09112016Kiduja4gbinder1.Pdf
Total Page:16
File Type:pdf, Size:1020Kb
Expansion of Residential, Retail, IT &Commercial Form 1 M/s. Larsen & Toubro Realty Ltd. FORM 1 1 Expansion of Residential, Retail, IT &Commercial Form 1 M/s. Larsen & Toubro Realty Ltd. FORM 1 (I) Basic Information Sr. Item Details No. 1. Name of the project/s Expansion of Residential, Retail, IT & Commercial project on plot bearing CTS. Nos. 117A, 117A/1,117B & 117C Village Tungwa, Saki Vihar Road, Powai, Mumbai – 400 072. 2. S. No. in the Schedule 8 (b) B1 3. Proposed capacity/ area/ length/ tonnage Total Plot area 1,46,679.50 Sq.M. to be handled/ command area/ lease area/ number of wells to be drilled FSI Area 2,91,090.21 Sq.M. Total Construction area 5,85,921.16 Sq.M. 4. New/ Expansion/ Modernization Expansion 5. Existing Capacity/ Area etc. Particulars Earlier EC (m2) Plot area 1,44,403.1Sq.M. FSI Area 1,62,402.51 Sq.M. Total Construction area 3,52,747.77 Sq.M. 6. Category of Project i.e. ‘A’ or ‘B’ ‘B’ 7. Does it attract the general conditions? If No. yes, please specify. 8. Does it attract the specific condition? If No. yes, please specify. 9. Location Plot/ Survey / Khasra No. At Plot bearing C.T.S. Nos. 117A, 117A/1, 117B & 117 C. Village Tungwa Tehsil Kurla District Mumbai 2 Expansion of Residential, Retail, IT &Commercial Form 1 M/s. Larsen & Toubro Realty Ltd. State Maharashtra 10. Nearest Railway Station/ Airport along Central Railway Station (Kanjurmarg)4.8 Km with distance in kms. (Towards East-North Aerial Distance) Metro railway station (Saki Naka) 0.5 km Chatrapati Shivaji International Airport 6.0 km (Aerial Distance) 11. Nearest Town, City, District Headquarters Mumbai District Headquarters. along with distance in kms. 12. Village Panchayats, Zila Parishad, Municipal Corporation of Greater Mumbai, Municipal Corporation, Local body (complete postal addresses with telephone Mahapalika Marg, Fort. Mumbai-400 001. nos. to be given) Tel No. 022 22620251 13. Name of the applicant LARSEN & TOUBRO LTD 14. Registered Address Ground Floor, Tower -A, TC-II, Saki Vihar Road, Gate No. 5, Powai East, Mumbai – 400 072. 15. Address for correspondence: Ground Floor, Tower -A, TC-II, Saki Vihar Road, Gate No. 5, Powai East, Mumbai – 400 072. Name Mr. Anand Rane Designation (Owner/ Partner/ CEO) DGM – Business Development Address (same as above) Pin Code 400072. E-mail [email protected] Telephone No. 022-67059038 Fax No. 022-67059038 16. Details of Alternative Sites examined, if No. any. Location of these sites should be shown on a toposheet. 17. Interlinked Projects No 3 Expansion of Residential, Retail, IT &Commercial Form 1 M/s. Larsen & Toubro Realty Ltd. 18. Whether separate application of Not Applicable interlinked project has been submitted? 19. If yes, Date of submission Not Applicable 20. If No, reason Not Applicable 21. Whether the proposal involves approval / No clearance under: If yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The CRZ Notification, 1991? 22. Whether there is any Government Order/ NA Policy relevant/ relating to the site? 23. Forest Land involved (hectares) Nil 24. Whether there is any litigation pending No against the project and/ or land in which the project is propose to be set up? (a) Name of the Court (b) (b) Case No. (c) Orders/ directions of the Court, if any and its relevance with the proposed project. • Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for 23 mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,) (II) Activity 1. Construction, operation or decommissioning of the project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies etc.) SR. Information/ Checklist Yes/ No Details thereof (with approximate NO. confirmation quantities/ rates, wherever possible) with source of information data 1.1 Permanent or temporary change in No Proponent proposed Expansion of land use, land cover or topography Residential, IT & Commercial buildings. including increase in intensity of 4 Expansion of Residential, Retail, IT &Commercial Form 1 M/s. Larsen & Toubro Realty Ltd. land use (with respect to local land use plan) 1.2 Clearance of existing land, Yes There are some trees present which vegetation and buildings? proposed to be transplanted / cut & Retained on Plot. 1.3 Creation of new land uses? Yes I TO R received dated 19-05-2016.Land use remains same as previous, i.e. - Residential cum Commercial. 1.4 Pre-construction investigations Yes Besides the regular pre construction e.g. bore houses, soil testing? investigations, the project proposes to carry out slope stability studies to ensure geo stability. 1.5 Construction works? No The proposed construction comprises; Residential Tower no.1- OC received 2 podiums/ part basement + Stilt + 18Upper Floors + Part 19th Floor Residential Tower no.2 –OC received 3 podiums/ part basement + Stilt + 23Upper Floors Residential Tower no.3 - OC received 3 podiums/ part basement + Stilt + 23Upper Floors Residential Tower No.4 – 3 podiums/ part basement + Stilt + 24 Upper Floors Residential Tower no.5- 3 podiums/ part basement + Stilt + 24 Upper Floors Residential Tower no.6 3 podiums/ part basement + Stilt + 24 Upper Floors Residential Tower no.7 3 podiums/ part basement + Stilt + 25 Upper Floors Residential Tower no.8 – 3 podiums/ part basement + Stilt + 25 Upper Floors Residential Tower no.9,10,15,16 Gr+3 podiums/ part basement + Stilt + 5 Expansion of Residential, Retail, IT &Commercial Form 1 M/s. Larsen & Toubro Realty Ltd. 27 Upper Floors- Residential Tower no. 12 ,13 Gr+ 3 podiums/ part basement + Stilt + 1 Upper Floors Residential Tower no. 11- Gr+ 3 podiums/ part basement + Stilt + 18 Upper Floors Residential Tower no. 14- Gr+ 3 podiums/ part basement + Stilt + 20 Upper Floors IT building no 9(TC-III)- OC received 2B +Ground + 7 upper Floors IT building no 10(TC-IV)- 2B +Ground + 11 upper Floors Health and Welfare Center- Ground + 6 upper floors 1.6 Demolition works No Not Applicable 1.7 Temporary sites used for Yes No labor camps proposed on site. A small construction works or housing of area has been reserved for construction construction workers? material storage. 1.8 Above ground buildings, Yes The above ground structures comprises of structures or earthworks including residential and commercial tower with linear structures, cut and fill or addition of Health and Welfare Center. excavations Excavation quantities will be used in backfilling and rest disposed of to landfill sites. 1.9 Underground works including No Lay down of underground pipes, cables mining or tunnelling? and excavation for basement has been done. 1.10 Reclamation works? No Not Applicable 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and manufacturing No Not Applicable Processes? 6 Expansion of Residential, Retail, IT &Commercial Form 1 M/s. Larsen & Toubro Realty Ltd. 1.14 Facilities for storage of goods or Yes Temporary sheds have been constructed materials? for the storage of construction materials during construction phase as per the material requirement. 1.15 Facilities for treatment or disposal Yes SOLID WASTE: of solid waste or liquid effluents? Total 4847 kg /day solid wastes will be generated in the project. Bio-degradable solid 2743 kg/day waste Non-Biodegradable 2105 kg/day solid waste Total Solid waste 4847 kg/day Bio – degradable waste will be treated by appropriate waste management technology on site. Non – Biodegradable waste is generated which will be handed over to recyclers. SEWAGE: 1330 KLD wastewater generated from domestic and flushing uses will be treated in STP of 1392 KLD capacity. The treated water have been utilized for flushing, landscaping and other washing purposes then excess water will be used for HVAC,Chiller plants,road medians and traffic islands. As it’s an IT park so E waste generated shall be managed as per E waste Management & Handling Rules, 2016. It will be handed over to authorized vendor. 1.16 Facilities for long term housing of No No long-term housing facilities proposed operational workers? as most of the skilled/unskilled manpower required for the construction /operation activities have been hired from the nearby areas. 7 Expansion of Residential, Retail, IT &Commercial Form 1 M/s. Larsen & Toubro Realty Ltd. 1.17 New road, rail or sea traffic during No JVLR & Saki Vihar Road are sufficient to construction or operation? cater the site transportation during construction and operation phase. 1.18 New road, rail, air waterborne or No No new Rail/road is required. The entire other transport infrastructure essential infrastructure is already including new or Altered routes available. and stations, ports, airports etc? 1.19 Closure or diversion of existing No No diversion or closure of the existing transport routes or infrastructure transport routes and infrastructure. leading to changes in traffic movements? 1.20 New or diverted transmission lines No Not Envisaged or pipelines? 1.21 Impoundment, damming, No Not Envisaged. realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No There is no natural stream passing through the site. 1.23 Abstraction or transfers of water No Project will receive water from MCGM from ground or surface waters? and Recycled water from STP. 1.24 Changes in water bodies or the May be These points have studied elaborately land surface affecting drainage or during the EIA. run-off? 1.25 Transport of personnel or Yes 27.0 m wide Saki Vihar Road & 45.75 m materials for construction, wide JVLR road have been utilizing for operation or decommissioning? the transportation of construction material.