Member Organisations for the Smart Grid Regional Group EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR ENERGY Directorate B – Internal Energy Market Unit B.1 – Networks & Regional Initiatives Member organisations for the Smart Grid Regional Group Member State Type Organisation The European Network of Transmission System Association Operators for Electricity (ENTSO-E) The Agency for the Cooperation of Energy Regulators (ACER) European Commission - Directorate-General for Energy (ENER) AUSTRIA Ministry Federal Ministry of Science Research and Economy NRA Energie Control Austria (E-Control) TSO Austrian Power Grid AG (APG) Company VERBUND AG BELGIUM Ministry Ministry of Economy DG Energy Commission de Régulation de l'Electricité et du Gaz / NRA Commission for Electricity and Gas Regulation (CREG) TSO ELIA BULGARIA Ministry Ministry of Economy and Energy NRA Energy and Water Regulatory Commission (EWRC) Electroenergien Sistemen Operator / Electricity TSO System Operator (ESO) CROATIA Ministry Croatian Ministry of Economy Croatian Energy Regulatory Agency / Hrvatska NRA energetska regulatorna agencija (HERA) Commission européenne/Europese Commissie, 1049 Bruxelles/Brussel, BELGIQUE/BELGIË - Tel. +32 22991111 HOPS, d.o.o. / Croatian Transmission System TSO Operator Ltd. (HOPS) DSO HEP-Operator distribucijskog sustava CYPRUS Ministry Ministry of Energy, Commerce, Industry and Tourism NRA Cyprus Energy Regulatory Authority (CERA) Transmission System Operator Cyprus (Cyprus TSO TSO) CZECH Ministry Ministry of Industry and Trade REPUBLIC NRA Czech Energy Regulatory Office (ERO) TSO Czech transmission system ČEPS a.s. (ČEPS) DSO E.ON Distribuce, a.s. DENMARK Ministry Ministry of Energy, Utilities and Climate Energitilsynet - Danish Energy Regulatory Authority NRA (DERA) TSO Energinet.dk ESTONIA Ministry Ministry of Economic Affairs and Communication Konkurentsiamet - Estonian Competition Authority - NRA Energy Regulatory Dept (ECA) TSO Elering AS (ELERING) FINLAND Ministry Ministry of Employment and the Economy NRA Energiavirasto - Energy Authority (EV) TSO Fingrid Oy Ministère de l'Ecologie, du Développement Durable FRANCE Ministry et de l'Energie Commission for Energy Regulation / Commission de NRA Régulation de l'Energie (CRE) TSO Reseau de Transport d'Electricité (RTE) DSO Electricité Réseau de France (ERDF) 2 GERMANY Ministry Federal Ministry for Economic Affairs and Energy Federal Network Agency for Electricity, Gas, NRA Telecommunications, Posts and Railway (Bundesnetzagentur - BNetzA) TSO 50Hertz Transmission GmbH (50Hertz) TSO Amprion GmbH (Amprion) TSO TenneT TSO GmbH (TenneT DE) TSO TransnetBW GmbH (TransnetBW) GREECE Ministry Ministry of Economy Development and Tourism Ρυθμιστική Αρχή Ενέργειας /Regulatory Authority for NRA Energy (PAE / RAE) Independent Power Transmission Operator S.A. TSO (IPTO) / ADMIE/ ΑΔΜΗΕ HUNGARY Ministry Ministry of National Development Magyar Energetikai és Közmű-szabályozási Hivatal NRA (MEKH) Hungarian Independent Transmission Operator TSO Company Ltd (MAVIR) Department of Communications, Energy & Natural IRELAND Ministry Resources NRA Commission for Energy Regulation (CER) TSO EirGrid plc (EirGrid) DSO SONI ITALY Ministry Ministry of economic development NRA Autorità per l'Energia Elettrica e il Gas (AEEGSI) TSO TERNA DSO ENEL DISTRIBUZIONE LATVIA Ministry The Ministry of Economics of the Republic of Latvia 3 Sabiedrisko pakalpojumu regulēšanas komisija / NRA Public Utilities Commission (PUC) Latvian independent system operator - AS TSO Augstprieguma tikls (Augstsprieguma tÏkls) LITHUANIA Ministry Ministry of Energy of Lithuania The National Control Commission for Prices and NRA Energy TSO Litgrid Ministry of Economy and External Trade - General LUXEMBOURG Ministry Directorate for Energy / Ministère de l'Économie Luxembourg NRA Institut Luxembourgeois de Régulation (ILR) TSO Creos Luxembourg S.A. (CREOS) MALTA Ministry The Energy and Water Agency NRA Regulator for Energy & Water Services (REWS) NETHERLANDS Ministry Ministry of Economic Affairs NRA Authority for Consumers and Markets (ACM) TSO TenneT TSO B.V. (TenneT NL) POLAND Ministry The Ministry of Energy Urząd Regulacji Energetyki / Energy Regulatory NRA Office (URE / ERO) TSO Polskie Sieci Elektroenergetyczne S.A (PSE) PORTUGAL Ministry Directorate-General for Energy and Geology (DGGE) Entidade Reguladora dos Serviços Energéticos NRA (ERSE) TSO Redes Energéticas Nacionais (REN) Ministry of Economic Affairs, Department of Energy / ROMANIA Ministry Ministerul Economiei, Departamentul pentru Energie NRA Autoritatea Națională de Reglementare în domeniul Energiei / Romanian Energy Regulatory Authority 4 (ANRE) TSO Transelectrica SLOVAKIA Ministry Ministry of Economy (MHSR) NRA Regulatory Office for Networks Industries (URSO) Slovenska elektrizacna prenosova sustava, a.s. / TSO SEPS DSO Západoslovenská distribučná a.s. SLOVENIA Ministry Ministry of Infrastructure - ENERGY DIRECTORATE Energy Agency of the Republic of Slovenia - NRA Electricity department (AGEN) TSO ELES, d.o.o. SODO electricity distribution system operator, d. o. DSO o. (SODO d. o. o.) SPAIN Ministry Ministry of Industry, Energy and Tourism National Commission of Markets and Competence NRA (CNMC) TSO Red Eléctrica de España (REE) SWEDEN Ministry Ministry of the Environment and Energy Energimarknadsinspektionen / Swedish Energy NRA Markets Inspectorate (EI) TSO Swedish National Grid (Svenska Kraftnät) UNITED Department of Energy and Climate Change (DECC), Ministry KINGDOM UK NRA Office of Gas and Electricity Markets (Ofgem) TSO National Grid TSO/DSO ESB NETWORKS TSO/DSO ELECTRICITY Northern Ireland 5 .
Recommended publications
  • PSI Energy EE High-Quality Control Technology for the Energy Market PSI Energy EE
    PSI Energy EE High-Quality Control Technology For The Energy Market PSI Energy EE Contents PSI Energy EE - Partner in energy technology .........4 Our projects - our pride ..................................6 The Products PSIcontrol - The control system ..................................10 PSIcommand - Effective workforce management .................. 18 PSIpassage - Systems for deregulated energy markets ...........22 PSIxchange - Secure connection with company IT in PSIcontrol systems ...............................26 The Divisions - our references TSO - Applications for transmission networks ...........30 DSO - Control technology for regional distribution networks .................40 PSIcontrol-Multinet - Control technology for combined energies ...... 100 PSIcontrol - providing control technology for Industrial networks ............................126 PSIcontrol - Control systems for operating rail electrification networks ...........130 Imprint .................................................. 143 Cover photos: Left: © Netzgesellschaft Düsseldorf mbH Centre: © f1-online Right: © Siegfried Bellach / Pixelio 2 3 PSI Energy EE PSI Energy EE - Partner in energy technology In the PSI Energy EE business divi- sion, more than 230 engineers, physicists, developers and mathema- ticians design and implement inno- vative high quality solutions for the energy market. PSI Energy EE does not only work in Germany but also abroad. In accord- ance with the PSI Group‘s rules, PSI cooperates with selected partners in various countries: • Russia OOO PSI, Moscow • Poland PSI, Poznan • Southeast Asia PSI INCONTROL SDN. BHD., Kuala Lumpur, Malaysia and other companies. Colleagues from these companies support us and you over the whole system life cycle: from sales through implementation to maintenance. © f1-online 4 5 PSI Energy EE Our projects - our pride References in Germany PSI Energy EE has a well-known name Even today, there is plenty of room We are proud of our customers who in the energy industry.
    [Show full text]
  • Cross-Border Electricity Trading in Southeast Europe Towards an Internal European Market †
    energies Article Cross-Border Electricity Trading in Southeast Europe Towards an Internal European Market † Despoina I. Makrygiorgou 1,2,*, Nikos Andriopoulos 1,2, Ioannis Georgantas 1, Christos Dikaiakos 1 and George P. Papaioannou 1 1 Research, Technology & Development Department, Independent Power Transmission Operator (IPTO) S.A., 89 Dyrrachiou & Kifisou Str. Gr, 10443 Athens, Greece; [email protected] (N.A.); [email protected] (I.G.); [email protected] (C.D.); [email protected] (G.P.P.) 2 Department of Electrical and Computer Engineering, University of Patras, 26500 Patras, Greece * Correspondence: [email protected] † This paper is an extended version of our paper published in 17th International Conference on the European Energy Market (EEM), IEEE, Stockholm, Sweden, 16–18 September 2020; pp. 1–6. Received: 8 December 2020; Accepted: 14 December 2020; Published: 17 December 2020 Abstract: The European Commission’s Target Model’s main objective is to integrate European electricity markets, leading to a single internal energy market and guaranteeing the instantaneous balance between electricity generation and demand. According to the target model for electricity trading, proposed by the European Network Transmission System Operators for Electricity (ENTSO-E), within each zone, electricity can be traded freely without taking into consideration network limitations. In contrast, for cross-border trading, the exchanges with other market areas are taken into account. Cross-border trade poses a further burden on the interconnection lines, resulting in increasing network congestion, which in turn restricts electricity trading. Thus, calculating the available capacity for trade has a significant ramification on the market. Today, the Available Transfer Capacity (ATC) mechanism dominates cross-border trading, but this methodology may be replaced by the Flow-Based (FB) approach across Europe.
    [Show full text]
  • ENTSO-E Overview of Transmission Tariffs in Europe: Synthesis 2018
    ENTSO-E Overview of Transmission Tariffs in Europe: Synthesis 2018 May 2018 1/63 This study was produced by the ENTSO-E Working Group Economic Framework. Drafting team: Rachel Tullis (Great Britain), Igor Jurišević (Serbia), Konrad Godzisz (Poland), Evdoxia Koutsoula (Greece), Ketil Grasto Røn (Norway), Karine Samson (Elia), Gerda de Jong (ENTSO-E). Frank Woessink (Convenor, Netherlands), Ervin Alliu (OST), Sandra Jaeger (Austria), Ann Vervaecke (Belgium), Aleksandar Miliša (Bosnia and Herzegovina), Viktoria Popovska (Bulgaria), Kristina Mravak Knezić (Croatia), Stelios Savvides (Cyprus), Martin Kodousek (Czech Republic), Steffen Østermark (Denmark), Peep Soone (Estonia), Anssi Nevalainen (Finland), François Regairaz (France), Izabela Netkova (FYROM), Lisa Beuger (Germany), Heiderose Adler (Germany), Benedikt Bartosch (Germany), Dennis Klink (Germany), Norbert Bugovics (Hungary), Svandis Hlin Karlsdottir (Iceland), Aoife Mills (Ireland), Anna Romano (Italy), Kristine Marcina (Latvia), Darius Zagorskis (Lithuania), Marc Schintgen (Luxemburg), Željko Adžić (Montenegro), Ian Stevenson (Northern Ireland), Gro Ballestad (Norway), Paula Almeida (Portugal), Ilinda Tudor (Romania), Jan Orac (Slovakia), Aleš Kolenc (Slovenia), José-Carlos Fernández (Spain), Rebecca Nilsson (Sweden), Simon Art (Switzerland). Disclaimer: Based on public data. The ENTSO-E association produces this overview in order to enhance public access to information about its work. If errors are brought to our attention, we will try to correct them. However, ENTSO-E association,
    [Show full text]
  • Eirgrid Plc Annual Report 2014
    EirGrid plc Annual Report 2014 www.eirgrid.com Our Mission Contents To provide quality, efficient, Chairperson’s Report 2 independent transmission and Chief Executive’s Review 6 market services for the benefit Financial Review 10 Operational Highlights of everyone across the island 14 Grid25 Initiatives 22 of Ireland. Europe 28 Corporate Social Responsibility 32 The Board 34 Organisational Structure 40 Executive Team 42 Financial Statements 47 Image Bibliography 113 EirGrid - It’s Your Grid Working with you for our energy future Ireland needs a safe, secure electricity network, to power our homes, schools, hospitals, farms and businesses. EirGrid Group is the organisation entrusted with the responsibility of managing the electricity grid in Ireland and Northern Ireland. As the designated Transmission System Operator and Market Operator, we operate the grid throughout the island of Ireland. We also own and operate the 260km East West Interconnector that runs between Ireland and Great Britain. We are a commercially run semi-state company, which operates in the interest of all people on the island. Our role is to deliver the electricity from where it is generated to where it is needed. We manage the network as safely and efficiently as possible, ensuring there is enough capacity to meet demand at any given time, 365 days of the year. EirGrid also operates the independent all-island electricity market, facilitating the buying of wholesale electricity by the suppliers who sell to the end user. We don’t participate in the wholesale or retail market, as we neither buy nor sell electricity. A quality electricity network is essential for everyone on the island of Ireland and one which we are proud to manage on your behalf.
    [Show full text]
  • Methodology of Comparison 2013
    METHODOLOGY OF COMPARISON 2013 Comparative Analysis of Sustainability Performance Methodological Remarks Convinced that a comparison of environmental, social and governance performance is of interest, not only to the Company itself, but also to its stakeholders, certain comparisons between Terna’s results and those of other com- panies are included in the 2013 Sustainability Report, as was the case in the preceding three years. Listed below are the main criteria adopted in the analysis, as an introduction to the reading and interpretation of the comparisons of individual indicators in the Report: • three panels of companies were identified: an industry panel, composed of the European transmission system operators and the major extra-European operators in terms of kilometres of lines managed; and two multi- industry panels, the first relative to large Italian companies (the 40 companies of the FTSE-MIB at 18 December 2013) and the second relative to the best international performers (the 24 world Sustainability Industry Group Leaders, identified by the RobecoSAM sustainability rating agency and disclosed at the publishing of the Dow Jones Sustainability Index of September 2013). The purpose of the three panels is to guarantee, also relative to the type of indicator reviewed, a comparison between companies with the same operational characteristics, an Italian comparison, and a comparison with the top international performers. The Terna figures do not contribute to the calculation of the average in the case of the RobecoSAM – Supersector Leaders panel; • the companies considered from among those in the three panels were those which publicise the information necessary for comparisons either on their websites, through the Sustainability Report (even if not prepared following the GRI guidelines) or through other documentation (HSE Report, financial report, etc.).
    [Show full text]
  • System Plan 2018 – Electricity and Gas in Denmark 2 System Plan 2018
    SYSTEM PLAN 2018 – ELECTRICITY AND GAS IN DENMARK 2 SYSTEM PLAN 2018 CONTENTS 1. A holistic approach to electricity and gas planning ......................................3 1.1 Energinet’s objectives and the political framework .............................................. 3 1.2 New organisation ............................................................................................................. 4 1.3 Analysis and planning .................................................................................................... 5 1.4 Research and development .......................................................................................... 8 1.5 Environmental reporting ..............................................................................................10 1.6 Energy efficiency ............................................................................................................11 2. Electricity .........................................................................................................16 2.1 Security of electricity supply ......................................................................................17 2.2 Resources to safeguard balance and technical quality ......................................22 2.3 Cooperation with other countries ..............................................................................24 2.4 Cooperation with other grid operators ....................................................................29 2.5 Planning for conversion and expansion of electrical installations
    [Show full text]
  • Annual Report 2020 Encevo
    Annual Report Encevo S.A. We embrace energy transition GRI 102-16 Our vision We envision Encevo as leading and sustainable energy player in the Greater Region. In the rapidly changing energy landscape, we will ensure a secure access and competitive supply of energy, and actively shape the transition to a sustainable energy sector by embracing technology, deploying innovative solutions and partnering with local communities. Encevo people are empowered and strive for excellence. We mobilise all our forces to bring the energy of tomorrow to our customers. Encevo S.A. Registered as a société anonyme (public limited company) under Luxembourg law with a capital of EUR 90,962,900 (31.12.2020). Registered office: Esch-sur-Alzette Luxembourg Trade and Companies’ Register B11723. Annual General Meeting of 11th May 2021. Index 6 Interview: Claude Seywert & Marco Hoffmann 10 Group Structure 12 Management Reflections 20 Key Figures: Activity at a Glance 27 Encevo Sustainability Context and Management Approach 32 Stakeholder Engagement 41 Business Integrity: General Compliance 49 Indirect and Direct Economic Impacts 54 Product Impact 59 Employee Well-being 70 Resource Efficiency 74 About the Report 80 Governance Details 82 Management Report 92 Consolidated Annual Accounts 134 Extract of the Annual Accounts of Encevo S.A. Claude Seywert CEO Encevo S.A. Chairman of the Executive Committee Marco Hoffmann Chairman of the Board of Directors GRI 102-14 Staying the course towards a sustainable energy transition In a year largely marked by the crisis caused by the pandemic, Encevo Group maintained its operational excellence. The group and its entities stayed the course towards a sustainable energy transition.
    [Show full text]
  • Comparison Methodology
    COMPARISON METHODOLOGY Comparative Analysis of Sustainability Performance Convinced that a comparison of environmental, social and governance performance is of interest, not only to the Company itself, but also to its stakeholders, certain comparisons between Terna’s results and those of other companies are included in the 2015 Sustainability Report, as was the case in previous years. The comparative sustainability indicators regard the following themes: CO2 emissions, SF6 leakage incidence rate, hours of training per capita provided to employees and the turnover rate on termination of personnel. Listed below are the main criteria adopted in the analysis, as an introduction to the reading and interpretation of the comparisons of individual indicators in the Report: • three panels of companies were identified: the first was composed of the European transmission system operators and the major non-European operators in terms of kilometres of lines managed; the second, multi-sectoral in nature, is made up of large Italian companies (the 40 listed companies of the FTSE MIB at 31/12/2015); the third formed by the best international performers in the “Electric Utilities - ELC” sector (identified by the RobecoSAM sustainability rating agency and included in the Dow Jones Sustainability World Index of September 2015). The purpose of the three panels is to guarantee, also relative to the type of indicator reviewed, a comparison between companies with the same operational characteristics, an Italian comparison, and a comparison with top international performers in the same sector; • the companies considered from among those in the three panels were those which publicise the information necessary for comparisons either on their websites, through the Sustainability Report (even if not prepared following the GRI guidelines) or through other documentation (HSE Report, Financial Report, etc.).
    [Show full text]
  • System Operation Stakeholders Committee
    System Operation Stakeholders Committee Materials for meeting 16th September 2020 1.1 Review of the Agenda Time Agenda Topics Documents Lead 1. Opening Uros Gabrijel 13:30-13:35 1.1 Review of the agenda Agenda 13:35-13:45 1.2 Review and approval of minutes from previous meeting Minutes 13:45-13:55 1.3 Review of actions Slides Ana Cigaran 13:55-14:15 2. Update on the implementation actions at pan-EU level Slides Ana Cigaran 3. System Operation Guideline Slides 14:15-14:30 3.1 Cost Benefit Analysis for FCR providers by Limited Energy Reservoirs: Luca Ortolano Status update 3.2 Information on Exchange\Sharing of reserves 14:30-15:00 Mohamed El Jafoufi 15:00-15:15 4. CGM Program Implementation Update Derek Lawler 15:15-15:45 5. NC ER Implementation update Slides Rafal Kuczynski 5.1 Update on TCM Status according to Art. 4. 6. Information on Low frequency Pump disconnection & energy storage units Rafal Kuczynski\Walter Sattinger 15:45-16:00 6.1 Why low frequency pump disconnection is triggered at different frequencies across Europe? 6.2 Outlook on the plans for the energy storage units 16:00-16:15 16:15-16:30 7. AOB – Next meeting 9th December Uros Gabrijel 2 1.3 Review of actions Ana Cigaran 3 1.3 Review of actions (I) ACTION ANSWER STATUS 1. Note for future SO GL active library to include pre- Preparation for SO GL Active Library Open qualification process aFRR, mFRR, RR. is in good progress both for the Digital and content part.
    [Show full text]
  • Minutes SDAC Joint Steering Committee Meeting 30/01/2020,11:00 – 17:00 CET, Brussels Airport
    Minutes SDAC Joint Steering Committee Meeting 30/01/2020,11:00 – 17:00 CET, Brussels Airport Present parties 50Hertz Cropex EPEX Spot Litgrid PSE Terna Admie EirGrid (TSO) ESO MAVIR REE TGE Amprion Eirgrid (SEMO PX) EXAA Nasdaq REN Transelectrica APG ElecLink Fingrid Nemo Link RTE Transnet BW AST Elering GME NGIC SEPS TTG BritNed ELES HEnEx OKTE SONI (SEMO PX) TTN BSP Elia HOPS OMIE SONI (TSO) ČEPS EMCO Nord Pool HUPX OPCOM Statnett Creos Energinet IBEX OTE Svk Attending in person Attending by phone Proxy arranged Not present Present chairs, TF leaders, PMOs, observers BMTF leader JSC Secretary MRC OPSCOM PMO MSD PMO PCR chair & PMO TSO co-chair EC MEPSO MSD NEMO co-leader NEMO co-chair Procedures TF leader Entso-e MRC OPSCOM leader MSD TSO co-leader OST Swissgrid Attending in person Attending by phone Not present Meeting agenda # Topic For 1 Welcome, practicalities 1.1 Confirm quorum Inf 1.2 Adoption of the agenda Dec 1.3 Approval of minutes of past meetings/calls (incl. part for publication) Dec 1.4 Review open action points Inf 1.5 Participation in SDAC JSCs – overview 2019 meetings Dis 2 Decisions required 2.1 Way forward Central Settlement Entity (without JAO present) Dec 2.2 NRA access to Simulation Facility & cost sharing Dec 2.3 Mandate for co-chairs to take actions after a decoupling event Dec LUNCH 3 TF status reports and decisions requested 3.1 BMTF Dec 3.2 MRC OPSCOM Dec 3.3 Procedures TF 3.4 MSD Dec 3.5 MNA Implementation Coordination Group Inf 3.6 Legal TF Inf 3.7 Communication TF Inf 3.8 Feedback from 29/01 Internal Coordination Team (ICT) strategy meeting Inf 4 Important points for SDAC from ENTSO-E/ NC/ NRAs/ ACER/ EC 4.1 NEMOs status report Inf 4.2 Feedback from 10/12 TCG and 18/12 MESC meetings Inf 4.3 Update on Algorithm Methodology 5 Any other business 5.1 Baltic Cable – status update on TSO certification Inf 5.2 CCP default Dis 5.3 Next meetings Inf 1 List of decisions # Topic Decision 1.2 Adoption of the The meeting agenda is approved.
    [Show full text]
  • NORTH-SOUTH 400Kv INTERCONNECTION DEVELOPMENT
    NORTH-SOUTH 400kV INTERCONNECTION DEVELOPMENT OUTLINE AND UPDATE OF EIRGRID’S CONSIDERATION OF THE TRANSMISSION TECHNOLOGY OPTIONS AS PRESENTED TO THE INDEPENDENT EXPERT GROUP DECEMBER 2017 A European Project of Common Interest EXECUTIVE SUMMARY The Minister for Communications, Climate Action and Environment has appointed an independent expert group (IEG) to examine the technical feasibility and cost of undergrounding the North-South Interconnector, taking into account the most recent developments in technology and experience gained from existing projects abroad. This report sets out EirGrid’s position on these matters. EirGrid is proposing that the proposed interconnector be implemented by means of a single circuit 400 kV overhead line. The proposed overhead line will be approximately 137 km in length (103 km in Ireland and 34 km in Northern Ireland) and will form a second high capacity tie-line between the networks of Ireland and Northern Ireland. Planning approval for the part of the proposal located in Ireland has been received from An Bord Pleanála. This report replicates and updates the evaluation of the technology options that was submitted to An Bord Pleanála by EirGrid during the planning process. EirGrid’s evaluation of the technology options was carried out in the knowledge that the proposed second North South Interconnector will be of the highest strategic importance for the island of Ireland, with a power carrying capacity equivalent to 23% of the island’s peak demand. It will form an internal reinforcement of the single ‘all-island’ network and will operate like any other transmission circuit in the meshed network. HVDC technology was considered as an option.
    [Show full text]
  • Status Review on Implementation of TSO and DSO Unbundling Provisions
    Legal Affairs Committee Implementation of TSO and DSO Unbundling Provisions – Update and Clean Energy Package Outlook CEER Status Review Ref: C18-LAC-02-08 14 June 2019 Council of European Energy Regulators asbl Cours Saint-Michel 30a, Box F – 1040 Brussels, Belgium Arrondissement judiciaire de Bruxelles – RPM 0861.035.445 Ref: C18-LAC-02-08 CEER Status Review on TSO and DSO Unbundling INFORMATION PAGE Abstract This CEER document (C18-LAC-02-08) presents an updated Status Review on the Implementation of Transmission and Distribution System Operators’ Unbundling Provisions of the 3rd Energy Package, focusing on new developments since summer 2015. It also briefly summarises the main changes and novelties with regard to unbundling-related provisions that were made in the recasts of the Electricity Directive and Electricity Regulation within the framework of “Clean Energy for All Europeans” package (CEP). Under the 3rd Energy Package, energy networks are subject to unbundling requirements which oblige Member States to ensure the separation of vertically integrated energy companies, resulting in the separation of the various stages of energy supply (generation, transmission, distribution, and retail). This Status Review aims to assess the status of DSO and TSO unbundling, highlighting the new developments since 2015 and to provide an overview of the main changes in unbundling-related provisions introduced in CEP. Topics explored included related issues such as: cases and reasons for reopening certification decisions; branding; financial independence in terms of staff and resources; compliance programmes and officers; investments, joint-venture TSOs and joint undertakings. Target Audience European Commission, energy suppliers, traders, gas/electricity customers, gas/electricity industry, consumer representative groups, network operators, Member States, academics and other interested parties.