Modelling indicates that a junction Route through Pitsford here will be most effective in Quarry to avoid reducing traffic through . Boughton Park

Holcot Road

A508 Harborough Road

Moulton Road Route through Boughton Fair Lane Connection to New Holcot Centre. Work Roundabout on A43 A43 required to replace affected facilities. Crosses Northampton and Lamport Railway, watercourse and HP gas Pitsford Road main, with least impact Brampton Lane on infrastructure Signalised Spectacle Lane Junction with controlled crossing for Alternative spur students road connections to Moulton Park Spur B Moulton

Boughton Road A5199 Northampton Road Spur A

Connection to Boughton Red House Road Moulton Lane

A43

Vyse Road Sandy lane Connects to Red Boughton Lane Brampton Lane House Road Roundabout

Buckton Fields Current A5076 Red House Road Brampton Heath development Future Round Spinney Golf Centre development

A5199 Welford Road A508 Harborough Road

Northamptonshire County Golf Club

A5076 Holly Lodge Drive Rugby to Milton Keynes Railway Flood Transport Plan Wider Schemes for Context Plain Planned dual carriageway North-west Relief Road Northampton Northern Orbital Route Grange (Option 7 is based on previous Option 1 from 2016 consultation) Farm Option 7 Option 7 variations for spur to Moulton Park Sections of road to be closed Junction/cross roads/roundabouts Northampton Kings Heath residential development (only one spur road will be chosen, Spur A and Spur B are (Dallington Grange) different options to connect to Moulton Park)

NORTHAMPTON NORTHERN ORBITAL ROUTE: Option 7