Connecting to a Net Zero Future Connecting to a net zero future Exploring the role of interconnectors in the transition to net zero June 2021 Connecting to a net zero future June 2021 | National Grid Contents 4 Route to net zero 6 Who we are and what we do 8 This publication in 60 seconds 10 How the energy system is changing 12 What are interconnectors and why are they needed? 14 How interconnectors work 18 How interconnectors benefit consumers 20 The power of now 22 Unlocking the potential of clean energy 24 A partnership across Europe 26 Looking to the future 2 3 National Grid | June 2021 Connecting to a net zero future Connecting to a net zero future June 2021 | National Grid North Sea Link: 1.4GW Under construction The route to net zero Live 2021 GB and Norway By 2024, National Grid’s flexible Viking Link: 1.4GW interconnector capacity will Under construction Live 2023 provide enough energy to power GB and Denmark eight million homes. Electricity interconnectors have an France, and the Netherlands. A further BritNed: 1GW important role to play in a radical shift three projects are under construction Operational Live 2011 to the way we produce and use energy. and many more are in development. GB and Netherlands Acting like international clean energy super-highways, they can stretch for Interconnection is in many ways the perfect Nemo: 1GW Operational hundreds of miles and cross borders, technology to integrate renewable energy and Live 2019 helping power to flow back and forth ensure a secure, affordable and sustainable GB and Belgium between Great Britain and neighbouring transition to a cleaner energy system. IFA: 2GW countries. This flexibility will be vital as By linking Britain to neighbouring countries, Operational 7.8 GW IFA2: 1GW Live 1986 Britain’s reliance on renewable sources interconnectors can import cheaper clean Operational GB and France of energy grows. energy when it is needed, while exporting Interconnector Live 2021 excess power - so that both Britain and its capacity already GB and France The UK Government has committed to neighbours have access to a broader and operational or under achieve net zero carbon emissions by 2050. more flexible supply of electricity. In December 2020, ministers pledged that construction, jointly in the next decade the UK will cut its carbon We know that increasingly large volumes owned by National Grid. emissions by 68% of 1990 levels. Meanwhile, of renewable energy – particularly offshore the proposed European Climate Law also wind – will need to connect to the grid includes a net zero target by 2050. So, how in the coming years to achieve net zero. do we reach these ambitious targets? Interconnectors can provide a way to achieve offshore wind connections at scale. Interconnectors, high voltage transmission cables that move electricity between In this publication we look at the role of countries, are already making a significant interconnectors now and in the future, contribution to the energy transition. explaining how the technology, the market and the regulation works. We also explore The technology is operating today and how interconnectors are already delivering delivering real benefits for consumers significant benefits for consumers, and how across the UK and Europe. A total of this trend is set to continue with increased six interconnectors currently link the interconnector capacity planned between Great Britain electricity grid to Northern GB and Europe. Ireland, the Republic of Ireland, Belgium, 4 5 National Grid | June 2021 Connecting to a net zero future Connecting to a net zero future June 2021 | National Grid “National Grid has a critical role to play in helping to accelerate Who we are towards a cleaner future. Tackling climate change and and what we do reaching net zero are top of our agenda. Our interconnector projects are critical to this, enabling us to deliver a cleaner About National Grid About National Grid Ventures and smarter energy system National Grid lies at the heart of a transforming National Grid Ventures develops, builds, for consumers both in the energy system, spanning the UK and the US. operates, and invests in technologies Our businesses supply gas and electricity, that decarbonise our economy and UK and in Europe.” safely, reliably, and efficiently to millions society. We are the competitive division John Pettigrew, Chief Executive, of customers and communities. We drive of National Grid, operating separately from National Grid change through engineering innovation and the company’s core regulated businesses. by incubating new ideas with the power to revolutionise our industry. We have a diverse portfolio of low-carbon and renewable energy projects in the UK, Europe As the world changes to embrace cleaner and US stretching from offshore transmission energy and businesses shift to operate in to battery storage, wind, and solar power. a more responsible way, we are leading We also have significant experience that charge. in developing and operating sub-sea electricity interconnectors. We are focused on finding ways to decarbonise the energy system; from building interconnectors to allow the UK to share clean energy with our neighbours in Europe, to investing in renewable energy generation in the US. We connect people to the energy they need to live their lives. We continually strive to find a better way. We Bring Energy to Life. 6 7 National Grid | June 2021 Connecting to a net zero future Connecting to a net zero future June 2021 | National Grid This publication in 60 seconds Read our 60-second summary of the role that interconnectors play today and how they will support the journey to net zero. Managing the energy transition A challenging decade ahead The UK is committed to net zero emissions Achieving net zero will require some by 2050. Meeting that target means dramatic shifts in how we produce transforming our energy system to one and use energy. The UK Government powered by zero-carbon generation. targets building 40 GW of offshore wind Interconnectors have an important part to capacity by 2030. Connecting large volumes play in this ambition by ensuring zero-carbon of renewable generation to the grid is a generation can be moved from where it is challenge and requires us to think differently. plentiful to where it is needed most. A connected future Interconnectors today Interconnectors can help to connect large Interconnectors give Great Britain access volumes of offshore wind by acting as a hub to clean energy from elsewhere in Europe for clean energy connections. National Grid and allow us to export excess clean power. Ventures is developing a new generation of They are helping to create a cleaner, more multi-purpose interconnector. These innovative secure, and more affordable energy system projects aim to connect offshore wind projects that benefits consumers. Between 2020 and here in Great Britain and to mainland Europe. 2030, we estimate our interconnectors will Multi-purpose interconnectors reduce the help Britain to prevent 100 million tonnes number of onshore connections needed of carbon emissions.* and lessen the impact of infrastructure on coastal communities. *This is an internal calculation based on pan-European modelling of hourly flows through interconnectors, then assuming that these flows were replaced by CCGTs in the UK. 8 9 National Grid | June 2021 Connecting to a net zero future Connecting to a net zero future June 2021 | National Grid How the energy system is changing The energy system is shifting ever further away from a reliance on fossil fuels towards renewables and a broader mix of zero-carbon generation, including wind and solar as well as nuclear power. Interconnectors are helping to enable this transition. • The way we produce and consume energy is changing rapidly. In 2019, zero-carbon sources delivered 48.5% of Britain’s electricity. • In 2019, zero-carbon generation outstripped fossil fuels over a 12-month period for the first time. • How did this happen? Via a combination of wind farms, solar, nuclear energy and clean power imported via interconnectors. • To achieve the UK’s net zero target, the 6th Carbon Budget Report by the Climate Change Committee published in December 2020 recommends growing offshore wind from a 40 GW ambition in 2030 to at least 100 GW by 2050. • That’s 10 times the offshore wind Britain has operational today. • A greater role for renewables means more intermittent generation and volatility on the system. When the sun shines and the wind blows, there could be excess generation available. When the weather is cloudy and calm, the opposite could be true. 10 11 National Grid | May 2021 Connecting to a net zero future Connecting to a net zero future June 2021 | National Grid What are interconnectors and why are they needed? Interconnectors act like super-highways for clean energy. They are high-voltage transmission cables that efficiently transmit electricity between countries, from where it is produced to where it is most needed. For Great Britain, sub- sea cables enable large volumes of zero-carbon generation to be imported or exported over long distances without significant energy loss along the way. 12 13 National Grid | June 2021 Connecting to a net zero future Connecting to a net zero future June 2021 | National Grid How interconnectors work The technology (HVDC). At either end, a converter station connect Great Britain to Denmark features a Interconnector technology has been transforms this to and from the alternating 765km cable – the longest of its type in the operating successfully for decades, so current needed to run the grid that supplies world. The project is due to be completed at it is well proven and reliable. our homes and businesses. This conversion the end of 2023. is needed to make sure power can be Sub-sea cables link the Great Britain transmitted over long distances via Currently, all existing and planned sub-sea transmission network to other countries interconnectors without significant losses.
Recommended publications
  • Gewijzigde Regels Veilingen Lange Termijn Capaciteit Elektriciteit Britned
    Autoriteit Consument & Markt Besluit Openbaar Ons kenmerk: ACM/DE/2015/206451_0V Zaaknummer: 15.0209.27 BESLUIT Besluit van de Autoriteit Consument en Markt op grond van artikel 5, zesde lid, van de Elektriciteitswet 1998. Autoriteit Consument & Markt Besluit Openbaar Inhoudsopgave 1 Inleiding 3 2 Procedure van totstandkoming van dit besluit 5 2.1 Terinzagelegging en zienswijzen 5 2.2 Notificatierichtlijn 5 3 Wettelijk kader 6 4 De voorstellen 7 4.1 Aanleiding voorstellen en gevolgde procedure 7 4.1.1 EU HAR 7 4.1.2 BritNed Access Rules 8 4.2 Toelichting op de voorgestelde wijzigingen 8 4.2.1 EU HAR 8 4.2.2 BritNed Access Rules 13 5 Beoordeling 14 5.1 Reactie op consultatie 14 5.2 EU HAR 15 5.2.1 Datum inwerkingtreding 15 5.2.2 Zekerheden en kredietlimiet 16 5.2.3 Minimumprijs 16 5.2.4 Beperking van transmissierechten 16 5.2.5 Conclusie 17 5.3 BritNed Access Rules 17 5.3.1 Conclusie 17 6 Dictum 18 Autoriteit Consument & Markt Besluit Openbaar 1 Inleiding 1. BritNed Development Limited (hierna: BritNed) is exploitant van een interconnector voor het transport van elektriciteit tussen Nederland en Groot-Brittannie. De minister van Economische Zaken heeft op 27 juni 2007 ontheffing verleend aan BritNed en TenneT TSO B.V. voor de BritNed interconnector. 2. In dit besluit wordt het verzoek van BritNed om goedkeuring van de volgende documenten beoordeeld: 1) de Allocation Rules for Forward Capacity Allocation (hierna: EU HAR); 2) Annex 1 List of Bidding Zone borders and/or their subsets to which the Allocation Rules apply including information on type of allocated Long Term Transmission Rights (hierna: Annex 1); 3) Annex 13 to the Harmonised Allocation Rules Border specific annex: BritNed lnterconnector (hierna: Annex 13); en 4) de gewijzigde BritNed Access Rules.
    [Show full text]
  • Annual Report and Accounts
    2010/11 Annual Report and Accounts 2010/11 Annual Report and Cautionary Statement performance against regulatory targets This document comprises the Annual and standards and against our peers Report and Accounts for the year ending with the aim of delivering stakeholder Accounts 31 March 2011 for National Grid and its expectations regarding costs and subsidiaries. It contains the Directors’ effi ciency savings, including those related Report and Financial Statements, to restructuring and internal transformation together with the Independent Auditor’s projects; and; customers and counterparties Report thereon, as required by the failing to perform their obligations to us National Grid plc Companies Act 2006. The Directors’ and our arrangements with the Long Island Report, comprising pages 10 to 108, Power Authority not being renewed. Other has been drawn up in accordance with factors that could cause actual results the requirements of English law, and to differ materially from those described liability in respect thereof is also governed in this document include fl uctuations by English law. In particular, the liability in exchange rates, interest rates and of the Directors for these reports is solely commodity price indices; restrictions to National Grid. in our borrowing and debt arrangements, funding costs and access to fi nancing; This document also contains certain our effective rate of tax; National Grid’s statements that are neither reported status as a holding company with no fi nancial results nor other historical revenue generating operations of its own; information. These statements are infl ation; seasonal fl uctuations; the future forward-looking statements within the funding requirements of our pension meaning of Section 27A of the Securities schemes and other post-retirement Act of 1933, as amended, and Section benefi t schemes; the loss of key 21E of the Securities Exchange Act of personnel or the ability to attract, train 1934, as amended.
    [Show full text]
  • IFA2 Latest: Leading Consultants Arcadis Appointed to Complete Airfield Assessment at Daedalus
    Investors Home Press Releases Media Contacts Home / Press Releases / IFA2 latest: Leading consultants Arcadis appointed to complete airfield assessment at Daedalus Independent compatibility study announced by National Grid IFA2 Ltd for proposed project at Daedalus site 28 Jul 2016 Leading consultants Arcadis appointed to help ensure IFA2 energy project can coexist with airport operations at the Daedalus site Assessment commissioned by National Grid IFA2 Ltd in conjunction with land owner Fareham Borough Council Assessment will be carried out between July and September 2016 Expert consultants have been hired to help ensure that proposed cross channel energy link IFA2 can operate alongside the Solent Airport at Daedalus. National Grid IFA2 Ltd, in conjunction with land owner Fareham Borough Council have appointed leading consultants Arcadis to carry out an independent assessment looking at how the IFA2 electricity interconnector would operate alongside the Solent Airport at the Daedalus site in Lee-on-the-Solent, Hampshire. National Grid IFA2 Ltd is proposing to lease land at Daedalus for the British part of its proposed IFA2 project, which would help boost access to safe, reliable, affordable energy supplies by providing a new energy link with France. Arcadis have been commissioned to carry out the assessment to ensure that the interconnector will be able to coexist with site owner Fareham Borough Council’s Vision for Daedalus and won’t adversely affect operations at the airport. Arcadis will start work on their assessment this month with the report due to be completed in September 2016. Morris Bray, from National Grid IFA2, who helped commission the assessment, said: “This independent assessment should help provide reassurance that our proposals won’t affect Fareham Borough Council’s Vision for Daedalus including its continued use as an operational airport.” Stef Scannali, Arcadis Head of Safety Risk Management, said: “We’re delighted to be supporting National Grid IFA2 Ltd and Fareham Borough Council on this vital project.
    [Show full text]
  • A Holistic Framework for the Study of Interdependence Between Electricity and Gas Sectors
    November 2015 A holistic framework for the study of interdependence between electricity and gas sectors OIES PAPER: EL 16 Donna Peng Rahmatallah Poudineh The contents of this paper are the authors’ sole responsibility. They do not necessarily represent the views of the Oxford Institute for Energy Studies or any of its members. Copyright © 2015 Oxford Institute for Energy Studies (Registered Charity, No. 286084) This publication may be reproduced in part for educational or non-profit purposes without special permission from the copyright holder, provided acknowledgment of the source is made. No use of this publication may be made for resale or for any other commercial purpose whatsoever without prior permission in writing from the Oxford Institute for Energy Studies. ISBN 978-1-78467-042-9 A holistic framework for the study of interdependence between electricity and gas sectors i Acknowledgements The authors are thankful to Malcolm Keay, Howard Rogers and Pablo Dueñas for their invaluable comments on the earlier version of this paper. The authors would also like to extend their sincere gratitude to Bassam Fattouh, director of OIES, for his support during this project. A holistic framework for the study of interdependence between electricity and gas sectors ii Contents Acknowledgements .............................................................................................................................. ii Contents ...............................................................................................................................................
    [Show full text]
  • The Political Economy of Energy Transitions
    The Political Economy of Energy Transitions “Case studies of natural gas and offshore wind in the Netherlands and the United Kingdom” Student: Steven Blom (s4261690) Project: Master thesis Public Administration Program: Comparative Public Administration (COMPASS) University: Radboud University, Nijmegen, the Netherlands Faculty: Nijmegen School of Management Thesis supervisor Tutors: Dr. J. (Johan) De Kruijf Prof. dr. S. (Sandra) van Thiel Research assignment Client: Dr.ir. R.P.J.M. (Rob) Raven Position: Professor Institutions and Societal Transitions Department: Innovation studies department of Utrecht University Former position: Industrial Engineering & Innovation Sciences - Eindhoven University of Technology [TU/e] th Date: August 11 , 2015 1 Table of contents Abbreviations & acronyms ..................................................................................................................... 5 Prologue .................................................................................................................................................. 6 1. Introduction ........................................................................................................................................ 7 1.1 Introduction ................................................................................................................................... 7 1.2 Chapter’s structure ........................................................................................................................ 7 1.3 Problem description .....................................................................................................................
    [Show full text]
  • Reforming the Electricity Market
    HOUSE OF LORDS Select Committee on Economic Affairs 2nd Report of Session 2016–17 The Price of Power: Reforming the Electricity Market Ordered to be printed 8 February 2017 and published 24 February 2017 Published by the Authority of the House of Lords HL Paper 113 Select Committee on Economic Affairs The Economic Affairs Committee was appointed by the House of Lords in this session “to consider economic affairs”. Membership The Members of the Select Committee on Economic Affairs are: Baroness Bowles of Berkhamsted Lord Layard Lord Burns Lord Livermore Lord Darling of Roulanish Lord Sharkey Lord Forsyth of Drumlean Lord Tugendhat Lord Hollick (Chairman) Lord Turnbull Lord Kerr of Kinlochard Baroness Wheatcroft Lord Lamont of Lerwick Declaration of interests See Appendix 1. A full list of Members’ interests can be found in the Register of Lords’ Interests: http://www.parliament.uk/mps-lords-and-offices/standards-and-interests/register-of-lords- interests Publications All publications of the Committee are available at: http://www.parliament.uk/hleconomicaffairs Parliament Live Live coverage of debates and public sessions of the Committee’s meetings are available at: http://www.parliamentlive.tv Further information Further information about the House of Lords and its Committees, including guidance to witnesses, details of current inquiries and forthcoming meetings is available at: http://www.parliament.uk/business/lords Committee staff The staff who worked on this inquiry were Ayeesha Waller (Clerk), Ben McNamee (Policy Analyst), Oswin Taylor (Committee Assistant) and Dr Aaron Goater and Dr Jonathan Wentworth of the Parliamentary Office of Science and Technology. Contact details All correspondence should be addressed to the Clerk of the Economic Affairs Committee, Committee Office, House of Lords, London SW1A 0PW.
    [Show full text]
  • Interconnectors
    Connecting for a smarter future How interconnectors are making energy better for consumers Benefiting customers today Stronger links for and tomorrow a smarter future Interconnectors are making energy more secure, affordable Interconnectors are transmission cables that allow and sustainable for consumers across Great Britain (GB) electricity to flow freely between markets. They are at and Europe. And they are set to deliver much more. the heart of the transition to a smarter energy system. Tomorrow’s energy will be cleaner, more flexible and more responsive to the individual needs of consumers. To efficiently deliver the energy system of tomorrow, European countries are working together to maximise the potential of technologies £3 billion investment like battery storage, wind and solar power. Interconnectors Since 2014, over £3 billion has been invested in 4.4 GW of new enable smarter energy systems to react quickly to changes interconnector capacity, which will more than double the existing in supply and demand, ensuring renewable energy flows capacity between GB and continental Europe by the early 2020s. from where it is being generated in large quantities, to where it is needed most. Consumers benefit from interconnectors because they open the door to cheaper energy sources and Power for 11 million homes help GB build a smarter energy system. 4.4 GW of capacity provides access to enough electricity to power National Grid recognises 11 million homes. While the future relationship between GB and the EU the challenges that remains unclear, we are confident that we will continue Brexit poses. However, to trade electricity across interconnectors. It is in the best interests of all consumers for GB to keep working closely we remain confident 9.5 GW more that trade in electricity There is potential to increase the benefits to consumers through a with the EU to build an energy system that makes the best further 9.5 GW of interconnectors that will help deliver a smarter, more use of all our energy resources.
    [Show full text]
  • Nautilus Interconnector April 2021 I National Grid
    Nautilus Interconnector April 2021 I National Grid Nautilus Interconnector Proposed by National Grid Ventures April 2021 1 National Grid I April 2021 Nautilus Interconnector Nautilus Interconnector April 2021 I National Grid Introducing Nautilus North Sea Link: Interconnector 1.4 GW Under construction Live 2021 GB and Norway At National Grid Ventures (NGV), we are bringing National Grid Ventures (NGV) forward plans for Nautilus, a new interconnector Proposals for Nautilus are being developed by in East Suffolk that could supply enough NGV and our respective joint venture partner in electricity to power around 1.4 million UK Belgium, Elia. Viking Link: 1.4 GW homes. Under construction Nautilus could connect 1.4 gigawatts (GW) of NGV is the competitive division of National Grid. It Live 2023 offshore wind to the transmission systems of Great operates outside of National Grid’s core regulated GB and Denmark Britain and Belgium through a sub-sea electricity businesses in the UK and US where it develops cable called an interconnector. The project would and operates energy projects, technologies and include underground cabling works and onshore partnerships to make energy cleaner, more secure infrastructure, which would be located in East Suffolk. and more affordable for consumers. We are also bringing forward proposals for a second There are three distinct business entities under the BritNed: 1 GW interconnector in East Suffolk, currently known as umbrella of National Grid plc in the UK, as detailed Operational EuroLink. Both projects are early in their respective in the diagram below, all with different roles and Live 2011 feasibility stages, and EuroLink is currently less responsibilities.
    [Show full text]
  • November 2018 Litigation and Dispute Resolution Review
    November 2018 Litigation and Dispute Resolution Review Contents Antitrust 2 First UK follow-on cartel damages ruling BritNed Development Ltd v ABB AB and ABB Ltd Crime 4 Cybercrime – remedies against unknown hackers CMOC Sales & Marketing Ltd v Person Unknown & 30 ors Bank ordered to disclose suspicious activity reports to customer Lonsdale v National Westminster Bank [2018] EWHC 1843 (QB), 18 July 2018 Data Protection 9 Employer vicariously liable for rogue employee’s data breach WM Morrison Supermarkets PLC v Various Claimants Equity 12 Secured creditor has equitable duty to perfect, but not necessarily to protect, security for benefit of a guarantor General Mediterranean Holding SA.SPF (aka General Mediterranean Holding SA) v Qucomhaps Holdings Ltd, William James Harkin (& anr) Privilege 14 In-house counsel emails not privileged Glaxo Wellcome UK Ltd (t/a Allen & Hanburys) & anr v Sandoz Ltd & ors Public law 17 Decisions of a private body acting as a “skilled person” cannot be judicially reviewed R (Holmcroft Properties Ltd) v KPMG LLP & ors Sanctions 19 Amy Edwards Mere risk of exposure to sanctions insufficient for underwriters to avoid liability Litigation – Senior Professional Mamancochet Mining Ltd v Defendants Managing Agency Ltd Support Lawyer – London Sovereign immunity 20 Contact Assets owned by a state-owned enterprise not immune from enforcement Tel +44 20 3088 2243 Botas Petroleum Pipeline Corporation v Tepe Insaat Sanayii AS [email protected] allenovery.com 1 Antitrust FIRST UK FOLLOW-ON CARTEL DAMAGES RULING BritNed Development Ltd v ABB AB and ABB Ltd [2018] EWHC 2616 (Ch), 9 October 2018 The UK High Court ordered Swiss engineering company ABB to pay Anglo-Dutch power-grid joint venture BritNed just over EUR11.5 million in damages in a follow-on action relying on the European Commission’s underground and undersea power cables cartel decision.
    [Show full text]
  • 4Th Regional Initiatives Annual Conference Europe's Energy Policy Objectives and Regional Market Integration
    4th Regional Initiatives Annual Conference Europe’s energy policy objectives and regional market integration – the way forward A joint conference by the European Commission and ERGEG 8 July 2010 First Name Last Name Organisation Country Dafydd Ab Iago Europolitics Europe Joana Abreu Jackson Dods EU Monitoring Europe Kai Adam BDEW - Bundesverband der Energie- und Wasserwirtschaft e.V Germany Ignacio Aguado Union Fenosa Gas Spain Ana Aguado DG ENER, European Commission Europe Matthew Allan Royal Dutch Shell Netherlands Cemil Altin EDF Trading/EFET UK Valentina Andrejeva PUC Latvia Chryssoula Argyriou DG ENER, European Commission Europe Paul Auckland National Grid plc UK Martina Beitke CEFIC Europe Michela Beltracchi Ofgem Spain Inge Benaerts DG ENER, European Commission Europe Sylvia Beyer DG ENER, European Commission Europe Charlotte Blum Argus Media Europe Oliver Bornkamm Bundesministers für Wirtschaft und Technologie Germany Simon Bradbury Pöyry Energy Consulting Norway José Braz ERSE Portugal Stanislav Brejcha Ministry of Industry and Trade Czech Republic Anna Butenko KEMA Nederland, Gas Consulting Services Netherlands Francesco Cariello ERI TF, ERGEG Italy Dimitrios Chaniotis ENTSO-E Europe Tim Collins CEER Secretariat Europe Jean-François Conil-Lacoste EuroPEX Europe Steve Coomber BritNed Netherlands Willem Coppoolse GDF SUEZ France María Teresa Costa Campí CNE Spain Eugene Coughlan CER Ireland Manuel Coxe EuroPEX Europe Martin Crouch Ofgem GB Jacques de Jong Clingendael International Energy Programme (CIEP) Netherlands Maria Angeles
    [Show full text]
  • North Sea Link
    NSL December 20 Update North Sea Link (NSL), a joint venture between National Grid and Statnett, is a 1,400 MW HVDC interconnector that will directly connect the electricity systems of the UK and Norway for the first time when it goes live in Q4 2021. Over the past few months, construction teams on both sides of the link have been working tirelessly to ensure that the project remains on track: UK- Blyth At Blyth, there are a number of key milestones which have already been achieved including the Substation connection works and all HVDC connections from the Converter Station to the landfall. At this very moment, HV equipment is being installed at site at a rapid rate of progress. With only a few key construction milestones left at Blyth, it is forecasted that the Converter Station here shall be completed in Spring 2021. Once complete, the Converter Station will undertake a series of testing and commissioning before go-live later next year. Norway – Kvilldal Progress in Kvilldal mirrors that in Blyth, with the connection to the Substation now being complete. This has allowed Kvilldal to complete their Statcom test program last month, ahead of schedule. As we move into 2021, focus turns to cable installation across the North Sea, especially the remaining sections towards the Norwegian border. Access Rules Consultation Thank you to all who responded to the recent Access Rules Consultation which closed on 1st December 2020 (see here). Moving forward, we are now preparing a consultation report for Ofgem which describes the responses that we’ve received and how we propose to deal with these.
    [Show full text]
  • MEDOW Training Event
    MEDOW Training Event 10/12/2013 BritNed converter station in Kent Prepared by : Gen Li and Tibin Joseph As a MEDOW training event, we visited the HVDC converter station of BritNed in Kent on 10th December. It is an updated one compared to the UK-France HVDC cross-channel converter station at National Grid’s Sellindge Substation, we visited in the morning that day, because it was fully operated in the April 2011 but the latter one was in 1986. The electrical devices and technologies are more advanced for the rapid and ongoing development of the electrical power system. Figure 1 shows the schematic diagram of this project. Figure 1 The design concept of the BritNed project [1] The basic principle of this system is: the AC power from Netherlands will be converted to DC power at the converter station in Maasvlakte, Netherlands, then the DC power will be transmitted through the submarine HVDC cables to the Kent converter station, at last the DC power will be inverted to AC power and transmitted into the Great Britain power grids. The construction of this subsea interconnector required careful planning and precise execution. BritNed worked with its construction partners as one single team to safely design, manufacture and install the BritNed Interconnector to high standards of civil, marine and electrical engineering. The construction comprises three major components: 1) Manufacturing of the subsea cable and corresponding cable installation; 2) Civil construction of two converter stations; 3) Manufacturing and installation of the required electrical equipment and components in the converter stations [1]. During the visiting, the operators there took us around the main equipment, such as the huge Siemens single-phase power transformer, the LCC converters and circuit breakers in the converter halls and filter yard installed in this station.