Public SW Report 31.07.21 to 06.08.21

Total Page:16

File Type:pdf, Size:1020Kb

Public SW Report 31.07.21 to 06.08.21 Newport City Council Road Works Report for the period Saturday 31st July 2021 to Friday 6th August 2021 Signing and Temporary Temporary Diversion Guarding Traffic Lights Road lane closure route in Closure place Stop and Go Give and Take Footway Closed Priority working START END TRAFFIC LOCATION DESCRIPTION OF WORKS DATE DATE MANAGEMENT A467 Resilient roads project - Carriageway 02.08.21 31.03.22 Temporary lane closure resurfacing / construction. Vehicle restraint system and drainage improvement / construction 1 START END TRAFFIC LOCATION DESCRIPTION OF WORKS DATE DATE MANAGEMENT Adeline Street outside number Wales and West Utilities installing main and 14.06.21 30.07.21 Give and take 37 to outside Tredegar Court services Albion Close rear of number 139 Western Power Distribution contractors 29.07.21 05.08.21 Signing & Guarding Commercial Road carrying out 2 joint holes and 1m trenching in footway for reconnection of supply Alicia Crescent new Costa Contractors carrying out connection of new 01.07.21 30.07.21 Temporary road closure Coffee Drive thru storm and foul drainage from new Costa Coffee development to existing Welsh Water drainage in East Dock Road Allt-yr-yn Avenue outside Openreach Contractors laying 2mt of duct in 29.07.21 02.08.21 Signing & Guarding number 87 the footway Allt-yr-yn Avenue outside Openreach Contractors replacing pole in the 04.08.21 06.08.21 Give and take number 59 and 69 verge 2 START END TRAFFIC LOCATION DESCRIPTION OF WORKS DATE DATE MANAGEMENT Anthony Drive near sub station Western Power Distribution contractors 04.08.21 04.08.21 Signing & Guarding vehicles / Hoist in carriageway Bassaleg Road junction of Kerb realignment and improvements to the 10.05.21 16.07.21 Temporary multi way Western Avenue island and footway for Cycle way traffic lights between 09:30 to 15:30hrs Bassaleg Road between Grange Carriageway surface dressing 29.07.21 31.07.21 Temporary road closure Court and Monmouth Court Basaleg Road outside number 84 Openreach Contractors gaining access to 02.08.21 04.08.21 Temporary multi way manhole cover traffic lights Bishton Road near Moorland Filming taking place 31.07.21 01.08.21 Filming Court 3 START END TRAFFIC LOCATION DESCRIPTION OF WORKS DATE DATE MANAGEMENT Bishton Road between the old Welsh Water contractors carrying out sewer 08.07.21 28.09.21 Temporary road closure town hall and Red House Lane relining works Bridge Street MEWP in road to carry out works to travel 01.06.21 31.08.21 Signing & Guarding lodge Bridge Street from the junction Contractors installing duct, rod and roping 01.08.21 01.08.21 Signing & Guarding of Stow Hill to Tunnel Terrace Bridge Street junction of Caxton Openreach Contractors re-roofing manhole 01.08.21 01.08.21 Temporary road closure Place cover Bryngwyn Road outside number Openreach Contractors renewing damaged 30.07.21 03.08.21 Signing & Guarding 1 cover in the footway 4 START END TRAFFIC LOCATION DESCRIPTION OF WORKS DATE DATE MANAGEMENT Brynhyfryd Road outside Openreach Contractors replacing pole in the 29.07.21 02.08.21 Give and take number 11 footway Caerau Crescent outside number Openreach Contractors replacing pole in the 02.08.21 04.08.21 Signing & Guarding 8 footway Caerleon Road outside number Openreach Contractors laying 10mts of duct 01.08.21 01.08.21 Temporary way traffic 491 to 474 in the footway and lights Caerphilly Road Between the Carriageway surface dressing 29.07.21 31.07.21 Stop and go Griffin to Orchard Close and from Maypole house to Machen Fach Farm 5 START END TRAFFIC LOCATION DESCRIPTION OF WORKS DATE DATE MANAGEMENT Cambrian Drive outside number Welsh Water contractors renewing leaking 30.07.21 03.08.21 Signing & Guarding 5 stop tap Cardiff Road Side of Tredegar Repairs to wall being carried out 02.08.21 20.08.21 Temporary lane closure Sports Ground between 09:30 to 15:30hrs Cedar Road Openreach Contractors re-roofing manhole 09.08.21 20.08.21 Temporary road closure Cefn Road junction of The Wales and West Utilities replacing main and 26.04.21 06.08.21 Temporary multi way Uplands to outside 72 Cefn services traffic lights Road Chepstow Road outside number Welsh Water contractors reconnecting 30.07.21 03.08.21 Signing & Guarding 657 supply pipe 6 START END TRAFFIC LOCATION DESCRIPTION OF WORKS DATE DATE MANAGEMENT Cherry Tree Close outside Welsh Water contractors renewing leaking 28.07.21 02.08.21 Signing & Guarding number 8 stop tap Church Crescent outside number Welsh Water contractors renewing leaking 28.07.21 02.08.21 Signing & Guarding 9 stop tap Clytha Park Road between Footway works being carried out 28.07.21 03.08.21 Temporary two-way Llanthewy Road and Caerau traffic lights Road Coast Road between Hawse Carriageway surface dressing 30.07.21 01.08.21 Temporary road closure Lane and Bryn glas farm Commercial Road outside Western Power Distribution contractors 29.07.21 05.08.21 Signing & Guarding number 139 carrying out 1 joint hole in footway for reconnection of supply Commercial Street outside Western Power Distribution contractors 29.07.21 02.08.21 Signing & Guarding number 40 carrying out urgent excavation in highway to locate and repair LV cable fault. 7 START END TRAFFIC LOCATION DESCRIPTION OF WORKS DATE DATE MANAGEMENT Commercial Street junction of Contractors installing duct, rod and roping 01.08.21 01.08.21 Signing & Guarding Corn Street to Westgate Constance Street outside number Openreach Contractors clearing blockage in 06.08.21 10.08.21 Signing & Guarding 8 the footway Copper Beech Close side of Openreach Contractors building new joint 02.08.21 04.08.21 Signing & Guarding number 71 Wentwood Road box in footway & lay 26m of duct (23mts in footway and 3mts in verge) Corn Street junction between Contractors installing duct, rod and roping 01.08.21 01.08.21 Signing & Guarding Skinner Lane and Commercial Street Corporation Road junction of Contractors carrying out investigatory works 03.08.21 03.08.21 Signing & Guarding Oxwich Road to detect & rectify fault in telecoms equipment Cot Hill near Little Milton Plant to removing soil from one site to 19.07.21 06.09.21 Temporary two-way another safely traffic lights 8 START END TRAFFIC LOCATION DESCRIPTION OF WORKS DATE DATE MANAGEMENT Court Crescent outside number 9 Contractors excavating 100m to lay micro 26.07.21 06.08.21 Signing & Guarding to 4 and side of 16 Forge Lane to ducting for fibre network 9 Court Crescent Crindau Road opposite number Western Power Distribution contractors 28.07.21 28.07.21 Signing & Guarding 14 having vehicles / hoist in carriageway Devon Place opposite number 43 Footway closure for work to be carried out 26.07.21 30.09.21 Signing & Guarding to 51 at Newport railway station Dolphin Street outside number Openreach Contractors replacing pole in the 04.07.21 06.08.21 Give and take 46 footway Drinkwater Close outside Virgin Media contractors clearing blockage 03.08.21 05.08.21 Give and take number 9 and laying 5mt of duct in the carriageway Druidstone Road junction of Wales and West Utilities contractors 14.06.21 10.09.21 Temporary road closure Began Road to junction of Cold installing main and services Pit Lane 9 START END TRAFFIC LOCATION DESCRIPTION OF WORKS DATE DATE MANAGEMENT Duffryn Drive Just past junction Contractors carrying out trial hole in the 22.07.21 26.07.21 Signing & Guarding with Wood Side verge East Dock Road near Blaina Contractors carrying out connection of new 01.07.21 30.07.21 Temporary road closure Wharf entrance storm and foul drainage from new Costa Coffee development to existing Welsh Water drainage in East Dock Road Fields Road rear of Civic Centre Tree cutting being carried out 04.08.21 05.08.21 Stop and go car park junction of Clytha Park Road Fosse Close outside number 3 Wales and West Utilities tracing and 27.07.21 02.08.21 Give and take repairing gas escape Frederick Mews rear of number Welsh Water contractors carrying out 03.08.21 04.08.21 Give and take 1 – 6 remedial work Glasllwch Crescent outside Welsh Water contractors renewing existing 30.07.21 03.08.21 Signing & Guarding number 47 stop tap 10 START END TRAFFIC LOCATION DESCRIPTION OF WORKS DATE DATE MANAGEMENT Glebe Street outside number 21 Wales and West Utilities replacing main and 19.07.21 27.08.21 Give and take to junction of Wharf Road services Godfrey Road junction of Openreach Contractors demolishing existing 26.07.21 05.08.21 Temporary multi way Faulkner Road manhole and rebuilding as a carriageway traffic lights joint box. Graham Street footway between Footway closure to repair retaining wall 26.07.21 02.08.21 Footway closure St Edward Street and Graham Street Griffin Street Road closure for MEWP to be placed in 29.03.21 20.08.21 Temporary road closure road to carry out work to Newport Market High Street junction of Market Compound area for Newport Market 15.01.21 31.07.21 Heras Fencing Street 11 START END TRAFFIC LOCATION DESCRIPTION OF WORKS DATE DATE MANAGEMENT Highfield Road, junction of Wales and West Utilities replacing main and 19.07.21 27.08.21 Give and take Highfield Way to junction of services Westfield Road Hoskins Street side of number Wales and West Utilities installing main and 02.08.21 17.09.21 Give and take 60 to outside number 70 services Howe Circle outside number 2 Virgin Media contractors installing tee in the 03.08.21 04.08.21 Signing & Guarding footway Langstone Cottages outside Wales and West Utilities tracing and 29.07.21 04.08.21 Give and take number 3 repairing gas escape Leicester Road, side of number Openreach Contractors clearing blockage in 29.07.21 02.08.21 Signing & Guarding 79 Somerset Road the footway
Recommended publications
  • 73 Bus Time Schedule & Line Route
    73 bus time schedule & line map 73 Newport - Chepstow View In Website Mode The 73 bus line (Newport - Chepstow) has 2 routes. For regular weekdays, their operation hours are: (1) Chepstow: 7:05 AM - 6:00 PM (2) Newport: 8:05 AM - 6:05 PM Use the Moovit App to ƒnd the closest 73 bus station near you and ƒnd out when is the next 73 bus arriving. Direction: Chepstow 73 bus Time Schedule 41 stops Chepstow Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 7:05 AM - 6:00 PM Friars Walk 11, Newport 1-7 Friars Walk Shopping Centre, Newport Tuesday 7:05 AM - 6:00 PM Cenotaph, Newport Wednesday 7:05 AM - 6:00 PM Clarence Place, Newport Thursday 7:05 AM - 6:00 PM Library, Maindee Friday 7:05 AM - 6:00 PM Maindee Square, Maindee Saturday 7:05 AM - 6:00 PM Chepstow Road, Newport Eveswell School, Maindee Walmer Road, Maindee 73 bus Info Direction: Chepstow Beechwood Park, Beechwood Stops: 41 422 Chepstow Road, Newport Trip Duration: 46 min Line Summary: Friars Walk 11, Newport, Cenotaph, Acacia Avenue, Somerton Newport, Library, Maindee, Maindee Square, 429 Chepstow Road, Alway Community Maindee, Eveswell School, Maindee, Walmer Road, Maindee, Beechwood Park, Beechwood, Acacia Farmwood Close, Lawrence Hill Avenue, Somerton, Farmwood Close, Lawrence Hill, 585 Chepstow Road, Alway Community Glanwern Grove, Bishpool, Man Of Gwent, Bishpool, Bishpool Lane, Bishpool, Royal Oak, Celtic Manor, Glanwern Grove, Bishpool Coldra, Taylors Cafe, Langstone, Cat`S Ash Road, 643 Chepstow Road, Alway Community Langstone, Grange, Langstone, New Inn,
    [Show full text]
  • Newport City Council Joint Housing Land Availability Study 2013
    NEWPORT CITY COUNCIL JOINT HOUSING LAND AVAILABILITY STUDY 2013 BETWEEN NEWPORT LPA AND THE STUDY GROUP: HOME BUILDERS’ FEDERATION DWR CYMRU LINC CYMRU MELIN HOUSING ASSOCIATION FAIRLAKE HOUSING ASSOCIATION STRATEGIC SITES AGENTS STUDY DATE: 1 st APRIL 2013 PUBLICATION DATE: MAY 2014 1 Contents 1.0 SUMMARY .................................................................................................................................. 3 2.0 HOUSING LAND SUPPLY ............................................................................................................. 4 3.0 COMMENTARY ........................................................................................................................... 5 4.0 MONITORING DATA .................................................................................................................... 6 Appendices ............................................................................................................................................. 7 2 1.0 SUMMARY 1.1 This is the Newport City Council Joint Housing Land Availability Study for 2013 which presents the housing land supply for the area at the base date of 1st April 2013. It replaces the report for the previous base date of 2012. 1.2 The JHLAS has been prepared in accordance with the requirements of Planning Policy Wales , Technical Advice Note 1 (TAN 1) and the Guidance Note on the JHLAS process 2012. Please refer to these documents for details of the requirements for the maintenance of a five year housing land supply in each
    [Show full text]
  • Newport Cycle Map Shows the Improving E
    E C LAN A4051 RE O PE NT L LE GE A O G VE W L B E N E A 4 K O N 2 O U D R E E 3 B C 6 N L A A To L 4 GL 0 A A D E R N O 5 4 - 0 D US R 1 L K C Cwmbran 4 E D H C I VE 2 F L I A O W R H E R L W T L A R I O D Y E O F A G N C T D R The Newport Cycle Map shows the improving E SO L N S D A G L E T A A D R R LD CL E P BE E FIE IV E RO H O M G R W I L D N O H M E C E network of ‘on’ and ‘off’ road routes for cycling. Be A S N S C T R O V L A ER O T O R E L H L ND SN S E A L C Y A CL D A E C E I L L A C S N W R P L L E O E T K P L R D A N ROO E L Y L A B R E A D N IE C it for getting to work, leisure or as a way to enjoy C L F O K G O N R S ESTFIELD IE H R DO CL G I F A A A HAR W H T L A B R L C R D N R E O IN E Y D DR G C A L F G S I A A R L O O T T AV T H I W E C F N N A L I I H W E D the heritage, attractions, city county or countryside L E L CL A V A A I RI D V D WAY E P A O H E D R H WHITTL E VI E D R L B M P R D C R A I D L S R L BAC D A N O O E IE L N F E N D W M I E of Newport.
    [Show full text]
  • 20C Bus Time Schedule & Line Route
    20C bus time schedule & line map 20C Newport - Newport via Spytty Retail Park View In Website Mode The 20C bus line Newport - Newport via Spytty Retail Park has one route. For regular weekdays, their operation hours are: (1) Newport: 7:50 AM - 5:30 PM Use the Moovit App to ƒnd the closest 20C bus station near you and ƒnd out when is the next 20C bus arriving. Direction: Newport 20C bus Time Schedule 56 stops Newport Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 7:50 AM - 5:30 PM Friars Walk 11, Newport 1-7 Friars Walk Shopping Centre, Newport Tuesday 7:50 AM - 5:30 PM Clarence Place, Newport Wednesday 7:50 AM - 5:30 PM 3/7 Clarence Place, Newport Thursday 7:50 AM - 5:30 PM Junction Road, Barnardtown Friday 7:50 AM - 5:30 PM 18 Caerleon Road, Newport Saturday 7:50 AM - 5:30 PM Durham Road, Newport Elysia Street, St. Julians Community Merlin Crescent, St Julians 20C bus Info Centurion, St Julians Direction: Newport Stops: 56 Caldy Close, St Julians Trip Duration: 71 min Brangwyn Crescent, Beechwood Community Line Summary: Friars Walk 11, Newport, Clarence Place, Newport, Junction Road, Barnardtown, Vale View, St Julians Durham Road, Newport, Merlin Crescent, St Julians, Centurion, St Julians, Caldy Close, St Julians, Vale Hove Avenue, Beechwood View, St Julians, Hove Avenue, Beechwood, Beechwood Road Top, Beechwood, Gibbs Road Top, Beechwood Road Top, Beechwood Beechwood, Christchurch Road Middle, Beechwood, Christchurch Road East, Beechwood, Cemetery, Gibbs Road Top, Beechwood Christchurch, Cemetery Lodge, Christchurch,
    [Show full text]
  • Part 1 Social Housing Grant Report.Pdf
    Report The Leader of the Council Part 1 Date: 15 December 2020 Subject Social Housing Grant Programme 2020/21 Purpose To inform the Leader of the planned development programme that has recently been approved by the Welsh Government. Author Housing Manager Strategy Ward All Summary The planned development programme, as agreed with RSL partners, has recently been approved by the Welsh Government. This report is to make the Leader aware of the schemes included, the amount of SHG funding received and the potential impact for Newport. Proposal To endorse the planned development programme as agreed by Welsh Government. Action by Head of Regeneration, Investment and Housing Timetable Immediate This report was prepared after consultation with: . Linc Cymru . Melin Homes . Newport City Homes . Pobl Group . Head of Law and Regulation - Monitoring Officer . Head of Finance - Chief Finance Officer . Head of People and Business Change . Director, Place Signed Background The Welsh Government distributed Social Housing Grant to local authorities on a formula basis. For the financial year 2020/21 Newport has been awarded £4,867,000 with indicative awards of £3,749,000 for 2021/22 and £2,662,000 for 2022/23. In addition to this £1,646,000 of Recycled Capital Grant has been utilised in 2020/21 making a total of £6,513,000 which will be used to fund new housing developments in Newport in 2020/21. The schemes included in the PDP for 2020/21 are as follows: Tredegar Court, Melin Homes, Pillgwenlly – an ongoing scheme to replace bedsits in a sheltered housing scheme with one and two bedroom flats and as well as improvements to external communal space.
    [Show full text]
  • Environment Agency Rip House, Waterside Drive Aztec West Almondsbury Bristol, BS32 4UD
    En v ir o n m e n t Agency ANNEX TO 'ACHIEVING THE QUALITY ’ Programme of Environmental Obligations Agreed by the Secretary of State for the Environment, Transport and the Regions and for Wales for Individual Water Companies As financed by the Periodic Review of Water Company Price Limits 2000*2005 The Environment Agency Rip House, Waterside Drive Aztec West Almondsbury Bristol, BS32 4UD June 2000 ENVl RO N ME NT, AGEN CY 1 ]2 7 0 0 CONTENTS For each water and sewerage company' there are separate lists for continuous, intermittent discharges and water abstraction sites. 1. Anglian Water 2. Welsh Water 3. Northumbrian Water Group Pic 4. North West Water Pic 5. Severn Trent Pic 6. Southern Water Pic 7. South West Water Pic 8. Thames Water Pic 9. Wessex Water Pic 10. Yorkshire Water Pic 11. List of water abstraction sites for water supply only companies National Environment Programme Key E A R e g io n Water Company ID Effluent Type A A n g lia n . A Anglian Water SCE Sewage Crude Effluent M Midlands DC Dwr Cymru Welsh Water SSO Sewage Storm Overflows NE North East N Northumbrian Water STE Sewage Treated Effluent NW North W est NW North West Water CSO Combined Sewer Overflow S Southern ST Severn Trent Water EO Emergency Overflow SW South W est S Southern Water ST Storm Ta n k T Th a m e s sw South West Water . WA W ales T Thames Water Receiving Water Type wx Wessex Water C Coastal Y Yorkshire Water E Estuary G Groundwater D rive rs 1 Inland CM 3 CM 1 Urban Waste Water Treament Directive FF1 - 8 Freshwater Fisheries Directive Consent conditions/proposed requirements **!**!** GW Groundwater Directive Suspended solids/BOD/Ammonia SW 1 -12 Shellfish Water Directive NR Nutrient Removal S W A D 1 - 7 Surface Water Abstraction Directive P Phosphorus (mg/l) H A B 1 - 6 Habitats Directive N Nitrate (mg/i) B A T H 1 -1 3 Bathing Water Directive 2 y Secondary Treatment SSSI SSSI 3 y Tertiary Treatment QO(a) - QO(g) River and Estuarine Quality Objectives LOC Local priority schemes .
    [Show full text]
  • Desert Island Times Summer Special
    D E S E RT I S L A N D T I M E S S h a r i n g f e l l o w s h i p i n NEWPORT SE WALES U3A Summer Special 17th August 2020 Tintern Abbey, one of our local Historical gems A miscellany of Contributions From OUR members NEWPORT U3A TIMETABLE SUBJECT WEDNESDAY THURSDAY FRIDAY ALL THAT JAZZ 12:15 - 13:15 W3 ART 10:00 - 12:00 W CAFÉ CULTURE/MONTHLY MEETING 10:00 - 12:00 W2 CHOIR. 10:00 - 12:00 W CLASSICAL MUSIC APPRECIATION 13:15 - 15:15 W1,3 CRAFT 10:00 - 12:00 W CREATIVE WRITING 13:15 - 15:15 W CRYPTIC CROSSWORDS 14:15 - 15:30 W2,4 CURRENT AFFAIRS 10:15 - 11:45 W 1,3,4,5 CYCLING Tuesdays April tO OctObEr - Contact Convenor for details EASY MOVEMENT 12:15 - 13:30 W FAMILY HISTORY 13:15 - 15:15 W2,4,5 FRENCH DEBS 14:15 - 15:45 W FRENCH INTERMEDIATE 09:45 - 11:15 W FRENCH LIT 09:45 - 11:15 W FRENCH CONVERSATION 11:30 - 13:00 W GARDENING & WILDLIFE 10:00 - 12:00 W1,3 GERMAN 14:15 - 15:45 W2,4 HISTORY 13:45 - 15:15 W1,3,4 ITALIAN CONVERSATION 12:30 - 13:30 ITALIAN IMPROVERS 13:30 - 14:45 W LINE DANCING 12:15 - 13:15 W1,3 LISTENING TO MUSIC 10:00 - 12:00 W MEDITATION 12:15 - 13:15 W1,3,4 PLAY READING 14:00 - 15:30 W READING 1 12:00 - 13:00 W2 READING 2 13:00 - 14:00 W2 REMINISCENCES 13:30 - 15:00 W2 STANDING PILATES 13:30 - 14:30 W SKITTLES (ST JULIANS INN) 13:15 – 14.30 W2,3 SPANISH (BEGINNERS) 10:00 - 11:15 W SPANISH (ADVANCED) 11:30 - 13:00 W SPECIAL EVENTS, TRIPS As advErtisEd SUNDAY LUNCH CLUB Monthly abOut 13:00.
    [Show full text]
  • Christianity in Newport
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by University of Birmingham Research Archive, E-theses Repository CHRISTIANITY IN NEWPORT By BEATRICE NAMBUYA BALIBALI MUSINDI A Thesis submitted to The University of Birmingham For the Degree of MASTER OF PHILOSOPHY Department of Theology and Religion School of Historical Studies The University of Birmingham September 2014 University of Birmingham Research Archive e-theses repository This unpublished thesis/dissertation is copyright of the author and/or third parties. The intellectual property rights of the author or third parties in respect of this work are as defined by The Copyright Designs and Patents Act 1988 or as modified by any successor legislation. Any use made of information contained in this thesis/dissertation must be in accordance with that legislation and must be properly acknowledged. Further distribution or reproduction in any format is prohibited without the permission of the copyright holder. ABSTRACT This thesis lays the groundwork for Christian congregations engaged in mission. It emerged from my shared experience and reflections of the Christians in Newport engaged in Mission. The focal point of exploration of the thesis was how Christians in Newport in South Wales defined their Christian task and how this affected their expression in the Communities where they lived. This thesis seeks to give a voice to the views of the People in Newport. A detailed overview of the historical and current status is explored and described. This reveals a considerable change and adaptation in missiology, Church expression and new forms of church. The current experience of some groups of Christians in Newport is described based on extensive fieldwork.
    [Show full text]
  • Welsh Government M4 Junction 28 Improvements NMU Context Report
    Welsh Government M4 Junction 28 Improvements NMU Context Report M4J28-ARP-ENM-SWG-RP-YT-000001 P01 | 22 May 2015 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party. Job number 240226 Ove Arup & Partners Ltd 4 Pierhead Street Capital Waterside Cardiff CF10 4QP United Kingdom www.arup.com Document Verification Job title M4 Junction 28 Improvements Job number 240226 Document title NMU Context Report File reference Document ref M4J28-ARP-ENM-SWG-RP-YT-000001 Revision Date Filename M4J28-ARP-ENM-SWG-RP-YT-000001.docx P01 22 May Description First draft 2015 Prepared by Checked by Approved by Name Signature Filename Description Prepared by Checked by Approved by Name Signature Filename Description Prepared by Checked by Approved by Name Signature Filename Description Prepared by Checked by Approved by Name Signature Issue Document Verification with Document V M4J28-ARP-ENM-SWG-RP-YT-000001 | P01 | 22 May 2015 \\MCCNTSI03\PW_ICS_WORKINGDIR\1583\61669_13\M4J28-ARP-ENM-SWG-RP-YT-000001.DOCX Welsh Government M4 Junction 28 Improvements NMU Context Report Contents Page 1 Introduction 1 1.1 Purpose of the Report 1 1.2 Methodology 1 1.3 Objectives 1 2 Scheme Description 2 3 Strategic Objectives 4 3.1 Welsh National Transport Strategy 4 3.2 Active Travel 4 3.3 Transport in the Cardiff Capital Region 4 3.4 Newport Unitary Development Plan 1996-2011 5 3.5 Scheme Specific Contract Objectives
    [Show full text]
  • LDP Examination Hearing Session 3 – Council's Response to Matters
    Newport City Council Local Development Plan Council Response to Matters Arising Hearing Session 2: Housing Provision & Hearing Session 3: Housing Delivery Hearing Session 2: Housing Provision 1 Review and update table in policy H1 of sites contributing to the identified overall housing supply of 11,622 units over the Plan period (ie identified requirement +12% flexibility allowance) in light of current evidence and points discussed during hearing. 1.1 The submitted LDP (Dec 2013) made provision for 11,622 units within the Plan period. An updated Housing Supply figure was prepared for Housing Session Paper 2 (Page 34), which gave a supply of 11,326. Anticipated delivery rates at Glan Llyn during the Plan period is the principal reason for this change in supply. These amended delivery rates match the rates agreed as part of the most recent JHLAS. 1.2 At Hearing Sessions 2 and 3, site specific housing figures were scrutinised and revisions made to reflect sites which were not going to be delivered within the plan period and changes in site capacity to reflect the latest position in the sites. Table H1 – Housing Commitments and Proposals, has been updated to reflect these changes (see Appendix 1). A detailed overview of each site in Table H1 has been prepared as a basis for demonstrating the deliverability within the plan period and highlighting site specific constraints (details are set out in Appendix 2). The Council maintains its position that the housing sites identified in Policy H1 are deliverable and has progressed with the housing calculations on this basis. 1.3 Updated Table H1 sites give the Council a supply of 9053 units (including 203 units on sites under construction).
    [Show full text]
  • 8A Bus Time Schedule & Line Route
    8A bus time schedule & line map 8A Newport - Ringland via Ringwood Avenue View In Website Mode The 8A bus line (Newport - Ringland via Ringwood Avenue) has 2 routes. For regular weekdays, their operation hours are: (1) Newport: 6:47 AM - 7:00 PM (2) Ringland: 6:30 AM - 6:43 PM Use the Moovit App to ƒnd the closest 8A bus station near you and ƒnd out when is the next 8A bus arriving. Direction: Newport 8A bus Time Schedule 19 stops Newport Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 6:47 AM - 7:00 PM Sterndale Bennett Road, Ringland Tuesday 6:47 AM - 7:00 PM Dawson Close, Ringland Wednesday 6:47 AM - 7:00 PM Milton Primary School, Ringland Thursday 6:47 AM - 7:00 PM Community Centre, Ringland Friday 6:47 AM - 7:00 PM Milton Close, Ringland Community Saturday 8:00 AM - 7:00 PM Hawkins Crescent, Ringland Royal Oak Treberth Rise, Ringland Community 8A bus Info Bishpool Lane, Bishpool Direction: Newport Stops: 19 Man Of Gwent, Bishpool Trip Duration: 21 min 711 Chepstow Road, Ringland Community Line Summary: Sterndale Bennett Road, Ringland, Dawson Close, Ringland, Milton Primary School, Garage, Bishpool Ringland, Community Centre, Ringland, Hawkins 592 Chepstow Road, Alway Community Crescent, Ringland, Royal Oak, Bishpool Lane, Bishpool, Man Of Gwent, Bishpool, Garage, Bishpool, Glanwern Grove, Bishpool Glanwern Grove, Bishpool, Farmwood Close, 635 Chepstow Road, Alway Community Lawrence Hill, Lawrence Hill, Somerton, Beechwood Park, Beechwood, Walmer Road, Maindee, Eveswell Farmwood Close, Lawrence Hill School, Maindee,
    [Show full text]
  • Newport City Council Joint Housing Land Availability 2019
    Newport City Council Joint Housing Land Availability 2019 Between Newport Local Planning Authority and the Study Group: Home Builders’ Federation and Study Group Members June 2019 Contents 1. Summary ......................................................................................................................................... 3 2. Housing Land Supply ...................................................................................................................... 4 Appendix 1 – Final Site Schedule ........................................................................................................... 5 Appendix 2 – Past Completion Data ...................................................................................................... 6 Appendix 3 – Previous Land Supply Data .............................................................................................. 7 1. Summary 1.1. This is the Newport City Council Joint Housing Land Availability Study (JHLAS) for 2019 which presents the housing land supply for the area at the base date of 1st April 2019. It replaces the report for the previous base date of 2018. 1.2. The JHLAS has been prepared in accordance with the requirements of Planning Policy Wales (PPW) and Technical Advice Note 1 (TAN 1). Please refer to these documents for details of the requirements for the maintenance of a five year housing land supply in each Local Planning Authority area and the process for undertaking the JHLASs http://gov.wales/topics/planning/policy/tans/tan1/?lang=en . 1.3. Section
    [Show full text]