Search Results Recreational Trails Program Project Database
Your search for projects in State: GA, Total Results : 354
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
GA 1997 Truman Parkway Linear Park Trail Construction Trail Construction 1 Chatham $47,000 $154,000 $201,000
GA 1999 Altamaha Park Recreational Acquisition of land and trail construction 1 Glynn $68,160 $17,040 $85,200
Trail
GA 2002 Bill Morris Park Walking Renovations, signage 1 Wayne $59,500 $24,126 $83,626
Track and Nature Trail
GA 2003 McMillan Creek Greenway McMillan Creek Greenway Construct Trail 1 Wayne $100,000 $29,000 $129,000
Trail Trail
GA 2006 McMillan Creek Greenway McMillan Creek Greenway Construct new boardwalk and natural surface 1 Wayne $74,155 $19,488 $93,643
Trail Trail Phase 2 trail.
GA 2008 Hog Pen Bluff Trails Land Acquisition Acquire 2,100 acres and develop trailhead 1 Camden $1,039,000 $4,000,000 $5,039,000
and trails for motorized vehicles, equestrians,
and hikers.
GA 2008 Skidaway Island Multi-Use Trail Construction Construction of multi-use trail 1 Chatham $99,000 $31,000 $130,000
Trail
GA 2009 Towns Bluff River Park Trail Trail Construction and Construct a half-mile of new trail, renovate 1 Jeff Davis $47,800 $29,662 $77,462
Renovation existing trail, and install amenities.
GA 2009 McMillan Creek Greenway Construct Boardwalk, Phase Construct boardwalk trail about one-fifth of a 1 Wayne $100,000 $44,127 $144,127
Trail 3 mile long.
GA 2010 Lower Ogeechee Trails Lower Ogeechee Trails The recommended grant will assist the 1 Chatham $100,000 $30,870 $130,870
Project County with the constructing two miles of
trails that will lead hikers through a
bottomland hardwood forest.
GA 2010 Martha Frazier Fisher Park Fisher Park Trail At an existing park in Screven, the City plans 1 Wayne $81,000 $34,870 $115,870
Trail to build a nature walk featuring educational
opportunities on the plant life of the area, and
the grant will assist with the construction.
GA 2012 Historic Baptismal Trail Historic Baptismal Trail Acquire 11 acres and build 0.25 mile new trail 1 Liberty $100,000 $25,000 $125,000
Phase II
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
GA 2012 Woodbine Nature Trail Liza Rudolf Extension 1.5 miles paved trail and trailhead and 1 Camden $100,000 $37,350 $137,350
amenities
GA 2013 The Murphy Mile The Murphy Mile Construct 0.75 mile of trail, access points, 1 Bryan $100,000 $47,747 $147,747
parking, and trail amenities
GA 2013 Laura Walker Lake Trail Laura Walker Lake Trail Construct boardwalk adjacent to lake, and 1 Ware $100,000 $50,873 $150,873
Extension construct 2 miles of upland trail
GA 2014 Martin Luther King Jr. Martin Luther King Jr. Blvd 1 Glynn $100,000 $25,000 $125,000
Boulevard Trail Trail
GA 2014 Bill Morris Park Nature Trail Bill Morris Park Nature Trail 1 Wayne $100,000 $25,000 $125,000
GA 2015 Martin Luther King Jr. Martin Luther King Jr. Brunswick officials are working to install 1 Glynn $100,000 $25,000 $125,000
Boulevard Trail Boulevard Trail sidewalks and trails along city streets with the
goal of making it safer to walk from one area
of town to another.
GA 2015 Bill Morris Park Nature Trail Bill Morris Park Nature Trail 1 Wayne $100,000 $25,000 $125,000
GA 2018 Jaycee Landing Trails Jaycee Landing Trails, Jaycee Landing Trails, Phase I 1 Wayne $200,000 $40,000 $240,000
Phase I
GA 2007 Langdale-Riley Trail Boardwalk and Trailhead Construct new boardwalk trail and re-route 1, 2 Lowndes $51,982 $22,174 $74,156
Construction existing trail sections, construct picnic shelter
with amenities, and improve parking area.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
GA 2000 State Tools and Equipment Southern Off-Road Bicycle Purchase 6 tool trailers and equipment to 1, 2, 3, 4, 5, 6, 7, Appling, Atkinson,
Association (SORBA) Tool stock trailers for use building and maintaining 8, 9, 10, 11, 12, Bacon, Baker,
Trailers multi-use trails throughout the State 13, 14 Baldwin, Banks,
Barrow, Bartow, Ben
Hill, Berrien, Bibb,
Bleckley, Brantley,
Brooks, Bryan,
Bulloch, Burke, Butts,
Calhoun, Camden,
Candler, Carrol,
Catoosa, Charlton,
Chatham,
Chattahoochee,
Chattooga,
Cherokee, Clarke,
Clay, Clayton, Clinch,
Cobb, Coffee,
Colquitt, Columbia,
Cook, Coweta,
Crawford, Crisp,
Dade, Dawson,
Decatur, DeKalb,
Dodge, Dooly,
Dougherty, Douglas,
Early, Echols,
Effingham, Elbert,
Emanuel, Evans,
Fannin, Fayette,
Floyd, Forsyth,
Franklin, Fulton,
Gilmer, Glascock,
Glynn, Gordon,
Grady, Greene, Gwinnet, Habersham,
Hall, Hancock,
Haralson, Harris,
Hart, Heard, Henry,
Houston, Irwin,
Jackson, Jasper, Jeff
Davis, Jefferson,
Jenkins, Johnson,
Lamar, Lanier,
Laurens, Lee, Liberty,
Lincoln, Long,
Lowndes, Lumpkin,
Macon, Madison,
Marion, McDuffie,
McIntosh,
Meriwether, Miller,
Mitchell, Monroe,
Montgomery,
Morgan, Murray,
Muscogee, Newton,
Oconee, Oglethorpe,
Paulding, Peach,
Pickens, Pierce, Pike,
Polk, Pulaski,
Putnam, Quitman,
Rabun, Randloph,
Richmond, Rockdale,
Schley, Screven,
Seminole, Spalding,
Stephens, Stewart,
Sumter, Talbot,
Taliaferro, Tattnall,
Taylor, Telfair,
Terrell, Thomas, Tifft,
Toombs, Towns,
Treutlen, Troup,
Turner, Twigs, Union, Upson, Walker,
Walton, Ware,
Warren, Washington,
Wayne, Webster,
Wheeler, White, $35,821 $9,000 $44,821
Whitfield, Wilcox,
Wilkes, Wilkinson,
Worth
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
GA 1993 Hard Labor Creek State Park Trail Construction 10 Morgan $13,500 $35,139 $48,639
Equestrian/Hiking Trail
GA 1993 Georgia Department of Trail Construction 10 Walton $9,045 $7,596 $16,641
Natural Resources
Educational Trail
GA 1996 Town Creek ATV Trail Trail maintenance, signage 10 Greene $23,986 $53,213 $77,199
GA 1997 Richard B. Russell State Trail Construction 10 Elbert $43,127 $45,000 $88,127
Park Trail
GA 1997 Town Creek ATV Trail Construction of new trail 10 Greene $20,000 $22,000 $42,000
GA 1999 Charlie Elliot Trail Construction of new trail 10 Newton $100,000 $25,000 $125,000
GA 2000 Jerrell Plantation Trail, Iron Trail restoration 10 Monroe $100,000 $25,000 $125,000
Hill Trail
GA 2000 Ocmulgee River Trailhead Trailhead facilities 10 Jasper $85,200 $21,300 $106,500
GA 2001 Town Creek ORV Trail Construct bridge and boardwalk to 10 Greene $62,000 $15,500 $77,500
rehabilitate poorly built trail sections
GA 2002 Jarrell Plantation Interpretive Phase II of trail rehabilitation 10 Jones $100,000 $25,000 $125,000
Trail
GA 2002 Victoria Bryant State Park Bridge 10 Franklin $100,000 $25,000 $125,000
Rice Creek Bridge
GA 2003 Salacoa Creek Americans Salacoa Creek Trail Construct Trail 10 Gordon $36,343 $14,896 $51,239
With Disabilities Act (ADA)
Trail
GA 2006 Locust Stake ATV Trail Locust Stake ORV Repairing trail tread, restoring grade dips and 10 Stephens $45,890 $11,485 $57,375
Maintenance erosion control devices, applying grass seed
and hay, installing silt fencing, closing illegal
trails, and enhancing sign system.
GA 2006 Oakey Mountain and Moates Oakey Mountain ATV Reshaping trail tread, reestablishing water 10 Habersham, Rabun $50,000 $12,500 $62,500
Knob ATV Areas Maintenance bars and dips, cleaning out wing ditches and
removing hazard trees, closing
environmentally sensitive area and
constructing replacement trail.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
GA 2006 Lake Russell Multi-Use Lake Russell Multi-Use Grading of trail tread, maintaining erosion 10 Stephens $28,098 $7,025 $35,123
Complex Trail Complex Trail Maintenance control devices, clearing trail corridor and
other non-routine maintenance.
GA 2007 Clarkesville Greenway Trail Trail Construction Construct 1.5 miles of trail and install 10 Habersham $100,000 $309,302 $409,302
signage.
GA 2007 Fort Yargo Trail Trail Accessibility Resurface wheelchair-accessible trail, 10 Barrow $100,000 $25,000 $125,000
Enhancements replace Braille signs, construct new multi-use
trail, and improve general signage.
GA 2007 Dauset-Indian Springs Trail and Trailhead Construct 1.5 miles of multi-use trail and 10 Butts $100,000 $25,000 $125,000
Multi-Use Trail Construction trailheads.
GA 2007 Fears Road Park Trail Trail and Trailhead Construct multi-use nature trail and picnic 10 Morgan $100,000 $245,910 $345,910
Construction area, shelter, restroom, parking area, signage
and other amenities.
GA 2007 Town Creek ATV Trail Trail Renovation and Perform non-routine maintenance on trail 10 Greene $185,000 $46,250 $231,250
Construction tread, construct and place puncheons and
boardwalks, remove old boardwalk, and
perform non-routine maintenance on
trailheads.
GA 2008 Cornelia City Park Trail Trail Renovation and Conduct trail system assessment, perform 10 Habersham $76,983 $34,404 $111,387
Trailhead Construction non-routine maintenance, and install
trailhead.
GA 2008 Tugaloo Corridor Hiking Trail Trail Construction Construction of trailhead and trail 10 Stephens $89,536 $48,264 $137,800
GA 2009 Cornelia City Park Trail Trail and Trailhead Renovate existing trail, construct wheelchair 10 Habersham $97,825 $37,699 $135,524
Renovation and Accessibility accessible trail and trailhead, and install
Improvements, Phase II interpretive signage.
GA 2009 Lake Loop Trail Trail Construction and Construct trailhead and trail about 4,250 feet 10 Rabun $26,865 $12,971 $39,836
Trailhead Improvements long.
GA 2009 Tri-County Wellness Park Trail Construction and Construct trailhead and about 2 miles of trail. 10 Hart, Franklin $98,400 $127,305 $225,705
Trailhead Improvements
GA 2011 Augusta Canal Trail System Canal Trail System Signage The Authority was selected to improve the 10 Richmond $91,500 $29,796 $121,296
system of information and way-finding that
trail visitors use to get the most from the
trails.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
GA 2012 Clarkesville Greenways Greenways Expansion Add 0.5 miles unpaved nonmotorized trail; 10 Habersham $100,000 $55,400 $155,400
Expansion Phase II acquire 1 acre
GA 2012 Briar Patch Trail Briar Patch Trail Restore 14.79 acres; Add 0.25 miles of new 10 Putnam $100,000 $124,995 $224,995
unpaved nonmotorized trail and trailhead
GA 2012 Cupid Falls Park Addition Cupid Falls Park Addition Acquire 11 acres and build 1 mile non paved 10 Towns $100,000 $33,400 $133,400
trail
GA 2013 Frady Branch Trail Frady Branch Trail Re-Route Close portion of equestrian/mountain-bike 10 Stephens $100,000 $26,032 $126,032
trail and create replacement route.
GA 2013 A.H. Stephens State Park Park Trail System Construction of 10 miles of trails for 10 Taliaferro $61,295 $14,462 $75,757
Trail System equestrian and other uses
GA 2013 Founders' Trail Founders' Trail Construct 0.4 mile trail with interpretive 10 Morgan $100,000 $65,230 $165,230
signage in historic district
GA 2014 Fishing Creek Community Fishing Creek Community 10 Baldwin $99,985 $24,996 $124,981
Trail Trail
GA 2014 Ocmulgee Bluff Equestrian Ocmulgee Bluff Equestrian 10 Jasper $100,000 $25,000 $125,000
Trail Trail
GA 2014 Town Creek ATV Trail Town Creek ATV Trail 10 Greene $130,950 $32,737 $163,687
Maintenance
GA 2014 War Hill Trail The War Hill Trail 10 Wilkes $76,220 $15,244 $91,464
GA 2015 Fishing Creek Community Fishing Creek Community 10 Baldwin $100,000 $25,000 $125,000
Trail Trail
GA 2015 Ocmulgee Bluff Equestrian Ocmulgee Bluff Equestrian 10 Jasper $100,000 $25,000 $125,000
Trail Trail Maintenance
GA 2015 Town Creek ATV Trail Town Creek ATV Trail 10 Greene $131,000 $32,750 $163,750
Maintenance
GA 2015 War Hill Trail - 1779 Battle of War Hill Trail - 1779 Battle of 10 Wilkes $77,000 $19,250 $96,250
Kettle Creek Kettle Creek
GA 2016 Fishing Creek Community Fishing Creek Community Natural surface trail (1 mi) 10 Baldwin $100,000 $20,000 $120,000
Trail Trail: Campus Connector
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
GA 2016 Firefly Trail Firefly Trail Construction of 2.1 miles of new trail with 10 Oglethorpe $100,000 $112,390 $212,390
roadside parking made of asphalt. Land
acquisition of approximately 6 acre parcel
with signage, trash bins, benches and
lighting.
GA 2017 Firefly Trail City of Union Point Firefly New trail construction of 1.2 miles, land 10 Greene $100,000 $130,040 $230,040
Trail acquisition of 2.2 miles
GA 2018 Jackson Trail Jackson Trail Construct trail 10 Butts $200,000 $40,000 $240,000
GA 2018 Orange and White Trail Orange and White Trail Orange and White Trail Enhancement and 10 Clarke $155,200 $31,040 $186,240
Enhancement and Realignment at State Botanical Garden
Realignment at State
Botanical Garden
GA 2007 Butler Creek Nature Trail and Trailhead Construct 2.6 miles of trail and install 10, 12 Richmond $100,000 $56,200 $156,200
Corridor-Lombard Mill Pond Construction trailhead amenities.
Trail
GA 2008 Augusta Canal Trail System Trail Assessment and Conduct trail system assessment and provide 10, 12 Richmond $35,672 $10,088 $45,760
Maintenance Training field-based maintenance training.
GA 2013 Canal Trail Trailhead at Lake Olmstead Construct trailhead to serve historic Canal 10, 12 Richmond $100,000 $58,500 $158,500
Trail
GA 2016 Sandy Run Creek Trail Sandy Run Creek Trail .34 miles of 10 feet wide new trail 10, 12 Columbia $100,000 $118,213 $218,213
Phase II construction with, bridge connecting to
neighborhoods, grassing and silt fencing
GA 2001 Little Mulberry Park Trail Construct multi-use trail 11 Gwinnett $100,000 $86,644 $186,644
GA 2003 Milam Farm/Etowah River Etowah River Blue Trail Construct Trail 11 Bartow $100,000 $81,781 $181,781
Trailway
GA 2003 Chattahoochee Greenway Chattooga River District Construct Trail 11 Heard $95,000 $27,600 $122,600
Trail Motorized Trail Maint.
GA 2006 Pine Log-Beasley Gap Trail Trail and Trailhead Construct 4.3 miles of trail and parking area. 11 Bartow $65,728 $16,433 $82,161
Construction
GA 2007 Pine Mountain-Cooper's Trail Construction Construct 2,044 feet of trail. 11 Bartow $39,542 $9,886 $49,428
Furnace Trail Linkage
GA 2007 Downtown Connector Trail Trail Construction Construct trail 2,200 feet long. 11 Floyd $100,000 $200,000 $300,000
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
GA 2008 Pettit Creek Trail Land Acquisition and Trail Acquire easement and develop 1 mile of trail. 11 Bartow $100,000 $197,931 $297,931
Construction, Phase II
GA 2008 Iron Hill Trail Trail Construction, Phase 4 Construction of multi-use trail 11 Bartow $100,000 $25,000 $125,000
GA 2009 Heritage Riverways Trail Accessible Trailhead Install wheelchair accessible trailheads and 11 Floyd $40,114 $15,000 $55,114
Construction rest areas.
GA 2010 County Canoe Trail Canoe Trail The County plans to establish a canoe trail 11 Haralson $51,150 $27,500 $78,650
along the Tallapoosa River, grant will assist
with the construction of five canoe launches
and related access areas along the river.
GA 2011 Oothcalooga Creek Nature Oothcalooga Creek Nature The grant will help build a new trail along 11 Bartow $100,000 $46,504 $146,504
Trail Trail Oothcalooga Creek and around City Lake
GA 2011 Little Tallapoosa Park Trail Little Tallapoosa Park Trail The County will use the grant to build about 11 Carroll $100,000 $25,000 $125,000
two miles of trail in this park located north of
Carrollton.
GA 2011 Etowah River Blue Trail Etowah River Blue Trail at The City proposed to build a canoe and 11 Bartow $32,924 $12,550 $45,474
Lake Mounds kayak launch for the Etowah River water trail.
GA 2011 Village Historic Trail Village Historic Trail The City will build a trailhead and trail that will 11 Bartow $100,000 $60,592 $160,592
provide for outdoor recreation in the
surroundings of a tradition-rich town.
GA 2011 Church Trail Whispering Lake - Church This is one of Multiple phases of a trail that 11 Cobb $100,000 $42,980 $142,980
Trail connects neighborhoods to the Big Shanty
Historic District and downtown Kennesaw.
GA 2012 Heritage Riverways Trail Heritage Riverways Trail Construct 15 rest areas for the disabled along 11 Floyd $53,905 $15,200 $69,105
Phase II existing trail
GA 2013 Village Historic Trail Village Historic Trail Phase II Construct 1.5 miles of trail, including bridges, 11 Bartow $100,000 $104,000 $204,000
in historic district
GA 2013 Lower Chattooga River Canoe/Kayak Trail Construct 3 canoe/kayak launches with 11 Chattooga $99,700 $42,475 $142,175
Canoe/Kayak Trail trailhead amenities
GA 2013 Willow Springs Trail Willow Springs Trail Construct 0.25 mile boardwalk trail to connect 11 Chattooga $100,000 $25,000 $125,000
two historic parks
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
GA 2016 Etowah River Water Trail Etowah River Water Trail at 6 miles of water trail with boat launch for 11 Bartow $100,000 $43,731 $143,731
Hardin Bridge canoes and kayaks, paved parking area for
50+ vehicles, one trailhead, landscaping,
picnic tables and directional signage
GA 2018 Mountain Bike Park at North Mountain Bike Park at North Mountain Bike Park at North Cooper Lake 11, 13 Cobb $200,000 $40,000 $240,000
Cooper Lake Park Cooper Lake Park, Phase I Park, Phase I
GA 1996 New Bartram Trail New Bartram Trail Trail construction, bike lane, handicap ramps, 12 Richmond $29,775 $30,000 $59,775
parking, trail head facilities, signage
GA 2006 Sands Greenway Trailhead Construction Acquire parcel and construct trailhead 12 Bulloch $100,000 $57,000 $157,000
including restroom, parking area, and
information shelter.
GA 2008 S&S Greenway Land Acquisition and Acquire 1 acre and develop trailhead. 12 Bulloch $100,000 $64,640 $164,640
Trailhead Construction,
Phase II
GA 2008 Partin Park Nature Trail Nature Trails Construct nature trail about 1,500 feet long. 12 Toombs $25,000 $41,603 $66,603
GA 2008 James Morgan Nature Park Trail and Trailhead Construct about a half-mile of trail and a 12 Emanuel $100,000 $31,024 $131,024
Leisure Trail Construction trailhead
GA 2010 Ohoopee Dunes Trail & Ohoopee Dunes Interpretive Construction of a new trail and trailhead. 12 Emanuel $100,000 $54,464 $154,464
River Launch Trail & River Access
GA 2010 Lower Fishing Creek Trail Fishing Creek Trail The Authority envisions a trail of over nine 12 Baldwin $100,000 $83,810 $183,810
miles in length to connect trail users with the
Oconee River on one end and a recreation
complex on the other, and the grant will
assist with the first phase of the trail.
GA 2010 Luetta Moore Trail Luetta Moore Trail Phase I Grant will assist with the design and 12 Bulloch $100,000 $139,096 $239,096
construction of the first phase of a trail that
will connect parks and neighborhoods on the
northwest side of the city. A substantial
portion of this first phase will pass through an
existing park.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
GA 2010 Vidalia Recreational Trail City Recreational Trail The City is developing a recreation facility on 12 Toombs $42,588 $28,264 $70,852
the eastern municipal boundary that is
planned to include fields and a swimming
pool. The grant will assist with the design and
construction of a nature trail on the property.
GA 2012 Rail Bed Trail Rail Bed Trail Phase II Add 4,000 feet of paved multi-use trail 12 Chatham $100,000 $25,005 $125,005
GA 2012 Ebenezer Greenway Ebenezer Greenway 0.6 unpaved non motorized trail; acquire 12 Effingham $70,000 $17,500 $87,500
28.15 acres for trail construction
GA 2014 Little Ohoopee River Blue Little Ohoopee River Blue 12 Emanuel $79,500 $19,875 $99,375
Trail Trail
GA 2015 Little Ohoopee River Blue Little Ohoopee River Blue The proposed Little Ohoopee River Blue Trail 12 Emanuel $80,000 $20,000 $100,000
Trail Trail will be 5 miles in length and is located in
close proximity to the Ohoopee Dunes
Wildlife Management Area and the Nature
Conservancy's Ohoopee Dunes Preserve.
The water trail will include the development...
GA 2016 Lyons Environmental Lyons Environmental .75 Miles of new trail construction, trailheads 12 Toombs $99,982 $53,400 $153,382
Education Trail Education Trail with signage, water fountains, benches, and
1.5 miles of trail maintenance
GA 2017 Pump Station Trailhead Pump Station Trailhead Construct a new entrance and parking area 12 Richmond $100,000 $105,436 $205,436
to provide public access to the wooden
bridge leading to Raw Water Pumping Station
and bike Trail. Gravel parking lot, wooden
fence, landscape screening, wooden guard
rail barriers, stone screenings walking...
GA 2007 Windham Creek Greenway Trail Construction Construct 1,500 feet of trail, and install 13 Fulton $100,000 $30,865 $130,865
Trail amenities and signs.
GA 2016 Chattahoochee Hills Trails Trails of Chattahoochee Hills Purchase and install a prefabricated 13 Rockdale $100,000 $25,000 $125,000
pedestrian/bike bridge, 4 miles of sustainable
trail and the Cochran Mill Nature Center,
maintain existing trailheads
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
GA 2016 Mayor's Park Trail Mayor's Park Trail New Trail Construction of 0.5 miles of trail, 13 Clayton $95,040 $79,000 $174,040
restroom facilities and maintenance of 0.7
miles of existing trail, benches and trash
recepticles
GA 1993 Simms Mountain Trail Property acquisition and trail construction 14 Floyd $16,748 $3,350 $20,098
GA 1993 Crockford-Pigeon Mountain Trail maintenance/rehabilitation & relocation 14 Walker $6,000 $3,800 $9,800
Wildlife Mgmt Area Trails
GA 1996 Silver Comet Trail Trail Construction 14 Polk $19,871 $19,871 $39,742
GA 2000 Rome-Floyd Heritage Trailhead facilities 14 Floyd $100,000 $25,000 $125,000
Riverway
GA 2000 Pinhoti Trail Construct trail and trailhead facilities 14 Gilmer, Fannin $66,600 $16,650 $83,250
GA 2000 Silver Comet Trail CSX overpass shelter 14 Polk $55,000 $13,750 $68,750
GA 2007 Ringgold Nature Trail Trail Construction Construct nature trail 4,340 feet long with 14 Catoosa $51,126 $27,529 $78,655
amenities and signs.
GA 2008 Black Branch Multi-Use Trail Land Acquisition and Trail Acquire easement and construct paved trail 14 Catoosa $100,000 $111,035 $211,035
Phase II Construction about 1,500 feet long.
GA 2009 Black Branch Multi-Use Trail Acquire Easement and Acquire easement and construct paved trail 14 Catoosa $100,000 $131,407 $231,407
Construct Paved Trail and and trailhead.
Trailhead, Phase III
GA 2014 Chattooga River Greenway Chattooga River Greenway 14 Walker $100,000 $25,000 $125,000
Trail Trail (Phase1)
GA 2014 Park Avenue Trail Park Avenue Trail 14 Chattooga $100,000 $25,000 $125,000
GA 2014 Conasuaga Ranger District Conasuaga Ranger District 14 Murray $78,000 $19,500 $97,500
Motorized Trails Motorized
GA 2015 Chattooga River Greenway Chattooga River Greenway 14 Walker $100,000 $25,000 $125,000
Trail Trail
GA 2015 Park Avenue Trail Park Avenue Trail 14 Chattooga $100,000 $25,000 $125,000
GA 2015 Conasauga Ranger District Conasauga Ranger District 14 Murray $78,000 $19,500 $97,500
Motorized Trails Motorized Trail Maintenance
GA 2017 Silver Comet Trail Silver Comet Accessibility Accessibility improvements for disabled users 14 Polk $100,000 $27,644 $127,644
Improvements and and maintenance of trail.
Maintenance Project
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
GA 2018 Rivers to Ridge-Model Mile Rivers to Ridge-Model Mile Construct Trail 14 Gordon $200,000 $40,000 $240,000
Trail Trail
GA 2018 Silver Comet Trail Church Street Trailhead Trailhead 14 Polk $95,500 $19,100 $114,600
GA 2018 Blue Devil Family Park Jackson Trail Blue Devil Construct trail 14 Harlalson $200,000 $40,000 $240,000
Walking Trail Family Park Walking Trail
GA 1996 North Riverwalk Trail construction 2 Muscogee $58,608 $73,600 $132,208
GA 1999 Reed Bingham Trail Trail reconstruction 2 Cook $95,000 $25,000 $120,000
GA 1999 Flint River Greenway Trail Construction 2 Dougherty $100,000 $159,000 $259,000
GA 2003 Leesburg Central Park Trails Leesburg Central Park Trail Construct Trail 2 Lee $80,000 $28,000 $108,000
GA 2006 Cherokee Park Trail Trail Construction Construct 1.3 mile trail, lake-crossing, and 2 Thomas $200,000 $63,500 $263,500
low-impact lighting.
GA 2008 North Peach Park Trail Trail Extension Construct about 6,800 feet of trail, and install 2 Peach $100,000 $203,850 $303,850
amenities.
GA 2009 Georgetown Recreational Trail Construction and Construct trailhead and about 0.5 miles of 2 Quitman $98,856 $28,552 $127,408
Trail Trailhead Improvements trail.
GA 2011 River Walk River Walk The City plans build a trail to connect several 2 Decatur $100,000 $721,000 $821,000
recreation facilities in the vicinity of the Earle
May Boat Basin and the Flint River.
GA 2011 Brown's Mill Battlefield Brown's Mill Battlefield The grant will help fund a portion of a larger 2 Coweta $100,000 $101,608 $201,608
Recreational Trails Recreational Trails trail system that is planned for the battlefield
site as the County seeks to highlight its rich
history.
GA 2013 Cochran Mill Park Trail Cochran Mill Park Trail Repair trail tread in 10-mile stretch of existing 2 Chattahoochee $100,000 $196,900 $296,900
trails. Construct 8 miles of new trail. Expand
trailhead parking
GA 2014 Byron's Cemetery Trail and Byron's Cemetery Trail & 2 Peach $67,590 $16,820 $84,410
Park Trail Park Trail
GA 2014 Festival Park Trail Festival Park Trail 2 Peach $100,000 $25,000 $125,000
GA 2014 South Peach Park Trail South Peach Park Trail 2 Peach $69,965 $17,491 $87,456
Extension
GA 2015 Byron's Cemetery Park Trail Byron's Cemetery Park Trail 2 Peach $70,000 $17,500 $87,500
GA 2015 Festival Park Trail Festival Park Trail 2 Peach $100,000 $25,000 $125,000
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
GA 2015 South Peach Park Trail South Peach Park Trail 2 Peach $70,000 $17,500 $87,500
Extension
GA 2016 Amerson Water Works Anderson Water Works and Construction of a new concrete paved short 2 Bibb $100,000 $453,000 $553,000
Ocmulgee Heritage Trail Ocmulgee Heritage Trail trail connector.
Connector Connector
GA 2016 Lee County Rails to Trails Lee County Rails to Trails Mulch trail (1 mi) and 3 trailheads 2 Lee $100,000 $20,000 $120,000
Trailheads
GA 2017 Whitewater Creek Trail Whitewater Creek Trail Canoe/kayak launch, flyover for dam, Mulch 2 Macon $100,000 $20,000 $120,000
System System trail (6.8 mi.)
GA 2018 Radium Springs Trail Radium Trailhead Develop trailhead 2 Dougherty $200,000 $40,000 $240,000
GA 2018 Sasser Trailhead Sasser Trailhead Develop trailhead 2 Terrell $100,000 $20,000 $120,000
GA 2007 Brasstown, Toccoa Purchase Trail Maintenance Purchase light machine and perform 2, 8, 9, 10, 14 Banks, Catoosa, $25,107 $6,276 $31,383
Equipment non-routine maintenance on trail tread and Chattooga, Dawson,
related areas. Fannin, Floyd,
Gilmer, Gordon,
Greene, Habersham,
Jasper, Jones,
Lumpkin, Monroe,
Morgan, Murray,
Oconee, Oglethorpe,
Putnam, Rabun,
Stephens, Towns,
Union, Walker, White,
Whitfield
GA 2003 Rock Hawk - Lawrence Lawrence Shoals Trail Maintenance, Construct Trail 3 Putnam $95,000 $68,230 $163,230
Shoals Trail
GA 2006 West Point Chattahoochee Trail and Trailhead Construct 2,000 linear feet of paved trail with 3 Harris $100,000 $25,000 $125,000
River Greenway Construction parking area and trailhead amenities.
GA 2007 Hogansville Water tower Concrete Trail Construction Design and construct 2,000 linear feet of 3 Troup $100,000 $25,930 $125,930
Trail concrete trail with interpretive signage.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
GA 2007 Bowdon-Creek Trails Land Acquisition and Acquire 9 acres and construct trail system to 3 Carroll $92,017 $63,431 $155,448
Trailhead Construction include paved path, hiking path, and
mountain-biking path, along with parking area
and trail amenities.
GA 2009 Chattahoochee River Chattahoochee River East Perform non-routine maintenance on 5 miles 3 Harris, Troup $100,000 $59,700 $159,700
National Water Trail Bank Park Connector of trail, acquire land and develop trailhead,
and construct canoe/kayak launch.
GA 2011 Water Tower Trail Water Tower Trail Phase II The City will use the grant to build a trail and 3 Troup $100,000 $67,934 $167,934
trailhead connecting to an earlier phase of
trail that is directly adjacent to the City's
historic water tower.
GA 2011 Pyne Road Park Trails Pyne Road Park The County was selected to receive a grant 3 Troup $100,000 $25,000 $125,000
for the development of hiking,
mountain-biking, and equestrian trails.
GA 2012 Greenbelt Lake Carroll Trail Greenbelt Lake Carroll Trail Add 800 feet of paved multi-use trail and 3 Carroll $100,000 $54,000 $154,000
trailhead and renovate landscape
GA 2012 Water Tower Trail Water Tower Trail Phase II Construct 0.07 miles of new trail and a 20 by 3 Troup $100,000 $35,124 $135,124
20 foot observation deck
GA 2013 Carrollton Greenbelt Carrollton Greenbelt, Spur to Construct concrete spur trail and bridge 3 Carroll $100,000 $39,100 $139,100
Elementary School connecting school to Greenbelt
GA 2014 Granger Park Trail Granger Park Trail & Park 3 Troup $100,000 $25,000 $125,000
Expansion
GA 2014 Lake Meriwether Trail Lake Meriwether Trail 3 Meriwether $100,000 $25,000 $125,000
GA 2015 Granger Park Trail Granger Park Trail 3 Troup $100,000 $25,000 $125,000
GA 2015 Lake Meriwether Trail Lake Meriwether Trail 3 Meriwether $100,000 $25,000 $125,000
GA 2016 Alabama Street Trialhead Alabama Street Trialhead Construct 150 LF of 12 ft. wide concrete path, 3 Henry $98,000 $19,600 $117,600
a small pocket park with shrubs and trees,
signage canoe launch, trailhead parking with
20 regular spaces + 2 ADA spaces. 25 ft. of
access drive from Alabama St. to site
GA 2017 Quarry's Edge Hike and Bike Quarry's Edge Hike and Bike Trail (4.2 mi.), trailhead, trailhead facility 3 Spalding $100,000 $20,000 $120,000
Trail at Dundee Park Trail at Dundee Park
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
GA 2017 Bush Head Shoals State Bush Head Shoals State Native soil trails (14.1 mi.) 3 Heard $1,103,526 $22,070 $1,125,596
ATV Park ATV Park
GA 2017 North Forty Trail North Forty Trail, Phase I Construction of two segments of trail phase I 3 Henry $92,608 $23,840 $116,448
totaling 0.60 miles, reconstruction of 0.25
miles of trail to paved trail. 6 trailheads.
GA 2018 THREAD-LaGrange College THREAD-LaGrange College Trail construction 3 Troup $200,000 $40,000 $240,000
Connector Connector
GA 2018 Water Tower Trail Hogansville Water Tower Hogansville Water Tower Trail Phase V 3 Troup $200,000 $40,000 $240,000
Trail Phase V
GA 2018 Carrollton Greenbelt Carrollton Greenbelt, Construct concrete spur trail 3 Carroll $200,000 $40,000 $240,000
Southside Spur
GA 2018 Harris County Rails to Trails Harris County Rails to Trails Harris County Rails to Trails Project 3 Harris $200,000 $40,000 $240,000
Project Project
GA 2006 McDonough InTown Trail Construction Construct two tenths mile of paved trail. 3, 13 Henry $74,157 $43,193 $117,350
Bike/Ped Connectivity
GA 2007 Anneewakee Creek Land Acquisition and Trail Acquire parcel for trailhead, construct 3, 13 Douglas $100,000 $85,800 $185,800
Greenway Construction trailhead, and construct one fourth mile of
trail.
GA 2003 Arabia Mountain Trail Arabia Mtn Trail Bridge 4 DeKalb $100,000 $55,000 $155,000
GA 2007 Pine Lake/Snapfinger Creek Trail and Boardwalk Construct boardwalk trail 3,065 feet long, and 4 DeKalb $99,136 $24,784 $123,920
Wetlands Walk Construction restore 1,280 feet of existing lakeside trail.
GA 2009 Camp Creek Greenway Lions Club/ Camp Creek Construct paved trail about 0.3 mile long trail. 4 Gwinnett $100,000 $395,000 $495,000
Greenway Connector
GA 2012 Black Shoals Scenic Trail Black Shoals Scenic Trail 1.8 miles of new unpaved, nonmotorized trail 4 Rockdale $100,000 $46,900 $146,900
and trailhead
GA 2013 Vaughters Farm Trailhead Panola Mountain State Park Construct trailhead parking area with 4 Rockdale $100,000 $25,000 $125,000
restroom facilities
GA 2014 Browns Bridge Launch Browns Bridge Launch 4 Newton $80,000 $16,000 $96,000
GA 2015 Yellow River Water Trail Yellow River Water Trail 4 Newton $80,000 $20,000 $100,000
Browns Bridge Launch
GA 2017 South Rockdale Community Shared Use Trails of South Shared use trail construction of 6.35 miles in 4, 13 Rockdale $100,000 $65,878 $165,878
Park Trails Rockdale Community Park 6 trail segments connecting to the Rockdale
River Trail.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
GA 2008 Harbins Park Trail System Trail Construction and Construct about 16 miles of hiking, 4, 6, 7, 10 Gwinnett $100,000 $1,000,000 $1,100,000
Renovation equestrian and mountain bike trails, and
perform non-routine maintenance on existing
trails.
GA 2006 Mulberry Riverwalk Trail Construction Construct 1.7 mile multi-use trail along 4, 6, 7, 9, 10 Jackson, Barrow, $100,000 $175,000 $275,000
Mulberry River, linking with Phase 1 at Gwinnett, Hall
Liberty Church Road and a proposed park on
Highway 124.
GA 2006 George Pierce Trail Trail Construction Construct two miles of new trail, trailhead 4, 7 Gwinnett $100,000 $1,000,000 $1,100,000
facility, and slope stabilization, and install
signs.
GA 2007 Ivy Creek Greenway Trail and Bridge Construction Construct pedestrian bridge, and construct 4, 7 Gwinnett $100,000 $275,000 $375,000
trail leading from bridge to environmental
education center.
GA 2007 Rogers Bridge Greenway Trail Construction Construct trail 2,700 feet long, with trail 4, 7 Gwinnett $100,000 $103,391 $203,391
Trail amenities and signs.
GA 1993 Cochran Shoals Trails Trail maintenance & restoration, trailhead 5 Fulton $7,000 Unknown $7,000
facilities, signage & parking
GA 2011 Sykes Park Recreational Sykes Park Recreational The City will use the grant to build a 1.5 mile 5 Fulton $80,000 $61,154 $141,154
Trail Trail trail and trail access points at an existing
community park.
GA 2013 Zonolite Park Trails Zonolite Park Trails Construct trailhead and .4 mile of unpaved 5 DeKalb $83,000 $45,140 $128,140
trail
GA 1999 Wild Horse Trail Trail Construction 6 Cobb $100,000 $45,087 $145,087
GA 2001 Pinhoti Trail Construction of a new trail to existing trails 6 Fannin, Gilmer $42,000 $10,500 $52,500
and a parking lot, installation of 1 SST toilet
(ADA)
GA 2008 Garland Mountain Trails Purchase Trail Maintenance Purchase trail-building machine and develop 6 Cherokee $75,000 $108,560 $183,560
Equipment and Trail 11.5 miles of equestrian and hiking trails.
Construction
GA 2009 Holly Springs Downtown Acquire Easement and Acquire easement and construct trail about a 6 Cherokee $100,000 $25,000 $125,000
Trail Construct Trail half-mile long.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
GA 2011 Brook Run Park Trail Brook Run Park Trail The City plans to restore an older trail system 6 DeKalb $100,000 $30,810 $130,810
in this 102-acre park.
GA 2012 Brook Run Park Trail Brook Run Park Trail Phase Add 1 mile of new trail and 1 mile of trail 6 DeKalb $100,000 $29,310 $129,310
II maintenance
GA 2012 Lost Corner Preserve Trail Lost Corner Preserve Trail Acquire 22 acres and construct a 0.84 mile 6 Fulton $90,000 $31,840 $121,840
unpaved trail
GA 2013 Heritage and Boling Heritage and Boling Acquire land access and construct 1 mile trail 6 Cherokee $100,000 $609,049 $709,049
Connector Trail Connector Trail
GA 2014 Old Mill Park Trail Old Mill Park Trail Phase 3 6 Fulton $100,000 $25,000 $125,000
GA 2015 Old Mill Park Trail Project Old Mill Park Trail Project 6 Fulton $100,000 $25,000 $125,000
Phase III Phase III
GA 2017 Briarwood Park Nature Trail Briarwood Park Nature Trail .5 miles of single-use trail, .5 miles of trail 6 DeKalb $100,000 $61,700 $161,700
restoration with environmental and
educational signage and removal of invasive
species throughout
GA 2018 Trails at Providence Park Trails at Providence Park Trails at Providence Park 6 Fulton $200,000 $40,000 $240,000
GA 2007 Kennesaw Community Trail Trail Construction Design and construct 4,200 linear feet of trail 6, 11 Cobb $100,000 $362,560 $462,560
with amenities.
GA 2007 Old Mill Park Trail Trail Renovation and Renovate existing trail and construct new trail 6, 11 Fulton $100,000 $266,588 $366,588
Construction 1,350 feet long, and install interpretive and
educational signage.
GA 2008 Community Trail Land Acquisition and Trail Acquire easements and construct trail about 6, 11 Cobb $100,000 $53,754 $153,754
Construction, Phase III 1,300 feet long.
GA 2007 Island Ford Trail Trail Construction Construct two miles of trail and install 6, 7, 11 Fulton $100,000 $61,315 $161,315
amenities and signs.
GA 1997 Silver Comet Trail Trail Construction Trail Construction 7 Paulding $50,000 $51,000 $101,000
GA 1997 Iron Horse Trail Trailhead Construction Trailhead construction 7 Polk $50,000 $50,000 $100,000
GA 1999 Silver Comet Trail Pumpkin Vine Creek bridge 7 Paulding $159,000 $39,750 $198,750
GA 1999 Silver Comet Trail Trailhead construction 7 Polk $80,000 $20,000 $100,000
GA 1999 Etowah River Trail Trail construction and bridge rehabilitation 7 Bartow $100,000 $60,117 $160,117
GA 2000 Iron Hill Trail Construction of new trail 7 Bartow $100,000 $25,000 $125,000
GA 2000 Pinhoti Trail Trailhead facilities 7 Chattooga $47,200 $11,800 $59,000
GA 2001 Etowah River Trail Develop bike trail to link 2 existing bike trails 7 Bartow $76,000 $19,000 $95,000
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
GA 2001 Silver Comet Trail Construction of full service trailhead for the 7 Paulding $45,000 $11,250 $56,250
Silver Comet Trail
GA 2001 Pinhoti Trail Construct a new trailhead for Pinhoti Trail to 7 Chattooga $80,000 $20,000 $100,000
include restroom, kiosk, and parking area
GA 2001 Iron Hill Bike Trail Construction of phase II of the trail 7 Bartow $100,000 $25,000 $125,000
GA 2001 Silver Comet Trail Construction of abutments and 12 foot wide 7 Polk $100,000 $25,000 $125,000
prefabricated metal bridge over Euharlee
Creek
GA 2002 Iron Hill Bike Trail Phase III of trail construction 7 Bartow $100,000 $25,000 $125,000
GA 2002 Silver Comet Trail Bridge 7 Polk $88,000 $25,000 $113,000
GA 2014 Tribble Mill Greenway Tribble Mill Greenway 7 Gwinnett $100,000 $25,000 $125,000
Connections Connections
GA 2015 Tribble Mill Greenway Tribble Mill Greenway 7 Gwinnett $100,000 $25,000 $125,000
Connection Connection
GA 2006 Laurel Trail Sawnee Mountain Preserve, Construct one fourth mile of paved trail and 7, 9 Forsyth $74,155 $207,295 $281,450
Laurel Trail three fourths mile of natural surface trail, with
signage, parking area and related amenities.
GA 1997 Ocmulgee Greenway Trailhead Construction Trailhead facilities 8 Bibb $50,000 $639,000 $689,000
GA 1999 Ocmulgee Greenway Trailhead construction 8 Bibb $100,000 $29,642 $129,642
GA 1999 Ocmulgee Greenway Trailhead construction 8 Bibb $100,000 $25,000 $125,000
GA 2000 Ocmulgee Greenway Trail Construction 8 Bibb $127,249 $552,656 $679,905
GA 2000 Ocmulgee Greenway Trail Construction 8 Bibb $100,000 $579,905 $679,905
GA 2000 Bay Gall Creek Greenway Trail Construction 8 Houston $100,000 $25,000 $125,000
GA 2001 Ocmulgee Greenway Trailhead facilities 8 Bibb $100,000 $25,000 $125,000
GA 2001 Jean Gillis Memorial Park Acquire 3 acres of land to construct a walking 8 Treutlen $45,000 $11,250 $56,250
Trail and fitness trail
GA 2002 Helena Community Park Community Park Walking Construct Trail 8 Telfair $27,262 $6,816 $34,078
Walking Trail Trail
GA 2007 Big Indian Creek Multi-Use Big Indian Creek Waterway Construct one mile of multi-use trail with 8 Houston $100,000 $50,000 $150,000
Trail Project signage.
GA 2008 Remerton Mill Trails Land Acquisition and Trail Acquire over 2 acres and develop trailhead 8 Lowndes $100,000 $133,064 $233,064
Construction and trail
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
GA 2009 Ocmulgee River Equestrian Equestrian Trail Perform non-routine maintenance on 8 Jasper $100,000 $125,000 $225,000
Trail Maintenance Maintenance equestrian trail and trailhead.
GA 2009 Tom White Linear Park Park Restoration and Design and construct toddler educational 8 Colquitt $100,000 $48,119 $148,119
Restoration and Expansion Expansion trail, repair existing asphalt trail, and install
amenities.
GA 2009 Big Indian Creek Waterway Trail Construction Construct paved trail about 0.4 miles long. 8 Houston $100,000 $57,500 $157,500
Trail #2
GA 2010 Arrowhead Park Multi-Use Arrowhead Park Multi-Use Help build new trails at site. 8 Bibb $91,500 $51,100 $142,600
Trail Trail
GA 2011 Riverwalk Trail Riverwalk Trail The City will use the grant for the design and 8 Pulaski $100,000 $31,700 $131,700
construction of a boardwalk trail on the
riverfront at Veteran's Memorial Park.
GA 2011 Camellia Gardens Trail Camellia Gardens Trail The City proposed to build a trail through the 8 Bibb $100,000 $25,000 $125,000
recently acquired Camellia Gardens and
connecting to Jackson Springs Park and the
Ocmulgee Heritage Trail.
GA 2012 Arrowhead Park Multi-Use Arrowhead Park Multi-Use This is the second year in a row that the 8 Bibb $97,200 $107,600 $204,800
Trail Trail County has been selected to receive a grant
for Arrowhead Park at Lake Tobesofkee. The
Park is home to a burgeoning trail system
that is cared for in part by mountain bikers.
GA 2012 Yellow River Park Trail Yellow River Park Trail Construct 0.5 mile new paved trail and 8 Newton $98,976 $39,300 $138,276
Phase II trailhead sign and canoe launch
GA 2013 Charleston Park Trails Charleston Park The County's park located on Lake Lanier will 8 Forsyth $52,700 $13,175 $65,875
soon be home to a new 6-mile trail system an
the grant will be used to build a trailhead with
parking spaces.
GA 2016 Big Indian Creek Waterway Big Indian Creek Waterway Construction of a 0.97 mile of concrete trail 8 Houston $100,000 $98,965 $198,965
Trail Trail Phase IV along Big Indian Creek
GA 2017 Half Moon Walking Trails Half Moon Walking Trails Develop and enhance .84 miles of trail 8 Wilcox $99,980 $22,330 $122,310
construction and assessment. Clearing,
grubbing, equip. rental, grading, drainage,
asphalt and engineering
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
GA 2018 Lanier County Parks and Lanier County Parks and Nature Trail in Lakeland 8 Lanier $104,356 $20,871 $125,227
Recreational Nature Trail Recreational Nature Trail
GA 2007 Oconee Riverwalk Park Trail Oconee Riverwalk Park Trail Construct 2,100 linear feet of paved trail. 8, 10 Baldwin $100,000 $54,050 $154,050
North Extension
GA 2006 Oconee Riverwalk Park Trail Trail Construction Construct 1,700 linear feet of paved trail and 8, 12 Baldwin $100,000 $54,050 $154,050
2,700 linear feet of soft surface trail.
GA 1993 Amicalola Falls State Park Trail Construction 9 Dawson $23,518 $81,482 $105,000
Nimberwill Ridge Trail
GA 1993 Bull Mountain Trail Trail maintenance/rehabilitation & relocation, 9 Lumpkin $9,000 Unknown $9,000
parking lot, and signage
GA 1996 Whissenhunt ORV Trail Trail maintenance, trailhead facilities, signage 9 Lumpkin $28,502 $28,502 $57,004
System
GA 1996 Houston Valley ATV Trail Trail maintenance, restroom, ADA accessible 9 Whitfield $27,000 $27,000 $54,000
ramp
GA 1996 Locust Stake ATV Trail Repair trail stream crossings, signage 9 Stephens $11,100 $11,100 $22,200
GA 1996 Beasley Knob ORV Trail Trail maintenance/rehabilitation, parking 9 Union $115,110 $15,450 $130,560
area, signage
GA 1996 Fort Mountain State Park Trail Construction 9 Murray $49,000 $56,540 $105,540
Trail
GA 1996 Jake Mountain Multi-Use Trail construction & restoration, parking, 9 Lumpkin $35,416 $33,920 $69,336
Trail bridges
GA 1996 Iron Mountain Trail Trail construction/maintenance/rehabilitation, 9 Fannin, Murray $6,000 $10,000 $16,000
signage, ADA view platform
GA 1996 Tallulah Gorge Access Trail Trail Construction 9 Rabun $25,000 $125,000 $150,000
GA 1997 Chicopee Woods Trails Trail Signage and educational programs 9 Hall $20,046 $20,152 $40,198
GA 1997 Keown Falls Trail Trail maintenance 9 Walker, Rabun $6,800 $6,916 $13,716
GA 1997 Beasley Knob OHV Trails, Trailhead renovation and trail maintenance 9 Union, Murray $12,500 $12,506 $25,006
Davenport OHV Trails
GA 1997 Whissenhunt ATV Trails Trail maintenance and construction 9 Lumpkin $21,000 $21,000 $42,000
GA 1997 Houston Valley ATV Area Trail maintenance 9 Whitfield $23,000 $23,000 $46,000
GA 1997 Locust Stake ATV Trails, Trail maintenance 9 Habersham, $19,600 $34,710 $54,310
Moates Knob ATV Trails Stephens
GA 1999 Chicopee Woods Bike Trail Restoration of trailhead 9 Hall $87,417 $21,854 $109,271
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
GA 1999 Cohutta Motorized Trails Trail maintenance and trailhead facilities 9 Murray $64,000 $16,000 $80,000
GA 1999 Beasley Knob OHV Trails, Trail restoration and trailhead construction 9 Union $104,000 $26,000 $130,000
Davenport OHV Trails
GA 1999 Houston Valley ORV Trails Trail maintenance 9 Whitfield $89,000 $22,250 $111,250
GA 1999 Oakey Mountain and Moates Trail maintenance and trailhead facilities 9 Rabun, Habersham $119,000 $29,750 $148,750
Knob ATV Areas
GA 1999 Willis Knob Trail Trail renovation and maintenance 9 Rabun $97,000 $24,250 $121,250
GA 1999 Toccata River Construction of a canoe take-out facility 9 Fannin $52,000 $13,000 $65,000
GA 2000 Houston Valley ATV Trail restoration 9 Whitfield $78,860 $15,772 $94,632
GA 2000 Sitton Gulch Trail Construction of new trail 9 Walker $100,000 $25,000 $125,000
GA 2000 Lake Russell Trails Trail Construction 9 Stephens, $150,000 $37,000 $187,000
Habersham
GA 2001 Sitton Gulch Trail Phase II of Sitton Gulch Trail at Cloudland 9 Walker $100,000 $25,000 $125,000
Canyon
GA 2001 Black Branch Multi-Use Trail Trail Construction 9 Catoosa $100,000 $25,000 $125,000
GA 2001 Cove Park Trail and Construct a trailhead, parking lot, and 2.4 9 Pickens $75,000 $18,833 $93,833
Trailhead miles of walking/hiking trail
GA 2001 White County Interpretive Construction of 10,000 linear feet 9 White $71,000 $17,750 $88,750
Trail interpretive/hiking trail and 4,000 linear feet
sidewalk/fitness trail
GA 2001 Anderson Creek ORV Trail Construct new motorized trails for connector 9 Gilmer $32,000 $8,000 $40,000
loops
GA 2001 Houston Valley ORV Trail Spot gravel 8 miles of trail; (re)construct 9 Whitfield $26,000 $6,500 $32,500
earthen water bars along 17 miles of trail
GA 2001 Whissenhunt ORV Trail Construct handicap ADA access ramp and 9 Lumpkin $26,000 $6,500 $32,500
concrete pad in parking lot and crosstie
loading ramp
GA 2002 Sitton Gulch Trail Phase III of trail construction 9 Dade $100,000 $25,000 $125,000
GA 2002 Windermere Windermere Trail Construct Trail 9 Forsyth $100,000 $25,000 $125,000
GA 2002 Lumpkin County Park Lumpkin Co. Park Construct trail, restrooms, shelters 9 Lumpkin $100,000 $50,000 $150,000
GA 2002 Williams Mill Greenspace Williams Mill Greenspace Construct Trail 9 Hall $65,000 $25,100 $90,100
Trail Trail
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
GA 2003 Davenport Mountain ATV ATV Trails Trail Maintenance 9 Union $65,000 $16,250 $81,250
Trails, Beasley Knob
GA 2003 Locust Stake ATV Trails ATV Trails Trail Maintenance 9 Stephens $34,000 $8,500 $42,500
GA 2003 Curry Creek Greenway Trail Curry Creek Greenway Trail Construct Trail 9 Jackson $100,000 $37,614 $137,614
GA 2003 Chicopee Woods Trails Chicopee Woods Trail Improvements, bridge 9 Hall $100,000 $31,693 $131,693
GA 2003 Bear Hair Trail Bear Hair Trail Construct Trail 9 Union $35,000 $9,492 $44,492
GA 2003 Nottley River Trail Nottley River Trail Construct Trail 9 Union $100,000 $105,565 $205,565
GA 2003 Sitton Gulch Trail Sitton Gulch Trail Construct Trail 9 Dade $100,000 $25,000 $125,000
GA 2003 Yahoola Creek Trail Yahoola Creek Trail Construct Trail 9 Lumpkin $99,000 $108,720 $207,720
GA 2006 Armuchee-Cohutta District Armuchee-Cohutta District Reshaping and repairing trail tread, 9 Whitfield, Murray $34,430 $8,608 $43,038
Motorized Trail Motorized Trail Rehab constructing and maintaining erosion control
dips, repairing and improving stream
crossings, closing illegal trails, spot graveling,
installing vault toilet at trailhead, and
improving signage.
GA 2006 Beasley Knob OHV Trail Beasley Knob/Davenport Replacing visitor information boards and 9 Union $70,730 $17,733 $88,463
Mountain OHV Maintenance trash cans, repairing trail tread, constructing
and maintaining erosion control dips, closing
illegal trails, spot graveling, installing silt
fencing and hay bales, and seeding and
mulching disturbed soil...
GA 2006 Whissenhunt OHV Trail Whissenhunt OHV Replacing visitor information boards and 9 Lumpkin $53,323 $13,331 $66,654
Maintenance trash cans, repairing trail tread, improving
stream crossings, closing illegal trails,
replacing silt fencing, and seeding disturbed
soil outside the travelways.
GA 2006 Amicalola River Access Trail Accessible Trail Construct one half mile of new, wheelchair 9 Dawson $53,581 $24,746 $78,327
Improvements accessible trail, and repair damage to
existing trail.
GA 2006 Gainesville Midtown Trail Construction Construct one half mile of paved trail with 9 Hall $99,732 $47,470 $147,202
Greenway crosswalks, signage and amenities.
GA 2006 Chicopee Woods Mountain Trail Renovation and Construct over 6 miles of new mountain bike 9 Hall $126,240 $31,560 $157,800
Bike Trails Re-route trail, and re-route certain existing trail.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
GA 2006 Byron Herbert Reece Trail and Bridge Construction Construct pedestrian bridge and trail at 9 Union $74,155 $18,539 $92,694
Trailhead historic site.
GA 2007 Saul Raisin Wood Mountain Trail and Trailhead Construct over 5 miles of mountain bike trail, 9 Whitfield $51,899 $18,860 $70,759
Bike Park Construction parking area and latrine.
GA 2007 Crawfish Springs Nature Trail Construction Construct trail from wetland area to Coke 9 Walker $40,000 $64,600 $104,600
Trail Ovens Park, including signage.
GA 2007 Durham Trail Rail-Trail Development Construct 2.3 miles of trail on former railroad 9 Walker $100,000 $100,276 $200,276
bed.
GA 2009 Beasley Knob ORV Trail Beasley Knob Trail Conduct trail system assessment to 9 Union $50,000 $12,500 $62,500
Assessment determine repair needs.
GA 2009 Conasauga Ranger District Motorized Trail Maintenance Perform non-routine maintenance on over 48 9 Whitfield, Murray $65,170 $16,293 $81,463
Motorized Trails miles of motorized trail.
GA 2010 Cloudland Connector Trail Connector Trail Several entities are pursuing the 9 Dade $96,960 $55,580 $152,540
Section 2 development of a network of trails in and
adjacent to Cloudland Canyon State Park.
This will assist with the construction of a
connecting trail, a series of mountain bike
trails, and two trailheads.
GA 2010 Harrison Memorial Park Memorial Park Trails The City intends to build trails on a park sire 9 Gilmer $100,000 $42,200 $142,200
Trails adjacent to the Ellijay River, grant will assist
with design and construction.
GA 2011 OHV Trail Maintenance Blue Ridge District OHV Trail For maintenance of off-highway vehicle trails 9 Dawson, Fannin, $43,600 $10,900 $54,500
Maintenance in the Blue Ridge District Gilmer, Lumpkin,
Towns, Union
GA 2011 Chattooga River Trail Chattooga River District For maintenance of off-highway vehicle trails 9 Banks, Stephens, $94,581 $23,645 $118,226
Maintenance Motorized Trail Maint. in the Chattooga River District. Habersham, Rabun,
White
GA 2011 Houston Valley Motorized Houston Valley-Cohutta For maintenance of off-highway vehicle trails 9 Whitfield $72,300 $18,075 $90,375
Trails Motorized Trail Maintenance in the Houston Valley and Cohutta areas.
GA 2011 Mount Rachel Multi-Use Trail Mount Rachel Multi-Use Trail The City proposed to build about five miles of 9 Whitfield $100,000 $28,850 $128,850
hiking and mountain biking trails.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
GA 2011 Amicalola Access Parking Amicalola Access Green This river access point, popular with 9 Dawson $70,420 $19,471 $89,891
Lot Parking Lot paddlers, swimmers and anglers, will get a
make-over of its trailhead.
GA 2011 Doris Washington Park Trails Doris Washington Park Trails The grant will assist the City in developing 9 Pickens $100,000 $52,600 $152,600
the first link in a plan to connect parks,
neighborhoods and the downtown district with
a greenway.
GA 2011 USDA Forest Service Trail Systemwide Non-Motorized Trail assessment of the 9 Multiple Counties $0 Unknown $0
Assessment Trail Assessment Chattahoochee-Oconee National Forests
non-motorized trails
GA 2012 Beasley Knob OHV Trail Beasley Knob OHV Trail 4.3 miles of unpaved trail, 11.6 miles of trail 9 Union $508,949 $128,600 $637,549
Maintenance maintenance
GA 2012 Pinhoti Trail Pinhoti Trail Re-route 2.4 miles unpaved trail, renovate existing 9 Banks, Catoosa, $65,000 $16,250 $81,250
trail, install directional signs Chattooga, Dawson,
Fannin, Floyd,
Gilmer, Gordon,
Greene, Habersham,
Jasper, Jones,
Lumpkin, Monroe,
Morgan, Murray,
Oconee, Oglethorpe,
Putnam, Rabun,
Stephens, Towns,
Union, Walker, White,
Whitfield
GA 2012 Mineral Springs Trail Mineral Springs Trail Add 0.5 miles of new trail; 0.5 mile trail 9 Fannin $100,000 $25,000 $125,000
maintenance; Acquire 13.98 acres; construct
benches, picnic tables
GA 2012 Stekoa Park Trail Stekoa Park Trail Add 0.3 miles of unpaved, nonmotorized trail 9 Clayton $30,424 $15,317 $45,741
GA 2012 West Chickamauga Creek West Chickamauga Creek Construct 0.3 miles of new paved non 9 Catoosa $100,000 $101,500 $201,500
Multi-Use Trail Multi-Use Trail motorized trail
GA 2013 Historic Rex Village Trails Historic Rex Village The grant will help the County to acquire 9 Clayton $100,000 $25,000 $125,000
historic property for future trail development.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
GA 2013 Whissenhunt OHV Trail Whissenhunt OHV Trail Motorized trail assessment and maintenance 9 Lumpkin $242,000 $66,000 $308,000
Assessment
GA 2013 Cohutta Motorized Trail Houston Valley-Cohutta Motorized trail system maintenance 9 Whitfield, Murray $78,900 $20,025 $98,925
Motorized Trail Maintenance
GA 2013 Trail of Tears National Trail of Tears Construct 0.5 mile paved trail with interpretive 9 Catoosa $100,000 $55,800 $155,800
Historic Trail signage and scenic creek overlook
GA 2013 Don Carter State Park Trails State Park Trails Network Construct 22 miles of new trail, bridges, 9 Hall $138,000 $34,500 $172,500
Network signage, and trailheads as well as
canoe/kayak launch
GA 2014 Hart County Trail Hart County Trail 9 Hart $57,636 $14,409 $72,045
GA 2014 Chicopee Woods Bridge Chicopee Woods Bridge 9 Hall $100,000 $25,000 $125,000
Project
GA 2014 Nature Trails at Maysville Nature Trails at Maysville 9 Banks, Jackson $100,000 $25,000 $125,000
City Park City Park
GA 2014 Chattooga River Ranger Chattooga River Ranger 9 Banks, Stephens, $119,220 $29,805 $149,025
District OHV Trails District OHV Habersham, Rabun,
White
GA 2014 Duncan Ridge Trail Duncan Ridge Trail 9 Union $86,976 $21,744 $108,720
Improvement
GA 2014 Panther Creek Trail Panther Creek Trail & 9 Habersham $77,000 $19,250 $96,250
Trailhead
GA 2014 Yonah Preserve Multi-Use Yonah Preserve Multi-Use 9 White $94,640 $23,660 $118,300
Trail Trail Phase 1
GA 2014 Pittard Park Trails Pittard Park Trails 9 Clarke $69,860 $17,465 $87,325
GA 2015 Chicopee Woods Bridge Chicopee Woods Bridge The funding will go toward replacing bridges 9 Hall $100,000 $25,000 $125,000
in the mountain bike trail system in the
Walnut Creek area north of Interstate 985
and a Walnut Creek tributary.
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
GA 2015 Hart County Trail Hart County Trail A walking trail through the botanical gardens, 9 Hart $60,000 $15,000 $75,000
but it will actually provide a paved path
through the botanical gardens. It will come
out behind the botanical gardens, and go
around the ball fields. It will circle around,
and, then, there will be...
GA 2015 Maysville City Park Nature Nature Trails at Maysville 9 Banks, Jackson $100,000 $25,000 $125,000
Trails City Park
GA 2015 Byron Herbert Reece Byron Herbert Reece 9 Union $100,000 $25,000 $125,000
Connector Trail Connector Trail
GA 2015 Chattooga River Ranger Chattooga River Ranger 9 Banks, Stephens, $120,000 $30,000 $150,000
District OHV Trails District OHV Trail Habersham, Rabun,
Maintenance White
GA 2015 Duncan Ridge Trail Duncan Ridge Trail 9 Union $87,000 $21,750 $108,750
Improvement
GA 2015 Panther Creek Trail Panther Creek Trail & 9 Habersham $77,000 $19,250 $96,250
Trailhead Maintenance
GA 2015 Yonah Preserve Multi-Use Yonah Preserve Multi-Use 9 White $95,000 $23,750 $118,750
Trail Trail
GA 2015 Pittard Park Trails Pittard Park Trails 9 Clarke $70,000 $17,500 $87,500
GA 2016 Main Street Park Trail Main Street Park Trail .94 miles of new trail construction with 3 9 Dawson $100,000 $58,655 $158,655
(7'x6') treated lumber/metal roof, parking,
signage and picnic tables
GA 2016 Trail of Tears National Trail of Tears Phase II 0.2 miles of multi-use trail, Handicap 9 Catoosa $100,000 $44,200 $144,200
Historic Trail accessible Trailhead to include parking lot
GA 2016 Yonah Preserve Multi-Use Yonah Preserve Multi-Use Construction of approximately 3 miles of 9 White $100,000 $53,432 $153,432
Trail Trail Phase II multi-use trail. Project will include an
assessment to determine if a portion of trail
system can be constructed to meet design
requirements for use by persons with
disabilities. A site assessment of the...
GA 2017 Lake Toccoa Recreational Lake Toccoa Recreational Concrete trail with boardwalk (.7 mi.) 9 Stephens $100,000 $20,000 $120,000
Trail Trail Project
State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds
Year
GA 2017 Helton Creek Falls Trail Helton Creek Falls Provide more stable and improved tread and 9 Union $100,000 $20,000 $120,000
Rehabilitation Trail Project step improvements, trail re-routing, new stair
section, boardwalks, hand rails, parking,
bridging, signage and tree removal.
GA 2017 Lula Nature Trails Project Nature Trails Project Construction of a single-use asphalt trail .6 9 Hall $79,000 $31,810 $110,810
mi.
GA 2018 Yahoola High Trestle Trail Yahoola High Trestle Trail Construct Trail 9 Lumpkin $134,502 $26,900 $161,402
GA 2018 Blue Ridge Ranger District Motorized Trail Maintenance Perform non-routine maintenance 9 Union, Lumpkin $199,998 $40,000 $239,998
Motorized Trails
GA 2018 Buzzards Roost/Grant Farm Buzzards Roost/Grant Farm Buzzards Roost/Grant Farm Mountain Bike 9 Whitfield $200,000 $40,000 $240,000
Mountain Bike Trail Mountain Bike Trail and Trail and Parking Facilities
Parking Facilities
GA 2008 Dry Creek Trail System Trail and Trailhead Perform non-routine maintenance on existing 9, 11 Chattooga, Walker $81,000 $21,500 $102,500
Construction trail, build new loop trail, and construct new
amenities and equestrian trailhead.
GA 2017 Conasauga Ranger District Conasauga Ranger District Trail maintenance of 48.6 miles of trail, 4 9, 14 Whitfield, Murray $70,000 $17,540 $87,540
Motorized Trails OHV Trail Maintenance trailhead facilities, 1.0 of new trail
2017-2019 construction. Environmental restoration.
GA 2018 Conasauga Ranger District Motorized Trail Maintenance Perform non-routine maintenance on over 48 9, 14 Whitfield, Murray $48,600 $9,720 $58,320
Motorized Trails miles of motorized trail.
Grand $33,480,674 $24,792,788 $58,273,462
Totals
(all results)