MUMBAI SLUM IMPROVEMENT BOARD a REGIONAL UNIT of (MAHARASHTRA HOUSING and AREA DEVELOPMENT AUTHORITY) Tel No.022-66405484, E-Mail- [email protected]
Total Page:16
File Type:pdf, Size:1020Kb
MUMBAI SLUM IMPROVEMENT BOARD A REGIONAL UNIT OF (MAHARASHTRA HOUSING AND AREA DEVELOPMENT AUTHORITY) Tel No.022-66405484, E-mail- [email protected] Ref. No. EE/City/MSIB / e-tender / 06 / 2017-18 e-TENDER NOTICE Digitally Signed & unconditional online Tender in form ``B-1'' (Percentage Rate) are invited by the Executive Engineer (City) Division Mumbai Slum Improvement Board (Unit of MHADA) Room No. 539 4th floor Griha Nirman Bhavan Bandra (East) Mumbai 400 051 from the contractors registered with PWD /MHADA /CPWD / CIDCO / MES / MJP / MIDC / Indian Railway / BPT / MCGM / in the corresponding appropriate class of contractor or any Govt. / Semi Govt. organization. Sr. Name of Works Estimated E.M.D. 1% Security Registration Tender Time of Deposit 2% (Class) of Price limit for No cost Estimated (1% in the Contractor including completi cost form of 12% on of FDR and GST in work 1% through Rs. RA Bills) 1 Providing and Fixing Paver Block and 961192.00 9612.00 19224.00 Class– 560.00 9 Months Ladi at P. T. Mane Udyan, Nagpada, VII & Mumbai above (MP-LAD-RSS / Shri.Hussain Dalwai) 2 Construction of Katte and Beautification 672834.00 6728.00 13456.00 Class– 560.00 9 Months Work Near Hanuman Mandir in front of VII & Wadala Udyog Bhavan above (Beautification) (180-Wadala) (2nd Call) 3 Seating Arrangment and Beautification 749730.00 7497.00 14994.00 Class– 560.00 9 Months Work Near Sai Mandir Old B. D. D. VII & Chawl (Beautification) (180-Wadala) above (2nd Call) 4 Construction of Vazhukhana, Water 2402980.00 24030.00 48060.00 Class– 560.00 12 Tank and Filling at Antop Hill, Muslim V-A & Months Dafanbhumi (SBVY) (180-Wadala) above (2nd Call) 5 Construction of Shed and Beautification 1922384.00 19224.00 38448.00 Class– 560.00 12 Work at Bhoiwada Smashanbhumi V-A & Months (SBVY) (180-Wadala) (2nd Call) above 6 Construction of Shed at Antop Hill, 1922384.00 19224.00 38448.00 Class– 560.00 12 Muslim Dafanbhumi V-A & Months (SBVY) (180-Wadala) (2nd Call) above 7 Construction of Drain and Passage 768954.00 7690.00 15380.00 Class– 560.00 9 Months Beside Kanchan Jewellers, Sangam VII & Nagar (MMNPSY) (179-Sion Koliwada) above 8 Construction of Drain and Passage at 576715.00 5767.00 11534.00 Class– 560.00 9 Months Maa.Ashtabhuja Seva Samiti, Shanti VII & Nagar, Azad Mohalla, Antop Hill, above Wadala (MMNPSY) (179-Sion Koliwada) 9 Conctruction of Drain and Passage and 480596.00 4806.00 9612.00 Class– 560.00 6 Months Providing and Laying Water Supply VIII & Line at Bhartiya Kamla Nagar, Chuna above Gully, Antop Hill, Mumbai-37 (MMNPSY) (179-Sion Koliwada) 10 Concreting Work and Providing and 1393728.00 13937.00 27874.00 Class– 560.00 9 Months Fixing Paver Block at Karbala Masjid, VI & Bhartiya Kamla Nagar, Sion Koliwada above (Beautification) (179-Sion Koliwada) 11 Providing and Fixing Paver Block and 1489847.00 14898.00 29796.00 Class– 560.00 9 Months Concreting Work in front of Toilet at VI & Vijay Nagar, Motilal Nehru Nagar, above Antop Hill, Sion Koliwada (Beautification) (179-Sion Koliwada) 12 Construction of Coba at New Police 865073.00 8651.00 17302.00 Class– 560.00 9 Months Colony (MMNPSY) (180-Wadala) VII & above 13 Concreting Work, Providing and Fixing 4805959.00 48060.00 96120.00 Class– 560.00 12 Ladi, Construction of Common Passage, V & Months Compound Plastering and Construction above of Weather Shed at Khoja Kabrasthan, S.V.P Road, Dongri, Mumbai (MMNPSY) (186-Mumbadevi) 14 Construction of Open Shed, Passage 950000.00 9500.00 19000.00 Class– 560.00 9 Months and Providing and Laying Water VII & Supply Line Near Mahaveer Tabela above Garden, G. K. Marg, Lower Parel (MP-LAD) (Shri. Anil Desai) 15 Construction of Drain and Passage at 900000.00 9000.00 18000.00 Class– 560.00 9 Months Shastri Nagar, Dharavi VII & (MP-LAD) (Shri. Anil Desai) above 16 Construction of Drain and Passage at 90 900000.00 9000.00 18000.00 Class– 560.00 9 Months Feet Road, Dharavi VII & (MP-LAD) (Shri. Anil Desai) above 17 Providing and Laying Water Supply 800000.00 8000.00 16000.00 Class– 560.00 9 Months Line and Construction of Drain and VII & Passage at Gaurakshak Wadi, above Thakurdwar, Girgaon (MP-LAD) (Shri. Anil Desai) 18 Providing and Fixing Paver Block and 990000.00 9900.00 19800.00 Class– 560.00 9 Months Construction of Drain Near Ruparel VII & Collage, Matunga above (MP-LAD) (Shri. Anil Desai) 19 Construction of Drain and Passage at 1200000.00 12000.00 24000.00 Class– 560.00 9 Months Shivdi Cross Road, Khedkar Marg, VII & Wadala above (MP-LAD) (Shri. Rahul Shewale) 20 Construction of Drain and Passage at 1000000.00 10000.00 20000.00 Class– 560.00 9 Months Nehru Nagar, Mahakawadi, Sion VII & Koliwada above (MP-LAD) (Shri. Rahul Shewale) 21 Construction of Drain and Passage Near 1600000.00 16000.00 32000.00 Class– 560.00 12 Deep Building, Bhoiwada Naka, V-A & Months Naigaon above (MP-LAD) (Shri. Rahul Shewale) 22 Construction of Drain and Passage at 1500000.00 15000.00 30000.00 Class– 560.00 9 Months Shindewadi, Dadar VI & (MP-LAD) (Shri. Rahul Shewale) above 23 Construction of Drain and Passage at 1200000.00 12000.00 24000.00 Class– 560.00 9 Months Tata Compound, Parel VI & (MP-LAD) (Shri. Rahul Shewale) above 24 Construction of Drain and Passage Near 1500000.00 15000.00 30000.00 Class– 560.00 9 Months Big Bazar, Shanti Welfare Aso. Mahim VI & (MP-LAD) (Shri. Rahul Shewale) above 25 Providing and Fixing Ladi and 980000.00 9800.00 19600.00 Class– 560.00 9 Months Construction of Drain at at Kohinoor VII & Compound, Naigaon above (MP-LAD) (Shri. Rahul Shewale) 26 Construction of Passage at Shivaji Park, 980000.00 9800.00 19600.00 Class– 560.00 9 Months Dadar (MP-LAD) (Shri. Rahul Shewale) VII & above 27 Construction of Drain and Passage at 1800000.00 18000.00 36000.00 Class– 560.00 12 Dhorwada Road Near Soneri Garden, V-A & Months Dharavi above (MP-LAD) (Shri. Rahul Shewale) 28 Construction of Drain and Passage at 1600000.00 16000.00 32000.00 Class– 560.00 12 Antop Hill, Wadala V-A & Months (MP-LAD) (Shri. Rahul Shewale) above 29 Construction of Toilet, Drain and 1500000.00 15000.00 30000.00 Class– 560.00 9 Months Passage Near Vidyalankar Collage, VI & Wadala above (MP-LAD) (Shri. Rahul Shewale) 30 Construction of Drain and Passage at 1500000.00 15000.00 30000.00 Class– 560.00 9 Months Kala Killa, Dharavi VI & (MP-LAD) (Shri. Rahul Shewale) above 31 Construction of Drain and Passage Near 1500000.00 15000.00 30000.00 Class– 560.00 9 Months Gurudutta Vyayamshala, Piwla Bungla, VI & Dharavi above (MP-LAD) (Shri. Rahul Shewale) 32 Construction of Toilet, Drain and 1500000.00 15000.00 30000.00 Class– 560.00 9 Months Passage Near Baldota House, Laxmi VII & Narayan Lane, Matunga above (MP-LAD) (Shri. Rahul Shewale) 33 Construction of Drain and Passage at 1730145.00 17301.00 34602.00 Class– 560.00 12 Sangam Nagar, Dharavi, P. M. G. P. V-A & Months Colony above (SIP) (Shri. Rahul Shewale) 34 Construction of Drain and Passage at 1730145.00 17301.00 34602.00 Class– 560.00 12 Sangam Nagar, Wadala V-A & Months (SIP) (Shri. Rahul Shewale) above 35 Providing and Laying Water Supply 461372.00 4614.00 9228.00 Class– 560.00 6 Months Line in front of Macchi Market, S. B. VIII & Marg (SIP) (180-Wadala) above 36 Concreting Work at Ramshamwadi, 605551.00 6056.00 12112.00 Class– 560.00 9 Months Garage Gully, Prabhadevi (E) VII & (SIP) (180-Wadala) above 37 Providing and Laying Water Supply 740118.00 7401.00 14802.00 Class– 560.00 9 Months Line in front of Krida Mandal, S. J. P. VII & Road, Naigaon (SIP) (180-Wadala) above 38 Providing and Laying Water Supply 547879.00 5479.00 10958.00 Class– 560.00 9 Months Line at Shri. Dnyansai Mitra Mandal, VII & Naigaon (SIP) (180-Wadala) above 39 Construction of Sabhagruha at R. A. 672834.00 6728.00 13456.00 Class– 560.00 9 Months Kidwai Nagar (SIP) (180-Wadala) VII & above 40 Concreting Work at Ambedkar Nagar, 946774.00 9468.00 18936.00 Class– 560.00 9 Months Prabhadevi (W) (SIP) (180-Wadala) VII & above 41 Providing and Fixing Tiles in Samaj 720894.00 7209.00 14418.00 Class– 560.00 9 Months Mandir and Patre, Replacement of Door VII & at Krnati Utsav Mandal above (SIP) (180-Wadala) 42 Construction of Drain and Passage at 682446.00 6824.00 13648.00 Class– 560.00 9 Months Turner Hill, Wadala (SIP) (180-Wadala) VII & above 43 Providing and Laying Water Supply 624775.00 6248.00 12496.00 Class– 560.00 9 Months Line, Providing and Fixing Pump and VII & Concreting Work at Baithi Chawl No.1 above Behind Sathe Nagar, Wadala (SIP) (180-Wadala) 44 Construction of Open Sabhagruha and 701670.00 7017.00 14034.00 Class– 560.00 9 Months Providing and Fixing Ladi at Wadala VII & Gaon, Ganesh Mandir Marg above (SIP) (180-Wadala) 45 Providing and Fixing Roof and Tiles and 961192.00 9612.00 19224.00 Class– 560.00 9 Months Construction of Drain and Passage at VII & Sudharshan, G. D. Ambekar Marg, above Bhoiwada (MLC-LAD) (Shri. Diwakar Rawte) 46 Providing and Fixing Roof and Tiles and 1153430.00 11534.00 23068.00 Class– 560.00 9 Months Construction of Drain and Passage at VI & Abhyuday Nagar, Building No.12, above Chaitraban, Kalachowky (MLC-LAD) (Shri. Diwakar Rawte) 47 Providing and Fixing Roof, Tiles, Doors, 961192.00 9612.00 19224.00 Class– 560.00 9 Months Windows and Construction of Passage at VII & Durgeshwar Devalay Samittee, Irani above Chawl, Elphinston (MLC-LAD) (Shri.