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Acquire rights‐of‐way as identified in the Los Lunas Corridor Study. Preliminary Engineering Los Lunas Corridor River Crossing ROW Proposed Morris B Proposed Morris B to follow the ROW process. Survey and ROW 537.3 Capacity Proj Village of Los Lunas $63,942,682 Funded Acquisition Alignment: I‐25 Alignment: NM 47 mapping, public meetings, property owner coordination, title searches and other appurtenances as needed. Purchase property and construct new street Los Lunas New Street Connection (S of Late 631.0 Rail Runner Station Area Los Lentes Rd from the Rail Runner station area to Los Capacity Proj Village of Los Lunas $500,000 Courthouse Rd) Term Lentes Road. Widen from 2‐4 lanes, including but not limited to storm drainage including retaining walls/arroyo bank stabilization, full City of Albuquerque‐ Late 368.8 McMahon Blvd Widening Improvements Universe Blvd Rockcliff Rd Capacity Proj $7,022,472 intersection/signal improvements, turn lanes, DMD Term deceleration lanes, ITS, bike/ped & ADA facilities, signing, stiping & lighting.

Provide for a uniform 6 lane roadway, add bicycle lanes as appropriate, implement multi‐ modal improvements consistent with the City of Albuquerque‐ 18.0 Menaul Boulevard Improvements Carlisle Blvd Tramway Blvd Capacity Proj $6,170,412 Funded planning principles for increasing person‐trip DMD capacity in a heavily congested arterial corridor. DONE

Pave existing dirt road, add curb, gutter, Late 148.2 Mesa Roadway Improvements Cannon Rd Camino del Llano sidewalks, lighting, signing, striping, Capacity Proj City of Belen $1,500,000 Term intersection improvements and related work Construct extension from end of SP023 81.0 Moonlight Drive Extension to NM 314 Current eastern terminus NM 314 Capacity Proj Pueblo of Isleta $2,738,264 Funded southeasterly to NM 314 approx. 1 mile. NM 347 Paseo del Volcan ‐ Rio Rancho Late 418.3 Unser Blvd Iris Rd Widen Roadway from 2 to 4 lanes. Capacity Proj NMDOT D‐3 $16,000,000 Sect ‐ Widening Stage I Term NM 347 Paseo del Volcan ‐ Rio Rancho Late 418.4 Iris Rd US 550 Widen Roadway from 2 to 4 lanes. Capacity Proj NMDOT D‐3 $30,353,600 Sect ‐ Widening Stage II Term NM 347 Paseo del Volcan & I ‐40 Interstate 40 & Paseo del ROW acqusition for the Pdv and I‐40 70.2 New Project Capacity Proj NMDOT D‐3 $6,116,240 Funded Interchange ROW Acquisition Volvan Interchange. ONGOING Design and construction of 2 lane roadway. NM 347 Paseo del Volcan ‐Construct 2 Near 70.3 Rainbow Blvd. Unser Blvd. ROW acquisition under A301570 and Capacity Proj County of Sandoval $7,000,000 Lane Roadway Term A301572. NM 347 Paseo del Volcan ROW ROW acquisition for the PDV Cooridor. (Old 70.1 I‐40 US 550 Capacity Proj NMDOT ROW Bureau $5,948,000 Funded Acquisition CN 2607) ONGOING

Appendix A 13 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Reconstruct Rio Bravo gap. Project includes the design and constuction of 2 additional NM 500 Rio Bravo Gap Widening travel lanes (4 to 6 lanes), multi‐use trail 42.3 2nd St SW South Diversion Channel Capacity Proj County of Bernalillo $5,750,000 Funded Improvements connection, sidewalks, bike lanes, lighting, signal upgrades and other appurtenances as needed. Pavement overlay and widening from 4 to 6 lanes including pavement markings, bike path, NM 528 Rio Rancho Blvd Improvements Ridgecrest Dr/Leon Grande drainage improvements, shoulders, signage, 493.4 Alberta Ave Capacity Proj NMDOT CRDC $28,027,166 Funded (Upper Section) Ave and other appurtenances as necessary. ED, PE & Design under A300380. DESIGN UNDERWAY NM 528 Rio Rancho Blvd Reconstruction Late 493.1 Northern Blvd US 550 Reconstruct to 6 lanes Capacity Proj NMDOT D‐3 $73,489,999 & Widening (D) Term Design, ROW, reconstruction & widening. Project includes intersection improvements to add general purpose lanes (turn‐lanes, 347.1 Northern Blvd Expansion Phase B Acorn loop Broadmoor Blvd. Capacity Proj City of Rio Rancho $16,878,194 Funded crosswalks), bicycle lanes, pedestrian facilities, lighting, signal timing & ITS upgrades & other appurtenances as needed.

Widen from 4 to 6 lanes, divided. Includes City of Albuquerque‐ Late 438.2 Osuna Blvd Widening Phase II Edith Blvd North Diversion Channel Capacity Proj $12,490,824 bike lanes and multi‐purpose trail. DMD Term Paseo del Norte NW Improvements & Escarpment end of Reconstruct & Widen from 2 to 4 lanes; City of Albuquerque‐ Late 529.1 Universe Blvd Capacity Proj $45,000,000 Widening current 4 lane includes Bike Lanes & Trail DMD Term Reconstruction and widen from 2 to 4 lanes, Paseo del Norte NW Improvements & City of Albuquerque‐ Late 529.2 Woodmont Ave Universe Blvd bike lanes, sidewalks & intersection Capacity Proj $22,000,000 Widening Stage I DMD Term improvements. Corridor study, alignment study, preliminary engineering, right‐of‐way mapping and Late 600.2 Progress Blvd ‐ Eastern Section Loma Colorado Blvd Paseo del Volcan Capacity Proj City of Rio Rancho $15,000,000 acquistion, final design, and construction of a Term 2‐lane roadway Corridor study, alignment study, preliminary engineering, right‐of‐way mapping and Late 600.3 Progress Blvd ‐ Middle Section Broadmoor Blvd Loma Colorado Blvd Capacity Proj City of Rio Rancho $10,000,000 acquistion, final design, and construction of a Term 2‐lane roadway Corridor study, alignment study, preliminary engineering, right‐of‐way mapping and Late 600.1 Progress Blvd ‐ Western Section Rainbow Blvd Broadmoor Blvd Capacity Proj City of Rio Rancho $12,000,000 acquistion, final design, and construction of a Term 2‐lane roadway

Appendix A 14 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Corridor study, alignment study, preliminary engineering, right‐of‐way mapping and Near 12.3 Rainbow Blvd Connection McMahon Blvd Southern Blvd Capacity Proj City of Rio Rancho $15,000,000 acquistion, final design, and construction of a Term 2‐lane roadway Preliminary engineering, right‐of‐way‐ Late 12.4 Rainbow Blvd Connection Widening McMahon Blvd Southern Blvd acquistion, final design, and construction of a Capacity Proj City of Rio Rancho $7,500,000 Term 4‐lane roadway Late 489.0 Rainbow Blvd Extension (Rio Rancho) Northern Blvd King Blvd Construct New 2 lanes; includes Bike Lanes. Capacity Proj City of Rio Rancho $12,700,000 Term Near 425.2 Roy Ave Improvements (West Sect.) NM 313, 4th Street Mile Marker #1.26 Reconstruct & Widen from 2 to 4 lanes Capacity Proj Pueblo of Sandia $6,482,800 Term Reconstruct and widen from 2 to 4 lanes with Late 579.1 Sage Rd Reconstruction & Widening Unser Blvd Coors Blvd bike lanes. 2 lane major collector with Capacity Proj County of Bernalillo $4,568,750 Term sidewalks. Reconstruct roadway including new detached Southeast Los Lentes Road 935.0 Morris Rd Aspen Dr multi‐use trail, drainage, lighting and related Capacity Proj Village of Los Lunas $2,100,000 Funded Improvements improvements. Final design, right of way mapping, right of 9.2 Southern Blvd Reconstruction Phase II Unser Blvd Golf Course Rd way acquisition and environmental clearance Capacity Proj City of Rio Rancho $6,302,124 Funded of Southern Blvd. Construct new 4 lane divided facility with bike 500' West of lanes includes signage, drainage, and other 437.0 Sunport Blvd Extension Broadway/Sunport I‐25 Exit 221 Interchange necessary appurtenances. Demo ID NM006. Capacity Proj County of Bernalillo $19,756,874 Funded intersection Project total includes capital outlay & county funds in previous FYs. UNDER DESIGN Construct and/or improve various roads in the Sunport Commerce Center area such as Late 281.0 Sunport Commerce Center Roadways Various Roads Capacity Proj County of Bernalillo $21,200,000 Prosperity Ave. Prince St., Commerce Center Term Ave., and Edmund St. City of Albuquerque‐ Near 367.0 Tower Rd Widening Unser Blvd Coors Blvd Widen from 2 to 4 lanes. Capacity Proj $4,500,000 DMD Term University Blvd & Los Picaros Ramp University Blvd at Los Construct ramps to make a full interchange at Near 395.1 Capacity Proj County of Bernalillo $3,000,000 Construction Picaros Rd. the existing grade seperation. Term Widen the two lane section in the Los Picaros City of Albuquerque‐ Near 395.0 University Blvd Widening Mesa del Sol Rio Bravo Blvd area from 2 to 4 lanes to provide lane Capacity Proj $2,500,000 DMD Term continuity.

Appendix A 15 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Complete a uniform 4 and/or 6 lane roadway facility & implement multi‐modal Unser Blvd Corridor Improvements Bernalillo‐Sandoval improvements; construction management City of Albuquerque‐ 465.1 Central Ave Capacity Proj $4,750,000 Funded Future Stages County Line services. Projet may be phased. (Some PE, DMD Design & ROW done under A300300) COMPLETED Widen roadway from 2 to 4 lanes including on‐ street bicycle lanes, off‐street multi use trail, City of Albuquerque‐ 465.3 Unser Blvd Gap Widening Phase 2 Kimmick Dr. Paradise Blvd. lighting, lanscape buffer, storm drainage Capacity Proj $45,000,000 Funded DMD improvements and storage area, and ITS related improvements. PARTIALLY FUNDED Unser Blvd Rights‐of‐way Acquisition for NM 347 (Paseo del 380.5 Cherry Rd. Purchase rights‐of‐way. Capacity Proj City of Rio Rancho $1,750,000 Funded Phase 2B Volcan) NM 347 (Paseo del Complete ROW land acquisitions for this 380.3 Unser Blvd Widening (Phase 2B) Farol/Cherry Rd Capacity Proj City of Rio Rancho $416,524 Funded Volcan) phase. Reconstruct & widen from 2 to 4 lanes. Project includes intersection improvements to Unser Blvd Widening (Phase 2B) and NM 347 (Paseo del add general purpose lanes (turn‐lanes, Near 380.4 Farol/Cherry Rd Capacity Proj City of Rio Rancho $13,344,250 Reconstruction Volcan) crosswalks), bicycle lanes, lighting, signal Term timing & ITS upgrades and other appurtenances as needed. City of Albuquerque‐ Late 498.3 Unser Blvd Widening (SW ABQ) Anderson Hill Rd Amole Arroyo Widen from 2 to 4 lanes. Capacity Proj $2,000,000 DMD Term Corridor study, alignment study, preliminary engineering, right‐of‐way mapping and Late 381.2 Unser Blvd Widening Upper Section Progress Blvd US 550 Capacity Proj City of Rio Rancho $63,168,000 acquistion, final design, and construction of a Term 2‐lane roadway Right‐of‐way acquisition and construction of a Late 380.2 Unser Blvd. Widening 2C King Blvd. Progress Blvd. Capacity Proj City of Rio Rancho $16,680,876 4‐lane roadway Term Roadway widening and rehab. (1 new NB US 550 Construction & Widening Phase lane), bridge rehabilitation & repairs, includes 386.4 MP 1.35 2.45 Capacity Proj NMDOT CRDC $16,186,429 Funded 1 ADA compliance, sidewalks and other appurtenances as necessary. COMPLETED

ROW purchase, reconstruction and widening (1 lane in each direction), bridge rehabilitation US 550 Construction & Widening Phase 386.5 MP.6 MP 3.0 and repairs. Project includes ADA Capacity Proj NMDOT CRDC $32,847,915 Funded 2 compliance, Sidewalks and other appurtenances as necessary. UNDERWAY

Appendix A 16 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

(Ref CP‐91) Reconstruction, widening (1 lane each dir), bridge rehabilitation & repairs, 386.3 US 550 Reconstruction & Widening MP .60 MP 3.00 includes ADA compliance, sidewalks and other Capacity Proj NMDOT CRDC $3,567,261 Funded appurtenances as necessary. DESIGN FUNDS COMPLETED Plan, design and construct West Aragon Road. Near 212.2 West Aragon Roadway Extension I‐25 Canal Project includes drainage improvements and Capacity Proj City of Belen $1,025,000 Term other appurtenances as needed. Preliminary engineering, ROW Acquisition, Westside Blvd Western Extension (Far Late 507.3 Rainbow Blvd Viga Rd. final design, and construction of a 4‐lane Capacity Proj City of Rio Rancho $10,000,000 West) Term roadway. Preliminary engineering, ROW Acquisition, Westside Blvd Western Widening (Far Late 507.2 Rainbow Blvd Viga Rd. final design, and construction of a 2‐lane Capacity Proj City of Rio Rancho $10,000,000 West) Term roadway. Rehab & widen from 2 to 4 lanes, bike lanes, pedestrian enhancements and other improvements per the Westside‐McMahon City of Albuquerque‐ 508.1 Westside Blvd Widening Golf Course Rd NM 528 Corridor Study. Transitions fr. Improv. To Capacity Proj $11,988,332 Funded DMD exist. Roadway sections include 350' w. of Westside/Golf Course intersection SEE REMARKS SEC. Category Totals Total Public Funded Highway Capacity Projects $1,028,526,628 Design and construction of new bicucle lanes, trail and/or sidewalks, drianage 2nd St.Rehab/Sidewalk and Lighting City of Albuquerque‐ 23.1 Avenida Cesar Chavez Hazeldine Ave improvements, utility relocation, ADA Hwy & Brg Pres $702,247 Funded Improvements DMD compliance and pedestrian lighting to promote redevelopment of the railyards.

2nd Street Improvements (South Valley) Two lane minor arterial with storm drainage, Late 550.0 Rio Bravo Woodward Ave. Hwy & Brg Pres County of Bernalillo $12,500,000 Phase 3 lighting, sidewalk, landscaping, and trail Term

Reconstruct 2 lane collector with storm 2nd Street SW Roadway Reconstruction drainage, lighting, sidewalk, and landscaping. Near 550.1 South Diversion Channel Rio Bravo Blvd Hwy & Brg Pres County of Bernalillo $8,000,000 Ph.2 FLAP 2 Includes pedestrian bridge over . Diversion Term Channel at the bosque trail. AMENDMENT

2 lane collector with storm drainage, lightiing, 2nd Street/Valle del Oro Access Valle del Oro Entrance 96.2 South Diversion Channel intersection, realignment, rail crossing, Hwy & Brg Pres County of Bernalillo $12,500,000 Funded Improvements north of Sandia Salida Rd. sidewalk, landscaping, and trail. COMPLETED

Appendix A 17 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Plan, design, acquire right‐of‐way and construct roadway improvements in accordance with the Fourth Street Corridor City of Albuquerque‐ Late 178.0 4th Street Corridor Enhancements Mountain Solar Hwy & Brg Pres $2,000,000 Plan including but not limited to, sidwalk DMD Term reconstruction, landscaping, and traffic calming measures. Reconstruct 2 lane Roadway and Bike Lanes & Late 512.0 Alameda Blvd Reconstruction Ventura Blvd Eubank Blvd Hwy & Brg Pres County of Bernalillo $7,437,500 Trail Term Plan, design and construciton of bridge repairs and/or rehabilitation of off‐system Bridge St (Avenida Cesar Bridge #7926. The project will be advance City of Albuquerque‐ 138.2 Albuquerque Bridge R&R ‐ Bridge #7926 over William St Hwy & Brg Pres $853,422 Funded Chavez) constructed (pend funding agreement). DMD Design funds to be used as "soft match" for federal const. funds. COMPLETED Plan, design and construction of bridge Albuquerque City Wide Off‐System City of Albuquerque‐ Late 138.9 City Wide repairs and/or rehabilitation of off‐system Hwy & Brg Pres $10,000,000 Bridge Program (Late Time Frame) DMD Term bridges. Plan, design and construction of pavement preservation activities including but not Albuquerque City‐Wide Pavement City of Albuquerque‐ 142.0 City Wide limited to mill and inlay, sidewalk/ramp ADA Hwy & Brg Pres $20,000,000 Funded Preservation (Collectors and Arterials) DMD compliance, signage, striping, crack seal, re‐ surfacing and othr appurtenances as needed. Albuquerque Complete Streets Implement design concepts from Great City of Albuquerque‐ Late 725.0 Various Locations T.B.D. Hwy & Brg Pres $20,000,000 (Mid/Late Time Frame) Facility Street Plan. DMD Term Plan, design, purchase ROW, construct, AMPA Wide Bridge Repair and Rehab Late 1016.1 AMPA Wide repair, rehab, and reconstruct bridge facilities Hwy & Brg Pres Various/Joint Effort $20,540,000 (Late Time Frame) Term throughout the AMPA. AMPA Wide Intersection Improvements Intersection improvements @ $1,000,000 per Late 1653.1 AMPA Wide Hwy & Brg Pres MRCOG $10,000,000 (Late Time Frame) year by various local agenices. Term

Design and construct new roadway. Project Aragon Rd.Improvements and Intersection of West 100' east of the includes new base, asphalt, curb, getter, Near 203.0 Pedestrian Improvements East of Main Aragon Rd. and North Main Railrunner crossing on sidewalks, drivepads, wheelchair ramps, Hwy & Brg Pres City of Belen $690,000 Term St. St. East Aragon Rd. pedestrian improvements and other appurtenances as needed. Resurface roadway, install/rehab. storm City of Albuquerque‐ 632.0 Atrisco Dr Improvements Hooper Rd Central Ave drainage, curbs, gutters, sidewalks, etc. Hwy & Brg Pres $3,100,000 Funded DMD COMPLETED Reconstruct 2 lane roadway with sidewalks Near 632.1 Atrisco Dr Improvements Arenal Rd Bridge Blvd Hwy & Brg Pres County of Bernalillo $3,700,000 and bike lanes. Term

Appendix A 18 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Atrisco Vista Blvd (DEII Rd) Rehabiliatate and resurface roadway. Includes Near 406.3 DE II Airport Access Road Paseo del Norte Hwy & Brg Pres County of Bernalillo $8,700,000 Rehabilitation multi‐use trail. Term Reconstruct 2‐lane roadway with sidewalks Near 284.0 Barcelona Rd Reconstruction Isleta Drain Isleta Blvd Hwy & Brg Pres County of Bernalillo $5,200,000 and bike lanes. Term Reconstruct 2 lane roadway with sidewalks Near 496.3 Blake Rd Reconstruction Isleta Drain Isleta Blvd Hwy & Brg Pres County of Bernalillo $4,250,000 and bike lanes. Term Design and implement full depth reclamation of Bonita Vista Blvd. Project includes new Near 222.0 Bonita Vista Blvd Improvements South Rio Del Oro Monterry Park Hwy & Brg Pres County of Valencia $2,000,000 streetlighting at appropriate intersections and Term other appurtenances as needed.

Recon. & or widen roadway sec. including intersec. improv/realignments, sidewalks, Bridge Blvd & Tower Rd Reconstruction Bridge Blvd fr Carlos Rey Dr Tower Rd fr Coors Blvd to ADA accomod., drainage, lighting, & other 872.3 Hwy & Brg Pres County of Bernalillo $15,731,157 Funded Phase I to Goff Blvd Bridge Blvd appurtenances as necess.. Portions of PE, ROW & Env under A300501(soft match) will be used to match A300503 const. UNDERWAY

Design, Recon. & or widen Rd. sections including intersec. improv/realignments, sidewalks, ADA accomod., drainage, lighting, Bridge Blvd and Tower Rd Bridge: Coors Blvd to 8th Tower: Stinson Street to 872.2 & other appurtenances as necess. (The Hwy & Brg Pres County of Bernalillo $1,730,526 Funded Reconstruction Street Old Coors Dr $80,376 HUD match includes $15,000 in‐ kind). Soft match in A300501, A300503 & future phases.

Design, Recon. & or widen Rd. sections including intersec. improv/realignments, sidewalks, ADA accomod., drainage, lighting, Bridge Blvd and Tower Rd 872.4 Young Ave La Vega (Approaches) & other appurtenances as necess. (The Hwy & Brg Pres County of Bernalillo $7,514,045 Funded Reconstruction Phase 2 $80,376 HUD match includes $15,000 in‐ kind). Soft match in A300501, A300503 & future phases.

Construct sidewalks, bike lanes, medians, lighting, landscaping & intersection improvments. including a roundabout & other 872.5 Bridge Blvd Reconstruction Phase 3Goff Blvd. Young Ave. appurtenances as needed.Costs incurred for Hwy & Brg Pres County of Bernalillo $6,700,000 Funded PE & environmental may be used as soft match for ROW & Construction. UNDER DESIGN

Appendix A 19 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Construct sidewalks, bike lanes, medians, lighting, landscaping & intersection Near 872.6 Bridge Blvd. Reconstruction Phase 4 Riverside Drain 8th Street Hwy & Brg Pres County of Bernalillo $6,300,000 improvments. including a roundabout & other Term appurtenances as needed.

Construct sidewalks, bike lanes, medians, lighting, landscaping & intersection Late 872.7 Bridge Blvd. Reconstruction Phase 58th Street I‐25 Hwy & Brg Pres County of Bernalillo $4,900,000 improvments. including a roundabout & other Term appurtenances as needed. Reconstruct 2‐lane roadway with bike lanes. 285.0 Browning St Reconstruction Anaheim Rd Elena Rd Hwy & Brg Pres County of Bernalillo $765,000 Funded UNDERWAY Resurfacing Camelot Blvd to accommodate Southernmost point of Intersection of NM6 and increase in traffic volume in anticipation of Near 932.1 Camelot Blvd Improvements Hwy & Brg Pres Village of Los Lunas $2,944,000 Camelot Blvd Camelot Blvd future connection to Sichler Rd/Morris Rd. Term Bike lanes and turn bays will be included.

Roadway improvements, including upgraded Camelot Blvd Reconstruction & Morris Late 933.0 Morris Rd NM 6 bike and ped facilities, access management, Hwy & Brg Pres Village of Los Lunas $5,000,000 Extension Term capacity improvements, safety improvements. North Bound I‐25 access 724.1 Camino del Llano Rehabilitation Phase I NM 314 Main St. Full depth reclamation of Camino del Llano. Hwy & Brg Pres City of Belen $1,000,000 Funded ramp Plan, design and construct level of service City of Albuquerque‐ 679.0 Carlisle and Constitution Intersection Carlisle Constitution improvements to the intersection of Carlisle Hwy & Brg Pres $605,000 Funded DMD and Constitution. COMPLETED Roadway rehab including new ped/bike Carson fr Aspen to Pine St; facility extensions to the Los Lunas Railrunner Carson Dr‐Aspen Dr‐NMRX Station Rd Connection to NMRX 936.0 Aspen fr Carson to Los Station. Project includes related ADA Hwy & Brg Pres Village of Los Lunas $875,563 Funded Bike & Pedestrian Improv. Station Rd Lentes improvements, lighting and drainage appertenances as necessary. Full depth reclamation of Carson Dr. Project inlcudes new ADA sidewalks, bike lanes, curb Near 936.1 Carson Drive Improvements Castillo St. Aspen Dr. and gutter with minor drainage Hwy & Brg Pres Village of Los Lunas $1,750,000 Term appurtenances and replacement of AC water line lateral within the project footprint.

Reconstruct and rehabilitate existing roadway City of Albuquerque‐ Late 176.0 Chappell Road Improvements Renaissance Osuna to include a three lane roadway section with Hwy & Brg Pres $4,000,000 DMD Term on‐street bike lanes and sidewalk. DELAY

Appendix A 20 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Implementation of improvements per the Rio Grande Corridor Plan including, but not limited to: pedestrian refuges, realignment of City of Albuquerque‐ 587.7 Complete Streets:South of Rio Grande Alhambra Ave I‐40 Frontage Road Hwy & Brg Pres $1,755,618 Funded I‐40 Trail crossing of the Rio Grande, bicycle DMD lanes and pedestrian improvements DESIGN UNDERWAY Reconstruct intersec. to include additional turn lanes at all 4 intersection legs, replace signals, & addition of bike lanes, curb, Coors Blvd & Blake Rd Intersection NM 45, Coors Blvd @ Blake 65.1 median, & sidewalk as well as storm drainage. Hwy & Brg Pres County of Bernalillo $2,977,060 Funded Improvements Rd Local match to be used as soft match for PE and design. Proj tied to A301790. COMPLETED. Coors Blvd:NM 45 Pavement Mill and fill Coors Blvd for system 90.1 Montano Rd. Irving Blvd. Hwy & Brg Pres NMDOT D‐3 $3,238,818 Funded Preservation preservation and maintenance COMPLETED Construct full intersection from NM 528 & Near 657.0 Corrales Access "A" Intersection NM 528 Northern Blvd Hwy & Brg Pres Village of Corrales $1,000,000 Northern Blvd to Don Julio Road Term District 3 Bridge Replacement‐ Replace Bridge 7628 on NM 313 MP 12.98. Near 75.8 Bridge # 7628 Hwy & Brg Pres NMDOT D‐3 $4,000,000 Algadones COMEBACK Term Bridge Deck Overlay: I‐25 SB over the Rio I‐25 over the Rio Grande & NM 528 over the Rio 115.0 District 3 Bridge Deck Overlays Grande (Bridge #7355) and NM 528 over the Hwy & Brg Pres NMDOT D‐3 $1,243,651 Funded (Bridge #7355) Grande (Bridge #8832) Rio Grande River (Bridge #8832). COMPLETED

District 3 Bridge Deck Repairs ((9921, Bridge deck repairs and/or overlay and/or 75.5 9922, 9923, 9924, 9962, 9931, 9959, Various locations joint repairs. Other appurtenances as Hwy & Brg Pres NMDOT D‐3 $1,603,836 Funded 9939, 9940) necessary. COMPLETED

Bridge deck repairs and/or overlay and/or District 3 Bridge Deck Repairs (8929, 75.7 various locations joint repairs. Other appurtenances as Hwy & Brg Pres NMDOT D‐3 $1,300,000 Funded 8930, 8666) necessary. COMPLETED

District 3 Bridge Deck Repairs (9949, Bridge deck repairs and/or overlay and/or 75.6 9950, 9951, 9932, 9933, 5989, 5990, various locations joint repairs. Other appurtenances as Hwy & Brg Pres NMDOT D‐3 $1,090,026 Funded 6149) necessary. COMPLETED Bridge #6901, Bridge #9901, Bridge # 6905, Bridge # 9905, Bridge #9909, Bridge #6908, 117.0 District 3 Bridge Preservation Various I‐40 Bridges Hwy & Brg Pres NMDOT D‐3 $3,162,867 Funded Bridge #9913, Bridge # 9917, Bridge #9918 and Bridge #9914. District 3 Bridge Preservation (Bridge New Project Various I‐40 Bridge Deck Overlay improvements on the 117.1 Hwy & Brg Pres NMDOT D‐3 $1,789,238 Funded Deck Overlays) Bridges following I‐40 bridges:

Appendix A 21 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

District 3 Bridge Rehab/Repl Program Rehabilitate and/or replace federal‐aid Late 1075.1 District 3 Wide Hwy & Brg Pres NMDOT D‐3 $15,000,000 (Late Time Frame) bridges. Term District 3 Bridge Repairs ‐ Mateo Bridge replacement on NM 22 Mateo 114.0 Hwy & Brg Pres NMDOT D‐3 $3,599,305 Funded Overpass Bridge Replacement Overpass (Bridge #7079). UNDER DESIGN Bridge replacement of bridge #7398 on FR Bridge #7398 (18.1 miles 4058 (Zuzax interchange) and other 116.0 District 3 Bridge Replacement‐FR 4058 Hwy & Brg Pres NMDOT D‐3 $7,102,001 Funded east of jct I‐25/I‐40) interchange modifications as needed, including replacement of CBC. UNDERWAY Replace five deficient slab bridges on NM 165 Bridge # 5155, 5156, 5916, 165.1 District 3 Bridge Replacements‐NM 165 with culverts. Bridge # 5155, 5156, 5916, Hwy & Brg Pres NMDOT D‐3 $1,500,000 Funded 5917, 5919 5917, 5919. Plan, design and construciton of bridge Bridge 3303 ‐ NM 304 over Near 138.3 District 3 Off System Bridge Program repairs and/or rehabilitation of off‐system Hwy & Brg Pres NMDOT D‐3 $434,993 San Juan Canal Term bridge. Bridge 3498 ‐ NM 109 over Plan, design and construciton of bridge Near 138.4 District 3 Off System Bridge Program Bosque Irrigation Canal MP repairs and/or rehabilitation of off‐system Hwy & Brg Pres NMDOT D‐3 $434,993 Term 1.3 bridge. Mill and Inlay on Paseo del Norte. 108.6 District 3 Pavement Preservation Hwy & Brg Pres NMDOT D‐3 $3,956,166 Funded COMPLETED Pavement preservation to include pavement District 3 Pavement Preservation ‐ I‐25 651.7 markings, signage and other appurtenances Hwy & Brg Pres NMDOT D‐3 $3,999,445 Funded North of Algodones Bridge as necessary. LATE TERM Perform pavement preservation and other District 3 Pavement Preservation ‐ I‐40 651.5 I‐25 Fr. Lomas to Comanche I‐40 Fr. 6th St. to Carlisle construction as necessary to I‐40 and I‐25 Hwy & Brg Pres NMDOT D‐3 $10,961,293 Funded and I‐25 (Big I) within the Big I interchange. COMPLETED Pavement preservation including pavement District 3 Pavement Preservation ‐ I‐40 Near 260.0 MP 149.0 MP 154.7 markings, signage and other appurtenances Hwy & Brg Pres NMDOT D‐3 $8,500,000 West of Coors Term as needed. District 3 Pavement Preservation (Late Roadway & bridge preservation on various Late 1108.1 District 3 Wide Hwy & Brg Pres NMDOT D‐3 $150,000,000 Time Frame) highways. Term District 3 Pavement Preservation: I‐25 Perform pavement preservation on I‐25 SB 651.4 MP 194.0 MP 197.0 Hwy & Brg Pres NMDOT D‐3 $3,000,000 Funded SB Lanes lanes. New asphalt, base, curb, gutter, sidewalks Near 205.0 Don Pasqual Roadway Improvements Intersection of NM 6 Intersection of Tondre Rd. drainage improvements to the existing two Hwy & Brg Pres Village of Los Lunas $1,300,000 Term lane facility. Design and Implement full depth reclamation of Van Camp Blvd Project includes new 180.0 El Cerro Mission Blvd Rehabilitation NM 263/El Cerro Loop San Martin Ave Hwy & Brg Pres County of Valencia $1,750,000 Funded streetlighting at appropiate intersections and other appurtenances as needed

Appendix A 22 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Encino Road Improvements (Sandoval Roadway improvements to accommodate Late 385.0 Northern Blvd proposed landfill site Hwy & Brg Pres County of Sandoval $500,000 Landfill Connection) heavy vehicles. Term Fed Aid Hwys Rehab/Reconst (Late Time Rehabilitate and/or reconstruct roadways to Late 1013.1 various locations annually Hwy & Brg Pres County of Bernalillo $22,500,000 Frame): Bernalillo County maintain and preserve the infrastructure. Term

Fed Aid Hwys Rehab/Reconst (Late Time Rehabilitate and/or reconstruct roadways to City of Albuquerque‐ Late 1011.1 various locations annually Hwy & Brg Pres $52,500,000 Frame): City of Albuquerque maintain and preserve the infrastructure. DMD Term

Fed Aid Hwys Rehab/Reconst (Late Time Rehabilitate and/or reconstruct roadways to Near 1012.1 various locations annually Hwy & Brg Pres City of Rio Rancho $40,000,000 Frame): City of Rio Rancho maintain and preserve the infrastructure. Term

Fed Aid Hwys Rehab/Reconst (Late Time Rehabilitate and/or reconstruct roadways to Late 1014.1 various locations annually Hwy & Brg Pres Various/Joint Effort $15,000,000 Frame): Smaller Municip. maintain and preserve the infrastructure. Term Resurface roadway, install/rehab. storm City of Albuquerque‐ 633.0 Fortuna Rd west of 76th St Coors Blvd drainage, curbs, gutters, sidewalks, bike lanes, Hwy & Brg Pres $3,600,000 Funded DMD etc. COMPLETED Rehabilitate and/or reconstruct Gun Club Rd. Gun Club Roadway Imrovements and Late 838.0 118th St NM 314, Isleta Blvd Project includes Bike Lanes/Trail and other Hwy & Brg Pres County of Bernalillo $12,000,000 Bike Lanes/Trail Term appurtenances. Includes Sidewalks

183.0 I/40 PCCP Rehab/Replacement Coor /I‐40 Interchange 6th Street Rehab and replace PCCP slabs COMPLETED Hwy & Brg Pres NMDOT D‐3 $10,109,357 Funded District 3 interstate infrastructure pavement 253.1 I‐25 (South) Pavement Preservation MP 175 MP 190 Hwy & Brg Pres NMDOT D‐3 $4,967,287 Funded preservation. I‐25 / Cesar Chavez Interchange Reconstrcut interchange with bridge rehab or 250.4 Bridge #6228 & 6229 Hwy & Brg Pres NMDOT CRDC $60,000,000 Funded Reconstruction replacement. I‐25 / Gibson Blvd. Interchange Design and ROW for interchange 91.1 Hwy & Brg Pres NMDOT CRDC $8,000,000 Funded Reconstruction (design and ROW) reconstruction. DESIGN UNDERWAY I‐25 / Montgomery Blvd. Interchange Reconstruct interchange with bridge rehab or 250.3 (Bridge #6261) Hwy & Brg Pres NMDOT CRDC $60,000,000 Funded Reconstruction replacement. DESIGN UNDERWAY Pavement preservation to include full depth I‐25 and NM 6 On & Off Ramps Rehab reclamation with localized full reconstruction 216.0 Sun Ranch Village Rd Emilio Lopez Rd Hwy & Brg Pres NMDOT D‐3 $4,467,287 Funded and Reconstruction on the on and off ramps at I‐25 and NM 6 interchange. Full depth reconstruction and pavement preservation (mill and inlay) including I‐25 Belen Reconstruction and 364.3 MP 189.7 MP 193.1 pavement markings, guardrail replacement, Hwy & Brg Pres NMDOT D‐3 $4,300,000 Funded Pavement Preservation signage, and other appurtenances as necessary. COMPLETED

Appendix A 23 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Highway preservation ‐ full depth 265.1 I‐25 FDR Phase 2MP 195.25 I‐25 MP 198.7 Hwy & Brg Pres NMDOT D‐3 $7,925,859 Funded reclamation. DESIGN COMPLETED Highway preservartion‐ full depth 265.2 I‐25 FDR Phase 3MP 198.7 MP 203.0 Hwy & Brg Pres NMDOT D‐3 $12,000,000 Funded reclamation. DESIGN COMPLETED I‐25 Interchange Reconstruction (Los Exit 203, Los Lunas Late 627.0 Reconstruct existing interchange. Hwy & Brg Pres NMDOT D‐3 $28,500,000 Lunas) Interchange Term Highway preservation ‐ full depth reclamation 265.0 I‐25 Northbound FDR Phase 1I‐25 MP 191.0 I‐25 MP 195.25 on Northbound I‐25 MP 191 ‐ MP 195.25. Hwy & Brg Pres NMDOT D‐3 $11,820,328 Funded DESIGN COMPLETE UNDERWAY Pavement preservation to include pavement Near 651.6 I‐25 S‐Curve Pavement Preservation Avenida Cesar Chavez Lomas Blvd. markings, signage, and other appurtenances Hwy & Brg Pres NMDOT D‐3 $4,500,000 Term as necessary. Rehabilitation and/or reconstruction of the on 98.0 I‐40 & Louisiana Blvd On/Off Ramps I‐40 (MP 162.5) I‐40 (MP 163.5) Hwy & Brg Pres NMDOT D‐3 $4,659,839 Funded and off ramps. COMPLETED Pavement rehabilitation and miscellaneous 359.2 I‐40 Canyon Pavement Rehabilitation Near Coyote Springs Woodland Hills Hwy & Brg Pres NMDOT D‐3 $15,000,000 Funded construction as needed. DESIGN UNDERWAY Rehabilitation an/or reconstruction of the on and off ramps and subsequent interchange 197.1 I‐40 Louisianna Westbound Ramps MP 162.5 MP 163.5 Hwy & Brg Pres NMDOT D‐3 $4,044,509 Funded area. Other appurtenances as necessary. COMPLETED I‐40 Pavement Preservation (Bernalillo Perform pavement preservation on I‐40 EB 359.3 MP 182.5 MP 184 Hwy & Brg Pres NMDOT D‐3 $3,926,166 Funded and Santa Fe County Line) and WB lanes. Perform pavement preservation on I‐40 EB 359.4 I‐40 Pavement Preservation (West ABQ) MP 147 MP 149 Hwy & Brg Pres NMDOT D‐3 $4,000,000 Funded and WB lanes. Full depth reconstruction of westbound Near 197.0 I‐40 Westbound Lanes Reconstruction Wyoming Blvd Louisiana Blvd. Hwy & Brg Pres NMDOT D‐3 $4,000,000 driving lanes and shoulders. COMEBACK Term Design and construction of a new box culvert Idalia Rd and Arroyo de la 613.4 Idalia Rd Culvert Crossing and adjacent arroyo bankstabilization Hwy & Brg Pres City of Rio Rancho $1,645,343 Funded Barranca improvements. Preliminary engineering, right of way mapping Near 613.2 Idalia Rd Reconstruction Northern Blvd Iris Rd and acquisition , final design, and construction Hwy & Brg Pres City of Rio Rancho $15,000,000 Term of a 2‐lane roadway. Design and Reconstruct Isleta Blvd with 511.4 Isleta Blvd.Reconstruction I‐25 Muniz Rd shoulders for bikes and pedestrians. Construct Hwy & Brg Pres County of Bernalillo $4,000,000 Funded in phases Pavement rehabilitation, repair and re‐ surfacing. Project includes removal and Juan Tabo Blvd. Rehabilitation & City of Albuquerque‐ 142.1 Montgomery Blvd. Spain Rd. replacement of ADA ramps, curbs and gutter, Hwy & Brg Pres $5,333,333 Funded Reconstruction DMD striping, signage and other appurtenances as needed.

Appendix A 24 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Plan, design and construct roadway, median, City of Albuquerque‐ 676.0 Ladera Drive Improvements Gavin Rd. Coors Blvd. Hwy & Brg Pres $4,148,000 Funded bicycle, and trail improvements. COMPLETED DMD Preliminary engineering, final design, and Late 540.4 Loma Colorado Blvd Reconstruction Broadmoor blvd Northern Blvd Hwy & Brg Pres City of Rio Rancho $5,000,000 reconstruction. Term Plan, design and construct roadway and City of Albuquerque‐ 144.0 Louisiana Median Improvements Uptown Blvd. Americas Parkway median improvements including fencing, Hwy & Brg Pres $1,000,000 Funded DMD landscaping and roadway rehabilitation. Major Bridge Rehabilitation: Bridge Blvd Major rehabilitation of the bridge. Possible Late 1006.0 Bridge Blvd over Rio Grande Hwy & Brg Pres NMDOT D‐3 $10,000,000 over Rio Grande widening. Term

Major Bridge Rehabilitation: Central Central Ave over Rio Major rehabilitation of the bridge. Possible City of Albuquerque‐ Late 1005.0 Hwy & Brg Pres $15,000,000 Avenue over Rio Grande Grande widening. DMD Term

Major Bridge Rehabilitation: I‐25 over Major rehabilitation of the bridge. Possible Late 1001.0 I‐25 over Rio Grande Hwy & Brg Pres NMDOT D‐3 $40,000,000 Rio Grande widening. Term Major Bridge Rehabilitation: I‐40 over Major rehabilitation of the bridge. Possible Late 1002.0 I‐40 over Rio Grande Hwy & Brg Pres NMDOT D‐3 $40,000,000 Rio Grande widening. Term Major Bridge Rehabilitation: Montano Montano Blvd over Rio City of Albuquerque‐ Late 1007.0 Major rehabilitation of the bridge. Hwy & Brg Pres $15,000,000 over Rio Grande Grande DMD Term Major Bridge Rehabilitation: NM 147 Late 1009.1 Major rehabilitation of the bridge. Hwy & Brg Pres NMDOT D‐3 $5,000,000 over Rio Grande Term Major Bridge Rehabilitation: NM 309 Late 1009.0 Major rehabilitation of the bridge. Hwy & Brg Pres NMDOT D‐3 $5,000,000 over Rio Grande Term Major Bridge Rehabilitation: NM 346 Late 1009.2 Major rehabilitation of the bridge. Hwy & Brg Pres NMDOT D‐3 $5,000,000 over Rio Grande Term Major Bridge Rehabilitation: NM 528, NM 528, Alameda Blvd over Major rehabilitation of the bridge. Possible Late 1004.0 Hwy & Brg Pres NMDOT D‐3 $15,000,000 Alameda Blvd over Rio Grande Rio Grande widening. Term Construct new turning lane on Manzano Manzano Expressway & Hillandale Ave Manzano Expressway and Expressway onto Hillandale Ave. Project Late 195.2 Hwy & Brg Pres City of Rio Communities $1,000,000 Intersection Improvements Hillandale Ave includes signal and signage components and Term other appurtenances. Full depth reclamation of Manzano Manzano Expressway Rehabilitation Expressway. Project includes pavement Near 940.2 Van Camp Blvd Meadowlake Rd Hwy & Brg Pres County of Valencia $1,200,000 Phase III markings, signage, and other appurtenances Term as necessary.

Appendix A 25 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Pavement preservsation and rehab including pavement markings, signage, widen 941.0 Meadowlake Road Improvements NM 263 (El Cerro Loop) Mesa Estates Rd. shoulders, drainage improvements and other Hwy & Brg Pres County of Valencia $4,225,000 Funded appurtenances as necessary. State Capital Outlay funds will be used to cover design.

Reconstruct roadway, improve alignment of Mesa Rd. Project includes bike and Near 148.1 Mesa Roadway Improvements Aragon Rd BL‐13 Business Loop pedestrian facility improvements, drainage, Hwy & Brg Pres City of Belen $2,750,000 Term signing, striping, lighting and other appurtenances as needed.

Design and implement full depth reclamation of Miller Street . Project includes new Near 223.0 Miller Street Improvements Peyton Road NM 314 Hwy & Brg Pres County of Valencia $2,000,000 streetlighting at appropriate intersections and Term other appurtenances as needed.

Roadway rehabilitation to include new Molina Road ‐ Roadway and Pedestrian sidewalks, drainage improvements, access 937.0 NM 47 Frederick Ln Hwy & Brg Pres Town of Peralta $312,815 Funded Improvements management and other appertenances as necessary. COMPLETED

Intersection improvements including but not limited to replacement of asphalt with Montgomery and Wyoming Intersection City of Albuquerque‐ 245.1 Wyoming and Montgomery concrete, sidewalk improvements, possible Hwy & Brg Pres $1,755,618 Funded Improvemnts DMD turn lane improvements and other appurtenances as needed. DONE Near 242.1 Nicklaus Dr. Road Improvements Chianti Rd Southern Blvd Final design and construction. Hwy & Brg Pres City of Rio Rancho $2,000,000 Term Mill and inlay; ADA; multiuse trail; access NM 14 Roadway Preservation & Rehab 99.3 MP 0.0 MP 2.0 control; drainage/erosion; evaluation of NM Hwy & Brg Pres NMDOT D‐3 $3,203,961 Funded Phase 1 14/NM536/Frost Road. COMPLETED

Mill and inlay, ADA improvement, multuse NM 14 Roadway Preservation & Rehab trail (from MP 0 ‐ MP 4), access control, 99.4 MP 0.0 Casa Loma Rd MP 4.0 Snowline Rd Hwy & Brg Pres NMDOT D‐3 $4,379,452 Funded Phase 2 drainage/erosion mitigation. Trail work begins at MP 0, road work at MP 2) COMPLETED Mill and inlay, ADA improvements, multiuse NM 14 Roadway Preservation & Rehab MP 4.0 (Melcor de Near 99.5 MP 6.0 (north of Frost Rd) trail, access management and Hwy & Brg Pres NMDOT D‐3 $4,664,689 Phase 3 Canoncito) Term drainage/erosion mitigation.UNDERWAY

Appendix A 26 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

NM 263 & El Cerro Mission Blvd Intersection of El Cerro Reconfigure intersection of El Cerro Mission 939.0 El Cerro Loop (NM 263) Hwy & Brg Pres County of Valencia $100,000 Funded Intersection Improvements Mission Blvd Blvd as it joins NM 263 COMPLETED NM 304 & Golf Course Rd Intersection NM 304 and Golf Course Construct new turning lane on NM 304 Late 195.4 Hwy & Brg Pres City of Rio Communities $1,000,000 Improvements Rd. southbound onto Golf Course Road. Term NM 304 & Vista del Rio Rd Intersection NM 304 and Vista del Rio Construct new turning lane on NM 304 Late 195.5 Hwy & Brg Pres City of Rio Communities $1,000,000 Improvements Blvd. westbound onto Vista del Rio Blvd.. Term Reconstruct NM 309 and BL00013 NM 309 and Belen Business Loop Late 149.0 Main St. and Reinken Ave. Intersection. Project includes other Hwy & Brg Pres NMDOT CRDC $4,000,000 Intersection Improvements Term appurtenances as necessary. Pavement Preservation on NM 313 NB and SB NM 313 Pavement Preservation 313.1 MP 6.3 MP 8.4 lanes. COMPLETED WITH STATE FUNDS Hwy & Brg Pres NMDOT D‐3 $3,345,700 Funded Improvements Project Deleted from TIP. Addition of northbound and southbound left‐ NM 314 & Courthouse Rd Intersection 314.0 MP 7.25 (Park Lane) MP 7.85 (Teles St) turn lanes and other intersection Hwy & Brg Pres NMDOT D‐3 $4,555,000 Funded Improvements improvements as needed. UNDERWAY

Design and possible construction of new NM 314 Access Management 314.1 Salaz Rd Morris Rd access points and auxiliary lanes on NM 314 Hwy & Brg Pres NMDOT D‐3 $2,000,000 Funded Improvements per the NMDOT's access management plan.

Northern Village/Pueblo Near 628.0 NM 314 Reconstruction in Los Lunas NM 6, Main St Reconstruct Roadway Hwy & Brg Pres Village of Los Lunas $12,837,000 Boundary Term

Replacement of bridge on NM 337 (Bridge 671.0 NM 337 Bridge Replacement in Chilili Bridge # 5548 Hwy & Brg Pres NMDOT CRDC $3,906,359 Funded Number 5548) DESIGN UNDERWAY

Redesign intersection and construct improvements to improve safety. Includes: NM 448 Corrales Road & Meadowlark NM 448 at Meadowlark Near 344.0 storm water control, bicycle & pedestrian Hwy & Brg Pres Village of Corrales $1,711,000 Lane Intersection Improvements Lane Term facilities and delineation of commercial driveways and other improvements.

Reconstruct roadway. This is proposed by the Late 348.0 NM 448, Corrales Road Reconstruction NM 528, Alameda Blvd NM 528 Rio Rancho Blvd Hwy & Brg Pres Village of Corrales $25,000,000 village to be in cooperation with NMDOT. Term

NM 47 & Manzano Expressway NM 47 and Manzano Construct new left turn lane from Manzano Late 195.0 Hwy & Brg Pres City of Rio Communities $1,000,000 Intersection Improvements Expressway Expressway to NM 47 Southbound. Term NM 47 & Nancy Lopez Rd Intersection NM 47 and Nancy Lopez Construct new turning lane on NM 47 Late 195.3 Hwy & Brg Pres City of Rio Communities $1,000,000 Improvements Blvd. southbound onto Nancy Lopez Blvd. Term

Appendix A 27 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Reconstruct left and right turning lanes from NM 47 & NM 304 Intersection Late 195.1 NM 304 and NM 47 Hwy 304 eastbound onto NM 47 (Both north Hwy & Brg Pres City of Rio Communities $1,000,000 Improvements Term bound and southbound) NM 47 Bridge Replacement over I‐25 SB NM 47 Bridge Replacement over the I‐25 SB Near 945.0 Hwy & Brg Pres NMDOT CRDC $7,000,000 Off Ramp Off Ramp. COMING BACK Term Isleta‐Bosque Farms Near 637.0 NM 47 Resurfacing I‐25 Interchange Resurface roadway Hwy & Brg Pres Pueblo of Isleta $800,000 Boundary Term Rehabilitate roadway, shoulders, etc. includes Late 363.0 NM 500 Atrisco Vista Blvd Rehabilitation Sen. Dennis Chavez Blvd I‐40 bike lanes and trail. CHANGE LEAD TO Hwy & Brg Pres NMDOT D‐3 $1,147,900 Term NMDOT PER BERN CO Plan, environmental, design, right‐of‐way, and construct intersection improvements with NM 500 Rio Bravo Blvd & 2nd St pedestrian and bicycle facilities. NOTE: local 42.1 NM 500 at 2nd St (MP 3.16) Hwy & Brg Pres County of Bernalillo $5,000,000 Funded Intersection Improvements match will be used as a soft match towards preliminary engineering and design. UNDER DESIGN Replacement of structurally deficient bridges 8.1 NM 500 Rio Bravo Bridge Replacement Isleta Blvd. Poco Loco Rd Hwy & Brg Pres NMDOT D‐3 $29,855,525 Funded on NM 500 over the Rio Grande. NM 500 Rio Bravo EB Bridge 8.0 NM 500 MM 2.39 NM 500 MM 2.43 Replace bridge. DESIGN ONLY FOR 8.1 Hwy & Brg Pres NMDOT D‐3 $1,000,000 Funded Replacement (Bridge #6204) Pavement preservation including pavement NM 556 Tramway Blvd Pavement Near 378.0 Central Ave Montgomery Blvd markings, signage, and other appurtenances Hwy & Brg Pres NMDOT CRDC $5,880,000 Preservation Term as necessary. UNDERWAY

Bridge Replacement and other appurtenances NM 6 Bridge Replacement ( Rio Grande 6.8 as necessary. CONSTRUCTION TO BE Hwy & Brg Pres NMDOT D‐3 $24,673,415 Funded Bridge #7453) IMPLEMENTED UNDERWAY

Pavement preservation to include ADA NM 6 Pavement Preservation in Los 260.1 Hunning Ranch Loop NM 47 improvements and other miscellaneous Hwy & Brg Pres NMDOT D‐3 $5,774,364 Funded Lunas construction as needed. DESIGN UNDERWAY Pavement preservation to correct surface NM 6 Pavement Preservation West of I‐ 260.2 NM 6 (MP 23.6) West of I‐25 (MP 32.6) defects, extend pavement life and improve Hwy & Brg Pres NMDOT D‐3 $17,265,460 Funded 25 safety along NM 6. DESIGN Pavement preservation including pavement NM 6 West Side of Los Lunas ‐ 6.0 MP 18.2 MP 24 markings, signage, and other appurtenances Hwy & Brg Pres NMDOT CRDC $7,575,101 Funded Pavement Preservation as necessary. COMPLETED

Appendix A 28 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Major rehab, deck replacement, pier and NM 6/BNSF Railroad Bridge abutment repair and beaing replacment on 138.5 NM 6 and Bridge # 7660 Hwy & Brg Pres NMDOT D‐3 $3,139,764 Funded Preservation NM6.BNSF Railroad Bridge #7660. UNDERWAY Full depth reclamation of North Los Lentes. North Los Lentes Rehabilitation Project includes new shared bike facilities and 828.2 Trujillo St NM 314 Hwy & Brg Pres Village of Los Lunas $800,000 Funded Improvements ADA improvements to non‐compliant curb ramps and other appurtenances as needed.

Design and implement full depth reclamation of North Rio del Oro. Project includes new Near 221.0 North Rio Del Oro Improvements Sandhill Road Bonita Vista Blvd Hwy & Brg Pres County of Valencia $1,000,000 streetlighting at appropriate intersections and Term other appurtenances as needed. Reconstruct 2‐lane roadway with sidewalks Near 64.1 Old Coors Reconstruction Coors Blvd Bridge Blvd Hwy & Brg Pres County of Bernalillo $7,105,000 and bike lanes. Term Osuna Blvd Widening Multi‐Modal Construct ped sidewalks, bike lanes, and Late 438.3 2nd St Railroad Hwy & Brg Pres County of Bernalillo $4,000,000 Improvements trails. Scale back project Term Paseo del Norte PCCP Intersection Design the PCCP intersections on NM 423 28.0 2nd Street Wyoming Blvd. Hwy & Brg Pres NMDOT D‐3 $9,500,000 Funded Design (PdN) between 2nd Street and Wyoming Blvd. Paseo del Norte PCCP Intersection west of Louisiana & PdN east of Louisiana & PdN RECONSTRUCT THE PCCP INTERSECTION at 28.1 Hwy & Brg Pres NMDOT D‐3 $1,000,000 Funded Reconstruction Intersection Intersection Lousiana Project includes construction of a three span, 250' long bridge over the Peralta Creek and Pueblo de Cochiti: BIA SP‐85 Bridge .5 miles south of Cochiti .25 miles south of Cochiti road reconstruction on bridge approaches. 517.0 Hwy & Brg Pres Pueblo of Cochiti $3,702,054 Funded Construction Pueblo on BIA SP‐85 Pueblo on BIA SP‐85 Project to include safety improvements. IRR and NMHSEM funds to be used as required match for 16 and 17 STP‐Rural funds. Rehabilitate Roadrunner Road to provide a Roadrunner Road (SP393) new surface, improved storm drainage (green Near 705.0 BIA SP85 Plaza Street Hwy & Brg Pres Pueblo of Cochiti $539,000 Improvements infrastructure), traffic calming, and walking Term paths. Road improvements: includes roadbed, Roadway Improvements on Road #N‐57 Near 664.0 beg. from west N‐56 easterly to N‐57 drainage, blacktop with bridge/culvert work Hwy & Brg Pres To'hajiilee‐Navajo Gov't. $3,500,000 & N‐58 Term as needed & signage, etc. Sara Rd and Meadowlark Ln. Preliminary engineering, ROW acquisition , Near 227.0 Sara Rd Meadowlark Hwy & Brg Pres City of Rio Rancho $3,000,000 Intersection Improvements final design and reconstruction. Term City of Albuquerque‐ Late 224.0 Shooting Range Road Improvements Paving and upgrades. Hwy & Brg Pres $2,500,000 Aviation Term

Appendix A 29 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Full depth reclamation of South Los Lentes. South Los Lentes and Morris Rd Project includes new bike and pedestrian 828.1 NM314 and Morris Rd Lopez Rd. Hwy & Brg Pres Village of Los Lunas $550,000 Funded Improvements Phase II facilities, lighting and drainage improvements as needed. Reconst. Southern Blvd. to include to include signalized intersection, street light installation, curb & gutter, sidwalk & roadway 9.1 Southern Blvd Reconstruction Phase I 630' West of Golf Course Rd NM 528 pavement replacement, turning lane Hwy & Brg Pres City of Rio Rancho $16,787,783 Funded construction, storm drain construction, striping & signage, & water & sewer line const. Right‐of‐way acquisition, final design, and Late 9.3 Southern Blvd Reconstruction Phase III Rainbow Blvd. Unser Blvd Hwy & Brg Pres City of Rio Rancho $49,542,500 construction of a 4‐lane roadway Term Southern Blvd Rehabilitation 9.5 Rainbow Blvd. Unser Blvd Rehabilitate existing roadway cross section. Hwy & Brg Pres City of Rio Rancho $800,000 Funded Improvements Construct new bridge over Rio Grande. SP 88 Westernmost p.t of SP 88 easternmost pt.of 723.0 SP 88 Rio Grande Bridge Reconstruction Construction and Construction Management. Hwy & Brg Pres Pueblo of Santo Domingo $4,381,804 Funded bridge bridge Connecting Santo Domingo Pueblo to Sile. City of Albuquerque‐ Near 437.1 Sunport Blvd Pavement Rehabilitation I‐25 Girard Blvd Mill & repave (or other pavement rehab.) Hwy & Brg Pres $2,000,000 Aviation Term Sunport Blvd Interchange Improvements to Sunport Blvd (West egde Sunport Blvd‐Interchange I‐25 On/Off ramps MP include striping, signals, paving, street lights, 437.3 of NMDOT ROW to East Hwy & Brg Pres County of Bernalillo $1,750,000 Funded Improvements 221.7 to MP 222.5 sidewalk, fencing and other appurtenances as edge of NMDOT ROW) needed. UNDER CONSTRUCTION Plan, design and reconstruct the two‐lane roadway with storm drainage, curb, gutter. 700.1 Sunset Rd Reconstruction Ph.2 Bridge Blvd Trujillo Rd. Project includes sidewalk and bike lane Hwy & Brg Pres County of Bernalillo $1,708,800 Funded improvements and other appurtenances as needed. Late 237.1 TR 56 Roadway Improvements Rehabilitate roadway. Hwy & Brg Pres To'hajiilee‐Navajo Gov't. $1,500,000 Term Near 237.2 TR 57 Roadway Improvemnts Chapter House TR 7070 Rehabilitate roadway. Hwy & Brg Pres To'hajiilee‐Navajo Gov't. $3,400,000 Term Intersection improvements including Tribal Road #97 & NM 47 Intersection NM 47 & Tribal Road widening, drainage and PMBP. Project also Near 89.1 Hwy & Brg Pres Pueblo of Isleta $2,213,272 Improvements Intersection includes addition of a south to west turn lane Term and enhancements to existing signal. Repair and rehabilitate eligible roads on Late 1080.1 Tribal Roads Rehab (Late Time Frame) various locations Hwy & Brg Pres Various/Joint Effort $42,726,846 Indian Reservations using TTPfunds. Term

Appendix A 30 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Repair and rehabilitate eligible roads on Near 1080.0 Tribal Roads Rehab (Near Term) various locations Hwy & Brg Pres Various/Joint Effort $19,821,028 Indian Reservations using TTP funds. Term Various multimodal transportation projects & 230.0 TTP‐ Pueblo de Cochiti activities. For project specific information Hwy & Brg Pres Pueblo of Cochiti $5,433,943 Funded contact the tribal government office.

Various multimodal transportation projects & 231.0 TTP‐Pueblo of Isleta activities. For project specific information Hwy & Brg Pres Pueblo of Isleta $14,290,338 Funded contact the tribal government office.

Various multimodal transportation projects & activities. For project specific information 232.0 TTP‐Pueblo of Laguna contact the tribal government office. FFY Hwy & Brg Pres Pueblo of Laguna $20,000 Funded 2023 funds for San Jose River Bridge in M137 in Valencia County per TTIP.

Various multimodal transportation projects & 233.0 TTP‐Pueblo of San Felipe activities. For project specific information Hwy & Brg Pres Pueblo of San Felipe $7,685,140 Funded contact the tribal government office.

Various multimodal transportation projects & 234.0 TTP‐Pueblo of Sandia activities. For project specific information Hwy & Brg Pres Pueblo of Sandia $2,853,629 Funded contact the tribal government office.

Various multimodal transportation projects & 235.0 TTP‐Pueblo of Santa Ana activities. For project specific information Hwy & Brg Pres Pueblo of Santa Ana $2,919,547 Funded contact the tribal government office.

Various multimodal transportation projects & 236.0 TTP‐Pueblo of Santo Domingo activities. For project specific information Hwy & Brg Pres Pueblo of Santo Domingo $7,844,862 Funded contact the tribal government office.

Various multimodal transportation projects & TTP‐To'hajiilee‐Navajo Gov't (Late Time Late 237.0 activities. For project specific information Hwy & Brg Pres To'hajiilee‐Navajo Gov't. $160,969 Frame) Term contact the tribal government office. Rehabilitate Turquoise Street to provide a new surface, improved storm drainage (green Near 706.0 Turquoise Street (SP395) Improvements BIA SP85 Plaza Street Hwy & Brg Pres Pueblo of Cochiti $541,000 infrastructure), traffic calming, and walking Term paths.

Appendix A 31 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Intersection improvements including but not limited to concrete replacement of the University and Lomas Intersection City of Albuquerque‐ Near 245.2 University and Lomas asphalt, sidewalk improvements, possible Hwy & Brg Pres $2,500,000 Improvements DMD Term turn lane improvements and other appurtenances as needed. Complete a uniform 4/6 lane facility and Unser Blvd. fr Fredrick Lane Central Ave. fr. Approx. Unser Blvd/Central Ave. Intersection implement multimodal improvements. Local City of Albuquerque‐ 143.0 approx. 400 feet north of 900 feet west of Unser to Hwy & Brg Pres $6,000,000 Funded and Approaches Improvements design funds may be used as soft match. DMD Sarracino approx. 75th St. COMPLETED Design and implement Full depth reclamation of Van Camp Blvd. Project includes new Near 220.0 Van Camp Blvd Improvements El Cerro Mission Blvd. El Cerro Mission Blvd. Hwy & Brg Pres County of Valencia $1,750,000 streetlighting at appropriate intersections and Term other appurtenances as needed

rehab roadway base, asphalt, curb and gutter. Intersection of North Mesa drainage improvements as well as sidewalk, 212.0 West Aragon Rd. Improvements Intersection of Main St. Hwy & Brg Pres City of Belen $2,362,000 Funded Rd. drive pads, and pedestrian facilities will all be included in the project.

Reconstruct roadway, intersection West Aragon Roadway and Intersection immprovements, pedestrian improvements, Late 212.1 Erica Lane Mesa Rd Hwy & Brg Pres City of Belen $1,750,000 Improvements signing, striping, lighting. Pave segment that is Term currently unpaved. Completely reconstruct Woodward Road to address vehicle, drainage, bicycle, and Intersection of 2nd St & Intersection of Broadway pedestrian needs. Bernalillo County will utilize 865.1 Woodward Road Improvements Project Hwy & Brg Pres County of Bernalillo $5,157,141 Funded Woodward Road Blvd & Woodward Rd design funds as soft match for construction per 08‐25‐15 letter from NMDOT. UNDER WAY Category Totals Total Public Funded Highway and Bridge Preservation Projects $1,475,289,857 Implementation and Intallation of ATSPM Alameda Blvd Operational signal timing to improve operations within City of Albuquerque‐ 920.1 Edith Blvd. San Pedro Dr. ITS‐TSM $959,738 Funded Improvements corridor between Edith Blvd and San Pedro DMD Dr. UNDERWAY ASTPM Installation to promote operational Albuquerque Complete Streets: East improvements for pedestrians, cyclists and City of Albuquerque‐ 682.0 Louisiana Blvd. Tramway Blvd. ITS‐TSM $1,170,412 Funded (Operational Improvements) vehicular traffic within the corridor. DMD UNDERWAY

Appendix A 32 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Construct, install, modify, upgrade and improve existing traffic signals/intersection AMPA Wide Intersection Signalization Late 1015.1 AMPA Wide control. Purchase related equipment, service ITS‐TSM Various/Joint Effort $26,675,000 Improvements (LateTime Frame) Term vehicles and computer systems required for the operation of intersection signalization. AMPA Wide Motorist Assistance Operate courtesy patrols (H.E.L.P. vehicles) 568.9 AMPA Wide ITS‐TSM NMDOT D‐3 $2,000,000 Funded Courtesy Patrols AMPA Wide ONGOING AMPA Wide Motorist Assistance Operate courtesy patrols (H.E.L.P) AMPA 214.1 New Project AMPA Wide ITS‐TSM NMDOT D‐3 $950,000 Funded Courtesy Patrols (FFY 2021‐2023) Wide AMPA Wide Motorist Assistance Operate courtesy patrols (H.E.L.P. vehicles) 214.5 AMPA Wide ITS‐TSM NMDOT D‐3 $500,000 Funded Courtesy Patrols (FFY 2024) AMPA Wide AMPA Wide Motorist Assistance Operate courtesy patrols (H.E.L.P. vehicles) 214.6 AMPA Wide ITS‐TSM NMDOT D‐3 $500,000 Funded Courtesy Patrols (FFY 2025) AMPA Wide AMPA Wide Motorist Assistance Late 1568.1 AMPA Wide Operate courtesy patrols (H.E.L.P. vehicles) ITS‐TSM NMDOT D‐3 $6,000,000 Courtesy Patrols (Late Time Frame) Term Plan, design, aquire property and construct TMS/ITS improvements for a full range of City of Albuquerque‐ Near 175.0 Central Ave. TSM/ITS Improvements 98th Street Rio Grande Blvd travel modes, including but not limited to ITS‐TSM $1,500,000 DMD Term roadway, transit, lighting, landscaping, bikeway, and pedestrian enhancements.

Collect travel time data on the roads and interstate system identified in the congested CMP Transp. Assmnt. Prog. (Late Time Late 1107.1 Region Wide network of the AMPA. Data will be used for ITS‐TSM MRMPO $3,000,000 Frame) Term the congestion management process (CMP) among other uses.

Collect travel time data on the roads and interstate system identified in the congested CMP Transp. Assmnt. Prog. (Near Time Near 1107.0 Region Wide network of the AMPA. Data will be used for ITS‐TSM MRMPO $1,500,000 Frame) Term the congestion management process (CMP) among other uses.

Collect travel time and other data to assess the performance of the transportation 201.0 CMP Transportation Analysis Program AMPA Wide network, analyze congested locations, identify ITS‐TSM MRMPO $224,951 Funded projects to address regional needs, use data for project prioritization.

Appendix A 33 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Collect travel time and other data to assess the performance of the transportation 201.1 CMP Transportation Analysis Program AMPA Wide network, analyze congested locations, identify ITS‐TSM MRMPO $225,000 Funded projects to address regional needs, use data for project prioritization.

Collect travel time and other data to assess the performance of the transportation 201.2 CMP Transportation Analysis Program AMPA Wide network, analyze congested locations, identify ITS‐TSM MRMPO $175,000 Funded projects to address regional needs, use data for project prioritization.

Collect travel time and other data to assess the performance of the transportation 201.3 CMP Transportation Analysis Program AMPA Wide network, analyze congested locations, identify ITS‐TSM MRMPO $200,000 Funded projects to address regional needs, use data for project prioritization.

Collect travel time and other data to assess the performance of the transportation 201.4 CMP Transportation Analysis Program AMPA Wide network, analyze congested locations, identify ITS‐TSM MRMPO $175,000 Funded projects to address regional needs, use data for project prioritization.

Collect travel time and other data to assess the performance of the transportation 201.5 CMP Transportation Analysis Program AMPA Wide network, analyze congested locations, identify ITS‐TSM MRMPO $200,000 Funded projects to address regional needs, use data for project prioritization.

Collect travel time and other data to assess the performance of the transportation CMP Transportation Assessment 107.6 AMPA Wide network, analyze congested locations, identify ITS‐TSM MRMPO $113,097 Funded Program projects to address regional needs, use data for project prioritization. COMPLETED

Collect travel time and other data to assess the performance of the transportation CMP Transportation Assessment 107.7 AMPA Wide network, analyze congested locations, identify ITS‐TSM MRMPO $113,098 Funded Program projects to address regional needs, use data for project prioritization. COMPLETED

Appendix A 34 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Collect travel time and other data to assess the performance of the transportation CMP Transportation Assessment 107.8 AMPA Wide network, analyze congested locations, identify ITS‐TSM MRMPO $200,000 Funded Program projects to address regional needs, use data for project prioritization. COMPLETED.

Collect travel time and other data to assess the performance of the transportation CMP Transportation Assessment 107.9 AMPA Wide network, analyze congested locations, identify ITS‐TSM MRMPO $363,814 Funded Program projects to address regional needs, use data for project prioritization. IN Progress Study, PE, Environmental Doc, and some 251.0 I‐25 Corridor Operations Study Broadway Blvd Big I (I‐40) design to identify operational improvements. ITS‐TSM NMDOT D‐3 $879,429 Funded COMPLETED Operations and Maintenance activities ITS ‐ AlbuquerqueTraffic Management associated with the Regional Transportation City of Albuquerque‐ 103.7 AMPA Wide ITS‐TSM $2,340,824 Funded Systems (FFY 2020 & 2021) Management Center, and/or purchase of ITS‐ DMD related equipment.

I‐25 & I‐40 & other State Implement ITS Improvements in conformance 104.5 ITS ‐ District 3 Deployment of ITS AMPA Wide ITS‐TSM NMDOT D‐3 $1,367,040 Funded Hwys to the Regional ITS Architecture COMPLETED

I‐25 & I‐40 & other State Implement ITS Improvements in conformance 104.6 ITS ‐ District 3 Deployment of ITS AMPA Wide ITS‐TSM NMDOT D‐3 $500,000 Funded Hwys to the Regional ITS Architecture COMPLETED

I‐25 & I‐40 & other State Implement ITS Improvements in conformance 104.7 ITS ‐ District 3 Deployment of ITS AMPA Wide ITS‐TSM NMDOT D‐3 $586,834 Funded Hwys to the Regional ITS Architecture COMPLETED

I‐25 & I‐40 & other State Implement ITS Improvements in conformance 104.8 ITS ‐ District 3 Deployment of ITS AMPA Wide ITS‐TSM NMDOT D‐3 $1,000,000 Funded Hwys to the Regional ITS Architecture. COMPLETED

I‐25 & I‐40 & other State Implement ITS Improvements in conformance 104.9 ITS ‐ District 3 Deployment of ITS AMPA Wide ITS‐TSM NMDOT D‐3 $750,000 Funded Hwys to the Regional ITS Architecture. COMPLETED ITS ‐ Regional ITS Expansion (Late Time Late 1048.1 AMPA Wide Implement ITS irmprovements. ITS‐TSM Various/Joint Effort $55,695,000 Frame) Term

Appendix A 35 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Implement ITS on CMP corridors to improve operational efficiency. Implementation AMPA river crossings, ITS Incident Management & Signal Oper. priority to be based on operational analysis & 50.0 frontage roads and selected ITS‐TSM MRCOG $1,354,457 Funded Enhancements CMP strategies matrix. Includes: signal timing CMP corridors enhancements & other ITS improvements & active corridor management.

ITS Regional Operations & Incident Enhance operations and incident managment Late 1049.1 Management Enhancements (FY 2026‐ AMPA Wide ITS‐TSM NMDOT Oper./ITS $24,000,000 programs and facilities as needed. Term 2040) Design & construct a regional transportation management center (TMC) for all ITS ITS Regional Transportation 400 Wyoming Blvd. NE, stakeholders. TMC will integrate multi‐ City of Albuquerque‐ 49.1 ITS‐TSM $15,996,933 Funded Management Center (TMC) Albuquerque, NM agency ITS components, signal systems, & DMD interstate/arterial monitoring systems for real‐ time transportation & incident management. Purchase and Install upgraded ITS equipment City of Albuquerque‐ 103.6 ITS‐Albuquerque Equipment Upgrades City Wide to ITS designated corridors throughout the ITS‐TSM $1,755,618 Funded DMD city. OK + LONG TERM Purchase and installl upgraded ITS equipment ITS‐Albuquerque Equipment Upgrades City of Albuquerque‐ Late 1048.2 City Wide to ITS designated corridors throughout the ITS‐TSM $30,000,000 (Late Time Frame) DMD Term city. Plan, Design, install, integrate and replace traffic signal infrastructure communications, ITS‐Albuquerque Traffic Management monitoring devices, other ITS related City of Albuquerque‐ 103.0 Albuquerque City Wide ITS‐TSM $5,459,176 Funded System elements & services, and construction DMD management services. Separate CNs will be issued for each FY as needed. Project Deleted Implementation of Automated Signal Timing ITS‐ASTM Improvements on City of Albuquerque‐ 249.0 Unser Blvd I‐25 Frontage Road Measures consistent with FHWA Every Day ITS‐TSM $1,755,618 Funded Montgomery/Montano DMD Counts Initiative. I‐25 & I‐40 & other State Implement ITS Improvements in conformance 217.3 ITS‐District 3 Deployment of ITS ITS‐TSM NMDOT D‐3 $1,000,000 Funded Hwys to AMPA wide to the Regional ITS Architecture. UNDERWAY

I‐25 & I‐40 & other State Implement ITS Improvements in conformance 217.4 ITS‐District 3 Deployment of ITS ITS‐TSM NMDOT D‐3 $1,000,000 Funded Hwys to AMPA wide to the Regional ITS Architecture.

I‐25 & I‐40 & other State Implement ITS Improvements in conformance 217.5 ITS‐District 3 Deployment of ITS ITS‐TSM NMDOT D‐3 $1,000,000 Funded Hwys to AMPA wide to the Regional ITS Architecture.

Appendix A 36 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

ITS‐District 3 Deployment of ITS (FFY I‐25 & I‐40 & Other State Implement ITS Improvements in conformance 217.0 AMPA Wide ITS‐TSM NMDOT D‐3 $1,000,000 Funded 2020) Hwys to the Regional ITS Architecture. KEEP Provide signal upgrade within intersection on NM 500 (Rio Bravo) and 98th Street 42.2 NM 500 and 98th Street all approaches and implement multimodal ITS‐TSM NMDOT D‐3 $300,000 Funded Signal Upgrade improvements. Install adaptive signal control system and fiber optic cable on Rio Bravo Blvd. from Coors NM 500 Rio Bravo Adaptive Signal 209.0 Coors Blvd University Blvd. Blvd. to University Blvd. NOTE: Local match ITS‐TSM County of Bernalillo $1,200,000 Funded Control Technology Project will be used as a soft match for preliminary engineering and design. Provide signal upgrades within intersection on NM 556 (Tramway Blvd) @ 41.1 200' N of Montgomery 200' S of Montgomery all approaches, and implement multimodal ITS‐TSM NMDOT D‐3 $737,559 Funded Montgomery Signal Upgrade improvements. Install a traffic signal at the intersection of Paradise and La Paz Traffic Signal City of Albuquerque‐ 259.0 Paradise and La Paz Paradise and La Paz per Council resolution. ITS‐TSM $150,000 Funded Improvements DMD COMPLETED Implement federal mandate for the provision of real‐time travel conditions on "routes of Real Time System Mgmt Info Program significance" (ROS). The rule applies to MSAs Near 208.0 AMPA Wide ITS‐TSM MRCOG $2,000,000 (1201 Mandate) over 1 Mill. population by Nov 8, 2016 and is Term tied to 10‐year census. ROS must be identified by NMDOT in coord with MPOs Category Totals Total Public Funded Intelligent Transportation Systems (ITS) and Transportation Systems Management (TSM) Projects $198,573,598 ABQ City‐Wide Median Landscaping & various locations in the City Install median landscaping and enhancements City of Albuquerque‐ 119.0 Misc $1,000,000 Funded Interstate Enhancements (Phase 1) of Albuquerque on various highways.COMPLETED DMD

ABQ City‐Wide Median Landscaping & various locations in the City Install median landscaping and enhancements City of Albuquerque‐ 119.1 Misc $2,000,000 Funded Interstate Enhancements (Phase 2) of Albuquerque on various highways. COMPLETED DMD

Implement design concepts from Great Streets Facility Plan. Termini: Central Ave Refer to project description from 98th St to 8th St, and from Girard to City of Albuquerque‐ 587.2 Albuquerque City Great Streets Misc $5,355,782 Funded for termini Tramway (West Central, Nob Hill & East DMD Central) and the vicinity of 12th St & Menaul Blvd; other locations may be included. Construction of median landscaping in Central Ave from Central Ave to Tramway City of Albuquerque‐ 587.5 Albuquerque Complete Streets: East accordance with COA Complete Streets Misc $1,170,412 Funded Pennsylvania St. Blvd DMD Ordinance. UNDERWAY

Appendix A 37 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Construction of complete streets improvements at Central Ave. and Eukank Albuquerque Complete Streets: East Central Ave. and Eubank City of Albuquerque‐ 682.1 Blvd. including but not limited to pedestrian Misc $1,170,412 Funded (Intersection Improvements) Blvd. DMD amenities and "gateway" identification. UNDERWAY Implementation of CABQ Complete Streets Ordinance, including ADA compliant sidewalks, pedestrian and cyclists amenities, City of Albuquerque‐ 587.9 Albuquerque Complete Streets: West 98th Street Unser Blvd Misc $2,340,824 Funded landscaping, strom drainage improvements, DMD pedestrian ligthting or transit/bus stop improvements. DESIGN UNDERWAY

Implementation of CABQ Complete Streets Ordinance, including ADA compliant sidewalks, pedestrian and cyclists amenities, City of Albuquerque‐ 683.0 Albuquerque Complete Streets: West 106th Street 98th Street Misc $3,511,236 Funded landscaping, storm drainage improvements, DMD pedestrian lighting or transit/bus stop improvements. UNDERWAY

Implementation of CABQ Complete Streets ordinance, consisting of median landscaping Central Ave from 106th City of Albuquerque‐ 587.4 Albuquerque Complete Streets: West Central Ave to Unser including plants, irrigation and median nose Misc $2,340,824 Funded Street DMD paving. Project extends along Central Avenue from Unser Blvd. to 106th St. UNDERWAY Corridor study for access management NM AMPA Wide Access Management and 160.0 47, NM 500, NM 314, West Central, NM 6, BL Misc NMDOT D‐3 $401,012 Funded Corridor Study Non‐Interstate Routes 13 UNDERWAY AMPA Wide Corridor Study Interstate Corridor study for congestion management. 160.1 various locations Misc NMDOT D‐3 $1,000,000 Funded and other NHS routes UNDERWAY Identify and evaluate different alignments with ROW for a two to four lane arterial with Atrisco Vista Blvd. Extension Study shoulders & parallel 10 ft wide multi‐use trail. 257.0 DE II Road Southern Blvd. Misc County of Bernalillo $534,043 Funded Phase 2 Alternatives will consider drainage, geotechnical & environmental conditions & ownership. Correct s curve. COMPLETED First phase to complete a corridor study and prelim. design. Then complete final design & construction of a 2 lane roadway with 332.0 Broadmoor Blvd (30th St) Expansion Northern Blvd Paseo del Volcan Misc City of Rio Rancho $7,125,251 Funded accommodation for future widening. Total cost includes FY 2010 local funding. COMPLETED

Appendix A 38 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Late 801.3 Ceja N/S Bike Trail Study Paseo del Volcan Sen. Dennis Chavez Blvd Conduct bike trail study Misc City of Albuquerque‐P&R $800,000 Term Plan for Transit Oriented Development along Central Ave. in coordination with the Central City of Albuquerque‐ABQ 345.5 Central Ave TOD Planning Atrisco Vista Blvd. Tramway Blvd. Ave. Bus Rapid Transit and Albuquerque's Misc $1,075,000 Funded Ride comprehensive plan and zoning update. COMPLETED Prepare plans in cooperation with other railroads and local govs. To improve rail : NMRX Plans and Studies Late 1445.3 transportation and pedestrian, bicycle, and Misc Rio Metro NMRRX $1,000,000 (Late Time Frame) Term vehicular access along and across the NMRX corridor. Plan, design, construction and equipment Coors Blvd. traffic Light System City of Albuquerque‐ 181.0 City of Albuquerque Limits improvements to Coors Blvd within City of Misc $796,000 Funded Improvements DMD Albuquerque limits. COMPLETED District 3 On‐Call Planning & Design District 3 Wide Projects Provide planning, engineering, & design 650.9 Misc NMDOT D‐3 $500,000 Funded Support T.B.D. services on an on‐call basis. District 3 On‐Call Planning & Design District 3 Wide Projects Provide planning, engineering, & design 650.4 Misc NMDOT D‐3 $1,200,000 Funded Support T.B.D. services on an on‐call basis. COMPLETED District 3 On‐Call Planning & Design District 3 Wide Projects Provide planning, engineering, & design 650.8 Misc NMDOT D‐3 $500,000 Funded Support T.B.D. services on an on‐call basis. UNDERWAY District 3 On‐Call Planning & Design District 3 Wide Projects Provide planning, engineering, & design 215.0 Misc NMDOT D‐3 $500,000 Funded Support (FFY 2022) T.B.D services on an on‐call basis. District 3 On‐Call Planning & Design District 3 Wide Projects Provide planning, engineering, & design 215.1 Misc NMDOT D‐3 $500,000 Funded Support (FFY 2024) T.B.D. services on an on‐call basis. District 3 On‐Call Planning & Design District 3 Wide Projects Provide planning, engineering, & design 215.2 Misc NMDOT D‐3 $500,000 Funded Support (FFY 2025) T.B.D. services on an on‐call basis. District 3 On‐Call Planning & Design Provide planning, engineering and design Late 1650.1 Misc NMDOT D‐3 $3,750,000 Support (Late Time Frame) services by contract. Term City of Albuquerque‐ Late 801.4 Eagle Ranch Rd Bike Lane Study Coors Blvd Irving Blvd Conduct bike lane study Misc $800,000 DMD Term Eubank Blvd & Candelaria Blvd Median Eubank from Lomas to Candelaria from San Install and maintain landscaping City of Albuquerque‐ 880.1 Misc $2,500,000 Funded Landscaping Montgomery Mateo to Eubank improvements COMPLETED DMD Freeway Overpasses to facilitate traffic flow. Poss loc: San Francisco/I‐25, Morris/I‐40, Various locations on I‐40 & Late 527.0 Freeway Overpasses Study I‐25 & I‐40 Midpt btwn Unser&Coors/I‐40, 118th/I‐40, Misc Various/Joint Effort $1,500,000 I‐25 t.b.d. Term Atrisco/I‐40, San Diego/I‐25. Cost is for EACH overpass. See proj #527.1 City of Albuquerque‐ 801.5 Girard Blvd Bike Lane Study Santa Clara Ave Indian School Road Conduct bike lane study COMPLETED Misc $800,000 Funded DMD

Appendix A 39 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Erosion control, vegetation management, I‐25 & NM 6 Interchange Beautification 6.9 I‐25 Exit 203 vicinity drainage improvements and landscaping as Misc Village of Los Lunas $1,700,000 Funded Enhancements Phase III appropriate. I‐25 & NM 6 Interchange Enhancements Erosion control, vegetation management, and 6.6 I‐25 Exit 203 vicinity Misc Village of Los Lunas $829,588 Funded Phase II landscaping as appropriate. COMPLETED Erosion control, vegetation management, I‐25 & NM6 Interchange Enhancements drainage improvements and landscaping as Late 246.0 NM6 and I‐25 Misc Village of Los Lunas $500,000 Ph 4 appropriate on the outside edeg of each Term ramp. Study, PE, Environmental Doc, and some 251.1 I‐25 Corridor North Study Update Big ITramway Blvd. design to identify improvements. Misc NMDOT D‐3 $500,000 Funded COMPLETED I‐25 Frontage Roads Feasibility Study ‐ Conduct a feasibility study to determine need, Late 623.0 North Belen Interchange Los Lunas Interchange Misc NMDOT D‐3 $1,000,000 Valencia County cost and schedule for implementation. Term

Reconstruction/rehabiliation of the Embudo Channel in the median of I‐40. Project to be 615.7 I‐40 Embudo Channel Improvements San Mateo Blvd Juan Tabo Blvd Misc NMDOT D‐3 $250,000 Funded staged in sections and built over several years. Project is joint effort with AMAFCA and COA. I‐40 Embudo Channel Improvements Reconstruction/rehabilitation of the Embudo Late 1615.1 approx. San Mateo Blvd approx. Juan Tabo Blvd. Misc NMDOT D‐3 $1,500,000 (Late Time Frame) Channel. Term Corridor Study to outline potential 613.1 Idalia Rd Corridor Study Northern Blvd Iris Rd Misc City of Rio Rancho $1,851,454 Funded reconstruction phasing of future project. Landscaping on various sections of Interstate Interstate Landscaping (Late Time Sections of Interstate City of Albuquerque‐ Late 1652.1 To Be Selected Highways. Cooperative effort with NMDOT D‐ Misc $3,160,000 Frame) Highways DMD Term 3. Improve drainage, erosion control, roadside Near 516.0 Ladera Rd Drainage Peralta Blvd Valencia Rd pond construciton and other work as Misc Town of Peralta $300,000 Term necessary. 540.0 Loma Colorado Blvd extension Northern Blvd NM 347 Paseo del Volcan Corridor study and alignment study. Misc City of Rio Rancho $1,287,377 Funded Main Street West Street lighting Near 247.0 Huning Ranch Loop West Desert Willow Rd. Install street lights to address visibility issues. Misc Village of Los Lunas $550,000 Improvements Term MP 4.2 (north of Slope erosion miitigation and other 99.1 NM 14 Slope Erosion Mitigation MP 3.5 (Canoncito Rd) Misc NMDOT D‐3 $3,462,222 Funded Snowline Rd) appurtenances as needed. UNDERWAY NM 347 Paseo del Volcan ROW Bernallilo‐Sandoval County Acquire rights‐of‐way for future roadway. 418.9 Unser Blvd Misc NMDOT ROW Bureau $26,700,000 Funded Acquisition ‐ Northern Sect. Line Project may extend beyond 2040 MTP. NMDOT CRDC On‐Call Planning & Provide Planning, engineering, & design 270.0 AMPA Wide projects T.B.D. Misc NMDOT CRDC $500,000 Funded Design Support services on an on‐call basis.

Appendix A 40 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Enhance. existing. & install new infrastruct. & equip.along NMRX ROW, on board NMRX Postive Train Control and Wi‐Fi NMRX Corridor (Belen NMRX Corridor (Santa Fe locomotives & cab cars, & in back office for 256.0 Misc Rio Metro NMRRX $352,338 Funded Infrastructure and Equipment Station) Depot Station) implem. of PT Contrl. Improv. Wi‐Fi improv. include all necessary infrastrucure & equip & all other appurtenances as needed. DONE Orthophotographic services provided by the 3.5 Orthophotography District 3 wide Mid‐Region Council of Governments per Misc NMDOT D‐3 $50,000 Funded MOU. COMPLETED Orthophotographic services provided by the 3.6 Orthophotography District 3 wide Mid‐Region Council of Governments per Misc NMDOT D‐3 $50,000 Funded MOU. COMPLETED Orthophotographic services provided by the 3.7 Orthophotography District 3 wide Mid‐Region Council of Governments per Misc NMDOT D‐3 $50,000 Funded MOU. Orthophotographic services provided by the 3.3 Orthophotography District 3 wide Mid‐Region Council of Governments per Misc NMDOT D‐3 $50,000 Funded MOU. COMPLETED Orthophotographic services provided by the 3.4 Orthophotography District 3 wide Mid‐Region Council of Governments per Misc NMDOT D‐3 $50,000 Funded MOU. COMPLETED Develop a 2016‐2020 Long Range Near 704.0 Pueblo de Cochiti 2016‐2020 LRTP Misc Pueblo of Cochiti $55,000 Transportation Plan Term Analyze corridors in the urbanized area to establish a plan for future high capacity transit Regional High Capacity Transit Corridors lines, appropriate modes to serve those City of Albuquerque‐ABQ Near 255.0 City Wide Misc $1,574,258 Plan corridors, and environmental documentation Ride Term and preliminary plans for development of the initial corridor(s). City of Albuquerque‐ 801.7 San Pedro Blvd Bike Lane Study Zuni Ave Lomas Blvd Conduct bike lane study COMPLETED Misc $800,000 Funded DMD Plan, design and construct improvements to City of Albuquerque‐ 675.2 San Pedro Street Light Improvements Lomas Blvd Haines Misc $62,000 Funded street lights. COMPLETED DMD

Identify and rehabilitate an existing facility for Rio Metro Sandoval County transit services to Near 210.0 Sandoval County Transit Yard TBD TBD include vehicle storage, maintenance shop, Misc Rio Metro Transit Dist $1,000,000 Term administration building, and other appurtenances.

Appendix A 41 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Rehabilitation and/or construction of rail NM Terminal Service Rail Near 228.0 Sunport South Rail Improvements Kirtland Rail Spur spurs serving south end of airport and siding Misc County of Bernalillo $9,500,000 Spur Term on mainline. Unser Blvd Access Management Plan Implementation of access control, ROW Near 381.9 Southern Blvd. Abrazo Rd. Misc City of Rio Rancho $6,000,000 Implementation Acquisition, and roadway rehabilitation. Term Conduct traffic operations study. Project is 386.1 US 550 Traffic & Operations Study NM 528 NM 313 funded with SPR (State Planning & Research) Misc NMDOT D‐3 $500,000 Funded funds. COMPLETED Category Totals Total Public Funded Miscellaneous Projects (studies, landscaping projects, etc.) $108,855,033 Intersection reconstruction including but not limited to warranted signal installation, 98th St and Blake Rd Intersection 98th St and Blake Rd concrete and pavement rehabilitation, ADA City of Albuquerque‐ Near 474.2 Safety $1,340,824 Improvements Intersection compliant curb ramps and sidewalks, ped DMD Term lighting, safety improvements and ITS‐related components.

Intersection reconstruction including but not limited to warranted signal installation, 98th St.& Gibson Blvd. Intersection 98th St and Gibson Blvd concrete and pavement rehabilitation, ADA City of Albuquerque‐ 474.3 Safety $2,340,824 Funded Improvements intersection compliant curb ramps and sidewalks, ped DMD lighting, safety improvements and ITS‐related components.

Implementation of a public awareness & educational safety campaign. Generation of Albuquerque Public Schools Vision Zero safety materials for students, families & APS 248.0 District Wide Safety Albuq. Public Schools $349,280 Funded for Youth Initiative employees. Project includes creating & implementation of bike/ped safety curriculum for K‐8 grade, using Vision Zero & SRTS.

Replace (as needed) regulatory, street, way‐ Albuquerque Street Sign Safety finding, and informational signs to be in City of Albuquerque‐ Late 20.1 Albuquerque City Wide Safety $7,500,000 Improvements compliance with new federal requirements DMD Term and the MUTCD. Replace (as needed) regulatory, street, way‐ Albuquerque Street Sign Safety finding, and informational signs to be in City of Albuquerque‐ 20.0 Albuquerque City Wide Safety $6,118,340 Funded Improvements compliance with new federal requirements DMD and the MUTCD. COMPLETED

Appendix A 42 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Installation of safety railings along shared‐use Late 800.2 Albuquerque Trail Edge Safety Railings various locations trail facilities located immediately adjacent to Safety City of Albuquerque‐P&R $800,000 Term storm drainage channels. Formulation and installation of a city‐wide Albuquerque Trail Safety Signage Late 800.3 various locations trail milemarker system, major cross streets, Safety City of Albuquerque‐P&R $690,000 System Term etc. Construct safety improvements utilizing AMPA Wide Safety Projects (Late Time Late 1620.1 various locations t.b.d. Highway Safety Improvement Program (HSIP) Safety Various/Joint Effort $30,000,000 Frame) Term funding for eligible projects. Plan, design, aquire right‐of‐way, construct Central and Yucca Roadway City of Albuquerque‐ 174.0 Central Yucca roadway improvements to realign existing Safety $4,000,000 Funded Realignment DMD intersection COMPLETED

Implement safety countermeasure startegies City of Albuquerque‐ Late 245.0 COA Major Intersection Improvements City Wide/tbd identified in various safety and crash reports Safety $84,000,000 DMD Term for intersections with high crash rates. Commuter Rail: NMRX Station ADA and Construct ADA rehabilitation and other Near 423.9 Belen Station Santa Fe Depot Safety Rio Metro NMRRX $1,000,000 Safety Improvements improvements at NMRX stations. Term Improve county maintained roads for all users County Wide Roadway Striping, Traffic with striping, traffic calming, pavement Late 191.0 Calming, Pavement Markings and County Wide Safety County of Bernalillo $2,000,000 markings, guardails, signals and signage Term Guardrails components. Implement roadway improvements that will Late 194.0 County Arterial Program (CAP) maximize safety of school bus routes on Safety County of Bernalillo $8,400,000 Term arterial roads. Courthouse Rd at Railroad Upgrade from a two‐quadrant gate railroad 630.1 Courthouse Rd & NMRX Gate Upgrades Crossing #0194624 Safety NMDOT Transit Rail $125,000 Funded Crossing crossing to a four‐quadrant railroad crossing.

Construct pedestrian improvements between Mesa Road and 10th Street. Roadway and Delgado Avenue Roadway & Pedestrian drainage improvements will be required to 681.0 North Mesa Rd 10th Street Safety City of Belen $822,222 Funded Improvements accommodate the new pedestrian facilities. Signage, striping, lighting and other appurtenances as needed. Construct right‐turn bay from EB El Pueblo to Edith Blvd & El Pueblo Rd Intersection SB Edith, implement signalization 334.0 Edith Blvd at El Pueblo Rd Safety County of Bernalillo $1,000,000 Funded Improvements improvements and other necessary appurtenances. Near 180.4 El Cerro Mission Blvd Street Lights NM 263/El Cerro Loop San Martin Avenue Install Street lights at appropriate intersection Safety County of Valencia $200,000 Term

Appendix A 43 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Gabaldon Road Signage & Pavement Pavement markings, signage and other 944.0 East Aragon Rd NM 314 Frontage Rd Safety County of Valencia $130,000 Funded Markings appurtenances as necessary. COMPLETED Installation of pedestrian lighting, ADA Gibson Blvd (West) Lighting and ADA compliant sidewalks and/or multi‐use trail City of Albuquerque‐ Near 476.4 118th Street Unser Blvd Safety $2,340,824 Improvements facility, and on ‐street bike lanes and DMD Term pavement markings. Emercgency project for foam injection to I‐25 Emergency Repairs (near correct depressions in I‐25 NB and SB. Project 335.1 MP 250 MP 248.5 Safety NMDOT D‐3 $564,836 Funded Algadones) also includes some pavement repair/rehab and OGFC. COMPLETED Improv. include removing the NB MLK off‐ ramp, extension of an auxillary lane on I‐25 between Lead & Lomas. & roadway improv. 250.5 I‐25 MLK NB Off Ramp Improvements Gibson Lomas Blvd. Safety NMDOT D‐3 $2,125,000 Funded to Oak St. from Central to MLK. Signage improv. along I‐25 NB & Oak St from Gibson to Lomas. Sinage on Lomas near High St. Indian School and Q Street Intersection Construction of a traffic circle north of the City of Albuquerque‐ 605.1 Louisiana Blvd Uptown Loop Safety $2,340,824 Funded Improvements uptown Target Shopping Center. DMD Intersection Improvements to improve traffic Intersection Improvements at Cabezon Cabezon Blvd @ Western Near 397.0 circulation. Analysis and design done through Safety City of Rio Rancho $2,000,000 Blvd and Western Hills Dr Hills Dr Term a NMDOT project in FY 2010. Intersection Improvements at King Blvd Intersection improvements to improve traffic Near 399.0 Kiing Blvd & Wilpett Rd Safety City of Rio Rancho $2,500,000 and Wilpett Rd circulation. Term Intersection Improvements at Meadows Near 396.0 Meadows Blvd. & King Blvd. Intersection improvements. Safety City of Rio Rancho $2,500,000 Blvd and King Blvd Term Construct intersection and roadway safety improvements consistent with the Lomas Blvd & Louisiana Blvd Safety Lomas Blvd at Louisiana City of Albuquerque‐ 620.5 recommendations in the city's Citywide Safety $490,000 Funded Improvements Blvd DMD Intersection LOS (Level of Service) Study COMPLETED Construct safety improvements at mid‐block Mid‐Block Bicycle/Pedestrian Crossings City of Albuquerque‐ 435.1 various locations roadway/trail crossings on San Mateo and Safety $100,000 Funded Phase II DMD other locations to be determined. DONE

Pavement preservsation and rehab including 943.0 Mill Road Signage & Pavement Markings NM 116 NM 109 pavement markings, signage and other Safety County of Valencia $410,000 Funded appurtenances as necessary. COMPLETED NM 314 & Courthouse Rd Railroad NM 314 @ Courthouse Rd Install pedestrian gate‐arms at all four Near 825.1 Safety Village of Los Lunas $650,000 Crossinig Bike/Ped Safety Project & NMRRX approaches to the railroad crossing. Term

Appendix A 44 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

NM314, NM45, NM317 intersection realignment & reconstruction, drainage infrastructure (incl. detention ponds & storm NM 314, NM 45 & NM 317 Intersection 82.0 drain pipes), access management, Safety Pueblo of Isleta $8,393,211 Funded Improvements & Realignment landscaping, signage, striping, signalization, lighting, & ped/bike facilities. Design funded in 2016‐17. NM 317/Sagebrush Intersection Widen NM 317 to add an exclusive west to Near 89.2 Safety Pueblo of Isleta $1,034,747 Improvements south left turn lane at Sagebrush. Term Design and construct new pedestrian walkway NM 333 & Patricio Garcia Shoulder Patricio Garcia Rd @ Patricio Garcia Rd @ NM 167.0 along Patricio Garcia and school bus pull off Safety Village of Tijeras $118,000 Funded Crossing Improvements Camino Municipal Rd 333 area along NM 333 and the intersection.

Design & Construct intersection improvements to NM 347 & Broadmoor Blvd. NM 347 (Paseo del Volcan) and Project includes a right turn lane on NM 347 and Broadmoor 332.4 Broadmoor Blvd Intersection eastbound PdV to southbound Broadmoor Safety City of Rio Rancho $326,112 Funded Blvd Improvemnts Blvd & a right turn lane on northbound Broadmoor Blvd to eastbound PdV. Other appurtenances as needed. Upgrade pavement markings, signage and NM 47 & NM 263 Street Lighting, 942.0 add street lighting at intersection for visibility Safety County of Valencia $120,000 Funded Signage & Markings issues. COMPLETED Design and reconstruct improved intersection 600' south of the 600' north of the geometry along with new ADA complient NM 47 & NM 6 Intersection 169.0 Intersection of NM 6 & NM Intersection of NM 6 & facilities. Project includes installation of new Safety Village of Los Lunas $835,000 Funded Improvements 47 NM 47 traffic signals, signage and other apputenances as needed.

Widen NM 47 along 3 segments between NM 47 Left Turn Lanes and Shoulder Tribal Road 2 and NM 147 to add a two‐way 638.2 Tribal Road 2NM 147 Safety Pueblo of Isleta $3,391,736 Funded Improvements left turn lane and shoulders. Project includes other appurtenances as needed.

Widening NM 47 along 3 segments to add a two‐way left turn lane and shoulder 147.1 NM 47 Safety Improvements Tribal Rd 2NM 147 Safety Pueblo of Isleta $2,914,562 Funded improvements. Project includes other appurtenances as needed. NM 47 & Los Cerritos Design and install street lights at identified 942.2 NM 47 Street Lighting Rd/NM 47 & Otero Rd/ NM Safety County of Valencia $200,000 Funded intersection 47 and NM 263

Appendix A 45 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Intersection improvements with possible NM14/NM 536/Frost Rd intersection NM 14 / NM 536 / Frost Rd 99.2 reconfiguration to increase safety and Safety NMDOT D‐3 $3,100,001 Funded Improvements Intersection decrease confusion at intersection. Construct intersection and roadway safety improvements consistent with the Paradise Blvd & Eagle Ranch Rd Safety Paradise Rd at Eagle Ranch City of Albuquerque‐ 620.6 recommendations in the city's Citywide Safety $300,000 Funded Improvements Rd DMD Intersection LOS (Level of Service) Study DONE Construct at‐grade pedestrian crossings and multi‐use trail with barrier fencing and other Rail Corridor Pedestrian Safety 262.0 Lucero Ave. 1/2 mile north of US 550 appurtenances as needed. This CN includes Safety Town of Bernalillo $782,022 Funded Improvements Phase I PE, ROW & Utilities for A302111. St Cap Outlay used for CMAQ‐Flex match. Construct pedestrian crossings and multi‐use Rail Corridor Pedestrian Safety 262.1 Lucero Ave 1/2 mile north of US 550 trail with barrier fencing and other Safety Town of Bernalillo $2,099,840 Funded Improvements Phase II appurtenances as needed. Railroad Crossing Improv ‐ 8th Street 8th Street ‐Railroad Construct new surface and approaches. (8th 172.3 Albuquerque and NMRX/BNSF RR Crossing #019679L, Safety NMDOT Transit Rail $150,000 Funded Street Between Aspen and Haines Ave). (Crossing 019679L) Albuquerque Railroad Crossing Improv ‐ Avenida Avenida Bernalilo (NM 473) Construct surface to accommodate 172.0 Bernalillo and NMRX RR (Crossing Railroard Crossing Safety NMDOT Transit Rail $400,000 Funded pedestrians. 013758J) #013758J, Bernalillo NMRX RR Crossing Railroad Crossing Improv ‐ Broadway 019409M at Broadway Install two new cantilever signal warning 172.4 Safety NMDOT Transit Rail $470,000 Funded Blvd and NMRX RR (Crossing 019409M) Blvd, 1.4 miles north of Rio lights and four quadrant gate arms Bravo Lucero Road‐Railroad Railroad Crossing Improv ‐ Lucero Rd 172.1 Crossing #013760D, Construct new surface. Safety NMDOT Transit Rail $160,000 Funded and NMRX RR (Crossing 013760D) Bernalillo Ortega Road‐Railroad Railroad Crossing Improv ‐ Ortega Rd Construct new surface on Ortega Rd between 172.2 Crossing #013773E, Safety NMDOT Transit Rail $165,000 Funded and NMRX RR (Crossing 013773E) Edith and 2nd Street NE. Albuquerque Reconstruct railroad crossing; includes new concrete surface, signage pavement markings, Railroad Crossing Imprv.‐Indian School Crossing # 019397V (NMRX 354.0 approaches and quad gate intallation. Project Safety NMDOT Transit Rail $898,000 Funded Road MP 900.79) includes other appurtenances as necessary. COMPLETED

Appendix A 46 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Construction of roundabout at the intersection of Rio Grande and Candelaria and Rio Grande Blvd Intersection approaches north and south of the City of Albuquerque‐ 63.1 Rio Grande Candelaria Safety $1,760,000 Funded Improvements intersection as necessary to accommodate DMD the transion of the facility. See old CN A300650. COMPLETED Purchase and install street lights along San Pedro Street and Trumbull Avenue City of Albuquerque‐ 675.1 TBD TBD Trumbull Avenue SE and San Pedro Drive SE. Safety $100,000 Funded Light Project DMD COMPLETED Construct new roadway which includes safety Sunset Rd SW Roadway and Safety improvements to add sidwalks, signage, 700.0 Goff Blvd Bridge Blvd Safety County of Bernalillo $7,000,000 Funded Improvements Phase 1 drainage and other appurtenances as necessary. COMPLETED

Construction of 8 ft shoulders (includes taper) on each side of roadway to eliminate drop‐off NW Loop/US 550 and to provide for a safe pull‐off area for Near 381.3 Unser Blvd Shoulders Upper Section Progress Blvd Safety City of Rio Rancho $3,000,000 Connection vehicles and also to provide a safe route for Term bicyclists. Includes recessed pavement reflectors & pavement markings. Construct a two‐lane roadway with traffic Loma Larga/Meadowlark calming features, including medians and 938.0 West Meadowlark Lane Improvements Municipal Boundary Safety Village of Corrales $700,333 Funded Intersection drainage facilities. 2016 MAP funds included in the total cost. Remove 3,000 ft of speed bumps, some 10' in Near 874.1 West Meadowlark Lane Safety Project Village line Loma Larga Rd width on both sides of the street, and install Safety Village of Corrales $100,000 Term four solar‐powered digital "Slow Down" units.

Construct ADA compliant sidewalks & ramps, minor intersection realignment, lighting, City of Albuquerque‐ 636.0 Zuni Rd Improvements Washington St Central Ave upgrade signage/markings, improve Safety $3,643,000 Funded DMD crosswalks or other measures to reduce pedestrian & bicycle crashes. COMPLETED Category Totals Total Public Funded Safety Projects $208,999,538

Appendix A 47 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Transportation Demand Management Program to increase alternative modes of transportation with activities including public 202.0 AMPA Wide Joint TDM‐Travel Demand AMPA Wide TDM Rio Metro Transit Dist $1,275,749 Funded education, outreach, promotions, information and related equipment and services. Joint lead with ABQ‐RIDE in FY20 & FY21.

Transportation Demand Management Program to increase alternative modes of transportation with activities including public 202.1 AMPA Wide Joint TDM‐Travel Demand AMPA Wide TDM Rio Metro Transit Dist $1,314,373 Funded education, outreach, promotions, information and related equipment and services. Joint lead with ABQ‐RIDEin FY20 & FY21.

Transportation Demand Management Program to increase alternative modes of AMPA Wide Joint TDM‐Travel Demand transportation with activities including public City of Albuquerque‐ABQ 123.8 AMPA Wide TDM $1,240,637 Funded Management education, outreach, promotions, information Ride and related equipment and services. Joint lead with Rio Metro in FY18 & FY19.

Transportation Demand Management Program to increase alternative modes of AMPA Wide Joint TDM‐Travel Demand transportation with activities including public City of Albuquerque‐ABQ 123.9 AMPA Wide TDM $1,275,749 Funded Management education, outreach, promotions, information Ride and related equipment and services. Joint lead with Rio Metro in FY18 & FY19.

AMPA Wide TDM‐Travel Demand TDM program to include marketing, public 123.6 AMPA Wide TDM Rio Metro Transit Dist $1,469,135 Funded Management education, outreach, etc. COMPLETED

Transportation Demand Management Program to increase alternative modes of AMPA Wide TDM‐Travel Demand transportation with activities including public 123.7 AMPA Wide TDM Rio Metro Transit Dist $1,170,412 Funded Management education, outreach, promotions, information and related equipment and services. Joint lead with ABQ‐Ride in FY17. COMPLETED Benalillo, Sandoval and Travel Demand Management programs and Late 1100.1 Region Wide TDM (Late Time Frame) TDM Various/Joint Effort $19,908,000 Valencia Counties activities @ $1.2 mil/yr. Term Category Totals Total Public Funded Travel Demand Management Projects $27,654,055

Appendix A 48 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Rehabilitate, upgrade and/or construct bus ABQ Ride ‐ Bus Stop Facilities stop infrastructure including access, paving, City of Albuquerque‐ABQ 431.5 ABQ Ride System Wide Transit $625,000 Funded Improvements signage, lighting, shelters and other amenities Ride & associated equipment.

Rehabilitate, upgrade and/or construct bus ABQ Ride ‐ Bus Stop Facilities stop infrastructure including access, paving, City of Albuquerque‐ABQ 431.6 ABQ Ride System Wide Transit $625,000 Funded Improvements signage, lighting, shelters and other amenities Ride & associated equipment.

Rehabilitate, upgrade and/or construct bus ABQ Ride ‐ Bus Stop Facilities stop infrastructure including access, paving, City of Albuquerque‐ABQ 431.8 ABQ Ride System Wide Transit $312,500 Funded Improvements signage, lighting, shelters and other amenities Ride & associated equipment. ABQ Ride ‐ Bus Stop Facilities Construct improvements to bus stops and City of Albuquerque‐ABQ Late 1431.1 ABQ Ride System Wide Transit $19,750,000 Improvements (Late Time Frame) stations. Ride Term Construct park & ride facility in the Coors City of Albuquerque‐ABQ 120.4 ABQ Ride ‐ Coors Corridor Park & Ride location t.b.d. Corridor to support current and future transit Transit $3,218,633 Funded Ride service focused on river crossing trips. ABQ Ride ‐ Fixed Route Expansions & City of Albuquerque‐ABQ Late 1497.1 ABQ Ride System Wide Expansion of bus service. Transit $15,800,000 Revisions (Late Time Frame) Ride Term Develop park & ride facilities at various ABQ Ride ‐ Park & Ride: Facility City of Albuquerque‐ABQ 120.0 ABQ Ride Service Area various locations locations. Includes design, ROW, Env., & Transit $1,250,000 Funded Development (Placeholder) Ride Construction. Purchase and install stationary fare collection ABQ Ride ‐ Staionary Fare Collection City of Albuquerque‐ABQ Near 36.1 ABQ Ride System Wide equipment and related structural Transit $3,000,000 Equipment Ride Term improvements Construct bus shelters, landscaping, bike/ped City of Albuquerque‐ABQ 200.0 ABQ Ride ‐ Transit Enhancements ABQ Ride Service Area access, signage, public art, and other Transit $135,000 Funded Ride enhancements. Construct bus shelters, landscaping, bike/ped City of Albuquerque‐ABQ 200.1 ABQ Ride ‐ Transit Enhancements ABQ Ride Service Area access, signage, public art, and other Transit $137,500 Funded Ride enhancements. Construct bus shelters, landscaping, bike/ped City of Albuquerque‐ABQ 200.2 ABQ Ride ‐ Transit Enhancements ABQ Ride Service Area access, signage, public art, and other Transit $121,250 Funded Ride enhancements. ABQ Ride ‐ Transit Enhancements (FY Construct bus shelters, landscaping, bike/ped City of Albuquerque‐ABQ 124.6 ABQ Ride Service Area Transit $116,250 Funded 2016 Allocation) access, signage, public art. Ride ABQ Ride ‐ Transit Enhancements (FY Construct bus shelters, landscaping, bike/ped City of Albuquerque‐ABQ 124.7 ABQ Ride Service Area Transit $130,000 Funded 2017 Allocation) access, signage, public art. Ride

Appendix A 49 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

ABQ Ride ‐ Transit Enhancements (FY Construct bus shelters, landscaping, bike/ped City of Albuquerque‐ABQ 124.8 ABQ Ride Service Area Transit $132,500 Funded 2018 Allocation) access, signage, public art. Ride ABQ Ride ‐ Transit Enhancements (FY Construct bus shelters, landscaping, bike/ped City of Albuquerque‐ABQ 124.9 ABQ Ride Service Area Transit $132,500 Funded 2019 Allocation) access, signage, public art. Ride ABQ Ride ‐ Transit Facilities various facilities and Rehabilitate and/or repairs to bus garages and City of Albuquerque‐ABQ Late 1432.1 Transit $15,800,000 Rehabilitation (Late Time Frame) garages other transit facilities. Ride Term City of Albuquerque‐ABQ 432.4 ABQ Ride ‐ Transit Facility Rehabilitation ABQ Ride System Wide Rehabilitate & Remodel Transit Facilities. Transit $1,250,000 Funded Ride City of Albuquerque‐ABQ 432.5 ABQ Ride ‐ Transit Facility Rehabilitation ABQ Ride System Wide Rehabilitate & Remodel Transit Facilities. Transit $1,250,000 Funded Ride City of Albuquerque‐ABQ 432.6 ABQ Ride ‐ Transit Facility Rehabilitation ABQ Ride System Wide Rehabilitate & remodel transit facilities. Transit $1,250,000 Funded Ride ABQ Ride ‐ Transit Facility Rehabilitation Rehabilitate & Remodel Transit Facilities. City of Albuquerque‐ABQ 432.3 ABQ Ride System Wide Transit $625,000 Funded (FY 2018‐2019) New CN will be issued for each FY as needed. Ride

ABQ Ride ‐ Transit Facility Rehabilitation Rehabilitate & Remodel Transit Facilities. City of Albuquerque‐ABQ 432.1 ABQ Ride System Wide Transit $3,125,000 Funded (Placeholder) New CN will be issued for each FY as needed. Ride Facilities & Operations Planning. Includes City of Albuquerque‐ABQ 126.4 ABQ Ride ‐ Transit Planning ABQ Ride System Wide short, medium and long range planning Transit $4,812,500 Funded Ride activities. Facilities & Operations Planning. Includes City of Albuquerque‐ABQ 126.5 ABQ Ride ‐ Transit Planning ABQ Ride System Wide short, medium and long range planning Transit $5,000,000 Funded Ride activities. Facilities & Operations Planning. Includes City of Albuquerque‐ABQ 126.6 ABQ Ride ‐ Transit Planning ABQ Ride System Wide short, medium and long range planning Transit $4,812,500 Funded Ride activities. Facilities & Operations Planning. Includes City of Albuquerque‐ABQ 126.3 ABQ Ride ‐ Transit Planning (FY 2019) ABQ Ride System Wide short, medium and long range planning Transit $4,500,000 Funded Ride activities. Facilities & Operations Planning. Includes ABQ Ride ‐ Transit Planning City of Albuquerque‐ABQ 126.0 ABQ Ride System Wide short, medium and long range planning Transit $9,000,000 Funded (Placeholder) Ride activities. ABQ Ride ‐ Transit Security Equipment Acquisition & installation of security related City of Albuquerque‐ABQ 429.2 ABQ Ride System Wide Transit $135,000 Funded Upgrade equipment. Ride ABQ Ride ‐ Transit Security Equipment Acquisition & installation of security related City of Albuquerque‐ABQ 429.3 ABQ Ride System Wide Transit $137,500 Funded Upgrade equipment. Ride ABQ Ride ‐ Transit Security Equipment Acquisition & installation of security related City of Albuquerque‐ABQ 429.1 ABQ Ride System Wide Transit $312,500 Funded Upgrade equipment. Ride Rehabilitate, upgrade and expand transit City of Albuquerque‐ABQ 130.9 ABQ Ride ‐ Transit Technology Upgrade ABQ Ride System Wide Transit $2,000,000 Funded technologies. Ride ABQ Ride ‐ Transit Technology Upgrade Rehabilitate, upgrade and expand transit City of Albuquerque‐ABQ 130.6 ABQ Ride System Wide Transit $1,250,000 Funded (FY 2016 Allocation) technologies. Ride

Appendix A 50 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

ABQ Ride ‐ Transit Technology Upgrade Rehabilitate, upgrade and expand transit City of Albuquerque‐ABQ 130.7 ABQ Ride System Wide Transit $625,000 Funded (FY 2017 Allocation) technologies. Ride ABQ Ride ‐ Transit Technology Upgrade Rehabilitate, upgrade and expand transit City of Albuquerque‐ABQ 130.8 ABQ Ride System Wide Transit $625,000 Funded (FY 2018‐2019 Allocation) technologies. Ride Acquire buses and associated equipment City of Albuquerque‐ABQ 121.6 ABQ Ride ‐ Vehicles & Equip. Purchase ABQ Ride System Wide including fare boxes, debt service and Transit $11,306,024 Funded Ride manufacturing inspections. Acquire buses, vans, support vehicles and associated equipment including fare boxes, City of Albuquerque‐ABQ 121.8 ABQ Ride ‐ Vehicles & Equip. Purchase ABQ Ride System Wide debt service and manufacturing inspections. Transit $10,659,311 Funded Ride FFY 2018 5310 funds were apportioned in FFY 2016.

Aquire buses, vans, support vehicles and ABQ Ride ‐ Vehicles & Equip. Purchase City of Albuquerque‐ABQ 121.9 ABQ Ride System Wide associated equipment including fare boxes, Transit $6,628,313 Funded (FFY 2019) Ride debt service and manufacturing inspections.

Aquire buses, vans, support vehicles and ABQ Ride ‐ Vehicles & Equip. Purchase City of Albuquerque‐ABQ 154.0 ABQ Ride System Wide associated equipment including fare boxes, Transit $12,496,386 Funded (FFY 2020) Ride debt service and manufacturing inspections.

Aquire buses, vans, support vehicles and ABQ Ride ‐ Vehicles & Equip. Purchase City of Albuquerque‐ABQ 154.1 ABQ Ride System Wide associated equipment including fare boxes, Transit $8,944,578 Funded (FFY 2021) Ride debt service and manufacturing inspections.

Aquire buses, vans, support vehicles and ABQ Ride ‐ Vehicles & Equip. Purchase City of Albuquerque‐ABQ 154.2 ABQ Ride System Wide associated equipment including fare boxes, Transit $11,212,048 Funded (FFY 2022) Ride debt service and manufacturing inspections.

Aquire buses, vans, support vehicles and ABQ Ride ‐ Vehicles & Equip. Purchase City of Albuquerque‐ABQ 154.3 ABQ Ride System Wide associated equipment including fare boxes, Transit $7,236,144 Funded (FFY 2023) Ride debt service and manufacturing inspections.

Aquire buses, vans, support vehicles and ABQ Ride ‐ Vehicles & Equip. Purchase City of Albuquerque‐ABQ 154.4 ABQ Ride System Wide associated equipment including fare boxes, Transit $10,625,797 Funded (FFY 2024) Ride debt service and manufacturing inspections.

Aquire buses, vans, support vehicles and ABQ Ride ‐ Vehicles & Equip. Purchase City of Albuquerque‐ABQ 154.5 ABQ Ride System Wide associated equipment including fare boxes, Transit $7,854,713 Funded (FFY 2025) Ride debt service and manufacturing inspections. ABQ Ride ‐ Vehicles & Equip. Purchase City of Albuquerque‐ABQ Late 1121.1 Replace buses and associated equipment. Transit $200,000,000 (Late Time Frame Revenue Vehicles) Ride Term

Appendix A 51 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Rehabilitate, upgrade and expand transit City of Albuquerque‐ABQ 155.0 ABQ‐Ride ‐ Transit Technology Upgrade ABQ Ride System Wide Transit $1,000,000 Funded technologies. Ride Renovate the building to house NM Rail Alvarado Transp. Ctr.: Santa Fe Freight 1st Street SW, Near 391.2 Old Santa Fe Freight Bldg Runner Express offices and dispatch and Transit Rio Metro Transit Dist $11,000,000 Bldg Renovation Albuquerque, NM Term RMRTD offices. AMPA Wide Park & Ride Lot Construct and/or expand park and ride lots Late 1690.1 Construction & Expansion (Late Time various locations t.b.d. throughout the AMPA. Est. = $200,000 per Transit Various/Joint Effort $7,900,000 Term Frame) 100 spaces. Planning, engineering, ROW, utilities, vehicle Unser Blvd & SW Transit Louisiana, Uptown and acquisitions, multi‐modal improvements, City of Albuquerque‐ABQ 345.4 Central Ave BRT ‐ Phase IB Transit $123,766,934 Funded Center Tramway segments operations & construction with other Ride appurtenances as necessary. COMPLETED

Provide capital maintenance of equipment and capital maintenance of way (track Commuter Rail Maint of Eqiup & Maint improvements, etc.) including 1% for Security 134.4 NMRRX Service Area Transit Rio Metro NMRRX $16,507,374 Funded of Way and 1% for Associated Transit Improvements for the NMRRX commuter train system and transit operations. Capital maintenance of equipment and capital maintenance of way (track improvements, Commuter Rail Maint of Eqiup & Maint 134.7 NMRRX Service Area etc.) including 1% for security, transit Transit Rio Metro NMRRX $18,573,523 Funded of Way operations and Positive Train Control (PTC) debt service. Capital maintenance of equipment and capital maintenance of way (track improvements, Commuter Rail Maint of Eqiup & Maint 134.6 NMRRX Service Area etc.) including 1% for security, transit Transit Rio Metro NMRRX $16,673,094 Funded of Way. operations and Positive Train Control (PTC) debt service. Capital maintenance of equipment and capital maintenance of way (track improvements, Commuter Rail Maint of Eqiup & Way & 134.9 NMRRX Service Area etc.) including 1% for security, transit Transit Rio Metro NMRRX $23,492,502 Funded Transit Oper operations and Positive Train Control (PTC) debt service. Capital maintenance of equipment and capital maintenance of way (track improvements, Commuter Rail Maint of Eqiup & Way & 135.0 NMRX Service Area etc.) including 1% for security, transit Transit Rio Metro NMRRX $23,344,275 Funded Transit Oper operations and Positive Train Control (PTC) debt service.

Appendix A 52 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Capital maintenance of equipment and capital maintenance of way (track improvements, Commuter Rail Maint of Eqiup & Way & 135.1 NMRX Service Area etc.) including 1% for security, transit Transit Rio Metro NMRRX $23,787,717 Funded Transit Oper (FY 2022 Alloc) operations and Positive Train Control (PTC) debt service. Capital maintenance of equipment and capital maintenance of way (track improvements, Commuter Rail Maint of Eqiup & Way & 135.2 NMRX Service Area etc.) including 1% for security, transit Transit Rio Metro NMRRX $24,142,706 Funded Transit Oper (FY 2023 Alloc) operations and Positive Train Control (PTC) debt service. Capital maintenance of equipment and capital Commuter Rail Maint of Eqiup & Way & maintenance of way (track improvements, 135.3 NMRX Service Area Transit Rio Metro NMRRX $24,552,616 Funded Transit Oper (FY 2024 Alloc) etc.) including 1% for Security, PTC debt service, and transit operations. IN TIP

Capital maintenance of equipment and capital Commuter Rail Maint of Eqiup & Way & maintenance of way (track improvements, 135.4 NMRX Service Area Transit Rio Metro NMRRX $24,969,828 Funded Transit Oper (FY 2025 Alloc) etc.) including 1% for Security, PTC debt service, and transit operations. IN TIP

Provide capital maintenance of equipment and capital maintenance of way (track improvements, etc.) including 1% for Security Commuter Rail Maint of Eqiup & Way & Near 135.5 NMRX Service Area and 1% for Associated Transit Improvements Transit Rio Metro NMRRX $23,303,000 Transit Oper (FY 2026 Alloc) Term for the Railrunner Express commuter train system and transit operations.

Provide capital maintenance of equipment and capital maintenance of way (track improvements, etc.) including 1% for Security Commuter Rail Maint of Eqiup & Way & Late 135.6 NMRX Service Area and 1% for Associated Transit Improvements Transit Rio Metro NMRRX $357,629,000 Transit Oper (FY 2027‐2040 Alloc) Term for the New Mexico Railrunner Express commuter train system and transit operations. Commuter Rail: Double Track Late 643.0 Abajo North Diversion Channel Construct second main track. Transit Rio Metro NMRRX $20,000,000 Construction Term Commuter Rail: Jointed Rail Replace jointed rail with continuous welded 646.0 North Valley Bernalillo Transit Rio Metro NMRRX $3,000,000 Funded Replacement rail. PROJECT COMPLETED

Appendix A 53 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Install power switch and control point on Commuter Rail: Albuquerque track near Marquette Ave. Install electric 641.1 Transit Rio Metro NMRRX $1,000,000 Funded Downtown Locks & Switches locks on industry crossovers and other‐than‐ main switches. PROJECT COMPLETED.

Commuter Rail: Albuquerque Albuquerque Downtown Construct new track and rail infrastructure Late 641.0 Transit Rio Metro NMRRX $11,000,000 Downtown Railyard Improvements Railyard and rehabiliate as necessary. Term Commuter Rail: Balloon Fiesta Park Construct a platform, siding and/or spur to Near 423.2 Existing Rail Line Balloon Fiesta Park Transit Rio Metro NMRRX $3,000,000 Access serve Balloon Fiesta Park Term design and install centralized traffic control Commuter Rail: Centralized Traffic system including signals, powered switches, 642.1 CP Abajo CP Hahn Transit Rio Metro NMRRX $10,037,230 Funded Control track material, hardware, software, and other appurtenances as needed. IN TIP Study, acquisition, design, construction, Commuter Rail: Facility Improvements reconstruction, installation and purchase of Late 1640.1 AMPA Wide Transit Rio Metro NMRRX $15,000,000 (Late Time Frame) rail facilities and misc. equipment as Term necessary. Commuter Rail: Fencing Program (Late Replace and/or extend approximately 5 miles Late 1446.1 Transit Rio Metro NMRRX $500,000 Time Frame) of fencing per year @ $50,000/yr. Term Commuter Rail: Fencing Program (Mid Replace and/or extend approximately 5 miles Near 1446.0 Transit Rio Metro NMRRX $250,000 Time Frame) of fencing per year @ $50,000/yr. Term Construct second platform and parking lot Commuter Rail: Los Ranchos Station west of the existing Los Ranchos/Journal Near 423.4 Transit Rio Metro NMRRX $3,000,000 Improvements Center Station.PORTION UNDERWAY Term (PARKING LOT)

Study the extension of existing Main Track 2 and constructing additional sections of Main 645.4 Commuter Rail: Main 2 Capacity Study Belen Station Santa Fe Depot Transit Rio Metro NMRRX $100,000 Funded Track 2 and sidings to satisfy future passenger and freight rail capacity.

Design and extend Main Track #2 by approx. 1.2 miles. Improvements include Milepost 897.9 (north of reconstructing the Hahn Lead with new 645.3 Commuter Rail: Main 2 Extension Hahn Control Point 899.1 Transit Rio Metro NMRRX $5,412,089 Funded Montano Rd.) ballast, concrete ties, existing roadbed, track, bridge structures and other appurtenances, and installing and upgrading signals. IN TIP Commuter Rail: NMRX Operating Operating assistance for the New Mexico Rail Late 1445.4 Transit Rio Metro NMRRX $15,000,000 Assistance (Late Time Frame) Runner Express. Term

Appendix A 54 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Construct miscellaneous track improvements Commuter Rail: NMRX Track Late 645.8 Belen Station Santa Fe Depot to account for future freight and passanger Transit Rio Metro NMRRX $5,000,000 Improvements Term rail traffic. Construct quiet zone improvements (quad Commuter Rail: Quiet Zone‐Bernalillo Near 422.9 gates, medians, etc.) at NMRX crossing at Transit Rio Metro NMRRX $560,000 Town Term Avenida Bernalillo and Lucero Ave Commuter Rail: Quiet Zone‐kewa Construct quiet zone improvements at NMRX Near 422.8 Transit Rio Metro NMRRX $300,000 Pueblo crossings in Kewa Pueblo. Term Construct quiet zone improvements (quad Near 422.7 Commuter Rail: Quiet Zone‐Los Lunas gates, medians, etc.) at NMRX crossing at Transit Rio Metro NMRRX $250,000 Term Courthouse Rd & Morris Rd. Commuter Rail: Railroad Sidings Construct additional sideings along the Rail Late 645.9 Belen Station Santa Fe Depot Transit Rio Metro NMRRX $8,000,000 Improvements (Late Time Frame) Corridor. Term Construct new siding between Alameda Blvd Commuter Rail: Railroad Sidings Vicinity of Sandia Pueblo 645.2 Alameda Blvd and vicinity of Sandia Pueblo Station. Transit Rio Metro NMRRX $1,600,000 Funded Improvements‐Alameda Siding Station COMPLETE Commuter Rail: Railroad Sidings Near 645.0 Chloe Siding Reconstruct siding into BNSF yard. Transit Rio Metro NMRRX $4,025,000 Improvements‐Chloe Term Commuter Rail: Railroad Sidings Reconstruct siding between Los Lunas Station Near 645.1 Morris Road Los Lunas Station Transit Rio Metro NMRRX $2,000,000 Improvements‐Los Lunas and Morris Road Term Purchase and improvements to locomotives, Near 1445.0 Commuter Rail: Rolling Stock Purchase Transit Rio Metro NMRRX $12,000,000 coach cars, and cab cars. Term Commuter Rail: RR Tie Replacement Replace railroad ties. (20 years at Late 647.0 Transit Rio Metro NMRRX $11,250,000 Program $450,000/yr) Term Study, acquisition, design, construct, purchase Commuter Rail: Service Expansion (2026‐ & misc. rail improvements, equipment, ROW, Late 1445.2 Transit Rio Metro NMRRX $45,000,000 2040) sidings, yards, rolling stock, etc. for service Term expansion. Commuter Rail‐NMRRX Operating Operating assistance for the New Mexico Rail 219.0 NMRRX Service Area Transit Rio Metro NMRRX $1,170,412 Funded Assistance FFY 2020 Runner Express. IN TIP Commuter Rail‐NMRRX Operating Operating assistance for the New Mexico Rail 219.1 NMRRX Service Area Transit Rio Metro NMRRX $1,170,412 Funded Assistance FFY 2021 Runner Express. IN TIP Commuter Rail‐NMRRX Operating Operating assistance for the New Mexico Rail 219.2 NMRRX Service Area Transit Rio Metro NMRRX $1,170,412 Funded Assistance FFY 2022 Runner Express. Commuter Rail‐NMRRX Operating Operating assistance for the New Mexico Rail 219.3 NMRRX Service Area Transit Rio Metro NMRRX $1,170,412 Funded Assistance FFY 2023 Runner Express. Construct phase 2 of a park and ride facility in the Coors Corridor to support current and City of Albuquerque‐ABQ 120.5 Coors Corridor Park & Ride Phase 2 Sequoia Paseo del Norte Transit $1,755,618 Funded future transit service focused on river crossing Ride trips.

Appendix A 55 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Construct/Expand park & ride lots in vicinity Vicinity of NM Rail Runner Near 691.0 Los Lunas Park & Ride Lot Expansion of NM Rail Runner Station: south, east and Transit Village of Los Lunas $1,650,000 Station Term north of the station. Expand, enhance and improve Bus Rapid Metro Area Enhanced Transit Late 1039.1 Region Wide Transit, Rapid Ride and other premium transit Transit Rio Metro Transit Dist $5,000,000 Improvements (Late Time Frame) Term services throughout the metropolitan area.

Complete environmental, design, construction and implementation of a PTC system on the NMRX corridor, including, but not limited to, 256.1 NMRX Positive Train Control Belen Station Santa Fe Depot Transit Rio Metro NMRRX $65,171,053 Funded back office, locomotive, and wayside and communications (incl. Wi‐Fi) segments.UNDERWAY

Proj. will include off‐track improvs, including widening NM314 at NM147 intersection to Phase II Quiet Zone ‐ NM 314 Widening Approx. 500' South of NM Approx. 700' north of NM widen shoulders, add exclusive turn lanes, & 422.6 Transit Pueblo of Isleta $1,184,495 Funded @ NM 147 147 147 remove & replace drainage structure under NM314 to improve flow & eliminate need for guardrail on NM 314 at the structure.

Regional High Capacity Transit Corridors Project development for the first phase of the City of Albuquerque‐ABQ Near 255.1 City Wide Transit $2,250,000 Plan Ph. 1 Project Development high capacity transit corridors plan. Ride Term Capital, operating & administrative funds for Rio Metro ‐ Los Lunas Small Urb Transit Rio Metro Regional Tranist Los Lunas Small Urban Late 139.3 bus and rail services for the Los Lunas Small Transit Rio Metro Transit Dist $33,758,099 Services (FY 2027‐2040 Alloc) District Area/Valencia Co. Term Urban Area. Capital, operating & administrative funds for Rio Metro ‐ Los Lunas Small Urban Rio Metro Regional Tranist Los Lunas Small Urban 136.3 bus and rail services for the Los Lunas Small Transit Rio Metro Transit Dist $3,115,131 Funded Transit Services District Area/Valencia Co. Urban Area. Capital, operating & administrative funds for Rio Metro ‐ Los Lunas Small Urban Rio Metro Regional Tranist Los Lunas Small Urban 136.4 bus and rail services for the Los Lunas Small Transit Rio Metro Transit Dist $1,641,302 Funded Transit Services District Area/Valencia Co. Urban Area. Capital, operating & administrative funds for Rio Metro ‐ Los Lunas Small Urban Rio Metro Regional Tranist Los Lunas Small Urban 136.5 bus and rail services for the Los Lunas Small Transit Rio Metro Transit Dist $1,674,127 Funded Transit Services District Area/Valencia Co. Urban Area. Capital, operating & administrative funds for Rio Metro ‐ Los Lunas Small Urban Rio Metro Regional Tranist Los Lunas Small Urban 136.6 bus and rail services for the Los Lunas Small Transit Rio Metro Transit Dist $1,707,611 Funded Transit Services (FY 2019 Alloc) District Area/Valencia Co. Urban Area. Capital, operating & administrative funds for Rio Metro ‐ Los Lunas Small Urban Rio Metro Regional Tranist Los Lunas Small Urban 136.7 bus and rail services for the Los Lunas Small Transit Rio Metro Transit Dist $1,741,763 Funded Transit Services (FY 2020 Alloc) District Area/Valencia Co. Urban Area.

Appendix A 56 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Capital, operating & administrative funds for Rio Metro ‐ Los Lunas Small Urban Rio Metro Regional Tranist Los Lunas Small Urban 136.8 bus and rail services for the Los Lunas Small Transit Rio Metro Transit Dist $1,776,597 Funded Transit Services (FY 2021 Alloc) District Area/Valencia Co. Urban Area. Capital, operating & administrative funds for Rio Metro ‐ Los Lunas Small Urban Rio Metro Regional Tranist Los Lunas Small Urban 136.9 bus and rail services for the Los Lunas Small Transit Rio Metro Transit Dist $1,812,130 Funded Transit Services (FY 2022 Alloc) District Area/Valencia Co. Urban Area. Capital, operating & administrative funds for Rio Metro ‐ Los Lunas Small Urban Rio Metro Regional Tranist Los Lunas Small Urban 139.0 bus and rail services for the Los Lunas Small Transit Rio Metro Transit Dist $1,848,372 Funded Transit Services (FY 2024 Alloc) District Area/Valencia Co. Urban Area. Capital, operating & administrative funds for Rio Metro ‐ Los Lunas Small Urban Rio Metro Regional Tranist Los Lunas Small Urban 139.1 bus and rail services for the Los Lunas Small Transit Rio Metro Transit Dist $1,870,443 Funded Transit Services (FY 2025 Alloc) District Area/Valencia Co. Urban Area. Capital, operating & administrative funds for Rio Metro ‐ Los Lunas Small Urban Rio Metro Regional Tranist Los Lunas Small Urban Near 139.2 bus and rail services for the Los Lunas Small Transit Rio Metro Transit Dist $1,907,851 Transit Services (FY 2026 Alloc) District Area/Valencia Co. Term Urban Area. Provide transit services, which may include taxi services, circulators, vanpool programs, 137.6 Rio Metro Community Transportation AMPA Wide Transit Rio Metro Transit Dist $382,000 Funded etc., operating within or connecting to the Albuquerque Urbanized Area.

Provide transit services, which may include taxi services, circulators, vanpool programs, 137.7 Rio Metro Community Transportation AMPA Wide Transit Rio Metro Transit Dist $382,000 Funded etc., operating within or connecting to the albuquerque Urbanized Area.

Provide transit services, which may include taxi services, circulators, vanpool programs, 137.3 Rio Metro Community Transportation AMPA Wide Transit Rio Metro Transit Dist $382,000 Funded etc., operating within or connecting to the albuquerque Urbanized Area.

Provide transit services, which may include taxi services, circulators, vanpool programs, 137.4 Rio Metro Community Transportation AMPA Wide Transit Rio Metro Transit Dist $382,000 Funded etc., operating within or connecting to the albuquerque Urbanized Area.

Provide transit services, which may include taxi services, circulators, vanpool programs, 137.5 Rio Metro Community Transportation AMPA Wide Transit Rio Metro Transit Dist $382,000 Funded etc., operating within or connecting to the albuquerque Urbanized Area.

Appendix A 57 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Provide transit services, which may include Rio Metro Community Transportation taxi services, circulators, vanpool programs, 137.9 AMPA Wide Transit Rio Metro Transit Dist $382,000 Funded (2023) etc., operating within or connecting to the albuquerque Urbanized Area.

Provide transit services, which may include Rio Metro Community Transportation taxi services, circulators, vanpool programs, 137.8 AMPA Wide Transit Rio Metro Transit Dist $382,000 Funded (FFY 2022) etc., operating within or connecting to the albuquerque Urbanized Area.

Provide transit services, which may include Rio Metro Community Transportation demand taxi, circulators, vanpool programs, 140.0 AMPA Wide Transit Rio Metro Transit Dist $382,000 Funded (FFY 2024) etc., operating within or connecting to the Albuquerque Urbanized Area.

Provide transit services, which may include Rio Metro Community Transportation demand taxi, circulators, vanpool programs, 140.1 AMPA Wide Transit Rio Metro Transit Dist $382,000 Funded (FFY 2025) etc., operating within or connecting to the Albuquerque Urbanized Area.

Provide transit services, which may include Rio Metro Community Transportation taxi services, circulators, vanpool programs, 137.2 AMPA Wide Transit Rio Metro Transit Dist $382,000 Funded (Job Access 2016) etc., operating within or connecting to the albuquerque Urbanized Area.

Provide transit services, which may include Rio Metro Community Transportation taxi services, circulators, vanpool programs, Late 140.2 AMPA Wide Transit Rio Metro Transit Dist $5,730,000 (Job Access 2026‐2040 Alloc) etc., operating within or connecting to the Term albuquerque Urbanized Area. Capital, operating and administrative funds Rio Metro Regioanl Transit outside ABQ& Los Lunas for bus service in areas outside the census‐ 151.2 Rio Metro Rural Transit Services Transit Rio Metro Transit Dist $1,833,149 Funded District UZAs defined Albuquerque and Los Lunas Urbanized areas. Capital, operating and administrative funds Rio Metro Regioanl Transit outside ABQ& Los Lunas for bus service in areas outside the census‐ 151.3 Rio Metro Rural Transit Services Transit Rio Metro Transit Dist $1,860,644 Funded District UZAs defined Albuquerque and Los Lunas Urbanized areas. Capital, operating and administrative funds Rio Metro Regioanl Transit outside ABQ& Los Lunas for bus service in areas outside the census‐ 151.4 Rio Metro Rural Transit Services Transit Rio Metro Transit Dist $1,888,555 Funded District UZAs defined Albuquerque and Los Lunas Urbanized areas.

Appendix A 58 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Capital, operating and administrative funds Rio Metro Regioanl Transit outside ABQ& Los Lunas for bus service in areas outside the census‐ 151.5 Rio Metro Rural Transit Services Transit Rio Metro Transit Dist $1,916,884 Funded District UZAs defined Albuquerque and Los Lunas Urbanized areas. Rio Metro Regioanl Transit outside ABQ& Los Lunas Capital, operating and administrative funds 151.0 Rio Metro Transit 5311 Funding Transit Rio Metro Transit Dist $1,779,366 Funded District UZAs for bus service in rural areas. Rio Metro Regioanl Transit outside ABQ& Los Lunas Capital, operating and administrative funds 151.1 Rio Metro Transit 5311 Funding Transit Rio Metro Transit Dist $1,806,057 Funded District UZAs for bus service in rural areas. Rio Metro Regional Transit outside ABQ & Los Lunas Capital, operating & administrative funds for 129.6 Rio Metro Transit 5311 Funding Transit Rio Metro Transit Dist $1,446,000 Funded District UZAs bus service in rural areas. Rio Metro Regional Transit outside ABQ & Los Lunas Capital, operating & administrative funds for 129.7 Rio Metro Transit 5311 Funding Transit Rio Metro Transit Dist $1,710,000 Funded District UZAs bus service in rural areas. Rio Metro Regional Transit outside ABQ & Los Lunas Capital, operating & administrative funds for 129.8 Rio Metro Transit 5311 Funding Transit Rio Metro Transit Dist $1,826,000 Funded District UZAs bus service in rural areas. Rio Metro Regional Transit outside ABQ & Los Lunas Capital, operating & administrative funds for 129.9 Rio Metro Transit 5311 Funding Transit Rio Metro Transit Dist $1,664,188 Funded District UZAs bus service in rural areas. Rehabilitate, construct, acquire, and/or repair Rio Metro Transit Facilities (Late Time Late 1693.1 bus garages, storage, offices, shelters, and Transit Rio Metro Transit Dist $2,800,000 Frame) Term other transit facilities. Rio Metro Transit Rural Transit Service Rio Metro Regional Transit outside Albuquerque & Capital, operating and administrative funds Late 1129.1 Transit Rio Metro Transit Dist $32,088,000 (5311) (FY 2026‐2040) District Los Lunas UZAs for bus service in rural areas. Term Rio Metro Transit Vehicles & Equip. Late 1604.1 Replace buses and associated equipment. Transit Rio Metro Transit Dist $5,000,000 Purchase (Late Time Frame Revenue Term Construct bus shelters, landscaping, bike/ped City of Albuquerque‐ABQ 200.3 Transit Enhancements ABQ Ride Service Area access, signage, public art, and other Transit $121,250 Funded Ride enhancements. Construct bus shelters, landscaping, bike/ped City of Albuquerque‐ABQ 200.4 Transit Enhancements ABQ Ride Service Area access, signage, public art, and other transit Transit $125,000 Funded Ride enhancements. Construct bus shelters, landscaping, bike/ped City of Albuquerque‐ABQ 200.5 Transit Enhancements ABQ Ride Service Area access, signage, public art, and other transit Transit $125,000 Funded Ride enhancements. Acquisition & installation of security related City of Albuquerque‐ABQ 429.4 Transit Security Equipment Upgrade ABQ Ride System Wide Transit $121,250 Funded equipment. Ride Acquisition & installation of security related City of Albuquerque‐ABQ 429.5 Transit Security Equipment Upgrade ABQ Ride System Wide Transit $121,250 Funded equipment. Ride Acquisition & installation of security related City of Albuquerque‐ABQ 429.6 Transit Security Equipment Upgrade ABQ Ride System Wide Transit $125,000 Funded equipment. Ride

Appendix A 59 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Planning, environ. Doc., design, ROW, utilities, multi‐modal improvements, vehicle University Corridor Rapid Service Phase acquisition, construction & operations with City of Albuquerque‐ABQ Near 692.4 Gibson Blvd Menaul Transit $65,000,000 2 Design and Construction other appurtenances as needed to provide Ride Term first phase of enhancing University corridor transit service to a BRT level of quality. TOD planning for UNM/CNM BRT corridor & surrounding area including, but not limited to: vision/goal setting, surveys, urban UNM/CNM BRT Transit‐Oriented University & Menaul Blvd 692.2 Sunport character/from/design recomm., TOD market Transit Rio Metro Transit Dist $715,000 Funded Development Planning Intersection demand assess, TOD infrastruc. Recomm. Interagency dev. Stand. & finance/fund mechanisms. Planning, environ. Doc., design, ROW, utilities, multi‐modal improvements, vehicle UNM/CNM/Sunport BRT acquisition, construction & operations with City of Albuquerque‐ABQ 692.3 Implementation Phase 1 (University Gibson Blvd Menaul Transit $4,681,648 Funded other appurtenances as needed to provide Ride Corridor Rapid Service) first phase of enhancing University corridor transit service to a BRT level of quality. Acquire land for, plan, design, and construct a transit facility, including admistration/ 145.0 Valencia County Transit Facility t.b.d. operations building, storage/ maintenance Transit Rio Metro Transit Dist $12,000,000 Funded building, fuel island, parking, and all appurtenaces. Plan, design and construct the proposed Volcano Heights Transit Blvd. Transit Blvd in coordination with RMRTD and City of Albuquerque‐ Late 721.0 Paseo del Norte Unser Blvd Transit $5,000,000 Construction ABQ‐Ride for the Volcano Heights Sector DMD Term Development Plan. Plan, design & construct street & transit improvements to accommodate & ensure complete integration with the Central Ave. City of Albuquerque‐ABQ 66.0 West Central Ave Improvements Rio Grande River San Pasqual Ave. Transit $5,096,442 Funded Bus Rapid Transit project. Project includes Ride pedestrian improv. to enhance transit use. Total proj. cost includes future phasing. Plan and design phased renovation of Yale City of Albuquerque‐ABQ 431.7 Yale Transit Facility Renovation Transit $3,750,000 Funded garages and operations buildings. Ride Category Totals Total Public Funded Transit Projects $1,585,583,258

Appendix A 60 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Publicly Funded Projects (Federal, State & Local)

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Total Est. Cost of All Publicly Funded Projects $4,920,647,322 Projected Federal & State Revenues 2016‐2040 $4,474,888,699 Projected Local Revenues 2016‐2041 $5,677,361,395 Projected Total Public Revenues $10,152,250,094 Projected Maint & Operations Cost for All Agencies $5,231,159,913 Projected Public Revenue Available for Capital Projects $4,921,090,181 Total Est. Cost of All Publicly Funded Projects (Public Funded MTP Project List above) $4,920,647,322 Difference (Capital Available ‐ Total Projects' Cost) $442,859

Category Totals % Total Cost of All Bike/Ped Projects (Public Funds) $287,165,356 5.84% Total Cost of All Highway Capacity Projects (Public Funds) $1,028,526,628 20.90% Total Cost of All Highway and Bridge Preservation Projects (Public Funds) $1,475,289,857 29.98% Total Cost of All ITS and TSM Projects (Public Funds) $198,573,598 4.04% Total Cost of All Miscellaneous Projects (Public Funds) $108,855,033 2.21% Total Cost of All Safety Projects (Public Funds) $208,999,538 4.25% Total Cost of All Travel Demand Management Projects (Public Funds) $27,654,055 0.56% Total Cost of All Transit Projects (Public Funds) $1,585,583,258 32.22% Total Est.Cost of All Projects (Public Funds) $4,920,647,322 100.00%

Appendix A 61 of 61 Connections 2040 MTP Project Listing by Project Type, then Project Title Private Developer Funded Projects

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Note: Some projects which are listed as privately funded may be all or partially funded through future funds derived from Public Improvement Districts (PIDs), Transportation Impovement Districts (TIDs), Tax Increment Financing (TIF) and other alternative financing methods in agreement with governmental jurisdictions. Near 474.1 98th St Bike Lanes (SW ABQ) Sen Dennis Chavez Blvd Blake Rd Build Bike Lanes Bike/Ped Private $1,815,000 Term Late 812.1 Amole Arroyo Trail Atrisco Vista Blvd (PdV) 98th St Construct bicycle/pedestrain facilities. Bike/Ped Private $2,750,000 Term Snow Vista Channel & Near 815.0 Gibson Blvd Bike Lane & Bike Trail Unser Blvd Construct Bike Lanes/Trail Bike/Ped Private $1,980,000 Barbados Ave Term Construct bike facilities. (Bike lanes if road is western Albuquerque City Late 476.2 Gibson Blvd West Bike Facilities Atrisco Vista Blvd built) CHANGE TO A PRIVATELY FUNDED Bike/Ped Private $1,608,750 Limits Term PROJECT PER BERN CO Near 484.1 Irving Blvd Bike Lanes (B) Universe Blvd La Paz Dr Build Bike Lanes. Bike/Ped Private $1,072,500 Term Late 878.0 La Orilla Bike Trail (Eastern Sect) Coors Blvd Rio Grande Bosque Construct Bike Trail Bike/Ped Private $198,000 Term Mesa del Sol Streets Bicycle/Ped Trails Near 454.6 Construct bicycle/pedestrain trails. Bike/Ped Private $5,000,000 Construction Stage I Term Mesa del Sol Streets Bicycle/Ped Trails Late 454.7 Construct bicycle/pedestrain trails. Bike/Ped Private $5,000,000 Construction Stage II Term Near 813.0 Sky View Channel Bike Trail Black Arroyo NM 528, Rio Rancho Blvd Construct Bike Trail Bike/Ped Private $618,750 Term Tijeras Arroyo Bike & Pedestrian Trail, Late 832.0 South Diversion Channel University Blvd Construct Bike/Pedestrian Trail Bike/Ped Private $2,250,000 Stage II Term Construct bicycle/pedestrain facilities. Atrisco Vista Blvd (Double Late 851.0 Upper St Bike/Ped Facilities Middle St REQUEST to CHANGE LEAD TO PRIVATE PER Bike/Ped Private $3,500,000 Eagle II Rd) Term NMDOT. Category Totals Total Public Funded Bike/Ped Projects $25,793,000 Future 118th Street Ext at I‐ Late 526.7 118th Street ‐ New I‐40 Interchange Construct full interchange with I‐40 Capacity Proj Private $40,000,000 40 Term Construct new 4 lane roadway; includes bike Near 526.1 118th Street (Middle Section) Amole Arroyo Eucariz Ave Capacity Proj Private $2,805,000 lanes and trail Term Near 526.2 118th Street (Southern Section B) Pajarito Rd Gun Club Rd Construct new 2 lane roadway with bike lanes Capacity Proj Private $3,500,000 Term Near 526.5 118th Street Ext (Northern Section) I‐40 Ladera Dr Construct new roadway and bike lanes Capacity Proj Private $2,150,000 Term 19th Ave NE/Montezuma Rd Near 19.0 Unser Blvd Loma Colorado Blvd Construct new 2 lane roadway. Capacity Proj Private $4,600,000 Construction Term Late 473.1 98th St Construction (SW ABQ) Gun Club Rd Sen Dennis Chavez Construct a new 2‐lane roadway. Capacity Proj Private $11,405,000 Term

Appendix A 1 of 6 Connections 2040 MTP Project Listing by Project Type, then Project Title Private Developer Funded Projects

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Note: Some projects which are listed as privately funded may be all or partially funded through future funds derived from Public Improvement Districts (PIDs), Transportation Impovement Districts (TIDs), Tax Increment Financing (TIF) and other alternative financing methods in agreement with governmental jurisdictions.

Additional travel lanes in each direction, deceleration lanes for right‐turn movements, continue existing bike/ped facilities, multi‐use 920.0 Alameda Blvd Improvements (phase 1) I‐25 Louisiana Capacity Proj Private $17,000,000 Funded trail, upgrade of traffic signals as needed, signal timing, ITS communiciations, and other appurtenances as necc. Alameda Blvd Reconstruction & Near 506.3 San Pedro Dr Louisiana Blvd Widen from 2 to 4 lanes UNDERWAY Capacity Proj Private $2,700,000 Widening, Stage III Term Alameda Blvd Reconstruction & Reconstruct and widen to a 4 lane roadway (2 Late 506.4 Barstow St Ventura St Capacity Proj Private $2,700,000 Widening, Stage IV lanes approved in EA) Term Near 283.0 Anderson Farms Road Extension La Monica Rd Las Estancias Blvd Construct 2‐lane roadway. Capacity Proj Private $4,970,000 Term Construct New 4 lane Roadway; includes Bike Near 521.0 Arroyo Vista Blvd (98th St) Stage II‐40 Interchange Lower St Capacity Proj Private $3,425,500 Lanes & Trail COMPLETE Term Construct New 4 lane Roadway; includes Bike Late 522.0 Arroyo Vista Blvd (98th St) Stage II Lower St Atrisco Vista Blvd Capacity Proj Private $21,157,499 Lanes & Trail Term Widen from 2 to 4 lanes. Includes multi‐use Late 406.4 Atrisco Vista Blvd (DEII Rd) Widening I‐40 Paseo del Norte trail. Private lead (reference Upper Petroglypf Capacity Proj Private $16,000,000 Term Sector Development Plan) Black Arroyo Blvd Western Extension Near 563.0 Rainbow Blvd 10th St (approx.) Construct 2 lane roadway. Capacity Proj Private $4,300,000 Construction Term Camino Encantadas Roadway Near 715.0 Hapsburg Rd Lincoln Ave Construct 2 lane road. COMPLETED Capacity Proj Private $144,000 Improvements Phase I Term Camino Encantadas Roadway Late 715.1 Camino Venada Enchanted Hills Blvd Construct 2 lane road. COMPLETED Capacity Proj Private $1,404,000 Improvements Phase II Term Near 717.0 Cardiff Ave Improvements Broadmoor Blvd Dinadan Dr Construct 2 lane road. Capacity Proj Private $1,122,497 Term Construct collector roads such as: Condershire Late 282.0 Ceja Vista Development Collector Roads Various Collectors Rd, Mead Rd, Borrego Rd, and School Access Capacity Proj Private $10,456,000 Term Rd. Arroyo Vista Blvd (98th Construct New 2 lane Roadway; includes Bike Near 501.0 Cross St Extension Ladera Dr Capacity Proj Private $4,403,000 St) Lanes Term Construct 2 lane road. Phased portion from Near 716.0 Edinburgh St. Improvements Northern Blvd Montezuma Blvd Capacity Proj Private $1,618,343 Northern Blvd to Goldenflare loop completed Term Construct New 2 lane Roadway; includes Bike Near 524.0 Estancias Pkwy (Middle St) Construction Ladera Dr Arroyo Vista Blvd Capacity Proj Private $5,950,000 Lanes Term

Appendix A 2 of 6 Connections 2040 MTP Project Listing by Project Type, then Project Title Private Developer Funded Projects

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Note: Some projects which are listed as privately funded may be all or partially funded through future funds derived from Public Improvement Districts (PIDs), Transportation Impovement Districts (TIDs), Tax Increment Financing (TIF) and other alternative financing methods in agreement with governmental jurisdictions.

Design, ROW acquisition, and constuction of I‐25 at new Mesa del Sol Late 454.9 I‐25 & Mesa del Sol Interchange new interchange .Privately funded with some Capacity Proj Private/NMDOT CRDC $38,000,000 Parkway Term public funding. See CN 4074 I‐25 and Bobby Foster Rd. New Convert current overpass into a full Near 454.8 I‐25 and Bobby Foster Capacity Proj Private $26,520,000 Interchange interchange. Term Design and Construct Basic Interchange. Project shall include Scope, Env Doc, PE & IJR. Late 719.2 I‐40 & Paseo del Volcan Interchange Capacity Proj Private/NMDOT CRDC $19,200,000 Per Santolina Phase B1 Master Plan Term Development Agreement‐Private Funds Construct a new 2 lane frontage road (to I‐40 Construction (Westside) Frontage Near 414.3 118th St 98th St serve proposed Sun Cal Town Center Capacity Proj Private $2,240,000 Road Term development). Near 590.1 Irving Blvd Extension, Phase 2Del Oeste Dr Ventana Ridge Rd Construct New 2 lane Roadway. Capacity Proj Private $3,200,000 Term Irving Blvd Reconstruction & Widening Reconstruct & Widen from 2 to 4 lanes; Late 483.2 Rainbow Blvd Universe Blvd Capacity Proj Private $3,800,000 (A) includes Bike Lanes Term Irving Blvd Reconstruction & Widening Late 484.0 Universe Blvd La Paz Dr Reconstruct & Widen from 2 to 4 lanes Capacity Proj Private $4,940,000 (B) Term Irving Blvd Widening (Far Western Late 590.2 Del Oeste Dr Rainbow Blvd Widen from 2 to 4 lanes with bike lanes. Capacity Proj Private $7,500,000 Section) Term Arroyo Vista Blvd (98th Construct New 2 lane Roadway; includes Bike Near 505.0 Ladera Drive Extension (Middle Section) Lower St Capacity Proj Private $8,151,500 St) Lanes Term Ladera Drive Extension (Western Construct new 2 lane roadway; includes bike Late 523.0 Atrisco Vista Blvd Lower St Capacity Proj Private $9,520,000 Section) lanes. Term Reconstruct & Widen from 2 to 4 lanes, Near 480.1 Ladera Drive Widening 118th St 98th St Capacity Proj Private $12,950,000 includes Bike Lanes Term Loma Colorado Extension ‐ Upper Construct New 4 lane Roadway; includes Bike Late 540.2 Paseo del Volcan Progress Blvd Capacity Proj Private $9,880,000 Section Lanes. Term Arroyo Vista Blvd (98th Construct New 2 lane Roadway; includes Bike Near 504.0 Lower St Construction Ladera Dr Capacity Proj Private $5,950,000 St) Lanes Term Construct New 2 lane Roadway. Includes bike Near 368.1 McMahon Blvd Extension Rainbow Blvd Universe Blvd Capacity Proj Private $3,213,000 lanes. Term Construct 2 lane Roadway, includes Bike Late 368.7 McMahon Blvd Extension Ventana Parkway West Rainbow Blvd Capacity Proj Private $5,950,000 Lanes Term Broadway & I‐25 Future Late 454.1 Mesa Del Sol Parkway Mesa del Sol Loop Rd Construct New 4 lane, divided & Bike Lanes Capacity Proj Private $8,325,000 Exit Term

Appendix A 3 of 6 Connections 2040 MTP Project Listing by Project Type, then Project Title Private Developer Funded Projects

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Note: Some projects which are listed as privately funded may be all or partially funded through future funds derived from Public Improvement Districts (PIDs), Transportation Impovement Districts (TIDs), Tax Increment Financing (TIF) and other alternative financing methods in agreement with governmental jurisdictions. Construct collector roads, minor arterial Mesa del Sol Streets and Roadways various roadways in Mesa Near 454.2 roadways and major arterial roadways in Capacity Proj Private $80,000,000 Construction Stage I del Sol Term Mesa del Sol. Construct collector roads, minor arterial Mesa del Sol Streets and Roadways various roadways in Mesa Late 454.3 roadways and major arterial roadways in Capacity Proj Private $100,000,000 Construction Stage II del Sol Term Mesa del Sol. Montezuma Blvd Roadway Near 718.0 Edinburgh Dr Unser Blvd Construct 2 lane road. Capacity Proj Private $3,000,000 Improvements Term Paseo del Norte (Far Westside) Future NM 347 Paseo del Construct New 2 lane Roadway. Add bike Late 530.0 Atrisco Vista Blvd Capacity Proj Private $8,600,000 Extension Volcan lanes. Term Reconstruct & Widen from 2 to 4 lanes as Late 470.0 Paseo del Norte Improvements Rainbow Blvd Calle Nortena Capacity Proj Private $19,142,500 Stage II. Includes Bike Lanes & Trail Term Paseo del Norte NW Improvements & Reconstruct & Widen from 2 to 4 lanes; Late 529.0 Atrisco Vista Blvd Woodmont Ave Capacity Proj Private $21,750,000 Widening Stage II includes Bike Lanes & Trail Term Construct 2 lane roadway, bike lane, and Late 719.3 Paseo del Volcan in Santolina Atrisco Vista Blvd I‐40 Capacity Proj Private $12,000,000 sidewalk. (Does not include I‐40 interchange.) Term Quail Ranch Devel. of Arterials and Late 722.1 Construction of arterials and collector roads. Capacity Proj Private $56,349,000 Collectors (Late Time Frame) Term Construct New 2 lane Roadway. Includes Bike Near 12.1 Rainbow Blvd Extension Irving Blvd McMahon Blvd Capacity Proj Private $3,867,500 Lanes & Trail Term Rainbow Blvd Extension Reconstruction Late 12.2 Irving Blvd McMahon Blvd Reconstruct & Widen from 2 to 4 lanes Capacity Proj Private $5,476,250 & Widening Term Rainbow Blvd Reconstruction & Woodmont Ave (near Reconstruct & Widen from 2 to 4 lanes; Near 531.0 Unser Blvd Capacity Proj Private $18,135,000 Widening Volcano Vista HS) includes Bike Lanes & Trail Term Rancho Cielo Development of Arterials Develop arterial and collector network for the Late 720.0 Capacity Proj Private $41,740,123 and Collectors (2025 Implementation) Rancho Cielo Master Planned Community. Term Rancho Cielo Development of Arterials Develop arterial and collector network for the Late 720.1 and Collectors (2026 ‐ 2040 Capacity Proj Private $67,827,500 Rancho Cielo Master Planned Community. Term Implementation) Develop arterial and collector network for the Santolina Development of Arterials & Near 719.0 Santolina Master Planned Community. Private Capacity Proj Private $60,000,000 Collectors (2030 Implementation) Term Funding with PIDs and TIDDs

Develop arterial and collector network for the Santolina Development of Arterials & Late 719.1 Santolina Master Planned Community. Private Capacity Proj Private $100,000,000 Collectors (2031‐2040 Implementation) Term Funding with PIDs and TIDDs

Appendix A 4 of 6 Connections 2040 MTP Project Listing by Project Type, then Project Title Private Developer Funded Projects

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Note: Some projects which are listed as privately funded may be all or partially funded through future funds derived from Public Improvement Districts (PIDs), Transportation Impovement Districts (TIDs), Tax Increment Financing (TIF) and other alternative financing methods in agreement with governmental jurisdictions. Construct and/or widen various Sunport South Devlopment Area Near 229.0 Various Roads roadways.Private Funding with PIDs and Capacity Proj Private $21,230,000 Roadway Improvements Term TIDDs Tierra Pintada Blvd (Old 98th St) end of existing Old 98th Construct New 4 lane Roadway & Bike Lanes Near 462.0 98th St Capacity Proj Private $13,875,000 Extension St COMPLETED Term Tierra Pintada Blvd (Old 98th St) Late 463.0 118th St 98th St Construct New 2 lane Roadway & Bike Lanes Capacity Proj Private $4,998,000 Extension Term Tierra Pintada Blvd (Old 98th St) Reconstruct & Widen from 2 to 4 lanes. Late 481.0 98th St Unser Blvd Capacity Proj Private $16,650,000 Reconstruction Includes Bike Lanes COMPLETED Term Construct 2 lane roadway with 1 bike lane & Near 487.1 Universe Blvd Connection Construction McMahon Blvd Westside Blvd Capacity Proj Private $4,380,000 sidewalk. Term Widen from 2 to 4 lanes with additonal bike Late 487.2 Universe Blvd Connection Widening McMahon Blvd Westside Blvd Capacity Proj Private $4,380,000 lane & sidewalk Term Universe Blvd Reconstruction & Near 487.0 Irving Blvd McMahon Blvd Reconstruct & Widen from 2 to 4 lanes Capacity Proj Private $4,940,000 Widening (B) Term Unser Blvd Extension (SW ABQ) Middle Construct new 4 lane roadway with bike Late 498.1 Gun Club Rd Sen Dennis Chavez Blvd Capacity Proj Private $13,260,000 Section lanes, sidewalks and trail. Term Construct new 2 lane roadway with bike Unser Blvd Extension (SW ABQ) Late 498.2 Pajarito Rd Gun Club Rd lanes, sidewalks and trail. REQUEST TO Capacity Proj Private $13,500,000 Southern Section Term CHANGE LEAD TO PRIVATE PER BERN CO. Construct and/or widen various Upper Petroglyphs Development Road Late 280.0 Various Roads roadways.Private Funding with PIDs and Capacity Proj Private $32,000,000 Improvements Term TIDDs Construct 2 lane Roadway, includes Bike Late 607.1 Ventana Parkway West Construction Irving Blvd McMahon Blvd (future) Capacity Proj Private $4,760,000 Lanes Term Volcano Heights Collectors (Late Time Late 721.2 Design and construct collector streets. Capacity Proj Private $12,782,000 Frame) Phase 1 Term Volcano Heights Collectors (Mid Time Late 721.1 Design and construct collector streets. Capacity Proj Private $6,391,000 Frame) Phase 2 Term Construct collector roads, minor arterial West Mesa (Estrella) Streets & Roadway various roadways on the Near 479.0 roadways and major arterial roadways on the Capacity Proj Private $50,000,000 Construction Stage I west mesa Term west mesa. Construct collector roads, minor arterial West Mesa (Estrella) Streets & Roadway various roadways on the Late 479.1 roadways and major arterial roadways on the Capacity Proj Private $50,000,000 Construction Stage II west mesa Term west mesa. Late 608.0 Westphalia Blvd (Southern Section) Paseo del Volcan Progress Blvd Construct New 4 lane Roadway Capacity Proj Private $8,360,000 Term Westside Blvd Western Extension Construct 2 lane roadway with 1 bike lane & Near 507.0 Viga Rd SE Unser Capacity Proj Private $8,600,000 Construction sidewalk Term

Appendix A 5 of 6 Connections 2040 MTP Project Listing by Project Type, then Project Title Private Developer Funded Projects

Time MPO # Project Title From To Project Description Project Type Lead Agency MTP_Plan Cost Frame

Time Frame: "Funded" = programmed with federal, state or local funding between FFY's 2016-2025; "Near Term" = project completion anticipated FFY's 2026-2030; "Late Term" = project completion anticipated FFY's 2031-2040

Note: Some projects which are listed as privately funded may be all or partially funded through future funds derived from Public Improvement Districts (PIDs), Transportation Impovement Districts (TIDs), Tax Increment Financing (TIF) and other alternative financing methods in agreement with governmental jurisdictions. Westside Blvd Western Extension Widen from 2 to 4 lanes and add 1 bike lane & Near 507.1 Viga Rd SE Unser Blvd Capacity Proj Private $8,600,000 Widening sidewalk. Term Category Totals Total Public Funded Highway Capacity Projects $1,207,744,212 Complete the reconfiuration of the exit and I‐25 North Belen Interchange entrance ramps and other appurtenances as Near 928.0 I‐25 Exit 195 Hwy & Brg Pres Private/City of Belen $8,000,000 Reconfiguration necessary. Funds will be private funds to the Term City of Belen. Category Totals Total Private Developer Funded Highway and Bridge Preservation Projects $8,000,000 Design and construction of an overpass on 218.0 NM 109, Jarales Rd. Railroad Overpass Trujillo Rd. Gallegos Rd. NM 109 over the RR tracks for safety Safety Private/NMDOT $30,000,000 Funded purposes. Partially funded by BNSF. Category Totals Total Private Developer Funded Safety Projects $30,000,000 Mesa del Sol Streets Transit Facilities Construct transit guideeways and other Near 454.4 Transit Private $10,625,000 Construction Stage I facilities in Mesa del Sol. Term Mesa del Sol Streets Transit Facilities Construct transit guideeways and other Late 454.5 Transit Private $15,000,000 Construction Stage II facilities in Mesa del Sol. Term Category Totals Total Private Developer Funded Transit Projects $25,625,000 Total Est. Cost of All Private Developer Funded Projects $1,297,162,212 Projected Private Revenue for Projects (cumulative cost of all developer projects equals amount to be paid by developers) $1,297,162,212 Difference (Private Developer Revenue Projected ‐ Total Projects' Cost) $0

Category Totals % Total Cost of All Private Developer Funded Bike/Ped Projects $25,793,000 1.99% Total Cost of All Private Developer Funded Highway Capacity Projects $1,207,744,212 93.11% Total Cost of All Private Developer Funded Highway and Bridge Preservation Projects $8,000,000 0.62% Total Cost of All Private Developer Funded Safety Projects $30,000,000 2.31% Total Cost of All Private Developer Funded Transit Projects $25,625,000 1.98% Total Cost of All Private Developer Funded Projects $1,297,162,212 100.00%