Warehouse Project M/S Future Retail Destination Ltd. Village- Ghijjarodh, Tehsil & District-Jhajja Prepared By: V S. NO

Total Page:16

File Type:pdf, Size:1020Kb

Warehouse Project M/S Future Retail Destination Ltd. Village- Ghijjarodh, Tehsil & District-Jhajja Prepared By: V S. NO Warehouse Project M/s Future Retail Destination Ltd. Village- Ghijjarodh, Tehsil & District-Jhajjar, Haryana S. CHECKLIST POINTS FOR REPLY NO. DESCRIPTION 1. The PP should submit Form-I, Form-IA and Refer Enclosed Application Document Conceptual plan duly filled and signed and Form I :- Page No. 1- 13 proposed TOR, if applicable. Form I A :- Page No. 14-76 Conceptual Plan :- Page No. 77 - 104 2. The PP should submit Copy of valid Copy of license is enclosed as Annexures-B1 license/CLU/Allotment letter along with self-contained note mentioning name of each licensee with land share and proper justification of title of the project. The PP should also submit the developer agreement in case of more than one licensee and project proponent not been licensee. 3. The PP should submit copy of resolution Copy of Resolution Authorizing person to file authorizing/nominating person to file an application is enclosed as Annexure-D5. application. (Some authenticated document having signatures with names of Directors/ the Director who is authorizing the signatory of application). 4. The PP should submit copy of resolution for Copy of Resolution for engaging services of engaging services of consultant. consultant is enclosed as Annexure-D9 5. The PP should submit copy of accreditation QCI/NABET Accreditation enclosed as certificate of consultant issued by Enclosure-2 QCI/NABET for the specific chapter. 6. The project proponent should submit brief Brief description of project is mentioned at description of the project. Page No. 78-79 of Conceptual Plan. 7. The project proponent shall give details of Soil Analysis Report is enclosed at as soil type, soil analysis (physical and Annexure-B7 chemical), slope analysis, vulnerability to Details regarding soil analysis, slope analysis, subsidence, and seismicity and natural seismicity and vulnerability to subsidence are drainage near the project site on contour maps and shall also give details of the mentioned at Page No. 18 of Form-1A. quantities of earthwork involved and its use. Project falls under Seismic Zone III. In case of surplus excavated soil, its disposal There is no surplus earth as cut and fill to identified site with permission of mining quantity is same. department for disposal. 8. The project proponent shall give the total Water Requirement for the project is tabulated quantity of water requirement with the in Table No. 4 of Conceptual Plan at Page No. breakup of requirements for various uses 81. and the sources along with water balance statement and shall provide physical, Water Balance diagram is shown at Page No. chemical, biological characteristics with 23 of Form-1A as Figure-2 class of water quality. The project proponent shall also submit depth of soil water 1 Prepared By: Vardan Environet, Gurgaon Warehouse Project M/s Future Retail Destination Ltd. Village- Ghijjarodh, Tehsil & District-Jhajjar, Haryana S. CHECKLIST POINTS FOR REPLY NO. DESCRIPTION availability and its analysis. Water Analysis Report is enclosed as Enclosure-1 9. The project proponent shall give the quantum 55 KLD of recycled water will be used for of water requirement to be met from horticulture purpose; Water Balance Diagram recycling of wastewater and shall give the at Page No. 23 of Form-1A. details of quantities, sources and usage. 10. The project proponent shall give the Refer Page No 21-24 of Form-1A for waste incremental pollution load from wastewater water generation, treatment and recycling generated from the proposed project along details. with details of the quantities and composition of wastewater generated from the proposed activity. 11. Parking provision to be made as per Parking Calculation is mentioned at Page No. NBC/DTCP norms whichever is higher 85 of Conceptual Plan. Parking Plan is with 20% extra capacity. It will further attached as Annexure-C2. comply with approved zoning plan. 12. The project proponent shall give the impacts There will be positive impact by recharge on of the proposal on the ground water and. shall ground water through Rainwater Harvesting give the details of ground water table, Pits with wells (7 Nos.) recharging capacity, and approvals obtained from competent authority. 13. The project proponent shall submit details of Water Harvesting calculation and other details rain water precipitation and it’s harvesting are given on Page No. 25-27 of Form-1A. proposals including ground water recharge. 14. The project proponent shall submit details for Refer Page No. 29-30 of Form-1A for Sewage collection, treatment & safe disposal of Treatment facilities. sewage by giving treatment capacities with technology & facilities for recycling and disposal along with dual plumbing system. 15. The project proponent shall give details of Refer Enclosure-1 for background air quality background air quality levels with predicted levels as Ambient Air Quality Monitoring values based on dispersion models taking Reports enclosed. There will be marginal into account the increased traffic generation impact on air quality by increase in traffic by as a result of the proposed constructions. project and by DG set emission. 16. The project proponent shall give details of Refer Page No. 34 of Form-1 A for internal the movement patterns with internal roads, roads. Movement patterns, ramps are shown in bicycle tracks, pedestrian pathways, footpaths Annexure C1 for Traffic Circulation Plan. etc., with areas under each category. 17. The project proponent shall give details of the Measures taken have been detailed on page no. sources and the measures proposed for 54-55 of Form-1A for the mitigation measures mitigation of traffic noise and vibration. of traffic noise and vibration. 18. The project proponent shall give energy Refer Page No. 41-43 of Form-1A for Energy conservation measures in the selection of Conservation Measures. building materials and their energy 2 Prepared By: Vardan Environet, Gurgaon Warehouse Project M/s Future Retail Destination Ltd. Village- Ghijjarodh, Tehsil & District-Jhajjar, Haryana S. CHECKLIST POINTS FOR REPLY NO. DESCRIPTION efficiency. Lighting equipment and appliances and process and operations. 19. The project proponent shall give details of Refer Page No. 17 of Form-1A. the power requirements, source of supply, backup source and distribution system. 20. The project proponent shall give the passive Architectural Design of Energy Conservation solar architectural features being used in the is mentioned at Page No. 41-43 of Form-1A. Building. 21. The project proponent shall give the details of Refer Point No. 9.5 and 9.13 of Form 1A at use of solar energy devices. page No. 42 and 49 respectively. 22. The project proponent shall give Refer Point No. 9.10 of Form 1A at Page No. precautions & safety measures proposed 44-48. against fire hazards and shall furnish details of emergency plans and risk assessment aspects. 23. The project proponent shall submit detailed Refer Page No. 49-76 of Form-1A for Environment Management Plan suggesting Environment Monitoring Plan and all mitigation and also Environmental Environment Management Plan. Monitoring plan for compliance of various environmental regulations, ventilation plan lighting (illumination) plan. 24. The project proponent shall submit Refer Annexure D1, D2, D3 for Electrical application along with (legible plans on safety, Noise & Vibration plan, Health & larger scale), he will also submit health, Welfare Safety respectively. welfare safety and electrical safety plans. (i) Location of project in the sector plan. (ii) (i) Location of project in the sector plan Plan showing surrounding features within enclosed as Annexure-A2. 500 meters radius. (iii) Green belt development plan. (iv) Lay out (ii) Plan showing surrounding features within plan/Building, plan/Zoning plan. 500 meters radius: - Annexure A1; also (different colours should be used to show Contour map enclosed under Annexure- existing and expansion proposal) (v) A6. Traffic circulation plan. (vi) Parking plan. (vii) Location of STP and Rain Water (iii) Green belt development plan: - Refer Harvesting structures on plan. (viii) Annexure-C4. Prospective view. (ix) Elevation section plan. (iv) Refer Annexure-C1 for Layout Plan and Annexure-B4 for Zoning Plan. (v) Traffic circulation plan: - Traffic circulation is shown in site layout plan attached as Annexures-C1. (vi) Parking plan: - Refer parking layout plan 3 Prepared By: Vardan Environet, Gurgaon Warehouse Project M/s Future Retail Destination Ltd. Village- Ghijjarodh, Tehsil & District-Jhajjar, Haryana S. CHECKLIST POINTS FOR REPLY NO. DESCRIPTION attached as Annexure-C2. (vii) Location of STP and Rain Water Harvesting structures on plan:- Refer Annexure-C3. (viii) Elevation and Section Plan: Refer Annexure-C5. 25. NOC from AAI regarding height clearance. This condition is not applicable on this project. 26. Certificate from competent Authority Certificate regarding the non-applicability of regarding non applicability of Aravali Aravali is not applicable as the project is in Notification in case of District Gurgaon as on District Jhajjar (Haryana). 07-05-1992. 27. Assurance of competent Authority (HUDA/ Application for the supply of water has been Municipal Corporation/Local Authorities) applied. Receiving for the same is enclosed as for supply of water/permission of CGWA for Enclosure-3. withdrawal of ground water, if proposed. 28. Assurance for supply of power from HBVN. Temporary power connection has already been installed at site from UHBVN. Please refer Enclosure-4 for Power Supply assurance. 29. All the original copies of analytical reports of Analytical Reports for Air, Water, Noise and soil, water, air and noise conducted and Soil from NABL/MoEF approved laboratory collected by NABL/MoEF approved are enclosed as Enclosure-1. Laboratories. 30. NOC from the concerned Forest Department NOC from forest department regarding non- regarding non-involvement of forest land. involvement of forest land has already been obtained and is attached as Annexure-B2. 31. The project proponent shall submit an Affidavits are attached with the application undertaking stating that. stating all the points mentioned are attached as (i) That no construction has been started at Annexure-D4.
Recommended publications
  • Exhibitions Director Archives Dept
    Phone:2561412 rdi I I r 431, SECTOR 2. PANCHKULA-134 112 ; j K.L.Zakir HUA/2006-07/ Secretary Dafeci:")/.^ Subject:-1 Seminar on the "Role of Mewat in the Freedom Struggle'i. Dearlpo ! I The Haryana Urdu Akademi, in collaboration with the District Administration Mewat, proposes to organize a Seminar on the "Role of Mewat in the Freedom Struggle" in the 1st or 2^^ week of November,2006 at Nuh. It is a very important Seminar and everyone has appreciated this proposal. A special meeting was organized a couple of weeks back ,at Nuh. A list ojf the experts/Scholars/persons associated with the families of the freedom fighters was tentatively prepared in that meeting, who could be aiv requ 3Sted to present their papers in the Seminar. Your name is also in this list. therefore, request you to please intimate the title of the paper which you ^ould like to present in the Seminar. The Seminar is expected to be inaugurated by His Excellency the Governor of Haryana on the first day of the Seminar. On the Second day, papers will be presented by the scholars/experts/others and in tlie valedictory session, on the second day, a report of the Seminar will be presented along with the recommendations. I request you to see the possibility of putting up an exhibition during the Seminar at Nuh, in the Y.M.D. College, which would also be inaugurated by His Excellency on the first day and it would remain open for the students of the college ,other educational intuitions and general public, on the second day.
    [Show full text]
  • Sr. NO District Name of Block Name of BDPO Conatct No
    Sr. Name of District Name of BDPO Conatct No NO Block Addl. charge to given 1 Ambala Ambala-I Rajan Singla BDPO 0171-2530550 Shazadpur Addl. charge to given 2 Ambala Ambala-II Sumit Bakshi, BDPO 0171-2555446 Naraingarh Addl. charge to given 3 Ambala Barara Suman Kadain, BDPO 01731-283021 Saha 4 Ambala Naraingarh Sumit Bakshi 01734-284022 5 Ambala Sehzadpur Rajan Singla 01734-278346 6 Ambala Saha Suman Kadian 0171-2822066 7 Bhiwani Bhiwani Ashish Kumar Maan 01664-242212 Addl. charge to given 8 Bhiwani Bawani Khera Ashish Kumar Maan, 01254-233032 BDPO Bhiwani Addl. charge to given 9 Bhiwani Siwani Ashish Kumar Maan, 01255-277390 BDPO Bhiwani 10 Bhiwani Loharu Narender Dhull 01252-258238 Addl. charge to given 11 Bhiwani K airu Ashish Kumar Maan, 01253-283600 BDPO Bhiwani 12 Bhiwani Tosham Subhash Chander 01253-258229 Addl. charge to given 13 Bhiwani Behal Narender Dhull , BDPO 01555-265366 Loharu 14 Charkhi Dadri Charkhi Dadri N.K. Malhotra Addl. charge to given 15 Charkhi Dadri Bond Narender Singh, BDPO 01252-220071 Charkhi Dadri Addl. charge to given 16 Charkhi Dadri Jhoju Ashok Kumar Chikara, 01250-220053 BDPO Badhra 17 Charkhi Dadri Badhra Jitender Kumar 01252-253295 18 Faridabad Faridabad Pardeep -I (ESM) 0129-4077237 19 Faridabad Ballabgarh Pooja Sharma 0129-2242244 Addl. charge to given 20 Faridabad Tigaon Pardeep-I, BDPO 9991188187/land line not av Faridabad Addl. charge to given 21 Faridabad Prithla Pooja Sharma, BDPO 01275-262386 Ballabgarh 22 Fatehabad Fatehabad Sombir 01667-220018 Addl. charge to given 23 Fatehabad Ratia Ravinder Kumar, BDPO 01697-250052 Bhuna 24 Fatehabad Tohana Narender Singh 01692-230064 Addl.
    [Show full text]
  • Section I/ Executive Summary
    PROJECT: 10 MLD Common Effluent Treatment Plant, Bahadurgarh Section I/ Executive Summary SECTION – I EXECUTIVE SUMMARY INDEX 1.1 IDENTIFICATION OF PROJECT................................................................................. 2 1.2 SALIENT FEATURES OF THE PROJECT ................................................................... 2 1.3 RAW MATERIAL............................................................................................................ 3 1.4 PRODUCT ......................................................................................................................... 4 1.5 CONCLUSION .................................................................................................................. 4 1 PROJECT: 10 MLD Common Effluent Treatment Plant, Bahadurgarh Section I/ Executive Summary EXECUTIVE SUMMARY 1.1 IDENTIFICATION OF PROJECT Pollution from small and medium size industries is a major problem in India. Nearly half of wastewater generated by the most polluting industries in India comes from the small and medium size industries. Modern Industrial Estate comprising of about 500 acres was set up at Bahadurgarh by the Haryana govt. In two parts i.e. MIE Part A & MIE Part B on either side of NH-10 road at Haryana-Delhi border to give relief to Delhi from its increasing industrial pressure. Total 2318 plots of various categories ranging from 10 Marla plots to two acres have been carved out. In this area most of the plots have been sold out and development works have already been completed by HUDA in the
    [Show full text]
  • A HISTORICAL Survey Monuments of Jhajjar
    © 2018 JETIR February 2018, Volume 5, Issue 2 www.jetir.org (ISSN-2349-5162) A HISTORICAL survey Monuments of Jhajjar SUSHIL KUMAR Master History Motilal Nehru School of Sports Rai, Sonipat. Abstract: Today Haryana stands tall with its achievements in art and culture. Rich in history, monuments, heritage, Jhajjar is a historical town from earliest time to modern era. Due to its agricultural importance, Firoz shah Tughaq gave attention and created canals. The peoples of Jhajjar faced rule of many dynasties as sultanate and Mughal and local nawabs .Every ruler of these dynasties built many structures in Jhajjar for many purposes. Key-words: Monument, Jhajjar, Sultanate, Mughal, Heritage, Mosque, Baoli. Introduction: Jhajjar is a town of Jhajjar District (Haryana) is located 32 Km South of Rohtak and 56 Km West of Delhi. Jhajjar lies of the confluence of Indo-Gangetic Plains.1 The town is said to have been found2 by one Chhaju Jat and Named Chhaju Nagar which was changed to Jhajjar. It is a historical town. In the Sultanate Period, Rulers started digging Canals in this Area. One of the five Canals created by Firozshah Tuglaq brought water from Sutluj to Jhajjar. During Akbar’s Reign this Area was a part of Delhi Province. After the fall of Mughal Empire. This Area was passed into many hands until the Jats defeated the Nawab of Farrukhanagar and established their Rule. In later period, king George Thomas made Jhajjar as his Head Quarter. In 18033, General Lake gave this Area of Jhajjar to Nawab Nijabat Ali Khan and its renamed under the Nawabs till 1857.
    [Show full text]
  • Compile List of Distt. Jhajjar Kiryana Store.Xlsx
    List of Grocery Retailers in District Jhajjar Sr.n. SHOP & OWNER NAME ADDRESS Mobile 1 MANUR KIRYANA STORE (ASHOK MANUR) SHASTRI NAGER BAHADURGARH 8168874880 2 RAJESH SABJI WALA VATS COLONEY BAHADURGARH 8607032175 3 USHA DEVI FRUIT SHOP VATS COLONEY BAHADURGARH 7876902374 4 MANISH KIRYANA STORE VATS COLONEY BAHADURGARH 5 RITIKA KIRYANA SDTORE TANDAHERI 9671312412 6 RAJESH KIRYANA STORE TANDAHERI 8221025678 7 PARDEEP SABJIWALA TANDAHERI 9992157952 8 MAHABIR SABJIWALA TANDAHERI 8059495268 9 RAJESH MISTHAN BHANDAR TANDAHERI 9812270188 10 NARENDER KIRYANA STORE TANDAHERI 9991172977 11 BHOOP KIRYANA STORE TANDAHERI 7056223027 12 ASHOK TEA STALL TANDAHERI 8607220582 13 RAJENDER KIRYANA STORE TANDAHERI 9466468558 14 SAGAR KIRYANA STORE TANDAHERI 9728030639 15 DIYA DAIRY TANDAHERI 8683882234 16 DALAL KIRYANA STORE TANDAHERI 8607475473 17 ROHIT KIRYANA STORE (MUKESH) SEC-9 BAHADURGARH 7988674772 18 NARESH ENTERPRISES WARD-14 BAHADURGARH 9728300361 19 QUALITY JUICE CORNER WARD-14 BAHADURGARH 9728924099 20 SANJAY KIRYANA STORE WARD-14 BAHADURGARH 9728656105 21 ROHIT KIRYANA STORE (MUKESH) KASAR 8053190030 22 SUKHBIR S/0 NETRAM KIRYANA STORE KASAR 8221965750 23 SATBIR/RANSINGH KIRYANA STORE KASAR 9467597694 24 NIRANKAR/SURAJBHAN KIRYANA STORE KASAR 9996984524 25 HOSHYAR/MIR SINGH KIRYANA STORE KASAR 9466279552 26 OMAL/LEKHRAM KIRYANA STORE KASAR 8685921045 27 SATYARKASH/SHRIKISHAN KIRYANA STORE KASAR 9467112138 28 BITTU/SURESH KIRYANA STORE KASAR 9466466448 29 MOHAN KIRYANA STORE MAHABIR PARK BAHADURGARH 8901271295 30 MOHIT KIRYANA STORE MAHABIR
    [Show full text]
  • Schedule for Drivers Proficiency Test (Venue Jhajjar Depot) Annexure
    Annexure 'A' Schedule for Drivers Proficiency Test (Venue Jhajjar Depot) Candidates belonging to Date of Test Roll No. (From) Roll No. (To) Candidates Station (Depot Name) per day JHAJJAR 15-Apr-13 1 60 60 JHAJJAR 16-Apr-13 61 120 60 JHAJJAR 17-Apr-13 121 180 60 JHAJJAR 18-Apr-13 181 240 60 JHAJJAR 22-Apr-13 241 300 60 JHAJJAR 23-Apr-13 301 360 60 JHAJJAR 25-Apr-13 361 420 60 JHAJJAR 26-Apr-13 421 480 60 JHAJJAR 29-Apr-13 481 540 60 JHAJJAR 30-Apr-13 541 600 60 JHAJJAR 01-May-13 601 660 60 JHAJJAR 02-May-13 661 720 60 JHAJJAR 03-May-13 721 780 60 JHAJJAR 06-May-13 781 840 60 JHAJJAR 07-May-13 841 900 60 JHAJJAR 08-May-13 901 960 60 JHAJJAR 09-May-13 961 1020 60 JHAJJAR 10-May-13 1021 1080 60 JHAJJAR 13-May-13 1081 1140 60 JHAJJAR 14-May-13 1141 1200 60 JHAJJAR 15-May-13 1201 1260 60 JHAJJAR 16-May-13 1261 1320 60 JHAJJAR 17-May-13 1321 1380 60 JHAJJAR 20-May-13 1381 1440 60 JHAJJAR 21-May-13 1441 1500 60 JHAJJAR 22-May-13 1501 1560 60 JHAJJAR 23-May-13 1561 1620 60 JHAJJAR 24-May-13 1621 1680 60 JHAJJAR 27-May-13 1681 1740 60 JHAJJAR 28-May-13 1741 1771 31 Total Candidates 1771 Annexure 'A' Schedule for Drivers Proficiency Test (Venue Panhckula Depot) Candidates belonging to Date of Test Roll No. (From) Roll No.
    [Show full text]
  • (Dumha), Farukh Nagar, Distt. Gurgaon
    MAHRISHI DAYANAND UNIVERSITY, ROHTAK LIST OF ENGINEERING COLLEGES S.N College Name . GURGAON 1 B.M. College of Technology & Management, Vill. Hari Nagar (Dumha), Farukh Nagar, Distt. Gurgaon. 2 Dronacharya College of Engineering, Tehsil Farukhnagar, Village Khentawas, District Gurgaon. 3 GITM Institute of Technology, VPO Bilaspur, Bilaspur Tauru Road, Gurgaon. 4 Global Institute of Technology & Management, 5KM Mile Stone, Kheda Khurampur, Farukhnagar, Haily Mandi Road, Gurgaon 5 Gurgaon College of Engineering, VPO Pathreri, Bilaspur Tauru Road, Gurgaon. 6 Gurgaon Institute of Technology & Management, VPO Pathreri, Bilaspur Tauru Road, Gurgaon. 7 Institute of Information Technology & Management, 7th Mile Stone, Silani Village, Sohna Palwal Bye Pass, NH-71B, Gurgaon 8 KIIT College of Engg. Sohna Road, Bhondsi (Gurgoan) 9 Savera Educational Trust Group of Institutions, 1 KM Stone, Haily Mandi Road, Farookh Nagar, Gurgaon, Haryana 10 World College of Technology & Management, Farukh Nagar-Haley Mandi Road, Gurgaon 11 World Institute of Technology & Management, 8 KM Stone, Sohna- Palwal Road, NH 71B, Sohna, Gurgaon (Haryana) 12 St. Andrews Institute of Technology & Management, Village khurrampur, Farukh Nagar, Haily Mandi Road, Gurgaon 13 DPG Institute of Technology & Management, Sector-34, Near Hero Honda Chowk, Gurgaon JHAJJAR 14 Akido College of Engineering, 6km mile stone, Bahadurgarh Jhajjar Road, Village Lowa Khurd, Bahadurgarh 15 CBS Group of Institutions, Jhajjar Kosli Road, Distt. Jhajjar (Haryana). 16 Dalal Global Institute of Technology, VPO Brahana, Tehsil Beri, Distt. Jhajjar 17 Delhi Technical Campus, 4th Mile Stone, Main Gurgaon, Badli Road, Near Sector-13, Nayagaon, Bahadurgarh. 18 Ganga Institute of Technology & Management, Kablana, Bahadurgarh-Jhajjar Road, District Jhajjar. 19 Haryana Institute of Technology, 34/41, KM Stone, Delhi-Rohtak Road, Asodha, Tehsil Bahadurgarh, district Jhajjar.
    [Show full text]
  • EXECUTIVE SUMMARY I About District Jhajjar District
    PLP – 2016-17 Jhajjar District EXECUTIVE SUMMARY I About District Jhajjar district with a geographical area of 1834 Sq. Km. (1911 Sq. Km. according to village papers) is situated in the Middle Eastern part of the Haryana State. It is surrounded by Rohtak and Sonepat districts in the North, Rewari and Gurgaon districts in the South, national capital Delhi in the East and Bhiwani district in the West. It comprises of 3 tehsils, 1 sub-tehsil, 5 blocks, 5 towns and 247 inhabited villages/ towns. Agro-climatically, Jhajjar district falls under sub-humid and semi-arid zone. The economy is purely agrarian and is supported by other economic activities like dairying, horticulture, service, trade and business. The district (except Bahadurgarh block) has been identified as an industrially backward. According to 2011 census, the population of the district is 9.58 lakh with a population density of 523 persons per KM. The Sex ratio is alarmingly low at 862 females per thousand males. District is in a better position with respect to roads, education, electricity and water availability and lagging behind in respect of irrigation, transportation, marketing facilities, etc. than the State Infrastructure Average Index. Out of the total 73203 landholdings, 50072 landholdings are with that of small and marginal farmers (68.4% of the total) who own up to 2 hectares of land. However, the land holding area of these farmers aggregate to 36516 hectares which constitutes 23.9% of the total land holding area of the district. Total geographical area of Jhajjar district is 1,91,000 hectares. The total cultivable area is 1,69,000 hectares.
    [Show full text]
  • Detailed Project Report
    HARYANA ORBITAL RAIL CORRIDOR FROM PALWAL TO SONIPAT BY LINKING PALWAL-PATLI-ASAUDAH -HARSANA KALAN STATIONS DETAILED PROJECT REPORT TABLE OF CONTENTS 1 EXECUTIVE SUMMARY ................................................................................................ 1 1.1 Introduction ........................................................................................................... 1 1.2 Traffic Demand Forecast ...................................................................................... 2 1.3 Total Freight Traffic in the Horizon years ........................................................... 2 1.4 Total passenger traffic along the project corridor ............................................. 3 1.5 Site Investigation .................................................................................................. 3 1.6 Civil Engineering .................................................................................................... 3 1.7 Salient Features..................................................................................................... 4 1.8 Power Supply and System of Traction ................................................................ 5 1.9 Signalling and Telecommunication ...................................................................... 5 1.10 Rolling Stock ...................................................................................................... 6 1.11 Cost Estimate ....................................................................................................
    [Show full text]
  • Chapter-Iv Revolt of 1857 and Muslims in Haryana
    CHAPTER-IV REVOLT OF 1857 AND MUSLIMS IN HARYANA In order to understand the regional and micro-level behaviour and attitude of Muslim Community towards British Raj or Western Culture it is necessary to have a separate chapter in this study. Hence this chapter on the great Revolt deserve its place in the present study. The great Revolt proved to be a perfect and representative historical event to analyze the general political attitude of various sections of the Muslim community of Haryana. The Sepoys, the people and feudal chiefs all took part in this revolt in large number. Their participation and struggle displayed a general attitude of confrontation towards British Raj. The study regarding Haryana began with the regional description, structural understanding of the society of Haryana, general survey of revolt, the role of the princely states and masses and ends with the inference that muslims took part in this great revolt with vigour and enthusiasm and suffered more than any other community of Haryana. The present Haryana region’s political history may be attributed to the very beginning of the nineteenth century when the British East India Company came to the scene. The Marathas who had over the territory of Haryana were ousted from here by the British. By the treaty of Surji Anjangaon on 30 December, 1803 between Daulat Rao Sindhia and the British, the territory of Haryana passed on the British East India Company. The East India Company assumed the direct control of Delhi, Panipat, Sonepat, Samalkha, Ganaur, Palam, Nuh, Hathin, Bhoda, Sohna, Rewari, Indri, Palwal, Nagina and Ferozepur Zhrka and appointed a resident on behalf of the Governor General.
    [Show full text]
  • EPCA Report on Strategies to Reduce Truck Pollution in Delhi
    1 EPCA Report (October 2015) In the matter of W.P. (C) No.13029 of 1985; M.C. Mehta v/s UOI & others Report on strategies to reduce air pollution from trucks entering and leaving Delhi Environment Pollution(Prevention and Control) Authority for NCR (EPCA) 2 Background The Hon’ble Supreme Court has been concerned about the pollution of trucks entering and leaving Delhi for the past decade. In its order of December 6, 2001, the Hon’bleSupreme Court had banned entry of non- destined commercial transit traffic effective from January 15, 2002. These vehicles could enter only on payment of toll and tax for transportation of goods to and from Delhi. Then in its order of 11.2.2005, 11.3.2005 and 1.8.2005 the Hon’bleSupreme Court had ruled,“that no corridor joining different highways should pass through Delhi”. Subsequently, the Supreme Court had directed to construct Western Peripheral Road also known as Kundli-Manesar-Palwal Expressway and Eastern Peripheral Expressway to take the non-destined trucks away to decongest Delhi. Subsequently, EPCA has continued to monitor progress in the above directions and has brought the matter of delay and non-implementation of the above directions to the attention the Hon’bleSupreme Court. The Hon’ble Supreme Court, driven by concern for growing pollution, has passed orders and directed for expeditious completion of the bypass. EPCA is constrained to bring the matter to the attention of the Hon’ble Court and to look for alternative strategies to control truck traffic for the following reasons: a. The ban on non-destined vehicle entry to Delhi has proved to be difficult to enforce.
    [Show full text]
  • Badli-Gurgaon Road Subproject Initial Environm
    Initial Environmental Examination Document Stage: Draft Project Number: 41598 ADB Loan Number: 2660 April 2013 India: National Capital Region Urban Infrastructure Financing Facility–Project 1 – Badli-Gurgaon Road Subproject Prepared by Marc Technocrats Private Limited For the Haryana State Roads and Bridges Development Corporation Limited The initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. ABBREVIATIONS ADB : Asian Development Bank BIS : Bureau of Indian Standards CBR : California Bearing Ratio CHC : Community Health Centres EC : Environmental Clearance EHS : Environmental Health and Safety EIA : Environmental Impact Assessment EMP : Environmental Management Plan EMS : Environmental Management System EO : Environmental Officer ESMS : Environmental and Social Management System GoI : Government of India GRC : Grievance Redressal Committee HSIIDC : Haryana State Industrial & Infrastructure Development Corporation HSRDC : Haryana State Road Development Corporation IA : Implementing Agency IEE : Initial Environmental Examination IRC : Indian Road Congress MDR : Major District Road MoEF : Ministry of Environment and Forest MoRTH : Ministry of Road Transport and Highways MSL : Mean Sea Level NCR : National Capital Region NCRPB : National Capital Region Planning Board NCRUIFF : National Capital Region Urban Infrastructure Financing Facility PHC : Primary Health Centres RoW : Right of Way RPM : Respirable Particulate Matter SC : Supervision Consultant SEIAA : State Environmental Impact Assessment Authority SPM : Suspended Particulate Matter CONTENTS Page I. INTRODUCTION 7 A. Overview 7 B. Environmental Compliance Requirements 7 II. DESCRIPTION OF SUBPROJECT 10 A. Need for the Subproject 10 B. Description of Subproject 10 C. Construction Activities 17 D. Implementation Schedule 17 III.
    [Show full text]