Text in Times New Roman, 12 Pt

Total Page:16

File Type:pdf, Size:1020Kb

Text in Times New Roman, 12 Pt TARURA - ARUSHA REGIONAL COORDINATOR INVITATION FOR BIDS 08th July, 2019 1. This Invitation for Tenders follows the General Procurement Notice for this Project which appeared in Tanzania Tender Portal dated 6th June, 2019. 2. The Government of the United Republic of Tanzania has set fund for operation of road maintenance through TARURA- Arusha Regional Coordinator during the financial year 2019/2020. It is intended that part of the proceeds of the fund will be used to cover eligible payment under the contracts for executions of the following works. TENDER NUMBER TENDER DESCRIPTIONS ELIGIBLE CIVIL CONTRACTORS (CLASS) AE/092/2019/2020/AR/W/01 Periodic maintenance jacaranda 0.2km, goliondoi 0.4km and kijenge V and Above juu-ngulelo 0.5km roads. Routine Maintenance, Spot AE/092/2019/2020/AR/W/03 Improvement, Periodic VI and Above maintenance and construction of drainage system along Lodhia 2.2km, Makaburini 0.6km, Mwanama-Kanisa 1.4km, Ebeneza 2.0km, Moshono kati 0.6km, Olkerian-Kanisa 2.0km and Masista mbonika 2.5km roads. Spot Improvement, Periodic Maintenance and structures along VI and above AE/092/2019/2020/AR/W/04 Meshuko 0.9km, Green Valley 0.6km, Kisimani-maweni 7.7km, Bar mpya 0.8km, BBC 4.5km roads VI and Above Spot Improvement and AE/092/2019/2020/AR/W/05 Construction of box culverts along Mkonoo 7.9km and Safina- Lolovono roads Routine maintenance, Spot VI and Above Improvement, Periodic AE/092/2019/2020/AR/W/06 maintenance and Construction of drainage system along Moshono- PPF 2.8km, Onsea-Moivaro 1.5km, Relini-Kambi ya Chupa 3.8km, Olepolosi 1.9km, Suye-Nazareti 2.3km, Tbl-Tanesco(Lemara) 2km,Moshono-kwa mrefu 2.3km,Ilboru 0.1km Boma siara roads. Routine Maintenance,Spot VI and above Improvement and Structures along AE/092/2019/2020/AR/W/07 Esso-Longdong 2.1km,Olmatevezi 4.6km,Bero 3.5km,Shamsi-Kibanda maziwa 1.6km,Urundini 1.3km,White rose 0.2km,Kibo 3.1km ,Majengo-Bumiko,White rose roads. AE/092/2019/2020/AR/W/08 Spot Improvement and Structures VII and above along Murriet-Sojema 2km, Oljoro- Kisimani 4.1km, Gambo and Murriet-Sojema roads. AE/092/2019/2020/AR/W/09 Periodic maintenance along VI and above Kisongo-Musa roads,Haki roads,Mateves-Musa -Mwandet roads,TPRI-Likamba-Mondulli roads, Spot improvement along Haki roads, Routine maintenance along Kisongo-Musa roads and TPRI- Likamba-Monduli roads AE/092/2019/2020/AR/W/10 Periodic maintenance works, Kwa VII and above Idd- Narumo roads, Spot improvement works along Oltruroto- Mringa roads, AE/092/2019/2020/AR/W/11 P0e00r0iodic maintenance along VI and above Sekei-Olgilai roads,Sokoni ll- Bangata-Midawe roads,Silent Inn - Freedom Hotel roads,White Rose- Loning'o,Ilboru-Selian-Loning'o- Ngaramtoni roads ,KKKT-Ilboru- Kwa Adiel, Spot improvement along Sanawari - oldonyosapuk roads,Sekei-Olgilai roads, Ilboru- Selian-loning'o- Ngaramtoni and Routine maintenance along Silent Inn-Freedom Hotel roads AE/092/2019/2020/AR/W/12 Periodic maintenance along VI and above Malalua-Nduruma-Bwawani- Simanjiro roads,Gomba Estate- Msitu wa Mbogo roads,Mbuyuni- Mirongoine roads, Spot improvement along Gomba Estate- msitu wa Mbogo roads, Ojoro- Duka la mabo-Laroi roads and Routine maintenance along malalua-Nduruma-Bwawani- Simanjiro roads AE/092/2019/2020/AR/W/13 Routine Maintenance,Spot VII and above improvement, Periodic Maintenance & Construction of structures along Njiapanda - M/Barazani and M/Barazani - Qangdend -Mang'ola ,Mkwajuni- Endamaghang and Changarawe - Endashangwet (21.4km). AE/092/2019/2020/AR/W/14 Routine Maintenance, Spot VI and above Improvement, Periodic Maintenance, along DDH -Bashay, Karatu -Qurus, & Charm - G/Arusha road 8.5km AE/092/2019/2020/AR/W/15 Routine maintenance, Spot VI and above Improvement, Periodic Maintenance and construction of structures along Manyara - Lositete,Rhotia -K/Simba, K/Simba -Slahamo, K/Simba -U/Kitete road 22.0 km AE/092/2019/2020/AR/W/16 Routine Maintenance, Spot VII and above Improvement,Periodic Maintenance along Endash -Manyara ,Endabash --Kansay, Basodawish - Endalla,Kibaoni-Endamarariek 16.0km AE/092/2019/2020/AR/W/17 Routine Maintenance, Spot VI and above improvement and Periodic maintenance along Longido - Mairouwa - Matale (7.24Km), Lesing'ita - Mundarara (1.7KM) and Namanga - Sinoniki - Mairouwa (6KM) Roads, Bridge protection along Lesing'ita - Mundarara and construction of Solid drift along Longido-Mairouwa - Matale Roads. AE/092/2019/2020/AR/W/19 Routine maintenance, Spot VI and above Improvement and periodic Maintenance along Namanga - Sinya 10Km and Namanga NMB - Eworendeke Health Centre Road (0.48 Km) AE/092/2019/2020/AR/W/20 Routine and Periodic maintenance VII and above works along Ketumbeine - Elang'atadapash - Noondoto Road (11km) AE/092/2019/2020/AR/W/22 Periodic maintenance along VI and above Ambureni - Nkoanrua 3.27Km, Nkoanrua - Kimundo 2.15Km, Kimundo - Seela 1.35Km, Routine maintenance along Machumba - Nkoanrua 2Km, Nkoaranga - Sura 2Km and Drainage works along Ubungo - Irikolanumbe road. AE/092/2019/2020/AR/W/24 Routine maintenance along VII and above Ngarenanyuki - Ngabobo road 2.5Km, Malula - Nkoansio - King'ori road 9.2Km, Maji ya Chai - Sakila road 6Km and Construction of 1Nos of Bridge along Kisimiri Sec Road AE/092/2019/2020/AR/W/25 Periodic maintenance work along VI and above Monduli - Lendikinya - Mti mmoja 4.14km road, Periodic and routine maintenance works along Monduli - Lashaine - Arkatan 7.5km road. AE/092/2019/2020/AR/W/26 Periodic maintenance work along VII and above Regional road - Lashaine road (Kuyoa road) 1.05km, Routine maintenance and Construction of 2- Cell Box Culvert along Monduli - Olarash - Kosovo road 12km. AE/092/2019/2020/AR/W/27 Spot improvement works along VII and above Kisongo - Moita Bwawani 5km, Periodic maintenance work along JKT Oljoro - Moita Bwawani 2km and Periodic maintenance work 3km along Meserani chini - Naalarami 3Km roads. AE/092/2019/2020/AR/W/29 Spot improvement work along VII and above Naitolia - Tree Top - Lemooti 5Km road and Periodic maintenance work along Makuyuni -Lemioni- Lemooti 4.14km road. AE/092/2019/2020/AR/W/30 Spot improvement work along VII and above Barabarani - Jangwani 3Km road, Spot improvement works along Barabarani - Migungani 3km road, periodic maintenance works along Kigongoni/Trunk road - Konoike road(Mto wa mbu Hospital road) 0.77km and Periodic maintenance work along Selela - Mbaashi 2km road. AE/092/2019/2020/AR/W/31 Periodic Maintenance works along VI and above Wasso Hospital road,Halmashauri road,NMB Bank-Prison road, LR 19 road and Spot Improvement works along Wasso-Sakala-Loliondo road. AE/092/2019/2020/AR/W/32 Routine Maintenance works along VII and above Oldonyowas-Ormania road,Kibaoni-Arash, Oldonyowas Shule ya Msingi and Spot Improvement works along Ormania-Olalaa-Malambo road. AE/092/2019/2020/AR/W/33 Periodic Maintenance works along VI and above Olorien/Magaiduru-Mageri- Samunge road and Spot Improvement works along Sale- Malambo road. AE/092/2019/2020/AR/W/35 Routine Maintenance works along VII and above Loliondo-Ng'arwa-Tinaga-Mugholo and Spot Improvement works along Wasso-Oloipiri-Soitsambu road. 3. The Tanzania Rural and Urban Roads Agency (TARURA) Arusha Region on behalf of chief Executive Officer (CEO)-TARURA now invites sealed Tenders from eligible and qualified Local Contractors registered by the Contractors Registration Board (CRB) in the above-mentioned Classes. 4. Tendering will be conducted through the National Competitive Bidding specified in the Procurement Regulations, 2013 – Government Notice No.446 and is open to all Tenderers as defined in the Regulations unless otherwise stated in the Tender Data Sheet. 5 Interested eligible Tenderers may obtain further information from and inspect the Tendering Documents at the office of The Secretary, Delegated TARURA – Arusha Regional Tender Board, P.O. Box 1970, Arusha. Located at Arusha International Conference Centre Building, (AICC) Kilimanjaro wing 3rd Floor, Room No. 321, between 07:30 am and 03:30 pm from Monday to Friday inclusive, except on public holidays. 6 A complete set of Tendering Document(s) in English and additional sets may be purchased by interested Tenderers on the submission of a written application to the address given under paragraph 5 above and upon payment of a non-refundable fee of Tsh 100,000.00 (Tanzania Shillings One Hundred Thousand only) for each set, payable either by Banker’s Cheque or Banker’s Draft to TARURA COLLECTION ACCOUNT, THROUGH NATIONAL MICROFINANCE BANK KAMBARAGE BRANCH DODOMA ACCOUNT NUMBER: 53010001080 PAYMENT MUST BE DONE BY OBTAINING PAYMENT CONTROL NUMBER THROUGH MOBILE NO.+255 763 362 670. 7 All Tenders must be accompanied by a Tender securing declaration in the format provided in the Tendering documents unless otherwise stated in the Tender Data Sheet. 8 All Tenders in one (1) original plus (three) 3 copies properly filled in, and enclosed in plain envelopes must be delivered to the address The Secretary, Delegated TARURA – Arusha Regional Tender Board, P.O. Box 1970, Arusha. Located at Arusha International Conference Centre Building, Kilimanjaro wing 3rd Floor, Room No. 321, on 22nd July, 2019. before 10:00 hours local time. Tenders will be opened promptly thereafter in public and in the presence of Tenderers’ representatives who choose to attend in the opening at the AICC Compound at the Arusha International Conference Center, Arusha immediately after submission deadline and in the presence of Tenderers’ representatives who choose to attend 9 The arranged site visit shall be conducted on 11th - 20th July, 2019 at 09 00 hours local time (Mandatory) . Participants will meet at the offices of the TARURA Council Managers.(for more detail you will find in a specific tender document) 10 Late Tenders portion of Tenders, electronic Tenders, Tenders not received, Tenders not opened at the Tender opening ceremony shall not be accepted for evaluation irrespective of the circumstances.
Recommended publications
  • Spatial Uncertainties in Fluoride Levels and Health Risks in Endemic Fluorotic
    Groundwater for Sustainable Development 14 (2021) 100618 Contents lists available at ScienceDirect Groundwater for Sustainable Development journal homepage: www.elsevier.com/locate/gsd Research paper Spatial uncertainties in fluoridelevels and health risks in endemic fluorotic regions of northern Tanzania Julian Ijumulana a,b,c,*, Fanuel Ligate a,b,d, Regina Irunde a,b,e, Prosun Bhattacharya a,g, Jyoti Prakash Maity f, Arslan Ahmad g,h,i, Felix Mtalo b a KTH-International Groundwater Arsenic Research Group, Department of Sustainable Development, Environmental Science and Engineering, KTH Royal Institute of Technology, Teknikringen 10B, SE-100 44 Stockholm, Sweden b Department of Water Resources Engineering, College of Engineering and Technology, University of Dar Es Salaam, Dar Es Salaam, Tanzania c Department of Transportation and Geotechnical Engineering, College of Engineering and Technology, University of Dar Es Salaam, Dar Es Salaam, Tanzania d Department of Chemistry, Mkwawa College of Education, University of Dar Es Salaam, Tanzania e Department of Chemistry, College of Natural and Applied Sciences, University of Dar Es Salaam, Tanzania f Department of Earth and Environmental Sciences, National Chung Cheng University, 168 University Road, Min-Hsiung, Chiayi County, 62102, Taiwan g KWR Water Cycle Research Institute, Groningenhaven 7, 3433 PE Nieuwegein, The Netherlands h SIBELCO Ankerpoort NV, Op de Bos 300, 6223 EP Maastricht, the Netherlands i Department of Environmental Technology, Wageningen University and Research (WUR), Wageningen, The Netherlands ARTICLE INFO ABSTRACT Keywords: Spatial uncertainty caused by large-scale variation in fluoride(F ) occurrence remains a setback for water supply Groundwater authorities in the F belts of the world. It is estimated that approximately 80 million people in the East African Fluoride contamination Rift Valley (EARV) regions and volcanic areas exhibit a wide variety of fluorosissymptoms due to drinking water Probability kriging with F‾ concentrations higher than 1.5 mg/L (WHO guideline limit).
    [Show full text]
  • Arumeru District Catherine W
    Conservation agriculture as practised in Tanzania Conservation agriculture in Africa series Series editors Bernard Triomphe Josef Kienzle Martin Bwalya Soren Damgaard-Larsen Titles Conservation agriculture as practised in Ghana Philip Boahen, Benjamin Addo Dartey, Genevieve Delali Dogbe, E. Asare Boadi, Bernard Triomphe, Soren Daamgard-Larsen, John Ashburner Conservation agriculture: a Uganda case study Paul Nyende, Anthony Nyakuni, John Peter Opio, Wilfred Odogola Conservation agriculture in Zambia: a case study of Southern Province Frédéric Baudron, Herbert M. Mwanza, Bernard Triomphe, Martin Bwalya Conservation agriculture as practised in Kenya: two case studies Pascal Kaumbutho, Josef Kienzle, editors Laikipia District Tom Apina, Paul Wamai, Philip Mwangi Siaya District Philip K. Mwangi, Kennedy O. Okelo, Tom Apina Conservation agriculture as practised in Tanzania: three case studies Richard Shetto, Marietha Owenya, editors Arumeru District Catherine W. Maguzu, Dominick E. Ringo, Wilfred Mariki, Marietha Owenya, Flora Kola, Charles Leseyo Karatu District Dominick E. Ringo, Catherine W. Maguzu, Wilfred Mariki, Marietha Owenya, Njumbo, Frank Swai Mbeya District Saidi Mkomwa, Ahaz Mussei, Remmy Mwakimbwala, Ndabhemeye Mulengera, Elimpaa Kiranga Conservation agriculture as practised in Tanzania: three case studies Richard Shetto, Marietha Owenya, editors Arumeru District Karatu District Mbeya District Publishers African Conservation Tillage Network (ACT) PO Box 14733, Westlands Nairobi 00800, Kenya tel and fax: +254 20 445 1391 website:
    [Show full text]
  • 1. Arumeru District Council
    1. Arumeru District Council P.1.1 : RR_SI and RR_PM Gombe Estate Mmbogo and P 1.1 : RR_SI and RR_PM Gombe Estate‐Mmbogo and Mlalua‐Nduruma‐Bwawani Mlalua‐Nduruma‐Bwawani P 1. 3 : Construction of Materninty Ward at Oltrumet P 1.2 : Construction of Materninty Ward at Oltrumet Health Centre Health Centre P 1.5 : Construction of Materninty Ward at Oltrumet Health Centre P 1. 4 : Construction of Sekei Bridge P.1. 5 : Construction of Sekei Bridge P 1. 6 : Construction of Boundary Fence around ADC 2. BAHI DISTRICT COUNCIL P 2.1: Aditors at contractor's site office reviewing P2.2: Uncompacted fill and poor concrete drawings workmanship on Kongogo Dam P 2.3: Un‐cemented Riprap at Kongogo Dam P 2.4: Poorly trimmed borrow pit at Kongogo P 2.5: Auditors checking dimensions compliance at Bahi DC P 2.6: Completed Kigwe Mnadani Drift Servant Quarters P 2.7: Auditors confirming a borehole at Mchito P 2.8: Auditors discussing with village leader at Borehole Mundemu on the way forward - dry borehole 3. Bukoba District Council P. 3.1: Cracks can be seen on the floor and walls of a newly constructed Agricultural Centre at Kikomelo P. 3.2: A newly constructed small bridge P 3.3: Oversize, dirty, sand stone coarse aggregates used for bridges/box culverts along Kalebe- Nyakibimbili road P 3.4: A bridge whose width was increased a day after casting without engineer’s approval along Kalebe- Nyakibimbili road 4. Geita District Council P 4.1: Poorly constructed pavement at the New Geita Bus Stand P 4.2: An auditor and PE Technician carrying out P 4.3: Well constructed headwalls and wingwalls and measurements at the New Geita Bus Stand poorly compacted approaches along Geita Town – Katoma Area Roads P 4.4 Poor workmanship on constructed headwall P 4.5 One of the existing “Bridges” along Sungusira and wing walls along Sungusira – Nyakaduha Road Road 5.
    [Show full text]
  • The Case Study of Three Villages in Karatu District Tanzani A
    SOUTHERN NEW HAMPSHIRE UNIVERSIT Y & THE OPEN UNIVERSITY OF TANZANI A MASTER OF SCIENCE IN COMMUNITY ECONOMIC DEVELOPMEN T (2005-2007) PERFORMANCE EVALUATION O F COMMUNITY BASED ENVIRONMENTA L CONSERVATION PROJECTS THE CASE STUDY OF THREE VILLAGES IN KARATU DISTRICT TANZANI A THE PROJECT REPORT SUBMITTED I N PARTIAL FULFILMEN T FO R THE REQUIREMENTS O F THE MASTER OF SCIENCE DEGREE IN COMMUNITY ECONOMIC DEVELOPMEN T (MSc-CED). SALUSTIN N . HALL U i SUPERVISOR'S CERTIFICATIO N I, D r Jame s Lweikiz a Kisoza , I certify tha t I have thoroughly rea d this projec t report o f Salusti n Nicola s Hall u title d PERFORMANC E EVALUATIO N O F COMMUNITY BASED ENVIRONMENTA L CONSERVATION PROJECTS . And found it to be in an acceptable form for submission ii COPYRIGHT: All rights reserved. No part of this work may be reproduced, copied or transmitted in any form or by any means of electronic retrieval or mechanical, without prio r permission of the author. iii DECLARATION I, Salusti n Nicola s Hallu , d o hereb y declar e t o th e SENAT E o f th e Ope n University o f Tanzania that this projec t pape r i s the resul t o f m y original findings , and tha t i t ha s no t bee n submitte d fo r th e simila r degre e awar d i n an y othe r University. iv DEDICATION I extend m y appreciatio n to m y family fo r thei r understanding , when the y misse d my ful l fatherl y car e when I was bus y undergoin g schedule s for m y MS c CED degree programme.
    [Show full text]
  • Local Knowledge of Soils Among the Iraqw in Selected Villages in Mbulu and Karatu Districts: Implications for Research Interventions
    Mwaseba D. et al.: Local knowledge of soils among the Iraqw in Mbulu 150 LOCAL KNOWLEDGE OF SOILS AMONG THE IRAQW IN SELECTED VILLAGES IN MBULU AND KARATU DISTRICTS: IMPLICATIONS FOR RESEARCH INTERVENTIONS Mwaseba1, D., Msanya1, B.M., Ole-Meiludie 2, D.J. and Massawe 3, A.W. 1Sokoine University of Agriculture, P. O. Box 3022, Morogoro, Tanzania 2 Ministry of Agriculture and Cooperatives, TOSCA, P.O. Box 1056 Morogoro, Tanzania 3 Ministry of Agriculture and Cooperatives, Rodent Control Centre, P.O. Box 3047 Morogoro, Tanzania ABSTRACT This article reports on some findings from an on-going study in seven villages in Mbulu and Karatu Districts. These are Kainam, Gunyoda and Moringa (Mbulu District) and Kambi ya Simba, Kilima Tembo, Rhotia Kati and Kansay (Karatu District). The selected villages are predominantly inhabited by the Iraqw who are Afroasiatic or Hamitic- Cushitic speaking people. They form 65% of the people in the two districts. Using a combination of Participatory Rural Appraisal (PRA) and formal surveys the study found that there is a wealth of knowledge with regard to soil classification in the area. On the whole farmers use various criteria to classify their soils that also guide land use decisions. However, reliance on local knowledge in the classification of soils, landforms and land use is more common with small-scale agriculture, wh ereas large-scale farmers particularly in Karatu District rely more on research recommendations communicated to them through the public extension service or by researchers themselves to improve productivity in the area. While acknowledging the wealth of local knowledge in the area, the study recommends for scientific research interventions in partnerships with the local people in order to address existing land use limitations.
    [Show full text]
  • Final Report
    Final Report Baseline Study for Hand in Hand Eastern Africa Program in Northern Tanzania August 2017 Table of Contents Table of Contents.................................................................................................................. 2 List of tables.......................................................................................................................... 3 List of figures ........................................................................................................................ 4 List of Abbreviations.............................................................................................................. 5 Acknowledgement................................................................................................................. 6 Executive Summary .............................................................................................................. 7 1. Introduction.................................................................................................................. 13 1.1 Overview of HiH EA Model.................................................................................... 13 1.2 HiH EA Expansion Plan for Tanzania.................................................................... 14 2. The Baseline Study...................................................................................................... 15 2.1 The Scoping Study................................................................................................ 15 2.1.1 Objectives of the Scoping
    [Show full text]
  • Arusha District Council
    ARUSHA DISTRICT COUNCIL INVESTMENT PROFILE DISCLOSE THE POTENTIAL OF ARUSHA DISTRICT COUNCIL February, 2017 FOREWORD I would like to welcome all esteemed investors to explore the irresistible opportunities provided by the Arusha District Council. Arusha District Council was established in 2007, the Council has a vision of to be a leading transformed Council that provides high quality services for Sustainable Development of the Community by 2025. In order to increase competitiveness in attracting investors to our District Council, effort and initiative to identify, expose and promote investment opportunities available in Arusha District Council is going on. We are indeed determined to utilize potential areas owned by the Council, Communities and those own by private developer. In this Investment Profile, we give you opportunities to realize your entrepreneurial ambitions and explore them. We believe in supporting our investors’ aspirations as the Council. As we want to be one among the leading investment avenues in Tanzania. In Arusha District Council investors are favoured with presence of suitable investment climate that will help you capitalize on untapped opportunities in Arusha and Tanzania as a whole. Whereby investment can be done to the following areas of interests include tourism, processing industries, livestock and agricultural sector, beekeeping, sports and recreation centre, modern market, real estate, socio-economic services. Investment climate is characterised by peace and stability, availability of raw materials, market, abundant natural resources, road and transportation network, electricity services and the strategic geographical location will support establishment and success of investments. It is because of the above mention few facts we are proud to say that Arusha District Council is the best investment destination of your choice.
    [Show full text]
  • Tanzanian Side)
    [Logo du client] Feasibility Studies and Detailed Design of the Multinational Arusha-Holili/ Taveta-Voi Road Resettlement Action Plan (Tanzanian side) Date 8/6/2012 Project reference DTE80147T Version Final Draft Informationsqualité du document Destinataires Pour Copie Nom Service Nom Service Lawrence Kiggundu AfDB / TTL Historique des modifications Contrôle final Date Nom Signature Version Date Rédigé par Contrôle interne Modifications 1 30/07/2012 Paul Manda S Osare / G Patricot Formatting and minor edits Autresinformations Auteur Prof Paul MANDA Confidentialité Sans restriction Date de référence 8/6/2012 Statut document Final Draft Titre du document Feasibility Studies and Detailed Design of Arusha-Holili/Taveta-Voi Road : Resettlement Action Plan (Tanzanian side) DTE80147T/RAP Arusha-Holili/Taveta-Voi Rd: Resettlement Action Plan (Tanzanianside) Page ii Table of Contents page 1. Description of the Project, Project Area and Area of Influence ............................................. 7 2. Potential Impacts .................................................................................................................... 9 3. Organizational Responsibilities ...........................................................................................10 4. Community Participation..........................................................................................................11 5. Socio-Economic Studies ......................................................................................................13 6. Legal Framework
    [Show full text]
  • Progress Report: GMH (#0090): an Integrated Approach to Addressing the Issue of Adolescent Depression In
    Progress Report: GMH (#0090): An Integrated Approach to Addressing the Issue of Adolescent Depression in Malawi and Tanzania August 5, 2014 Submitted To: Grand Challenges Canada Submitted By: Farm Radio International Progress against milestones for period ending July 15, 2014 MoUs signed with Ministry Health and Education in Tanzania To date, we have held two stakeholder meetings and one mental health training to secure buy-in from relevant government ministries. Representatives from the regional and district level MoE and MoH were invited to attend the meetings. We have also had one face-to-face meeting with the Director of Mental Health Services in the Ministry of Health in Dar es Salam. Representatives from the ministries have indicated their enthusiasm and support for the project, and their willingness to form a technical advisory group and to sing Memoranda of Understanding for the project. MoUs have been sent to the national MoE and MoH, and are awaiting a reply 35 schools selected for participation in target districts in Tanzania 35 secondary schools have been selected for participation in the program, and we have received clearance to conduct activities by the regional and district level representatives from the Ministry of Education. To date, we have completed a baseline survey of 350 youth from 10 schools, and will survey another 350 youth from an additional 10 schools by the end of August, 2014. Attached (annex 1) is a list of 35 schools selected for participation in the program 2 MOUs signed with radio stations We have selected 2 radio stations in the Arusha region to participate in the communication component of the program in Tanzania.
    [Show full text]
  • Waache Wasome Let Them Learn
    Waache Wasome Let Them Learn TANZANIA Quarterly Progress Report Y 3 Q1 October 1, 2018 – December 31, 2018 Cooperative Agreement AID-OAA-A-17-00001 Submitted by the Bantwana Initiative of World Education, Inc. (WEI/Bantwana) Waache Wasome Let Them Learn Tanzania | Y3 Q1 Progress Report 1 Table of Contents Acronyms ....................................................................................................................................................................... 3 Executive Summary ............................................................................................................................................... 4 A. Introduction ................................................................................................................................................... 5 B. Project Activities .......................................................................................................................................... 8 Objective 1: Build the agency, knowledge, and protective assets of girls in secondary school ..... 8 Objective 2: Increase family commitment and capacity to invest in girls’ education...................... 10 Objective 3: Foster a girl friendly and supportive school environment ............................................ 20 Objective 4…………………………………………………………………………….……….30 C. Monitoring, Evaluation and Learning ................................................................................................. 35 D. Project Management .................................................................................................................................
    [Show full text]
  • HEAL​ ​International​ ​Health​ ​Education 2017​ ​Program
    HEAL International ​ ​ PO Box 77, Usa River, Arusha, Tanzania ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ Phone: +255 (0) 626 608 190 ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ Website: www.healinternational.org ​ ​ HEAL International Health Education ​ ​ ​ ​ ​ ​ 2017 Program Report ​ ​ ​ ​ June 20 - August 5, 2017 ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ HEAL International ​ ​ PO Box 77, Usa River, Arusha, Tanzania ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ Phone: +255 (0) 626 608 190 ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ Website: www.healinternational.org ​ ​ Introduction HEAL International is a non-profit organization that is dedicated to improving the health and ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ well-being of individuals living in low resource areas by providing health education and ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ health related services. HEAL International believes that community development begins ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ with education and that the HIV/AIDS epidemic creates both an imperative to act and an ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ opportunity to learn. ​ ​ ​ ​ HEAL International provides service in Arumeru District, Arusha Region in Tanzania and in ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ Phoenix, Arizona in the United States. We operate as a fiscal agent for the Fusion ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ Foundation in the United States (EIN:26-3429018) and is a registered non-governmental ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ organization in the United Republic of Tanzania (Registration No.: I-NGO/00007289). The ​ ​ ​ ​ ​
    [Show full text]
  • Agwater Solutions Project Case Study
    AgWater Solutions Project Case Study Adoption and Outscaling of Conservation Agriculture in Tanzania S.D. Tumbo Soil Water Management Research Group, Sokoine University of Agriculture, Tanzania K.D. Mutabazi Soil Water Management Research Group, Sokoine University of Agriculture, Tanzania F.C. Kahimba Soil Water Management Research Group, Sokoine University of Agriculture, Tanzania W.B. Mbungu Soil Water Management Research Group, Sokoine University of Agriculture, Tanzania September, 2012 Acknowledgment The authors and project partners wish to thank the Bill & Melinda Gates Foundation for the generous grant that made this project possible. The AWM Project The AgWater Solutions project was implemented in five countries in Africa and two states in India between 2008 and 2012. The objective of the project was to identify investment options and opportunities in agricultural water management with the greatest potential to improve incomes and food security for poor farmers, and to develop tools and recommendations for stakeholders in the sector including policymakers, investors, NGOs and small-scale farmers. The leading implementing institutions were the International Water Management Institute (IWMI), the Stockholm Environment Institute (SEI), the Food and Agriculture Organization of the United Nations (FAO), the International Food Policy Research Institute (IFPRI), International Development Enterprises (iDE) and CH2MHill. For more information on the project or detailed reports please visit the project website http://awm-solutions.iwmi.org/home-page.aspx . Disclaimer This report is based on research funded by the Bill & Melinda Gates Foundation. The findings and conclusions contained within are those of the authors and do not necessarily reflect positions or policies of the project, its partners or the Bill & Melinda Gates Foundation.
    [Show full text]