Eleventh Street Ledger

Total Page:16

File Type:pdf, Size:1020Kb

Eleventh Street Ledger Eleventh Street Ledger THE NEWSLETTER OF THE 11TH STREET BRIDGE PROJECT JANUARY 2011 11th Street Bridge Project Ward 8 Resident Structures Continue to Rise Daily First OJT Graduate There’s a glint in his eye and a proud smile crosses his face when Lawrence Brad- shaw Sr. talks about the delight his 4-year- old son Lawrence Jr. has in telling people “Daddy’s fixing the bridge.” Bradshaw, a 24-year-old Ward 8 resident, works as an apprentice on the 11th Street Bridge Project after becoming the first District Department of Transportation A contractor for the 11th Street Bridge Project works to complete the landside connection graduate of the proj- of steel girders in Anacostia Park for the new inbound freeway bridge. ect’s on-the-job-training (OJT) program in October 2010. ew structures of the 11th Street the first of the 169 structural steel girders To earn his OJT graduation certificate, Bridge Project continue to rise required to support the three bridges. he completed 1,040 hours of on-site train- from the ground almost daily, The girders, weighing an average of 34 ing while initially setting up and break- all with minimal impact on tons and ranging in length from 60 to 130 ing down lane closures for the project as a NDistrict residents, motorists and other im- feet long, were delivered by trucks from Maintenance of Traffic (MOT) laborer for portant stakeholders. Wisconsin and offloaded onto barges in the construction contractor Skanska-Facchina. More than a year into construction, the Anacostia River. Bradshaw came to DDOT and the proj- District’s largest-ever transportation con- From there, cranes hoisted the 7-foot- ect in February 2010 through the Calvin struction project is more than a third of the high, foot-and-a-half-wide girders into Woodland Foundation, which provides way complete. place at all hours of the day without impact- qualified southeast District residents with For much of the first year, project con- ing freeway traffic. job training skills and job placement. struction consisted mainly of excavation, As of the end of January 2011, crews set The foundation helped him get training foundation and substructure work for proj- 48 of the 54 girders needed for the new in tamping, jack hammering, shoveling, ap- ect structures northwest of, southeast of inbound freeway bridge, connecting the plying picks and leg boards, safety, all facets and in the Anacostia River. four bridge piers in Anacostia River and of MOT and basic Spanish. Since November 2010, however, neigh- the bridge’s southeastern-most abutment, Bradshaw credits DDOT, Skanska-Fac- bors and passersby on both sides of the or touch-down point, in Anacostia Park. china and the Woodland Foundation with river have witnessed new structural steel Work setting girders connecting this bridge giving him an opportunity to better his and placed for one of the three new bridges, el- to the northwestern side of the river is to his family’s life by providing him with valu- evated portions of southbound I-295/DC follow in early 2011. able education and training. 295 and connecting ramps to and from the In addition, crews prepared to begin set- He also relishes the long-term contribu- SE/SW Freeway. ting the 52 girders for the outbound free- tion he is making to the District. way bridge, starting with its landside con- “I look forward to coming to work every In the River nections in Anacostia Park. day,” he said. “It makes me excited to know Overnight on Tuesday, November 2 con- Into Spring 2011, crews will attach steel that the work I am doing makes a difference struction contractors Skanska-Facchina set Structures Continued on page 2 OJT Graduate Continued on page 3 1301 M St. SE • Washington DC 20003 • 202.484.2300 • www.ddot.dc.gov/11thStreetBridge Structures Continued from Page 1 deck pans and reinforcing steel to the to northbound DC 295. Workers also Early foundation work also continued girders. continue excavation, demolition of por- for a future connecting ramp from the As the weather warms, they will begin tions of existing highway overpasses new inbound freeway bridge north di- placing concrete for the eight to ten-inch and construction of new portions above rectly to M Street SE. This will replace an thick roadway decks in anticipation of Good Hope Road to allow widening of existing ramp now carrying traffic to M opening both new freeway bridges to northbound 295 and construction of up- Street via 12th Street SE. traffic by the end of the year. coming connecting ramps to both direc- By the end of January 2011, in the At the same time, workers continued tions of the highway. median of the SE-SW Freeway, workers with substructure work for the new lo- built the first of four new piers needed cal bridge, constructing pier struts and Northwest of the River north of M Street to construct a ramp to caps to connect its river piles and later Between the river and O Street SE, connect the new inbound freeway bridge allow placement of steel girders on them crews continue to construct abutments to the freeway. as well. for the new freeway bridges to allow steel As work progresses on this ramp into The new local bridge is planned to girders to soon be set connecting the Summer 2011, steel girders for the ramp open to traffic about a year later, in Win- bridge to the northwest side of the river. will be placed above M Street and the ter 2012/2013. From M to O Street between 11th and freeway. 12th Street SE, demolition of retain- In addition, traffic traveling west- Southeast of the River ing walls and portions of connecting bound from Pennsylvania Avenue to the While work continued in the river, ramps between the existing bridges and freeway will be shifted to the left to allow crews southeast of the river continued the Southeast-Southwest Freeway con- crews space to connect the new ramp to constructing the more than 700-foot- tinued, as did installation of drainage the freeway in order to have it open to long retaining walls for the starting point structures and setting of structural steel traffic when the new inbound freeway of new realigned portions of southbound for new portions of these ramps above N bridge opens in late Fall 2011. I-295/DC 295. Street SE. By December 2010, work in this area advanced enough to allow crews to begin MILESTONES TO DATE setting the 52 steel girders for the 1,000- SE/SW Freeway November 2010 – Began Placing River Bridge foot long elevated structure. By January Structural Steel 2011, the girders were placed along exist- August 2010 – Reopened DC295 Pedestrian Bridge M Street SE Between Anacostia High School Anacostia Pool ing southbound 295, over the existing in- and Fitness Center bound and outbound connecting ramps July 2010 – Completed Anacostia Community with I-295, Martin Luther King Jr. Ave- Boathouse Association Relocation nue and 13th Street. Completion of their May 2010 – Finished Driving 63 Concrete River Bridge Piles. touchdown point, south of the existing December 2009 – Construction Began 11th Street bridges, will soon follow. 11th Street Bridges In February 2011, crews are to begin CURRENT CONSTRUCTION ACTIVITIES attaching steel deck pans to the girders Navy Yard DC 295 / I-295 Demolition Work and Construct New Inbound/ and placing reinforcing steel on them. As Outbound Freeway Bridge Abutments and Ramps the weather warms, workers will place Pier and Steel Placement Work for New Outbound Ramp to Martin Luther King Jr. Ave. concrete for the roadway deck and in- Demolition, Retaining Wall, Pier and Steel stall drainage structures in anticipation Placement Work for New Southbound I-295/DC 295 of having the new southbound I-295/DC Anacostia River Construct New Inbound/Outbound Freeway 295 be the first new portion of the proj- Bridge Abutments and Ramps ect to open to traffic in late Spring 2011. Good Hope Road Construct New Northbound 295 Ramps 13th Street SE At the same time, other new structures Complete Bridge Pier Construction and Place continue to rise up between the existing Steel Girders for Freeway Bridges bridges, the highway, the river and His- CURRENT CONSTRUCTION ACTIVITIES toric Anacostia. As crews work to complete the touch- Demolition Work and Construct New Demolition, Retaining Wall, Pier and down points for the new freeway bridges Inbound/Outbound Freeway Bridge Steel Placement Work for realigned and in Anacostia Park, they also have begun Abutments and Ramps elevated Southbound I-295/DC 295 building the land side touch-down for Complete Bridge Pier Construction and Construct New Inbound/Outbound the new local bridge southeast of the riv- Place Steel Girders for Freeway Bridges Freeway Bridge Abutments and Ramps er and its connection to Martin Luther Pier and Steel Placement Work for New Widen Northbound 295 and build new King Jr. Avenue. Outbound Ramp to Martin Luther King ramp Concrete piers continue to be con- Jr. Ave. structed for a future connecting ramp from the new outbound freeway bridge OJT Graduate continued from Page 1 on something that Washingtonians depend on every day to get to and from work. I am For More Information excited to be part of something that will last for many years to come.” To get involved with DDOT’s Bradshaw encourages others who may workforce training programs, contact be thinking about taking a similar path to Linda Fennell at [email protected] “never give up, put forth your best effort or (202) 645-8620. and take advantage of everything you are For more information on 11th Street offe re d .” Bridge Project employment, vendor or His reputation for hard work and de- subcontractor opportunities, contact pendability on the job have earned him op- Nyime Brown at Nyime.brown@ portunities to begin studying carpentry and skanska.com or 202-484-2330, ext.
Recommended publications
  • Staff Recommendation
    STAFF RECOMMENDATION D. Sullivan NCPC File No. 6951/6955 11TH STREET BRIDGE REPLACEMENT PROJECT AND RELATED TRANSFER OF JURISDICTION OF A PORTION OF RESERVATION 343D Southeast Washington, D.C. Submitted by the District Department of Transportation and the National Park Service August 27, 2009 Abstract The District Department of Transportation (DDOT), in coordination with the Federal Highway Administration (FHWA), has submitted a concept design for the 11th Street Bridge project. The purpose of the project is to improve the highway connection between the Southeast/Southwest Freeway (I-695) and the Anacostia Freeway (I-295) in Southeast Washington, D.C. The project would replace the 40-year-old pair of bridges across the Anacostia River and provide safety enhancements to the bridge and approach ramp structures. In order to accommodate new ramp configurations for the project, the National Park Service proposes to transfer jurisdiction of approximately 1.5 acres of Reservation 343D (Anacostia Park) in Washington, D.C. The portion of Reservation 343D that is proposed for jurisdictional transfer is located adjacent to the existing upstream bridge on the east side of the river in Anacostia Park in between Anacostia Drive, SE and the Anacostia Freeway. The underlying land will remain titled in the United States. Commission Action Requested by Applicant Approval of approval of transfer of jurisdiction pursuant to 40 U.S.C. § 8124(a) and approval of comments on concept design pursuant to 40 U.S.C. § 8722(b)(1). Executive Director’s Recommendation The Commission: Approves the transfer of jurisdiction of approximately 1.5 acres of Reservation 343D (Anacostia Park) to the District of Columbia government for transportation purposes as shown on NCPC Map File No.
    [Show full text]
  • 11Th Street Bridge Park
    Executive Director’s Recommendation Commission Meeting: April 2, 2020 PROJECT NCPC FILE NUMBER 11th Street Bridge Park 7755 11th Street Bridge, Southeast Washington, DC NCPC MAP FILE NUMBER 8.10(70.00)45088 SUBMITTED BY District of Columbia Department of APPLICANT’S REQUEST Transportation Approval of preliminary site development plans REVIEW AUTHORITY District Projects Outside the Central Area PROPOSED ACTION per 40 U.S.C. § 8722(b)(1) Approve preliminary site development plans with comments ACTION ITEM TYPE Staff Presentation PROJECT SUMMARY The District Department of Transportation (DDOT) has submitted preliminary site development plans for the 11th Street Bridge Park, located in southeast Washington, DC. The project seeks to reuse the existing piers from the old 11th Street Bridge crossing at the Anacostia River to create an urban destination and park. A national competition, led by Building Bridges Across the River and the District Office of Planning (OP), in coordination with DDOT, selected a conceptual design for the bridge park from the winning team of OMA + OLIN. The Commission reviewed the concept plan in late 2017 and since that time, DDOT and the design team have continued to study the feasibility of the design and the existing structure. Overall, the major components of the design have not changed, and the applicant has continued to coordinate with the relevant stakeholders, including both the Department of the Navy and the National Park Service (NPS). The project is focused on the success of four goals. These goals include: • Economic - Serve as an anchor for inclusive economic opportunity • Environment - Re-engage residents with the Anacostia River • Health - Improve public health disparities; and • Social - Reconnect Communities The park will serve as an area of interest for DC residents and visitors, but also as a device to bridge the gap between the two wards.
    [Show full text]
  • 11Th Street Bridge Park Transfer of Jurisdiction
    11th Street Bridge Park Transfer of Jurisdiction 11th Street Bridge Park Anacostia Drive, SE at 11th Street, SE Approval of Transfer of Jurisdiction United States Department of the Interior 1 NationalDecember Capital 3, 2020 Planning | File: 8230Commission File: 8230 Project Summary Commission Meeting Date: December 3, 2020 NCPC Review Authority: 40 U.S.C. § 8124(a) Applicant Request: Approval of Transfer of Jurisdiction Session: Consent NCPC Review Officer: Matthew Flis NCPC File Number: 8230 Project Summary: The National Park Service (NPS) has submitted a transfer of jurisdiction for approximately 2.75 acres to the District Department of Transportation (DDOT) for the new 11th Street Bridge Park. The Park is a collaboration between the District of Columbia, sponsored by the local non-profit Building Bridges Across the River (BBAR), and would involve the transformation of the defunct infrastructure of the old 11th Street Bridge into DC's first elevated park. The park is envisioned to include community driven programming such as outdoor performance spaces, playgrounds, urban agriculture, an environmental education center, and a variety of gathering spaces to connect with the community and the Anacostia River. The enclosed map depicts the general location of the project area. The concept for the Bridge Park was initiated as an opportunity to link long disconnected communities following the reconstruction of the new vehicular 11th Street bridges. Implementation of the 11th Street Bridge Park would involve a portion of the Anacostia Park; therefore, necessitating a transfer of jurisdiction between NPS and DDOT. The application includes two new transfers of land and the modification of two existing transfers.
    [Show full text]
  • 11 Street Bridge Project Enters Project Completion Phase
    th 11 Street Bridge Project Enters Project Completion Phase Significant Traffic Pattern Changes and Lane Closures to Occur Along the Southeast/Southwest Freeway between Barney Circle and 8th Street, SE The 11th Street Bridge Project, the District Department of Transportation’s (DDOT) largest infrastructure project, is nearing substantial completion of Phase 1 and beginning its Project Completion Phase (Phase 2). Phase 2 will further improve connections between the SE/SW Freeway and the new 11th Street Bridges and reconnect local streets on the west side of the Anacostia River. It will also lay the groundwork for replacement of the SE/SW Freeway with an at-grade boulevard between 11th Street, SE and Barney Circle (Pennsylvania Avenue). Phase 2 – Project Completion Phase Phase 2 is located within the Capitol Hill/Navy Yard area and includes replacing the 2-lane outbound I- 695 (SE/SW Freeway) flyover bridge over M Street with a new 3-lane bridge structure. This new flyover bridge will connect to the new I-695 Outbound Freeway Bridge. The SE/SW Freeway between 8th Street, SE and 13th Street, SE will be raised approximately 20 feet and re-designated from a freeway to a Boulevard. 12th Street is to be extended from M Street to connect to the new Boulevard. This work is part of the $90M Phase 2 Change Order and will establish the groundwork for the future Barney Circle Project, which is an element of the Anacostia Waterfront Initiative (AWI) Master Plan. The 11th Street Bridge over the SE/SW Freeway will be removed in phases as it is reconstructed, the bridge will become an at grade roadway with both on and off ramps from the Boulevard and SE/SW Freeway.
    [Show full text]
  • Urban Design Framework Plan Executive Summary January 16, 2013
    Urban Design Framework Plan Executive Summary January 16, 2013 Concept of future potential conditions along New The Vision Jersey Avenue at Tingey Square The Capitol Riverfront is uniquely positioned to become a new kind of DC waterfront; a connected, vibrant neighborhood of urban density, regional attractions and distinct local amenities. The neighborhood is gaining momentum and has significant attractions, however development to date has often been diffused and disconnected. Barriers exist between destinations that interrupt Capitol Riverfront to optimize its potential the atmosphere and lifestyle of the the sense of community and allow and become, in effect, a new downtown community. To maximize its potential, emerging vibrancy to dissipate. It will by the water. the Capitol Riverfront must become take an emphasis on achieving strategic increasingly engaging, accessible, regional connections and developing an To achieve this goal, walkability must comfortable, and convenient. undeniably walkable character for the go beyond the sidewalk to permeate Conceptual rendering of the PEPCO substation as future industrial art on Half Street, SW looking south Stakeholder Objectives • Access and celebrate the river and parks. • Create faster connections to Capitol Hill, Union Station, L’Enfant Plaza, & Downtown. • Provide links to the SW Waterfront and St. Elizabeths Campus. • Establish new transit choices to relieve pressures on the Green line A Critical Moment and M Street, SE. 32% of the projected build-out has regional transportation components to • Interconnect and animate the street been achieved. The neighborhood is now maximize the opportunities in the Capitol and Riverwalk Trail network creating enjoying new restaurants and emerging Riverfront and adjoining destinations.
    [Show full text]
  • Report of Contracting Activity
    Vendor Name Address Vendor Contact Vendor Phone Email Address Total Amount 1213 U STREET LLC /T/A BEN'S 1213 U ST., NW WASHINGTON DC 20009 VIRGINIA ALI 202-667-909 $3,181.75 350 ROCKWOOD DRIVE SOUTHINGTON CT 13TH JUROR, LLC 6489 REGINALD F. ALLARD, JR. 860-621-1013 $7,675.00 1417 N STREET NWCOOPERATIVE 1417 N ST NW COOPERATIVE WASHINGTON DC 20005 SILVIA SALAZAR 202-412-3244 $156,751.68 1133 15TH STREET NW, 12TH FL12TH FLOOR 1776 CAMPUS, INC. WASHINGTON DC 20005 BRITTANY HEYD 703-597-5237 [email protected] $200,000.00 6230 3rd Street NWSuite 2 Washington DC 1919 Calvert Street LLC 20011 Cheryl Davis 202-722-7423 $1,740,577.50 4606 16TH STREET, NW WASHINGTON DC 19TH STREET BAPTIST CHRUCH 20011 ROBIN SMITH 202-829-2773 $3,200.00 2013 H ST NWSTE 300 WASHINGTON DC 2013 HOLDINGS, INC 20006 NANCY SOUTHERS 202-454-1220 $5,000.00 3900 MILITARY ROAD NW WASHINGTON DC 202 COMMUNICATIONS INC. 20015 MIKE HEFFNER 202-244-8700 [email protected] $31,169.00 1010 NW 52ND TERRACEPO BOX 8593 TOPEAK 20-20 CAPTIONING & REPORTING KS 66608 JEANETTE CHRISTIAN 785-286-2730 [email protected] $3,120.00 21C3 LEADERSHIP DEVELOPMENT LL 11 WATERFORD CIRCLE HAMPTON VA 23666 KIPP ROGERS 757-503-5559 [email protected] $9,500.00 1816 12TH STREET NW WASHINGTON DC 21ST CENTURY SCHOOL FUND 20009 MARY FILARDO 202-745-3745 [email protected] $303,200.00 1550 CATON CENTER DRIVE, 21ST CENTURY SECURITY, LLC #ADBA/PROSHRED SECURITY BALTIMORE MD C. MARTIN FISHER 410-242-9224 $14,326.25 22 Atlantic Street CoOp 22 Atlantic Street SE Washington DC 20032 LaVerne Grant 202-409-1813 $2,899,682.00 11701 BOWMAN GREEN DRIVE RESTON VA 2228 MLK LLC 20190 CHRIS GAELER 703-581-6109 $218,182.28 1651 Old Meadow RoadSuite 305 McLean VA 2321 4th Street LLC 22102 Jim Edmondson 703-893-303 $13,612,478.00 722 12TH STREET NWFLOOR 3 WASHINGTON 270 STRATEGIES INC DC 20005 LENORA HANKS 312-618-1614 [email protected] $60,000.00 2ND LOGIC, LLC 10405 OVERGATE PLACE POTOMAC MD 20854 REZA SAFAMEJAD 202-827-7420 [email protected] $58,500.00 3119 Martin Luther King Jr.
    [Show full text]
  • Smithgroupjjr Studio Template Version
    SOUTHEAST BOULEVARD Planning Study June, 2015 Washington, DC View of study area looking east toward Barney Circle CONTENTS Executive Summary....................................................................5 1. Introduction.......................................................................9 2. Existing Conditions...............................................................13 3. Concept A.............................................................................24 4. Concept B.............................................................................29 5. Concept C.............................................................................34 6. Community and Stakeholder Input.......................................39 7. Conclusion.........................................................................41 8. Acknowledgements..........................................................43 Appendices A - Review of Background Documentation..............................46 B - Initial Concepts.................................................................55 Southeast Boulevard Planning Study 3 Table of Contents GOALS FOR THE FUTURE SOUTHEAST BOULEVARD COMMUNITY CONNECTIVITY GREEN SPACE SUSTAINABILITY Ensure that the SE Boulevard and land Create new high-quality parks and green spaces, 1 uses around it enhance and strengthen the 9 and trails for outdoor recreation neighborhood fabric Establish linkages between the Southeast Ensure new land uses in the SE Boulevard area 10 Boulevard area and the waterfront to maximize 2 are compatible
    [Show full text]
  • Poplar Point Administrative Record Index
    POPLAR POINT ADMINISTRATIVE RECORD INDEX AR-10001 to AR-24005 October 2018 U.S. National Park Service ADMINISTRATIVE RECORD INDEX POPLAR POINT SITE OCTOBER 2018 Document Document Document Type Title/Description Author Recipient Date Number War Department Office of Chief Engineers Map; 1/1/1925 AR‐10001 Map Anacostia River Harbor Lines from Anacostia Bridge to War Department Unknown Mouth Washington, D.C. Final Environmental Impact Statement, Washington U.S. Department of Transportation, Urban Mass 9/1/1981 AR‐10002 Report Metrorail System, Anacostia Segment Green Line (F) Public Transportation Administration Route National Capital Planning Commission, Reginald W. 4/11/1984 AR‐10318 Letter In Reply Refer To: NCPC Files Nos. 2304 and 2356 Architect of the Capitol, George White Griffith, Executive Director Agreement Relating to the Transfer of Property District of Columbia, City Administrator/Deputy Mayor 9/28/1984 AR‐10319 Legal Document Between the Architect of the Capitol and the District of Architect of the Capitol, District for Operations Columbia Cooperative Letter Agreement between District of 9/28/1984 AR‐10327 Legal Document Columbia, Washington Metropolitan Area Transit Unknown Unknown Authority, and Architect of the Capital Adminstrative Record Index 1 of 26 ADMINISTRATIVE RECORD INDEX POPLAR POINT SITE OCTOBER 2018 Document Document Document Type Title/Description Author Recipient Date Number Defense Environmental Restoration Program for Department of the Army, U.S. Army Crops of Commander, North Atlantic Division, M. Arabatzis; 5/5/1993 AR‐10332 Memorandum Formerly Used Defense Sites ‐ Naval Station, Anacostia Engineers, Environmental Restoration Division, Commander, Huntsville Division, R. Britton Annex, Washington DC Directorate of Military Programs D.C.
    [Show full text]
  • An Urban and Environmental History of the Anacostia River and Near Southeast Waterfront in Washington, D.C
    Claremont Colleges Scholarship @ Claremont Pitzer Senior Theses Pitzer Student Scholarship 2013 Currents of Change: An Urban and Environmental History of the Anacostia River and Near Southeast Waterfront in Washington, D.C. Emily C. Haynes Pitzer College Recommended Citation Haynes, Emily C., "Currents of Change: An Urban and Environmental History of the Anacostia River and Near Southeast Waterfront in Washington, D.C." (2013). Pitzer Senior Theses. Paper 36. http://scholarship.claremont.edu/pitzer_theses/36 This Open Access Senior Thesis is brought to you for free and open access by the Pitzer Student Scholarship at Scholarship @ Claremont. It has been accepted for inclusion in Pitzer Senior Theses by an authorized administrator of Scholarship @ Claremont. For more information, please contact [email protected]. Currents of Change: An Urban and Environmental History of the Anacostia River and Near Southeast Waterfront in Washington, D.C. Emily Haynes In partial fulfillment of a Bachelor of Arts Degree in Environmental Analysis, 2012-2013 Academic Year, Pitzer College, Claremont, California Readers: Professor Lily Geismer Professor Brinda Sarathy May 3, 2013 Acknowledgements The idea for this thesis was born in the mud flats of the Anacostia River, but it would never have turned into a finished product without the help of so many people. I would first like to offer my deepest gratitude to my readers, Prof. Geismer and Prof. Sarathy, for their tireless guidance and support throughout the research and writing process. I would also like to thank Prof. Char Miller for his help and encouragement, and for teaching me everything I know about environmental history. A huge thank you as well to Warren Roberts and Sarah Evers for their invaluable GIS support, and to the staff of the Anacostia Watershed Society for enabling me to spend so much time out on the river.
    [Show full text]
  • February 17, 2020 Jeffrey Marootian, Director District Department Of
    921 Pennsylvania Avenue SE February 17, 2020 Washington, DC 20003-2141 [email protected] Jeffrey Marootian, Director District Department of Transportation OFFICERS 55 M Street SE Chairperson Washington, DC 20003 Brian Ready VIA email: [email protected] Vice-Chair RE: ANC6B Comments on 2021-2024 State Transportation Improvement Plan Chander Jayaraman (STIP) Secretary Dear Director Marootian; Jerry Sroufe At a properly noticed regular meeting of Advisory Neighborhood Commission 6B on Treasurer February 11, 2020, with a quorum present, the Commission voted 8-1-1 to urge Corey Holman DDOT to consider the Commission’s comments on the FY 2021-2024 State Transportation Improvement Plan that is currently under review. Parliamentarian Kelly Waud Specifically, ANC 6B comments on three elements of the STIP: (1) Plans to Widen I- 695’s D-4 Exit, (2) the Reconfiguration of the Pennsylvania Avenue and Potomac Avenue SE Intersection, and (3) the SE Boulevard Engineering Design, and the Commission proposes a new project for funding. Specifics are outlined below. COMMISSIONERS SMD 01 Jennifer Samolyk ANC 6B welcomes the opportunity to comment. ANC 6B believes that community- driven planning leads to effective uses of federal and local tax dollars, by engaging SMD 02 Jerry Sroufe stakeholders early to gain support and make necessary modification for large capital SMD 03 Brian Ready projects. SMD 04 Kirsten Oldenburg Thus, the ANC encourages the District Department of Transportation (DDOT) and SMD 05 Steve Holtzman Metropolitan Washington Council of Governments' Transportation Planning Board SMD 06 Corey Homan (TPB) to incorporate the suggested changes in the STIP. As a procedural matter, if SMD 07 Kelly Waud necessary, ANC 6B expects to make similar suggestions for changes to the FY2021- 2025 Capital Plan during budget season to the Council of the District of Columbia.
    [Show full text]
  • Anacostia Historic District Brochure Has Been Funded with the Assistance of a Matching Grant from the U.S
    DISTRICT HISTORIC WASHINGTON, D.C. WASHINGTON, ANACOSTIA D.C. Historic Preservation Office 801 North Capital Street, NE Suite 3000 Washington, D.C. 20002 (202) 442-8800 1 Frederick Douglass, The sage of Anacostia. Revised March 2007 Courtesy National Archives Anacostia Historic District East Of The River east of the Anacostia River, in sight of the U.S. Capitol, lies an area of unusual natural beauty and rich heritage . A narrow ridge of land 200” – 300” high Eparallels the river once known as the Eastern Branch of the Potomac. The ridge drops off abruptly to the broad bank of the Anacostia, its steep slope slashed by intersecting ravines. on the side away from the river, the ridge descends precipitously into Oxon Run, a small stream that flows into the Potomac about 3 miles below the mouth of the Anacostia. This isolates the ridge and the river bank from the countryside to the east as effectively as the Anacostia itself separates the community from the monumental center of the capital city. On a clear day the panoramic views from the Our Lady of Perpetual Help Roman Catholic Church and St. Elizabeths Hospital overlooks are breathtaking. They are rivaled only by those from the Washington Monument on the National Mall, yet they are not public views. They are the special treasure of those who live in Anacostia, glimpsed briefly by outsiders who travel along Martin Luther King, Jr. Avenue or visit the Frederick Douglass National Historic Site. View of Washington from Across the Eastern Branch, engraving by William J. Bennett (after a painting by George Cooke), 1833.
    [Show full text]
  • Poplar Point Existing Conditions Report
    Background Information on Poplar Point The Site Poplar Point occupies a prime and highly visible location on the east side of the Anacostia River, directly across from the Navy Yard. It is a 110-acre area, bounded by the Anacostia River to the north, the Frederick Douglass Bridge to the west, the 11th Street Bridges to the east, and the Anacostia Freeway (Interstate 295) and Suitland Parkway to the south. The site contains the Anacostia Metro station, a WMATA parking garage, the US Park Police and National Park Service complex and helipad, and 60 acres of managed meadows The majority of the site is owned by the National Park Service (NPS) with the exception of the Metro station and bus garage which are owned by WMATA and the private property that exists along Howard Road. Pending congress approval, the site will be transferred from NPS to the District of Columbia. Existing Conditions and Planning Efforts Related to Poplar Point Existing Conditions Proposed in Recent Plans Floodplain: 42% of 60 acres of Poplar Point lies A grass planted earthen berm should replace within the floodplain. The 100-year floodplain the function of the concrete and metal levee stretches along the entire shoreline of the sections. Anacostia River; however, the largest portion of this flood zone is located in the eastern section of Environmental the property. A flood protection levee located on the east bank of the Anacostia River extends from Poplar Point to the southwest corner of the Naval 1 Existing Conditions Proposed in Recent Plans District Washington Anacostia Annex, approximately 9,700 feet (1.84) miles.
    [Show full text]