APPLICATION for ENVIRONMENTAL CLEARANCE FORM-I for by M/S RAMU & CO At

Total Page:16

File Type:pdf, Size:1020Kb

APPLICATION for ENVIRONMENTAL CLEARANCE FORM-I for by M/S RAMU & CO At APPLICATION FOR ENVIRONMENTAL CLEARANCE FORM-I For ‘THE PROPOSED MULTI STOREYED RESIDENTIAL BUILDING HAVING 2 BASEMENT + STILT +2 UPPER PARKING FLOORS + 16 FLOORS WITH 124 DWELLING UNITS + SWIMMING POOL’ M/s RAMUBy & CO At Door No: 8/91, Survey. No. 1646/3, Block No: 34, C.P Ramasamy Road, Alwarpet, MylaporeVillage, Taluka: Mylapore Taluk, District: Chennai State: Tamil Nadu ENVIRONMENTAL CONSULTANT HUBERT ENVIRO CARE SYSTEMS (P) LTD CHENNAI JANUARY 2019 List of Annexures S.No List of Annexure Details 1. Annexure 1 CMDA Acknowledgement 2. Annexure 2 Site Photos 3. Annexure 3 Soil Test Report 4. Annexure 4 Water Balance 5. Annexure 5 Overall Site Layout 6. Annexure 6 Green Belt Layout 7. Annexure 7 Site Plan Showing External Storm Water Layout 8. Annexure 8 STP Flow Diagram 9. Annexure 9 STP Process & Specification 10. Annexure 10 Site Plan Showing STP & UG Sump Location Layout 11. Annexure 11 Dual Plumbing System 12. Annexure 12 Basement 1 & 2 Car Parking Layout 13. Annexure 13 Stilt Floor Parking Plan Layout 14. Annexure 14 Upper Parking 1 & 2layout 15. Annexure 15 Traffic Movement Plan 16. Annexure 16 Fire NOC Acknowledgement 17. Annexure 17 FMB Layout 18. Annexure 18 500M Topo map 19. Annexure 19 10 KM Radius Satellite Map 20. Annexure 20 Satellite image of the project 21. Annexure 21 Contour Map 22. Annexure 22 Land Document 23. Annexure 23 Terrace Floor & Solar panel Layout 24. Annexure 24 Water Supply Acknowledgement 25. Annexure 25 Environmental Management Plan 26. Annexure 26 Storm Water & Rain Water Harvesting Calculation 27. Annexure 27 Energy Saving Details FORM-1 (I) Basic Information S.No Item Details 1. Name of the Project The Proposed Multi Storeyed Residential Building Having 2 Basement + Stilt +2 Upper Parking Floors + 16 Floors With 124 Dwelling Units + Swimming Pool 2. S. No. in the schedule 8 (a) 3. Proposed capacity/area/length/tonnage Project details: to be handled/command area/lease area/number of wells to be drilled. Site Area: 8154.77 sq. m Total Built up area: 69150.31 sq. m 3BHK Houses:60 Nos 4BHK Houses:64 Nos Total Houses:124 Nos 4. New/Modernization New 5. Existing Capacity/Area etc. - 6. Category of Project i.e., ‘A’ or ‘B’ B2 7. Does it attract general condition? If yes, No please specify. 8. Does it attract specific condition? If Yes, No please specify. 9. Location Lat: 13° 2'11.49"N Long: 80°15'23.26"E Plot/Survey/Khasra No. S.F No. 1646/3 Village Alwarpet Tehsil Mylapore District Chennai State Tamilnadu 10. Nearest Railway Station/Airport along Railway Station: with distance in kms. Thirumayilai Railway station: 1.16 Km-ESE Airport: Chennai International airport: 8.72 Km- WSW 11. Nearest Town, City, District Site situated within the Chennai city Headquarters along with distance in kms. 5.53Km-NNE 12. Village Corporations, Zilla Parishad, Municipal Corporation, Municipal Corporation, Local body No 29, C P Ramasamy Road, Mylapore, (complete postal addresses with Chennai - 600004, Opposite Keerthi Lal telephone nos. to be given) Jewellers 13. Name of Applicant M/s Ramu & Co 14. Registered Address No 2, Ethiraj Salai, C-in C Road, Egmore, Chennai - 600008 15. Address for correspondence: No 2, Ethiraj Salai, C-in C Road, Egmore, Chennai-60008 Name Rajesh Bhansali Designation (Owner/Partner/CEO) Managing Partner Address No 2, Ethiraj Salai, C-in C Road, Egmore, Chennai Pin Code 600008 E – mail [email protected] Telephone No. 9710611000 Fax. No. - 16. Details of Alternate Sites examined, if No Alternate Sites examined. any. Location of these sites should be shown on a topo sheet 17. Interlinked Projects No 18. Whether separate application of No interlinked project has been submitted? 19. If yes, date of submission - 20. If no, reason - 21. Whether the proposal involves - approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z. Notification, 1991? 22. Whether there is any Government No Order/Policy relevant/relating to the site? 23. Forest Land involved (hectares) No 24. Whether there is any litigation pending No against the product and/or land in which the project is propose to set up? (a) Name of the Court (b) Case. No. (c) Orders/Directions of the court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. Confirmation rates, wherever possible) with source of information data 1.1 Permanent or No The survey numbers fall in urbanized area as temporary change in classified by CMDA The land use letter is enclosed land use, land cover or as Annexure 1. topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing yes 74 trees are present and Site condition land, vegetation and photographs are enclosed as Annexure 2. building? Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. Confirmation rates, wherever possible) with source of information data 1.3 Creation of new land Yes The proposed project is construction of Multi uses Storied Residential Building 1.4 Pre-construction yes Soil investigation Report is enclosed in Annexure investigations e.g. bore 3. houses, soil testing? 1.5 Construction works? Yes Civil structure will be constructed 1.6 Demolition Works? No NA 1.7 Temporary sites used No Construction workers will be hired from nearby for construction works villages. Hence, no housing facilities for or housing of construction workers are planned on site. construction workers? 1.8 Above ground yes The excavated soil will be used in backfilling, soft buildings, structures or landscaping and road formation and top soil will be earthworks including stacked separately and used for green belt development linear structures, cut and fill or excavations 1.9 Underground works No No underground work except construction of including mining or basements. tunneling? 1.10 Reclamation works? No NA 1.11 Dredging? No NA 1.12 Offshore structures? No NA 1.13 Production and No NA manufacturing Process? 1.14 Facilities for storage of Yes Temporary sheds will be created at the project site goods or materials? during the construction phase, for the storage of construction raw materials. Separate raw material handling yard will be made as per requirement. Cement will be separately stored under covered bags. Sand will be stacked neatly under tarpaulin cover. Bricks and steel will be laid in open. The raw material handling yard will be located within the project site and separated by enclosures. Show in site layout with ear marking with enclosures and proximity to nearby house holds 1.15 Facilities for Yes Solid Waste Generation: treatment or disposal of solid Construction phase: waste or liquid effluents? During the Construction phase, solid waste of about 50 Kg/Day will be generated. Disposal: Construction material waste will be reused to the maximum possible and excess will be disposed through authorized vendors as per Construction and Demolition Waste rules 2016. Operation phase: During operation phase, total population expected is 930 people, the Municipal Solid waste generated will be about 569 Kg/Day. Waste Quantity Collection Treatment / (kg/day) method disposal method Organic 224 Bins Will be STP Sludge 10 composed by own and used as Manure Inorganic 335 Bins Disposed to authorized vendor Average : 0.60 kg per capita per day for metropolitan cities Source : As per CPCB Norms Liquid Effluent For construction activity, about 25 KLD of water will be required, which will be sourced from CMWSSB. Phase Man Quantity Sewage/ Treatment power of total Generated method water KLD required KLD Constru 185 25 7.4 Mobile ction STP Opera 930 130 130 STP tion Source: Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) After treatment, total treated water quantity is 117 KLD. Treated water will be reused for Toilet Flushing (40 KLD), Landscaping (5 KLD) & Excess treated water will be let into UG Sump/nearest pumping station (72 KLD). Water Balance is enclosed in Annexure 4. 1.16 Facilities for long term No No long-term housing facilities proposed as most of housing of operational the skilled/unskilled manpower required for the workers? operation activities will be hired from the surrounding villages. 1.17 New road, rail or sea No The existing 18 m wide CP Ramasamy Road will traffic during be used as access road. construction or operation? 1.18 New road, rail, air No NA waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc.? 1.19 Closure or diversion of No There will not be any closure or diversion of existing transport existing transportation routes routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted No Not Applicable transmission lines or pipelines? 1.21 Impoundment, No Not Applicable damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No There is no stream crossing across the site 1.23 Abstraction or transfers Yes Water will be sourced from CMWSSB of water from ground or surface waters? 1.24 Changes in water No There will not be any change in the drainage bodies or the land pattern or nearby water bodies. surface affecting drainage or run-off 1.25 Transport of personnel Yes The existing CP Ramasamy Road will be utilized or materials for for the transportation of material and personnel construction, operation during construction and operation phases. or decommissioning? 1.26 Long-term dismantling No Not Applicable or decommissioning or restoration works? 1.27 Ongoing activity during No Not Applicable decommissioning which could have an impact on the environment? 1.28 Influx of people to an Yes Construction phase area in either Around 185 people will be engaged for the activity temporarily or temporarily.
Recommended publications
  • Zooplankton Diversity of Freshwater Lakes of Chennai, Tamil Nadu with Reference to Ecosystem Attributes
    International Journal of Int. J. of Life Science, 2019; 7 (2):236-248 Life Science ISSN:2320-7817(p) | 2320-964X(o) International Peer Reviewed Open Access Refereed Journal Original Article Open Access Zooplankton diversity of freshwater lakes of Chennai, Tamil Nadu with reference to ecosystem attributes K. Altaff* Department of Marine Biotechnology, AMET University, Chennai, India *Corresponding Author: [email protected] Manuscript details: ABSTRACT Received: 18.04.2019 Zooplankton diversity of twelve water bodies of Chennai with reference to Accepted: 05.05.2019 variation during pre-monsoon, monsoon, post-monsoon and summer Published: 20.06.2019 seasons is investigated and reported. Out of 49 zooplankton species recorded, 27 species belonged to Rotifera, 10 species to Cladocera, 9 Editor: Dr. Arvind Chavhan species to Copepoda and 3 species to Ostracoda. The Rotifers dominated compared to all other zooplankton groups in all the seasons. However, the Cite this article as: diversity of zooplankton varied from season to season and the maximum Altaff K (2019) Zooplankton diversity was recorded in pre- monsoon season while minimum was diversity of freshwater lakes of observed in monsoon season. The common and abundant zooplankton in Chennai, Tamil Nadu with reference these water bodies were Brachionus calyciflorus, Brchionus falcatus, to ecosystem attributes, Int. J. of. Life Brachionus rubens, Asplancna brightwelli and Lecane papuana (Rotifers), Science, Volume 7(2): 236-248. Macrothrix spinosa, Ceriodaphnia cornuta, Diaphnosoma sarsi and Moina micrura (Cladocerans), Mesocyclops aspericornis Thermocyclops decipiens Copyright: © Author, This is an and Sinodiaptomus (Rhinediaptomus) indicus (Copepods) and Stenocypris open access article under the terms major (Ostracod). The density of the zooplankton was high during pre- of the Creative Commons Attribution-Non-Commercial - No monsoon and post-monsoon period than monsoon and summer seasons.
    [Show full text]
  • Thiruvallur District
    DISTRICT DISASTER MANAGEMENT PLAN FOR 2017 TIRUVALLUR DISTRICT tmt.E.sundaravalli, I.A.S., DISTRICT COLLECTOR TIRUVALLUR DISTRICT TAMIL NADU 2 COLLECTORATE, TIRUVALLUR 3 tiruvallur district 4 DISTRICT DISASTER MANAGEMENT PLAN TIRUVALLUR DISTRICT - 2017 INDEX Sl. DETAILS No PAGE NO. 1 List of abbreviations present in the plan 5-6 2 Introduction 7-13 3 District Profile 14-21 4 Disaster Management Goals (2017-2030) 22-28 Hazard, Risk and Vulnerability analysis with sample maps & link to 5 29-68 all vulnerable maps 6 Institutional Machanism 69-74 7 Preparedness 75-78 Prevention & Mitigation Plan (2015-2030) 8 (What Major & Minor Disaster will be addressed through mitigation 79-108 measures) Response Plan - Including Incident Response System (Covering 9 109-112 Rescue, Evacuation and Relief) 10 Recovery and Reconstruction Plan 113-124 11 Mainstreaming of Disaster Management in Developmental Plans 125-147 12 Community & other Stakeholder participation 148-156 Linkages / Co-oridnation with other agencies for Disaster 13 157-165 Management 14 Budget and Other Financial allocation - Outlays of major schemes 166-169 15 Monitoring and Evaluation 170-198 Risk Communications Strategies (Telecommunication /VHF/ Media 16 199 / CDRRP etc.,) Important contact Numbers and provision for link to detailed 17 200-267 information 18 Dos and Don’ts during all possible Hazards including Heat Wave 268-278 19 Important G.Os 279-320 20 Linkages with IDRN 321 21 Specific issues on various Vulnerable Groups have been addressed 322-324 22 Mock Drill Schedules 325-336
    [Show full text]
  • 29 Dec 2016 150913530ZNT6I
    1. Performance monitoring of all STPs in Chennai, especially those commissioned under NRCP reflecting the impact of CCRCP. During 2000-01, the Government of Tamil Nadu, along with the Government of India formulated the Chennai City River Conservation Project (CCRCP) with an objective to: i. Prevent sewage entering into the waterways. ii. Augment the treatment capacity of the Sewage Treatment Plants at Nesapakkam, Koyambedu, Kodungaiyur and Perungudi. iii. Keep the city waterways clean on a sustainable basis. The Ministry of Environment & Forests, Government of India during the year 2000-01 had sanctioned a sum of Rs.491.52 crore for the component “Prevention of untreated sewage flow reaching waterways in Chennai City”, which was carried out through Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) under NRCP. The following are the major components: S.No. Work Components Amount (Crore) 1 Strengthening & Capacity expansion of sewer system 382.00 2 Construction of STPs 109.52 Total 491.52 CCRCP was commenced and implemented by CMWSSB from the year 2001 in 16 packages. These works were implemented not just in the Cooum River Basin, but also in Adyar River Basin, Captain Cotton Canal Basin, Otteri Nallah Basin, Buckingham Canal Basin and in Mambalam Drain Basin. The project consisted of laying of interceptors for a length of 59.2 km, improvements to 28 pumping stations, construction of 3 new pumping stations, laying of sewage pumping mains for a length of 28.85 km and gravity conveying mains for a length of 17.3 km through 12 packages. Construction of 4 sewage treatment plants to enhance the sewage treatment capacity by 264 MLD was carried out in Packages 13 to 16.
    [Show full text]
  • Banks Branch Code, IFSC Code, MICR Code Details in Tamil Nadu
    All Banks Branch Code, IFSC Code, MICR Code Details in Tamil Nadu NAME OF THE CONTACT IFSC CODE MICR CODE BRANCH NAME ADDRESS CENTRE DISTRICT BANK www.Padasalai.Net DETAILS NO.19, PADMANABHA NAGAR FIRST STREET, ADYAR, ALLAHABAD BANK ALLA0211103 600010007 ADYAR CHENNAI - CHENNAI CHENNAI 044 24917036 600020,[email protected] AMBATTUR VIJAYALAKSHMIPURAM, 4A MURUGAPPA READY ST. BALRAJ, ALLAHABAD BANK ALLA0211909 600010012 VIJAYALAKSHMIPU EXTN., AMBATTUR VENKATAPURAM, TAMILNADU CHENNAI CHENNAI SHANKAR,044- RAM 600053 28546272 SHRI. N.CHANDRAMO ULEESWARAN, ANNANAGAR,CHE E-4, 3RD MAIN ROAD,ANNANAGAR (WEST),PIN - 600 PH NO : ALLAHABAD BANK ALLA0211042 600010004 CHENNAI CHENNAI NNAI 102 26263882, EMAIL ID : CHEANNA@CHE .ALLAHABADBA NK.CO.IN MR.ATHIRAMIL AKU K (CHIEF BANGALORE 1540/22,39 E-CROSS,22 MAIN ROAD,4TH T ALLAHABAD BANK ALLA0211819 560010005 CHENNAI CHENNAI MANAGER), MR. JAYANAGAR BLOCK,JAYANAGAR DIST-BANGLAORE,PIN- 560041 SWAINE(SENIOR MANAGER) C N RAVI, CHENNAI 144 GA ROAD,TONDIARPET CHENNAI - 600 081 MURTHY,044- ALLAHABAD BANK ALLA0211881 600010011 CHENNAI CHENNAI TONDIARPET TONDIARPET TAMILNADU 28522093 /28513081 / 28411083 S. SWAMINATHAN CHENNAI V P ,DR. K. ALLAHABAD BANK ALLA0211291 600010008 40/41,MOUNT ROAD,CHENNAI-600002 CHENNAI CHENNAI COLONY TAMINARASAN, 044- 28585641,2854 9262 98, MECRICAR ROAD, R.S.PURAM, COIMBATORE - ALLAHABAD BANK ALLA0210384 641010002 COIIMBATORE COIMBATORE COIMBOTORE 0422 2472333 641002 H1/H2 57 MAIN ROAD, RM COLONY , DINDIGUL- ALLAHABAD BANK ALLA0212319 NON MICR DINDIGUL DINDIGUL DINDIGUL
    [Show full text]
  • Monsoon Assemblages
    MONSOON ASSEMBLAGES ELEMENTS OF THE URBAN HYDROLOGY OF SOUTH CHENNAI Literature Review Author: Michele Vianello Date: February 2017 ProJect Document Number: OV_Vianello_2017A Monsoon Assemblages sis a proJect funded by the European Research Council (ERC) under the European Union’s Horizon 2020 research and innovation programme. Grant Agreement No. 679873. This review looks at the literature regarding the hydrology and the built up environment of South Chennai as well as the different types of knowledge shaped around them. It examines academic papers, books and book chapters originating in a wide variety of disciplines (eg. architecture, social sciences, geography, hydrology) as well as non-academic texts (eg. newspaper articles, official administrative body websites, NGO reports) and maps (eg. from official agencies, academic papers). It particularly attempts to understand how the different monsoonal cycles have been playing a role in shaping the hydrology and the built up environment as well as the different types of knowledge used to interpret them and act upon them, or else how these cycles failed to be effectively captured in the knowledge production. Addressing these themes required to examine a very diverse literature, at times tackling very specific aspects of the issues at hand. A consistent attempt has been made to coherently extract those bits of information and build an overall picture of the area while laying out the context and identifying relevant issues for the Monsoon Assemblages research project. In spite of this, this review does not claim to be a complete investigation on the elements of the hydrology of South Chennai: the objective has been rather that of identifying which gaps, pertinent to the Monsoon Assemblages line of enquiry, will have to be filled as well as scoping the field for the overall research.
    [Show full text]
  • SNO APP.No Name Contact Address Reason 1 AP-1 K
    SNO APP.No Name Contact Address Reason 1 AP-1 K. Pandeeswaran No.2/545, Then Colony, Vilampatti Post, Intercaste Marriage certificate not enclosed Sivakasi, Virudhunagar – 626 124 2 AP-2 P. Karthigai Selvi No.2/545, Then Colony, Vilampatti Post, Only one ID proof attached. Sivakasi, Virudhunagar – 626 124 3 AP-8 N. Esakkiappan No.37/45E, Nandhagopalapuram, Above age Thoothukudi – 628 002. 4 AP-25 M. Dinesh No.4/133, Kothamalai Road,Vadaku Only one ID proof attached. Street,Vadugam Post,Rasipuram Taluk, Namakkal – 637 407. 5 AP-26 K. Venkatesh No.4/47, Kettupatti, Only one ID proof attached. Dokkupodhanahalli, Dharmapuri – 636 807. 6 AP-28 P. Manipandi 1stStreet, 24thWard, Self attestation not found in the enclosures Sivaji Nagar, and photo Theni – 625 531. 7 AP-49 K. Sobanbabu No.10/4, T.K.Garden, 3rdStreet, Korukkupet, Self attestation not found in the enclosures Chennai – 600 021. and photo 8 AP-58 S. Barkavi No.168, Sivaji Nagar, Veerampattinam, Community Certificate Wrongly enclosed Pondicherry – 605 007. 9 AP-60 V.A.Kishor Kumar No.19, Thilagar nagar, Ist st, Kaladipet, Only one ID proof attached. Thiruvottiyur, Chennai -600 019 10 AP-61 D.Anbalagan No.8/171, Church Street, Only one ID proof attached. Komathimuthupuram Post, Panaiyoor(via) Changarankovil Taluk, Tirunelveli, 627 761. 11 AP-64 S. Arun kannan No. 15D, Poonga Nagar, Kaladipet, Only one ID proof attached. Thiruvottiyur, Ch – 600 019 12 AP-69 K. Lavanya Priyadharshini No, 35, A Block, Nochi Nagar, Mylapore, Only one ID proof attached. Chennai – 600 004 13 AP-70 G.
    [Show full text]
  • Urban and Landscape Design Strategies for Flood Resilience In
    QATAR UNIVERSITY COLLEGE OF ENGINEERING URBAN AND LANDSCAPE DESIGN STRATEGIES FOR FLOOD RESILIENCE IN CHENNAI CITY BY ALIFA MUNEERUDEEN A Thesis Submitted to the Faculty of the College of Engineering in Partial Fulfillment of the Requirements for the Degree of Masters of Science in Urban Planning and Design June 2017 © 2017 Alifa Muneerudeen. All Rights Reserved. COMMITTEE PAGE The members of the Committee approve the Thesis of Alifa Muneerudeen defended on 24/05/2017. Dr. Anna Grichting Solder Thesis Supervisor Qatar University Kwi-Gon Kim Examining Committee Member Seoul National University Dr. M. Salim Ferwati Examining Committee Member Qatar University Mohamed Arselene Ayari Examining Committee Member Qatar University Approved: Khalifa Al-Khalifa, Dean, College of Engineering ii ABSTRACT Muneerudeen, Alifa, Masters: June, 2017, Masters of Science in Urban Planning & Design Title: Urban and Landscape Design Strategies for Flood Resilience in Chennai City Supervisor of Thesis: Dr. Anna Grichting Solder. Chennai, the capital city of Tamil Nadu is located in the South East of India and lies at a mere 6.7m above mean sea level. Chennai is in a vulnerable location due to storm surges as well as tropical cyclones that bring about heavy rains and yearly floods. The 2004 Tsunami greatly affected the coast, and rapid urbanization, accompanied by the reduction in the natural drain capacity of the ground caused by encroachments on marshes, wetlands and other ecologically sensitive and permeable areas has contributed to repeat flood events in the city. Channelized rivers and canals contaminated through the presence of informal settlements and garbage has exasperated the situation. Natural and man-made water infrastructures that include, monsoon water harvesting and storage systems such as the Temple tanks and reservoirs have been polluted, and have fallen into disuse.
    [Show full text]
  • Analysis of Sewage Water from Cooum River in Chennai
    International Journal of Pure and Applied Mathematics Volume 116 No. 13 2017, 123-129 ISSN: 1311-8080 (printed version); ISSN: 1314-3395 (on-line version) url: http://www.ijpam.eu Special Issue ijpam.eu ANALYSIS OF SEWAGE WATER FROM COOUM RIVER IN CHENNAI 1Aswathy.M, 2Gautam Kumar, 3Dilip Kumar Thakur 1,2,3 Department of Civil Engineering, BIST, Bharath Institute of Higher Education and Research (BIHER), Bharath University, Chennai. [email protected], [email protected], [email protected] Abstract: The present study assesses the sewage water physiological activities and life processes of aquatic of cooum river (Saidapet) Chennai, Tamil Nadu, India. organisms are generally influenced by such polluted five water samples were taken on different timings. waste and hence[1-7], it is essential to study physico- Some sample were collected from logged water and chemical characteristics of water. The following are the some samples were collected from perennial flow of parameter analysed to assess the water quality: water. Water is an indispensable natural resource on Physical parameters: Colour, Temperature, Turbidity earth. Safe drinking water is the primary need of every and Odour. Chemical parameters: pH, Electrical human being. The quality of water is of vital concern Conductivity (E.C), Total Solids (TS), Total Dissolved for mankind since it is linked with human health, Solids (TDS), Total Suspended Solids (TSS), protection of the environment, plant growth and Alkalinity, Total Hardness, Calcium Hardness, sustainable development. River water is used in huge Magnesium Hardness, Nitrates, Phosphates, Sulphates, amount for domestic purpose, industrial purpose, and Chlorides, Residual Chloride, Dissolved Oxygen agriculture purpose and also the water were treated in (D.O), Biological Oxygen Demand (BOD), Chemical water treatment plant and used for drinking and many Oxygen Demand (COD), Fluorides, Free Carbon- other purpose.
    [Show full text]
  • Analysis and Reuse of Ground Water Near Cooum River
    Published by : International Journal of Engineering Research & Technology (IJERT) http://www.ijert.org ISSN: 2278-0181 Vol. 5 Issue 03, March-2016 Analysis and Reuse of Ground Water Near Cooum River Venkatesan G.1 Loganathan K.2, Madhan K.3 1.Research Scholar, Centre for Research, 2,3. Assistant Professor, Anna University, Chennai, Assistant Professor, Department of Civil Engineering, Department of Civil Engineering, Priyadarshini Priyadarshini Engineering College, Engineering College, Affiliated to Anna University, Chennai, Affiliated to Anna University, Chennai, Tamil Nadu, India. Tamil Nadu, India. Karthik S.4 Nagarajan B5 4. Assistant Professor, 5. Assistant Professor, Department of Electronics and Department of Computer Science and Engineering, Communication Engineering, Priyadarshini Engineering College, Priyadarshini Engineering College, Affiliated to Anna University, Affiliated to Anna University, Chennai, Tamil Nadu, India. Chennai, Tamil Nadu, India. Abstract:- In this paper, Groundwater quality in Chennai city supplies of water and of agricultural and other biological along the Cooum river, on 6/7/2015 was analyzed. products, the most common types of pollution and Groundwater samples were collected from 10 bore wells of the pollutants discharged, encountered in domestic and river. The analysis focused on the determination of ten industrial waste waters, along with their possible effects on specific water quality parameters, namely, pH, COLOUR, the water resources are discussed. Chemicals area major TDS, BOD, COD, HARDNESS, TURBIDITY, ALKALITY, METHYL ORANGE AND CHLORIDE using INDIAN source of water contamination that introduced during water STANDARDS procedures. The analysis of the collected movement samples reveals that the standard water quality parameters through geological materials, manufactured chemicals may have nearly complied with the IS:10500 standards, but the cause problems.
    [Show full text]
  • Tamil Nadu Sustainable Urban Development Project Final EA for SWD to Selected Areas of Coc
    Tamil Nadu Sustainable Urban Development Project Final EA for SWD to selected areas of CoC Public Disclosure Authorized Tamil Nadu Sustainable Urban Development Project (TNSUDP) Storm Water Drainage Project for the Selected Areas of Chennai Corporation Public Disclosure Authorized Tamil Nadu Sustainable Urban Development Project Public Disclosure Authorized Final Environmental Assessment Report Public Disclosure Authorized January 2015 Storm Water Drains Department, Corporation of Chennai 1 Tamil Nadu Sustainable Urban Development Project Final EA for SWD to selected areas of CoC Executive Summary 1. INTRODUCTION 1. Government of Tamil Nadu has proposed to implement the World Bank supported Tamil Nadu Sustainable Urban Development program (TNSUDP) to improve the delivery of urban services. The provision of Storm Water Drains to selected areas of Corporation of Chennai is one of the sub-projects proposed to be implemented by the Corporation of Chennai (CoC). This component is coordinated by Government of Tamil Nadu with Tamil Nadu Urban Infrastructure Financial Services Ltd. (TNUIFSL), Chennai as the fund Manager. This sub project is proposed to be implemented along the roadsides and canals and doesn’t involve any Land Acquisition and required land is owned by the Corporation of Chennai. 2. PROJECT DESCRIPTION 2. The Storm Water Drainage project for the selected areas of Corporation of Chennai proposed to be taken up under the TNSUDP involves construction of storm water drains and canals in the project area. This sub project proposed to be implemented in the 4 Zones of the CoC. The total length of the drains to be constructed is about 270.33 kilometres including the 11.05 km length in the canals.
    [Show full text]
  • Environmental and Social Systems Assessment Report March 2021
    Chennai City Partnership Program for Results Environmental and Social Systems Assessment Report March 2021 The World Bank, India 1 2 List of Abbreviations AIIB Asian Infrastructure Investment Bank AMRUT Jawaharlal Nehru National Urban Renewal Mission BMW Bio-Medical Waste BOD Biological Oxygen Demand C&D Construction & Debris CBMWTF Common Bio-medical Waste Treatment and Disposal Facility CEEPHO Central Public Health and Environmental Engineering Organisation CETP Common Effluent Treatment Plant CMA Chennai Metropolitan Area CMDA Chennai Metropolitan Development Authority CMWSSB Chennai Metro Water Supply and Sewage Board COD Chemical Oxygen Demand COE Consent to Establish COO Consent to Operate CPCB Central Pollution Control Board CRZ Coastal Regulation Zone CSCL Chennai Smart City Limited CSNA Capacity Strengthening Needs Assessment CUMTA Chennai Unified Metropolitan Transport Authority CZMA Coastal Zone Management Authority dBA A-weighted decibels DoE Department of Environment DPR Detailed Project Report E & S Environmental & Social E(S)IA Environmental (and Social) Impact Assessment E(S)MP Environmental (and Social) Management Plan EHS Environmental, Health & Safety EP Environment Protection (Act) ESSA Environmental and Social Systems Assessment GCC Greater Chennai Corporation GDP Gross Domestic Product GL Ground Level GoTN Government of Tamil Nadu GRM Grievance Redressal Mechanism HR Human Resources IEC Information, Education and Communication ICC Internal Complaints Committee JNNRUM Jawaharlal Nehru National Urban Renewal Mission
    [Show full text]
  • INDIA the Economic Scenario
    ` ` 6/2020 INDIA Contact: Rajesh Nath, Managing Director Please Note: Jamly John, General Manager Telephone: +91 33 40602364 1 trillion = 100,000 crores or Fax: +91 33 23217073 1,000 billions 1 billion = 100 crores or 10,000 lakhs E-mail: [email protected] 1 crore = 100 lakhs 1 million= 10 lakhs The Economic Scenario 1 Euro = Rs.82 Economic Growth As per the United Nations Conference on Trade and Development (UNCTAD), India’s economy could prove the most resilient in South Asia and its large market will continue to attract market-seeking investments to the country even as it expects a dramatic fall in global foreign direct investment (FDI). However, inflows may shrink sharply. India jumped to ninth spot in 2019 on the list of global top FDI recipients from the twelfth spot in 2018. Due to the Covid-19 crisis, global FDI flows are forecast to nosedive by upto 40% in 2020, from their 2019 value of € 1.40 ($1.54) trillion, bringing FDI below € 0.91 ($1) trillion for the first time since 2005. FDI is projected to decrease by a further 5-10% in 2021 and a recovery is likely in 2022 amid a highly uncertain outlook. A rebound in 2022, with FDI reverting to the pre-pandemic underlying trend, is possible, but only at the upper bound of expectations. The outlook looks highly uncertain. FDI inflows into India rose 13% on year in FY20 to a record € 45 ($49.97) billion compared to € 40 ($44.36) billion in 2018-19. In 2019, FDI flows to the region declined by 5%, to € 431 ($474) billion, despite gains in South East Asia, China and India.
    [Show full text]