July 29, 2020 REQUEST for APPROVAL and TRANSFER of APPROPRIATED FUNDS UNDER the AIRPORT DEVELOPMENT PROGRAM
Total Page:16
File Type:pdf, Size:1020Kb
MICHIGAN AERONAUTICS COMMISSION July 29, 2020 REQUEST FOR APPROVAL AND TRANSFER OF APPROPRIATED FUNDS UNDER THE AIRPORT DEVELOPMENT PROGRAM Airport Based Concept # Project Description Federal Federal State State Local Local Total Aircraft/Total Fund Fund Fund Operations Year Year Year Alma 29 205547 Conduct/Update MP study ALP & $130,050 2020 $7,225 2020 $7,225 2020 $144,500 Gratiot Community 9,500 Narrative Report Ann Arbor 142 210821 Extend Runway 6/24 FAA RA for EA $25,123 2020 $1,396 2020 $1,396 2020 $27,915 Ann Arbor Muni 76,430 Review (Sponsor Reimbursement) Environmental Bad Axe 26 128665 Rehab Runway 17/35 Construction $3,171,812 2020 $22,500 2020 $22,500 2020 $3,216,812 Huron County Memorial 5,370 Battle Creek 103 121225 Reconstruct Taxiway C Phase III & E $2,957,282 2020 $77,778 2020 $77,778 2020 $3,112,838 W K Kellogg 85,317 Connector Construction Battle Creek 103 126707 Reconstruct Taxiway Lighting C Phase $887,980 2020 $887,980 W K Kellogg 85,317 III & E Connector Construction Bay City 58 132277 Acquire Easement for Approaches Rwy $62,484 2020 $62,484 James Clements Muni 9,006 18 (Parcel E12) Bellaire 25 204896 Rehabilitate Taxiway A & Connector B $1,388,485 2020 $18,509 2020 $18,509 2020 $1,425,503 Antrim County 6,048 and Airfield Paint Marking Construction Detroit 37 210858 Construct Taxiway (standards) Extend $27,539,701 2020 $27,539,701 Detroit Metropolitan 396,909 Taxiway P and Reconstruct P Wayne County Construction Flint 69 210877 Reconstruct Perimeter Fencing (non 49 $2,281,949 2020 $2,281,949 Bishop Intl 28,213 CFR 1542) South Design Flint 69 210878 Shift or Reconfigure Existing Taxiway $266,000 2020 $266,000 Bishop Intl 28,213 A Design Gaylord 50 121518 Construct/Exp/Imp/Rehab Building Box $562,547 2020 $23,425 2020 $23,425 2020 $609,397 Gaylord Rgnl 10,000 Hangar Construction Page 1 of 4 MICHIGAN AERONAUTICS COMMISSION July 29, 2020 REQUEST FOR APPROVAL AND TRANSFER OF APPROPRIATED FUNDS UNDER THE AIRPORT DEVELOPMENT PROGRAM Airport Based Concept # Project Description Federal Federal State State Local Local Total Aircraft/Total Fund Fund Fund Operations Year Year Year Grand Haven 33 128633 Rehab Runway 9/27 Construction $969,040 2020 $20,681 2020 $20,681 2020 $1,010,402 Grand Haven Meml 8,728 Airpark Hancock 18 122915 Construct Taxiway (capacity) Hangar $399,617 $399,617 Houghton County 16,054 Area Memorial Hancock 18 132372 Obstruction Marking/Lighting/Removal $149,182 2020 $149,182 Houghton County 16,054 (Non-Hazard) 25 End Design Memorial Hancock 18 132619 Rehabilitate Runway 13/31 Crack $133,978 $133,978 Houghton County 16,054 Sealing & Marking Memorial Hancock 18 132622 Rehabilitate Runway 7/25 Crack Sealing $62,481 2020 $62,481 Houghton County 16,054 & Marking Construction Memorial Hancock 18 210602 Rehabilitate Taxiway A, B, C Crack $68,105 2020 $68,105 Houghton County 16,054 Sealing & Marking Construction Memorial Hastings 62 204742 Acquire Snow Removal Equipment $180,873 2020 $3,077 2020 $3,077 2020 $187,027 Hastings 11,500 Carrier Vehicle w/ Displacement Plow Construction Marquette 29 121763 Seal Rwy Pavement Surface/Joints 1/19 $211,130 2020 $211,130 Sawyer Intl 15,400 Crack Sealing & Marking Marquette 29 122784 Const/Rehab/Mod/Exp Sand/Chem $186,666 2020 $186,666 Sawyer Intl 15,400 Storage Bldg Airfield Deicing Fluid Storage Tank Marquette 29 210598 Seal Taxiway Pavement Surface/Joints $76,997 2020 $76,997 Sawyer Intl 15,400 A, B, C, D, E, F, G Crack Sealing & Marking Mason 56 209594 Conduct/Update MP study ALP & $198,822 2020 $11,046 2020 $11,046 2020 $220,914 Mason Jewett Field 10,300 Narrative Report Page 2 of 4 MICHIGAN AERONAUTICS COMMISSION July 29, 2020 REQUEST FOR APPROVAL AND TRANSFER OF APPROPRIATED FUNDS UNDER THE AIRPORT DEVELOPMENT PROGRAM Airport Based Concept # Project Description Federal Federal State State Local Local Total Aircraft/Total Fund Fund Fund Operations Year Year Year Muskegon 78 121658 Acquire Misc Equipment Sweeper for $224,901 2020 $224,901 Muskegon County 25,802 FOD Muskegon 78 202792 Acquire/Install/Rehab Emergency $98,788 2020 $98,788 Muskegon County 25,802 Generator Construction Muskegon 78 202827 Acquire Misc Equipment Sweeper for $13,689 2020 $13,689 Muskegon County 25,802 FOD Design Ontonagon 5 210863 Obstruction Marking/Lighting/Removal $66,877 2020 $3,715 2020 $3,716 2020 $74,308 Ontonagon County - 1,428 (Non-Hazard) Rwy 35 LPV Approach Schuster Field Environmental Pontiac 501 122049 Rehab Runway 9R/27L Construction $6,552,285 2020 $6,552,285 Oakland County Intl 140,167 Pontiac 501 122067 Construct Taxiway (standards) J & L $3,086,999 2020 $171,500 2020 $171,500 2020 $3,429,999 Oakland County Intl 140,167 incl. Rehab H, N, U & Remove K, L, M & R Construction Pontiac 501 128575 Reconstruct Rwy Lighting 9R/27L $1,110,905 2020 $1,110,905 Oakland County Intl 140,167 Construction Saginaw 24 128857 Rehabilitate Taxiway C Pavement $297,000 2020 $297,000 MBS Intl 18,296 (75'x8002') Design Saginaw 24 132982 Reconstruct Taxiway Lighting C $34,000 2020 $34,000 MBS Intl 18,296 (75'x8002') Design Saginaw 24 210844 Reconstruct Guidance Signs Redesignate $16,000 2020 $16,000 MBS Intl 18,296 C,D,H Design Saginaw 24 210845 Install Misc NAVAIDS Rotating Beacon $19,000 2020 $19,000 MBS Intl 18,296 Design Page 3 of 4 MICHIGAN AERONAUTICS COMMISSION July 29, 2020 REQUEST FOR APPROVAL AND TRANSFER OF APPROPRIATED FUNDS UNDER THE AIRPORT DEVELOPMENT PROGRAM Airport Based Concept # Project Description Federal Federal State State Local Local Total Aircraft/Total Fund Fund Fund Operations Year Year Year Saginaw 24 210847 Security Enhancements System Upgrade $156,350 2020 $156,350 MBS Intl 18,296 Construction Sandusky 24 128928 Rehab Runway 9-27 Construction $1,325,635 2020 $1,325,635 Sandusky City 3,300 South Haven 21 208618 Acquire Land for Approaches Rwy 23 $124,798 2020 $124,798 South Haven Area Rgnl 27,016 Parcel 41 Sparta 66 208881 Conduct/Update MP study ALP $136,890 2020 $7,605 2020 $7,605 2020 $152,100 Paul C. Miller-Sparta 15,075 Sturgis 18 132221 Rehab Runway 18/36 Construction $3,774,356 2020 $3,774,356 Kirsch Muni 8,000 Traverse City 79 209663 Acquire Land for Approaches Rwy 36 $366,972 2020 $366,972 Cherry Capital 84,773 RPZ - 718 Duell Rd Land Acquisition Traverse City 79 209664 Expand Terminal Bldg (capacity) $1,741,200 2020 $1,741,200 Cherry Capital 84,773 Passenger Loading Bridge Construction Traverse City 79 210849 Acquire Misc Equipment Electric Utility $72,420 2020 $72,420 Cherry Capital 84,773 Vehicles Construction Grand Total: $61,129,369 $368,457 $368,458 $61,866,284 Page 4 of 4.