Corporate Energy Plan

Total Page:16

File Type:pdf, Size:1020Kb

Corporate Energy Plan CORPORATE ENERGY PLAN City of Fremantle AUTHOR Josh Byrne & Associates, InfraNomics, and Merz Consulting PREPARED FOR City of Fremantle PROJECT TITLE Corporate Energy Plan DATE September 2017 L AN D S C A P E • S U S TA I N A B I L I T Y • C OM MU N I C AT I O N S T 08 9433 3721 E [email protected] W joshbyrne.com.au A Suite 109 Atwell Buildings 3 Cantonment Street Fremantle WA 6160 PROJECT NO. 1707 This document may only be used for the purpose for which it was commissioned in accordance with the Terms of Engagement. DATE OF ISSUE REVISION NO. REASON FOR ISSUE AUTHOR REVIEWED BY Client 27/4/2017 Prelim. This structural draft has been issued to CE/MT GP MT provide an indication of the intended report format AND to establish an understanding with the City on the language and objectives of the Plan. 10/5/2017 Interim Structural Draft revised based on CE/MT GP MT comment from CoF (AS) 12/07/2017 First Draft for client review CE/MT MT AS 28/7/2017 Issue Final draft delivered to client CE/MT MT AS 24/08/2017 Revised Interim revised draft for further review CE/MT MT AS 25/08/2017 Revised 2 Second Interim revised draft for further CE/MT MT review 04/09/2017 Final Proposed for adoption by council CE/MT MT AS 11/9/2017 Final Removed “Commercial in Confidence” MT - - banners JOSH BYRNE & ASSOCIATES - LANDSCAPE • SUSTAINABILITY • COMMUNICATIONS Page 1 Contents 1 Executive Summary ....................................................................................................................... 4 1.1 Indicative Cost Savings ............................................................................................................................ 5 2 Priorities for implementation ........................................................................................................ 6 2.1 Implementation of the Plan .................................................................................................................... 6 2.2 Stage 1 Implementation - Workload ....................................................................................................... 7 2.3 Proposed Management Actions - Summaries presented in staged implementation ............................. 9 3 Background ................................................................................................................................ 15 3.1 Alignment to City Positions and Existing Plans ...................................................................................... 15 3.2 Background to the Western Australian Energy Market ........................................................................ 16 3.3 Applicable Renewable Energy Technologies ......................................................................................... 19 4 Introduction to the Plan .............................................................................................................. 25 4.1 Goals and objectives .............................................................................................................................. 25 4.2 How this report addresses the brief ...................................................................................................... 25 5 Review of available information .................................................................................................. 27 5.1 Quality of Available Information and Data ............................................................................................ 27 5.2 Summary of estimated energy, cost and emissions profiles ................................................................. 28 5.3 Financial information - energy .............................................................................................................. 29 5.4 Street and Park lighting ......................................................................................................................... 33 5.5 Summary of Information Review........................................................................................................... 37 6 King’s square development ......................................................................................................... 38 6.1 Briefing notes from building engineers ................................................................................................. 38 7 Outline options for reducing carbon credit offset costs. ............................................................... 39 8 Innovative financing partnerships ............................................................................................... 41 8.1 Clean Energy Finance Corporation ........................................................................................................ 41 8.2 ARENA .................................................................................................................................................... 42 8.3 City Deals ............................................................................................................................................... 42 9 Methodology and decision-making process ................................................................................. 43 9.1 Method Statement ................................................................................................................................ 43 9.2 Review Process ...................................................................................................................................... 43 9.3 Template for Presentation of Management Action options ................................................................. 43 10 Recommended Management Actions .......................................................................................... 45 10.1 Management Action: Energy Data Reform and Annual Energy Report ................................................ 46 10.2 Management Action: Energy Plan Status Update ................................................................................. 51 10.3 Management Action: Energy Portfolio .................................................................................................. 53 10.4 Management Action: Fremantle Leisure Centre – Energy Systems ...................................................... 60 10.5 Management Action: Energy Efficient Buildings ................................................................................... 68 JOSH BYRNE & ASSOCIATES - LANDSCAPE • SUSTAINABILITY • COMMUNICATIONS Page 2 10.6 Management Action: Street and Park Lighting Upgrades ..................................................................... 74 10.7 Management Action: Voltage Optimisation .......................................................................................... 82 10.8 Management Action: City Owned Photovoltaic Systems ...................................................................... 85 10.9 Management Action: Local Renewable Energy Supply ......................................................................... 96 10.10 Management Action: Gas Accounts ...................................................................................................... 99 10.11 Management Action: Sustainable Corporate Transport ..................................................................... 101 11 Disclaimer ................................................................................................................................. 111 Figures Figure 1: City of Fremantle - Forecast energy profile evolution over the period of this Plan ............................. 5 Figure 2: Levelised Cost of Energy, Generation Technologies .......................................................................... 20 Figure 3: Levelised Cost of Energy trends ......................................................................................................... 21 Figure 6: City of Fremantle Energy mix: Consumption/Cost/Emissions ............................................................ 28 Figure 7: Cost trends for City electricity consumption - buildings and streetlights ($) (Source: City of Fremantle) ........................................................................................................................................................................... 30 Figure 8: Traditional Energy Provision – Centralised ......................................................................................... 55 Figure 9: Today’s Energy Provision – Hybrid Centralised / distributed ............................................................. 55 Figure 10: Tomorrow’s Energy Provision – Fully distributed and sharing ......................................................... 56 Figure 11: Clockwise from top left: Solar PV panels, the co-generation plant and the geothermal plant. ...... 62 Figure 12: Nett Exports for April 2017 if PV had been connected (negative values are Imports) .................... 63 Figure 13: Summary chart of FLC energy sources ............................................................................................. 64 Figure 14: Overall City of Fremantle gas consumption and cost data (source: CoF) ........................................ 65 Figure 15: LED streetlights at the Maritime Museum near E-Shed. Installed by the Fremantle Port Authority75 Figure 16: Streetlight Cost Comparison by State - MV ...................................................................................... 77 Figure 17: Streetlight Cost Comparison by State - CFL .....................................................................................
Recommended publications
  • Annual Report 2016-17 Overview Agency Performance Significant Issues Disclosures and Legal Compliance Appendix
    ANNUAL REPORT 2016-17 OVERVIEW AGENCY PERFORMANCE SIGNIFICANT ISSUES DISCLOSURES AND LEGAL COMPLIANCE APPENDIX Promoting fair prices, quality services and choice Image courtesy of Western Power Statement of compliance Dear Treasurer Hon. Ben Wyatt MLA ECONOMIC REGULATION AUTHORITY 2016-17 ANNUAL REPORT Treasurer In accordance with section 61 of the Financial Management Act 2006, I hereby submit for your 11th Floor, Dumas House information and presentation to Parliament, the annual report of the Economic Regulation Authority Havelock Street for the financial year ended 30 June 2017. West Perth WA 6005 The annual report has been prepared in accordance with the provisions of the Financial Management Act 2006, the Public Sector Management Act 1994 and the Treasurer’s Instructions. Yours sincerely, Nicola Cusworth Chair Front cover image courtesy of Western Power 2 Annual Report 2016-2017 Economic Regulation Authority OVERVIEW AGENCY PERFORMANCE SIGNIFICANT ISSUES DISCLOSURES AND LEGAL COMPLIANCE APPENDIX Accessing the annual report Our 2016-17 annual report and previous Image courtesy of Western Power annual reports are available on our website www.erawa.com.au. To make our annual report as accessible as possible, we have provided it in the following formats: • An interactive PDF version, which has links to other sections of the annual report, as well as external links to content on our website. • An online version, which allows for quick and Contact details easy viewing of annual report sections. This Office address Postal address version also features easy to use download and Office hours 9:00 am to 5:00 pm PO Box 8469, Perth WA 6849 print functions.
    [Show full text]
  • Creating Customer Choice by Being the World's Best Microgrid Company
    Creating customer choice by being the world’s best microgrid company We work with our customers to eliminate barriers to new energy innovations Who we are Horizon Power generates, distributes, and We’re at the forefront of sells electricity to more than 47,000 customers, energy innovation supplying over 100,000 residents and 10,000 businesses in regional towns and remote The energy industry is undergoing an communities across Western Australia. unprecedented period of change, driven by customers adopting new technologies like solar We’re a Government Trading Enterprise and we PV systems and batteries, as they seek to play operate across the full energy supply chain – a greater role in how they receive energy and generation, distribution and transmission, and engage with their energy provider. retail services. Our operations cover a vast service area, approximately 2.3 million square kilometres The Energy Networks Association and CSIRO of rugged terrain, which means we service the have forecast that by 2030 about 50 per cent biggest geographical area with the least amount of the electricity produced will come from of customers in the world. For every 53.5 square consumers, mainly generated by rooftop solar kilometres of terrain, we have only one customer. PV systems and batteries. Our vision is to create customer choice by being Horizon Power is exploring a future where the world’s best microgrid company and our electricity is generated by households and purpose is to provide Energy for Life. industry using rooftop solar, batteries and standalone power systems which can be incorporated into the electricity network or microgrid systems.
    [Show full text]
  • Post-Show Report
    POST-SHOW REPORT 2016 sponsors and exhibitors included: +61 (0)2 8188 7597 [email protected] www.energyweek.com.au | 1 AUSTRALIAN ENERGY WEEK 2016 REVIEW FROM THE CHAIR Dear Energy Executive, More than 400 attendees at Australian Energy Week in Melbourne in mid-June had the benefit of 88 expert presenters and panelists over 4 days, across 8 different tracks. They covered a wide range of issues that stand between the Australian community and achievement of the CoAG Energy Council’s recently-announced goal of integrating energy and climate change policies to deliver secure supply and the lowest possible prices. Not surprisingly, much of the speakers’ focus - and the audience’s questions - was on the drivers for change and the need for a durable, bipartisan approach to settle investors’ nerves and to encourage lenders’ support for new developments. One of the most interesting questions was posed by speaker Roberto Bocco, Head of Energy Industries at the World Economic Forum. “We are witnessing a continuous trend for decarbonisation,” he said, “but what if the future of energy is different from what we are expecting?” Diversity among leading nations pursuing the transformation of electricity supply, he pointed out, highlights that there is no single pathway to a more affordable, sustainable and secure energy system. The capacity of the Australian Energy Week presenters to pursue the prospects of diversity and the differing pathways to our national energy future was, I think, the major strength of the conference - which will be held again in Melbourne in May next year. Feedback from the attendees thronging the Albert Park venue for the event repeatedly pointed to the benefits of being exposed to a wide range of views in an environment notable for calm discussion - and, having organised and participated in a multitude of conferences over the past 35 years, I was struck by the high level of networking I saw around me.
    [Show full text]
  • ERM Power's Neerabup
    PROSPECTUS for the offer of 57,142,858 Shares at $1.75 per Share in ERM Power For personal use only Global Co-ordinator Joint Lead Managers ERMERR M POWERPOWEPOWP OWE R PROSPECTUSPROSPEOSP CTUCTUSTU 1 Important Information Offer Information. Proportionate consolidation is not consistent with Australian The Offer contained in this Prospectus is an invitation to acquire fully Accounting Standards as set out in Sections 1.2 and 8.2. paid ordinary shares in ERM Power Limited (‘ERM Power’ or the All fi nancial amounts contained in this Prospectus are expressed in ‘Company’) (‘Shares’). Australian currency unless otherwise stated. Any discrepancies between Lodgement and listing totals and sums and components in tables and fi gures contained in this This Prospectus is dated 17 November 2010 and a copy was lodged with Prospectus are due to rounding. ASIC on that date. No Shares will be issued on the basis of this Prospectus Disclaimer after the date that is 13 months after 17 November 2010. No person is authorised to give any information or to make any ERM Power will, within seven days after the date of this Prospectus, apply representation in connection with the Offer which is not contained in this to ASX for admission to the offi cial list of ASX and quotation of Shares on Prospectus. Any information not so contained may not be relied upon ASX. Neither ASIC nor ASX takes any responsibility for the contents of this as having been authorised by ERM Power, the Joint Lead Managers or Prospectus or the merits of the investment to which this Prospectus relates.
    [Show full text]
  • ATCO Ltd. | 2015 | Annual Report
    ATCO Ltd. | 2015 | Annual Report CHAPTER TITLE FOR EASY REFERENCE 1 Table of Contents 1 Financial Highlights 2 Return on Investment ATCO STRUCTURES & LOGISTICS 3 Letter to Share Owners ATCO SUSTAINABLE INTERNATIONAL 5 ATCOenergy COMMUNITIES Competing Globally Through 7 Innovative Solutions STRUCTURES & LOGISTICS STRUCTURES & LOGISTICS ATCO ELECTRIC 9 GLOBAL BUSINESS UNIT INTERNATIONAL ATCO ATCO PIPELINES 10 Modular Structures POWER ATCO GAS ATCO ENERGY SOLUTIONS 12 Lodging and Support Services ELECTRICITY INTERNATIONAL 13 Logistics and Facility Operations and Maintenance Services PIPELINES GLOBAL & LIQUIDS 14 Sustainable Communities ATCOenergy ELECTRICITY 16 GLOBAL BUSINESS UNIT 17 Electricity Transmission and Distribution 19 Power Generation 20 Distributed Generation 22 Northern Operations 25 International Operations Ronald D. Southern PIPELINES & LIQUIDS C.C., C.B.E., A.O.E., B.Sc., LL.D • 1930 – 2016 26 GLOBAL BUSINESS UNIT On January 21, 2016 the world lost a giant. 27 Natural Gas Distribution With nearly 8,000 employees and assets A man who has touched the lives of so many with his fierce determination and tireless pursuit 31 Natural Gas Transmission of approximately $19 billion, ATCO is a of excellence. A true citizen of the globe and Hydrocarbon Storage diversified global corporation delivering a brilliant mind. His is a legacy that will be 32 and Industrial Water service excellence and innovative business remembered for generations to come. 34 International Operations solutions in Structures & Logistics (workforce As Founder of ATCO Group, he played a pivotal housing, innovative modular facilities, and visionary role in every major development in 37 Indigenous Partnerships construction, site support services, and the evolution and growth of the company.
    [Show full text]
  • Inquiry Into the Funding Arrangements of Horizon Power
    Economic Regulation Authority Inquiry into the Funding Arrangements of Horizon Power Issues Paper 3 June 2010 A full copy of this document is available from the Economic Regulation Authority website at www.erawa.com.au. For further information, contact Economic Regulation Authority Perth, Western Australia Phone: (08) 9213 1900 The copying of this document in whole or in part for non-commercial purposes is permitted provided that appropriate acknowledgement is made of the Economic Regulation Authority and the State of Western Australia. Any other copying of this document is not permitted without the express written consent of the Authority. Disclaimer This document has been compiled in good faith by the Economic Regulation Authority (the Authority). This document is not a substitute for legal or technical advice. No person or organisation should act on the basis of any matter contained in this document without obtaining appropriate professional advice. The Authority and its staff members make no representation or warranty, expressed or implied, as to the accuracy, completeness, reasonableness or reliability of the information contained in this document, and accept no liability, jointly or severally, for any loss or expense of any nature whatsoever (including consequential loss) (“Loss”) arising directly or indirectly from any making available of this document, or the inclusion in it or omission from it of any material, or anything done or not done in reliance on it, including in all cases, without limitation, Loss due in whole or part to the negligence of the Authority and its employees. This notice has effect subject to the Trade Practices Act 1974 (Cth) and the Fair Trading Act 1987 (WA), if applicable, and to the fullest extent permitted by law.
    [Show full text]
  • Horizon Power's Submission in Response To
    Horizon Power's submission in response to the Issues Paper – Coverage Alinta's application for coverage of the Horizon Power transmission and distribution network in the Pilbara – 16 October 2017 1 Contents 1. BACKGROUND ......................................................................................................................... 4 1.1 Structure of document ................................................................................................... 4 2. SUMMARY OF SUBMISSION ................................................................................................... 6 3. NWIS NETWORKS .................................................................................................................... 9 3.1 Horizon Power Network ................................................................................................ 9 3.2 Other networks in the Plbara ...................................................................................... 11 4. CURRENT ISSUES FACING THE NWIS ................................................................................ 14 4.1 Issues affecting economic efficiency ........................................................................... 14 4.2 Adverse TEC (subsidy impacts) .................................................................................. 16 4.3 Operational and technical issues ................................................................................ 18 4.4 Deficient and fragmented regulatory regime ..............................................................
    [Show full text]
  • Horizon Power Asset Management Systems Review • Integrated Regional Licence Audit Report Rev 2
    Horizon Power Asset Management Systems Review • Integrated Regional Licence Audit Report Rev 2 November 2008 Contents Glossary of Terms i Executive Summary ii 1. Asset Management Systems Review Scope 1 1.1 Introduction 1 1.2 Review Objectives 1 1.3 Period of the Review 2 1.4 Risk Assessment 2 1.5 Staff Interviews 5 1.6 Key Documents and Information Sources 6 1.7 Review Team and Resource Allocation 6 2. Previous Review 7 3. Asset Management Systems Effectiveness 8 3.1 Assessment and Measurement of Compliance 8 3.2 Compliance Levels Observations 8 3.3 Asset Management Systems Assessments 19 3.4 Asset Management Systems Summary 26 4. Field Studies 28 4.1 Pilbara Region – Karratha, Dampier, Roebourne and Port Samson 28 4.2 Gascoyne District – Carnarvon 29 4.3 Kimberley Region – Broome, Derby, Camballin and Fitzroy Crossing 33 4.4 Southern Region • Esperance 35 5. Conclusions and Recommendations 38 5.1 Observations 38 5.2 Changes to the Licence 38 5.3 Review Sign•Off 39 6. Post Review Implementation Plan 40 61/22458/78622 Rev2.1 Asset Management Systems Review • Integrated Regional Licence 2 Audit Report Table Index Table 1 Glossary of Terms i Table 2 Initial Risk Assessment of Licence Compliance 3 Table 3 Asset management review effectiveness rating scale 8 Table 4 Asset Management Systems Assessments – Network Customer Services 20 Table 5 Asset Management Systems Assessments – Generation 23 Table 6 Asset Management Effectiveness Summary • NCS 26 Table 7 Asset Management Effectiveness Summary • Generation 27 Table 8 Post Review Implementation
    [Show full text]
  • Energy Infrastructure Map January 2018
    110° 115° 120° 125° W E S T E R N A U S T R A L I A ENERGY INFRASTRUCTURE MAP JANUARY 2018 INSET A Mutineer LEGEND Modec Venture 11 Fletcher 0 20 40 Exeter Finucane ENERGY INFRASTRUCTURE ELECTRICITY DISTRIBUTION SYSTEMS NEWMAN Towns supplied by Electricity Supply Authorities Kilometres Jigalong Remote communities that generate >1 MW of electricity Hermes Liquefied natural gas plant Western Power South West Interconnected Network (SWIN) Searipple Athena Angel Liquefied petroleum gas plant Horizon Power Pilbara Network Persephone GAS DISTRIBUTION SYSTEMS Wanaea Natural gas plant Perseus Cossack Horizon Power Esperance System Okha Mid West & South West gas distribution system 10° North Rankin Natural gas storage Liquefied petroleum gas distribution centre Goodwyn Oil refinery ELECTRICITY GENERATION STATIONS Gas transmission pipeline 10° Tidepole LPG storage Renewable fuel Fuel storage tank >1 million litres Biogas Landfill gas Wind PETROLEUM FIELDS Jansz Pluto Wheatstone Hydro Solar Xena PETROLEUM INFRASTRUCTURE Gas Operating............ Reindeer Non-renewable fuel Reindeer Production platform Oil Proposed............ Ichthys Pluto Mini platform / monopod Oil/gas Wandoo B Wandoo A FPSO (Floating Production ELECTRICITY TRANSMISSION LINES Port Hedland Storage and Offloading facility) Mine (major projects that are operating or under care and 330 kV 132 kV maintenance. Only selected mines shown) Stag Platform Legendre Island 220 kV 66 kV Montebello Regional development commission areas Islands Gorgon John Brookes South Hedland I N D I A N O
    [Show full text]
  • Customer Charter II Contents
    Customer Charter II Contents How to contact us 2 Our service commitment to you 3 Who this Customer Charter applies to 3 Our service area 4 Our regional offices 5 Understanding the roles of generation, distribution and retail 6 Your electricity account 7 Financial hardship 8 New connections 8 Moving property 9 Disconnection 10 Reconnection 11 Special needs for life support 12 Billing concessions 13 Power interruptions 14 Momentary power interruptions 16 Electrical safety 17 Tree clearing and vegetation 18 Damage to customer equipment 20 Street lighting 21 Your role in ensuring a safe and reliable supply of electricity 22 Access to Horizon Power equipment on your property 23 Underground power program 24 Frequently asked questions 25 Useful contacts 28 Thank you 29 Queries 30 1 How to contact us We would like to assure you that you will receive our highest standard of service when we are responding to your enquiries. There are a number of ways you can contact us: Web www.horizonpower.com.au My Account www.myaccount.horizonpower.com.au Email [email protected] Phone Residential customers (8 am - 5 pm weekdays) 1800 267 926 Business customers (8 am - 5 pm weekdays) 1800 737 036 TTY (for customers with hearing or speech difficulties) 1800 461 499 TIS (translating service for customers who don’t speak English) 13 14 50 Mail Horizon Power PO Box 1066 BENTLEY DC WA 6983 Pre-payment metering 1800 447 707 Other useful contacts Fax 1800 420 998 Emergency or supply faults/interruptions 13 23 51 (24 hours a day) Faulty streetlights (24 hours a day) 1800 264 914 Dial Before You Dig 1100 2 Our service commitment to you Horizon Power is committed to providing you with courteous, professional and prompt service.
    [Show full text]
  • Coverage of the Horizon Power Electricity Network in the North West Interconnected System – Issues Paper
    16 October 2017 Zaeen Khan Public Utilities Office Department of Treasury Locked Bag 11 Cloisters Square WA 6850 Sent via email to: [email protected] Dear Zaeen Coverage of the Horizon Power electricity network in the North West Interconnected System – Issues Paper Alinta Energy (Alinta) welcomes the opportunity to comment on the Public Utilities Office (PUO) Issues Paper: Coverage of the Horizon Power electricity network in the North West Interconnected System (Issues Paper). Alinta’s detailed submission on the Issues Paper is enclosed. Alinta’s Coverage Application, and its submission to the Issues Paper, has demonstrated that the granting of coverage will promote competition in the retail electricity market that exists in the form of those customers supplied with electricity using the Horizon NWIS Network. This will occur through Alinta’s economically efficient use of the network and its services, and so aligns with the Code objective. Further, the benefits provided through lower energy costs and enhanced productivity will support and grow the contribution made by the NWIS geographical region, to benefit those in the region and the State more broadly. Given this and in circumstances where all three coverage criteria are satisfied, Alinta submits that the Minister should decide to cover the Horizon NWIS Network in accordance with the Code. If you wish to discuss this matter further please don’t hesitate to contact me on 08 9486 3709 or Jacinda Papps on 08 9486 3009. Yours sincerely Ken Woolley Executive Director Merchant Energy Issues Paper – Coverage of Horizon Power electricity Network in the North West Interconnected System Alinta Energy Submission 16 October 2017 Issues Paper – Coverage of the Horizon Power electricity network in the NWIS Alinta Energy Submission Page 1 of 51 Table of Contents Table of Contents .................................................................................................................
    [Show full text]
  • On-Supply of Electricity in Embedded Networks
    On-supply of electricity Electricity licensing Under section 7 of the Electricity Industry Act 2004 (Act), anyone who sells electricity to a customer for consumption in Western Australia must hold a licence. A licence is also required to construct and/or operate generating works, transmission systems and distribution systems. Under section 8 of the Act, the Governor can grant a licence exemption to a person or class of persons. The Economic Regulation Authority administers licences and the Public Utilities Office administers licence exemptions on behalf of the State Government. What is the on-supply of electricity? The on-supply of electricity occurs in residential and commercial premises. The on-seller purchases electricity from a licensed retailer (such as Synergy) at a master meter and on-sells the electricity under a licence exemption to customers (usually tenants) on sub-meters in the embedded network controlled by the exempt on-seller. The on-seller is usually the landlord/property owner, but can be someone that manages the embedded network on their behalf. Licence exemptions that allow the on-supply of electricity on commercial and residential premises are in the Electricity Industry Exemption Order 2005. There are separate licence exemptions for caravan park operators in the Electricity Industry (Caravan Park Operators) Exemption Order 2005. Both Exemption Orders are available on the State Law Publisher website. What is an embedded network? An embedded electricity network will normally be a small privately-owned and operated electricity distribution system that sits behind the main electricity network. For example, in Western Australia, the main electricity network (the South West Interconnected System) is owned and operated by Western Power and embedded networks are connected to this main network.
    [Show full text]