PROCUREMENT PLAN Poverty Reduction Fund Project Fund: Original Grant No

Total Page:16

File Type:pdf, Size:1020Kb

PROCUREMENT PLAN Poverty Reduction Fund Project Fund: Original Grant No PROCUREMENT PLAN Poverty Reduction Fund Project Fund: Original Grant No. IDA H685-LA and Additional Credit No. 5677-LA Revised as of 19 December 2016 I. GENERAL Public Disclosure Authorized 1. Project information - Country: LAO PDR - Project Implementing Agency: Poverty Reduction Fund 2. Bank’s approval Date of the procurement Plan: - Original Plan: 21 April 2015 - First Revision on: 21 December 2015 - Second Revision on: 29 July 2016 - Third Revision on: 19 December 2016 3. Date of General Procurement Notice: Public Disclosure Authorized - UNDB online: September 9, 2015 4. Period covered by this procurement plan: The PRF (additional financing) activities in Central and Provincial level excluding sub-projects grant under community participation in procurement II. GOODS AND WORKS AND NON-CONSULTING SERVICES 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Contract Value Prior Review No. Procurement Method Comments Public Disclosure Authorized Threshold USD Threshold USD 1 ICB (Goods) >= 600,000 All ICB contracts 2 NCB (Goods) 100,000 - <600,000 3 Shopping (Goods) <100,000 4 Direct Contracting (Goods, Works, - All contracts and Non-consulting Services) 5 ICB (Works) >= 2,000,000 All ICB contracts 6 NCB (Works) 200,000 - <2,000,000 7 Shopping (Works) <200,000 2. Prequalification. Not expected for the works/goods packages Public Disclosure Authorized 3. Reference to Project Operational Manual: PRF 4. Any Other Special Procurement Arrangements: N/A 1 5. Procurement Packages for Works & Goods (prior & post reviews) with Methods and Time Schedule: The following table lists goods, furniture, works contracts for which procurement activities are expected to commence within the 12 months. A. GOODS Review Expected PQ Domestic by Bid/ Estimated Proc. No. Contract (Description) (yes/ Preference Bank Quotation Comment Cost USD Method no) (yes/no) (Prior / Opening Post) Date G001 5 Pick-ups 4x4 WD 150,000 NCB No No Post Jan-2016 Completed Diesel Engine, Double Lao Ford City (160,926 USD) Cab to replace the damage vehicle (purchased since PRF I) G002 51 Motorcycles 100cc for 71,400 Shopping No No Post Oct-2015 Completed New Chip Xeng Co. CDD (15) and LN (24), (461,958,000 LAK) PRF (12) G003 Equipment including: 15,500 Shopping No No Post Dec-2015 Completed 1. 23 Laptops for CDD Unitech Co. (125,226,860 LAK) (15) and LN (8) 2. 8 LCD Projectors for LN G004 8 Small Electric Shopping No No Post Cancelled Generator for LN G005 4 Furniture sets for 4 new Shopping No No Post Cancelled district added, LN G006 1 Minibus 36,000 Shopping No No Post Aug-2016 Completed Toyota Champa Co. (247,716,000 LAK) G007 6 Pick-ups 4x4 WD 198,000 NCB No No Post Aug-2016 Completed Double Cab Keo Auto Co. (1,506,960,000 LAK) G008 90 Motorcycles 100-125 99,000 Shopping No No Post Aug-2016 Completed cc New Chip Xeng Co. (981,000,000 LAK) G009 IT equipment including: 153,300 NCB No No Post Oct-2016 Completed 14 laptops, 64 desktop Unitech Co. (747,281,232 LAK) computers, 14 A3 B/W printers, 42 A4 B/W printers, 55 fax machines G010 Equipment for TA incl: 13,750 Shopping No No Post Aug-2016 Completed 55 Electronic Digital Lao Inter Network (395,074,680 LAK) Calipers, and 55 Laser Distant Meters G011 55 GPSMAPs for TA and 24,000 Shopping No No Post Aug-2016 M&E G012 40 Amplifiers 8,000 Shopping No No Post July-2016 2 A. GOODS Review Expected PQ Domestic by Bid/ Estimated Proc. No. Contract (Description) (yes/ Preference Bank Quotation Comment Cost USD Method no) (yes/no) (Prior / Opening Post) Date G013 10 Meeting Telephone 13,000 Shopping No No Post Aug-2016 Completed Unitech Co. (107,118,000 LAK) G014 3 Pick-ups 4x4 WD 96,000 Shopping No No Post Nov-2016 The WB’s NOL, dated 13 Oct 2016 Double Cab Completed Keo Auto Co. (753,000,000 LAK) G015 105 Motorcycles 100-125 143,115 NCB No No Post Nov-2016 The WB’s NOL, dated 13 Oct 2016 cc Completed New Chip Xeng Co. (1,144,500,000 LAK) G016 70 Computers 92,050 Shopping No No Post Nov-2016 The WB’s NOL, dated 13 Oct 2016 Completed LT Computer Co. (540,000,000 LAK) G017 10 Photocopiers 28,000 Shopping No No Post Nov-2016 The WB’s NOL, dated 13 Oct 2016 Completed Cyberia Co. (172,000,000 LAK) All Total (Goods): 1,141,115 B. WORKS Review Expected Estimated PQ Domestic by Bid/ Proc. No. Contract (Description) Cost (yes/ Preference Bank Quotation Comment Method USD no) (yes/no) (Prior / Opening Post) Date Office Repair (10 70,000 Shopping No No Post Sep-2016 Multiple Province and 40 District packages, Office and 1 Central procured at Office in case of move to province level other place) W001 Xiengkouang Province Completed (52,227,500 LAK) W002 Mork District, Completed Xiengkhouang Province (85,069,490 LAK) W003 Beng and Namor District, Completed Oudomxai Province (11,480,000 LAK) W004 LuangPrabang Province Completed (45,023,000 LAK) W005 Savvannakhet Province Completed (18,310,000 LAK) 3 B. WORKS Review Expected Estimated PQ Domestic by Bid/ Proc. No. Contract (Description) Cost (yes/ Preference Bank Quotation Comment Method USD no) (yes/no) (Prior / Opening Post) Date W006 Sepone District, Completed Savannakhet Province (28,547,000 LAK) W007 Thapangthong District, Completed Savannakhet Province (20,427,000 LAK) W008 Atsaphone District, Completed Savannakhet Province (23,0874805 LAK) W009 Salavan Province Completed (80,989,052 LAK) W010 Taoy District, Salavan Completed Province (42,403,185 LAK) W011 Samouy District, Salavan Completed Province (36,659,700 LAK) W012 Sekong Province Completed (4,231,000 LAK) All Total (Works): 70,000 C. INFORMATION, EDUCATION AND COMMUNICATION MATERIAL (IEC) Review Expected Estimated PQ Domestic by Bid/ Proc. No. Contract (Description) Cost (yes/ Preference Bank Quotation Comment Method USD no) (yes/no) (Prior / Opening Post) Date IEC01 1,010 sets, Production of 45,000 Shopping No No Post Jan-2016 Completed Modern Image new toolkits set for CDD (355,492,500 LAK) IEC02 Printing of Livelihood TG 40,000 Shopping No No Post Jan-2016 Completed Modern Image and other material (511,060,000 (Booklets, leaflets, LAK) Passbook flipbook and (merged IEC2 + posters) for LN IEC3) IEC03 Printing of Nutrition TG 40,000 Shopping No No Post Jan-2016 and other material (Booklets, leaflets, Passbook flipbook and posters) for LN IEC04 Printing and Publication 254,197 Shopping No No Post Sep-2016 Multiple including: PRF III packages operation manual, PRF III 1. Modern Image introduction brochure, (785,581,500 LAK) DCDD introduction book, 2. Family Media VDP& KDP manual, social (550,275,000 4 C. INFORMATION, EDUCATION AND COMMUNICATION MATERIAL (IEC) Review Expected Estimated PQ Domestic by Bid/ Proc. No. Contract (Description) Cost (yes/ Preference Bank Quotation Comment Method USD no) (yes/no) (Prior / Opening Post) Date safeguards, environment LAK) 3. Family Media safeguards, FRM (561,880,000 manual/poster/brochure/ind LAK) 4. Family Media icator and etc… (329,796,500 LAK) IEC05 Printing and Publication for 76,060 Shopping No No Post Sep-2016 Multiple LN (Livelihood and packages Nutrition) including: saving 1. Family Media book, saving record book, (35,750,000 LAK) cash record book, loan 2. Modern Image record book, balance sheet (226,600,000 LAK) book, ledger book, poster, booklet, and etc…. IEC06 Produce 2 sort film (woman 10,000 Shopping No No Post Oct-2016 Completed (non- leadership and PRF 1. Phipath introduction) consultant Phamueang - service Ender Video (4,000 USD) 2. Chongkham (Cartoon Animation) (6,000 USD? IEC07 Publication of good and bad 10,500 Shopping No No Post Sep-2016 Completed Modern Image pictogram for TA (81,235,000 LAK) IEC08 Public Kumban Mapping Shopping No No Post Oct-2016 Cancelled IEC09 Production of 42 sets of 2,190 Shopping No No Post Aug-2016 Completed Khaulaung Photo BCC Materials (CLTS Coppy Activities) for TA (28,089,600 LAK) the WB’s NOL dated 27 Jul 2016 All Total (IEC): 477,947 5 III. SELECTION OF CONSULTANTS 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Contract Value Prior Review Threshold No. Selection Method Comments Threshold (USD) (USD) 1 Competitive Methods (Firms) – >= 300,000 All contracts Quality & Cost Based Selection (QCBS) and Quality Based Selection (QBS) 2 Competitive Methods (Firms) – Least- <300,000 >= 100,000 Cost Selection (LCS) and Selection Based on Consultant Qualifications (CQS) 3 Single Source (Firms) All contracts 4 Individual Consultants Legal and Fiduciary Consultants and all sole- source selection >=10,000 2. Short list comprising entirely of national consultants: No short lists of consultants for services are expected to comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. However, if a need arises during the project implementation and if it is warranted, short lists of consultants for services estimated to cost less than $200,000 equivalent per contract may be composed entirely of national consultants 3. Any Other Special Selection Arrangements: Advance contracting may be applied for some items as specified in the Procurement Plan. 4. Consultancy Assignments with Selection Methods (prior & post reviews) and Time Schedule Estimate Selection Bank Expected Sr. Description of Consultant Services Cost Comments Method Review EOI Date (USD) C001 PRF: 147 Local Staff (Provincial 1,405,577 IC Post Jan-16 Completed and District Staff ) Continuation Competitive under PRF I or II (Houaphan, Xiengkhouang, LuangNamtha, Savannakhet, Salavanh, Sekong, and Attapeu) C002 PRF: Accountant Assistant 18,000 IC Post Oct-15 Completed Continuation Competitive Ms.
Recommended publications
  • Ministry of Agriculture and Forestry
    LAO PEOPLE’S DEMOCRATIC REPUBLIC PEACE INDEPENDENCE DEMOCRATIC UNITY PROSPERITY Ministry of Agriculture and Forestry POVERTY REDUCTION FUND PHASE III ANNUAL PROGRESS REPORT (January – December 2019) Suspended bridge, Luangphakham to Nongkham village, Long district, Luangnamtha province (January 2020) Nahaidiao Rd, P.O.Box 4625, Vientiane, Lao PRF Tel: (+856) 21 261479 -80 Fax: (+856) 21 261481, Website: www.prflaos.org January 2018 ABBREVIATIONS AWPB Annual Work Plan and Budget AFN Agriculture for Nutrition CD Community Development CDD Community Driven Development CF Community Facilitator CFA Community Force Account CLTS Community-Lead Total Sanitation DAFO District Agriculture and Forestry Office Deepen CDD Deepen Community Driven Development DPO District Planning Office DRM Disaster Risks Management DSEDP District Social Economic Development Plan EM Energy and Mine FRM Feedback and Resolution Mechanism FNG Farmer Nutrition Group GESI Gender Equity and Social Inclusion GOL Government of Lao GIS Geography information system GPAR Governance Public Administration Reform HH Household(s) HR Human Resource IE Internal Evaluation IEC Information, Education, Communication IGA Income Generating Activities IFAD International Fund for Agriculture Development IFR Interim Un-Audited Financial Report KBF Kum Ban Facilitator KDPs Kum Ban Development Plans KPIs Key Performance Indicators LAK Lao Kip (Lao Currency) LN Livelihood and Nutrition LWU Lao Women Union LYU Lao Youth Union M&E Monitoring and Evaluation MIS Management information system MNS Minutes
    [Show full text]
  • (I) Towards Participatory Forest Management in Laos
    Towards Participatory Forest Management in Laos —Laos Country Report 2003— (i) (ii) Towards Participatory Forest Management in Laos —Laos Country Report 2003— Editor in chief HYAKUMURA Kimihiko and Editors INOUE Makoto Martinus Nanarg HARADA Kazuhiro KOMATSU Kiyoshi Institute for Global Environmental Strategies Kanagawa, Japan (iii) Published by Institute for Global Environmental Strategies 2108-11 Kamiyamaguchi, Hayama, Miura, Kanagawa, 240-0115, JAPAN Printed by Sato Printing Co. Ltd., Yokohama, JAPAN Cover (upper left) Local people and cardamom, Ngoi District, Luang Phabang Province. Photo credit: HYAKUMURA Kimihiko Cover (upper right) Swidden land and paddy field, Nambak District, Luang Phabang Province. Photo credit: HYAKUMURA Kimihiko Cover (lower left) Elephant and people, Nambak District, Luang Phabang Province. Photo credit: HYAKUMURA Kimihiko Cover (lower right) Women carrying fuel wood, Pakeng District, Oudomxay Province. Photo credit: MORIMOTO Takashi Back Cover1 River in the morning, Phalanxai District, Savannakeht Province. Photo credit: HYAKUMURA Kimihiko. Back Cover2 Wild konjak potato and local people: Nambak District, Luang Phabang Province. Photo credit: HYAKUMURA Kimihiko Back Cover3 Threshing the rice, Atsaphone District, Savannakhet Province. Photo credit: HYAKUMURA Kimihiko Back Cover4 Ceremony in the spiritual forest, Atsaphone District, Savannakhet Province. Photo credit: HYAKUMURA Kimihiko Back Cover5 Fallow land and swidden land, Pakbeng District, Oudomxay Province, Photo credit: MORIMOTO Takashi All Right Reserved © 2004 The Institute for Global Environmental Strategies Although every effort is made to ensure objectivity and balance, the printing of a book or translation does not imply IGES endorsement or acquiescence with its conclusions or the endorsement of IGES financers. IGES maintains a position of neutrality at all times on issues concerning public policy.
    [Show full text]
  • Preliminary Gibbon Status Review for Lao PDR 2008
    Preliminary Gibbon Status Review for Lao PDR 2008 J.W. Duckworth December 2008 This work was carried out with funding from the Arcus Foundation. Preliminary gibbon status review for Lao PDR 2008 This review is a work in progress for the conservation of gibbons in Lao PDR. It is intended to be updated periodically. Any comment on this document, including further records, would be gratefully received by the author and by Fauna & Flora International, at the addresses below. Citation: J. W. Duckworth, 2008, Preliminary gibbon status review for Lao PDR 2008, Fauna & Flora International, Unpublished report. Author: J. W. Duckworth, PO Box 5773, Vientiane, Lao PDR Email: [email protected] Date: December 2008 For more information or to send further comments contact: Paul Insua-Cao Fauna & Flora Asia-Pacific Programme, 340 Nghi Tam, Hanoi, Vietnam Tel: +84-(0)43-719 4117 Fax: +84-(0)43-719 4119 Email: [email protected] Front cover photo of a captive young yellow-cheeked crested gibbon by Monty Sly. All views expressed within are the author’s alone unless attributed otherwise and do not necessarily reflect the opinion of Fauna & Flora International. While the authors and editors strive for rigour and accuracy in presenting this report, Fauna & Flora International make no representations as to completeness, suitability or validity of any information contained, and will not be liable for any errors or omissions. The editors and Fauna & Flora International take no responsibility for any misrepresentation of material resulting from translation of this report into any other language. Reproduction of any part of this report for educational, conservation and other non-profit purposes is authorised without prior permission from the copyright holder, provided that the source is fully acknowledged.
    [Show full text]
  • Basic Education (Girls) Project
    Completion Report Project Number: 29288 Loan Number: 1621 July 2008 Lao People’s Democratic Republic: Basic Education (Girls) Project CURRENCY EQUIVALENTS Currency Unit – kip (KN) At Appraisal At Project Completion 30 April 1998 31 July 2007 KN1.00 = $0.000419 $0.000104 $1.00 = KN2,383.50 KN9,550 ABBREVIATIONS CCED – committee for community education and development DEB – district education bureau DNFE – Department of Non-Formal Education EA – executing agency EMIS – education management information system EQIP – Education Quality Improvement Project GDP – gross domestic product GEMEU – Gender and Ethnic Minorities Education Unit Lao PDR – Lao People’s Democratic Republic MOE – Ministry of Education NGO – nongovernment organization NRIES – National Research Institute for Educational Science PES – provincial education service PWG – project working group RRP – report and recommendation of the President TA – technical assistance TTC – teacher training center NOTES (i) The fiscal year (FY) of the Government ends on 30 September. FY before a calendar year denotes the year in which the fiscal year ends, e.g., FY2008 ends on 30 September 2008. (ii) In this report, “$” refers to US dollars Vice President C. Lawrence Greenwood, Jr. Operations 2 Director General A. Thapan, Southeast Asia Department (SERD) Director G.H. Kim, Lao Resident Mission (LRM), SERD Team leader K. Chanthy, Senior Project Implementation Officer, LRM, SERD Team member S. Souannavong, Assistant Project Analyst, LRM, SERD iii CONTENTS Page BASIC DATA i I. PROJECT DESCRIPTION 1 II. EVALUATION OF DESIGN AND IMPLEMENTATION 2 A. Relevance of Design and Formulation 2 B. Project Outputs 4 C. Project Costs 7 D. Disbursements 7 E. Project Schedule 7 F.
    [Show full text]
  • Initial Emergency Report Format
    We are responsive Lao PDR 2019 Flooding Emergency Response Report January 2020 Table of contents: 1. PROJECT SUMMARY ............................................................................................................ 2 2. DESCRIPTION OF DISASTER ............................................................................................. 5 3. NEED ASSESSMENT ............................................................................................................. 6 4. COORDINATION MECHANISM......................................................................................... 6 5. RELIEF RESPONSE................................................................................................................ 6 6. EARLY RECOVERY PHASE ................................................................................................. 7 7. PROCUREMENT AND DISTRIBUTION OF FOOD ......................................................... 8 8. BENEFICIARIES ACCOUNTABILITY ................................................................................ 8 9. POST MONITORING QUALITY ....................................................................................... 11 10. BUDGET FOR EXPENDING IN EMERGENCY RESPONSE .......................................... 11 11. ANNEXES ............................................................................................................................. 11 1. Project Summary Project Name Lao PDR Flooding Emergency Response 2019 213246 relief phase PBAS Project # 213441 early recovery phase Declaration
    [Show full text]
  • Thammasat Institute of Area Studies (TIARA), Thammasat University
    No. 06/ 2017 Thammasat Institute of Area Studies WORKING PAPER SERIES 2017 Regional Distribution of Foreign Investment in Lao PDR Chanthida Ratanavong December, 2017 THAMMASAT UNIVERSITY PAPER NO. 09 / 2017 Thammasat Institute of Area Studies, Thammasat University Working Paper Series 2017 Regional Distribution of Foreign Investment in Lao PDR Chanthida Ratanavong Thammasat Institute of Area Studies, Thammasat University 99 Moo 18 Khlongnueng Sub District, Khlong Luang District, Pathum Thani, 12121, Thailand ©2017 by Chanthida Ratanavong. All rights reserved. Short sections of text, not to exceed two paragraphs, may be quoted without explicit permission provided that full credit including © notice, is given to the source. This publication of Working Paper Series is part of Master of Arts in Asia-Pacific Studies Program, Thammasat Institute of Area Studies (TIARA), Thammasat University. The view expressed herein are those of the authors and do not necessarily reflect the view of the Institute. For more information, please contact Academic Support Unit, Thammasat Institute of Area Studies (TIARA), Patumthani, Thailand Telephone: +02 696 6605 Fax: + 66 2 564-2849 Email: [email protected] Language Editors: Mr Mohammad Zaidul Anwar Bin Haji Mohamad Kasim Ms. Thanyawee Chuanchuen TIARA Working papers are circulated for discussion and comment purposes. Comments on this paper should be sent to the author of the paper, Ms. Chanthida Ratanavong, Email: [email protected] Or Academic Support Unit (ASU), Thammasat Institute of Area Studies, Thammasat University Abstract The surge of Foreign Direct Investment (FDI) is considered to be significant in supporting economic development in Laos, of which, most of the investments are concentrated in Vientiane.
    [Show full text]
  • Family Planning Situation Analysis Lao People’S Democratic Republic
    Family Planning Situation Analysis Lao People’s Democratic Republic July 2015 Family Planning Situation Analysis 1 Copyright © 2015 United Nations Population Fund Lao PDR Ban Phonsavanh Tai, P.O Box 345 Vientiane Capital Photo Credit: UNFPA LAO PDR / Micka Perrier 2 Family Planning Situation Analysis FOREWORD The United Nations Population Fund - UNFPA, together with other development partners, has been supporting the Ministry of Health to implement its Family Planning programme over the past two decades. This programme has been mainly implemented as part of a larger maternal health programme and has not been specifically assessed, thus highlighting the need for updated an analysis on the situation of Family Planning in the country. In response to this need, UNFPA commissioned analysis with the specific purpose of assessing the current situation of family plan- ning in Lao PDR, so that it would provide an evidence base to inform UNFPA’s support, as well as the Government’s future programming in the area. The analysis is also expected to assist UNFPA in developing a more integrated approach to family planning in the country in line with the global UNFPA Family Planning Strategy “Choices not Chance”, and the International Conference on Pop- ulation and Development (ICPD) Action Plan, which emphasise the broadening of contraceptive choices, improving quality of care, and ensuring reproductive rights. The report outlines the current landscape of Family Planning in the areas of policy, service delivery and resources. It notes the gains that have been made in increasing the contraceptive prevalence rate and in the reduction of maternal mortality and unmet need for family planning, and highlights remaining challenges and disparities by region, age and ethnicity.
    [Show full text]
  • Ministry of Agriculture and Forestry
    LAO PEOPLE‟S DEMOCRATIC REPUBLIC PEACE INDEPENDENCE DEMOCRATIC UNITY PROSPERITY Ministry of Agriculture and Forestry POVERTY REDUCTION FUND PHASE III ANNUAL PROGRESS REPORT (January – December 2018) Nahaidiao Rd, P.O.Box 4625 Vientiane, Lao PRF Tel: +856(0)21 261479-80 Fax: +856(0)21 261481 Website: www.prflaos.org February 2019 Abbreviations AWPB Annual Work Plan and Budget AFN Agriculture for Nutrition CD Community Development CDD Community Driven Development CFA Community Force Account CLTS Community-Lead Total Sanitation DAFO District Agriculture and Forestry Office Deepen CDD Deepen Community Driven Development DPO District Planning Office DRM Disaster Risks Management DSEDP District Social Economic Development Plan EM Energy And Mine FRM Feedback and Resolution Mechanism GESI Gender Equity and Social Inclusion GOL Government of Lao GIS Geography information system GPAR Governance Public Administration Reform HH Household(s) HR Human Resource IE Internal Evaluation IEC Information, Education, Communication IGA Income Generating Activities IFAD International Fund for Agriculture Development KBF Kum Ban Facilitator KDPs Kum Ban Development Plans KPIs Key Performance Indicators LAK Lao Kip (Lao Currency) LN Livelihood and Nutrition LWU Lao Women Union LYU Lao Youth Union M&E Monitoring and Evaluation MIS Management information system MTR Mid-Term Review NGPES National Growth and Poverty Eradication Strategy NCRDPE National Committee for Rural Development and Poverty Eradication NGOs None Governmental Organizations NPL Non Performance
    [Show full text]
  • [Draft Implementing Decree for New FIL]
    Authentic in Lao Only LAO PEOPLE’S DEMOCRATIC REPUBLIC Peace Independence Democracy Unity Prosperity Prime Minister’s office No. 301/PM Vientiane Capital, dated 12 October 2005 Decree of the Prime Minister Regarding the Implementation of The Law on the Promotion of Foreign Investment - Pursuant to the Law on the Government of the Lao PDR No. 02/NA, dated 6 May 2003; - Pursuant to the Law on the Promotion of Foreign Investment No. 11/NA, dated 22 October 2004; - Referencing to the proposal of the President of the Committee for Planning and Investment. SECTION I General Provisions Article 1. Objective This Decree is set out to implement the Law on the Promotion of Foreign Investment correctly to the objectives and uniformly throughout the country on the principles, methods and measures regarding the promotion, protection, inspection, resolution of disputes, policies towards productive persons and measures against the violators. Article 2. Legal Guarantees The State provides legal guarantees to foreign investors who are established under the Law on the Promotion of Foreign Investment as follows: 2.1 administer by Law and regulation on the basis of equality and mutual interests; 2.2 undertake all of the State’s obligations under the laws, international treaties in which the State is a party, the Agreement Regarding the Page 1 of 61 Promotion and Protection of Foreign Investment and the agreements that the government has signed with the foreign investor; 2.3 do not interfere with the legally business operation of foreign investors. Article 3. Capital Contribution which is an Intellectual Property The State recognizes the shared capital contribution of the enterprises which is an intellectual property; the evaluation of the intellectual property value shall be determined in detail by the scope of rights, obligations and interest in the resolution of a shareholders’ meeting and the business joint venture agreement of the enterprise.
    [Show full text]
  • DC: Lao PDR: Pakse Urban Environmental Improvement Project
    Pakse Urban Environmental Improvement Project (RRP LAO 43316) DEVELOPMENT COORDINATION A. Major Development Partners: Strategic Foci and Key Activities 1. The Asian Development Bank (ADB) has been a lead partner in water supply and other municipal infrastructure and services sector in the Lao People’s Democratic Republic (Lao PDR). Other development partners active in the sector include Agence Française de Développement, Japan International Cooperation Agency (JICA), Korean International Cooperation Agency, the Neighboring Countries Economic Development Cooperation Agency of Thailand, the United Nations Human Settlements Programme, the United Nations Children’s Fund, the World Bank, the World Health Organization, and SNV Netherlands Development Organization. The Norwegian Agency for Development Cooperation and the United Nations Development Programme have provided assistance in solid waste management (including Pakse). JICA is assisting the Ministry of Home Affairs in the implementation of the Law on Local Administration of the Lao PDR, 2003. The table highlights a number of projects in the urban sector development and water supply and sanitation subsectors.1 B. Institutional Arrangements and Processes for Development Coordination 2. The Infrastructure Technical Working Group (TWG-Infrastructure) is host to development coordination in infrastructure development, and includes a subgroup on urban development, water supply, and sanitation. The subgroup, chaired by the minister of public works and transport, is co- chaired by ADB, the Embassy of Japan, and the World Bank. Its first meeting was held in October 2011. The project seeks to enhance partnerships during implementation through regular updates provided at biannual TWG-Infrastructure subgroup meetings. The Pakse Urban Development Strategy, 2011–2030 and its investment plan will enable development partners to coordinate urban development initiatives in Pakse.
    [Show full text]
  • III-4 LAND USE PLANNING III-4.1 Current Land Use Lao PDR Is A
    PLANET CPC – JICA III-4 LAND USE PLANNING III-4.1 Current Land Use Lao PDR is a mountainous country with a total land area of 236,800 km3. Approximately 80% of the country is mountainous, the north being very rugged, covered by forest and often inaccessible. Also the country is rich in forest, water, biodiversity, mineral and land resources. However, the overall land resource base is fragile, with the majority of land susceptible to degradation because of less fertile soils, steep terrain, and traditional land-use practices. 1) Topographic Feature The Study area is located in the central to southern part of the country with a total land of 3,808,000 hectares in two provinces (based on GIS data in 2000). Undulation of the mountain range flows from the northwest towards the southeast with the highest elevation at more than 2,000 m. The two provinces in SKR show difference in the topographic features. Khammouan consists of 60% of mountainous topography; about 50% of the province land is over 500 m in altitude and has more than a 8-degree slope. Savannakhet is a fairly flat lowland province, about 60% of which is under 200 m in altitude and more than 50% of the area has under 2% degree, which makes this province unique in the mountainous country. Area Distribution by Elevation : Khammouan Province District Nongbok Xaibouathong Xebangfai Mahaxai Thakhek Boualapha Gnommalat Hinboun Nakay 0 100,000 200,000 300,000 400,000 500,000 (ha) 0- 99 m 100- 199 m 200- 499 m 500- 999 m 1000 < m Figure III4-1 Area Distribution in Khammouan III - 72 The
    [Show full text]
  • Mapping Priority Jurisdictions for REDD+ in Lao PDR
    Climate Protection through Avoided Deforestation (CliPAD) Mapping Priority Jurisdictions for REDD+ in Lao PDR Analysis and Priority Gabriel Eickhoff, Kyle Hemes, Rankings Jeremy Ferrand and Sithong Thongmanivong Climate Protection through Avoided Deforestation (CliPAD) Published by: Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) Climate Protection through Avoided Deforestation Programme (CliPAD) Department of Forestry That Dam Campus, Chanthaboury District PO Box 1295 Vientiane, Lao PDR T: +856 21 254082 F: +856 21 254083 Website: www.giz.de Authors: 1 – Gabriel Eickhoff, Kyle Hemes and Jeremy Ferrand, PT Forest Carbon Consultants 2 – Sithong Thongmanivong, Faculty of Forestry, National University of Laos. Acknowledgements: We would like to thank the following persons who have offered significant constructive technical inputs as well as those who have participated in the peer review process, including: Mathew Hansen, Lucio Pedroni, Kevin Brown, Belinda Arunawati, Scott Stanley, Agus Salim, Doug Fuller, Lief Mortenson, Jamie Halperin, Colin Moore, Daniel Müller, Georg Buchholz, Steffen Lackmann, Dietmar Bräutigam, Sebastian Koch, Cornelia Hett and Andreas Heinimann. The analysis, results and recommendations in this publication represent the opinion of the author and are not necessarily representative of the position of the Deutsche Gesellschaft für Zusammenarbeit (GIZ) GmbH. Distributed by: CliPAD TC Report completed in July 2013, Printed in August 2013 Designed by: Mark Turgesen ii Analysis and Priority Rankings Mapping
    [Show full text]