155 Appendix-1.1.1

Total Page:16

File Type:pdf, Size:1020Kb

155 Appendix-1.1.1 Appendices Appendix-1.1.1 (Referred to paragraph 1.1.7; page 4) Statement showing the position of Outstanding Inspection Reports, Paragraphs and Amount involved (` in crore) Social Sectors Economic & General Sectors Year Section Section Amount Section Section Amount IRs IRs A B involved A B involved 2003-04 46 80 313 77.32 0 0 0 0.00 2004-05 126 312 844 194.96 73 52 166 225.78 2005-06 214 338 1243 607.54 108 94 490 694.58 2006-07 226 432 843 749.73 126 143 540 361.71 2007-08 192 381 761 346.77 110 119 452 452.77 2008-09 208 175 974 486.52 109 169 410 633.86 2009-10 221 157 1185 373.51 92 64 293 957.88 2010-11 227 239 1161 1257.03 95 104 407 1132.56 2011-12 229 141 1260 2353.91 34 37 260 264.35 2012-13 201 71 1349 1884.42 83 127 614 777.92 2013-14 142 117 999 2003.62 55 59 302 5680.08 Total 2032 2443 10932 10335.33 885 968 3934 11181.50 155 Audit Report on General, Social and Economic (Non-PSUs) Sectors for the year ended 31 March 2014 Appendix-1.1.2 (Referred to paragraph 1.1.7; page 4) Statement showing types of irregularities in outstanding paragraphs Social Sector-I -fructuous and Year No. of IRs Defalcation / Misappropriation/ Loss/Theft Excess payment/ Recoverable /Non- Deduction of Tax Undue aid to the contractor Excess payment In Wasteful expenditure Diversion of funds Retention of fund Non-fulfillment of objectives Delay in execution of schemes Miscellaneous Total 2003-04 44 30 23 27 50 38 61 34 21 20 82 386 2004-05 29 20 18 20 30 20 24 16 8 8 39 203 2005-06 96 58 46 30 79 76 75 49 42 38 91 584 2006-07 96 43 35 28 58 53 48 49 46 43 98 501 2007-08 87 34 30 20 46 44 45 48 47 32 52 398 2008-09 100 33 28 18 37 44 46 28 27 26 71 358 2009-10 136 56 52 29 89 81 68 62 61 57 128 683 2010-11 158 58 52 44 83 71 74 72 88 79 125 746 2011-12 151 61 55 35 98 80 79 71 86 58 133 756 2012-13 106 37 35 41 64 62 74 47 63 35 140 598 2013-14 70 12 15 22 32 37 27 34 47 33 152 411 (9/13) Total 1073 442 389 314 666 606 621 510 536 429 1111 5624 Social Sector-II / Year No. of IRs Misappropriation/ loss/defalcation Recoverable/excess payment Undue aid to contractor Excess expenditure/ avoidable expenditure Unfruitful expenditure Non adherence to rules/ irregular expenditure non- deduction of VAT/ Non adjustment of advances Blockage of andfund unutilised fund Non achievement of target/payment without work standardSub plan and delayed execution of schemes Miscellaneous Total 2003-04 2 0 7 7 2004-05 97 0 110 197 17 55 167 21 150 209 27 953 2005-06 118 0 170 160 24 23 183 20 181 205 31 997 2006-07 130 0 102 149 14 39 158 27 153 109 23 774 2007-08 105 0 98 51 8 18 150 20 173 190 34 742 2008-09 108 0 142 152 19 25 166 18 105 135 29 791 2009-10 85 0 116 118 15 15 110 17 124 120 20 655 2010-11 69 0 113 91 15 17 119 15 141 136 7 654 2011-12 78 0 130 110 5 11 134 30 110 95 21 646 2012-13 95 0 151 135 19 31 162 22 161 126 15 822 2013-14 72 0 105 109 28 49 126 39 113 105 36 710 Total 959 0 1237 1272 164 283 1482 229 1411 1430 243 7751 156 Appendices Economic & General Sector realization – Year No. of IRs Unfruitful Expenditure Infructuous Expenditure Creation of Liability Doubtful execution of work/purchase Irregular Expenditure/Purchase Non-adjustment of advances/Outstanding temporary advance Illegal mining/felling encroachment/grazing etc. Non-Completion/show progress of work Non-raising of demand/short raising of demand /non of demand for compensatory afforestation and net present value 1 2 3 4 5 6 7 8 9 10 11 2003-04 2004-05 73 13 5 3 2 10 4 12 4 8 2005-06 108 33 9 12 14 27 12 29 11 24 2006-07 126 32 16 14 14 33 14 31 14 26 2007-08 110 35 9 14 16 29 12 28 12 23 2008-09 109 35 14 9 12 27 12 28 12 23 2009-10 92 22 6 9 7 18 7 17 7 14 2010-11 95 30 12 11 9 25 10 24 11 19 2011-12 34 18 8 12 6 14 3 14 6 12 2012-13 83 39 13 11 15 32 13 32 2 26 2013-14 55 34 10 3 8 26 1 8 0 22 Total 885 291 102 98 103 241 88 223 79 197 paragraphs Year Execution of work without approval from competent authority Irregular refund Irregular award of work /undue favour to contractor Non-adjustment of mobilization advance Excess expenditure/payment Short /non-deduction/levy of Royalty/ Tax/ IT/S. Labour cess Suspected misappropriation/ misutillisation Blocked of fund Other Total 12 13 14 15 16 17 18 19 20 21 2003-04 2004-05 3 2 4 2 8 5 4 6 123 218 2005-06 6 6 12 6 17 12 9 14 331 584 2006-07 14 26 8 7 14 7 21 13 379 683 2007-08 6 5 12 6 18 11 13 11 311 571 2008-09 6 5 12 5 18 11 9 10 331 579 2009-10 2 4 7 3 10 9 7 11 197 357 2010-11 5 7 10 5 12 9 11 14 287 511 2011-12 2 5 6 3 9 8 6 109 56 297 2012-13 6 8 13 6 19 12 9 12 473 741 2013-14 6 10 10 5 15 3 2 5 193 361 Total 56 78 94 48 140 87 91 205 2681 4902 157 Audit Report on General, Social and Economic (Non-PSUs) Sectors for the year ended 31 March 2014 Appendix-2.1.1 (Referred to paragraph 2.1.7.1 and 2.1.7.3; page 11 and 12) Details showing under utilisation and uneven UCs in test-checked districts during 2009-14 (` in crore) Release Expenditure Expenditure Excess Opening Available Closing Districts including Per as per UCs reported balance fund Amount balance interest cent submitted expenditure Dhanbad 6.67 12.45 19.12 5.15 27 13.97 7.90 2.75 Dumka 1.73 26.25 27.98 15.00 54 12.98 20.16 5.16 Garhwa 6.66 19.77 26.43 12.21 46 14.22 11.30 - 0.91 Gumla 5.04 9.62 14.66 3.31 23 11.35 3.85 0.54 Ramgarh 0.85 7.95 8.80 7.68 87 1.12 7.87 0.19 Ranchi 12.97 43.37 56.34 33.45 56 25.03 -- Total 33.92 119.41 153.33 76.82 50 78.67 (Source Audit Reports and UCs of 2009-13 and expenditure report of 2013-14 of DWSMs) 158 Appendices Appendix-2.1.2 (Referred to paragraph 2.1.9.4; page 16) Results of physical verification Number of Number Number of Number of Number of Sl.. Gram IHHL District Block of IHHL IHHL IHHL not IHHL No. Panchayats beneficiaries in use defunct existed incomplete verified 1 Jamdiha 14 4 7 3 Nil 2 Amarpur 11 8 3 Nil Nil 3 Jaynagar 17 4 13 Nil Nil 4 Nagar Kiyari 11 Nil 11 Nil Nil 5 Govindpur Asanbani-2 12 Nil 12 Nil Nil 6 Barwa East 12 3 8 1 Nil 7 Mahubani 15 3 12 Nil Nil 8 Dhanbad Bagsuma 11 4 6 1 Nil 9 Udaypur 10 Nil 10 Nil Nil 10 Suranga 15 10 5 Nil Nil 11 Jagdish 10 10 Nil Nil Nil 12 Alalkdiha 10 10 Nil Nil Nil Balliapur 13 Balliapur west 10 7 3 Nil Nil 14 Balliapur East 11 5 6 Nil Nil 15 Dullabar 11 6 5 Nil Nil Sub total 180 74 101 5 Nil 16 Jhinjri 21 17 4 Nil Nil 17 Mandro 14 8 6 Nil Nil 18 Mandar Malti 22 9 13 Nil Nil 19 Karge 13 12 1 Nil Nil 20 Sarba 10 10 Nil Nil Nil 21 Silagai 11 Nil 9 2 Nil 22 Chama 13 Nil 7 6 Nil Chanho 23 Tala 10 Nil 10 Nil Nil 24 Lundri 10 1 9 Nil Nil 25 Lalkhanga 10 1 6 Nil Nil Ranchi 26 Sithio 11 9 Nil 2 27 Bandhawa 11 Nil 11 Nil Nil Namkum 28 Hurua 11 Nil 11 Nil Nil 29 Rampur 11 2 9 Nil Nil 30 Dumre 8 Nil Nil Nil 8 31 Ptarahatu 9 3 Nil Nil 1 32 Bisaria 8 Nil Nil Nil 8 33 Silli Halmad 10 Nil 2 1 5 34 Hakedag 14 Nil 3 Nil 11 35 Muri West 9 Nil 2 Nil 7 Sub total 236 72 103 09 42 36 Jata 10 2 8 Nil Nil 37 Madhaia 10 Nil 10 Nil Nil 38 Pipara 10 2 8 Nil Nil Garhwa 39 Parehara 10 3 7 Nil Nil 40 Garhwa Kalyanpur 10 9 1 Nil Nil 41 Tildag 10 3 7 Nil Nil 42 Sonpurwa 10 3 7 Nil Nil 43 Manjhigao Rampur 10 2 8 Nil Nil 44 Karamdih 10 2 8 Nil Nil 159 Audit Report on General, Social and Economic (Non-PSUs) Sectors for the year ended 31 March 2014 Number of Number Number of Number of Number of Sl.
Recommended publications
  • Jharkhand Report No 4 of 2016 Revenue Sector
    Report of the Comptroller and Auditor General of India on Revenue Sector for the year ended 31 March 2016 Government of Jharkhand Report No. 4 of the year 2016 TABLE OF CONTENTS Paragraph Page Preface v Overview vii CHAPTER – I: GENERAL Trend of receipts 1.1 1 Analysis of arrears of revenue 1.2 5 Arrears in assessments 1.3 6 Evasion of tax detected by the Department 1.4 7 Pendency of Refund Cases 1.5 7 Response of the Departments/Government towards Audit 1.6 8 Analysis of mechanism for dealing with issues raised by 1.7 11 Audit Audit execution for the financial year 2015-16 1.8 12 Results of audit 1.9 13 Coverage of this Report 1.10 13 CHAPTER – II: TAXES ON SALES, TRADE ETC. Tax administration 2.1 15 Results of Audit 2.2 15 Implementation of mechanism of cross-verification of VAT/CST transactions in Commercial Taxes 2.3 17 Department System of collection of arrears of revenue in 2.4 28 Commercial Taxes Department in Jharkhand Irregularities in determination of actual turnover 2.5 46 Interest not levied 2.6 48 Irregularities in compliance to the Central Sales Tax Act 2.7 51 Application of incorrect rate of tax under JVAT Act 2.8 53 Incorrect exemptions 2.9 54 Irregularities in grant of Input Tax Credit (ITC) 2.10 55 Purchase tax was not levied 2.11 56 Penalty not imposed 2.12 57 CHAPTER – III: STATE EXCISE Tax administration 3.1 59 Results of Audit 3.2 60 Provision of Acts/Rules not complied with 3.3 61 Retail liquor shops not settled 3.4 61 Short lifting of liquor by retail vendors 3.5 62 i Audit Report for the year ended 31 March 2015
    [Show full text]
  • Government of India
    Contents: Sl. No Topic Page No 1 General characteristics of the District 1 1.1 Location & geographical area 1 1.2 Topography 1 1.3 Availability of Minerals 2 1.4 Forest 2 1.5 Administrative setup 2 2 District at a Glance 3-5 2.1 Existing status of Industrial Area in the District 6 3 Industrial Scenario of …. 6 3.1 Industry at a glance 6 3.2 Year wise trend of Units registered 7 3.3 Details of existing Micro & small enterprises & Artisan Units in the 8 District 3.4 Large Scale Industries/ Public Sector Undertakings 9 3.5 Major Exportable Items 9 3.6 Growth Trend 10 3.7 Vendarization /Ancillarisation of the Industry 10 3.8 Medium Scale Enterprises 11 3.8.1 List of the units in Dhanbad & near by Area 11 3.8.2 Major Exportable Item 11 3.9 Service Enterprises 11 3.9.1 Coaching Industry --------- 3.9.2 Potential Areas for Service Industry 11 3.10 Potentials for New MSMEs 12-15 4 Existing clusters of Micro & Small Enterprise 15 4.1 Details of Major Clusters 15 4.1.1 Manufacturing Sector 15 4.1.2 Service Sector 15 4.2 Details of identified cluster 15 4.2.1 Refractory Cluster: Present Status, 15 5 General issues raised by the industry association during the course of 16 meeting 6 Steps to set up MSMEs 17 Brief Industrial Profile of Dhanbad District 1. General Characteristics of the District: Dhanbad District, an administrative district of Jharkhand has it’s headquarter at Dhanbad.
    [Show full text]
  • Dto Name Jun 2016 Jun 2016 1Regn No V Type
    DTO_NAME JUN_2016 JUN_2016_1REGN_NO V_TYPE TAX_PAID_UPTO O_NAME F_NAME ADD1 ADD2 CITY PINCODE STATUS TAX_AMOUNT PENALTY TOTAL RANCHI N N JH01BZ8715 BUS 19-08-16 KRISHNA KUMHARS/O LATE CHHOTUBARA MURIKUMHAR CHHOTASILLI MURI RANCHI SUCCESS 6414 1604 8018 RANCHI N N JH01G 4365 BUS 15-08-16 ASHISH ORAONS/O JATRU ORAONGAMARIYA SARAMPO- MURUPIRIRANCHI -PS- BURMU 000000 SUCCESS 5619 1604 7223 RANCHI N N JH01BP5656 BUS 29-06-16 SURESH BHAGATS/O KALDEV CHIRONDIBHAGAT BASTIBARIATU RANCHI SUCCESS 6414 6414 12828 RANCHI N N JH01BC8857 BUS 22-07-16 SDA HIGH SCHOOLI/C HENRY SINGHTORPA ROADKHUNTI KHUNTI , M- KHUNTI9431115173 SUCCESS 6649 3325 9974 RANCHI Y Y JH01BE4699 BUS 21-06-16 DHANESHWARS/O GANJHU MANGARSIDALU GANJHU BAHERAPIPARWAR KHELARIRANCHI , M- 9470128861 SUCCESS 5945 5945 11890 RANCHI N N JH01BF8141 BUS 19-08-16 URSULINE CONVENTI/C GIRLSDR HIGH CAMIL SCHOOL BULCKERANCHI PATH , M- RANCHI9835953187 SUCCESS 3762 941 4703 RANCHI N N JH01AX8750 BUS 15-08-16 DILIP KUMARS/O SINGH SRI NIRMALNEAR SINGH SHARDHANANDANAND NAGAR SCHOOLRANCHI KAMRE , M- RATU 9973803185SUCCESS 3318 830 4148 RANCHI Y Y JH01AZ6810 BUS 12-01-16 C C L RANCHII/C SUPDT.(M)PURCHASE COLLY MGR DEPARTMENTDARBHANGARANCHI HOUSE PH.NO- 0651-2360261SUCCESS 19242 28862 48104 RANCHI Y Y JH01AK0808 BUS 24-04-16 KAMAKHYA NARAYANS/O NAWAL SINGH KISHORECHERI KAMRE NATHKANKE SINGH RANCHI SUCCESS 4602 2504 7106 RANCHI N N JH01AE6193 BUS 04-08-16 MRS. GAYTRIW/O DEVI SRI PRADEEPKONBIR KUMARNAWATOLI GUPTA BASIAGUMLA SUCCESS 4602 2504 7106 RANCHI Y Y JH01AE0222 BUS 22-06-16 RANCHI MUNICIPALI/C CEO CORPORATIONGOVT OF JHARKHANDRANCHI RANCHI SUCCESS 2795 3019 5814 RANCHI N N JH01AE0099 BUS 06-07-16 RANCHI MUNICIPALI/C CEO CORPN.GOVT.
    [Show full text]
  • Sl. No. Application Sl. No. Name of the Candidates and Father's JHARIA
    JHARIA REHABILITATION AND DEVELOPMENT AUTHORITY List of Eligible Candidates for the post of Computer Operator Sl. Application Sl. Name of the No. No. candidates and Father's Sanjeev Kumar S/o Ramashish Yadav 1 173 B-11/94 Karmik Nagar, PO-ISM Campus, Dhanbad-826004 Manoj Kumar S/o HiralalAt-Loharkulhi 2 100 Post-Saraidhela, Dhanbad-828127 Shambhu Gupta S/o Nand Kishor Sahu 3 113 Gr-153, Gola Road Opp.-UCO Bank Ramgarh-829122 Ranglal Mandal S/o Subal Chandra Mandal 4 41 Qr. No.-A1/301, Koyla Nagar, Dhanbad Ajay Kumar S/o Krishna Sahu 5 17 Qr. No.-F-7B ACC Colony, Sindri, Dhanbad Neeraj Kumar Vishwakarma S/o Umashankar Vishwakarma 6 260 At-Bhuda C/o Gayatri Studio Rani Road, Dist.-Dhanbad PIN- 826001 Vikash Kumar S/o Kameshwar Pd. Singh 7 114 Gali No-10, Jai Prakash Nagar, Dhanbad PIN-826001 Rajat Kr. Singh S/o Akhilesh Singh 8 92 At-Bishanpur, Rajput Tola, Post-Mansahi, Distt.-Katihar (Bihar) PIN-854103 Md. Kadir Ansari S/o Md. Farid Ansari 9 101 At-Kanchandih, Post-Mugma Dhanbad-828204 Santosh Kr. Mandal S/o Ajit Kr. Mandal 10 103 At+Post-Mahuli, Distt-Darbhanga Bihar Pin-847201 Deepak Kumar S/o Gallu Mahto 11 74 At+Post-Badgaon Distt.-Ramgarh Jharkhand PIN-829134 Md Faiyaz Ansari S/o Muslim Ansari Shamsher Nagar, Near Quality bakery, Post-B.Polytechnic, 12 267 Dhanbd-828130 Sonali Saha D/o Lt. Shankar Kr. Saha 13 224 Telipara Kali Mandir , Masterpara Hirapur Dhanbad Kumari Janki Mahto D/o Kalipada Mahto 14 277 At-Baghmara, Post-Baliapur, dist.-Dhanbad PIN-828201 Shahjadi Khatoon D/o Md.
    [Show full text]
  • BHARAT COKING COAL LIMITED (A Subsidiary of Coal India Limited) OFFICE of the G.M., E.J
    BHARAT COKING COAL LIMITED (A subsidiary of coal India limited) OFFICE OF THE G.M., E.J. AREA PO. BHOWRA (DHANBAD) Ref. no. – GM(EJA) ACE/NIT/10-11/462 Dated: - 31.01.2011 Notice inviting Tender Sealed tenders in two parts ( Part-I & Part –II) on overall percentage rate basis are invited from experienced and eligible contractors for the following works. Cost of Sl. Estimated Time of Name of work E.M tender No. amount Completion paper 1. Repair of overhead structure Rs 68,075.03 Rs 681.00 Rs. 100 1 month at KM 319/J 12-13 between Bhowra – Jamadoba SE Rly. Track under EJ Area AVAILABILITY OF TENDER DOCUMENTS From 11.02.2011 to 12.02.2011 Tender documents will be issued on all working days during working hours except on Sunday & holiday in the event of thr specified date for submission, opening of bids being declared a holiday the bids will be received opened on the appointed time on the next working day. The Tender document is also available on web site : http://bccl:cmpdi:co:in and can be downloaded. TIME & DATE IF RECEIPT/OPENING OF TENDER The Tender will be received on 15.02.2011 from 10.00AM to 1.00PM in Tender box at (1). CISF post near Koyla Bhawan gate, Koyla Nagar, BCCL, Dhanbad. (2). CISF’S office of EJ Area and will be opened on 18.02.2011 at 4.00 PM in the office of the ACE/EJA 1. ELIGIBILITY CRITERIA a). The intending Tenderer must have in its name as a prime contractor experience of having successfully completed similar works during last 7(seven) years ending last day of month previous to the one in which bid applications are invited should be either of the following :- (1).
    [Show full text]
  • Block) Mobile No RAKESH KUMAR (71036) JHARKHAND (Garhwa
    Volunteer Name with Reg No State (District) (Block) Mobile no RAKESH KUMAR (71036) JHARKHAND (Garhwa) (Majhiaon) 7050869391 AMIT KUMAR YADAW (71788) JHARKHAND (Garhwa) (Nagar Untari) 0000000000 AMIRA KUMARI (70713) JHARKHAND (Garhwa) (Danda) 7061949712 JITENDRA KUMAR GUPTA (69517) JHARKHAND (Garhwa) (Sagma) 9546818206 HARI SHANKAR PAL (69516) JHARKHAND (Garhwa) (Ramna) 9905763896 RENU KUMARI (69513) JHARKHAND (Garhwa) (Dhurki) 8252081219 VANDANA DEVI (69510) JHARKHAND (Garhwa) (Meral) 840987061 PRIYANKA KUMARI (69509) JHARKHAND (Garhwa) (Bardiha) 8969061575 RAVIKANT PRASAD GUPTA (69496) JHARKHAND (Garhwa) (Chiniya) 9905448984 RAKESH TIWARI (71431) JHARKHAND (Garhwa) (Ramkanda) 9934009456 CHANDAN KUMAR RAM (72016) JHARKHAND (Garhwa) (Ramkanda) 6207157968 NEHA NISHE TIGGA (71038) JHARKHAND (Garhwa) (Bhandariya) 7061187175 SATENDRA KUMAR YADAV (71186) JHARKHAND (Garhwa) (Sadar) 8863853368 BHUSHBU KUMARI (69501) JHARKHAND (Garhwa) (Kandi) 9155478910 DURGA KUMARI (69499) JHARKHAND (Garhwa) (Dandai) 7070518032 CHATURGUN SINGH (69498) JHARKHAND (Garhwa) (Ranka) 7489917090 KUMARI SABITA SINGH (69766) JHARKHAND (Garhwa) (Chiniya) 8252202210 RAM AWATAR SHARMA (69497) JHARKHAND (Garhwa) (Kandi) 9939333182 RAHUL KUMAR PAL (69495) JHARKHAND (Garhwa) (Sadar) 9155182855 JIYA SHALIYA TIGGA (69502) JHARKHAND (Garhwa) (Bhandariya) 7323001422 CHANDAN KUMAR PAL (69569) JHARKHAND (Garhwa) (Ramna) 9608927730 MANAS KISHOR MEHTA (73595) JHARKHAND (Garhwa) (Majhiaon) 8002796352 OMPRAKASH YADAV (67380) JHARKHAND (Garhwa) (Bhavnathpur) 9504289861 NAGENDRA RAM (73338)
    [Show full text]
  • Jharkhand Result .Pdf
    Government of India Ministry of Law and Justice Department of Legal Affairs Notary Cell **** Notary Cell, Department of Legal Affairs had conducted Interviews for appointment as notaries for the State of Jharkhand on 25.02.2019 at Patna. The candidates were assessed keeping in view their competency, legal knowledge and other relevant factors related to the selection of Notary as per requirement of the Notaries Act, 1952, the Notaries Rules, 1956 and the relevant guidelines by the Interview Board constituted for the purpose by the Central Government. On the basis of the performance of the candidates before the Interview Board, the Interview Board has recommended names of the following candidates for appointment as notaries for the State of Jharkhand. 2. All the successful candidates, whose names appear in the below mentioned list, will be issued Appointment Letters for appointment as Notary shortly. The candidates are strictly advised not to visit this Office personally for submission of any document or for issue of certificate of practice. Only after receiving appointment letter from this Department, the concerned candidate is required to send the documents mentioned in the appointment letter. The certificate will be issued in due course of time. BY THE ORDER OF THE COMPETENT AUTHORITY NOTARY CELL 08.03.2019 Interview Date of S.No. Name Category Area of Practice Father's Name Address Enrol. No. Sl.No. App'n At- Uday Bhawan Dhaiya Dhanbad-Cum- Ranjit Near Trimurti Appertment 1885-A/2001 1 1 Gen 23.04.2018 Kenduadih-Cum- Late Uday Kant Jha Kumar Jha Po- Dt.09.05.01 Jagata Ism,Dhanbad,Jharkhand Lodna Nadipar Madhuban Jharia-Cum- Rajesh Sri Kanu Hajam Kujama Basti Lodna Tisra 1503/2002 2 2 Gen 03.06.2018 Jorapokhar-Cum- Sharma Sharma Dhanbad Jharkhand Dt.09.09.02 Sindri ,Dhanbad,Jharkhand Hare Lucky Sweet Opposite 117/2001 3 3 Krishna Obc 19.08.2018 Ranchi Late Binod Sahu New Market Ratu Road Dt.14.06.01 Gupta ,Ranchi,Jharkhand Camp-1, Qtr.
    [Show full text]
  • Is the Head of the Administration of Our BCCL. Admini
    ADMINISTRATION DEPARTMENT Director (Personnel) is the head of the Administration of our BCCL. Administration Department BCCL(HQ) successfully and smoothly functioning in the right direction and are always ready to undertake any type of challenging job for the Company as a whole and to develop image of the Company. Important activities of the Administration Department: (1) Koyla Bhawan Administration Activity : 1. Central Despatch 2. Central Store 3. Maintenance, repairing of office furniture /equipment new procurement. 4. Sanitation / Cleanliness 5. Gardening and beautification of land scap of Koyla Bhawan Complex (2) Koyla Bhawan Civil Deptt. : Maintenance of whole Building, Water Supply and Civil Jobs. (3) KNTA & JNTA, KARMIK NAGAR, EXEX----CBCBCBCB Colony a. Revenue Collection b. Within boundary Estate matter c. Maintenance of township . d. Transit Hostel e. Four Nos. Golambers maintenance and Gardening. i. Subhash Chowk ii. Ambedkar Chowk iii. Saheed Chowk iv. Rajiv Gandhi Chowk (4) BTA : Maintenance and repairing of Bhuli Township consisting of 6011 nos. of quarters (biggest workers colony of Asia) including water supply & electricity. (5) BCCL PRESS : Printing Jobs. (6) Guest House's/Transit Hostels : Maintenance and supervision of KNGH, JNGH, Expert Hostel & Executive Hostel. (7)CAW & CTP : 1. Departmental Vehicles, Repairing and Maintenance 2. Procurement & tender processing of LCV,TATA 407 for CISF & buses for school duty & CISF. (8) Regional Hospital, Bhuli ::: 1. 20 Bed Hospital, 2. PME 3. Outdoor function 4. Family welfare camp INFORMATION ON GUEST HOUSE OF HEAD QUARTER Sl. Name of Guest House Appx.Distance from Appx. Distance from Dhanbad Rail Station Dhanbad Bus Station No. 1. Jagjiwan Nagar Guest House 5 KM 5 KM 2.
    [Show full text]
  • ENVIRONMENTAL STATEMENT in FORM-V (Under Rule-14, Environmental Protection Rules, 1986)
    ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986) (2015-2016) FOR CLUSTER NO. – 2 (GROUP OF MINES) Mugma Area Eastern Coalfields Limited Prepared at Regional Institute – I Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal India Ltd.) G. T. Road (West End) Asansol - 713 304 CMPDI ISO 9001:2008 Company Environmental Statement (Form-V) Cluster No. – 2 (Group of Mines) 2015-16 ENVIRONMENTAL STATEMENT FORM – V Environmental statement for the financial year ending 31st March, 2016 Cluster No. – 2 FOR THE YEAR: 2015-16 CONTENTS SL.NO. CHAPTER PARTICULARS PAGE NO. 1 CHAPTER-I INTRODUCTION 2-5 2 CHAPTER-II ENVIRONMENTAL STATEMENT FORM-V (PART A TO I ) 6-11 LIST OF ANNEXURES ANNEXURE NO. PARTICULARS PAGE NO. I AMBIENT AIR QUALITY 12-14 II NOISE LEVEL REPORT 15-16 III WATER QUALITY REPORT – MINE WATER QUALITY AND GROUND 17-20 WATER QUALITY IV GROUNDWATER LEVEL REPORT 21 PLATES I LOCATION PLAN II PLAN SHOWING LOCATION OF MONITORING STATIONS 1 Environmental Statement (Form-V) Cluster No. – 2 (Group of Mines) 2015-16 CHAPTER – I INTRODUCTION 1.1 GENESIS: The Gazette Notification vide G.S.R No. 329 (E) dated13th March, 1992 and subsequently renamed to ‘Environmental Statement’ vide Ministry of Environment & Forests (MOEF), Govt. of India gazette notification No. G.S.R No. 386 (E) Dtd.22nd April’93 reads as follows. “Every person carrying on an industry, operation or process requiring consent under section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued under the Environmental Protection Act, 1986 shall submit an Environmental Audit Report for the year ending 31st March in Form V to the concerned State Pollution Control Board on or before the 30th day of September every year.” In compliance with the above and in fulfillment of condition laid out in the EC for the Cluster, the work of Environmental Statement for Cluster No.
    [Show full text]
  • Social Impact Assessment Report for the Koderma -Jamuabypass Road in the District Koderma
    SOCIAL IMPACT ASSESSMENT REPORT FOR THE KODERMA -JAMUABYPASS ROAD IN THE DISTRICT KODERMA SUBMITTED TO DISTRICT COLLECTOR KODERMA SUPPORT HAZARIBAG SOCIAL IMPACT ASSESSMENT ………………….KODERMA JAMUA BYPASS ROAD Table of Contents LIST OF FIGURES ........................................................................................................................ 5 LIST OF TABLES ........................................................................................................................... 5 LIST OF ABBRIVIATIONS ............................................................................................................ 6 EXECUTIVE SUMMARY .............................................................................................................. 7 1. PROJECT LOCATION AND PUBLIC PURPOSE ................................................................. 7 2. SIZE AND ATTRIBUTION OF LAND ACQUISITION ............................................................. 8 3. ALTERNATIVES CONSIDERED ............................................................................................ 8 4. SOCIAL IMPACT ASSESSMENT .......................................................................................... 9 5. Nature, Present Use and Classification of Land ........................................................... 9 6. Structures on the Land Proposed to be acquired ....................................................... 9 7. Directly Affected ...........................................................................................................
    [Show full text]
  • Change Detection Analysis of Ground Water Quality And
    CHANGE DETECTION ANALYSIS OF GROUND WATER QUALITY AND ITS MANAGEMENT IN THE DISTRICT DHANBAD, JHARKHAND, INDIA Shiv Kumar Gupta1, Kumar Nikhil2, Aditya Shrestkar3, Gaurav Gehlot4 1,3,4Students of B.Tech.(Final) in Environmental Science & Engineering, ISM, Dhanbad, Jharkhand, (India) 2Principal Scientist, CSIR-CIMFR, Barwa Road, Dhanbad, Jharkhand, (India) ABSTRACT Dhanbad, a major coal mining area of India for more than a century, is situated in the middle of the Damodar river basin. The thickness, size, extent and openness of the weathered zone and the interconnections of fractures govern the groundwater movement in the Dhanbad area of Jharkhand and the depth to ground water generally ranges from 2 to 10 m below ground level. Urbanisation and the unregulated growth of the population have altered the terrain and slope morphology of the area. As a consequence, changes have taken place in the surface drainage system which indirectly affects the hydrogeology while the water infiltration ratio has resulted in a lowering of the groundwater. Inadequate environmental protection measures in the coal mining and related industries as well as the presence of active and abandoned coal mines, waste dumps, coal washeries, coking coal plants, thermal power plants, refractories, steel, fertilizer and cement plants have resulted in significant water pollution. In this paper study had been conducted in all the nine block of district Dhanbad. Randomly five villages were selected from each block with well or handpump were selected according to the availability and water sampling, testing and analysis done for pH, EC, TDS, Salinity, Fe, Mn and Zn availability followed by its assessmentand management.
    [Show full text]
  • Master Plan for Dealing with Fire, Subsidence and Rehabilitation in the Leasehold of Bccl
    STRICTLY RESTRICTED FOR COMPANY USE ONLY RESTRICTED The Information given in this report is not to be communicated either directly or indirectly to the press or to any person not holding an official position in the CIL/Government BHARAT COKING COAL LIMITED MASTER PLAN FOR DEALING WITH FIRE, SUBSIDENCE AND REHABILITATION IN THE LEASEHOLD OF BCCL UPDATED MARCH’ 2008. CENTRAL MINE PLANNING & DESIGN INSTITUTE LTD REGIONAL INSTITUTE – 2 DHANBAD - 1 - C O N T E N T SL PARTICULARS PAGE NO. NO. SUMMARISED DATA 4 1 INTRODUCTION 11 2 BRIEF OF MASTER PLAN ‘1999 16 3 BRIEF OF MASTER PLAN ‘2004 16 CHRONOLOGICAL EVENTS AND NECESSITY OF 4 17 REVISION OF MASTER PLAN 5 SCOPE OF WORK OF MASTER PLAN 2006 19 MASTER PLAN FOR DEALING WITH FIRE 6 21 MASTER PLAN FOR REHABILITATION OF 7 UNCONTROLLABLE SUBSIDENCE PRONE 49 INHABITATED AREAS 8 DIVERSION OF RAILS & ROADS 77 9 TOTAL INDICATIVE FUND REQUIREMENT 81 10 SOURCE OF FUNDING 82 ` - 2 - LIST OF PLATES SL. PLATE PARTICULARS NO. NO. 1 LOCATION OF JHARIA COALFIELD 1 2 COLLIERY WISE TENTATIVE LOCATIONS OF FIRE AREAS 2 3 PLAN SHOWING UNSTABLE UNCONTROLLABLE SITES 3 4 LOCATION OF PROPOSED RESETTLEMENT SITES 4 5 PROPOSED DIVERSION OF RAIL AND ROADS 5 - 3 - SUMMARISED DATA - 4 - SUMMARISED DATA SL PARTICULARS MASTER PLAN’04 MASTER PLAN’06 MASTER PLAN’08 NO A Dealing with fire 1 Total nos. of fires 70 70 70 identified at the time of nationalisation 2 Additional fires identified 6 7 7 after nationalisation 3 No. of fires extinguished 10 10 10 till date 4 Total no.
    [Show full text]