Press Release

Total Page:16

File Type:pdf, Size:1020Kb

Press Release PRESS RELEASE Bombardier to showcase its winning INNOVIA monorail solution at TransMEA in Cairo • Bombardier will present its INNOVIA monorail solution that has been chosen for the multi-billion-dollar Cairo Monorail project • Visitors to the TransMEA 2019 exhibition can explore Bombardier’s mobility solution portfolio for Middle East and Africa Berlin, November 24, 2019 – Mobility solution provider Bombardier Transportation will showcase its winning BOMBARDIER INNOVIA monorail 300 system for Cairo at TransMEA 2019 in Egypt on December 1-4, 2019. Focusing on mobility technology, the TransMEA exhibition is arranged under the auspices of the Minister of Transportation of Egypt, His Excellency Lieutenant General Kamel El-Wazir. “To be chosen by Cairo for two new monorail lines is a great privilege for us and our partners,” said Ahmed Eldamanhoury, Managing Director Egypt at Bombardier Transportation. He added, “With its advanced technology, the INNOVIA monorail 300 system will increase mobility for Cairo’s citizens, reduce congestion and benefit the local economy as well as the environment: The two lines will transport around 45,000 passengers per hour in each direction when ultimate capacity is reached.” Bombardier and its partners Orascom Construction and Arab Contractors won the Engineering, Procurement and Construction (EPC) and 30-year Operation and Maintenance (O&M) contract in August 2019 for the delivery of two urban monorail lines for Cairo. With operating speeds up to 80 km/h, the two INNOVIA Monorail systems will significantly reduce commuters’ travel times when operations begin in 2022 for phase 1 of the New Administrative Capital line and 2024 for the 6th of October City line. A 54 km monorail line will connect the New Administrative Capital and East Cairo to provide an end-to-end journey time of approximately 60 minutes and a 42 km line will connect 6th of October City and Giza City in a journey time of around 42 minutes. Today’s cities are calling for easy-to-implement, cost effective, low impact, high capacity, safe, comfortable and environmentally friendly mass transit solutions. The INNOVIA monorail 300 system is the best-in-class solution on the market today, allowing fast construction of high-capacity transit lines, and combining the service proven BOMBARDIER CITYFLO 650 driverless train control technology with the latest in wide-bodied, lightweight, aerodynamically styled monorail trains. Bombardier has previously installed monorail systems in the cities of São Paulo, Brazil, and Las Vegas, USA, as well as airport installations in Jacksonville, Newark and Tampa in the USA. It is currently delivering two monorail lines in Bangkok, Thailand (combined length 65 km) and two lines in Wuhu, China (combined length 46.8 km). Bombardier has been a long-term partner to Egypt’s railways since the 1970s and successful in winning and delivering projects across the MEA region. In Egypt, Bombardier supplied around 50% of Egypt National Railways’ locomotive fleet, as well as turbo trains and fleet support services. In the Middle East, Bombardier delivered the highly reliable INNOVIA APM 300 system at the Dubai International Airport in 2016, a fully automated 1.5 km long transit system operating at over 99.7% availability and with the capacity to carry more than 200,000 passengers daily, and it is also supplying a fleet of 47 two- car INNOVIA Metro trainsets to Line 3 of the impressive Riyadh Metro which opens in 2020. TransMEA is part of the influential Cairo ICT 2019 exhibition and its 2019 theme is “The Digital Experience”. At the show, Bombardier will present its latest product portfolio, including rolling stock, signalling, servicing and maintenance solutions using digital presentation tools, such as its Virtual Reality showcase. The Bombardier team will be available at the show to discuss latest technologies, solutions and industry trends, including digitalization, sustainability and mobility innovation. Visit Bombardier Transportation at the TransMEA 2019 exhibition in Hall 2 at the Egypt International Exhibition Centre (EIEC) in Cairo from December 1 to 4, 2019. Further information about Bombardier Transportation and its mobility solutions can be found on the website: http://www.rail.bombardier.com. Further information about the exhibition can be found on the organiser’s website: https://cairoict.com/ About Bombardier Transportation Bombardier Transportation is a global mobility solution provider leading the way with the rail industry’s broadest portfolio. It covers the full spectrum of solutions, ranging from trains to subsystems and signalling to complete turnkey transport systems, e-mobility technology and data-driven maintenance services. Combining technology and performance with empathy, Bombardier Transportation continuously breaks new ground in sustainable mobility by providing integrated solutions that create substantial benefits for operators, passengers and the environment. Headquartered in Berlin, Germany, Bombardier Transportation employs around 40,650 people and its products and services operate in over 60 countries. About Bombardier With over 68,000 employees, Bombardier is a global leader in the transportation industry, creating innovative and game-changing planes and trains. Our products and services provide world-class transportation experiences that set new standards in passenger comfort, energy efficiency, reliability and safety. Headquartered in Montreal, Canada, Bombardier has production and engineering sites in 28 countries as well as a broad portfolio of products and services for the business aviation, commercial aviation and rail transportation markets. Bombardier shares are traded on the Toronto Stock Exchange (BBD). In the fiscal year ended December 31, 2018, Bombardier posted revenues of $16.2 billion US. The company is recognized on the 2019 Global 100 Most Sustainable Corporations in the World Index. News and information are available at bombardier.com or follow us on Twitter @Bombardier. 2 Notes to editors For news, related material and photos, visit our newsroom at www.rail.bombardier.com/en/newsroom.html. Please subscribe to our RSS Feed to receive press releases or follow Bombardier Transportation on Twitter @BombardierRail. Bombardier, INNOVIA and CITYFLO are trademarks of Bombardier Inc. or its subsidiaries. For information Media relations, Egypt Global media relations Emma Brett +49 174 926 2017 +44 7717 700597 [email protected] [email protected] You can also contact one of our worldwide contacts for specific press inquiries. 3 .
Recommended publications
  • EGYPT PROJECT MARKET OUTLOOK: 2021 in PARTNERSHIP with MEED PROJECTS Projects Market Overview 2
    HELD UNDER THE PATRONAGE OF HIS EXCELLENCY DR. MOUSTAFA MADBOULY, PRIME MINISTER OF THE ARAB REPUBLIC OF EGYPT www.thebig5constructegypt.com EGYPT PROJECT MARKET OUTLOOK: 2021 IN PARTNERSHIP WITH MEED PROJECTS Projects Market Overview 2 With the only country in the whole MENA region whose economic growth is projected to be positive despite the Covid-19 impact in 2020 and a pipeline of more than $350bn of projects, Egypt’s projects market is well set to grow strongly over the coming years. In addition, the country’s economic robustness stems from its introduction of the most significant stimulus package outside of the GCC, relatively sustained project activity across sectors. Historical Current Outlook Egypt was the third largest projects market in the MENA There are currently about $435.9bn worth of The pipeline of known planned and un-awarded projects planned or under way in Egypt, making projects in Egypt is $354.8bn making it the third region, with about $14.9bn worth of contract awards in it the third largest in the MENA region biggest market in the MENA region 2020 The largest current sector in terms of work Of this total, $166.2bn is in construction, Between 2016 and 2020, a total of $91.2bn contracts under execution is construction with $35.1bn $64.3bn in transport and $59.1bn in oil and gas were awarded, with an annual average of $18.4bn worth of work underway, followed by transport The pipeline consists of $14.2bn projects in at $17.8bn The largest single sector has historically been construction bidding, $209.5bn in design or FEED, and followed by power and transport The largest single client is Egypt Ministry of $131.1bn under study Housing Utilities & Urban Communities with Project activity has been a bright spot for the The market hit its peak in 2018 with $26.2bn worth of $48bn worth of projects currently under Egyptian economy in recent years and spending contracts awarded construction is expected to continue with foreign funding in Though the impact of Covid-19 pandemic and low oil At $5.7bn of contracts under execution, China the future.
    [Show full text]
  • Agility Emerging Markets Logistics Index 2020
    AGILITY EMERGING MARKETS LOGISTICS 2020 index Business Trade compatibility more War - important than fallout not ever – big wins diminishing for Gulf states China’s potential Recession Risk two thirds of survey respondents expect a global recession in 2020 CONTENTS 4 Foreword 14 The Top 10 14 China 6 Key Findings 14 India 15 UAE 8 The Agility Emerging 16 Indonesia Markets Logistics Index 16 Malaysia 2020 17 Saudi Arabia 12 Recession Risk - the Global 18 Qatar Economy and Emerging Markets in 2020 19 Mexico 19 Thailand 14 Overall Dynamics 19 Turkey 26 6 38 14 2 Contents 20 Domestic Logistics 37 The Emerging Markets Opportunities Index 40 Growth in Emerging Markets 23 International Logistics Opportunities Index 43 The Future of Global Trade 25 Business Fundamentals 50 SMEs Index 53 Megacities 28 The Agility Emerging Markets Logistics Index 56 Appendix 1 Survey 2020 58 Appendix 2 – Emerging 31 Deglobalisation & Trade Barriers: the Future of Markets Trade Lane Data Emerging Market Growth Contents 3 FOREWORD John Manners-Bell, CEO Transport Intelligence This year it could be argued that prospects for emerging markets are more fragile than ever, as politicians and traders prepare to face a range of unpredictable challenges. Since the initiation of the Agility Emerging Markets such as China and India, are still on an upward Logistics Index in 2008, rarely has there been a trajectory, fulfilling many of the criteria which make year in which we have not highlighted economic for successful economies. They are politically and uncertainty, social unrest and political tensions financially stable; have good governance (relative to along, of course, with the many opportunities which other emerging markets); diversified economies and present themselves to investors.
    [Show full text]
  • Alstom Uses KM Tools Smartline Jigs for Construction of Trains for New Cairo Monorail KM Tools Has Designed and Manufactured
    Alstom uses KM Tools SmartLine Jigs for construction of trains for new Cairo Monorail KM Tools has designed and manufactured multiple SmartLine Jigs to enable the efficient assembly of Alstom INNOVIA™ monorail 300 trains for export to the Cairo Monorail project. The new Cairo Monorail is a landmark project for Egypt and a key component of its commitment to lower carbon emissions. Alstom led a consortium of three companies that signed a $4.5 billion contract with Egypt's National Authority for Tunnels to design, construct, operate and maintain the new monorail1. The project includes a 34-mile (54 km) line between the New Administrative City with East Cairo as well as a 26-mile (42 km) stretch between 6th of October City and Giza. Opening is expected in 20232. Running the routes will be 70 automated Alstom INNOVIA™ monorail 300 trains with four cars each3. These are being built at Alstom's famous Litchurch Lane facility in Derby, which has been producing rolling stock since the 19th century. Recently, the facility benefitted from upgrades to its production line, which included the installation of multiple SmartLine Jigs designed and manufactured by Staffordshire-based KM Tools. Neil Harrison, Sales Manager at KM Tools, expands: "We have developed a close working relationship with Alstom, which has been a driving force in our technical involvement at Derby. We have designed, manufactured and installed a multitude of SmartLine Jigs to the company's specification for the Litchurch Lane facility, which assist in the welding and assembly of Aventra trains. We have also manufactured the erection and water test rigs for all Aventra production lines at Derby." This June, the first unit for the Cairo Monorail was completed and ready for delivery, an occasion marked by the visit of UK International Trade Secretary, Rt.
    [Show full text]
  • New Models of Containing the Urban Populations: a Case Study of Cairo
    Urban Planning (ISSN: 2183–7635) 2021, Volume 6, Issue 2, Pages 202–217 DOI: 10.17645/up.v6i2.3880 Article Enclaving the City; New Models of Containing the Urban Populations: A Case Study of Cairo Safa H. Ashoub 1,* and Mohamed W. ElKhateeb 2 1 Chair for Urban Design and Urbanisation, TU Berlin, 10623 Berlin, Germany; E‐Mail: [email protected]‐berlin.de 2 Independent Researcher, Germany; E‐Mail: [email protected] * Corresponding author Submitted: 30 November 2020 | Accepted: 25 March 2021 | Published: 25 May 2021 Abstract This article builds on theoretical foundations from enclave urbanism, authoritarian planning and neoliberal urbanisation to explore contemporary socio‐spatial transformation(s) happening in Cairo, Egypt. Relying on a nationwide road develop‐ ment project, inner‐city neighbourhoods in Cairo are turning into urban enclaves, whereby populations are being separated by a multiplicity of transport‐related infrastructure projects. As these rapid planning processes are occurring, our article aims to explain why these developments are crucial and unique in the context of the post‐Arab Spring cities. We argue that the new road infrastructure is creating a spatially and socially fragmented city and transforming the urban citizenry into a controllable and navigable body. We use an inductive approach to investigate the effects of the new road infrastructure and its hegemonic outcomes on the city. On a conceptual level, we propose that the enclaving of the city is a containment method that has erupted since the mass mobilisations of the Arab Spring. In doing so, we use qualitative analysis to explain empirical evidence showing how the city is being transformed into nodes of enclaves, where communities are getting sep‐ arated from one another via socio‐spatial fault lines.
    [Show full text]
  • 2020Annual Report
    ANNUAL REPORT 2 20 01 02 03 04 Introduction Group Overview Operational Review Management Discussion and Analysis 06 At a Glance 18 Our History 40 MEA 86 Financial Performance 08 Note from the CEO 20 Our Strategy 62 USA 12 Highlights of 2020 22 Our Footprint 74 BESIX 24 Our Brands 32 Construction Materials & Investments 05 Our People 94 Our People 06 07 08 Corporate Governance Sustainable Development Consolidated Financial Statements 108 Board of Directors 130 Corporate Social 112 Corporate Governance Structure Responsibility 116 Risk Management and Controls 124 Risk Management Approach 126 Statement of the Director’s Responsibility TABLE OF CONTENTS 01 INTRODUCTION Orascom Construction PLC is a leading global engineering and construction contractor with operations covering the infrastructure, industrial and commercial sectors and a footprint primarily spanning the Middle East, Africa, and the United States. East Port Said Seawater Treatment Plant Annual Report 2020 | Orascom Construction PLC | 5 Introduction At a Glance Orascom Construction PLC is a leading global engineering and construction contractor with a footprint covering the Middle East, Africa and the United States and operations encompassing the infrastructure, industrial, and commercial sectors. The Group develops and invests in infrastructure opportunities and holds a building materials and facilities management portfolio. Orascom Construction PLC (Orascom or “the Orascom also owns a 50% stake in the Bel- Group”) was launched in 1950 as a local con- gium-based BESIX Group and has investments tractor based in Upper Egypt. Since then, it has in infrastructure and concession projects. Ad- 70 10 Years of contracting Countries where Orascom is grown into a leading global engineering and con- ditionally, it maintains a portfolio of subsidiaries experience currently executing projects struction group with a reputation for excellence and affiliates operating in industries adjacent across its footprint.
    [Show full text]
  • Egypt's 2021 Voluntary National Review
    EGYPT’S 2021 VOLUNTARY NATIONAL REVIEW 1 Copyright @ 2021 The Ministry of Planning and Economic Development 9 St. Salah Salem Street, Nasr City, Cairo, Egypt www.mped.gov.eg All rights reserved. No part of this publication may be reproduced, stored in a retrieval system or transmitted, in any form or by means, electronic, mechanical, photocopying, recording or otherwise, without prior permission. This VNR was made possible with the help of the United Nations Development Programme. 2 Temple of Isis, Island of Philae, Aswan 3 photo: © svstrelkov CONTENTS 01 Page 08 05 Page 23 Opening Statement Progress on Goals & Targets SDG 1: No Poverty SDG 2: Zero Hunger SDG 3: Good Health and Well-being 02 Page 10 SDG 4: Quality Education SDG 5: Gender Equality SDG 6: Clean Water and Sanitation Policy Enabling Environment SDG 7: Affordable and Clean Energy SDG 8: Decent Work and Economic Growth SDG 9: Industry, Innovation and Infrastructure 2.1 Governing framework: Updated Egypt’s Vision 2030 SDG 10: Reduced Inequalities 2.2 Localization of Sustainable Development SDG 11: Sustainable Cities and Communities 2.3 Evidence Based Policy SDG 12: Responsible Consumption and Production SDG 13: Climate Action SDG 14: Life Below Water SDG 15: Life on Land SDG 16: Peace, Justice and Strong Institutions SDG 17: Partnerships For the Goals 03 Page 16 Review Methodology 06 Page 79 A Decade of Development Ahead: Page 19 04 Challenges & Way Forward Towards a More Resilient Economy: Egypt’s Economic Reform Page 85 4.1 Results of the First Phase of the Reform Program 4.2
    [Show full text]
  • UK International Trade Secretary Liz Truss Visits Alstom Derby to Mark Major Milestone in Cairo Monorail Project
    PRESS RELEASE UK International Trade Secretary Liz Truss visits Alstom Derby to mark major milestone in Cairo Monorail project • Major milestone in Cairo Monorail export project • First of 70 units completed on time at Alstom’s Derby, UK factory 25 June 2021 – UK International Trade Secretary, Rt. Hon Liz Truss MP, today visited Alstom’s Derby facility, to mark a major milestone in the Alstom-led Cairo Monorail project. The first Alstom Innovia™ 300 monorail for the project has been completed on time at Alstom’s Derby, UK factory and is now bound for Cairo. The dispatch of the first 4 of 280 fully automated, driverless cars is a major milestone in the Cairo Monorail project which will deliver Egypt’s first two monorail lines, linking New Capital City and 6th of October City to the Greater Cairo area. In August 2019, an Alstom-led consortium also involving Orascom Construction and Arab Contractors signed a €2.7bn contract to design, construct, operate, and maintain the two lines. The project includes a 54km line connecting the New Administrative City with East Cairo and a second 42km line connecting 6th of October City with Giza. Both lines are expected to open in 2023. After the construction phase is completed, the Alstom- led consortium will provide 30 years of operation and maintenance (O&M) services for both lines. The export of the cars from Derby, the UK’s largest train-building factory, is the first UK rolling stock export since the Gautrain project in South Africa, which was completed in 2008. “We are delighted with the progress on this landmark project for Egypt.
    [Show full text]
  • HSBC City Report: Cairo the Essence of Past, Present, and Future
    HSBC City Report: Cairo The essence of past, present, and future HSBC City Report: Cairo 1 2 HSBC City Report: Cairo Contents Cairo’s rapid growth trajectory p.4-7 Key development priorities for Cairo p.8-9 Future plans and ambitions p.10-15 COVID19 and the next cycle of Cairo p.16-18 HSBC a key partner in the sustainable evolution of Cairo p.19-21 HSBC City Report: Cairo 3 The Next Chapter of Cairo 1. Cairo’s rapid growth trajectory Home to more than 20 million residents in 2020, Greater Cairo’s growth has been exponential since 1965 (see Figure 1). Its population has almost tripled between 1980 and 2020. 1 Cairo is projected to grow by more than 35% by 2035, making it one of the world’s fastest growing megacities. 2 Year Population 1965 4,738,000 1975 6,450,000 1985 8,328,000 1995 11,962,000 2005 15,174,000 2015 18,820,000 2025 23,074,000 Figure 1: Population growth in Greater Cairo and maps showing the scale of urban growth 2035 28,504,000 Boosted by targeted national investment, young demographics and a recent suite of economic reforms, Cairo has been a magnet for investment, attracting the largest volume of foreign direct investment between 2003 and 2016 of all African cities. 3 4 HSBC City Report: Cairo Greater Cairo Transport Regulatory Authority created Building of the Opening of Completion of New Asyut Cairo Cairo Metro Administrative highway Line 3 Capital Opening of Cairo Creation Economic Completion of 3 new Metro Line 1 Free Zones metro lines + 2 monorail 1980 1990 2000 2010 2020 2030 Building of the Al New Cairo Wastewater Hirafiyeen neighbourhood Treatment Plant Opening of Cairo Construction for Metro Line 2 New Administrative Capital starts Figure 2: Timeline of major projects and developments in Greater Cairo since 1980 Cairo’s dynamic growth has added to imperatives to plan and invest effectively to reduce growth externalities such as congestion, overcrowding and pollution, and to limit environmental damage and achieve higher-quality living standards for its residents.
    [Show full text]
  • Multimodal Network Planning, Identification of High Capacity Bus Corridor and Park and Ride Facilities
    Multimodal network planning, identification of high capacity bus corridor and park and ride facilities Final Report v3.3 05-09-2019 File Name V Date Project Lead Authors Contributors ° Adham Kalila ° Abdelrahman Melegy Project Start 0.1 29-Oct-2018 Mohamed Hegazy ° Hussein Mahfouz ° Mohamed Daif Inception Report 1 29-Nov-2018 same same same Inception Report 1.1 25-Dec-2018 same same same Interim Report (1) 1 02-Feb-2019 same same same Interim Report (1) 1.1 04-Mar-2019 same same same Interim Report (2) 2 17-Mar-2019 same same same + ° Karim Ghaleb Final Report 3 18-May-2019 same same same Final Report 3.1 17-Jun-2019 same same same Final Report (Update) 3.2 10-Aug-2019 same same same Final Report (Update) 3.3 05-Sep-2019 same same same Final Report v3.3 August ‘19 update Page 0 Title Picture: Bicycle Lane in El-Sheikh Zayed City. A dedicated bus lane and a cyclist are superimposed. Informal Transport is using the dedicated bus lane. (Collage by Transport for Cairo) Introduction Error! Bookmark not defined. Purpose of This Study 8 Scope of the Study 8 Geographical boundary of corridors and park and ride facilities identification: 8 Planning and policy outputs 9 Methodology of network planning 12 The user experience within urban mobility 12 Datasets: Transport Supply and Transport Demand 13 Transport Supply 13 Background Box 1: General Transit Feeds Standard (GTFS), the mp3 of public transit. 13 Future Transport Supply 14 Cities As Labor Markets - Models for Transport Demand 14 Opportunities (Where to) 14 Population (Where from) 15 Ridership - Ride Hailing Data 15 Background Box 2: What constitutes good Public Transport? A definition by Jarrett Walker.
    [Show full text]
  • AUC Knowledge Fountain Lﻟﺒﻌﺪ The
    American University in Cairo AUC Knowledge Fountain Papers, Posters, and Presentations 2021 البعد /The Social Dimension in Transportation Planning االجتماعي في نظام تخطيط النقل العام في مصر Ahmed Hamdy [email protected] Fatma Rashad [email protected] Lama Atef [email protected] Follow this and additional works at: https://fount.aucegypt.edu/studenttxt Part of the Public Affairs Commons, Public Policy Commons, Transportation Commons, and the Urban Studies Commons Recommended Citation البعد /Hamdy, Ahmed; Rashad, Fatma; and Atef, Lama, "The Social Dimension in Transportation Planning .Papers, Posters, and Presentations. 85 .(االجتماعي في نظام تخطيط النقل العام في مصر" (2021 https://fount.aucegypt.edu/studenttxt/85 This Other is brought to you for free and open access by AUC Knowledge Fountain. It has been accepted for inclusion in Papers, Posters, and Presentations by an authorized administrator of AUC Knowledge Fountain. For more information, please contact [email protected]. The Social Dimension in Transportation Planning A Policy Paper Prepared by* Ahmed Hamdy Fatima Rashad Lama Atef Under the supervision of: Dr. Aisha Saad Fellow of the Program on Corporate Governance Harvard Law School June 2021 *Names are listed in alphabetical order* Published by: The Public Policy HUB The School of Global Affairs and Public Policy (GAPP) The American University in Cairo (AUC) Project Director: Dr. Laila El Baradei, Professor of Public Administration Project Co-Director: Dr. Shahjahan Bhuiyan, Associate Professor of Public Administration & Associate Dean of Undergraduate Studies & Administration Senior Project Manager: Mohamed Kadry, MPP Senior Project Specialist: Waleed Wagdy El-Deeb Senior Communication & Outreach Specialist: Ghadeer Ahmed Ali «The opinions in the paper are those of the authors and do not reflect AUC policies or views.
    [Show full text]