APPLICATION FOR ENVIRONMENTAL CLEARANCE

FORM-I

For

‘THE PROPOSED MULTI STOREYED RESIDENTIAL BUILDING HAVING 2 BASEMENT + STILT +2 UPPER PARKING FLOORS + 16 FLOORS WITH 124 DWELLING UNITS + SWIMMING POOL’

M/s RAMUBy & CO

At Door No: 8/91, Survey. No. 1646/3, Block No: 34, C.P Ramasamy Road, , MylaporeVillage, Taluka: Taluk, District: State:

ENVIRONMENTAL CONSULTANT HUBERT ENVIRO CARE SYSTEMS (P) LTD CHENNAI JANUARY 2019 List of Annexures

S.No List of Annexure Details

1. Annexure 1 CMDA Acknowledgement

2. Annexure 2 Site Photos

3. Annexure 3 Soil Test Report

4. Annexure 4 Water Balance

5. Annexure 5 Overall Site Layout

6. Annexure 6 Green Belt Layout

7. Annexure 7 Site Plan Showing External Storm Water

Layout

8. Annexure 8 STP Flow Diagram

9. Annexure 9 STP Process & Specification

10. Annexure 10 Site Plan Showing STP & UG Sump

Location Layout

11. Annexure 11 Dual Plumbing System

12. Annexure 12 Basement 1 & 2 Car Parking Layout

13. Annexure 13 Stilt Floor Parking Plan Layout

14. Annexure 14 Upper Parking 1 & 2layout

15. Annexure 15 Traffic Movement Plan

16. Annexure 16 Fire NOC Acknowledgement

17. Annexure 17 FMB Layout

18. Annexure 18 500M Topo map

19. Annexure 19 10 KM Radius Satellite Map

20. Annexure 20 Satellite image of the project 21. Annexure 21 Contour Map

22. Annexure 22 Land Document

23. Annexure 23 Terrace Floor & Solar panel Layout

24. Annexure 24 Water Supply Acknowledgement

25. Annexure 25 Environmental Management Plan

26. Annexure 26 Storm Water & Rain Water Harvesting

Calculation

27. Annexure 27 Energy Saving Details FORM-1 (I) Basic Information

S.No Item Details 1. Name of the Project The Proposed Multi Storeyed Residential Building Having 2 Basement + Stilt +2 Upper Parking Floors + 16 Floors With 124 Dwelling Units + Swimming Pool 2. S. No. in the schedule 8 (a) 3. Proposed capacity/area/length/tonnage Project details: to be handled/command area/lease area/number of wells to be drilled. Site Area: 8154.77 sq. m Total Built up area: 69150.31 sq. m 3BHK Houses:60 Nos 4BHK Houses:64 Nos Total Houses:124 Nos 4. New/Modernization New 5. Existing Capacity/Area etc. - 6. Category of Project i.e., ‘A’ or ‘B’ B2 7. Does it attract general condition? If yes, No please specify. 8. Does it attract specific condition? If Yes, No please specify. 9. Location Lat: 13° 2'11.49"N Long: 80°15'23.26"E Plot/Survey/Khasra No. S.F No. 1646/3 Village Alwarpet Tehsil Mylapore District Chennai State Tamilnadu 10. Nearest Railway Station/Airport along Railway Station: with distance in kms. Thirumayilai Railway station: 1.16 Km-ESE Airport: Chennai International airport: 8.72 Km- WSW 11. Nearest Town, City, District Site situated within the Chennai city Headquarters along with distance in kms. 5.53Km-NNE 12. Village Corporations, Zilla Parishad, Municipal Corporation, Municipal Corporation, Local body No 29, C P Ramasamy Road, Mylapore, (complete postal addresses with Chennai - 600004, Opposite Keerthi Lal telephone nos. to be given) Jewellers 13. Name of Applicant M/s Ramu & Co 14. Registered Address No 2, Ethiraj Salai, C-in C Road, , Chennai - 600008

15. Address for correspondence: No 2, Ethiraj Salai, C-in C Road, Egmore, Chennai-60008 Name Rajesh Bhansali Designation (Owner/Partner/CEO) Managing Partner Address No 2, Ethiraj Salai, C-in C Road, Egmore, Chennai Pin Code 600008 E – mail [email protected] Telephone No. 9710611000 Fax. No. - 16. Details of Alternate Sites examined, if No Alternate Sites examined. any. Location of these sites should be shown on a topo sheet 17. Interlinked Projects No 18. Whether separate application of No interlinked project has been submitted? 19. If yes, date of submission - 20. If no, reason - 21. Whether the proposal involves - approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z. Notification, 1991? 22. Whether there is any Government No Order/Policy relevant/relating to the site? 23. Forest Land involved (hectares) No 24. Whether there is any litigation pending No against the product and/or land in which the project is propose to set up? (a) Name of the Court (b) Case. No. (c) Orders/Directions of the court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. Confirmation rates, wherever possible) with source of information data 1.1 Permanent or No The survey numbers fall in urbanized area as temporary change in classified by CMDA The land use letter is enclosed land use, land cover or as Annexure 1. topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing yes 74 trees are present and Site condition land, vegetation and photographs are enclosed as Annexure 2. building? Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. Confirmation rates, wherever possible) with source of information data 1.3 Creation of new land Yes The proposed project is construction of Multi uses Storied Residential Building 1.4 Pre-construction yes Soil investigation Report is enclosed in Annexure investigations e.g. bore 3. houses, soil testing? 1.5 Construction works? Yes Civil structure will be constructed 1.6 Demolition Works? No NA 1.7 Temporary sites used No Construction workers will be hired from nearby for construction works villages. Hence, no housing facilities for or housing of construction workers are planned on site. construction workers? 1.8 Above ground yes The excavated soil will be used in backfilling, soft buildings, structures or landscaping and road formation and top soil will be earthworks including stacked separately and used for green belt development linear structures, cut and fill or excavations 1.9 Underground works No No underground work except construction of including mining or basements. tunneling? 1.10 Reclamation works? No NA 1.11 Dredging? No NA 1.12 Offshore structures? No NA 1.13 Production and No NA manufacturing Process? 1.14 Facilities for storage of Yes Temporary sheds will be created at the project site goods or materials? during the construction phase, for the storage of construction raw materials. Separate raw material handling yard will be made as per requirement. Cement will be separately stored under covered bags. Sand will be stacked neatly under tarpaulin cover. Bricks and steel will be laid in open. The raw material handling yard will be located within the project site and separated by enclosures. Show in site layout with ear marking with enclosures and proximity to nearby house holds 1.15 Facilities for Yes Solid Waste Generation: treatment or disposal of solid Construction phase: waste or liquid effluents? During the Construction phase, solid waste of about 50 Kg/Day will be generated.

Disposal:

Construction material waste will be reused to the maximum possible and excess will be disposed through authorized vendors as per Construction and Demolition Waste rules 2016.

Operation phase:

During operation phase, total population expected is 930 people, the Municipal Solid waste generated will be about 569 Kg/Day.

Waste Quantity Collection Treatment / (kg/day) method disposal method Organic 224 Bins Will be STP Sludge 10 composed by own and used as Manure Inorganic 335 Bins Disposed to authorized vendor Average : 0.60 kg per capita per day for metropolitan cities Source : As per CPCB Norms

Liquid Effluent For construction activity, about 25 KLD of water will be required, which will be sourced from CMWSSB. Phase Man Quantity Sewage/ Treatment power of total Generated method water KLD required KLD Constru 185 25 7.4 Mobile ction STP Opera 930 130 130 STP tion Source: Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)

After treatment, total treated water quantity is 117 KLD. Treated water will be reused for Toilet Flushing (40 KLD), Landscaping (5 KLD) & Excess treated water will be let into UG Sump/nearest pumping station (72 KLD). Water Balance is enclosed in Annexure 4. 1.16 Facilities for long term No No long-term housing facilities proposed as most of housing of operational the skilled/unskilled manpower required for the workers? operation activities will be hired from the surrounding villages. 1.17 New road, rail or sea No The existing 18 m wide CP Ramasamy Road will traffic during be used as access road. construction or operation? 1.18 New road, rail, air No NA waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc.? 1.19 Closure or diversion of No There will not be any closure or diversion of existing transport existing transportation routes routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted No Not Applicable transmission lines or pipelines? 1.21 Impoundment, No Not Applicable damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No There is no stream crossing across the site

1.23 Abstraction or transfers Yes Water will be sourced from CMWSSB of water from ground or surface waters? 1.24 Changes in water No There will not be any change in the drainage bodies or the land pattern or nearby water bodies. surface affecting drainage or run-off 1.25 Transport of personnel Yes The existing CP Ramasamy Road will be utilized or materials for for the transportation of material and personnel construction, operation during construction and operation phases. or decommissioning? 1.26 Long-term dismantling No Not Applicable or decommissioning or restoration works? 1.27 Ongoing activity during No Not Applicable decommissioning which could have an impact on the environment? 1.28 Influx of people to an Yes Construction phase area in either Around 185 people will be engaged for the activity temporarily or temporarily. permanently? Operation phase Since the proposed project is a Residential development there will be step in population of 930 people. There will be regular movement of residents, Security, servants and related personals. 1.29 Introduction of alien No Not envisaged species? 1.30 Loss of native species No Not envisaged or genetic diversity? 1.31 Any other actions? No Not Applicable 2. Use of Natural resources for construction or operation of Project (such as land, water, materials or energy, especially any resources which are non- renewable or in short supply).

Sr. Information/Checklist Yes/N Details thereof (with approximate quantities/ No. Confirmation o rates, wherever possible) with source of information data 2.1 Land specially No Not Applicable. Proposed project is located in non undeveloped or agricultural land. agricultural land (ha) 2.2 Water (expected The fresh water requirement for kitchen use will be source & competing Yes 110 KLD. It will be obtained from CMWSSB. users) unit KLD source Quantity Source Competin (KLD) g Users Fresh water 110 CMWSS Nil requirement B (Domestic & kitchen) Treated 117 Recyclin Nil waste water g of for toilet waste flushing, water gardening and U G.Sump 2.3 Minerals (MT) No Not Applicable 2.4 Construction material – Yes Construction Materials will be procured directly from stone, aggregates, manufacturers and/soil (expected source-MT) 2.5 Forests and timber No Doors used will be flush doors or panel (source-MT) doors/laminated timbers. UPVC windows will be used. 2.6 Energy including Yes Power requirement: electricity and fuels Details Capacity Source (source, competing Power 4*500 KVA TANGEDCO users) Unit: fuel (MT), Requirement energy (MW) Power Back 2*1000 KVA DG Sets Up 2.7 Any other natural No Not Applicable resources (use appropriate standard units) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health

Sr. Information/Checklist Yes/ Details thereof (with approximate No. Confirmation No quantities/ rates, wherever possible) with source of information data

3.1 Use of substances or No This is a Residential building and no storage of materials, which are hazardous chemicals (as per MSIHC rules), hazardous (as per MSIHC apart from spent oil and LPG. Suitable rules) to human health or management practice will be adopted for the the environment (flora, same. fauna, and water supplies) HSD (low sulphur variety) will be used for DG sets. However, the quantity stored will be below the threshold limit specified by the MSIHC rules. 3.2 Changes in occurrence of No Suitable drainage and waste management disease or affect disease measures will be adopted in both construction vectors (e.g. insect or water and operational phase, which will restrict borne diseases) stagnation of water or accumulation of waste. This will effectively restrict the reproduction and growth of disease vectors. 3.3 Affect the welfare of people No Not Applicable e.g. by changing living conditions? 3.4 Vulnerable groups of people No Not Applicable who could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No Not Applicable

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

Sr. Information/Checklist Yes/ Details thereof (with approximate quantities/ No. Confirmation No rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine No Not Applicable wastes 4.2 Municipal waste (domestic Yes Solid Waste and or commercial wastes) During the Construction phase, solid waste of about 50 Kg/Day will be generated. Construction waste will be reused to the maximum possible and excess will be disposed through authorized vendors. During operation phase, total population expected is 930 people, the Municipal Solid waste generated will be about 569 Kg/Day.

Waste Quantity Collecti Treatment (kg/day) on / disposal method method Organic 224 Bins Will be STP 10 composed Sludge and used as Manure Inorganic 335 Bins Disposed to authorized vendor Average : 0.60 kg per capita per day Source : As per CPCB Norms 4.3 Hazardous wastes (as per Yes Spent oil from DG sets will be carefully stored hazardous waste in HDPE drums in isolated covered facility. This management rules) spent oil will be sold to vendors authorized by TNPCB/MoEF for treatment of same. Suitable care will be taken so that spills/leaks of spent oil from storage could be avoided.

4.4 Other industrial process No Not Applicable wastes 4.5 Surplus product No Not Applicable 4.6 Sewage sludge or other Yes Sewage sludge generated from STP of 10 Kg/ sludge from effluent day will be used as manure. treatment 4.7 Construction or demolition Yes Construction waste generated will be about 50 wastes kgs/Day which will be limited to the construction phase and project site. These will be reused for backfilling after manual segregation. Unusable and excess construction debris will be disposed as per Construction and Demolition waste rules 2016. 4.8 Redundant machinery or No Not Applicable equipment 4.9 Contaminated soils or No Not Applicable other materials 4.10 Agricultural wastes No Not Applicable 4.11 Other solid wastes No Not Applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air (kg/hr) Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. Confirmation rates, wherever possible) with source of information data 5.1 Emissions from Yes Construction Phase : combustion of fossil fuels from stationary or Stationary Sources : mobile sources No stationary sources involved during construction phase

Mobile Sources :

Movement of construction vehicles like lorries, trucks, dumpers, roller, excavator, HVM, etc would result in air pollution.

During the operation phase, the movement of vehicles in and around the project site also increase the emission load. All vehicles used during construction phase will have PUC certificate.

Operation Phase:

The DG sets of 2 No. 1000 kVA capacities provided for power back up will also generate air pollutants

like NOx.

Separate DG yards will be provided within the site and adequate DG stack height shall be provided for safe emission of the flue gases. DG Stack Height: S. DG Calculation Stack ht. No Capacity Building Height required + [(0.2)*(Capacity (m) in kVA)1/2]

1 2 x 1000 68 + [(0.2) √400] 74.3 kVA Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. Confirmation rates, wherever possible) with source of information data 5.2 Emission from No There is no production in this project production processes 5.3 Emissions from Yes This will be restricted to the construction phase and materials handling construction site only and the generation of such including storage or emission will be very minimal. transport 5.4 Emissions from Yes The fugitive emission will be restricted during the construction activities mixing of aggregates. This will be restricted to the including plant and construction phase and to the construction site only. equipment It will be minimized by sprinkling water. 5.5 Dust or odours from Yes Dust is likely to be generated during construction, this handling of materials will be minimized by water sprinkling and tarpaulin including construction cover will be provided over stored raw materials to materials, sewage and reduce dust emission. waste On site, sanitation facilities will be provided for construction workers during construction period. 5.6 Emissions from No Not Applicable incineration of waste 5.7 Emissions from No Not applicable. burning of waste in open air (e.g. slash materials, construction debris) 5.8 Emissions from any No Not Applicable other sources

6. Generation of Noise and vibration and emissions of Light and heat Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No Confirmation rates, wherever possible) with source of information data 6.1 From operation of Yes The machinery which will be used for construction equipment e.g. engines, will be of highest standard of reputed make and will ventilation plant, adhere to international standards. Hence crushers insignificant impacts due to construction machinery are envisaged. Source of noise in the operational phase will be DG sets and vehicular sources only. The DG sets will be in operation during power failure duration only. Moreover, the DG room shall be acoustically enclosed. 6.2 From industrial or similar No NA processes 6.3 From construction or Yes It has been estimated that during this period the Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No Confirmation rates, wherever possible) with source of information data demolition average noise level resulting from construction activities and traffic movement in the adjacent road will be around 80-85 dB (A) during peak hours. During the process workers shall be provided with protective gears. 6.4 From blasting or piling No No blasting or mechanized piling will be done in the construction phase. 6.5 From construction or Yes Negligible noise will be generated from vehicular operational traffic movement in the construction and operational phase. 6.6 From lighting or cooling No NA systems 6.7 From any other sources No NA

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal wasters or the sea Sr. Information/Checklist Yes/ Details thereof (with approximate quantities/ No. Confirmation No rates, wherever possible) with source of information data 7.1 From handling, storage, No Spent oil will be handled with utmost care, it will use or spillage of be stored in HDPE drums stationed over concrete hazardous materials platforms and will be directly transferred to vendors authorized to handle such hazardous material. 7.2 From discharge of sewage No The wastewater generated will be treated in STP. or other effluents to water Treated water shall be mainly used for green belt or the land (expected Development, flushing etc. Sewage will not be discharged into the open surface causing the mode and place of contamination of ground water. discharge) 7.3 By deposition of pollutants No Proper air pollution control measures will be taken emitted to air into the land care by providing adequate stack height and or into water parking facility to avoid deposition of pollutant into nearby land and water. 7.4 From any other sources No NA 7.5 Is there a risk of long term No Not envisaged build up of pollutants in the environment from these sources? 8. Risk of accidents during construction or operation of the project, which could affect human health or the environment Sr. Information/Checklist Yes/No Details thereof (with approximate No. Confirmation quantities/ rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires, No Not envisaged. The ‘HSD’ will be etc from storage, handling, use or stored as per hazardous substance production of hazardous handling guidelines. substances 8.2 From any other causes No NA 8.3 Could the project be affected by No The project falls under seismic zone- natural disasters causing III according to the Indian Standard environmental damage (e.g. Seismic Zoning Map. There is a floods, earthquakes, landslides, chance for Moderate Earthquakes so could burst etc)? suitable seismic coefficients in horizontal and vertical directions will be adopted while designing the structures. Foundation design enclosed in Annexure 5.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality.

Sr. Information/Checklist Yes/ Details thereof (with approximate No. Confirmation No quantities/ rates, wherever possible) with source of information data 9.1 Lead to development of supporting, Yes Supporting and ancillary utilities, ancillary development or development will not cause any development stimulated by the consequences. project which could have impact on the environment e.g.:

Supporting infrastructure (roads, Yes Internal Roads, Rainwater power supply, waste or waste water Harvesting, Storm Water Drain, STP treatment, etc) will be provided.

Housing development Yes The project involves the construction of Multi Storied Residential Building Having 2 Sr. Information/Checklist Yes/ Details thereof (with approximate No. Confirmation No quantities/ rates, wherever possible) with source of information data Basement + Stilt +2 Upper Parking Floors + 16 Floors With 124 Dwelling Units + Swimming Pool.

Ground coverage= 47.88%

Extractive industries No -

Supply industries No - Other No - 9.2 Lead to after use of the site, which No No significant impact envisaged. The could have an impact on the domestic traffic is likely to increase. environment 9.3 Set a precedent for later Yes This may allow commercial & developments residential developments near the site. 9.4 Have cumulative effects due to No No effect on any planned project in proximity to other existing or planned the locality projects with similar effects

(III) Applicable Environmental Sensitivity

Sr. Areas Name / Aerial distance (with 15-km) Proposed project No. Identity location boundary 1 Areas Yes • National Park-8.44Km(SW) protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value Sr. Areas Name / Aerial distance (with 15-km) Proposed project No. Identity location boundary 2 Areas which yes S.N Name Distance Dir are important o (≈ Km) or sensitive of 1. 8.44 SW ecological 2. Chennai beach() 2.40 E reasons – 6.80 NW wetlands, water 3. Lake courses or 4. Lake 11.0 NW other water 5. Adayar river 5.29 S bodies, coastal zone, 6. 0.5 N biospheres, 7. Lake 11.0 SW mountains, forests 8. 0.5 W 3 Areas used by yes S.N Name Distance Dir protected, o (≈ Km) important or 1. Guindy National Park 8.44 SW sensitive 2. Chennai beach(Bay of Bengal) 2.40 E species of flora or fauna for 3. Chetpet Lake 6.80 NW breeding, 4. Retteri Lake 11.0 NW nesting, 5. Adayar river 5.29 S foraging, resting, over 6. Cooum River 0.5 N wintering, 7. 11.0 SW migration 8. Buckingham Canal 0.5 W

4 Inland, coastal, Yes S.No Name Distance Direction marine or (≈Km) underground 1 Chennai beach(Bay 2.40 E waters of Bengal) 2 Adayar river 5.29 S 3 Cooum River 0.5 N

5 State, national No NIL within 15km radius boundaries 6 Routes or yes S.No Name Distance Direction facilities used (≈Km) by the public 1 Tamil Nadu 1.17 N for access to Assembly recreation or Sr. Areas Name / Aerial distance (with 15-km) Proposed project No. Identity location boundary other tourist, 2 Corporation park 5.2 SW pilgrim areas 3 Zodiac army Park 1.0 NW 4 Napier Park 1.74 NW 5 stadium 0.5 W 6 Jawaharlal Nehru 1.17 NW stadium

7 Defense yes Officers Training academy: 8.88 Km-WSW installations 8 Densely Yes Chennai Area 8,850 Sq. Km-70.9 lakhs populated or built-up area Source: Census 2011.

9 Areas occupied Yes 1.Tamil Nadu Assembly:~1.17km-N by sensitive 2.Corporation park:~5.2km-SW man made land 3.Zodiac army Park-~1.0km-NW uses (hospitals, schools, places 4.Napier Park:~1.74km-N of worship, 5.Chepauk stadium: ~0.5km-N community 6.Jawaharlal Nehru stadium:~1.17km-NW facilities) 7. Madras University:~0.5 km-W 8. Presidency College: ~ 0.75 km-SW 9. Parthasarathy Temple: ~1.5 km-SW 10. Church: ~ 3.5 km-S Sr. Areas Name / Aerial distance (with 15-km) Proposed project No. Identity location boundary 10 Areas yes 1.Chennai beach : ~2.40Km- E containing 2.Chetpet Lake : ~6.80km-NW important, high 3.Retteri Lake: ~11.0 km-NW quality or scarce 4.Adayar river:~5.29km-S resources 5.Cooum River:~0.5km-N (ground water resource, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already No Nil subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas NO The area under study falls in Zone-III, according to the susceptible to Indian Standard Seismic Zoning Map. Suitable seismic natural hazard coefficients in horizontal and vertical directions respectively, have to be adopted while designing the which could structures. cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) (IV) Declaration

“I hereby given undertaking that the data and information given on the application and closures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost.

Date: Place:

Managing Partner, No 2, Ethiraj Salai, C-in C Road, Egmore, Chennai.