APPLICATION for ENVIRONMENTAL CLEARANCE FORM-I for by M/S RAMU & CO At
Total Page:16
File Type:pdf, Size:1020Kb
APPLICATION FOR ENVIRONMENTAL CLEARANCE FORM-I For ‘THE PROPOSED MULTI STOREYED RESIDENTIAL BUILDING HAVING 2 BASEMENT + STILT +2 UPPER PARKING FLOORS + 16 FLOORS WITH 124 DWELLING UNITS + SWIMMING POOL’ M/s RAMUBy & CO At Door No: 8/91, Survey. No. 1646/3, Block No: 34, C.P Ramasamy Road, Alwarpet, MylaporeVillage, Taluka: Mylapore Taluk, District: Chennai State: Tamil Nadu ENVIRONMENTAL CONSULTANT HUBERT ENVIRO CARE SYSTEMS (P) LTD CHENNAI JANUARY 2019 List of Annexures S.No List of Annexure Details 1. Annexure 1 CMDA Acknowledgement 2. Annexure 2 Site Photos 3. Annexure 3 Soil Test Report 4. Annexure 4 Water Balance 5. Annexure 5 Overall Site Layout 6. Annexure 6 Green Belt Layout 7. Annexure 7 Site Plan Showing External Storm Water Layout 8. Annexure 8 STP Flow Diagram 9. Annexure 9 STP Process & Specification 10. Annexure 10 Site Plan Showing STP & UG Sump Location Layout 11. Annexure 11 Dual Plumbing System 12. Annexure 12 Basement 1 & 2 Car Parking Layout 13. Annexure 13 Stilt Floor Parking Plan Layout 14. Annexure 14 Upper Parking 1 & 2layout 15. Annexure 15 Traffic Movement Plan 16. Annexure 16 Fire NOC Acknowledgement 17. Annexure 17 FMB Layout 18. Annexure 18 500M Topo map 19. Annexure 19 10 KM Radius Satellite Map 20. Annexure 20 Satellite image of the project 21. Annexure 21 Contour Map 22. Annexure 22 Land Document 23. Annexure 23 Terrace Floor & Solar panel Layout 24. Annexure 24 Water Supply Acknowledgement 25. Annexure 25 Environmental Management Plan 26. Annexure 26 Storm Water & Rain Water Harvesting Calculation 27. Annexure 27 Energy Saving Details FORM-1 (I) Basic Information S.No Item Details 1. Name of the Project The Proposed Multi Storeyed Residential Building Having 2 Basement + Stilt +2 Upper Parking Floors + 16 Floors With 124 Dwelling Units + Swimming Pool 2. S. No. in the schedule 8 (a) 3. Proposed capacity/area/length/tonnage Project details: to be handled/command area/lease area/number of wells to be drilled. Site Area: 8154.77 sq. m Total Built up area: 69150.31 sq. m 3BHK Houses:60 Nos 4BHK Houses:64 Nos Total Houses:124 Nos 4. New/Modernization New 5. Existing Capacity/Area etc. - 6. Category of Project i.e., ‘A’ or ‘B’ B2 7. Does it attract general condition? If yes, No please specify. 8. Does it attract specific condition? If Yes, No please specify. 9. Location Lat: 13° 2'11.49"N Long: 80°15'23.26"E Plot/Survey/Khasra No. S.F No. 1646/3 Village Alwarpet Tehsil Mylapore District Chennai State Tamilnadu 10. Nearest Railway Station/Airport along Railway Station: with distance in kms. Thirumayilai Railway station: 1.16 Km-ESE Airport: Chennai International airport: 8.72 Km- WSW 11. Nearest Town, City, District Site situated within the Chennai city Headquarters along with distance in kms. 5.53Km-NNE 12. Village Corporations, Zilla Parishad, Municipal Corporation, Municipal Corporation, Local body No 29, C P Ramasamy Road, Mylapore, (complete postal addresses with Chennai - 600004, Opposite Keerthi Lal telephone nos. to be given) Jewellers 13. Name of Applicant M/s Ramu & Co 14. Registered Address No 2, Ethiraj Salai, C-in C Road, Egmore, Chennai - 600008 15. Address for correspondence: No 2, Ethiraj Salai, C-in C Road, Egmore, Chennai-60008 Name Rajesh Bhansali Designation (Owner/Partner/CEO) Managing Partner Address No 2, Ethiraj Salai, C-in C Road, Egmore, Chennai Pin Code 600008 E – mail [email protected] Telephone No. 9710611000 Fax. No. - 16. Details of Alternate Sites examined, if No Alternate Sites examined. any. Location of these sites should be shown on a topo sheet 17. Interlinked Projects No 18. Whether separate application of No interlinked project has been submitted? 19. If yes, date of submission - 20. If no, reason - 21. Whether the proposal involves - approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z. Notification, 1991? 22. Whether there is any Government No Order/Policy relevant/relating to the site? 23. Forest Land involved (hectares) No 24. Whether there is any litigation pending No against the product and/or land in which the project is propose to set up? (a) Name of the Court (b) Case. No. (c) Orders/Directions of the court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. Confirmation rates, wherever possible) with source of information data 1.1 Permanent or No The survey numbers fall in urbanized area as temporary change in classified by CMDA The land use letter is enclosed land use, land cover or as Annexure 1. topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing yes 74 trees are present and Site condition land, vegetation and photographs are enclosed as Annexure 2. building? Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. Confirmation rates, wherever possible) with source of information data 1.3 Creation of new land Yes The proposed project is construction of Multi uses Storied Residential Building 1.4 Pre-construction yes Soil investigation Report is enclosed in Annexure investigations e.g. bore 3. houses, soil testing? 1.5 Construction works? Yes Civil structure will be constructed 1.6 Demolition Works? No NA 1.7 Temporary sites used No Construction workers will be hired from nearby for construction works villages. Hence, no housing facilities for or housing of construction workers are planned on site. construction workers? 1.8 Above ground yes The excavated soil will be used in backfilling, soft buildings, structures or landscaping and road formation and top soil will be earthworks including stacked separately and used for green belt development linear structures, cut and fill or excavations 1.9 Underground works No No underground work except construction of including mining or basements. tunneling? 1.10 Reclamation works? No NA 1.11 Dredging? No NA 1.12 Offshore structures? No NA 1.13 Production and No NA manufacturing Process? 1.14 Facilities for storage of Yes Temporary sheds will be created at the project site goods or materials? during the construction phase, for the storage of construction raw materials. Separate raw material handling yard will be made as per requirement. Cement will be separately stored under covered bags. Sand will be stacked neatly under tarpaulin cover. Bricks and steel will be laid in open. The raw material handling yard will be located within the project site and separated by enclosures. Show in site layout with ear marking with enclosures and proximity to nearby house holds 1.15 Facilities for Yes Solid Waste Generation: treatment or disposal of solid Construction phase: waste or liquid effluents? During the Construction phase, solid waste of about 50 Kg/Day will be generated. Disposal: Construction material waste will be reused to the maximum possible and excess will be disposed through authorized vendors as per Construction and Demolition Waste rules 2016. Operation phase: During operation phase, total population expected is 930 people, the Municipal Solid waste generated will be about 569 Kg/Day. Waste Quantity Collection Treatment / (kg/day) method disposal method Organic 224 Bins Will be STP Sludge 10 composed by own and used as Manure Inorganic 335 Bins Disposed to authorized vendor Average : 0.60 kg per capita per day for metropolitan cities Source : As per CPCB Norms Liquid Effluent For construction activity, about 25 KLD of water will be required, which will be sourced from CMWSSB. Phase Man Quantity Sewage/ Treatment power of total Generated method water KLD required KLD Constru 185 25 7.4 Mobile ction STP Opera 930 130 130 STP tion Source: Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) After treatment, total treated water quantity is 117 KLD. Treated water will be reused for Toilet Flushing (40 KLD), Landscaping (5 KLD) & Excess treated water will be let into UG Sump/nearest pumping station (72 KLD). Water Balance is enclosed in Annexure 4. 1.16 Facilities for long term No No long-term housing facilities proposed as most of housing of operational the skilled/unskilled manpower required for the workers? operation activities will be hired from the surrounding villages. 1.17 New road, rail or sea No The existing 18 m wide CP Ramasamy Road will traffic during be used as access road. construction or operation? 1.18 New road, rail, air No NA waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc.? 1.19 Closure or diversion of No There will not be any closure or diversion of existing transport existing transportation routes routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted No Not Applicable transmission lines or pipelines? 1.21 Impoundment, No Not Applicable damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No There is no stream crossing across the site 1.23 Abstraction or transfers Yes Water will be sourced from CMWSSB of water from ground or surface waters? 1.24 Changes in water No There will not be any change in the drainage bodies or the land pattern or nearby water bodies. surface affecting drainage or run-off 1.25 Transport of personnel Yes The existing CP Ramasamy Road will be utilized or materials for for the transportation of material and personnel construction, operation during construction and operation phases. or decommissioning? 1.26 Long-term dismantling No Not Applicable or decommissioning or restoration works? 1.27 Ongoing activity during No Not Applicable decommissioning which could have an impact on the environment? 1.28 Influx of people to an Yes Construction phase area in either Around 185 people will be engaged for the activity temporarily or temporarily.