09/12/2013
Paul Hesk
Regional Manager – Middle East, India and Africa
Van Oord Offshore bv
Dredging for Oil and Gas
CEDA UK Seminar Dredging for the Offshore Industries ICE London, 3 December 2013
Offshore and EPC Contractors
Text small (build up) including image
Recent Investments
Company Profile
Leading international contractor, specialising in:
• Dredging and Reclamation • Offshore Oil and Gas
• Marine Engineering
• Offshore Wind Farms • Infrastructure
• Soil Improvement
Offshore and EPC Contractors
1 09/12/2013
Oil and Gas Sector Related Activities • Dredging and Reclamation
• Trenching and Backfilling
• Pipeline (and Cable) Installation
• SPM System Installation
• Subsea Rock Installation • Protection and Stabilisation of Pipelines, Cables and Structures • Ballasting of Structures
• Scour Protection
• GBS Installation
Offshore and EPC Contractors
In presentation-modus:
Click on the logo to go back to menu
Dredging and Reclamation
Das Island, United Arab Emirates
• New platform for airport extension and accommodation
• 160 km offshore
• 16 million m3 sand (including soil improvement by vibro-compaction)
• 7 km of revetment
• 3.5 million tonnes Rock • 140,000m3 Concrete
• 39,000 No. X-blocks
Offshore and EPC Contractors © Copyright Van Oord | 2012 4
2 09/12/2013
In presentation-modus:
Click on the logo to go back to menu
Trenching and Backfilling
Typical Equipment Types:
• Trailing Suction Hopper Dredgers
• Cutter Suction Dredgers
• Backhoe Dredgers
Selection Criteria: Shallow to Deep Water
• Soil Properties • Water Depth
• Disposal Area
• Environmental Considerations
Near Shore
Offshore and EPC Contractors © Copyright Van Oord | 2012 5
Full image
Pipeline Installation
Offshore and EPC Contractors © Copyright Van Oord | 2012 6
3 09/12/2013
Text (large) including image
On-bottom Pull
The pipeline is pulled from an onshore stringing yard into the water with the aid of Linear Pulling Winches mounted on an offshore construction barge.
Offshore and EPC Contractors
Full image
Pipeline Installation – Bottom pull
© Copyright Van Oord | 2012 8
4 09/12/2013
Text (large) including image
Pipe Lay
In the near shore area, the pipeline is pulled from a Shallow Water Lay Barge moored offshore to the shore with the aid of Linear Pulling Winches. In deeper water, the pipeline is installed on the seabed by a Shallow Water Pipe Lay Barge.
Offshore and EPC Contractors © Copyright Van Oord | 2012 9
In presentation-modus:
Click on the logo to go back to menu
Shallow Water Pipe Lay Barge
• Shallow water applications (up to 100m) • 6” to 60” diameter pipe
• 7 Stations:
• 3 Welding • 1 Non Destructive Testing
• 3 Field Joint Coating
Offshore and EPC Contractors © Copyright Van Oord | 2012 10
5 09/12/2013
In presentation-modus:
Click on the logo to go back to menu
Single Point Mooring (SPM) System Installation
• Pipe Line End Manifold (PLEM) Installation
• CALM Buoy Installation:
• Subsea and Floating Hoses (including Umbilicals)
• Anchor and Chains
• Mooring Hawser
Offshore and EPC Contractors © Copyright Van Oord | 2012 11
Full image
Subsea Rock Installation
• Stabilisation
• Free-span Support
• Pre-lay • Post-Lay
• Crossings
• Upheaval Buckling Mitigation
• Protection
• Anchors • Dropped Objects
• Spudcan Pugmark Filling
• GBS Related Applications
Offshore and EPC Contractors © Copyright Van Oord | 2012 12
6 09/12/2013
Full image
From the Archive……..
Offshore and EPC Contractors © Copyright Van Oord | 2012 13
Full image
Offshore and EPC Contractors © Copyright Van Oord | 2012 14
7 09/12/2013
Full image
Flexible Fall Pipe Vessels
• DP-2
• Highly accurate installation
• Large capacity (up to 28,000 tonnes)
• Installation in water depths of up to 1,200m • Ability to work close to live structures
Offshore and EPC Contractors © Copyright Van Oord | 2012 15
Full image
Offshore and EPC Contractors © Copyright Van Oord | 2012 16
8 09/12/2013
Full image
Side Stone Dumping Vessels
• DP-2
• Accurate installation in water depths of up to 50m • Ability to work close to……
Offshore and EPC Contractors © Copyright Van Oord | 2012 17
Full image
Side Stone Dumping Vessels
…… or under live structures
Offshore and EPC Contractors © Copyright Van Oord | 2012 18
9 09/12/2013
Full image
Offshore and EPC Contractors © Copyright Van Oord | 2012 19
Full image
Pipeline Stabilisation
Offshore and EPC Contractors © Copyright Van Oord | 2012 20
10 09/12/2013
Full image
Trench Backfilling
Offshore and EPC Contractors © Copyright Van Oord | 2012 21
Full image
Thermal Insulation
Offshore and EPC Contractors © Copyright Van Oord | 2012 22
11 09/12/2013
Full image
Free-span Correction
Offshore and EPC Contractors © Copyright Van Oord | 2012 23
Full image
Pre and Post Lay Installation
Offshore and EPC Contractors © Copyright Van Oord | 2012 24
12 09/12/2013
Full image
Crossings
Offshore and EPC Contractors © Copyright Van Oord | 2012 25
Full image
Upheaval Buckling Mitigation
Offshore and EPC Contractors © Copyright Van Oord | 2012 26
13 09/12/2013
Full image
Anchor Protection
Offshore and EPC Contractors © Copyright Van Oord | 2012 27
Full image
Dropped Objects
Offshore and EPC Contractors © Copyright Van Oord | 2012 28
14 09/12/2013
Full image
Infill of Spudcan Pugmarks
Offshore and EPC Contractors © Copyright Van Oord | 2012 29
Full image
Gravity Based Structure (GBS) installations • Sea Bed Preparation
• Tow Out
• Sinking • Ballasting
• Scour Protection
Offshore and EPC Contractors © Copyright Van Oord | 2012 30
15 09/12/2013
Full image
Seabed Preparation
Offshore and EPC Contractors © Copyright Van Oord | 2012 31
Full image
Tow-Out and Sinking
Offshore and EPC Contractors © Copyright Van Oord | 2012 32
16 09/12/2013
Full image
Ballasting
Offshore and EPC Contractors © Copyright Van Oord | 2012 33
Full image
Scour Protection
Offshore and EPC Contractors © Copyright Van Oord | 2012 34
17 09/12/2013
Chapter title
Thank you for your attention
Are there any questions?
Offshore and EPC Contractors
18