MUMBAI SLUM IMPROVEMENT BOARD a REGIONAL UNIT of (MAHARASHTRA HOUSING and AREA DEVELOPMENT AUTHORITY) Tel No.022-66405484, E-Mail- [email protected]

Total Page:16

File Type:pdf, Size:1020Kb

MUMBAI SLUM IMPROVEMENT BOARD a REGIONAL UNIT of (MAHARASHTRA HOUSING and AREA DEVELOPMENT AUTHORITY) Tel No.022-66405484, E-Mail- Damusuryawanshi@Gmail.Com MUMBAI SLUM IMPROVEMENT BOARD A REGIONAL UNIT OF (MAHARASHTRA HOUSING AND AREA DEVELOPMENT AUTHORITY) Tel No.022-66405484, E-mail- [email protected] Ref. No. EE/City/MSIB / e-tender / 06 / 2017-18 e-TENDER NOTICE Digitally Signed & unconditional online Tender in form ``B-1'' (Percentage Rate) are invited by the Executive Engineer (City) Division Mumbai Slum Improvement Board (Unit of MHADA) Room No. 539 4th floor Griha Nirman Bhavan Bandra (East) Mumbai 400 051 from the contractors registered with PWD /MHADA /CPWD / CIDCO / MES / MJP / MIDC / Indian Railway / BPT / MCGM / in the corresponding appropriate class of contractor or any Govt. / Semi Govt. organization. Sr. Name of Works Estimated E.M.D. 1% Security Registration Tender Time of Deposit 2% (Class) of Price limit for No cost Estimated (1% in the Contractor including completi cost form of 12% on of FDR and GST in work 1% through Rs. RA Bills) 1 Providing and Fixing Paver Block and 961192.00 9612.00 19224.00 Class– 560.00 9 Months Ladi at P. T. Mane Udyan, Nagpada, VII & Mumbai above (MP-LAD-RSS / Shri.Hussain Dalwai) 2 Construction of Katte and Beautification 672834.00 6728.00 13456.00 Class– 560.00 9 Months Work Near Hanuman Mandir in front of VII & Wadala Udyog Bhavan above (Beautification) (180-Wadala) (2nd Call) 3 Seating Arrangment and Beautification 749730.00 7497.00 14994.00 Class– 560.00 9 Months Work Near Sai Mandir Old B. D. D. VII & Chawl (Beautification) (180-Wadala) above (2nd Call) 4 Construction of Vazhukhana, Water 2402980.00 24030.00 48060.00 Class– 560.00 12 Tank and Filling at Antop Hill, Muslim V-A & Months Dafanbhumi (SBVY) (180-Wadala) above (2nd Call) 5 Construction of Shed and Beautification 1922384.00 19224.00 38448.00 Class– 560.00 12 Work at Bhoiwada Smashanbhumi V-A & Months (SBVY) (180-Wadala) (2nd Call) above 6 Construction of Shed at Antop Hill, 1922384.00 19224.00 38448.00 Class– 560.00 12 Muslim Dafanbhumi V-A & Months (SBVY) (180-Wadala) (2nd Call) above 7 Construction of Drain and Passage 768954.00 7690.00 15380.00 Class– 560.00 9 Months Beside Kanchan Jewellers, Sangam VII & Nagar (MMNPSY) (179-Sion Koliwada) above 8 Construction of Drain and Passage at 576715.00 5767.00 11534.00 Class– 560.00 9 Months Maa.Ashtabhuja Seva Samiti, Shanti VII & Nagar, Azad Mohalla, Antop Hill, above Wadala (MMNPSY) (179-Sion Koliwada) 9 Conctruction of Drain and Passage and 480596.00 4806.00 9612.00 Class– 560.00 6 Months Providing and Laying Water Supply VIII & Line at Bhartiya Kamla Nagar, Chuna above Gully, Antop Hill, Mumbai-37 (MMNPSY) (179-Sion Koliwada) 10 Concreting Work and Providing and 1393728.00 13937.00 27874.00 Class– 560.00 9 Months Fixing Paver Block at Karbala Masjid, VI & Bhartiya Kamla Nagar, Sion Koliwada above (Beautification) (179-Sion Koliwada) 11 Providing and Fixing Paver Block and 1489847.00 14898.00 29796.00 Class– 560.00 9 Months Concreting Work in front of Toilet at VI & Vijay Nagar, Motilal Nehru Nagar, above Antop Hill, Sion Koliwada (Beautification) (179-Sion Koliwada) 12 Construction of Coba at New Police 865073.00 8651.00 17302.00 Class– 560.00 9 Months Colony (MMNPSY) (180-Wadala) VII & above 13 Concreting Work, Providing and Fixing 4805959.00 48060.00 96120.00 Class– 560.00 12 Ladi, Construction of Common Passage, V & Months Compound Plastering and Construction above of Weather Shed at Khoja Kabrasthan, S.V.P Road, Dongri, Mumbai (MMNPSY) (186-Mumbadevi) 14 Construction of Open Shed, Passage 950000.00 9500.00 19000.00 Class– 560.00 9 Months and Providing and Laying Water VII & Supply Line Near Mahaveer Tabela above Garden, G. K. Marg, Lower Parel (MP-LAD) (Shri. Anil Desai) 15 Construction of Drain and Passage at 900000.00 9000.00 18000.00 Class– 560.00 9 Months Shastri Nagar, Dharavi VII & (MP-LAD) (Shri. Anil Desai) above 16 Construction of Drain and Passage at 90 900000.00 9000.00 18000.00 Class– 560.00 9 Months Feet Road, Dharavi VII & (MP-LAD) (Shri. Anil Desai) above 17 Providing and Laying Water Supply 800000.00 8000.00 16000.00 Class– 560.00 9 Months Line and Construction of Drain and VII & Passage at Gaurakshak Wadi, above Thakurdwar, Girgaon (MP-LAD) (Shri. Anil Desai) 18 Providing and Fixing Paver Block and 990000.00 9900.00 19800.00 Class– 560.00 9 Months Construction of Drain Near Ruparel VII & Collage, Matunga above (MP-LAD) (Shri. Anil Desai) 19 Construction of Drain and Passage at 1200000.00 12000.00 24000.00 Class– 560.00 9 Months Shivdi Cross Road, Khedkar Marg, VII & Wadala above (MP-LAD) (Shri. Rahul Shewale) 20 Construction of Drain and Passage at 1000000.00 10000.00 20000.00 Class– 560.00 9 Months Nehru Nagar, Mahakawadi, Sion VII & Koliwada above (MP-LAD) (Shri. Rahul Shewale) 21 Construction of Drain and Passage Near 1600000.00 16000.00 32000.00 Class– 560.00 12 Deep Building, Bhoiwada Naka, V-A & Months Naigaon above (MP-LAD) (Shri. Rahul Shewale) 22 Construction of Drain and Passage at 1500000.00 15000.00 30000.00 Class– 560.00 9 Months Shindewadi, Dadar VI & (MP-LAD) (Shri. Rahul Shewale) above 23 Construction of Drain and Passage at 1200000.00 12000.00 24000.00 Class– 560.00 9 Months Tata Compound, Parel VI & (MP-LAD) (Shri. Rahul Shewale) above 24 Construction of Drain and Passage Near 1500000.00 15000.00 30000.00 Class– 560.00 9 Months Big Bazar, Shanti Welfare Aso. Mahim VI & (MP-LAD) (Shri. Rahul Shewale) above 25 Providing and Fixing Ladi and 980000.00 9800.00 19600.00 Class– 560.00 9 Months Construction of Drain at at Kohinoor VII & Compound, Naigaon above (MP-LAD) (Shri. Rahul Shewale) 26 Construction of Passage at Shivaji Park, 980000.00 9800.00 19600.00 Class– 560.00 9 Months Dadar (MP-LAD) (Shri. Rahul Shewale) VII & above 27 Construction of Drain and Passage at 1800000.00 18000.00 36000.00 Class– 560.00 12 Dhorwada Road Near Soneri Garden, V-A & Months Dharavi above (MP-LAD) (Shri. Rahul Shewale) 28 Construction of Drain and Passage at 1600000.00 16000.00 32000.00 Class– 560.00 12 Antop Hill, Wadala V-A & Months (MP-LAD) (Shri. Rahul Shewale) above 29 Construction of Toilet, Drain and 1500000.00 15000.00 30000.00 Class– 560.00 9 Months Passage Near Vidyalankar Collage, VI & Wadala above (MP-LAD) (Shri. Rahul Shewale) 30 Construction of Drain and Passage at 1500000.00 15000.00 30000.00 Class– 560.00 9 Months Kala Killa, Dharavi VI & (MP-LAD) (Shri. Rahul Shewale) above 31 Construction of Drain and Passage Near 1500000.00 15000.00 30000.00 Class– 560.00 9 Months Gurudutta Vyayamshala, Piwla Bungla, VI & Dharavi above (MP-LAD) (Shri. Rahul Shewale) 32 Construction of Toilet, Drain and 1500000.00 15000.00 30000.00 Class– 560.00 9 Months Passage Near Baldota House, Laxmi VII & Narayan Lane, Matunga above (MP-LAD) (Shri. Rahul Shewale) 33 Construction of Drain and Passage at 1730145.00 17301.00 34602.00 Class– 560.00 12 Sangam Nagar, Dharavi, P. M. G. P. V-A & Months Colony above (SIP) (Shri. Rahul Shewale) 34 Construction of Drain and Passage at 1730145.00 17301.00 34602.00 Class– 560.00 12 Sangam Nagar, Wadala V-A & Months (SIP) (Shri. Rahul Shewale) above 35 Providing and Laying Water Supply 461372.00 4614.00 9228.00 Class– 560.00 6 Months Line in front of Macchi Market, S. B. VIII & Marg (SIP) (180-Wadala) above 36 Concreting Work at Ramshamwadi, 605551.00 6056.00 12112.00 Class– 560.00 9 Months Garage Gully, Prabhadevi (E) VII & (SIP) (180-Wadala) above 37 Providing and Laying Water Supply 740118.00 7401.00 14802.00 Class– 560.00 9 Months Line in front of Krida Mandal, S. J. P. VII & Road, Naigaon (SIP) (180-Wadala) above 38 Providing and Laying Water Supply 547879.00 5479.00 10958.00 Class– 560.00 9 Months Line at Shri. Dnyansai Mitra Mandal, VII & Naigaon (SIP) (180-Wadala) above 39 Construction of Sabhagruha at R. A. 672834.00 6728.00 13456.00 Class– 560.00 9 Months Kidwai Nagar (SIP) (180-Wadala) VII & above 40 Concreting Work at Ambedkar Nagar, 946774.00 9468.00 18936.00 Class– 560.00 9 Months Prabhadevi (W) (SIP) (180-Wadala) VII & above 41 Providing and Fixing Tiles in Samaj 720894.00 7209.00 14418.00 Class– 560.00 9 Months Mandir and Patre, Replacement of Door VII & at Krnati Utsav Mandal above (SIP) (180-Wadala) 42 Construction of Drain and Passage at 682446.00 6824.00 13648.00 Class– 560.00 9 Months Turner Hill, Wadala (SIP) (180-Wadala) VII & above 43 Providing and Laying Water Supply 624775.00 6248.00 12496.00 Class– 560.00 9 Months Line, Providing and Fixing Pump and VII & Concreting Work at Baithi Chawl No.1 above Behind Sathe Nagar, Wadala (SIP) (180-Wadala) 44 Construction of Open Sabhagruha and 701670.00 7017.00 14034.00 Class– 560.00 9 Months Providing and Fixing Ladi at Wadala VII & Gaon, Ganesh Mandir Marg above (SIP) (180-Wadala) 45 Providing and Fixing Roof and Tiles and 961192.00 9612.00 19224.00 Class– 560.00 9 Months Construction of Drain and Passage at VII & Sudharshan, G. D. Ambekar Marg, above Bhoiwada (MLC-LAD) (Shri. Diwakar Rawte) 46 Providing and Fixing Roof and Tiles and 1153430.00 11534.00 23068.00 Class– 560.00 9 Months Construction of Drain and Passage at VI & Abhyuday Nagar, Building No.12, above Chaitraban, Kalachowky (MLC-LAD) (Shri. Diwakar Rawte) 47 Providing and Fixing Roof, Tiles, Doors, 961192.00 9612.00 19224.00 Class– 560.00 9 Months Windows and Construction of Passage at VII & Durgeshwar Devalay Samittee, Irani above Chawl, Elphinston (MLC-LAD) (Shri.
Recommended publications
  • What Dalits Want... ‘You Are Dalits, Politics in Uttar Pradesh, There Nate Delay in Courts While Are Around 65 Dalit Castes Seeking Justice
    February 28, 2019 Justice. Liberty. Fraternity. Equality www.dalitpost.com Brick workers demand end to bondage In many cases, Brick kiln workers pass on their debt and poverty to their chil- dren, who end up working at the brick kilns and very often in inhuman con- ditions..... Dalit Post - page 8 What Dalits in India want... - page 2 I don’t want to be a Divisive policies chowkidar... undermining growth - pg 3 - page 4 Image credit: Courtesy Satish Acharya The BJP’s do A taste of his or die own return medicine? battle in - page 7 of the the Brahmin? Northeast... - Saeed Naqvi -page 11 - Sujit Chakraborty -page 12 Do facts As usual, BJP Poor add up to Athawale suppressed representation Yogi’s senses a Dalits, of women in claims? kill.... Backward NE politics... communities... - page 9 -page 13 -page 14 -page 15 Much, Much More Inside! For free private circulation Atrocities... Dalit POST www.dalitpost.com February 28, 2019 2 What Dalits want... ‘You are Dalits, politics In Uttar Pradesh, there nate delay in courts while are around 65 Dalit castes seeking justice. And they is for us’ “You are Dalits. You all who fall under the Sched- see justice delayed as jus- are downtrodden. You uled Caste (SC) category. tice denied. So, they want belong to Scheduled In the districts of eastern this to change. Castes. Politics is for us UP, their population var- In UP, there are more (Kammas). The leader- ies between 16% and 40% than 40 Dalit communities ship posts are reserved of the total SC population.
    [Show full text]
  • LOK SABHA UNSTARRED QUESTION No. 2524 to BE ANSWERED on 01.08.2016
    LOK SABHA UNSTARRED QUESTION No. 2524 TO BE ANSWERED ON 01.08.2016 New Petroleum Policy 2524. SHRI GAJANAN KIRTIKAR: PROF. RAVINDRA VISHWANATH GAIKWAD: DR. K. GOPAL: SHRI RAHUL SHEWALE: DR. SUNIL BALIRAM GAIKWAD: SHRIMATI K. MARAGATHAM: SHRI SUDHEER GUPTA: SHRI V. ELUMALAI: KUNWAR HARIBANSH SINGH: DR. HEENA VIJAYKUMAR GAVIT: SHRIMATI SUPRIYA SULE: ADV. M. UDHAYAKUMAR: SHRI GOPAL SHETTY: पेट्रोलियम और प्राकर्तिक गैस मंत्री Will the Minister of PETROLEUM AND NATURAL GAS be pleased to state : (a) whether the domestically produced crude oils cheaper than the imported crude oil and if so, the details thereof; (b) whether there is increase/decrease in import of crude oil during the last three years and the current year if so, the details thereof along with the likely impact on foreign exchange reserves of the country; (c) whether the Government has set a target of reducing crude oil imports by 10 percentage points to 66 per cent of the total requirement by 2022 and if so, the details thereof along with steps taken to increase domestic resources in order to become self-reliant in the production of oil and gas; (d) whether the consumption of oil and gas is likely to grow three folds by 2040 and if so, the details thereof along with the concrete steps taken to diversify our sources and technology to meet the demand in future; and (e) whether the Government proposes to launch domestic/international roadshows to promote and monetise un-remunerative/ surrendered small oil and gas blocks i.e., discovered small fields by upstream companies such as ONGC and Oil India Limited, and if so, the details thereof? पेट्रोलियम और प्राकृलिक गैस मंत्रािय में राजय ् मंत्री (सविंत्र ् प्रभार) (श्री धमेनद्र ् प्रधान) MINISTER OF STATE (INDEPENDENT CHARGE) IN THE MINISTRY OF PETROLEUM & NATURAL GAS (SHRI DHARMENDRA PRADHAN) (a): The price of crude is based on its properties and gross product value.
    [Show full text]
  • Arvind Sawant, 63 Areas Promises Performance Public Source Performance Self Declared Shiv Sena 1
    Do you know Who your MP is? GOPAL SHETTY, BJP BORIVALI GAJANAN DAHISAR KIRTIKAR, KANDIVALI SHS MALAD ANDHERI (E&W), GOREGAON, JUHU, N JOGESHWARI (E&W), VILE PARLE (W) NW NE POONAM MAHAJAN, BJP ANDHERI (E), BANDRA (E&W), NC CHUNA BHATI, KHAR (E&W), KURLA, KHERWADI, KIRIT TILAKNAGAR, SOMAIYA VIDYA VIHAR, SC BJP VILE PARLE (E&W) SANTACRUZ (E&W), BHANDUP, CHEMBUR, WHAT GHATKOPAR, GOVANDI, KANJUR MARG, KHINDI PADA DOES S MANKHURD, MULUND, TROMBAY, VIDYA VIHAR, AN MP VIKHROLI ARVIND SAWANT, SHS DO? BYCULLA, MASJID, CST AREA, BUNDER CHARNI RD, MAZGAON, RAHUL SHEWALE, SHS CHINCHPOKLI, MUMBADEVI, CHURCHGATE, MUMBAI CENTRAL, ANTOP HILL, MAHIM, COLABA, NAGPADA, CHEMBUR, MATUNGA, COTTON GREEN, OPERA HOUSE, CHUNA BHATI, NAINGAUM, CURREY RD, PAREL, DADAR, PAREL, DOCKYARD RD, REAY RD, DHARAVI, PRABHADEVI, ELPHINSTONE RD, SANDHURST RD, ELPHINSTONE SION, GIRGAUM, SEWRI, ROAD, GOVANDI, TILAK NAGAR, GRANT ROAD, TARDEO, GTB NAGAR, TROMBAY, KALBHADEVI KH UMERKHADI, KING’S CIRCLE, WADALA MARINE LINES, WORLI 2 3 RESPONSIVENESS OF THE MPs TO MUMBAIVOTES QUESTIONNAIRE Name Response type Questionaire Date of response forwarded on The data for the qualitative analysis of the MPs have along with corresponding proofs. The second part been collected from 2 sources: of the questionnaire seeking details of the legislative Gopal Shetty No Response 18th March 2015 NA a. Public Source (News Research) performance (Attendance in Loksabha, questions asked, Gajanan Kirtikar Completely filled up questionnaire provided 18th March 2015 2nd April 2015 b. Questionnaire forwarded by MumbaiVotes to the MPs MPLAD expenditure, etc) of the MPs was forwarded along with corresponding proof of work The questionnaire was forwarded to the MPs in 2 on 15th April 2015.
    [Show full text]
  • Download Brochure
    Celebrating UNESCO Chair for 17 Human Rights, Democracy, Peace & Tolerance Years of Academic Excellence World Peace Centre (Alandi) Pune, India India's First School to Create Future Polical Leaders ELECTORAL Politics to FUNCTIONAL Politics We Make Common Man, Panchayat to Parliament 'a Leader' ! Political Leadership begins here... -Rahul V. Karad Your Pathway to a Great Career in Politics ! Two-Year MASTER'S PROGRAM IN POLITICAL LEADERSHIP AND GOVERNMENT MPG Batch-17 (2021-23) UGC Approved Under The Aegis of mitsog.org I mitwpu.edu.in Seed Thought MIT School of Government (MIT-SOG) is dedicated to impart leadership training to the youth of India, desirous of making a CONTENTS career in politics and government. The School has the clear § Message by President, MIT World Peace University . 2 objective of creating a pool of ethical, spirited, committed and § Message by Principal Advisor and Chairman, Academic Advisory Board . 3 trained political leadership for the country by taking the § A Humble Tribute to 1st Chairman & Mentor, MIT-SOG . 4 aspirants through a program designed methodically. This § Message by Initiator . 5 exposes them to various governmental, political, social and § Messages by Vice-Chancellor and Advisor, MIT-WPU . 6 democratic processes, and infuses in them a sense of national § Messages by Academic Advisor and Associate Director, MIT-SOG . 7 pride, democratic values and leadership qualities. § Members of Academic Advisory Board MIT-SOG . 8 § Political Opportunities for Youth (Political Leadership diagram). 9 Rahul V. Karad § About MIT World Peace University . 10 Initiator, MIT-SOG § About MIT School of Government. 11 § Ladder of Leadership in Democracy . 13 § Why MIT School of Government.
    [Show full text]
  • Thursday, February 7, 2019 / Magha 18, 1940 (Saka) ______
    LOK SABHA ___ SYNOPSIS OF DEBATES (Proceedings other than Questions & Answers) ______ Thursday, February 7, 2019 / Magha 18, 1940 (Saka) ______ OBITUARY REFERENCE HON’BLE SPEAKER: Hon. Members, I have to inform the House about the sad demise of our former colleague Shri Jeetendra Singh Bundela. Shri Jeetendra Singh Bundela was a Member of the 15th Lok Sabha representing the Khajuraho Parliamentary Constituency of Madhya Pradesh. Earlier, Shri Bundela was a Member of Madhya Pradesh Legislative Assembly from 2003 to 2008. He was also a member of the Committee on Human Resource Development. He had keen interest in social work. Shri Jeetendra Singh Bundela passed away on 3 February, 2019 in New Delhi at the age of 60. We deeply mourn the loss of our former colleague. I am sure the House would join me in conveying our condolences to the bereaved family. The Members then stood in silence for a short while. _____ *MATTERS UNDER RULE 377 1. SHRI ABHIJIT MUKHERJEE laid a statement regarding additional attempts to UPSC Civil Services aspirants. 2. SHRI K. ASHOK KUMAR laid a statement regarding guidelines for Post-Matric Scholarship for Scheduled Caste students. 3. DR. K. GOPAL laid a statement regarding welfare measures for fishermen community of Tamil Nadu. 4. SHRI BALBHADRA MAJHI laid a statement regarding need to improve BSNL/MTNL mobile/internet services in Nabarangpur Parliamentary Constituency in Odisha and Delhi. 5. SHRI RAHUL SHEWALE laid a statement regarding need to waive the loan taken by fishermen of Maharashtra. 6. SHRI N.K. PREMACHANDRAN laid a statement regarding need to develop Kollam Bypass as a four lane road.
    [Show full text]
  • Government of India Ministry of Power Lok Sabha
    GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.141 ANSWERED ON 28.12.2017 ELECTRIFICATION OF VILLAGES †*141. SHRIMATI BHAVANA PUNDALIKRAO GAWALI PATIL: Will the Minister of POWER be pleased to state: (a) the details of the electrification of villages carried out during each of the last three years, State/UT-wise; (b) the details of the estimated requirement of electricity in the country and the quantum of electricity available at present; and (c) the details of the assessment made by the Government on the loss of electricity during transmission and distribution in terms of quantity and revenue in order to address the issue? A N S W E R THE MINISTER OF STATE (INDEPENDENT CHARGE) FOR POWER AND NEW & RENEWABLE ENERGY ( SHRI R. K. SINGH ) (a) to (c) : A Statement is laid on the Table of the House. *********** STATEMENT STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (c) OF STARRED QUESTION NO.141 ANSWERED IN THE LOK SABHA ON 28.12.2017 REGARDING ELECTRIFICATION OF VILLAGES. ********* (a) : As reported by the States, 14,528 villages have been electrified during the last three years i.e. from 2014-15, 2015-16 & 2016-17. The State-wise details are given at Annexure. (b) : As per 19th Electric Power Survey report brought out by Central Electricity Authority, the required capacity is estimated at 1,76,897 MW whereas the installed capacity in the country is 330.0 GW as on 30.11.2017. (c) : Some Transmission & Distribution (T&D) losses are inherent in the system. These are termed technical losses.
    [Show full text]
  • Annual Report 2016-2017
    ANNUAL REPORT 2016-2017 MINISTRY OF PARLIAMENTARY AFFAIRS Annual Report 2016-2017 CONTENTS Chapter No. Chapter Page No. CHAPTER -I INTRODUCTION AND ORGANISATIONAL SET-UP 1-3 (a) Introduction……………………………………………………... 1-2 (b) Organisational set-up…………………………………………… 2 (c) Organisational Chart…………………………………………….. 3 CHAPTER -II SUMMONING AND PROROGATION OF HOUSES OF PARLIAMENT 4-5 (a) Summoning and Prorogation…………………………………… 4 (b) Sessions 4 (i) Summoning………………………………………………….. 4 (ii) Prorogation…………………………………………………... 5 (c) Dates of Poll, Constitution, First Sitting, expiry of the term and 5 Dissolution of Lok Sabha (First to Sixteenth Lok Sabhas) 4-5 CHAPTER -III PRESIDENT’S ADDRESS AND ORDINANCES 6-10 (a) President’s Address……………………………………………... 6 (b) Provisions regarding Ordinance…………………...................... 6-7 (c) Ordinances………………………………………………………. 7-8 (d) Ordinances promulgated by the President from 1952- 31.12.2016 ……………………………………………………... 8-10 CHAPTER –IV GOVERNMENT BUSINESS IN PARLIAMENT AND TIME DISTRIBUTION 11-15 (a) Government Business……………………………....................... 11 (b) Planning of Government Business……………………………… 11-12 (c) Management of Government Business…………………………. 12 (d) Resume of Government Business Transacted 12-13 (i) Legislative………………………………....................... 12 (ii) Financial……………………………………………….. 13 (iii) Budget…………………………………………………. 13 (e) Motion of Confidence in the Council of Ministers…………….. 13 (f) Broad distribution of Official Time ……………………………. 14 (g) Time Lost on Adjournments due to Interruptions etc. (h) Other Non-Official Business…………………………………… 14 (i) Number of Sittings………………………………………....... 15 CHAPTER –V PRIVATE MEMBERS’ BUSINESS 16-22 (a) Lok Sabha 16-17 (i) Discussion Under Rule 193……………………………. 16-17 (ii) Calling Attention………… …………………………… 17 (b) Rajya Sabha 18-20 (i) Discussion under Rule 176……………………………… 18 (ii) Calling Attention…………. ……………………………. 20 (iii) Discussion on the working of Ministries...……………. 20 (c) Government’s Stand on Private Members’ Bills and Resolutions …………………………………………………….
    [Show full text]
  • 1. Councillors & Officers List
    Yeejleer³e je<ì^ieerle HetCe& peveieCeceve-DeefOevee³ekeÀ pe³e ns Yeejle-Yeei³eefJeOeelee ~ Hebpeeye, efmebOeg, iegpejele, cejeþe, NATIONAL ANTHEM OF INDIA êeefJe[, GlkeÀue, yebie, efJebO³e, efncee®eue, ³ecegvee, iebiee, Full Version G®íue peueeqOelejbie leJe MegYe veeces peeies, leJe MegYe DeeeqMe<e ceeies, Jana-gana-mana-adhinayaka jaya he ieens leJe pe³eieeLee, Bharat-bhagya-vidhata peveieCe cebieueoe³ekeÀ pe³e ns, Punjab-Sindhu-Gujarata-Maratha Yeejle-Yeei³eefJeOeelee ~ Dravida-Utkala-Banga pe³e ns, pe³e ns, pe³e ns, pe³e pe³e pe³e, pe³e ns ~~ Vindhya-Himachala-Yamuna-Ganga mebef#eHle Uchchala-jaladhi-taranga peveieCeceve-DeefOevee³ekeÀ pe³e ns Tava Shubha name jage, tava subha asisa mage Yeejle-Yeei³eefJeOeelee ~ Gahe tava jaya-gatha pe³e ns, pe³e ns, pe³e ns, Jana-gana-mangala-dayaka jaya he pe³e pe³e pe³e, pe³e ns ~~ Bharat-bhagya-vidhata Jaya he, jaya he, jaya he, Jaya jaya jaya jaya he. Short version Jana-gana-mana-adhinayaka jaya he Bharat-bhagya-vidhata Jaya he, Jaya he, jaya he jaya jaya jaya, jaya he, PERSONAL MEMORANDUM Name ............................................................................................................................................................................ Office Address .................................................................................................................... ................................................................................................................................................ .................................................... ..............................................................................................
    [Show full text]
  • MMJ Apr 2018 LV.Cdr
    April 2018 > A MonthlyNewsletter > For private circulation only Action for good Governance & Networking in India Forward This To All - And All Forward - Together Mumbai MP promises his F/North Ward Special MPLAD funds for Garbage Editorial Processing Wardwise special r. Rahul Shewale, MP issue of MMJ Mbelieves that it is not his is the first special acceptable for Mumbai's civic Tissue covering F/North administration to pass on to 1,000 tons of wet waste a day ward. citizens the responsibility of and give it to the Municipal It was decided that every dealing with wet waste. The Corporation of Greater alternate issue will cover a municipal administration has Mumbai (MCGM). particular ward and the ward threatened to cut off the He is willing also to use his co o rd in ato r will s en d power and water supply to own MPLAD funds or the CSR Supreme Court that two new materials on the ward cooperative societies and bulk funds of corporates to provide land filling sites would be including information that generators which produce 100 smaller composting machines identified. Nothing has would help the citizens of the kg wet waste per day if they do to cooperative housing happened, nor have machines ward with contacts etc. not segregate their waste and societies processing wet waste come up to turn the 3000 ton In this issue you will find compost the wet waste. The on their own premises in his per day garbage to power at articles on F/North ward, MP was speaking to Mr.
    [Show full text]
  • Title: Further Discussion on the Motion for Consideration of the Constitution (One Hundred and Twenty-Second Amendment) Bill, 2014 (Bill Passed)
    an> Title: Further discussion on the motion for consideration of the Constitution (One Hundred and Twenty-Second Amendment) Bill, 2014 (Bill Passed). THE MINISTER OF FINANCE, MINISTER OF CORPORATE AFFAIRS AND MINISTER OF INFORMATION AND BROADCASTING (SHRI ARUN JAITLEY): Madam Speaker, I am extremely grateful to the large number of hon. Members who have spoken on the debate relating to the One Hundred and Twenty-Second Amendment to the Constitution to bring in the concept of the Goods and Services Tax, a destination tax as far as the whole country is concerned. It is unquestionably a very important moment because the whole process of indirect taxation in India will change once the GST itself is implemented. This entire debate has consumed more than 12 years. The Kelkar Committee was appointed by the first NDA Government in the year 2003. Thereafter the Report of the Kelkar Committee came which referred to a new system of indirect taxation in India which causes the least amount of harassment, the least amount of evasion and brings about a single taxation structure across the country. The advantage of such a structure would be that besides being a destination tax, it would involve several important features. There will be uniformity of taxation as far as the whole country is concerned. You will not come across a situation where trucks are either waiting outside a State or outside a city in order to enter. There will be a seamless transfer of goods and services. The whole country, which is one-sixth of world's population, would become a single market.
    [Show full text]
  • LOK SABHA ___ SYNOPSIS of DEBATES (Proceedings Other Than
    LOK SABHA ___ SYNOPSIS OF DEBATES (Proceedings other than Questions & Answers) ______ Thursday, February 7, 2019 / Magha 18, 1940 (Saka) ______ OBITUARY REFERENCE HON’BLE SPEAKER: Hon. Members, I have to inform the House about the sad demise of our former colleague Shri Jeetendra Singh Bundela. Shri Jeetendra Singh Bundela was a Member of the 15th Lok Sabha representing the Khajuraho Parliamentary Constituency of Madhya Pradesh. Earlier, Shri Bundela was a Member of Madhya Pradesh Legislative Assembly from 2003 to 2008. He was also a member of the Committee on Human Resource Development. He had keen interest in social work. Shri Jeetendra Singh Bundela passed away on 3 February, 2019 in New Delhi at the age of 60. We deeply mourn the loss of our former colleague. I am sure the House would join me in conveying our condolences to the bereaved family. The Members then stood in silence for a short while. _____ *MATTERS UNDER RULE 377 1. SHRI ABHIJIT MUKHERJEE laid a statement regarding additional attempts to UPSC Civil Services aspirants. 2. SHRI K. ASHOK KUMAR laid a statement regarding guidelines for Post-Matric Scholarship for Scheduled Caste students. 3. DR. K. GOPAL laid a statement regarding welfare measures for fishermen community of Tamil Nadu. 4. SHRI BALBHADRA MAJHI laid a statement regarding need to improve BSNL/MTNL mobile/internet services in Nabarangpur Parliamentary Constituency in Odisha and Delhi. 5. SHRI RAHUL SHEWALE laid a statement regarding need to waive the loan taken by fishermen of Maharashtra. 6. SHRI N.K. PREMACHANDRAN laid a statement regarding need to develop Kollam Bypass as a four lane road.
    [Show full text]
  • MUMBAI SLUM IMPROVEMENT BOARD a REGIONAL UNIT of (MAHARASHTRA HOUSING and AREA DEVELOPMENT AUTHORITY) Tel No.022-66405484, E-Mail- [email protected]
    MUMBAI SLUM IMPROVEMENT BOARD A REGIONAL UNIT OF (MAHARASHTRA HOUSING AND AREA DEVELOPMENT AUTHORITY) Tel No.022-66405484, E-mail- [email protected] Ref. No. EE/City/MSIB / e-tender / 04 / 2017-18 e-TENDER NOTICE Digitally Signed & unconditional online Tender in form ``B-1'' (Percentage Rate) are invited by the Executive Engineer (City) Division Mumbai Slum Improvement Board (Unit of MHADA) Room No. 539 4th floor Griha Nirman Bhavan Bandra (East) Mumbai 400 051 from the contractors registered with PWD /MHADA /CPWD / CIDCO / MES / MJP / MIDC / Indian Railway / BPT / MCGM / in the corresponding appropriate class of contractor or any Govt. / Semi Govt. organization. Sr. Name of Works Estimated E.M.D. 1% Security Registration Tender Time of Deposit 4% (Class) of Price limit for No cost Estimated (2% in the Contractor including completi cost form of 12% on of FDR and GST in work 2% through Rs. RA Bills) 1 Construction of Toilet at Ganesh Bhavan 500000.00 5000.00 20000.00 Class– 560.00 6 Months Gokhale Road, Mahim VIII & (MP-LAD-RSS) (Shri. Piyush Goyal) above 2 Construction of Toilet, Providing and 500000.00 5000.00 20000.00 Class– 560.00 6 Months Laying Drainage Line at Gopal Bhavan, VIII & Kapad Bazar, Mahim above (MP-LAD-RSS) (Shri. Piyush Goyal) 3 Construction of Toilet at Janseva 500000.00 5000.00 20000.00 Class– 560.00 6 Months Rahiwashi Sangh Zopadpatti, Mahim VIII & (MP-LAD-RSS) (Shri. Piyush Goyal) above 4 Construction of Toilet at Ravwadi, 500000.00 5000.00 20000.00 Class– 560.00 6 Months Matunga VIII & (MP-LAD-RSS) (Shri.
    [Show full text]