LANGEBAAN MUNICIPAL SPORT COMPLEX

Portion 12 of the Farm Olifantskop nr 191

APPLICATION FOR:

Subdivision and Rezoning

April 2019

CLIENT: APPLICANT:

Messrs African Consulting Surveyors For Municipality

33 Primula Avenue Durbanville 7550 Cel: 082 440 2103 Fax: 086 671 6091 Email: [email protected]

1 Portion 12 of the Farm Olipantskop nr 191 Langebaan (New Municipal Sports Complex)

Contents

1.0 INTRODUCTION 4

1.1 Project Summary 4 1.2 Purpose of Report 4 1.3 Location 6

2.0 APPLICATION 6

3.0 BACKGROUND INFORMATION 8 3.1 Regional Locality 8 3.2 Property Description and Ownership 9 3.3 Title Deed Restrictions 9 3.4 Local Authority 10 3.5 Existing Policy Frameworks 10 3.6 Existing Land Uses and Densities 10 3.7 Existing Zoning 11

4.0 MOTIVATION - PROPOSED DEVELOPMENT 12 4.1 Development Vision 12 4.2 Services Error! Bookmark not defined.

5.0 SUMMARY 16

2 Portion 12 of the Farm Olipantskop nr 191 Langebaan (New Municipal Sports Complex)

LIST OF ANNEXURES

A - SPECIAL POWER OF ATTORNEY B - APPLICATION FORM C - TITLE DEED D – LOCALITY PLAN AND SDF PROPOSAL E – SPECIALIST STUDIES AND ENVIRONMENTAL AUTHORISATION F - PROPOSED PLAN OF SUBDIVISION G - CONCEPT SITE DEVELOPMENT PLAN

3 Portion 12 of the Farm Olipantskop nr 191 Langebaan (New Municipal Sports Complex)

LANGEBAAN MUNICIPAL SPORT COMPLEX

Portion 12 of the Farm Olifantskop nr 191 Langebaan

1.0 INTRODUCTION

1.1 Project Summary

APPLICANT: Conradie Goodwin & Associates

OWNER: Saldanha Bay Municipality

PROPERTY: Portion 12 of the Farm Olifantskop nr

191, Langebaan

EXTENT: 290,6446 ha

ZONING: Agriculture

APPLICATION FOR: Subdivision of Approximately 33ha

and Rezoning to Authority Zone

RESTRICTIVE TITLE CONDITIONS: None

BONDHOLDER: Not Bonded

1.2 Purpose of Report

The Saldanha Bay Municipality has in the 2011 Langebaan SDF and its 2012-2017 IDP identified the need for a comprehensive Sports Complex for Langebaan.

4 Portion 12 of the Farm Olipantskop nr 191 Langebaan (New Municipal Sports Complex)

During 2016 the Messrs CES commenced with the environmental process so as to obtain an Environmental Approval (EA) for the establishment of this complex on a portion of Portion 12 of the Farm Olifantskop nr 191, Langebaan (“the subject property”). This initial environmental application involved only 10ha and was an Environmental Authorisation issued in 2017.

Since this approval the Municipality has realized that given the nature of this facility as well as the scarcity of available land, that it should pro- actively plan and reserve a larger track of land for this Sports Complex, hence the proposal for the subdivision and rezoning of approximately 33ha.

Conradie Goodwin and Associates was appointed by the Saldanha Bay Municipality (the Client) to apply for the subdivision and rezoning of this portion of Portion 12 of the Farm Olifantskop nr 191, Langebaan to allow for the establishment of this new Sports Complex.

It is therefore the purpose of this report to:

 successfully motivate the application for the Subdivision of approximately 33 ha from Portion 12 of the Farm Olifantskop nr 191, and  the Rezoning of this subdivided portion from Agriculture to Authority Zone

5 Portion 12 of the Farm Olipantskop nr 191 Langebaan (New Municipal Sports Complex)

1.3 Location

The relevant portion of Portion 12 of the Farm Oliphantskop nr 191 Langebaan is situated immediately north of the Langebaan Country Estate, south of Oostewal Road and southwest of the Oostewal Road/MR559 intersection.

Access to the subject portion is proposed off Oostewal Street, approximately 240m north east of the existing Langebaan Counrty Estate access. This is an existing road that provides access to Prinro (Building Materials), as well as other construction companies.

A second access is also proposed off Oostewal street, west of Flamingo’s and approximately 360m southwest of the Oostewal/MR 559 intersection (please refer to ANNEXURE D).

2.0 APPLICATION

We hereby apply:

1. in terms of Section 15 (2) (d) of the Saldanha Bay Municipality: By-Law on Municipal Land Use Planning, GN. 7468 of August 2015- for the Subdivision of approximately 33 ha from Portion 12 of the Farm Olifantskop nr 191, Langebaan, and

2. in terms of Section 15 (2) (a) of the Saldanha Bay Municipality: By-Law on Municipal Land Use Planning, GN. 7468 of August 2015- for the Rezoning of this approximate 33ha of portion of Portion 12 of the Farm Olifantskop nr 191, from Agriculture to

6 Portion 12 of the Farm Olipantskop nr 191 Langebaan (New Municipal Sports Complex)

Authority Zone to allow for the establishment of a comprehensive Sports Complex for Langebaan.

Attached please find the following administrative documentation in support of this application:

ANNEXURE A: Special Power of Attorney This document gives Conradie Goodwin & Associates the mandate to act on behalf of the Saldanha Bay Municipality as the registered owner of the subject property.

ANNEXURE B: Application Form This form provides all the relevant information required in terms of the Saldanha Bay Municipality: By-Law on Municipal Land Use Planning, GN. 7468 of August 2015.

ANNEXURE C: Title Summary The Title Deed from the deeds office provides: 1. Property detail, 2. Title Deed detail, 3. Owners detail, and 4. Endorsements

ANNEXURE D: Locality Plan and Planning Documentation This document reflects the regional and local position of Portion 111 of Farm 1065, Langebaan as well as the forward planning philosophy for the area.

7 Portion 12 of the Farm Olipantskop nr 191 Langebaan (New Municipal Sports Complex)

ANNEXURE E: Plan of Subdivision for Portion 12 of the Farm Olifantskop nr 191 Langebaan This plan reflects the proposed Plan of Subdivision and extent of rezoned area for Portion 12 of the Farm Olifantskop nr 191, Langebaan.

ANNEXURE G: Draft Site Development Plan Messrs Studio 4 prepared a Draft SDP as well as street level perspectives, reflecting the overall design philosophy and architectural style of the envisaged development.

3.0 BACKGROUND INFORMATION

3.1 Regional Locality

With reference to Para 1.3 above the subject property is situated in Langebaan, approximately 130km north of and immediately southwest of the Oostewal Road/MR559 intersection.

Langebaan is the southern-most town within Saldanha Bay municipal area. It is connected to the other towns within the municipal area via Oostewal Street (MR233) Main Road 559 and Trunk Road 77/1 ().

The subject property is immediately north (-east) of the Langebaan Country Club Estate, 1,5km northeast of the Sea View residential area and 2,6km from the Langebaan CBD at Breë Street (refer to ANNEXURE D).

8 Portion 12 of the Farm Olipantskop nr 191 Langebaan (New Municipal Sports Complex)

Oostewal Road provides access to Langebaan off the R27 (West Coast Road) while MR559, provides access to the Laguna residential and commercial node, Club Mykonos Resort, Saldanha and .

Langebaan is situated on the eastern shore of the Langebaan Lagoon and in close proximity to the . Both the Lagoon and the West Coast National Park are environmental resources of national and regional significance.

3.2 Property Description and Ownership

The subject property is registered as Portion 12 of the Farm Olifantskop nr 191 Langebaan, is according to the Title Deed 290,6446 ha in extent and is situated in the Saldanha Bay Municipality, District of Malmesbury, Province.

Portions 21 (Solid Waste Area), 22, 23 (Prinro), 24, 25 (Sub Station) and Erf 8585 (Flamingo’s) were historically subdivided from Portion12.

The registered owner of Portion 12 of the Farm Olifantskop nr 191 Langebaan, is the Saldanha Bay Municipality.

3.3 Title Deed Restrictions

The Title Deed T35945/2001 (see ANNEXURE C) contains no servitudes or conditions that can impact on this development proposal. The property is not bonded.

9 Portion 12 of the Farm Olipantskop nr 191 Langebaan (New Municipal Sports Complex)

3.4 Local Authority

The subject property falls within the area of jurisdiction of the Saldanha Bay Municipality. The offices of this local authority are situated in Vredenburg, with an extension office in Langebaan.

3.5 Saldanha Bay Spatial Development Framework

In terms of the Saldanha Bay SDF, area specific plans, reflecting the local spatial development, were prepared. The purpose of these area specific plans is inter alia:  to contextualise the spatial principles for the local circumstances,  provide a strategic framework to formulate a appropriate land use management system,  identify desired patterns of land use  the conservation of the natural and built environment, and  to identify areas where land use intensity should be intensified or reduced.

In terms of the Langebaan SDF, the subject property is earmarked for Sport fields and Recreation and Commercial and Mixed Use land use (please refer to ANNEXURE D).

3.6 Existing Land Uses and Densities

The existing average erf size in this area is ± 700m2 (within the Langebaan Country Estate) Property in the immediate vicinity of Portion 12 of the Farm Olifantskop nr 191 Langebaan, are zoned for either Light Industrial, Single Residential, Open Space or Agriculture uses and utilised as such.

10 Portion 12 of the Farm Olipantskop nr 191 Langebaan (New Municipal Sports Complex)

3.7 Existing Zoning

The subject property is zoned as Agriculture.

3.8 Approval from other Authorities

3.8.1 Department of Agriculture

The subject property is exempted from the provisions of Act 70 of 70 (Subdivision of Agricultural Land) and was included within the Urban Edge of Langebaan, since 2011.

3.8.2

A comprehensive Heritage Impact Assessment (HIA) of the entire area was undertaken by Messrs ACRM.

Nothing of any significance was found and no mitigation is required. However, if any unmarked human remains, or ostrich eggshell caches, or fossil shell beds are exposed or uncovered during excavations, these must immediately be reported to Heritage Western Cape and relevant specialist (please refer to ANNEXURE E).

The recommendations contained in this report compiled by Messrs ACRM were accepted by Heritage Western Cape on 20 June 2016.

11 Portion 12 of the Farm Olipantskop nr 191 Langebaan (New Municipal Sports Complex)

3.8.3 Department of Environmental Affairs and Development Planning (DEADP)

An Environmental Authorisation for the development of a sports facilities and associated infrastructure on approximately 10ha was issued on 19 April 2017 (please refer to ANNEXURE E).

Although this approval was for 10ha, the department has been notified of the Municipality’s intention to extend the sports facility over approximately 29ha, in future.

DEADP has noted that while the Municipality may continue with the construction of the sports facilities over the approved 10ha, Environmental Authorisation must be obtained should the Municipality wishes to use the remainder of the property for the Sport Field Complex.

It should be noted that this application for the subdivision and rezoning of the approximately 33ha does not exempt the Municipality from complying with the above provision.

4.0 MOTIVATION - PROPOSED DEVELOPMENT

4.1 Development Vision

Langebaan fulfils an important role as a recognized holiday and tourist destination. This role will be amplified with the increased development of the Saldanha Bay Port, industrial area and the concurrent growth of Saldanha and Vredenburg.

12 Portion 12 of the Farm Olipantskop nr 191 Langebaan (New Municipal Sports Complex)

As larger numbers of permanent residents settle in Langebaan, the need for the provision of a greater variety of economic and recreational opportunities for the local residents increases.

The Saldanha Bay Municipality in preparing the 2011 Spatial Development Framework for Langebaan, considered the need for a comprehensive sport and recreational facility for Langebaan. This facility was proposed as part of the restructuring of Langebaan, where development was proposed east of the established Langebaan Town, along Oostewal Street.

This proposed node includes the development of the Sport and Recreational facility, Mixed land use (Commercial and Residential) and Residential. The position of this node on the eastern periphery of Langebaan along Oostewal Street, allows for excellent accessibility, also off MR559 whilst negating possible congestion within Langebaan.

In terms of the 2012-2017 Integrated Development Plan, development of this facility was budgeted for in the 2013/2014 financial year.

During 2016 the Messrs CES commenced with the environmental process so as to obtain an Environmental Approval (EA) for the establishment of this complex on a portion of Portion 12 of the Farm Olifantskop nr 191, Langebaan (“the subject property”). This initial environmental application involved only 10ha and was an Environmental Authorisation issued on 19 April 2017.

Since this approval Messrs ACA architects drafted a conceptual layout for the entire envisaged Sports Complex as envisaged in the Langebaan

13 Portion 12 of the Farm Olipantskop nr 191 Langebaan (New Municipal Sports Complex)

SDF. This entire complex is situated on an area of approximately 29ha (please refer to ANNEXURES F & G).

This 29ha leaves an impractical ±4ha sliver of land between the proposed sports complex and the future LCE development phases. It was agreed with the Municipality that this approximately 4ha should be included with this application, hence the proposal for the subdivision and rezoning of approximately 33ha (as opposed to 29ha).

Extending the development footprint by the 4ha will allow the Municipality to utilise this apparent redundant area, practically and functionally within the context of the envisaged extension of the Sports Complex.

4.2 Access and Traffic

Messrs Sturgeon Engineers prepared an addendum to their original report for the Upgrading of Oostewal Road (please refer to ANNEXURE E).

This report assessed the proposed accesses off Oostewal as an Alternative 1, being further to the north and Alternative 2, adjacent to LCE.

This report investigated the expected transport related impacts of the Sports Complex development on a portion of Portion 12 of Farm 191 in Langebaan combined with the future and planned developments in the greater Langebaan area. The analysis evaluated both the current and future year 2033 design hour conditions. The key findings and recommendations of the report can be summarised as follows:

14 Portion 12 of the Farm Olipantskop nr 191 Langebaan (New Municipal Sports Complex)

All the study intersections are currently operating a acceptable levels of service during the normal weekday PM peak hour, however during the holiday seasons some of the intersections experience high levels of demand and are close to or exceeding capacity. Two alternative sites have been proposed for the location of the Sports Complex and the preferred site is Alternative 1 due to it being further away from the adjacent intersection and will have less of an impact on the adjacent residential area. Alternative 2 is less favourable, but not excluded for implementation, as this is closer to the adjacent intersection and will have a greater impact, in terms of traffic volumes, on the adjacent residential area. Access to Alternative 1 is via an existing gravel road approximately 360m west of the MR559 intersection and conforms to the minimum spacing requirements along Oostewal Road as well as having sufficient SSD in both directions. This new access will have a two‐lane cross section (one lane in, one lane out). The Oostewal Road/Sports Complex intersection is recommended to have turning lanes as well as a separate right turn lane. Overall, this intersection will operate satisfactorily. Under the 2033 total traffic conditions, all the study intersections are forecast to operate at unacceptable levels of service (LOS F) during the average weekday peak hour. The road network can accommodate the proposed development provided the recommended improvements are in place, in addition to the upgrades listed in the 2014 TIA. The proposed Sports Complex will provide 100 parking bays on-site. Stacking space for approximately 6 vehicles (±36m) is required at the entrance to the Sports Complex.

15 Portion 12 of the Farm Olipantskop nr 191 Langebaan (New Municipal Sports Complex)

A large portion of the community attracted to the Sports Complex will access the site by non‐motorised transport (NMT) modes i.e. on foot or by bicycle. Implement the accommodation of pedestrians on the sidewalks along the site frontage. Proposed public transport embayments/stops must be provided in the vicinity of the Sports Complex.

The report has shown that the proposed sports complex can be accommodated by the adjacent transport network, provided the recommendations presented in the report are implemented.

4.3 Availability of Services and Infrastructure

Services and associated infrastructure to the area will be required. The Saldanha Bay Municipality will be responsible for the budget allocation, appointment of consultants and construction of the required infrastructure.

5.0 SUMMARY

The Saldanha Bay Municipality in preparing the 2011 Spatial Development Framework for Langebaan, considered the need for a comprehensive sport and recreational facility for Langebaan. This facility was proposed as part of the restructuring of Langebaan, where development was proposed east of the established Langebaan Town, along Oostewal Street.

This proposed node includes the development of the Sport and

16 Portion 12 of the Farm Olipantskop nr 191 Langebaan (New Municipal Sports Complex)

Recreational facility, Mixed land use (Commercial and Residential) and Residential. The position of this node on the eastern periphery of Langebaan along Oostewal Street, allows for excellent accessibility, also off MR559 whilst negating possible congestion within Langebaan.

An Environmental Authorisation for the development of a sports facilities and associated infrastructure on approximately 10ha was issued on 19 April 2017.

Although this approval was for 10ha, the department has been notified of the Municipality’s intention to extend the sports facility over approximately 29ha, in future.

DEADP has noted that while the Municipality may continue with the construction of the sports facilities over the approved 10ha, Environmental Authorisation must be obtained should the Municipality wishes to use the remainder of the property for the Sport Field Complex.

It should be noted that this application for the subdivision and rezoning of the approximately 33ha does not exempt the Municipality from complying with the above provision.

Approval of this application will allow the Saldanha Bay Municipality to continue with the development of the Langebaan Sports Complex on the 10ha for which and Environmental Authorisation has been issued, whilst applying for the required environmental approvals on the remainder of the 33ha property.

17 Portion 12 of the Farm Olipantskop nr 191 Langebaan (New Municipal Sports Complex)

In view of the above we respectfully request Council’s approval for:

1. in terms of Section 15 (2) (d) of the Saldanha Bay Municipality: By-Law on Municipal Land Use Planning, GN. 7468 of August 2015- for the Subdivision of approximately 33 ha from Portion 12 of the Farm Olifantskop nr 191, Langebaan, and

2. in terms of Section 15 (2) (a) of the Saldanha Bay Municipality: By-Law on Municipal Land Use Planning, GN. 7468 of August 2015- for the Rezoning of this approximate 33 ha of portion of Portion 12 of the Farm Olifantskop nr 191, from Agriculture to Authority Zone to allow for the establishment of a comprehensive Sports Complex for Langebaan.

May 2019 CONRADIE GOODWIN & ASSOCIATES

18 Portion 12 of the Farm Olipantskop nr 191 Langebaan (New Municipal Sports Complex)

A SPECIAL POWER OF ATTORNEY

SPECIAL POWER OF ATTORNEY I, the undersigned,

______

Being the Lawful Representative of:

Portion 12 of the Farm Oliphantskop nr 191 (Langebaan)

Do hereby nominate, constitute and appoint

CONRADIE GOODWIN & ASSOCIATES (Mr B J Goodwin 6703085186081)

With the power of Substitution, to be our lawful Attorney(s) and Agent(s) in my/our name, place and stead,

To apply to the relevant authorities:

1. for the amendment, departure, consent use, rezoning, subdivision and/or consolidation in terms of the relevant section 15 of the Saldanha Bay Municipal Planning By-Law, 2015 so as to allow for a Sport and Recreational Complex on a approximate 33 ha portion of said property, and generally for effecting the purposes aforesaid, to do or cause to be done whatsoever shall be requisite, as fully and effectually, for all intents and purposes, as I might or could do if personally present and acting herein – hereby ratifying, allowing and confirming and promising and agreeing to ratify, allow and confirm all and whatsoever my said Planner and Agent shall lawfully do, or cause to be done, by virtue of these presents.

Signed at______

This ______day of ______2019

______

In the presence of the undersigned witnesses.

AS WITNESSES

1. ______2. ______

B APPLICATION FORM

T2

T: (022) 701 7000 • F: (022) 715 1518 [email protected] • www.sbm.gov.za Private Bag X12 • Vredenburg • 7380

LAND USE PLANNING APPLICATION FORM (for applications in terms of Section 15 of the Saldanha Bay Municipal Land Use Planning By-law)

KINDLY NOTE: Please complete this form using BLOCK capitals and ticking the appropriate boxes.

PART A: APPLICANT DETAILS

First name(s) Jaco

Surname Goodwin South African Council for Planners (SACPLAN) registration number (if applicable) Company name (if applicable) CONRADIE GOODWIN & ASS

Postal Address 33 Primula Ave, Postal Durbanville 7550 Code

Email [email protected] Tel 0824402103 Fax 0866716091 Cell 0824402103

PART B: REGISTERED OWNER(S) DETAILS (If different from applicant) Registered owner(s) Saldanha Bay Municipality

c/o 33 Primula Ave Physical address Postal Durbanville 7550 code E-mail [email protected] Tel 022 701 7000 Fax Cell

Page 1 of 6

T2

PART C: PROPERTY DETAILS Property description as per title deed Portion 12 of Farm Oliphantskop191, Langebaan [Erf Number(s)/ Farm portion(s) & allotment area.]

Physical Address Oostewal Road/ MR233 33°02'22.18"S GPS Coordinates Town/City Langebaan 18°02'56.88"E

Current Zoning Agriculture Extent 290ha Are there existing buildings? Y N

Applicable Vredenburg-Saldanha Zoning Scheme Current Land Use Undeveloped Title Deed number and T T35945/2001 date If Yes, list the Are there any condition(s) restrictive Y N (page and conditions of paragraph title? number) Are the restrictive conditions in If Yes, list the Y N favour of a third party(ies) party(ies)? Is the property If Yes, list encumbered by Y N bondholder(s) a bond? Are there any existing unauthorized buildings and/or If yes, is this application to legalize Y N Y N land use on the subject property(ies)? the building / land use? Are there any land claim(s) Are there any pending liquidation /court case(s) / Y N registered on the subject Y N court order(s) relating to the subject property(ies)? property(ies)?

PART D: PRE-APPLICATION CONSULTATION

Has there been any pre-application If Yes, complete the information below and attach the Y N consultation? minutes of the pre-application consultation.

Name of Date of Official April 2019 Mr Gaffley consultation consulted

Page 2 of 6

T2

PART E: TYPE OF LAND USE PLANNING APPLICATION IN TERMS OF SECTION 15 OF THE SALDANHA BAY MUNICIPAL LAND USE PLANNING BY-LAW AND APPLICATION FEES PAYABLE Tick Section Type of application Cost

X 15(2)(a) a rezoning of land; R a permanent departure from the development parameters of the zoning 15(2)(b) R scheme; a temporary departure to utilise land for a purpose not permitted in terms 15(2)(c) R of the primary rights of the zoning of the land; a subdivision of land that is not exempted in terms of section 24, including 15(2)(d) R X the registration of a servitude or lease agreement; 15(2)(e) a consolidation of land that is not exempted in terms of section 24; R a removal, suspension or amendment of restrictive conditions in respect 15(2)(f) R of a land unit; 15(2)(g) a permission required in terms of the zoning scheme; R an amendment, deletion or imposition of conditions in respect of an 15(2)(h) R existing approval; 15(2)(i) an extension of the validity period of an approval; R an approval of an overlay zone as contemplated in the zoning scheme; 15(2)(j)/(t) R or approval of architectural/development guidelines an amendment or cancellation of an approved subdivision plan or part 15(2)(k) R thereof, including a general plan or diagram; 15(2)(l) a permission required in terms of a condition of approval; R 15(2)(m) a determination of a zoning; R 15(2)(n) a closure of a public place or part thereof; R 15(2)(o) a consent use contemplated in the zoning scheme; R 15(2)(p) an occasional use of land; R 15(2)(q) to disestablish a home owner’s association; R to rectify a failure by a home owner’s association to meet its obligations 15(2)(r) R in respect of the control over or maintenance of services; a permission required for the reconstruction of an existing building that 15(2)(s) constitutes a non-conforming use that is destroyed or damaged to the R extent that it is necessary to demolish a substantial part of the building. TOTAL A: R PRESCRIBED NOTICE AND FEES** (for completion and use by official) Notification of application in Type of procedure (strike through which not Tick Cost media applicable) SERVING OF NOTICES Delivering by hand; registered post; data messages R Local Newspaper(s); Provincial Gazette; Municipality’s PUBLICATION OF NOTICES R website ADDITIONAL PUBLICATION OF Site notice, public meeting, local radio station, R NOTICES Municipality’s website, letters of consent or objection NOTICE OF DECISION Provincial Gazette R INTEGRATED PROCEDURES To be calculated separately R TOTAL B: R

TOTAL APPLICATION FEES* (A + B) R

Page 3 of 6

T2

* Application fees that are paid to the Municipality are non-refundable and proof of payment of the application fees must accompany an application. ** The applicant is liable for the cost of publishing and serving notice of an application.

BANKING DETAILS FOR PAYMENT OF FEES

Name: Saldanha Bay Municipality

Bank: Standard bank

Branch no.: 05051100

Account no.: 083290044

Payment reference: …………………………………………………………………………………… (if applicable)

PART F: DETAILS OF PROPOSAL Brief description of proposed development / intent of application:

Subdivision and Rezoning of a portion of Portion 12 of the Farm 191 Langeberg so as to establish a Sport and Recreational complex.

PART G: ATTACHMENTS AND SUPPORTING INFORMATION AND DOCUMENTATION FOR LAND USE PLANNING APPLICATION Complete the following checklist and attach all the information and documentation relevant to the proposal. Please note that failure to submit all information and documentation required will result in the application being deemed incomplete and acceptance may be refused.

Compulsory information and documentation required:

Power of attorney / Owner’s consent if Y N Y N Bondholder’s consent (if applicable) applicant is not owner Resolution or authorisation that applicant Proof of registered ownership or any Y N can act on behalf of a juristic entity (e.g. Y N other relevant right held in the land company resolution) concerned Y N Written motivation Y N S.G. diagram / General plan extract Site development plan or conceptual Y N Locality plan Y N layout plan Proof of agreement or permission for Y N Proposed subdivision plan Y N required servitude Y N Proof of payment of application fees Y N Full copy of the title deed Minutes of pre-application consultation Y N Conveyancer’s certificate Y N meeting (if applicable)

Page 4 of 6

T2

Supporting information and documentation:

Y N N/A Consolidation plan Y N N/A Land use plan / Zoning plan Y N N/A Street name and numbering plan 1 : 50 / 1:100 Flood line Y N N/A Landscaping / Tree plan Y N N/A determination (plan / report) Home Owners’ Association Y N N/A Abutting owner’s consent Y N N/A consent Copy of Environmental Impact Y N N/A Y N N/A Abutting owner’s consent Assessment (EIA) Copy of Heritage Impact Y N N/A Y N N/A Proof of lawful use right Assessment (HIA) Copy of Traffic Impact Assessment Services Report or indication of Y N N/A (TIA) / Traffic Impact Statement Y N N/A all municipal services / registered (TIS) servitudes Copy of Major Hazard Impact Proof of failure of Home owner’s Y N N/A Y N N/A Assessment (MHIA) association Any additional documents or Copy of Environmental information required as listed in Y N N/A Authorisation(EA) / Record of Y N N/A the pre-application consultation Decision (ROD) form / minutes Copy of original/previous Y N N/A approval and conditions of Y N N/A Other (specify) approval Required number of Y N N/A documentation copies

PART H: AUTHORISATION(S) IN TERMS OF OTHER LEGISLATION National Heritage Resources Act, 1999 National Water Act, 1998 (Act 36 of Y N/A Y N/A (Act 25 of 1999) 1998) National Environmental Management National Environmental Management: Y N/A Y N/A Act, 1998 (Act 107 of 1998) Waste Act, 2008 (Act 59 of 2008) National Environmental Integrated Subdivision of Agricultural Land Act, 1970 Y N/A Y N/A Coastal Management Act, 2008 (Act (Act 70 of 1970) 24 of 2008) Spatial Planning and Land Use National Environmental Management: Y N/A Management Act, 2013 (Act 16 of Y N/A Air Quality Act, 2004 (Act 39 of 2004) 2013)(SPLUMA) Occupational Health and Safety Act, Environmental Conservation Act, 1989 Y N/A 1993 (Act 85 of 1993): Major Hazard Y N/A (Act 73 of 1989) Installations Regulations Land Use Planning Act, 2014 (Act 3 of Y N/A Y N/A Other (specify) 2014) (LUPA) If required, has application for EIA / HIA / TIA / TIS / MHIA approval been made? If yes, attach Y N documents / plans / proof of submission etc. If required, do you want to follow an integrated application procedure in terms of section 44(1) of Y N the Saldanha Bay Municipal Land Use Planning By-law? If yes, please attach motivation.

Page 5 of 6

T2

SECTION I: DECLARATION

I hereby wish to confirm the following :

1. That the information contained in this application form and accompanying documentation is complete and correct.

2. I’m aware that it is an offense in terms of section 86(1)(d) of the Saldanha Bay Municipal Land Use Planning By-law to supply particulars, information or answers knowing it to be false, incorrect or misleading or not believing them to be correct, and that I can be held liable on conviction to a fine or imprisonment not exceeding 20 years or to both such fine and imprisonment.

3. I am properly authorized to make this application on behalf of the registered land owner and (where applicable) that a copy of the relevant power of attorney or consent are attached hereto.

4. Where an agent is appointed to submit this application on the land owner’s behalf, it is accepted that correspondence from and notifications by the Municipality in terms of the by-law will be sent only to the applicant as indicated on this application form.

5. That this submission includes all necessary land use planning applications required to enable the development proposed herein and that the municipality cannot be held responsible for the omission of use rights not applied for herein.

6. I confirm that the relevant title deed(s) have been investigated and that there are no restrictive title deed restrictions which impact on this application, or alternatively that an application for removal/suspension or amendment of such title deed restrictions forms part of this submission.

7. I am aware that development charges to the Municipality in respect of the provision and installation of external engineering services are payable by the land owner/developer as a result of the proposed development, as determined in terms of Council policy.

28/05/2018 Applicant’s signature: Date:

Full name: BARTHOLOMEUS JACOBUS GOODWIN

Capacity in which PLANNER application is being made:

FOR OFFICE USE ONLY

Received by:

Municipal Date Stamp

______

Name:

Page 6 of 6

C TITLE DEED

Suite G01, Waterview 2, Waterview Close, Century OLIPHANTS KOP 191, P:12 (CAPE TOWN) City Tel: +27 860 340 000 Database Property Farm Website: https://www.searchworks.co.za

SEARCH INFORMATION

Summary

Search Type DATABASE PROPERTY FARM

Search Description OLIPHANTS KOP 191, P:12 (CAPE TOWN)

Reference JANNEKE / GOODWIN

Date 29/04/2019

FARM INFORMATION

Summary

Deeds Office CAPE TOWN

Property Type FARM

Farm Name OLIPHANTS KOP

Farm Number 191

Portion Number 12

Registration Division NULL

Municipality SALDANHA BAY

Province WESTERN CAPE

Title Deed Number T35945/2001

Size (SQ) 2.91 km²

Size (HA) 290.6446 HA

Last Sale Date 01/01/1900

Last Sale Price 0

LPI Code C04600000000019100012

ENDORSEMENT(S)

Bond Number Institution Reg. Date Amount

No information available.

OWNER INFORMATION

Owner 1 of 1

Owner Name MUN SALDANHABAAI

Owner Type LOCAL AUTHORITY

ID / Reg. Number -

Title Deed T35945/2001

Share -

Page 1 of 2 REPORT INFORMATION

Date of Information 29/04/2019 10:12

Print Date 29-04-2019 10:14

Generated By CHARLENE THERON

Reference JANNEKE / GOODWIN

Report Type DATABASE PROPERTY FARM

The data displayed above is provided by our data suppliers and is not altered by SearchWorks. Terms of Use are applicable to this information and can be found on https://app.searchworks.co.za/. SearchWorks is not liable for any damages caused by this information.

Page 2 of 2

D LOCALITY PLAN AND SDF PROPOSAL

LANGEBAAN Ptn12 of Farm Oliphantskop nr 191

SPORT COMPLEX SUBDIVISION

33 Primula Ave Durbanville 7550 Cel.: 082 440 2103 Fax: 086 671 9071 email: congood @mweb.co.za

Client: Saldanha Bay Municipality

May 2019 NTS

Regional Locality

Annexure D

PROPOSED ROAD RESERVE ROAD PROPOSED 191/21

Langebaan SWS PROPOSED ROAD RESERVE ROAD PROPOSED MR 559

Langebaan WWTW RE/12/191

LANGEBAAN ACCESS 2 Ptn12 of Farm Oliphantskop nr 191 191\24 SubStation

RE/12/191 ERF 8585 191 Oostewal/MR233 FLAMINGO'S Flamingo’s SPORT COMPLEX

(20 - 40m recommended)

5m buffer zone

Spectators

Cricket pitch (22 521m²)

Phase 2 storm water retention dam

Service road

Soccer field: 12 bays

6 bays 90 X 120m P ACCESS 1 11 bays 28 bays WEST COAST CRICKET Indoor sports 65 Bays Spectators (10800m²) 8 bays

(eg. basketball) 12 bays 12 bays 33 Primula Ave H J 191\12-2 S

36 bays

122 Bays Pipeline Servitude. G 21 bays 32 bays E Retaining embankment Indoor training Signage Durbanville 102 Bays (7 433m²) Indoor pool 25 bays intact vegetation excluded Multi-purpose hall R from the development. Competition layout E 27 bays 12 bays 16 bays Indoor sports OOSTEWAL ROAD (MR 00233) (50 X 25m - olympic) (eg. hockey) Service road

Practice ProposedF Sport51 bays Complexnets 29 bays 7550 150 Bays Irrigation pump station. 38 bays Boom

Sports equipment & 25 bays maintenance crew

Future E staff room 22 bays Tennis Tel.: 021 975 9393

Rugby training field: (669m² each) Signage Gate Tractor 144 X 70m shed Sel.: 082 440 2103 P Storm water retention dam (10 080m²) Slip lane. 3 7 Busses Refuse & O Gathering space / Faks: 086 671 9071 grounds equipment. sponsors' garden O F 7 busses 7 Bays B C 191\23 G P 10 Bays taxis Bank. L Q 6 Bays 16 mini-bus email: congood @mweb.co.za 1 2 3 R 4 Sports building andV 11 Bays 5 6 gymnastics Bowls U Spectator area 23/191 15 bays Covered verandah R VIP parking

Ditch. 18 bays

10 bays 18 bays Squash 100 bays N 1 18 bays Client: 21 bays G S H J M T Slip road Boom Saldanha Bay Municipality Prinro Bicycles D Gate 5-7 Busses A 8 bays E Drop-&-go 36 bays

36 bays 21 bays 12 bays 259 Bays

32 bays 180 bays 29 bays 32 bays

31 bays

31 bays 67 Bays 17 bays 28 bays 36 bays 28 bays Future LCE Phases 192 Bays LCE 10 bays May 2019

S

BCO NTS

18 bays

34 bays D Gates 2

MARRACON CIVIL

RE/1/191191 Locality Annexure D

RE/1/191

NOTES: Erven to be surveyed by registered Land Surveyor.

! NOTE: SALDANHA BAY ASC OT CIRCL E 9 , 9!

SUMM ER VE LDT , ASC OT IR E CL C Nature orientated development SUMM ER VE LDT

N

W RKE T A EWM cP&

ADD L ER

Y

S

MME V ER UM M

E

L

TDT

STR AN D

N D STR A

ASC OTCIRCL E STR AN D

OD ARE OS

NEWM A YSS E SPATIAL A A E ADO N IS

U AR

RKE T

S EL

AST ERIA DEL PHI STR AN D

AST ERI A

OD P

AIN EE TR Y SS E c U S

AST ERIA

ZEU S

IC

LOO P

RUSAR

STR A

ORPH EUS DN PEG DEVELOPMENT

AS U

S

S

US EU R A IC EUS

ZEU S ODYSS PH

OR

OD YSS EU S

A RT EM IS NEWM A RKE T FRAMEWORK

NEWM A RKE T

ODYSS EU S

S

RA TR

D N

E

SAN TO R

NI I

MYKO NO S OS S

O TINO PAR L SA D ROS N SPATIAL PROPOSALS: N T A L OS E

KIM O L D O R NII S SER IF OS O O S OS AMORG R KE

LO O P AM OR GO S

S KEA YR OS

KYT H N OS

O NOS NAX OS

MYK

SYR OS LANGEBAAN

SPATIAL PLANNING CATEGORIES

E PS O M

LOO P CONSERVATION 1

CONSERVATION 2

CORE AGRICULTURE

BUFFER ZONE P WATERWAYS

c RESIDENTIAL & EXISTING RESIDENTIAL AREA

EXTENSIVE RESIDENTIAL

PROPOSED RESIDENTIAL

RESIDENTIAL REDEVELOPMENT

& BUSINESS AND INDUSTRIES cP BUSINESS LOCAL BUSINESS NODE

PROFESSIONAL AND TOURISM RELATED BUSINESS AREA

SERVICE INDUSTRY

PROPOSED SERVICE INDUSTRY

PROPOSED MIXED USE - BUSINESS & INDUSTRIAL S&R COMMUNITY FACILITIES GOVERNMENT USE

COMMUNITY USE

E EDUCATION

PROPOSED COMMUNITY FACILITY

S&R SPORTFIELDS AND RECREATION

c&P PROPOSED SPORTFIELDS AND RECREATION S&R ROADS S&R S&R DISTRIBUTOR H HOOF O O F

SE E ME E ARE ND U LK VA

S WAE LTJI

PAR AD IS E BO ET SUI KE LOM CO PIK EWI KE WYN E COLLECTOR KI RK AN SW

H O O VI N AE LTJI F JI E K TEA L LT WY N K AE S L W E RK AN TA TIC E E SW AA KI E W I IK ST ERT JIE M O S SUIK E T SI E PA T U RYS

VA N EE PR B RO AVO O T SPR O O IB PROPOSED ROADS E S&R V A ON U E C E AALW K K E T N S IE MAIN ROAD 1 5 Y S N F SPR EE BO G E Y A

TI N K TI SNI

N S&R PET ERS AALWY N K IE PE

ON OL

J

EN HI BI BIR S&R D SCU IE

IE S SEA F S&R LO R URBAN EDGE DE LIE D MA OOF H S&R AAN DB L

RO DG ER O M E S&R TE A PRO

VY HIGH PRIORITY EDGE G IE A

SKO O L MINE TO K

E A ROT OF P O H KELK IE LE S&R LI E VYG EI TO KA S&R S&R MI NE LOW PRIORITY EDGE TRE WWA

GO U S&R GO I KE RK AN U S US BLO S BLO M M A R C H S&R M FULMA R

BEN JAM I N L A DISA

EW AN T OTHER O N I O S I E N I NI I E EE K AN TO N I O S OOST HO LID S&R G BR AY DA

E

I

EY

S G BEN GUELK LA I PP E BEN BO SIEN I FA I R W A Y IND U S T R GU EL LA R CEMETERY FL O O R N O S B R A N GR AN D SLA M C O R D D T ANT ONIO S&R LE E N T J S&R AN AN IE S BEN GU K ER NST F AI D ME RM O C

LLAEL HOO TR O O N FA I R W RO A Y S TI C P A N J E OPEN SPACE KO M F ROO TR O A I R DI E W M E R E S T I JN A Y L LA N PEA T J IES R E O B B GU M E R E S T I J N E N N EN CE E B HOEK FUL

LE PE RT S R S&R EL

SL E I G H SL E I G H SL E I G H WANDER E SPI N WN A D FA RI W A Y PROVISION FOR ECOLOGICAL / QU PU H E F FI N AT GA RR IC K E DAS SE N RD R O N NE EC K ELF R EI WA N D E R E R S

I DDELB URG WAL M OPEN SPACE CORRIDOR BEN D

STE S SE N

A DAS SE N D OO F LO N W MA E

SU FF R E N R TT E

URG

T J IES JU

GA B

N ANC

L

E

D A E HO AGR E

LE D RESORT W SCH AA P A N E N D E R ER S

MID SL E I G H C LO E T E LI NG VONDE C US BIR LAN D D R AR Y CAN A

M C S&R E

VO N D E CONCEPT

L I N G

NE YSU CK L HO # # PROPOSED RESORT DEVELOPMENT

SUM

M ER ND MA D LA LGA LI S D BIR

N

P K &

C ZEE LAN c E

G ER R RA A N D E SA L M

TOURISM RELATED BUSINESS D WA R S DI C HO E DUIK IX AS N A SE ON IZ

D HOR CRO . BIR ST SEE DU AD RA O IK P ER

SU N

F

O ZE E L A N D

O

H

FREN WAL RA O F PAD E ^` YACHT CLUB

U

S ST

O

O

ALBA TR OS

BR E E cP PUBLIC PARKING (ACCESS TO BEACH) & P A BR E c OB E JAK & E ACCESS TO BEACH

F ER I C A HOO UN DU

AN SE LATA A H AV

R D

TM SM IT H EN EN D E

IGH

R S T E I N UNBI W

S L PEDESTRIAN LINK RO OD E V OS EN DA LGNGELEGAN S

BLO EM MA RR A

SIA

LIM O DU YNB EE EME K N NA S SA U NE UM

FELI S CI A LU INDEMNITY

G LAD IO

RO OS ENBER G RWY K AL A B A M A WY L

WEST E FELI CIA O

V OS & E URBAN DYNAMICS MAKES NO WARRANTY OF ANY KIND, EXPRESSED OR IMPLIED, WITH REGARD TO THE DATA PF

ROOD cHOO AU DA TA SPIER DI JK C FE MY DR E LI CI A AND SHALL NOT BE HELD LIABLE IN ANY EVENT FOR ANY INCIDENTAL OR CONSEQUENTIAL DAMAGES IN CONNECTION C HT O RT K

O IC

AL SM AL I NGO G N AM WITH OR ARISING OUT OF THE USE OF THIS DATA. THE DATA REMAINS THE SOLE PROPERTY OF THE CLIENT AND MAY FL D MA AG ER AA T T PO SBE RG RO OD EV O IGH S W

ONLY BE USED FOR THE PURPOSES OF A PROJECT WITH THE PRIOR WRITTEN APPROVAL OF THE CLIENT.

AM OO STE WAL TOR TI LI S

VOLEN D MA RI NA

R TI LI S O T

BA U E R M E E S T D E R

R

C Y P H IA

UNBI

S

TOR TI L U IT S I G I S DATE: CLIENT

BO S PAN OR AMA PU IS HAR #

P

P A A N N

O O R AM A R

A

M A BAB IANA FEB 2011

H A R P U I A AGOON O O G LA

B IAN SU N BA S E T ALB U U CA SALDANHA BAY MEE C S B O S H ASM AN TH E MELCK

M E L IA N S T H U S A A N VIO O D U N B I R D O U S V KAB ELJ ORAM LEM OE N KR Y LTJI E PA IEG U G ER SCALE:

NB

O

S O

K L A W E T O S US W

BA S

E G N O S SEE LINESCALE

NGEG EN I A

AL R RA R S L FE OOSTE W

S

A SC

N OL IA

R E D A R H D BIF AA I B

S P S U N B I R D NIN GBOS O PLAN NO: EU R R I E H STE EN KOTZE MUNICIPALITY P E L A

OP ER

K R

T HA E STE R E O NR PU IS BR

S O IBI S 35

EG R E T P&

c O O ST EW

PEN S DP IPER A ER DE N

GU NI SAN

L FILE NAME: A L I ` N ^ G

S BO

HAR PU IS

TO

IEB S C O O R HAR PU B IS BO S K M L H O RAN A E R UP M

IS T OB S

ARK P 9! , SEA VIEW BUILDING ¯ NO. 3 DJ WOOD WAY BELLVILLE - 7530

# PO BOX 2445 BELLVILLE 0 500 1 0001 5002 000 7535

TEL: (021) 948 1545 m FAX: (021) 948 1588 e-mail: [email protected] (Project Manager)

E SPECIALIST STUDIES AND ENVIRONMENTAL AUTHORISATION

Postal: PO Box 12606, Die Boord, , 7613

Cell: 083 243 0994

Email: [email protected] Web: www.cornerstoneenviro.co.za

MINUTES OF MEETING

CONSULTATION MEETING WITH THE DEPARTMENT OF ENVIRONMENTAL AFFAIRS AND DEVELOPMENT PLANNING (DEA&DP) LANGEBAAN SPORTS COMPLEX Date: 1 November 2018 Time: 10:00 – 11:00 Location: Utilitas Building, 7 th Floor Boardroom, 1 Dorp Street, Cape Town Meeting Facilitator: Pieter de Villiers

Attendees: Ms Melanese Schippers – DEA&DP (MS) Mr Pieter de Villiers – Cornerstone Environmental Consultants (PdV)

Absent: None

Apologies: None

Agenda: 1. Brief Project Description – Previous and newly proposed Site Development Plan 2. Environmental Process to be undertaken 3. General Discussion 4. Way Forward

Please note that minutes are not verbatim and only critical issues and items for action have been noted.

Discussion

1 PdV: Recapped the Basic Assessment (BA) process and public participation process that were undertaken for the proposed Langebaan Sports Complex in 2016/2017. Environmental authorisation was obtained on 19 April 2017 for the Preferred Alternative site, which is approximately 10 hectares in size (see the approved Site Layout Plan attached to these minutes as Appendix A). The new proposed Site Development Plan (SDP) was discussed. It was indicated that this new proposal requires approximately 29 hectares of land (Appendix B ).

2 MS stated that the Municipality will have to obtain environmental authorisation for the remainder of the property, the approximately 19 hectares west of Flamingo’s, needed for the proposed new SDP footprint. A Basic Assessment (BA) Process will be required for this, as long as the activities remain below the thresholds of the listed activities for a full Scoping and Environmental Impact Assessment (EIA) process.

Cornerstone Environmental Consultants (Pty) Ltd. | Reg. No. 2014/119899/07 Director: PJ de Villiers 1 Langebaan Sport Complex Minutes of Meeting 1 November 2018

Discussion She further stated that the area for which environmental authorisation has been obtained may be developed (this area will thus be excluded from any future impact assessments). However, she warned that development of the proposed SDP layout should not occur on this portion before authorisation has been obtained for the remainder of the property. The DEA&DP may not necessarily grant environmental authorisation for the remainder, because the impact on the intact vegetation will first need to be assessed again.

3 The indigenous vegetation area (the no-go area), containing Saldanha Flats Strandveld, was discussed. It was mentioned that Cape Nature already indicated that if the Municipality wishes to develop this portion of the site, they would have to investigate and obtain a biodiversity offset (see their comment dated 14 July 2016 attached as Appendix C). MS confirmed that they, the DEA&DP, will have to see this action implemented before agreeing to the development of this area. Therefore, if the client wishes to pursue an environmental authorisation process for the remainder of the site (that which was not authorised by the first BA process), they will have to investigate a biodiversity offset, or other alternative opportunities, where this vegetation type will be protected. PdV suggested the investigation of the natural area east of, adjacent Flamingoes, as a possible trade for the intact vegetation area that is required for the new proposed SDP footprint. This eastern area also contains similar indigenous vegetation than that found towards the west and it is closer to the area further east, which is indicated as a Critical Biodiversity Area on the Biodiversity Maps ( Appendix D). The Municipality may want to investigate the possibility of preserving and protecting the vegetation in this area, as opposed to a biodiversity offset somewhere else, if Cape Nature agrees to it.

4 Environmental authorisation should be obtained if the Municipality wishes to use the remainder of the property for the Sport Field Complex. A Basic Assessment process will be required to be undertaken. The botanical study will have to be revisited. Verify if all other specialist studies is still relevant to the proposed new project, i.e. traffic impact assessment etc. MS suggested that if the Municipality pursues an environmental authorisation process for the remainder of the property, that the Environmental Assessment Practitioner (EAP) discusses the proposed approach with Cape Nature at commencement and that a pre-application BA process be followed. She also recommended that if Cape Nature requires a biodiversity offset study to be undertaken, that this be finalized during the pre-application phase of the BA process.

Pieter de Villiers

CORNERSTONE ENVIRONMENTAL CONSULTANTS \\PIETER-DESKTOP\WORK\01-PROJECTS\0099-LANGEBAAN SPORTS COMPLEX-BA\I - MINUTES & AGENDA'S OF MEETINGS\0099-MINUTES OF MEETING-LANGEBAAN SPORTS-WITH DEA&DP-1 NOV 2018.DOCX

Cornerstone Environmental Consultants (Pty) Ltd. | Reg. No. 2014/119899/07 Director: PJ de Villiers 2 APPENDIX A: APPROVED SITE LAYOUT PLAN Waste Water Treatment Works Flamingo’s Oostewal Road

Langebaan Country Estate

Postal: PO Box 12606, Die Boord, Appendix B1: Alternatives Site Plan Stellenbosch, 7613 THE PROPOSED DEVELOPMENT OF A SPORTS FIELD Cell: 083 243 0994 COMPLEX ON PORTION 12 OF THE FARM OLIFANTS KOP Email: [email protected] NO. 191, MALMESBURY RD, LANGEBAAN, WESTERN CAPE Web: www.cornerstoneenviro.co.za PROVINCE Scale: As per Google Earth Image APPENDIX B: PROPOSED NEW SITE DEVELOPMENT PLAN

APPENDIX C: CAPE NATURE’S COMMENTS

SCIENTIFIC SERVICES

postal Private Bag X5014 Stellenbosch 7599 physical Assegaaibosch Nature Reserve Jonkershoek website www.capenature.co.za telephone +27 21 866 8000 fax +27 21 866 1523 email [email protected] reference SSD14/2/6/1/8/4/191-12_SportsComplex_Olifantskop date 14 July 2016

Pieter de Villiers Cornerstone Environmental Consultants PO Box 12606 Die Boord Stellenbosch 7613

By email : [email protected]

Dear Mr de Villiers

Re: Proposed development of a sports field complex on portion 12 of the Farm Oliphants Kop No. 191, Langebaan – Pre-application Draft Basic Assessment Report. DEA&DP Ref: 16/3/3/6/7/1/F4/7/3034/15

CapeNature would like to thank you for the opportunity to comment on this application and wish to make the following comments:

1. According to the South African Vegetation Map the vegetation on site consists of Saldanha Granite Strandveld which is considered to be an Endangered vegetation type. According to the vegetation maps compiled for the CAPE fine-scale project, the vegetation on site is more typical of Saldanha Flats Strandveld and the findings of the ecological specialist concur with this.

2. In an effort to utilize best available science and to generate figures which more accurately reflect the current degree of habitat loss in the Western Cape, CapeNature has recently produced updated provincial ecosystem status statistics in accordance with the National principles, criteria, and approach 1. The key findings relevant to this study show that d Saldanha Flats Strandveld, which only has less than 35% of its original extent remaining, meets the criteria for listing as Endangered in terms of Section 52 of the Biodiversity Act. We acknowledge that the list of threatened ecosystems published in 2011 under NEMBA still lists Saldanha Flats Strandveld as Vulnerable (although the reasons for its downgrade from the previously published list where it was listed as Endangered were never made clear and we believe this was done in error).

1 Government Gazette 34809, No. 1002. National list of ecosystems that are threatened and in need of protection. National Environmental Management: Biodiversity Act, 9 December 2011.

The Western Cape Nature Conservation Board trading as CapeNature Board Members: Prof Gavin Maneveldt (Chairperson), Mr Carl Lotter (Vice Chairperson), Mr Mervyn Burton, Prof Denver Hendricks, Dr Colin Johnson, Dr Bruce McKenzie, Ms Merle McOmbring-Hodges, Adv Mandla Mdludlu, Mr Danie Nel, Prof Aubrey Redlinghuis, Mr Paul Slack, Prof Kamilla Swart-Arries

3. Although most of the site has become degraded, there is still some intact vegetation on site (approximately 1.5ha). Ideally, all intact Endangered vegetation should be protected from being developed and where this is unavoidable, a biodiversity offset should be obtained which is in line with the requirements laid out in the Western Cape Draft Biodiversity Offset Guidelines. Although, the site has not been determined as a Critical Biodiversity Area (2010 and 2014 update), there has been considerable loss of habitat in the Saldanha area over the last 5 years and areas currently mapped as “Other Natural Area” may be required to meet conservation targets in future.

4. We do acknowledge the site is relatively small and is unlikely to contribute significantly to meeting conservation targets. However, the 2016 provincial Critical Biodiversity Area map is due to be completed in the next month and we suggest a review of the site and possibly other alternatives after consideration of the 2016 product.

5. With regards to water use on the site, it must be noted that there is already a shortage of water supply in the area and CapeNature cannot support the use of potable water for irrigation on site. Recycling of treated effluent and stormwater must be considered for irrigation.

CapeNature reserves the right to revise initial comments and request further information based on any additional information that may be received.

Yours sincerely

Alana Duffell-Canham For: Manager (Scientific Services)

The Western Cape Nature Conservation Board trading as CapeNature Board Members: Prof Gavin Maneveldt (Chairperson), Mr Carl Lotter (Vice Chairperson), Mr Mervyn Burton, Prof Denver Hendricks, Dr Colin Johnson, Dr Bruce McKenzie, Ms Merle McOmbring-Hodges, Adv Mandla Mdludlu, Mr Danie Nel, Prof Aubrey Redlinghuis, Mr Paul Slack, Prof Kamilla Swart-Arries

SCIENTIFIC SERVICES

postal Private Bag X5014 Stellenbosch 7599 physical Assegaaibosch Nature Reserve Jonkershoek website www.capenature.co.za telephone +27 21 866 8000 fax +27 21 866 1523 email [email protected] reference SSD14/2/6/1/8/4/191-12_SportsComplex_Olifantskop date 18 November 2016

Pieter de Villiers Cornerstone Environmental Consultants PO Box 12606 Die Boord Stellenbosch 7613

By email : [email protected]

Dear Mr de Villiers

Re: Proposed development of a sports field complex on portion 12 of the Farm Oliphants Kop No. 191, Langebaan – Draft Basic Assessment Report. DEA&DP Ref: 16/3/3/6/7/1/F4/7/3034/15

CapeNature would like to thank you for the opportunity to comment on the Draft Basic Assessment Report. The following comments should be read in conjunction with our previous comments on the pre-application Basic Assessment Report.

1. The report, including the conclusion refers frequently to the vegetation on site being predominantly Saldanha Granite Strandveld. As stated in our previous comments, although the South African Vegetation Map (2006 & 2009) 1 indicates the site as being covered by Saldanha Granite Strandveld, according to the vegetation maps compiled for the CAPE fine-scale project, the vegetation on site is more typical of Saldanha Flats Strandveld and the findings of the ecological specialist concur with this.

2. Nevertheless, we find the preferred development site as indicated in Appendix B1 to be acceptable. The preferred site largely avoids the intact vegetation on site as mapped by the ecological specialist. Note that the intact vegetation (also indicated in Appendix B1) must be considered as a no-go area for associated infrastructure (e.g. pipelines), future expansion or any new projects. This should be included as a condition of authorisation. Ideally this area should be managed in such a way so that no further degradation occurs.

3. Our concerns with regard to the use of potable water for irrigation remain valid and only recycled treated effluent and stormwater should be used for this purpose.

1 Note that the 2012 South African Vegetation Map (available on SANBIs BGIS website) now shows the site as being mostly Saldanha Flats Strandveld. The Western Cape Nature Conservation Board trading as CapeNature Board Members: Prof Gavin Maneveldt (Chairperson), Mr Carl Lotter (Vice Chairperson), Mr Mervyn Burton, Prof Denver Hendricks, Dr Colin Johnson, Dr Bruce McKenzie, Ms Merle McOmbring-Hodges, Adv Mandla Mdludlu, Mr Danie Nel, Prof Aubrey Redlinghuis, Mr Paul Slack, Prof Kamilla Swart-Arries

CapeNature reserves the right to revise initial comments and request further information based on any additional information that may be received.

Yours sincerely

Alana Duffell-Canham For: Manager (Scientific Services)

The Western Cape Nature Conservation Board trading as CapeNature Board Members: Prof Gavin Maneveldt (Chairperson), Mr Carl Lotter (Vice Chairperson), Mr Mervyn Burton, Prof Denver Hendricks, Dr Colin Johnson, Dr Bruce McKenzie, Ms Merle McOmbring-Hodges, Adv Mandla Mdludlu, Mr Danie Nel, Prof Aubrey Redlinghuis, Mr Paul Slack, Prof Kamilla Swart-Arries

APPENDIX D: BIODIVERSITY MAP Appendix D1: Critical Biodiversity Map of the study area, showing that the site does not fall within a Critical Biodiversity Area THE PROPOSED DEVELOPMENT OF A SPORTS FIELD COMPLEX ON PORTION 12 OF THE FARM OLIPHANTS KOP NO. 191, MALMESBURY RD, LANGEBAAN, WESTERN CAPE PROVINCE Alternative 1 Preferred Alternative Site

Appendix D2: The ecological sensitivity map of the site, showing the intact fragments of vegetation at the site which are considered to be of Moderate to High Sensitivity THE PROPOSED DEVELOPMENT OF A SPORTS FIELD COMPLEX ON PORTION 12 OF THE FARM OLIPHANTS KOP NO. 191, MALMESBURY RD, LANGEBAAN, WESTERN CAPE PROVINCE CORNERSTONE ENVIRONMENTAL CONSULTANTS

SPECIALIST ECOLOGICAL REPORT:

PROPOSED LANGEBAAN SPORTS GROUNDS.

PRODUCED BY SIMON TODD CONSULTING

[email protected]

August 2015 DECLARATION OF CONSULTANTS’ INDEPENDENCE

 I Simon Todd, as the appointed independent specialist hereby declare that I:  act/ed as the independent specialist in this application;  regard the information contained in this report as it relates to my specialist input/study to be true and correct, and  do not have and will not have any financial interest in the undertaking of the activity, other than remuneration for work performed in terms of the NEMA, the Environmental Impact Assessment Regulations, 2014 and any specific environmental management Act;  have and will not have no vested interest in the proposed activity proceeding;  have disclosed, to the applicant, EAP and competent authority, any material information that have or may have the potential to influence the decision of the competent authority or the objectivity of any report, plan or document required in terms of the NEMA, the Environmental Impact Assessment Regulations, 2010 and any specific environmental management Act;  am fully aware of and meet the responsibilities in terms of NEMA, the Environmental Impact Assessment Regulations, 2014 (specifically in terms of regulation 13 of GN No. R. 982 and Appendix 6 of GN No. R. 982) and any specific environmental management Act, and that failure to comply with these requirements may constitute and result in disqualification;  have provided the competent authority with access to all information at my disposal regarding the application, whether such information is favourable to the applicant or not; and  am aware that a false declaration is an offence in terms of regulation 48 of GN No. R. 982.

Note: The terms of reference must be attached.

Simon Todd Pr.Sci.Nat 400425/11. August 2015

2 Langebaan Sports Grounds Fauna & Flora Specialist Report

INTRODUCTION

The Saldanha Bay Municipality is proposing to develop sports grounds on Portion 12 of the Farm Olifants Kop No. 191, located outside of Langebaan on the West Coast. The development would consist of a rugby field, soccer field and various supporting buildings and irrigation infrastructure.

The site falls largely within the Saldanha Granite Strandveld vegetation type, which is listed as Endangered. Due to potential concern regarding the impact of the development on such listed vegetation types, Cornerstone Environmental Consultants has appointed Simon Todd Consulting to provide an ecological assessment of the proposed development site in order to inform the Basic Assessment process for the development.

The report provides a brief characterisation of the receiving environment and details the findings of a site visit that was conducted to assess the presence of sensitive vegetation or habitats within or near the proposed development footprint. Furthermore, mitigation and avoidance measures that should be implemented to reduce the potential impact of the development are identified and described.

RELEVANT ASPECTS OF THE DEVELOPMENT

The development would consist of a 10 000m2 rugby field, a soccer field of 5000m2 and a 3000m2 spacing between the fields. There will also be a clubhouse, spectator stands and a separate facility for the storage of equipment. Two development alternatives have been proposed, a site closer to town and the second alternative which is further away.

SITE VISIT

The site visit was conducted on the 16th of August 2015. During the site visit, the development footprint and adjacent areas were searched and a full plant species list for the affected area was developed. The presence of any plant species of conservation concern within the affected area was recorded and their locations recorded on a GPS if necessary. Areas of intact vegetation were noted in the field and marked with a GPS. In addition to flora, the presence of any faunal habitats of concern within the footprint was noted in field where present. A variety of photographs of the site were taken in order to characterise the site and illustrate any sensitive features present. It is important to note that the conditions at the time of the site visit were excellent as it was the wet season and the vegetation was growing the majority of species were in flower. There were few species present that could not be identified and the species list obtained for the site is therefore considered reliable and comprehensive. It is therefore unlikely that there are any important species present which were not visible at the time of the site visit. As a result, there are few limitations associated with the site visit and field assessment.

3 Langebaan Sports Grounds Fauna & Flora Specialist Report

DESCRIPTION OF THE AFFECTED ENVIRONMENT

According to the National Vegetation Map (Mucina & Rutherford 2006) the site falls within the Saldanha Granite Strandveld vegetation type, with a very small extent of Saldanha Flats Strandveld within the south west of the site. However, the vegetation has been mapped in more detail and more recently by Helme (2007), which is considered a more reliable representation of the vegetation of the area. According to this map, depicted below in Figure 1, the site falls almost entirely within the Saldanha Flats Strandveld with a small fragment of Saldanha Granite Strandveld in the eastern corner of the site.

Characteristic species associated with the Saldanha Flats Strandveld vegetation type, which were observed at the site include Willdenowia incurvata, which is dominant across large parts of the central part of the site, especially on areas of deeper sands; woody and succulent shrubs such as Othonna cylindrica, Salvia lanceolata, Cissampelos capensis, Nylandtia spinosa, Hermannia scordifolia, Tetragonia fruticosa, Asparagus capensis, Ruschia tumidula, Jordaaniella dubia, Clutia daphnoides, Chrysanthemoides incana, Zygophyllum morgsana, Cotyledon orbiculata, Lebeckia sericea, Eriocephalus racemosus, Aspalathus hispida, Trachyandra divaricata, T.ciliata, Ehrharta calycina, Euphorbia caput medusae, E. mauritanica, and E.burmanii. Such intact areas are relatively limited but are likely to be impacted by the development for either case. However it is likely that the more distant 2nd Alternative would impact more intact vegetation than the 1st Alternative. The intact areas are depicted below in Figure 2 and 3. The south-western part of the site which has been disturbed in the past is dominated by dense stands of Zygophyllum morgsana and Lebeckia sericea and was probably cleared in the past with these species having recolonised this area (Figure 4)

Although the majority of the western half of the site is relatively open, there are some thicket elements in the northeast, with species such as Gymnosporia buxifolia, Euclea racemosa, Putterlickia pyracantha, Diospyros austro-africana, Osyris compressa, Olea exasperata, Rhus glauca, and Rhus laevigata present either as scattered individuals or in small bush clumps.

The majority of the northern part of the site has been disturbed in the past, especially in the area around the dump site. Alien species were dominant in this area with species such as Pennisetum clandestinum, Bromus japonicus and Acacia cyclops dominant (Figure 5). Other alien species prevalent at the site include Erodium moshatum, various alien Brassicaceae such as Raphanus and Sisymbrium with occasional rows or free standing Eucalyptus trees.

4 Langebaan Sports Grounds Fauna & Flora Specialist Report

Figure 1. Vegetation map of the study area, according to Helme (2007), showing that the site falls into the Saldanha Flats Strandveld vegetation type.

Figure 2. Disturbed but apparently intact vegetation in the central part of the site, with Othonna cylindrica, Nylandtia spinosa, Chrysanthemoides incana, Zygophyllum morgsana and Lebeckia sericea especially prominent. 5 Langebaan Sports Grounds Fauna & Flora Specialist Report

Figure 3. The most intact part of the site is south of the dump area, which still has some scattered Acacia cyclops. Dominant species include Willdenowia incurvata, Eriocephalus racemosus, Aspalathus ternata, Passerina truncata and Struthiola ciliata.

Figure 4. The highly disturbed area around the dump site in the north of the site, with the levelled area of the rehabilitated dump pictured left and the adjacent area invaded by Acacia cyclops on the right.

6 Langebaan Sports Grounds Fauna & Flora Specialist Report

Figure 5. Vegetation near the western margin of the site, nearest to Langebaan. The vegetation in this area is previously disturbed and dominated by Zygophyllum and Lebeckia, with very few other species present indicating that it has probably been cleared in the past.

The Critical Biodiversity Areas map for the study area is depicted below in Figure 6. The site does not fall within a CBA, indicating that it is not considered to be a conservation priority in the area. This probably relates to the disturbed state of the vegetation across large parts of the site as well as the fact that it has probably historically been marked for development and was therefore purposefully excluded from the CBAs. However, these considerations aside, the site still contains some intact remnants of a listed vegetation type and may be of local significance. However, given the proximity of the site to the urban fringe of Langebaan and the fragmentary and disturbed nature of the intact vegetation of the site, it does not appear to be of high significance and some loss of habitat and landscape connectivity resulting from the development is not likely to generate any impacts of broader significance. The sensitivity map of the site is illustrated below in Figure 7, the intact parts of the site are considered to be of moderate to high sensitivity. Although it would be preferable not to develop the intact areas, this does not seem possible under the current development plans, but the Alternative closer to Langebaan is identified as the preferred alternative as the potential for disruption of landscape connectivity is lower and the amount of intact habitat that would be lost also appears to be lower.

7 Langebaan Sports Grounds Fauna & Flora Specialist Report

Figure 6. Critical Biodiversity Map of the study area, showing that the site does not fall within a CBA.

Figure 7. The ecological sensitivity map of the site, showing the intact fragments of vegetation at the site which are considered to be of Moderate to High Sensitivity.

8 Langebaan Sports Grounds Fauna & Flora Specialist Report

CONCLUSIONS & RECOMMENDATIONS

The development of the Langebaan Sports Grounds would require approximately 3 ha of land. In the context of the site, this would probably result in the loss of about 1ha of currently intact habitat. Although the affected area is listed as Saldanha Granite Strandveld which is Endangered, the site is close to the urban edge and is not within a CBA. The majority of the site is fairly disturbed and no listed species were observed at the site. As a result, the potential loss of some intact habitat is unlikely to result in any impacts of broader significance in terms of a direct loss of biodiversity within the footprint or an impact on broad-scale ecological processes as the site is not likely to be of high significance for faunal movement. In the absence of the development, it is likely that continued alien invasion will slowly erode the biodiversity value of the site and it is recommended that the woody alien vegetation is cleared from those parts of the site which are not going to be used for the development.

In terms of the two proposed alternatives, the alternative which is nearest to Langebaan is identified as the preferred alternative as it is likely to result in less overall habitat loss and the proximity to the urban fringe means that the potential for disruption of landscape connectivity is lower. No highly sensitive species or habitats were observed at the site and the loss of 1-2ha of habitat at the site is not likely to be of broader significance.

9 Langebaan Sports Grounds Fauna & Flora Specialist Report

LITERATURE CITED

Helme, N. A. 2007. Botanical report: Fine scale vegetation mapping in the Sandveld. Report for CapeNature, as part of the C.A.P.E. programme.

Mucina L. & Rutherford M.C. (eds) 2006. The Vegetation of , Lesotho and Swaziland. Strelitzia 19. South African National Biodiversity Institute, Pretoria.

Pence, G.Q.K. 2008. C.A.P.E. Fine-Scale Systematic Conservation Planning Assessment: Technical Report. Produced for CapeNature as part of the GEF-funded C.A.P.E. Fine- Scale Biodiversity Planning Project. Cape Town, South Africa.

Threatened Ecosystems in South Africa: Descriptions and Maps (available on BGIS website: http://bgis.sanbi.org.

10 Langebaan Sports Grounds Case No. 15110404WD1111E

HERITAGE IMPACT ASSESSMENT

PROPOSED DEVELOPMENT OF A SPORTS FIELD COMPLEX AND ASSOCIATED INFRASTRUCTURE ON PORTION 12 OF THE FARM OLIFANTS KOP NO 191 LANGEBAAN, WESTERN CAPE

Assessment conducted under Section 38 (3) of the National Heritage Resource Act (No. 25 of 1999)

Prepared for:

Cornerstone Environmental Consultants Att: Pieter de Villiers PO Box 12606, Die Boord, Stellenbosch, 7613 Email: [email protected]

Applicant:

SALDANHA BAY MUNICIPALITY

By

ACRM 5 Stuart Road, Rondebosch, 7700 P: 021 685 7589 M: 082 321 0172 Email: [email protected]

MAY 2016 Heritage Impact Assessment, proposed sports field complex and associated infrastructure, Farm 191, Langebaan

EXECUTIVE SUMMARY

Introduction

ACRM was appointed by Cornerstone Environmental Consultants, on behalf of the Saldanha Bay Municipality to conduct a Heritage Impact Assessment (HIA) for the proposed development of a sports field complex on Portion 12 of the Farm Olifants Kop 191 in Langebaan, in the Western Cape.

The Development proposal

The proposed development entails the following activities:

1. A rugby field (± 10 000m²) 2. A soccer field (± 5000m²) 3. A multi-purpose sports field (± 5000m²) 4. Spectator stands 5. Clubhouse, and 6. Equipment store rooms

A HIA, comprising an archaeological study and a palaeontological desk top study was requested by Heritage Western Cape (HWC) following the submission of a Notice of Intent to Develop.

HWC also requested that comments from registered conservation bodies and the local municipality must also be included in an integrated HIA report.

The HIA forms part of a Basic Assessment process that is being done by Cornerstone Environmental Consultants.

Studies have shown that Langebaan is a known sensitive archaeological and palaeontological landscape.

Aim of the HIA

The purpose of the HIA is to assess the sensitivity of archaeological and palaeontological resources on the proposed development site, to determine the potential impacts on such resources, and to avoid and/or minimise such impacts by means of management and/or mitigation measures.

Results of the study

Archaeology

A field assessment of the proposed activities was undertaken by ACRM in May 2016, in which the following observations were made:

 No pre-colonial archaeological resources were identified during the baseline study.

 A cluster of derelict demolished and ruined buildings and structures occur in the south western corner on the subject property.

ACRM, May 2016 1 Heritage Impact Assessment, proposed sports field complex and associated infrastructure, Farm 191, Langebaan

 Indications are that the proposed development will not impact on surface archaeological heritage, although some Early and Middle Stone Age resources may be uncovered during excavations for foundations and services.

 Unmarked (Khoisan) human remains may be uncovered during excavations for foundations and services.

Palaeontology

The study area is situated entirely on Q2 “heuweltjiesveld” soil, while only remnants of the Varswater Formation marine deposits occur over portions of the proposed development site. Shelly marine deposits of the Uyekraal Formation extend seawards beneath the Q2 cover sands, and crop out near the shoreline where they occur beneath the Langebaan Formation aeolianites.

Excavations between 1 and 2m below the Q2 cover sands are likely to expose shelly marine gravels and calcrete deposits. Similar deposits were encountered during bulk earthworks at the golf estate west of the subject property. While fossils are sparse in the cover sands and soils, fossil bones are occasionally discovered during construction activities where the finds are usually large bones such as antelopes and buffalo, rhino, hippo, bush pigs and elephants. The bones of an elephant were discovered in the Q2 sands on the Langebaan Country Estate.

Fossil shells and bones in the subsurface of the Q2 sands are often in an archaeological context. Bone and shell concentrations related to buried Middle Stone Age archaeological sites may occur in the underlying Langebaan Formation aeolianites and palaeosoils.

Marine deposits of the Uyekraal Formation have fossil shell fauna with abundant oysters and extinct species. Residual marine deposits of the older Varswater Formation that may exist are expected to contain a similar fauna, but with more extinct taxa. However, the marine shell fauna of the early Pliocene in the Saldanha region is poorly known as the formation is seldom exposed. Thus the potential exposure of shell beds in this eastern part of the study area above is of considerable scientific interest.

Conclusion

Archaeology

The impact significance of the proposed development of a sports field complex and associated infrastructure on the Farm Olifants Kop 191/12 Langebaan on archaeological resources is rated as being low.

Early and Middle Stone Age implements, unmarked Khoisan burials and ostrich eggshell caches, may be uncovered or exposed during excavations for foundations and bulk services.

ACRM, May 2016 2 Heritage Impact Assessment, proposed sports field complex and associated infrastructure, Farm 191, Langebaan

Palaeontology

General construction activities for foundations and services, and grading of the playing fields, will mainly affect the Q2 cover sands, but may intersect underlying Langebaan Formation calcreted aeolianites and Pliocene shelly beds.

Recommendations

Archaeology

1. No mitigation is required.

2. No monitoring is required, but the Environmental Control Officer (ECO) must be briefed by the archaeologist prior to construction activities commencing.

3. If any unmarked human remains, or ostrich eggshell caches, for example, are exposed or uncovered during excavations and earthworks, these must immediately be reported to Heritage Western Cape (Att: Mr Guy Thomas or Andrew September, 021 483 9543), or the archaeologist (Jonathan Kaplan 0823210172).

4. The above recommendations must be included in the Environmental Management Plan (EMP) for the proposed development

Palaeontology

1. On-site personnel must be alerted to the occurrence of fossil bones. The Environmental Control Officer (ECO) and construction supervisor must inform staff of the need to watch for potential fossil occurrences.

2. In the event of possible fossil and/or archaeological finds, the contracted archaeologist or palaeontologist must be contacted. For possible fossil finds, the palaeontologist will assess the information and liaise with the developer and the ECO and a suitable response will be established. If a significant occurrence of fossil bones is discovered a professional palaeontologist must be appointed to collect them and to record their contexts. Similarly, if fossil shell beds are uncovered a palaeontologist must be appointed to take samples and to record their contexts, the latter involving the sampling of ambient fossil content, the recording of the stratigraphy and sedimentary geometry of the exposures and the compilation of the report to Heritage Western Cape and the IZIKO S.A. Museum.

3. The above recommendation must be included in the Environmental Management Plan (EMP) for the proposed development

Comments from registered conservation bodies and the local municipal authority

The Saldanha Bay Municipality is the applicant and is therefore likely to support the proposed development. The HIA will be distributed to local conservation bodies as part of the Basic Assessment process. Comments from the Saldanha Bay Municipality and registered conservation bodies will then be included in the final Basic Assessment Report, which will be submitted to Heritage Western Cape for comment.

ACRM, May 2016 3 Heritage Impact Assessment, proposed sports field complex and associated infrastructure, Farm 191, Langebaan

Table of Contents

Page

EXECUTIVE SUMMARY 4

1. INTRODUCTION 5

2. HERITAGE LEGISLATION 7

3. TERMS OF REFERENCE 7

4. DESCRIPTION OF THE RECEIVING ENVIRONMENT 7

5. STUDY APPROACH 12 5.1 Method of survey 12 5.2 Constraints & limitations 12 5.3 Identification of potential risks 12 5.4 Heritage context 12

6. FINDINGS 13 7.1 Archaeology 14 7.2 Palaeontology 14

7. CONCLUSION 14 8.1 Archaeology 14 8.2 Palaeontology 14

8. RECOMMENDATIONS 15 8.1 Archaeology 15 8.2 Palaeontology 15

9. COMMENTS FROM LOCAL MUNICIPAL AUTHORTY & 15 REGISTERED CONSERVATION BODIES

10. REFERENCES 16

Appendix A: Palaeontological Impact Assessment: desktop study 17

ACRM, May 2016 4 Heritage Impact Assessment, proposed sports field complex and associated infrastructure, Farm 191, Langebaan

1. INTRODUCTION

ACRM was appointed by Cornerstone Environmental Consultants, on behalf of the Saldanha Bay Municipality to conduct a Heritage Impact Assessment (HIA) for the proposed development of a sports field complex on Portion 12 of the Farm Olifants Kop 191 in Langebaan, in the Western Cape (Figures 1-3).

The proposed development entails the following activities:

1. A rugby field (± 10 000m²) 2. A soccer field (± 5000m²) 3. A multi-purpose sports field (± 5000m²) 4. Spectator stands 5. Clubhouse, and 6. Equipment store rooms

A HIA comprising an archaeological and palaeontological study was requested by Heritage Western Cape (Case No. 15110404WD1111E) following the submission of a Notice of Intent to Develop.

HWC also requested that comments from registered conservation bodies (in Langebaan) and the local municipality must also be included in an integrated HIA report.

The HIA forms part of a Basic Assessment process that is being done by Cornerstone Environmental Consultants.

Study site

Figure 1. Site locality (3317 BB Saldanha Bay). Red polygon indicates the location of the proposed development site.

ACRM, May 2016 5 Heritage Impact Assessment, proposed sports field complex and associated infrastructure, Farm 191, Langebaan

N

Study site

Figure 2. Google satellite map indicating the location of the proposed development site.

Figure 3. Close up Google Satellite map illustrating the proposed and proposed alternative development sites.

ACRM, May 2016 6 Heritage Impact Assessment, proposed sports field complex and associated infrastructure, Farm 191, Langebaan

2. HERITAGE LEGISLATION

The National Heritage Resources Act (Act No. 25 of 1999) makes provision for a compulsory HIA when an area exceeding 5000m² is being developed. This is to determine if the area contains heritage sites and to take the necessary steps to ensure that they are not damaged or destroyed during development. The Act provides protection for the following categories of heritage resources:

 Landscapes, cultural or natural (Section 3 (3))  Buildings or structures older than 60 years (Section 34);  Archaeological sites, palaeontological material and meteorites (Section 35);  Burial grounds and graves (Section 36);  Public monuments and memorials (Section 37);  Living heritage (including cultural tradition, oral history, performance, ritual, popular memory, skills and techniques, indigenous knowledge systems and the holistic approach to nature, society and social relationships) (Section 2 (d) (xxi)).

3. TERMS OF REFERENCE

The terms of reference for the archaeological and palaeontological study are to:

 Determine whether there are likely to be any important heritage resources that may be impacted by the proposed development;

 Indicate any constraints that would need to be taken into account in considering the development proposal;

 Recommend any mitigation action

4. DESCRIPTION OF THE RECEIVING ENVIRONMENT Farm 191/12 is located north-east of Langebaan. alongside Oostewal Road, just a few kilometers before one enters the town from the West Coast Road/R27. The Langebaan Country Estate lies immediately to the south-west of the property. The dance hall venue known as Flamingo’s is situated in the middle of the farm with its entrance off Oostewal Road. The narrow section of the property, closest to town and south-west of Flamingo’s, is demarcated for the two alternative sites that are being assessed as part of the Basic Assessment process (Figure 4-9). There are no significant landscape features such as rocky outcrops, or deflated dunes on the subject property. The western half of the farm (i.e. the preferred alternative) is undeveloped, with extremely dense thicket elements covering most of the proposed site. A windbreak of blue gum trees cuts across the site in the northwest. The proposed development site has been disturbed in the past due to agricultural activities (pieces of old irrigation pipe are visible over the property). The site is fairly level on a substrate of thick cover sand. Dune mole rat activity and burrowing are extensive. Storm water channels have been excavated diagonally across the site, originating from a cluster of ruined, derelict and demolished farm buildings and structures in the south western corner (Figures 10-13) which constitutes a highly transformed area. The Langebaan Waste Water Treatment Works is situated north of Oostewal Road, directly alongside Flamingo’s dance hall (Alternative Site 1). The site is more elevated

ACRM, May 2016 7 Heritage Impact Assessment, proposed sports field complex and associated infrastructure, Farm 191, Langebaan

with dune hummock occurring on the higher slopes, covered in very dense vegetation, mostly Restio grasses. The soils on the upper slopes alongside the fence (refer to Figure 9) comprise mostly weathered quartzite sands. Dune mole rat activity is also extensive.

N

Figure 4. Google satellite map indicating the proposed and proposed alternative development sites

Figure 5. View of the proposed site facing north east

ACRM, May 2016 8 Heritage Impact Assessment, proposed sports field complex and associated infrastructure, Farm 191, Langebaan

Oostewal Rd

Figure 6. View of the proposed site facing north east.

Figure 7. View of the proposed road facing northwest with Langebaan in the distance

ACRM, May 2016 9 Heritage Impact Assessment, proposed sports field complex and associated infrastructure, Farm 191, Langebaan

Oostewal Rd

Figure 8. View of the site facing north east.

Figure 9. View of the site facing north east

ACRM, May 2016 10 Heritage Impact Assessment, proposed sports field complex and associated infrastructure, Farm 191, Langebaan

Figure 10. Ruined and derelict farm buildings

Figure 11. Ruined house

Figure 12. Ruined labourer’s cottage

ACRM, May 2016 11 Heritage Impact Assessment, proposed sports field complex and associated infrastructure, Farm 191, Langebaan

Figure 13. Ruined labourer’s cottages

5. STUDY APPROACH

5.1 Method

The overall purpose of the study is to assess the sensitivity of archaeological and palaeontological resources in the affected area, and to determine potential impacts on such resources.

A survey of the proposed development site was undertaken by ACRM on 6 May 2016 (Figure 14). A literature survey was also carried out to assess the archaeological context surrounding the proposed development site.

The PIA study by Pether (2016) comprises a desktop study.

5.2 Constraints and limitations

Both site alternatives are covered in dense vegetation, resulting in poor archaeological visibility. Large portions of the property are virtually impenetrable due to thick vegetation cover.

5.3 Identification of potential risks

Early and Middle Stone Age resources and unmarked human remains may be exposed or uncovered during excavations for foundations and services.

5.4 Heritage context

A large number of archaeological sites have been recorded between Lentjiesklip and Lynch Point on the eastern shore of the Langebaan Lagoon (Hart 1997, 1998, 2001; Kaplan 1993, 1999; Parkington & Poggenpoel 1987). Studies have shown that the rocky shoreline at Langebaan acted as foci that attracted Later Stone Age (LSA) people as they offered greater opportunities for the exploitation of marine foods particularly shellfish (Hart 1998, 1997, 2001; Kaplan 2000). The archaeology suggests that the

ACRM, May 2016 12 Heritage Impact Assessment, proposed sports field complex and associated infrastructure, Farm 191, Langebaan

pattern of occupation of the Langebaan area in pre-colonial times involved people locating themselves at the coast where shellfish was consumed, as well as seals, fish, bird, tortoise and small antelope. Evidence also suggests that LSA people may have been scheduling their visits to collect lower tidal zone shellfish such as limpets and perlemoen (Hart 1991). Excavations at Lentjiesklip (Hart 1997; Parkington et al 1988) show that some of the sites in the region date to between 4000 and 1800 years ago (Hart 1997, 2001; Kaplan 2000), some of which have been found buried up to three metres below the sand body. A human burial was also uncovered during excavation of a service trench at Lentjiesklip 2 (Hart 1997).

Ephemeral sites comprising a few stone flakes and fragments of shellfish have also been documented further away from the coast on the Groot Oliphantskop Farm, north east of the proposed development site (Hart and Halkett 1992; Orton 2008).

6. FINDINGS

6.1 Archaeology

No archaeological resources were identified during the baseline field study. No deflated dunes, or rock outcrops occur over the site which might indicate the presence of some archaeological heritage. No shellfish was found associated with dune mole rat dumps, which are extensive across the proposed development site.

No historical archaeological resources such as glass, ceramics, or older building foundations were located in the south western corner of the farm, which constitutes a highly transformed landscape (refer to Figures 10-13).

N

Figure 14. Survey track paths (red).

ACRM, May 2016 13 6.2 Palaeontology

According to consulting palaeontologist John Pether (2016 & Appendix A), the study area is situated entirely on Q2 “heuweltjiesveld” soil that mantles the slope of the hill known as Hartbeesrug that overlooks the proposed development site in the south east. Only patchy remnants of the Varswater Formation marine deposits occur beneath the proposed site. Shelly marine deposits of the Uyekraal Formation extend seawards beneath the Q2 cover sands and crop out near the shoreline where they occur beneath the Langebaan Formation aeolianites.

Excavations for foundations and services between 1 and 2m below the covers sands, and grading of the surface in the western part of the proposed site are likely to expose shelly marine gravels and calcretes. Similar deposits were encountered during bulk earthworks at the golf estate west of the proposed site. While fossils are sparse in the cover sands and soils, fossil bones, such as antelopes and buffalo, rhino, hippo, bush pigs and elephants, are occasionally discovered during construction activities. The bones of an elephant were discovered in the Q2 sands on the Langebaan Country Estate.

Fossil shells and bones in the subsurface of the Q2 sands are often in an archaeological context. Bone and shell concentrations related to buried Middle Stone Age archaeological sites may occur in the underlying Langebaan Formation aeolianites and palaeosoils (Pether 2016).

Marine deposits of the Uyekraal Formation have fossil shell fauna with abundant oysters and extinct species typical of the Pliocene marine deposits of Namaqualand. Residual marine deposits of the older Varswater Formation that may exist are expected to contain a similar fauna, but with more extinct taxa. However, the marine shell fauna of the early Pliocene in the Saldanha region is poorly known as the formation is seldom exposed. Thus the potential exposure of shell beds in this eastern part of the study area above is of considerable scientific interest.

7. CONCLUSION

7.1 Archaeology

Indications are that the proposed development of a sports field complex on Farm 191/12 will not impact on any important archaeological heritage.

Early and Middle Stone Age implements and unmarked Khoisan burials may be uncovered or exposed during bulk earthworks and excavations for services.

The impact significance of the proposed development on archaeological resources is assessed as LOW and therefore, there are no objections to the authorization of the proposed development.

7.2 Palaeontology

General construction activities for foundations and services, and grading of the playing fields, will mainly affect the Q2 cover sands, but may intersect underlying Langebaan Formation calcreted aeolianites and Pliocene shelly beds. Heritage Impact Assessment, proposed sports field complex and associated infrastructure, Farm 191, Langebaan

8. RECOMMENDATIONS

With regard to the proposed development of a sports field complete on the Farm Groot Olifants Kop 191/12 in Langebaan, the following recommendations are made.

8.1 Archaeology

1. No mitigation is required.

2. No monitoring is required, but the Environmental Control Officer (ECO) must be briefed by the archaeologist prior to construction activities commencing.

3. If any unmarked human remains, or ostrich eggshell caches, for example, are exposed or uncovered during excavations, these must immediately be reported to Heritage Western Cape (Att: Mr Guy Thomas or Andrew September, 021 483 9543), or the archaeologist (Jonathan Kaplan 0823210172).

4. The above recommendations must be included in the Environmental Management Plan (EMP) for the proposed development

8.2 Palaeontology

1. On-site personnel must be alerted to the occurrence of fossil bones. The Environmental Control Officer (ECO) and construction supervisor must inform staff of the need to watch for potential fossil occurrences. Appendices 2 and 3 outline monitoring by construction personnel and general Fossil Find Procedures

2. In the event of possible fossil and/or archaeological finds, the contracted archaeologist or palaeontologist must be contacted. For possible fossil finds, the palaeontologist will assess the information and liaise with the developer and the ECO and a suitable response will be established. If a significant occurrence of fossil bones is discovered a professional palaeontologist must be appointed to collect them and to record their contexts. Similarly, if fossil shell beds are uncovered a palaeontologist must be appointed to take samples and to record their contexts, the latter involving the sampling of ambient fossil content, the recording of the stratigraphy and sedimentary geometry of the exposures and the compilation of the report to Heritage Western Cape and the IZIKO S.A. Museum.

3. The above recommendation must be included in the Environmental Management Plan (EMP) for the proposed development

9. COMMENTS FROM THE LOCAL AUTHORITY AND REGISTERED CONSERVATION BODIES

The Saldanha Bay Municipality is the applicant and is therefore likely to support the proposed development. The HIA will be distributed to local conservation bodies as part of the Basic Assessment process. Comments from the Saldanha Bay Municipality and registered conservation bodies will then be included in the final Basic Assessment Report, which will be submitted to Heritage Western Cape for comment.

ACRM, May 2016 15 Heritage Impact Assessment, proposed sports field complex and associated infrastructure, Farm 191, Langebaan

10. REFERENCES

Hart, T. 1997. Phase 2 archaeological excavations at Lentjiesklip 2, Langebaan. Report prepared for Langebaan Waterfront (Pty) Ltd. Archaeology Contracts Office, University of Cape Town.

Hart, T. 1998. Phase 2 sampling of archaeological sites at Paradise Beach, Lynch Point, Langebaan. Report prepared for CML Developers (Pty) Ltd. Archaeology Contracts Office, University of Cape Town.

Hart, T. 2001. Phase 2 archaeological excavations at Lentjiesklip 3, Club Mykonos, Langebaan. Report prepared for CML Developers (Pty) Ltd. Archaeology Contracts Office University of Cape Town.

Hart, T. and Halkett, D. 1992. A first phase survey of a Portion of 1065 (Oliphantskop) near Langebaan. Report prepared for Brand Crous Steyn and Berger Town and Regional Planners. Archaeology Contracts Office University of Cape Town

Heritage Western Cape. 2012. A short guide to and policy statement on grading. Version 6, 30th May 2012.

Kaplan, 2000. Archaeological test excavations, Erf 2078, Langebaan. Report prepared for Langebaan Cove (Pty) Ltd. Agency for Cultural Resource Management.

Kaplan, J. 1999. Archaeological assessment, Erf 2078, Langebaan. Report prepared for Crowther Campbell & Associates. Agency for Cultural Resource Management.

Kaplan, J. 1993. The state of archaeological information in the coastal zone from the Orange River to Ponta do Ouro. Report prepared for the Department of Environmental Affairs and Tourism. Agency for Cultural Resource Management.

Orton, J. 2008. Heritage statement for a proposed pipeline on Remainder of Oliphantskop 191/12 Langebaan Hopefield Magisterial District. Report prepared for Guillaume Nel Environmental Consultants. Archaeology Contracts Office, University of Cape Town

Parkington, J. & Poggenpoel, C. 1997. An archaeological survey of the Lynch Point Lentjiesklip area. Department of archaeology, University of Cape Town.

Parkington, J., Poggenpoel, C. & Hart, T. 1988. Report on the first phase of excavations at Lynch Point, Langebaan. Report prepared for Club Mykonos, Langebaan. Archaeology Contracts Office, University of Cape Town.

Pether, J. 2016. Basic Palaeontological Assessment (desktop study). Proposed development of a sports field complex on Portion 12 of the Farm Olifants Kop No. 191, Saldanha Bay Municipality, Western Cape. Report prepared for Cornerstone Environmental Consultants,

ACRM, May 2016 16 Heritage Impact Assessment, proposed sports field complex and associated infrastructure, Farm 191, Langebaan

Appendix I

Palaeontological Impact Assessment, desk top study

ACRM, May 2016 17

Addendum to Transport Impact Assessment Oostewal Road Upgrade: Sports Complex, Langebaan, Western Cape

Final June 2016

Oostewal Road Upgrade: Langebaan Sports Complex

Transport Impact Assessment Addendum

Addendum Report June 2016

PREPARED BY: PREPARED FOR: STURGEON CONSULTING SALDANHA BAY MUNICIPALITY

CONTACT PERSON: CONTACT PERSON: Sarah Larratt Mr Jeremy Jarvis/ Mr Waldo Julius Tel no: 083 418 4241 Tel no: 022 701 7000

DOCUMENT CONTROL SHEET

DATE REPORT AUTHORED BY: APPROVED BY: STATUS

NAME NAME Sarah Larratt, Pr Tech Eng Barend du Preez, Pr Eng

SIGNATURE SIGNATURE Draft for 20 May 2016 Comment

NAME NAME Sarah Larratt, Pr Tech Eng Barend du Preez, Pr Eng

SIGNATURE SIGNATURE 7 June 2016 Final

TITLE: OOSTEWAL ROAD UPGRADE: LANGEBAAN SPORTS COMPLEX DEVELOPMENT – ADDENDUM TO TRANSPORT IMPACT ASSESSMENT

CARRIED OUT BY: COMMISSIONED BY: Sturgeon Consulting Nadeson Consutling Services Postnet Suite #347 P.O. Box 51121 Private Bag x1 Victoria & Alfred Waterfront 7437 8002

Tel: +27 21 553 4167 Email: [email protected] Fax: +27 86 559 5327 Email: [email protected] SYNOPSIS: This report assesses the key transportation issues for Oostewal Road pertaining to the proposed future developments in Langebaan including the proposed Langebaan Sports Complex.

SUMMARY SHEET

Report Type Addendum Traffic Study Title Oostewal Road Upgrade: Langebaan Sports Complex Development Location Langebaan, Western Cape Client Reference Number STUR0081 Project Team Sarah Larratt Barend du Preez Contact Details 083 418 4241 or [email protected] Date June 2016 Report Status Final

This report has been prepared by a suitable qualified and registered professional traffic engineer. Details of any of the calculations on which the results of this report are based will be made available on request.

TABLE OF CONTENTS

Report – Summary Table

1. Background 2. Scope of Work 3. Proposed Development 4. Existing Access 5. Existing Road Network 6. Future Road Planning 7. Scenarios Analysed 8. Study Intersection 9. Existing Traffic Operations 10. Trip Generation 11. Development Trips 12. Trip Distribution 13. Site Access 14. Future Traffic Impact 15. Queue Analysis 16. Parking Requirements 17. Non‐Motorised Transport (NMT) 18. Public Transport 19. Conclusions & Recommendations References Appendices Appendix A : Figures Appendix B : Tables List of Figures Figure 1 : Locality Map Figure 2 : Proposed Development Figure 3 : Present Traffic Demand (2013) Figure 4 : Development Traffic: Sports Complex Figure 5 : Future Average Daily Peak Hour Traffic Demand (2033) Figure 6 : Shoulder Sight Distance (SSD) – Alternative 1 Figure 7 : Shoulder Sight Distance) (SSD – Alternative 2 Figure 8 : Site Access Alternative 1

Figure 9 : Site Access Alternative 2 List of Tables Table 1: Existing PM Peak Hour Traffic Conditions at Key Intersections along Oostewal Road Table 2: Proposed Trip Generation Rates Table 3: Estimated Trip Generation Table 4: Capacity Analysis for 2033 PM Peak Hour Traffic Conditions at Key Intersections along Oostewal Road Table 5: Expected Queuing and Required Stacking at Entrance Acronyms AM – Morning d – Average delay in seconds LCE – Langebaan Country Estate LOS – Level of Service MBT – Minibus Taxi PHF – Peak Hour Factor PM – Afternoon SBM – Saldanha Bay Municipality SDP – Site Development Plan TIA – Traffic Impact Assessment v/c – Volume/capacity ratio vph – vehicles per hour Sturgeon Consulting Oostewal Road Upgrade Transport Impact Study

Traffic Study Oostewal Road Upgrade: Langebaan Sports Complex – Addendum to Transport Impact Assessment

1. Background In 2013 Nadeson Consulting was appointed by Saldanha Bay Municipality (SBM) to do the detail design for the upgrade of Oostewal Road in Langebaan, and Sturgeon Consulting was appointed as a sub‐consultant to prepare a Transport Impact Assessment (TIA). The TIA was undertaken to assess the impact the existing, planned and future development in the greater Langebaan area for the next 20 years (2033) would have on the surrounding road network in terms of capacity, access and operation. Since 2014, the SBM proposes to develop a Sports Complex on Portion 12 of the Farm Olifants Kop No. 191, Langebaan. It has therefore been necessary to update the TIA to reflect the changes. It is therefore recommended that this report be read as an addendum to the TIA for Oostewal Road; “Transport Impact Assessment for Oostewal Road Upgrade Langebaan, Western Cape, March 2014”. Sturgeon Consulting, acting as transport consultants, prepared the original TIA and has been retained as transport consultants to revisit the traffic and transportation concerns for both the existing and future intersection operations surrounding the proposed site. This addendum report covers the traffic analysis of the sports complex with the development of the greater Langebaan area.

2. Scope of Work This report examines the traffic implications of the sports complex development, taking into account the planned and future Reference: Figure 1 developments of the greater Langebaan area and their impact on the surrounding road network. The focus area of this study is a portion of Portion 12 of Farm Olifants Kop No. 191 to the southwest of the Oostewal Road/MR559 intersection. The Scope of Works is to amend the TIA that was undertaken for Oostewal Road to incorporate the proposed sports complex and to take both alternatives into consideration and make recommendations of which of the two sites are best suited in terms of accessibility. Traffic data for the existing traffic situation on the road network has been obtained by means of peak hour intersection counts along Oostewal Road between the MR559 and Bree Street, during the Friday PM and Saturday Midday peak hours. The data has been consolidated into a future scenario i.e. long term (2033) which take into account all the planned and future developments in the Langebaan area. The impact of the additional traffic generated by all the developments on the intersections along Oostewal Road has been

STUR0081 OOSTEWAL ROAD TIA | FINAL | JUNE 2016 Sports Complex ‐ TIA Addendum_Final_June_2016 Page 1

Sturgeon Consulting Oostewal Road Upgrade Transport Impact Study

assessed using computerised traffic analysis techniques and improvements to critical intersections have been suggested where necessary.

3. Proposed Development The Sports Complex will consist of: Reference: Figure 2  A rugby field of ±10 000m2;  A soccer field of ±7 000m2;  Multi‐purpose sports field of ±5 000m2;  Spectator stands next to each sports field (for a total of ±3 000 spectators);  A clubhouse; and  Equipment store rooms. Two location alternatives on Portion 12 of Farm 191 have been proposed for the Sports Complex. These two areas are situated next to each other, between Flamingo’s and the Langebaan Country Estate. Refer to Figure 2 for the Alternative Site Plans for the proposed development.

4. Existing Access Access to both alternatives are via two existing gravel roads off Oostewal Road. The new site access point for each alternative will be discussed later in Section 13.

5. Existing Road Network Oostewal Road (MR233): Class 3 secondary arterial in an intermediate development environment and is a proclaimed Main Road (MR233) up to KM12.84. It is a two‐lane undivided road, which extends from the R27 (TR77/1) in the northeast to Sunbird Avenue in the south. Posted speed limit in the vicinity of the proposed site is 80km/h.

6. Future Road Planning A future extension of Bree Street linking to Meeuwklip and Myburgh Park neighbourhoods is proposed to join up with Sunbird Avenue. For the purposes of this report, it has been assumed that this link will be constructed by 2033. Langebaan is slowly becoming more than just a holiday town as

STUR0081 OOSTEWAL ROAD TIA | FINAL | JUNE 2016 Sports Complex ‐ TIA Addendum_Final_June_2016 Page 2

Sturgeon Consulting Oostewal Road Upgrade Transport Impact Study

more and more people are starting to make it their permanent home. Local business and industry are slowly growing and developing permanent employment opportunities in the area. This trend will result in a greater demand for movement not only during the holiday periods, but throughout the year. The existing road based problems in Langebaan are caused by amongst others the following:

 High seasonal demand flows (Easter and Christmas holidays).

 Growth in population and the associated residential developments.

 Limited alternative routes for the major routes in the town. Trips are mainly confined to Oostewal Road, Jon Olafsson Road (road to Mykonos) and the Proclaimed Main Road 559.

 Limited parking and the ability of the network to absorb vehicles at the trip destinations.

 Insufficient network and facilities for pedestrians and cyclists. To address these issues the following should be considered:

 There will always be seasonal demand, but as Langebaan grows the relative difference between the seasonal peaks and the average daily peaks will reduce.

 The growth of Langebaan must be planned and managed appropriately.

 A pedestrian and bicycle plan for the town must be developed with a realistic implementation schedule. Adequate parking facilities must be developed near major traffic generators such as the main beach and the shopping centres along Oostewal Road.

7. Scenarios Analysed 2013 Existing Traffic Conditions 2033 Total Traffic Conditions plus all Development Intersection analyses were done using SIDRA 7 Intersection software which is for use as an aid for design and evaluation of individual intersections and networks of intersections.

8. Study Intersections Based on our experience with similar traffic studies, the anticipated traffic impact on the surrounding road network and its location within the wider road network, the following intersections were included in the scope of the study: 1. Oostewal Road/MR559 2. Oostewal Road/Goedehoop Street/Spilbergen Street 3. Oostewal Road/Jan Olofsson Road

STUR0081 OOSTEWAL ROAD TIA | FINAL | JUNE 2016 Sports Complex ‐ TIA Addendum_Final_June_2016 Page 3

Sturgeon Consulting Oostewal Road Upgrade Transport Impact Study

4. Oostewal Road/Antonion Sieni Street 5. Oostewal Road/Sleigh Street 6. Oostewal Road/Padrao Street 7. Oostewal Road/Bree Street The following future intersection was also analysed: 8. Oostewal Road/New Sports Complex Access

9. Existing Traffic Peak period traffic counts were conducted as part of the original TIA Operations during the Friday PM and Saturday morning peak periods for All Vehicles in August 2013. As in the 2014 TIA, the weekday PM peak References: Figure 3, has been used to test the capacity constraints in this report. Figure Table 1 3 depicts the existing 2013 PM peak hour traffic conditions. This figure shows the full extent of the surrounding road network. Analysis of the existing intersections was carried out using SIDRA 6 Intersection software programme to determine the levels of service at the key intersections. Details of the intersection PM peak hour analysis are shown in Table 1. From the analysis it is obvious that during the average daily peak hour, all study intersections operate at acceptable levels of service.

10. Trip Generation The assumption has been made that the urban development areas Reference: Table 2 will be fully developed by 2033. Therefore, the traffic flow conditions will be considered for the year 2033 for the average weekday peak hour. The trip generation rates as stated in the 2014 TIA Report are still relevant. The trip generation rate for a Sports Stadium has been obtained from the South African Trip Data Manual, September 2013 published by the Committee of Transport Officials (COTO) and has been used to estimate the traffic that will be generated by the proposed Sports Complex development. As in the 2014 TIA Report, the total trips generated have been reduced by 10% to account for internal trips and by 15% to account for possible public transport trips. The recommended peak hour trip generation rate for a Sports Stadium is:

 150 trips/1000 seats (PM 90:10)

11. Development Trips The total peak hour trips likely to be generated by the sports Reference: Figure 4 and complex development in the PM peak hour is: Table 3  338 total PM trips (304 inbound 34 outbound) The above trip rates together with the associated land use and the number of peak hour trips that would be generated by the future development for the Langebaan area are summarised in Table 3. The total peak hour trips for the greater Langebaan development area is:

STUR0081 OOSTEWAL ROAD TIA | FINAL | JUNE 2016 Sports Complex ‐ TIA Addendum_Final_June_2016 Page 4

Sturgeon Consulting Oostewal Road Upgrade Transport Impact Study

 5 316 Total PM Trips (3 023 inbound 2 293 outbound)

12. Trip Distribution The development traffic for the proposed sports complex development has been distributed on the surrounding road network Reference: Figure 5 taking the following into account:  Present traffic conditions  The nature of the development being a sports complex The distribution for the PM peak hour used is as follows:  30% to/from the north along MR559  10% to/from the east via R27  50% to/from the south along Oostewal Road  10% to/from the north along Jan Olofsson Road The resultant development trips were assigned to the analysed intersections as shown in Figure 5 and added to the future (2033) traffic scenario.

13. Site Access Alternative 1: Access to the proposed development will be off Oostewal Road via the existing gravel access to Flamingo’s, References: Figures 6 – 9 approximately 360m west of MR559. The recommended access spacing according to the Western Cape Government’s Road Access Guidelines (RAG) along Class 3 roads in an intermediate environment for an equivalent side road/median opening is 120m and for a signalised intersection is 375m. Should in the future the MR559 intersection becomes signalised, the access spacing will be acceptable. The available shoulder sight distance (SSD) at this access to the east is approximately 370m and to the west approximately 300m, which is sufficient to ensure the access operates safely. The recommended SSD along a two‐lane road with a posted speed of 80km/h is at least 155m for passenger cars and 240m for single unit (SU) trucks as recommended in the Urban Transport Guidelines (UTG1, Figure 10.2). Alternative 2: Access to Alternative 2 will be off Oostewal Road via an existing gravel access to the Langebaan Country Estate Contractors Entrance and other buildings, approximately 245m east of the main entrance to the Langebaan Country Estate (Goedehoop St/Spilbergen St). This access satisfies the minimum intersection spacing for an equivalent side road/median opening. The available SSD at this access to the east is at least 400m and to the west it is in excess of 500m. Figure 6 and Figure 7 show the available SSD from each of the access locations for Alternative 1 and Alternative 2, respectively. Figure 8 and Figure 9 shows the proposed site access for both alternatives. Both access locations are favourable from a traffic safety

STUR0081 OOSTEWAL ROAD TIA | FINAL | JUNE 2016 Sports Complex ‐ TIA Addendum_Final_June_2016 Page 5

Sturgeon Consulting Oostewal Road Upgrade Transport Impact Study

perspective, however we would recommend that Alternative 1 is the preferred location as it is further away from the adjacent intersection and will not impact on the adjacent residential area as Alternative 2 might. Access Control: The SBM have indicated that the Sports Complex entrance will have a gate/boom access control with a two‐lane cross section (one lane in, one lane out). The required stacking space is commented on in Section 15. The capacity of the proposed access onto Oostewal Road was tested using SIDRA. The analysis is discussed in Section 14.

14. Future Traffic Impact The upgrades listed in the 2014 TIA Report are still relevant and the upgrades required to accommodate the growth in the development References: Figure 5, traffic from 2013 to 2033 have been applied in this analysis. Table 4 The MR559/Oostewal Road intersection should only be upgraded and signalised once the mixed use business and industrial development in the vicinity of the intersection proceeds and the extension of MR559 is required for access as well as the warrants for signalisation have been met. The analysis of this intersection for the 2033 scenario has not been undertaken as it falls outside the study area of the 2014 TIA. The development trips were added to the year 2033 future traffic volumes to determine the year 2033 total traffic conditions at the study intersections for the PM peak hour. Intersections with capacity constraints:  Jon Olofsson/Oostewal Road intersection o Issue: Oostewal SWB approach is expected to exceed capacity (v/c>1) and operates at LOS F. o Mitigation: Widen SWB approach to provide a left turn lane. o Operations with mitigation: Overall and SWB approach level of service (LOS) C.  Antonio Sieni Street/Oostewal Road o Issue: Oostewal NB and Antonio Sieni EB approaches are expected to exceed capacity (v/c>1) and operate at LOS F. o Mitigation: Widen NB and EB approach to provide left turn lanes. o Operations with mitigation: LOS C for both approaches.  Bree Street/Oostewal Road o Issue: Bree EB approach is expected to exceed capacity (v/c>1) and operate at LOS F. o Mitigation: Widen EB approach to provide a left turn lane. o Operations with mitigation: LOS C for the EB approach. Oostewal Road/Sports Complex This intersection is expected to operate overall at acceptable levels

STUR0081 OOSTEWAL ROAD TIA | FINAL | JUNE 2016 Sports Complex ‐ TIA Addendum_Final_June_2016 Page 6

Sturgeon Consulting Oostewal Road Upgrade Transport Impact Study

of service. However, the Sports Complex NB right turn is expected to operate at unacceptable levels of service (LOS F), which is partly due to the high through volumes expected along Oostewal Road. In reality, the right turn movement should be able to take acceptable gaps in the traffic. It is suggested that turning lanes be implemented on Oostewal Road at this intersection from a safety perspective. The results of the 2033 intersection analysis are summarised in Table 4. The detailed analyses are available on request.

15. Queue Analysis A queue analysis was conducted for the access on Oostewal Road using the highest expected inbound traffic flow to determine the Reference: Table 5 maximum theoretical delay at the access. It is proposed that a manned boom access will be in operation during sports events. An average service rate of 200 vehicles per hour has been used for analysis to allow for this type of access control. The peak inbound volume is 182 vph for the proposed development during the PM peak hour. It is recommended that a 95th percentile queue length be used as applicable to access on Class 1 to 4 roads to determine the theoretical required stacking at the access. The 95th percentile queue length is the vehicle queue length that will only be exceeded 5 times out of a 100. Based on the analysis results shown in Table 5, the 95th percentile queue requires a minimum of 36m (6m per vehicle) to be provided between the gate/boom and the edge of Oostewal Road. The entry lane width must also allow for unimpeded access for emergency and service vehicles. The exit lane should also be available for emergencies depending on the peak direction of flow at the time of the incident. A minimum height clearance of 4.2m should also be provided to allow for emergency and service vehicles.

16. Parking Requirements The parking provision for the proposed development should satisfy the requirements according to the NDoT Parking Standards PG 3/85, November 1985 published by the Department of Transport. The standard parking ratio for a sports complex/stadium is 0.25 spaces/seat, which means for a stadium that can cater for a maximum of 3000 spectators/seats, parking must be provided for a minimum of 750 cars. However, the municipality have indicated that a large portion of the community will walk or take public transport to the sports complex and a provision of 100 parking bays will be provided on‐site, which the SBM is satisfied will be sufficient. The standard width of a parking bay is 2.5m with a 7.0m aisle width (two‐way).

17. Non‐Motorised NMT integration is providing infrastructure that supports walking Transport (NMT) and cycling and provides individuals with an alternative and sustainable choice of travel. Cycle facilities can be classified as illustrated below:

STUR0081 OOSTEWAL ROAD TIA | FINAL | JUNE 2016 Sports Complex ‐ TIA Addendum_Final_June_2016 Page 7

Sturgeon Consulting Oostewal Road Upgrade Transport Impact Study

The proposed NMT facilities listed in the 2014 TIA Report as part of the Oostewal Road upgrade, which is currently underway are being implemented. A summary of the NMT improvements along Oostewal Road are listed below:  Class 2 facility on north‐western side between Main Road 559 & LCE.  3m shared path on north‐western side between LCE & Jon Olofsson  Widen existing sidewalk to 3m shared path on western side and 2m sidewalk on eastern side between Jon Olofsson & Antonio Sieni.  3m shared path on western side and 2m sidewalk on eastern side between Antonio Sieni & Sleigh.  3m shared path on western side and 1.8‐2m sidewalk on eastern side between Sleigh & Padrao.  3m shared path on western side and 2m sidewalk on eastern side between Padrao & Bree.  1.5m Class 3 facility and 1.8m sidewalk on both sides between Bree & Sunbird.  Introduction of dropped kerbs and bubble paving at all crossing points to provide for universal access.  Introduction of pedestrian crossings at all crossing points. The sidewalk along the southern edge of Oostewal Road must extend the length of the frontage of the site. No further improvements are suggested at such time, as the proposed sidewalk will be sufficient for the purpose of pedestrians walking to and from the sports complex.

STUR0081 OOSTEWAL ROAD TIA | FINAL | JUNE 2016 Sports Complex ‐ TIA Addendum_Final_June_2016 Page 8

Sturgeon Consulting Oostewal Road Upgrade Transport Impact Study

18. Public Transport There appear to be no formal public transport facilities operating along Oostewal Road although some minibus taxis were observed travelling along this route, which stopped to pick up and drop off passengers in the gravel areas. As mentioned in the previous 2014 TIA Report, it is recommended that the Municipality start concentrating seriously on the provision of scheduled public transport services and facilities to avoid any future widening of Oostewal Road. As part of the Oostewal Road Upgrade project currently underway, public transport embayments/stops will be implemented along Oostewal Road approximately 500m apart and located downstream of an intersection. It will be necessary to implement a public transport stop/embayment in the vicinity of the Sports Complex for Alternative 1.

19. Conclusions & This report investigates the expected transport related impacts of Recommendations the Sports Complex development on a portion of Portion 12 of Farm 191 in Langebaan combined with the future and planned developments in the greater Langebaan area. The analysis evaluates bot the existing year 2013 and the future year 2033 design hour conditions. The findings and recommendations of this report can be summarised as follows:  All the study intersections are currently operating at acceptable levels of service during the normal weekday PM peak hour, however during the holiday seasons some of the intersections experience high levels of demand and are close to or exceeding capacity.  The weekday PM peak hour has been used in the analysis as the typical average weekday peak hour.  The proposed Sports Complex is estimated to generate approximately 338 new trips during the weekday PM peak hour.  Two alternative sites have been proposed for the location of the Sports Complex and the preferred site is Alternative 1 due to it being further away from the adjacent intersection and will have less of an impact on the adjacent residential area.  Alternative 2 is less favourable, but not excluded for implementation, as this is closer to the adjacent intersection and will have a greater impact, in terms of traffic volumes, on the adjacent residential area.  Access to Alternative 1 is via an existing gravel road approximately 360m west of the MR559 intersection and conforms to the minimum spacing requirements along Oostewal Road as well as having sufficient SSD in both directions. This new access will have a two‐lane cross section (one lane in, one lane out).  The Oostewal Road/Sports Complex intersection is recommended to have turning lanes as well as a separate

STUR0081 OOSTEWAL ROAD TIA | FINAL | JUNE 2016 Sports Complex ‐ TIA Addendum_Final_June_2016 Page 9

Sturgeon Consulting Oostewal Road Upgrade Transport Impact Study

NB right turn lane. Overall, this intersection will operate satisfactorily.  The future developments proposed for the Langebaan area are estimated to generate approximately 5 316 new trips during the average weekday peak hour. This scenario reflects if all the spatial proposals materialise as detailed in the Saldanha Bay Municipality Spatial Development Framework (Feb 2011) by the year 2033.  Under the 2033 total traffic conditions, all the study intersections are forecast to operate at unacceptable levels of service (LOS F) during the average weekday peak hour.  The road network can accommodate the proposed development provided the following improvements are in place, in addition to the upgrades listed in the 2014 TIA Report:  Jon Olofsson/Oostewal Road o Add separate SWB left turn lane  Antonio Sieni Street/Oostewal Road o Add separate NB and EB left turn lanes  Bree Street/Oostewal Road o Add separate EB left turn lane  The proposed Sports Complex will provide 100 parking bays on‐site.  Stacking space for approximately 6 vehicles (±36m) is required at the entrance to the Sports Complex.  A large portion of the community attracted to the Sports Complex will access the site by non‐motorised transport (NMT) modes i.e. on foot or by bicycle.  Implement the accommodation of pedestrians on the sidewalks along the site frontage.  Proposed public transport embayments/stops must be provided in the vicinity of the Sports Complex. This report has shown that the proposed sports complex can be accommodated by the adjacent transport network, provided the recommendations presented in the report are implemented. From a traffic engineering perspective, the application for this development is supported.

STUR0081 OOSTEWAL ROAD TIA | FINAL | JUNE 2016 Sports Complex ‐ TIA Addendum_Final_June_2016 Page 10

Sturgeon Consulting Oostewal Road Upgrade Transport Impact Study

1. Sidra Solutions, Akcelik and Associates Pty Ltd, SIDRA Intersection 7, 2016. 2. Sturgeon Consulting, Oostewal Road Upgrade: Transport Impact Assessment, Final, March 2014. 3. Provincial Administration: Western Cape, Department of Economic Affairs, Agriculture and Tourism: Transport Branch, Road Access Guidelines and Policies, Sept 2002. 4. Department of Transport, South African Trip Generation Rates, Report No. RR92/228, Pretoria, 1995. 5. Committee of Transport Officials (COTO), South African Trip Data Manual, Volume 1 TMH 17, September 2012. 6. Department of Transport, Pedestrian and Bicycle Facility Guidelines: Engineering manual to plan and design safe pedestrian and bicycle facilities, Draft 1.0, Pretoria, 2003. 7. Department of Transport, Parking Standards, PG 3/85, November 1985.

STUR0081 OOSTEWAL ROAD TIA | FINAL | JUNE 2016 Sports Complex ‐ TIA Addendum_Final_June_2016 Page 11

Sturgeon Consulting Oostewal Road Upgrade Transport Impact Study

STUR0081 OOSTEWAL ROAD TIA | FINAL | JUNE 2016 Sports Complex ‐ TIA Addendum_Final_June_2016 Page 12

Sports Complex Alternative 1

Sports Complex Alternative 2

Job No: OOSTEWAL ROAD UPGRADE TRANSPORT STUDY STUR0081

Fig: Transport Planning & Traffic LOCALITY MAP 1 Engineering Sports Complex Development: ‐ Rugby field ±10 000m2 ‐ Soccer field ±7 000m 2 ‐ Multi‐purpose sports field ±5 000m2 ‐ Spectator stands ±3 000 seats ‐ Clubhouse ‐ Equipment store rooms

Job No: OOSTEWAL ROAD UPGRADE TRANSPORT STUDY STUR0081

Fig: Transport Planning & Traffic PROPOSED DEVELOPMENT 2 Engineering 559 St

Road

Olafsson

Spilbergen Jon Main

230 42 273

255 30 237

180 L 24 L 399 214 T 214 12 29 291 244 T 13512 254 143 L 187 50 161 Oostewal St 5RRT L23RRT L 111 T R L L T RR47 LT RR14 R 130 543 635T 312 375 30411T 327 374 T 194 324 L16 L33

14 45 86 L 202 15 T 81 388 74 130 33 61 Antonio Sieni St 101 R R T L L T RR27 220 118 294 41 T 21 86 L38

453 St

514

26 L

58 13 T 33 354 127 214 Goedehoop 19 R R T L Sleigh St L T RR87 80 29 329 74 T 18 160 L55

432

407

82 L 162 13 T 94 292 21 47 67 R R T L Padrao St L T RR21 174 66 282 13 T 14 49 L14

361

366

148 L 178 8 T 98 231 37 48 22 R R T L Bree St L T RR19 117 16 195 3 T 3 22 L0

214 FRIDAY PM PEAK HOUR (16:15 ‐ 17:15) 253

Job No: OOSTEWAL STREET UPGRADE TRANSPORT STUDY STUR0081

Fig: PRESENT TRAFFIC DEMAND (2013) 3 Transport Planning & Traffic Engineering Jan Olofsson Spilbergen MR559  3   30 10   91     10    152 152 30 182 182 182 182 182  14 13 3 91 3              182              3     17  17 20 20 20 20 20 20 14 122 121 30 30     122

34   304 152   17

MR559 Extension 17 Goedehoop Sport  Complex 1 Antonio Sieni  152

152   17 151   15

15 

15  12 3 5     Sleigh    30

106 2 30 

108   12 106   12

10 22

  Padrao    15 91   8

91 15

15  

15  5 35  91   10    Bree    30

46 2  30 

48   5

WEEKDAY PM PEAK HOUR Schematic

Job Ref No: OOSTEWAL ROAD UPGRADE TRANSPORT STUDY STUR0081 Fig: DEVELOPMENT TRAFFIC: SPORTS COMPLEX 4 559 St

Road

Olafsson

Jon Main Spilbergen

332 397 906

489 204 1283

252 L 169 L 170 L 1167 884 T 383 9 97 1014 619T924073 612 106 T 698 535 50 237 T 264 Oostewal St 31 R R T L 225 R R T L 336 R RTL 456 R L T R R 76 L T R R 196 LTR R 348 LR T 142 1241 36 5 26 T 756 864 76 31 11 T 670 1079 120 388 226 T 262 246 27 L 52 194 L 32 L 180 L 76

66.7 118 89 L 735 947 261 23 T 89 1056 97 231 72 445 Antonio Sieni St 149 R R T L LTR R40 290 173 1022 111 T 28 165 L97

1306 St

1358

259 L

411 71 T 199 751 408 814 Goedehoop 521 T 81RRTL Sleigh St 182 R Oostewal L T R R 194 L R T 958 318 77 1001 335 T 42 391 20 14 L 122 L 155

1413

991.2

86 L 169 13 T 142 817 33 75.7 70RRTL Padrao St LTR R53 Access to Sports Complex Alt 1 / Alt 2 226 70 1063 30 T 14 96.3 L29

1163

916.6

434 L 541 70 T 233 393 291 414 38RRTL Bree St L T R R 324 327 27 603 53 T 67 441 L50

683.4 PROPOSED ROUNDABOUT 480 AVERAGE DAILY PEAK HOUR

Job: No OOSTEWAL STREET UPGRADE TRANSPORT STUDY STUR0081

Fig: FUTURE AVERAGE DAILY PEAK HOUR TRAFFIC DEMAND (2033) 5 Transport Planning & Traffic Engineering OOSTEWAL ROAD / SPORTS COMPLEX ALTERNATIVE 1 SPEED LIMIT: 80KM/H REQUIRED SSD: 240m SSD TO WEST: 370m SSD TO EAST: 300m

VIEW TO WEST VIEW TO EAST

Project: Job No: OOSTEWAL ROAD UPGRADE TRANSPORT STUDY STUR0081

Figure: Transport Planning & Traffic Engineering SHOULDER SITE DISTANCE (SSD) ‐ ALTERNATIVE 16 021 553 4167 / 083 701 2299 OOSTEWAL ROAD / SPORTS COMPLEX ALTERNATIVE 2 SPEED LIMIT: 80KM/H REQUIRED SSD: 240m SSD TO WEST: +500m SSD TO EAST: +400m

VIEW TO WEST VIEW TO EAST

Project: Job No: OOSTEWAL ROAD UPGRADE TRANSPORT STUDY STUR0081

Figure: Transport Planning & Traffic Engineering SHOULDER SITE DISTANCE (SSD) ‐ ALTERNATIVE 27 021 553 4167 / 083 701 2299 Flamingo's Night Club

Access into Sports Complex

Sports Field Alternative 1

Job No: OOSTEWAL ROAD UPGRADE TRANSPORT STUDY STUR0081

Fig: Transport Planning & Traffic SITE ACCESS ALTERNATIVE 18 Engineering Sports Field Alternative 2

Access into Sports Complex

LCE Property

Job No: OOSTEWAL ROAD UPGRADE TRANSPORT STUDY STUR0081

Fig: Transport Planning & Traffic SITE ACCESS ALTERNATIVE 29 Engineering Sturgeon Consulting Oostewal Road Upgrade Transport Impact Study

STUR0081 OOSTEWAL ROAD TIA | FINAL | JUNE 2016 Sports Complex ‐ TIA Addendum_Final_June_2016 Page 13

Sturgeon Consulting Oostewal Road Upgrade Transport Impact Study

Table 1: Existing PM Peak Hour Traffic Conditions at Key Intersections along Oostewal Road

Peak Hour 2013 Existing PM Peak Hour

LOS Delay V/C

Oostewal/MR559 A 6.6 0.341

Oostewal/Goedehoop/Spilbergen A 3.7 0.195

Oostewal/Jan Olofsson A 6.7 0.506

Oostewal/Antonio Sieni C 20.0 0.766

Oostewal/Sleigh C 19.8 0.787

Oostewal/Padrao C 19.9 0.798

Oostewal/Bree D 28.3 1.058

LOS – Level of Service, Delay in seconds per vehicle, V/C – Volume to Capacity Ratio Table 2: Proposed Trip Generation Rates

LAND USE UNITS TRIP RATE DESIGN HOUR

IN OUT

Low Income Residential Du 0.50 35% 65%

Medium Income Residential Du 0.44 25% 75%

High Income Residential Du 0.60 25% 75%

Speciality Retail 100m2 2.71 44% 56%

Office 100m2 2.3 15% 85%

Shopping Centre 100m2 7.5 50% 50%

Medium Industrial 100m2 0.60 25% 75%

Sports Stadium2 1000 150 90% 10% seat

Guest Unit 0.3552 50% 50% Housing/Holiday/Retirement

Note: 1. ITE 9th Edition (LUC 826) 2. COTO TMH17 South African Trip Data Manual

STUR0081 OOSTEWAL ROAD TIA | FINAL | JUNE 2016 Sports Complex ‐ TIA Addendum_Final_June_2016 Page 14

Sturgeon Consulting Oostewal Road Upgrade Transport Impact Study

Table 3: Trip Generation Estimates

LAND USE UNITS EXTENT PM PEAK HOUR

IN OUT TOTAL

Low Income Residential Du 1 950 634 341 975

Medium Income Residential Du 3 300 1089 363 1452

High Income Residential Du 77 35 12 46

Retail (Shopping Centre) 100m2 22 152 332 332 665

Speciality Retail 100m2 46 210 149 189 338

Office 100m2 9 200 24 135 159

Medium Industrial 100m2 359 550 216 647 863

Sports Stadium 1000 3000 304 34 338 seat

Guest Du 1352 240 240 480 Housing/Holiday/Retirement

Total Future Development Trips 3023 2293 5316

STUR0081 OOSTEWAL ROAD TIA | FINAL | JUNE 2016 Sports Complex ‐ TIA Addendum_Final_June_2016 Page 15

Sturgeon Consulting Oostewal Road Upgrade Transport Impact Study Table 4: Capacity Analysis for 2033 PM Peak Hour Traffic Conditions at Key Intersections along Oostewal Road (with improvements)

Peak Hour 2033 Proposed PM Peak Hour

LOS Delay V/C

Oostewal/Sports Complex Alt 1 A 1.9 0.590

Oostewal/Goedehoop/Spilbergen B 12.8 0.784

Oostewal/Jan Olofsson C 29.8 0.939

Oostewal/Antonio Sieni C 31.8 1.016

Oostewal/Sleigh D 40.6 1.078

Oostewal/Padrao C 32.7 1.017

Oostewal/Bree C 28.5 0.985

LOS – Level of Service, Delay in seconds per vehicle, V/C – Volume to Capacity Ratio

Table 5: Expected Queuing and Required Stacking at Entrance

DESCRIPTION ANLYSES RESULTS

Average arrival rate inbound (vph) 182

Average service rate (sec/veh) 18

Average services rate (services/hr) 200

Traffic Intensity 0.91

Number of Channels (gates) 1

95th Percentile queue length (< n vehicles) 6

Average number of vehicles in the system 10.1

Average Delay (sec) 200

STUR0081 OOSTEWAL ROAD TIA | FINAL | JUNE 2016 Sports Complex ‐ TIA Addendum_Final_June_2016 Page 16

F PROPOSED PLAN OF SUBDIVISION

PROPOSED ROAD RESERVE ROAD PROPOSED

191/21 PROPOSED ROAD RESERVE ROAD PROPOSED

Remainder Portion 12 ofRE/12/191 Farm 191 LANGEBAAN Ptn12 of Farm Oliphantskop nr 191

RE/12/191

191 SPORT COMPLEX FLAMINGO'S

33 Primula Ave Durbanville Portion “A” 7550 Tel.: 021 975 9393 Sel.: 082 440 2103 Faks: 086 671 9071 email: congood @mweb.co.za

23/191 Client: Saldanha Bay Municipality

May 2019 NTS

RE/1/191191 Plan of Subdivision Proposed Subdivision of Portion 12 of Farm 191 Annex F

RE/1/191 Portion 12/191 290,6446 ha NOTES: Erven to be surveyed by registered Land Surveyor. Subdivided Portion “A” 33,0000 ha Remiander Portion 12/191 257.6446 ha

G

CONCEPT SITE DEVELOPMENT PLAN