EXPANSION OF ENVIRONMENT CLEARANCE FOR PROPOSED

Central Reserve Police CONSTRUCTION OF 171 NOS. (T/II- 119, T/III-24, T/IV- 10 & T/V-18) FAMILY FORM 1 Force, Bawana QUARTERS & 01-180 MEN BARRACKS AT BCS BAWANA, CRPF, NEW

FORM 1

(I) Basic Information

S. Item Details No. 1. Name of the project/s Construction of 171 Nos. (T/II- 119, T/III-24, T/IV- 10 & T/V-18) Family quarters & 01-180 Men barracks - Phase 1, at BCS Bawana, CRPF, New Delhi 2. S. No. in the Schedule S. No. 8 (a): Building & Construction Projects 3. Proposed capacity/ area/ length/ tonnage to be handled/ command area/ lease area/ number of wells to be drilled: Type of project Housing Total Plot area 428967.00 m2 Plot area for which land use has not been changed 36421.7 m2 Area deduction under road widening in the unchanged land 14643.32 m2 use area Net Plot Area 392559 m2 Pocket Area for Development in Phase 1 (Four Pockets) 69146.38 m2 Built-up area 23441.48 m2 Number of floors Max: S+9/ G+9 Number of Dwelling Units 171 Residential and One Barrack Project Cost Rs. 62.23 Crore

4. New/ Expansion/ Modernization Expansion 5. Existing capacity/ area etc. Existing Built-up area: 6562.00 m2

The existing features of the project site includes: Permanent housing facilities for 06 nos. quarter guard building and ESS having built-up area 6562.00 m2

Other structures includes: Office Cabins (Temporary Structures) Barracks (Temporary Structures) Few temporary pre fab structure 6. Category of project i.e. ‘A’ or ‘B’ Category ‘B’ 7. Does it attract the general condition? If yes, No please specify. 8 Does it attract the specific condition? If yes, No please specify. 9. Location CRPF Bawana, Delhi Plot/ survey/ khasra no. Details are attached in Annexure B1 Village - Tehsil District State Delhi 10. Nearest railway station/ airport along with New Delhi railway station: 24.50 Km/SE distance in kms IGI airport: 26.19 km/SE 11. Nearest town, city, district headquarters Nearest Town: Bawana along with distance in kms District: North West District of Delhi

ITHC/PRJ/20-21/EIA/36/Rev02 1 IND TECH HOUSE CONSULT

EXPANSION OF ENVIRONMENT CLEARANCE FOR PROPOSED

Central Reserve Police CONSTRUCTION OF 171 NOS. (T/II- 119, T/III-24, T/IV- 10 & T/V-18) FAMILY FORM 1 Force, Bawana QUARTERS & 01-180 MEN BARRACKS AT BCS BAWANA, CRPF, NEW DELHI

S. Item Details No. 12. Village panchayats, zilla parisad, municipal North West MCD corporation, local body (complete postal addresses with telephone nos. to be given) 13. Name of the applicant Central Reserve Police Force, Bawana 14. Registered address 55 Bn., CRPF Bawana, New Delhi-110039 15. Address for correspondence: 55 Bn., CRPF Bawana, New Delhi-110039 Name Sh. Deepak Dhoundiyal Designation (Owner/ partner/ CEO) Commandant Address 55 Bn., CRPF Bawana, New Delhi Pin Code 110039 E-mail [email protected] Telephone no. 011-27751197 Fax no. 16. Details of alternative sites examined, if No. The construction is proposed within the existing any. Location of these sites should be boundary of the project site. shown on a topo sheet. 17. Interlinked projects Not Envisaged 18. Whether separate application of interlinked Not Envisaged project has been submitted? 19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable 21. Whether the proposal involves approval/ clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? No (b) The Wildlife (Protection) Act, 1972? No (c) The C.R.Z. Notification, 1991? No 22. Whether there is any government order/ No policy relevant/ relating to the site? 23. Forest land involved (hectares) No forest land is involved 24. Whether there is any litigation pending LAC No. 45/2017 filed by Surjeet @ Surajmal vs Union against the project and/ or land in which of and Others for enhanced compensation the project is propose to be set up? (a) Name of the Court Rohini Court (b) Case No. LAC No. 45/2017 filed by Surjeet @ Surajmal vs Union of India and Others and Execution petition no. 379/2019 (c) Orders/directions of the court, if any and Court passed order on 19th January 2019 on LAC No. its relevance with the proposed project. 45/2017, for payment. Execution petition no. 379/2019 filed in Rohini Court. Final hearing to take place.

ITHC/PRJ/20-21/EIA/36/Rev02 2 IND TECH HOUSE CONSULT

EXPANSION OF ENVIRONMENT CLEARANCE FOR PROPOSED

Central Reserve Police CONSTRUCTION OF 171 NOS. (T/II- 119, T/III-24, T/IV- 10 & T/V-18) FAMILY FORM 1 Force, Bawana QUARTERS & 01-180 MEN BARRACKS AT BCS BAWANA, CRPF, NEW DELHI

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

S. Information / Checklist Yes/ Details thereof (with approximate quantities No. confirmation No /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in:  Landuse No Total Plot Area : 106 Acres = 428967 Sqm The Landuse of 97 acres out of total 106 acres was changed from 'Rural Use' to ' Public-Semi Public' as per notification no.k-13011/9/96-ddib dated 1st sep,97 ,issued by ministry of urban affairs & employment, deptt of urban development).

 Land cover Yes The pockets to be developed (Pocket 1, Pocket 2, Pocket 3 and Pocket 4) are presently vacant land, which will be developed for residential blocks, parking and green areas. Hence there will be permanent change in the land cover.

 Topography Yes Topography of Pocket 1, Pocket 2, Pocket 3 and Pocket 4 is presently slightly undulated. These areas will be leveled for construction purpose. Hence there will be change in the topography within the project area. including increase in intensity of land use (with respect to local landuse plan) 1.2 Clearance of existing land, Yes At present, the entire plot has 1980 number of trees. vegetation and buildings? The area under development of first phase of the project pocket 2, pocket 3 and pocket 4 is devoid of any vegetation, trees and buildings. Hence no clearance of existing land, vegetation and building is envisaged. However, pocket 1 has 41 trees, out of which 9 trees are expected to be cut/ transplanted in order to develop the roads, and buildings. These trees will be cut/transplanted in consultation with the forest department and only after obtaining the Tree Cutting/ transplanting permission from Forest department. Remaining 32 trees shall be retained within the pocket 1. Compensatory plantation of 90 trees (10 times the trees cut/ transplanted) will be done within the project site itself. Some existing Barracks (Temporary Structures) are expected to get demolished in pocket 1. 1.3 Creation of new land uses? No The Landuse of 97 acres out of total 106 acres was changed from 'Rural Use' to 'Public-Semi Public' as per notification no.k-13011/9/96-ddib dated 1st sep,97 ,issued by ministry of urban affairs & employment, deptt of urban development). Entire construction/ development of the project will take place within the landuse area notified under 'Public- Semi Public'

ITHC/PRJ/20-21/EIA/36/Rev02 3 IND TECH HOUSE CONSULT

EXPANSION OF ENVIRONMENT CLEARANCE FOR PROPOSED

Central Reserve Police CONSTRUCTION OF 171 NOS. (T/II- 119, T/III-24, T/IV- 10 & T/V-18) FAMILY FORM 1 Force, Bawana QUARTERS & 01-180 MEN BARRACKS AT BCS BAWANA, CRPF, NEW DELHI

S. Information / Checklist Yes/ Details thereof (with approximate quantities No. confirmation No /rates, wherever possible) with source of information data 1.4 Pre-construction investigations e.g. Yes Soil testing has already been done and attached as bore houses, soil testing? Annexure B3. 1.5 Construction works? Yes Construction work expected are as follows:

Pocket Type of construction No. of Floors P1 Type II Full residential G+9 Quarters

Type II Half residential G+9 Quarters

Type III Residential Quarters G+5 P2 Type IV & Type V Residential G+9 Quarters P3 Sports Field (Green Area) P4 180 men’s barrack G+3

1.6 Demolition works? Yes Some Barracks (Temporary Structures), Offices/ Admin (Temporary Structures), is expected to get demolished. 1.7 Temporary sites used for Yes Temporary project office, material storage areas and construction works or housing of labour camp will be developed within the project site. construction workers? 1.8 Above ground buildings Yes Type II Full residential Quarters; Type II Half residential Quarters; Type III Residential Quarters; Type IV & Type V Residential Quarters; and 180 men’s barrack + admin block

Structures No No other above ground building structure is expected other than the above mentioned residential blocks

Earthworks including  linear structures, No Not anticipated  cut and fill Yes Only limited to the leveling of ground (Pocket)  excavations Yes Only limited to excavation for foundation of building works 1.9 Underground works including mining No No underground works including mining/ tunneling is or tunneling? envisaged 1.10 Reclamation works? No No reclamation work envisaged 1.11 Dredging? No No dredging envisaged 1.12 Offshore structures? No No offshore structures envisaged 1.13 Production and manufacturing No No production and manufacturing process is processes? involved. 1.14 Facilities for storage of goods or Yes For storing construction materials. Limited only to the materials? construction phase of the project.

ITHC/PRJ/20-21/EIA/36/Rev02 4 IND TECH HOUSE CONSULT

EXPANSION OF ENVIRONMENT CLEARANCE FOR PROPOSED

Central Reserve Police CONSTRUCTION OF 171 NOS. (T/II- 119, T/III-24, T/IV- 10 & T/V-18) FAMILY FORM 1 Force, Bawana QUARTERS & 01-180 MEN BARRACKS AT BCS BAWANA, CRPF, NEW DELHI

S. Information / Checklist Yes/ Details thereof (with approximate quantities No. confirmation No /rates, wherever possible) with source of information data 1.15 Facilities for treatment or disposal of Yes Solid Waste: solid waste or liquid effluents? During Construction Phase, the municipal solid wastes generated from the 100 number of labour is expected to be 24.15 kg/day. The waste generated will be collected and disposed through the existing waste collector to the MCD disposal site.

During operation phase, the solid waste generated from project will be 0.55 TPD. Solid wastes generated will be segregated. Biodegradable and non-biodegradable wastes will be collected in separate bins. The biodegradable wastes will be composted in an on-site composting unit and the manure will be used for landscaping. The non- biodegradable/ recyclable wastes will be disposed at MCD designated site through authorized vendors.

Liquid Effluent: During Construction Phase, waste water generated from the labour camp will be 4.58 kld which will be treated in mobile STP.

In operation phase, the sewage (85 kld) will be treated up to tertiary level in an on-site STP of 100 kld capacity to meet the treatment level up to CPCB discharge standard. 1.16 Facilities for long term housing of No There will be no facilities for long-term housing of operational workers? operational workers. 1.17 New road, rail or sea traffic during No No new road, rail or sea traffic is envisaged. construction or operation? 1.18 New road, rail, air water borne or No No new road, rail, air, water borne or other transport other transport infrastructure infrastructure is envisaged including new or altered including new or altered routes and routs and stations, ports, airports etc. stations, ports, airports etc.? 1.19 Closure or diversion of existing No No closure or diversion of existing transport routes or transport routes or infrastructure infrastructure leading to changes in traffic leading to changes in traffic movements is envisaged. movements? 1.20 New or diverted transmission lines or No No new or diversion of transmission lines or pipelines pipelines? is envisaged 1.21 Impoundment, damming, culverting, No No impoundment, damming, culverting, realignment realignment or other changes to the or other changes to the hydrology of surface water- hydrology of watercourses or aquifers? courses or aquifers is envisaged. 1.22 Stream crossings? No Not stream crossings is envisaged 1.23 Abstraction or transfers of water form No In operation phase of the project, total water ground or surface waters? requirement will be 118 kld. Out of which 75 kld will be fresh water and will be met from the Delhi Jal Board. No abstraction or transfer of water from ground or surface water is envisaged.

ITHC/PRJ/20-21/EIA/36/Rev02 5 IND TECH HOUSE CONSULT

EXPANSION OF ENVIRONMENT CLEARANCE FOR PROPOSED

Central Reserve Police CONSTRUCTION OF 171 NOS. (T/II- 119, T/III-24, T/IV- 10 & T/V-18) FAMILY FORM 1 Force, Bawana QUARTERS & 01-180 MEN BARRACKS AT BCS BAWANA, CRPF, NEW DELHI

S. Information / Checklist Yes/ Details thereof (with approximate quantities No. confirmation No /rates, wherever possible) with source of information data 1.24 Changes in water bodies or the land No The project site does not have any water body within surface affecting drainage or run-off? its premise. The entire project site is protected by boundary wall. Hence there will be no effect of surface runoff from the project site to the surrounding areas of the project site and vice versa is anticipated. 1.25 Transport of personnel or materials Yes Construction phase: for construction, operation or Transport of personnel/ material during construction decommissioning? phase is envisaged. Operation phase: Since the work place and residence both are within the CRPF campus, movement of outside personnel will be limited only to the visitors. This project is expected to have approximately 138 visitors per day. Decommissioning Phase: Not Anticipated 1.26 Long-term dismantling or No Not anticipated decommissioning or restoration works? 1.27 Ongoing activity during No Not anticipated. decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either No During Construction phase: temporarily or permanently? Temporary influx of people in the form of labours is envisaged. Approx. 100 no. of local labours shall be employed. During Operation Phase: This project is dedicated for housing of CRPF personnel. It is expected to have about 888 residents and 180 CRPF Personnel in Barrack. 1.29 Introduction of alien species? No Not envisaged 1.30 Loss of native species or genetic No Not envisaged. diversity? 1.31 Any other actions? No Not envisaged.

2. Use of Natural resources for construction or operation of the project (such as land, water, materials or energy, especially any resources, which are non-renewable or in short supply):

S. Information/ Checklist Yes/ Details thereof (with approximate quantities/ No. confirmation No rates, wherever possible) with source of information data 2.1 Land especially undeveloped or No The entire project site is within the CRPF Campus. agricultural land (ha) No additional land is acquired for this project. 2.2 Water (expected source & competing Yes Construction phase: users) unit: kld Construction water will be sourced from local water supplier through tankers. Operation Phase: It is expected that approximately 118 kld water will be required for this project. Out of this, about 75 kld fresh water will be required, which will be sourced from water supply by Delhi Jal Board. Remaining 43 kld water will be met from the treated

ITHC/PRJ/20-21/EIA/36/Rev02 6 IND TECH HOUSE CONSULT

EXPANSION OF ENVIRONMENT CLEARANCE FOR PROPOSED

Central Reserve Police CONSTRUCTION OF 171 NOS. (T/II- 119, T/III-24, T/IV- 10 & T/V-18) FAMILY FORM 1 Force, Bawana QUARTERS & 01-180 MEN BARRACKS AT BCS BAWANA, CRPF, NEW DELHI

S. Information/ Checklist Yes/ Details thereof (with approximate quantities/ No. confirmation No rates, wherever possible) with source of information data waste water available from the onsite STP. No groundwater will be used. 2.3 Minerals (MT) No Not applicable. 2.4 Construction material-stone, Yes Construction materials required: aggregates, sand/ soil (expected S. No. Material Source source-MT) 1. Steel (MT) Supplier 2. Cement (Bags) Supplier 3. Stone Aggregate (m3) Supplier 4. Sand (m3) Supplier 5. Bricks (m3) Supplier 6. Glass (m2) Supplier 7. Flyash based products (m3) Supplier Source: Steel and cement will be procured by the contractor from authorized vendors. Sand & aggregate will be procured by the contractor from local material suppliers. 2.5 Forests and timber (source - MT) Yes Plywood for doors & windows shall be used which shall be procured from local market. 2.6 Energy including electricity and fuels Yes Power requirement is 1421 kVA that will be met from (source, competing users) Unit: fuel Grid supply of Tata Power Delhi Distribution Limited (MT), energy (MW) (TPDDL). DG sets of total capacity 1000 kVA (500x2) will be provided as backup power supply during power failure. Ultra low sulphur diesel (ULSD) will be used as fuel for DG sets. 2.7 Any other natural resources (use No None appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

S. Information/ Checklist Yes/ Details thereof (with approximate quantities/ No. confirmation No rates, wherever possible) with source of information data 3.1 Use of substances or materials No The proposed project is a housing project. Hence, no which are hazardous (as per MSIHC storage of hazardous chemicals (as per MSIHC rules) to human health or the rules) will be done, except HSD required to run environment (flora, fauna, and water backup DG sets, for which the quantity stored will be supplies) below the threshold limit specified in the MSIHC rules. Necessary permission will be obtained from the Explosives Dept. if applicable. 3.2 Changes in occurrence of disease or No No changes in occurrence of disease or affect affect disease vectors (e.g. insect or disease vectors are envisaged. water borne diseases) 3.3 Affect the welfare of people e.g. by Yes This project will enable housing of CRPF personnel changing living conditions? within the CRPF campus. 3.4 Vulnerable groups of people who No Effect to Vulnerable groups of people e.g. hospital could be affected by the project e.g. patients, children, the elderly etc. is not envisaged. hospital patients, children, the elderly

ITHC/PRJ/20-21/EIA/36/Rev02 7 IND TECH HOUSE CONSULT

EXPANSION OF ENVIRONMENT CLEARANCE FOR PROPOSED

Central Reserve Police CONSTRUCTION OF 171 NOS. (T/II- 119, T/III-24, T/IV- 10 & T/V-18) FAMILY FORM 1 Force, Bawana QUARTERS & 01-180 MEN BARRACKS AT BCS BAWANA, CRPF, NEW DELHI

S. Information/ Checklist Yes/ Details thereof (with approximate quantities/ No. confirmation No rates, wherever possible) with source of information data etc., 3.5 Any other causes No Not envisaged.

4. Production of solid wastes during construction or operation or decommissioning (MT/ month)

S. Information / Checklist Yes/ Details thereof (with approximate quantities No. confirmation No /rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes No No such spoil, overburden or mine waste is expected to get generated. 4.2 Municipal waste (domestic and or Yes Municipal Solid waste generated from the project is commercial wastes) expected to be 0.55 TPD. Composition of solid wastes during operation phase will be: Biodegradable 0.33 TPD (Waste vegetables and foods etc.) Non- 0.22 TPD (Papers, cartons, biodegradable thermocol, plastics etc.) Total: 0.55 TPD

4.3 Hazardous wastes (as per Yes Hazardous wastes generated from the project will be Hazardous Waste Management used /spent oil from backup DG sets which is Rules) classified as Hazardous Waste Category 5.1 as per Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016. 4.4 Other industrial process wastes No Not envisaged 4.5 Surplus product No Not envisaged 4.6 Sewage sludge or other sludge from Yes Approx. 31.35 Kg/day of dried sludge will be effluent treatment generated from STP within colony during operation phase. 4.7 Construction or demolition wastes Yes The construction waste will consist of cement bags, waste concrete and mortar, broken bricks, steel, wood, plastics, insulating and packaging materials etc. Recyclable waste construction materials will be sold to recyclers. Unusable and excess construction debris will be disposed at designated places in tune with the local norms. 4.8 Redundant machinery or equipment No Not envisaged 4.9 Contaminated soils or other materials No Not envisaged 4.10 Agricultural wastes No Not envisaged 4.11 Other solid wastes No Not envisaged

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/ hr)

S. Information / Checklist Yes/ Details thereof (with approximate quantities/ No. confirmation No rates, wherever possible) with source of information data 5.1 Emissions from combustion of fossil Yes Combustion of fossil fuel in the form of High Speed fuels from stationary or mobile Diesel (HSD) due to operation of Diesel Generator

ITHC/PRJ/20-21/EIA/36/Rev02 8 IND TECH HOUSE CONSULT

EXPANSION OF ENVIRONMENT CLEARANCE FOR PROPOSED

Central Reserve Police CONSTRUCTION OF 171 NOS. (T/II- 119, T/III-24, T/IV- 10 & T/V-18) FAMILY FORM 1 Force, Bawana QUARTERS & 01-180 MEN BARRACKS AT BCS BAWANA, CRPF, NEW DELHI

sources Sets which will be used for power backup. The expected emission from the DG sets is as follows: SO2: 1.009664 Kg/ hr NOx: 4.12874 Kg/ hr CO: 1.579527 Kg/ hr HC: 0.542484 Kg/ hr Particulate Matters:0.257376 Kg/ hr

Emission is also expected from vehicular exhaust due to movement of personal and official vehicles. 5.2 Emissions from production processes No Not envisaged 5.3 Emissions from materials handling Yes Dust is expected to be generated during construction including storage or transport phase from material handling and storages of loose materials like sand, cement and aggregates 5.4 Emissions from construction Yes Fugitive emission from DG sets used during activities including plant and construction phase. equipment 5.5 Dust or odors from handling of Yes Dust is expected to be generated during construction materials including construction phase from material handling and storages of loose materials, sewage and waste materials like sand, cement and aggregates 5.6 Emissions from incineration of waste No No incinerator will be installed. Hence no emission from incineration waste expected. 5.7 Emissions from burning of waste in No Open burning of biomass/ other material will strictly open air (e.g. slash materials, be prohibited. construction debris) 5.8 Emissions from any other sources No Not anticipated.

6. Generation of Noise and Vibration, and Emissions of Light and Heat

S. Information / Checklist Yes/ Details thereof (with approximate quantities No. confirmation No /rates, wherever possible) with source of information data 6.1 From operation of equipment e.g. Yes Source of noise in the operational phase will be from engines, ventilation plant, crushers backup DG sets (which will be in operation only during power failure) and water pumps. All the machinery will be of highest standard of reputed make and will comply with national standards that take care of air and noise pollution control/ vibration control. Therefore, no significant impact due to operation of machinery is envisaged. 6.2 From industrial or similar processes No Not envisaged 6.3 From construction or demolition Yes Due to various construction activities, there will be short-term increase in noise level in the immediate vicinity of the project site. The construction activities will include the following noise generating activities: • Concreting, mixing & operation of DG sets • Movement of heavy machines & vehicles 6.4 From blasting or piling No No blasting or mechanized piling is envisaged 6.5 From construction or operational Yes Noise level will increase due vehicular movement in traffic the construction and operational phase. 6.6 From lighting or cooling systems No Not envisaged.

ITHC/PRJ/20-21/EIA/36/Rev02 9 IND TECH HOUSE CONSULT

EXPANSION OF ENVIRONMENT CLEARANCE FOR PROPOSED

Central Reserve Police CONSTRUCTION OF 171 NOS. (T/II- 119, T/III-24, T/IV- 10 & T/V-18) FAMILY FORM 1 Force, Bawana QUARTERS & 01-180 MEN BARRACKS AT BCS BAWANA, CRPF, NEW DELHI

S. Information / Checklist Yes/ Details thereof (with approximate quantities No. confirmation No /rates, wherever possible) with source of information data 6.7 From any other sources No Not envisaged.

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

S. Information/ Checklist Yes/ Details thereof (with approximate quantities/ No. confirmation No rates, wherever possible) with source of information data 7.1 From handling, storage, use or No The only hazardous wastes in the project will be used spillage of hazardous materials / spent oil from backup DG sets. The spent oil will be carefully stored in HDPE drums under isolated storage, and periodically sold to authorized recyclers. All precautions will be taken to avoid spillage from storage. 7.2 From discharge of sewage or other No 32 kld treated waste water will be use for effluents to water or the land construction / Roadside Green and Public Parks. (expected mode and place of There will be no adverse impact for the discharge discharge) 7.3 By deposition of pollutants emitted to No There will be no deposition of pollutants in to air and air into the land or into water water 7.4 From any other sources No Not applicable. 7.5 Is there a risk of long term build up of No Not applicable. pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

S. Information/Checklist Yes/ Details thereof (with approximate quantities/ No. confirmation No rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires etc. No This is a construction project and does not involve from storage, handling, use or major hazardous construction activity. No industrial production of hazardous substances or process activity is involved in this project. Hence, chances of explosions, spillages, fires are minimal.

During construction, all construction workers will be provided with personal protective equipment (PPE) by the contractors as required under the health & safety norms. Training and awareness about the safety norms will be provided to all involved in construction activities. Suitable fire-fighting measures will be provided. 8.2 From any other causes No Not applicable. 8.3 Could the project be affected by Yes The study area falls in Zone-IV, as per the Indian natural disasters causing environ- Standard Seismic Zoning Map. Suitable seismic mental damage (e.g floods, earth consideration will be adopted while designing the quakes landslides, cloudburst etc)? structures to mitigate the seismic impacts as per

ITHC/PRJ/20-21/EIA/36/Rev02 10 IND TECH HOUSE CONSULT

EXPANSION OF ENVIRONMENT CLEARANCE FOR PROPOSED

Central Reserve Police CONSTRUCTION OF 171 NOS. (T/II- 119, T/III-24, T/IV- 10 & T/V-18) FAMILY FORM 1 Force, Bawana QUARTERS & 01-180 MEN BARRACKS AT BCS BAWANA, CRPF, NEW DELHI

NBC/ IS Code. There are no chances of floods and landslide.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

Details thereof (with approximate quantities/ S. Information / Checklist Yes/ rates, wherever possible) with source of No. confirmation No information data 9.1 Lead to development of supporting, facilities, ancillary development stimulated by the project which could have impact on the environment e.g.: • Supporting infrastructure (roads, No The project site is located along the Bawana-Narela power supply, waste or waste water road. The surrounding area of the project site has treatment etc.) already developed roads, power supply, waste water treatment facilities. • Housing development No The project site is a restricted area within the CRPF Campus • Extractive industries No Not applicable • Supply industries No Not applicable • Other No Not applicable 9.2 Lead to after-use of the site, which No Not applicable could have an impact on the environment 9.3 Set a precedent for later No Not applicable developments 9.4 Have cumulative effects due to No The project site is a restricted area within the CRPF proximity to other existing or planned Campus. projects with similar effects

(III) Environmental Sensitivity

S. Name/ Aerial distance (within 15 km) from Areas No. Identity proposed project location boundary 1. Areas protected under international No Not Envisaged conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or No Not envisaged sensitive for ecological reasons- Wetlands, water courses or other water bodies, coastal zone, biospheres, mountains, forests. 3 Areas used by protected, important Yes Mamupur PF: 8.6 km NE or sensitive species of flora or Bawana RF: 1.0 km NE fauna for breeding, nesting, foraging, Sultanpur Dabas RF: 4.6 km SW resting, over wintering, migration

ITHC/PRJ/20-21/EIA/36/Rev02 11 IND TECH HOUSE CONSULT

EXPANSION OF ENVIRONMENT CLEARANCE FOR PROPOSED

Central Reserve Police CONSTRUCTION OF 171 NOS. (T/II- 119, T/III-24, T/IV- 10 & T/V-18) FAMILY FORM 1 Force, Bawana QUARTERS & 01-180 MEN BARRACKS AT BCS BAWANA, CRPF, NEW DELHI

S. Name/ Aerial distance (within 15 km) from Areas No. Identity proposed project location boundary 4 Inland, coastal, marine or No Not located within 15 km of the proposed underground waters project location. 5 State, National boundaries Yes Delhi - Haryana border: 2.2 km NW 6 Routes or facilities used by the public No Not envisaged for access to recreation or other tourist, pilgrim areas 7 Defense installations Yes Air Force Station, Ghoga is located at about 250 m in the north west of the project site. 8 Densely populated or built-up area Yes Density of surrounding development is as per master plan 9 Areas occupied by sensitive man- Yes Hospitals: made land uses (hospitals, schools, Schools: Kendriya Vidyalaya (AFS – Bawana) – places of worship, community 900 m North West facilities) Temples: Hamuman Shiv Mata Mandir and Shanidev Nav Graha Kaali Maata Bhairav Mandir located adjoining the project boundary (along the Bawana-Narela Road) but at a distance of about 300 m from the entry gate of the project campus. Community Facilities: Baba Dham Dharmshala Bawana located adjoining the project boundary (along the Bawana-Narela Road) but at a distance of about 300 m from the entry gate of the project campus 10 Areas containing important, high Yes The region is declared as a region of scarce quality or scarce resources (ground ground water resource region. water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution No Nothing Specific or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard which could cause the project to present environmental problems  Earthquakes Yes The project is located at Seismic Zone-IV according to Indian Standard Seismic Zoning Map.  Subsidence No The area is not susceptible to subsidence,  Landslides No landslides, erosion or flooding  Erosion No  Flooding No

O  Extreme or adverse climatic Yes The maximum temperature is 47.5 C in conditions summer The minimum temperature is -2.2OC in winter Maximum Rainfall is xx mm

ITHC/PRJ/20-21/EIA/36/Rev02 12 IND TECH HOUSE CONSULT