County Summary
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Social Infrastructure Audit
Client Platinum Land Limited Project Title Former Chivers Factory Document Title Social Infrastructure Audit Document No. “SIA 01” OSI Licence No EN0005415 Document DCS TOC Text Appendices Comprises 1 1 7 2 Prepared by Nathan Smith Checked by Nathan Smith Rev. Status Issue Date B ISSUED 23.04.19 1.1 This Social Infrastructure Audit has been prepared by McCutcheon Halley Planning Consultants on behalf of Platinum Land Limited in respect of the proposed Built to Rent residential development proposal at the Former Chivers Factory Site, Coolock Drive, Coolock, Dublin. 1.2 This report is produced as an assessment of social infrastructure in the Coolock area in relation to development at Former Chivers Factory Site, Coolock Drive. It provides a contextual overview of the area surrounding the site, a review of the social infrastructure within its catchment and identifies possible future needs in the area. 1.3 Social Infrastructure covers many diverse services and facilities. In this instance this SIA has categorised as follows; • Education & Childcare- Childcare, Primary, Post Primary or Further education & Training; • Sports & Recreation- Parks, Playgrounds, Sports Clubs, Fitness Facilities and Recreation; • Health & Wellbeing- Hospital & Specialist Care, GP & Medical Centres, Dental, Pharmacy’s or physiotherapy; • Community Services- Social Service or Information Centre, Family Service, Employment Support, Parish or Community Centre, Youth Club, Retirement Club, Specialist Club or Library; • Faith- Churches and Cemeteries; • Other- Post Offices, Credit Unions, Banks, Recycling Bring Centres and key retail locations; and • Emergency Services- Fire Brigade and Garda Station. 1.4 The report is structured as follows; • Site Context; • Policy Context; • Profile of the area; • Existing Facilities; • Assessment of needs; • Conclusion; and • Appendix. -
Hydrology Report Date
Fingal East Meath Flood Risk Assessment and Management Study PROJECT: Fingal East Meath Flood Risk Assessment and Management Study DOCUMENT: HYDROLOGY REPORT DATE: January 2010 Fingal East Meath Flood Risk Assessment and Management Study Hydrology Report Checking and Approval Prepared by: Keshav Bhattarai December 2009 Senior Hydrologist Checked by: Scott Baigent December 2009 Associate / Senior Hydrologist Checked by: Jenny Pickles December 2009 Principal Water Management Consultant Approved by: Anne-Marie Conibear January 2010 Project Manager Contents amendment record Issue Revision Description Date Signed 1 0 1st draft for review Oct ‘09 2 1 Final Jan ‘10 3 2 Final Report Apr ‘10 (additional text in response to OPW comments) Halcrow Barry has prepared this report in accordance with the instructions of Fingal County Council, Meath County and the OPW for their sole and specific use. Any other persons who use any information contained herein do so at their own risk. Halcrow Barry Tramway House, 32 Dartry Road, Dublin 6, Ireland Tel +353 1 4975716, Fax +353 1 4975716 www.halcrow.com www.jbbarry.ie © Halcrow Barry, Fingal County Council, Meath County Council & Office of Public Works, 2010 i Fingal East Meath Flood Risk Assessment and Management Study Hydrology Report ii Fingal East Meath Flood Risk Assessment and Management Study Hydrology Report Executive Summary Fingal County Council (FCC), in conjunction with Meath County Council (MCC) and the Office of Public Works (OPW), are undertaking a flood risk assessment and management study in Fingal and East Meath – the Fingal East Meath Flood Risk Assessment and Management Study (FEM FRAMS). Halcrow Barry (HB) was commissioned to carry out the work on behalf of FCC/MCC/OPW. -
River Dodder Catchment Flood Risk Management Plan
RIVER DODDER CATCHMENT FLOOD RISK MANAGEMENT PLAN HYDROLOGICAL ANALYSIS REPORT OCTOBER 2008 River Dodder Catchment Flood Risk Assessment and Management Study Hydrological Analysis Report DOCUMENT CONTROL SHEET Client Dublin City Council Project Title River Dodder Catchment Flood Risk Assessment and Management Study Document Title Hydrological Analysis Report Document No. MDW0259Rp0016 No. of DCS TOC Text List of Tables List of Figures This Document Appendices Comprises 1 1 92 1 1 6 Rev. Status Author(s) Reviewed By Approved By Office of Origin Issue Date F01 Approval C. O’Donnell B. Elsaesser B. Elsaesser West Pier 31.10.08 River Dodder Catchment Flood Risk Management Plan Hydrological Analysis Report IMPORTANT DISCLAIMER – HYDROLOGICAL ANALYSIS Please read below the disclaimer, and limitations associated with this report to avoid incorrect interpretation of the information and data provided. DISCLAIMER Dublin City Council, South Dublin County Council, Dun Laoghaire and Rathdown County Council and The Office of Public Works make no representations, warranties or undertakings about any of the information provided in this report including, without limitation, on its accuracy, completeness, quality or fitness for any particular purpose. To the fullest extent permitted by applicable law, neither the State, Dublin City Council, South Dublin County Council, Dun Laoghaire and Rathdown County Council nor The Office of Public Works nor any of their members, officers, associates, consultants, employees, affiliates, servants, agents or other representatives -
Social Housing Construction Projects Status Report Q3 2019
Social Housing Construction Projects Status Report Q3 2019 December 2019 Rebuilding Ireland - Action Plan for Housing and Homelessness Quarter 3 of 2019: Social Housing Construction Status Report Rebuilding Ireland: Social Housing Targets Under Rebuilding Ireland, the Government has committed more than €6 billion to support the accelerated delivery of over 138,000 additional social housing homes to be delivered by end 2021. This will include 83,760 HAP homes, 3,800 RAS homes and over 50,000 new homes, broken down as follows: Build: 33,617; Acquisition: 6,830; Leasing: 10,036. It should be noted that, in the context of the review of Rebuilding Ireland and the refocussing of the social housing delivery programme to direct build, the number of newly constructed and built homes to be delivered by 2021 has increased significantly with overall delivery increasing from 47,000 new homes to over 50,000. This has also resulted in the rebalancing of delivery under the construction programme from 26,000 to 33,617 with acquisition targets moving from 11,000 to 6,830. It is positive to see in the latest Construction Status Report that 6,499 social homes are currently onsite. The delivery of these homes along with the additional 8,050 homes in the pipeline will substantially aid the continued reduction in the number of households on social housing waiting lists. These numbers continue to decline with a 5% reduction of households on the waiting lists between 2018 and 2019 and a 25% reduction since 2016. This progress has been possible due to the strong delivery under Rebuilding Ireland with 90,011 households supported up to end of Q3 2019 since Rebuilding Ireland in 2016. -
Inspectors Report (302/R302039.Pdf, .PDF Format 2249KB)
Inspector’s Report ABP301908-18 / ABP302039-18. Development Greater Dublin Drainage Project incorporating a Regional Biosolids Storage Facility. Location Dublin City and Dublin County. Applicant Irish Water Planning Authorities Fingal County Council and Dublin City Council. Prescribed Bodies 10 prescribed bodies - Listed in Appendix Observers to Planning Application 152 observations - Listed in Appendix Objectors to CPO 14 objectors - Listed in Appendix Types of Applications Application under the provisions of S37 of the Planning and Development Act and Compulsory Purchase of Lands under the Housing Act 1966.. ABP301908-18 / ABP302039-18 Inspector’s Report Page 1 of 399 Dates of Site Inspections 8th August 2018, 3rd September 2018, 7th September 2018, 6th March 2019, 9th March 2019, 15th March 2019, 24th March 2019 . Inspector Mairead Kenny. ABP301908-18 / ABP302039-18 Inspector’s Report Page 2 of 399 Contents 1.0 Introduction .......................................................................................................... 6 2.0 Site Location and Description .............................................................................. 8 3.0 Proposed Development ..................................................................................... 12 Overview ..................................................................................................... 12 Regional Biosolids Storage Facility ............................................................. 13 Orbital pipeline route - Blanchardstown to N2 (Ch 0,000-CH 5,500) -
PDF (Dun Laoghaire
DUN LAOGHAIRE – RATHDOWN LOCAL DRUG TASK FORCE SECOND REPORT SEPTEMBER 1997 Table of Contents Page 1. Introduction 3 2. The process of preparing 2nd Task Force Report 4 3. Profile of Dun Laoghaire - Rathdown Task Force Area 5 3.1 Introduction 3.2 Population Profile 3.3 Social Disadvantage 4. The nature and extent of drug problem in the Dun 8 Laoghaire/Rathdown area 4.1 Introduction 4.2 Local Survey Data 4.3 Health Statistics 4.4 Other Health Data 4.5 Probation Service 4.6 Law Enforcement Statistics 5. Outline of Current/Planned Service provision and Service 33 development proposals from the Task Force 5.1 Introduction 5.2 (i) Current Education and Prevention Provision (ii) Service development Proposals 5.3 (i) Current Treatment and Rehabilitation Provision (ii) Service Development Proposals 5.4 Supply and Estate Management 6. The role of the Task Force in implementation and 59 monitoring of the Service Development Proposals. 7. Conclusions 60 Appendices: Members of Task Force 61 Letters Requesting Submissions 62 List of Submissions Received 63 Summary of Funding Proposals 64 Members of Task Force sub-committees 65 2 SECTION 1 AN INTRODUCTION TO DUN LAOGHAIRE-RATHDOWN DRUGS TASK FORCE 2ND REPORT The Task Force was established in March 1997 to prepare a service development plan for the Dun Laoghaire-Rathdown county area including Whitechurch and parts of Rathfarnham. There was an initial expectation that Task Forces would submit plans by early summer but this was not possible for us because of time constraints. The Task Force decided therefore to prepare interim proposals pending the elaboration of a detailed report and project proposals for submission to the National Drug Strategy Team. -
Dublin Bay North
Dublin Bay North Constituency of Dublin Bay North 2019/20 Polling Place Polling Polling District PD Voters Voters Table Polling Station Code From To Totals District Totals St. Fiacras Senior N.S. 75 Beaumont B NB 1 516 516 2874 Montrose Park 76 517 1282 766 Dublin 5 77 1283 2044 762 78 2045 2874 830 St. John Vianney Parish Hall 79 Beaumont C NC 1 718 718 2295 Ardlea Road 80 719 1480 762 Artane 81 1481 2295 815 Dublin 5 Gaelscoil Cholmcille 82 Kilmore A pt. NE 1 445 706 1495 Coolock Lane ( 1198 1204 behind Astro Park ( 1271 1524 Dublin 17 83 1525 2313 789 Scoil Fhursa N.S. 84 Kilmore B NH 1 514 514 1961 Cromcastle Green 85 515 1178 664 Dublin 5 86 1179 1961 783 87 Kilmore A pt. NE 446 1197 818 818 ( 1205 1270 Northside Civic Centre 88 Kilmore C NJ 1 454 454 1011 Bunratty Road 89 455 1011 557 Dublin 17 St Brendans Parish Hall 90 Kilmore D NK 1 508 508 1704 Coolock Village 91 509 1062 554 Dublin 5 92 1063 1704 642 St Davids BNS 93 Beaumont F pt RC 1 332 531 1622 Kilmore Road ( 1186 1384 Artane Dublin 5 94 1385 2042 658 95 2043 2475 735 ( Beaumont D RA 1 302 1750 96 303 1005 703 97 1006 1750 745 St Brendan's N S 98 Harmonstown A TJ 1 714 714 2207 Mc Auley Road 99 715 1422 708 Artane 100 1423 2207 785 Dublin 5 101 Harmonstown B TK 1 610 610 2018 102 611 1275 665 103 1276 2018 743 St. -
Draft Development Plan 2004-2010
South Dublin County Council South Dublin County Council Draft Development Plan 2004-2010 Draft Development Plan Written Statement South Dublin County Council South Dublin County Council Draft Development Plan 2004-2010 Draft Development Plan Written Statement Máire Ardagh Mayor Joe Horan County Manager Kieran Kennedy Director of Planning Michael Kenny November 2003 Senior Planner South Dublin County Council Comhairle Chontae Átha Cliath Theas The Council of an Administrative County consists of a Mayor and Councillors. South Dublin has a total of 26 Councillors who are elected from 5 electoral areas – Clondalkin, Lucan, Tallaght Central, Tallaght South and Terenure/Rathfarnham. County Council Members November 2003 Clondalkin Electoral Area Robert Dowds Labour Colm McGrath Independent Sheila O’Brien Fianna Fáil Thérèse Ridge Fine Gael Colm Tyndall Progressive Democrats Lucan Electoral Area Deirdre Doherty-Ryan Fianna Fáil Derek Keating Independent Fintan McCarthy Green Eamonn Tuffy Labour Tallaght Central Electoral Area Mark Daly Sinn Féin Eamonn Maloney Labour Paul Ringland Fine Gael Roderick Smyth Fianna Fáil Don Tipping Labour Tallaght South Electoral Area Mick Billane Fianna Fáil Jim Daly Fianna Fáil John Hannon Fianna Fáil Cathal King Sinn Féin Denis Mackin Labour Terenure/Rathfarnham Electoral Area Máire Ardagh, Mayor, Fianna Fáil Cáit Keane Progressive Democrats John Lahart Fianna Fáil Stanley Laing, Deputy Mayor, Fine Gael Meg Murphy Independent Ann Ormonde, Senator, Fianna Fáil Eamonn Walsh Labour Acknowledgements This Draft Plan -
Chapter 8 Hydrogeology & Hydrology
Chapter 8 Hydrogeology and Hydrology 8.0 Introduction Assessments have been undertaken of the likely significant environmental impacts on the hydrogeological and hydrological environments associated with the proposed National Paediatric Hospital Project. The project description is detailed in Chapter 2 of the Environmental Impact Statement (EIS) and includes a number of development sites: within – or associated with – the main project site on the campus of St. James’s Hospital, Dublin 8: o a new children’s hospital and associated Family Accommodation Unit, sited in the west of the campus; o a new Children’s Research and Innovation Centre sited along James’s Street; o associated works to boundaries, roads, entrances, parking areas, hard and soft landscaping etc. within the application site boundary; and o a temporary construction compound, directly associated with the above developments at St. James’s Hospital Campus, at Davitt Road, Drimnagh, Dublin 12. 8-1 a new children's hospital satellite centre at Tallaght Hospital, Dublin 24; and a new children's hospital satellite centre at Connolly Hospital, Blanchardstown, Dublin 15. This Chapter provides a description of the existing hydrogeological and hydrological environments for each of the project sites, and a statement of the likely impacts associated with both the construction and operation phases of the National Paediatric Hospital Project. Mitigation measures are proposed in the form of ameliorative, remedial and reductive measures and residual impacts are described. Assessments for each site are detailed in this Chapter with relevant technical information included in Appendices: Appendix 8.1 Feasibility Study for a Potable Groundwater Supply, new children’s hospital, Arup Consulting Engineers. -
A Short History of Dundrum and Gordonville
Gordonville: A Short History of Dundrum and Gordonville MICHAEL VAN TURNHOUT Introduction My wife grew up in a beautiful old house in Dundrum called Gordonville, at Sydenham Villas. It is still in the hands of her family. I wanted to know a bit more about the house and I discovered it was a symbol of a very important period in the development of Dundrum. This is its story. Note: in the article, it will also be referred to as ‘1 Sydenham Terrace’, as this was its original designation. Dundrum in the early days The name Dundrum goes back to the time of the Anglo-Norman conquest. Originally it was part of a larger estate, but one of its many owners gave part of it to the Priory of the Holy Trinity. This is now Taney. The remainder became Dundrum. An interesting footnote in history is that a later owner exchanged his Dundrum lands for land in Limerick! Dundrum was often raided by native Irish people, who would come down from Wicklow. This was something that was happening all over the southern edge of the Pale. To improve the situation, land was often given to families, who in exchange would build and maintain fortifications. Thus, the Fitzwilliam family appears in Dundrum, who erected Dundrum Castle. Ruins of this castle can still be seen today. In 1816 the vast Fitzwilliam Estate was inherited by the 11th Earl of Pembroke. The estate - although reduced in size - still exists. One of its many possessions was land on which Gordonville would later be built, as we will see below. -
The Official Voice for the Communities of South Dublin County
The official voice for the Adamstown Clondalkincommunities Jobstown Lucan Newcastle Palmerstownof Rathcoole Rathfarnham Saggart Tallaght Templeogue Adamstown Clondalkin Jobstown Lucan Newcastle PalmerstownSouth Rathcoole Dublin Rathfarnham Saggart Tallaght Templeogue AdamstownCounty. Clondalkin Jobstown Lucan Newcastle Palmerstown Rathcoole Rathfarnham Saggart Tallaght Templeogue Adamstown Clondalkin Jobstown Lucan Newcastle Palmerstown Rathcoole Rathfarnham Saggart Tallaght Templeogue Adamstown Clondalkin Jobstown Lucan Newcastle Palmerstown Rathcoole Rathfarnham Saggart Tallaght Templeogue Lucan Newcastle Adamstown Clondalkin Jobstown Lucan Newcastle Palmerstown Rathcoole Rathfarnham Saggart Tallaght Templeogue Adamstown Clondalkin Jobstown Lucan Newcastle Palmerstown Rathcoole Rathfarnham Saggart Tallaght Templeogue Adamstown Clondalkin Jobstown Lucan Newcastle Palmerstown Rathcoole Rathfarnham Saggart Tallaght Templeogue Adamstown Clondalkin Jobstown Lucan Newcastle Palmerstown Rathcoole Rathfarnham Saggart Tallaght Templeogue Adamstown Clondalkin Jobstown Lucan Newcastle Palmerstown Rathcoole Rathfarnham Saggart Tallaght Templeogue Lucan Newcastle Adamstown Clondalkin Jobstown Lucan Newcastle Palmerstown Rathcoole Rathfarnham Saggart Tallaght Templeogue Adamstown Clondalkin Jobstown Lucan Newcastle Palmerstown Rathcoole Rathfarnham Saggart Tallaght Templeogue Adamstown Clondalkin Jobstown Lucan Newcastle Palmerstown Rathcoole Rathfarnham What is the South Dublin County Public Participation Network? The South Dublin County Public -
Liberating Learning. a Study of Daytime Education Groups in Ireland. INSTITUTION AONTAS, Dublin (Ireland).;University Coll., Dublin (Ireland)
DOCUMENT RESUME ED 374 220 CE 067 110 AUTHOR Inglis, Tom; And Others TITLE Liberating Learning. A Study of Daytime Education Groups in Ireland. INSTITUTION AONTAS, Dublin (Ireland).;University Coll., Dublin (Ireland). REPORT NO ISBN-0-906826-03-9 PUB DATE 93 NOTE 105p. AVAILABLE FROMAONTAS, 22 Earlsfort Terrace, Dublin 2, Ireland (5.99 Irish pounds). PUB TYPE Reports Research/Technical (143) Tests /Evaluation Instruments (160) EDRS PRICE MF01/PC05 Plus Postage. DESCRIPTORS Access to Education; *Adult Education; *Day Programs; Educational Research; Foreign Countries; Lifelong Learning; Noncredit Courses; *Nonformal Education; *Womens Education IDENTIFIERS *Ireland ABSTRACT A study examined daytime education groups, a major phenomenon in Irish adult education. Results showed that 96 groups were operating, mostly in suburban areas, particularly Dublin. These groups had 8,723 adults participating in their courses and programs. What made them unique was their voluntary, locally based nature. The groups received little or no recognition, encouragement, or support from the Department of Education. They were generally dependent on local level support. More than half operated from private homes. Two-thirds rented premises. One in three did not have any insurance coverage for their activities. Two-thirds provided child care, which approximately one-fifth of the participants used. The groups provided a large number and wide range of educational courses and programs. In contrast to statutory providers, the groups had greater control over the whole process. Although crafts and skill-based learning were still emphasized. the main type of learning was oriented toward social and personal understanding. Most courses were run on a strict self-financing basis.