STUBLACH GAS STORAGE PROJECT

MINUTES OF LOCAL LIAISON COMMITTEE MEETING

HELD THURSDAY 5th DECEMBER 2017 AT

STUBLACH GAS STORAGE SITE

Elected as Chairperson: Mark Simmons West and Council

Attendees: Alan Leadbetter Storengy UK Ltd John O’Donnell Storengy UK Ltd Kathy O’Donoghue Frank Still Parish Council

Apologies/ Non-attendees: John Beecroft Byley Parish Councillor Gaye Billington Pete Kelly Lostock Gralam Fiona Dunning Cheshire West and Chester Council Richard Stevenson Inovyn

Storengy UK Limited King street, , Cheshire, CW9 7SE Tel: 00 44 1606 814 680 – Fax: 00 44 1606 4 44 67 Registered in 6311795

1. INTRODUCTIONS

M. Simmons welcomed everyone to the Storengy Local Liaison Committee (LLC). A. Leadbetter described the LLC meeting agenda.

2. PROGRESS AT STUBLACH AND WHAT IS HAPPENING ON SITE OVER THE NEXT 3 MONTHS

J. O’Donnell presented an overview of the progress of the Stublach Phase 2 development together with a description of the planned work for the next three months.

From August to December 2017 major civils works have taken place on the Gas Plant to construct the foundations for the two new compressors and dehydration units. Three caverns have had their final work-overs to prepare them for conversion to gas operations in 2018.

In Quarter 1 2018 two more caverns will have had their final work-overs to prepare them for conversion to gas operations.

3. STORENGY LOW CARBON COMMUNITY FUND

Storengy is offering £40,000 of funding to help improve the energy efficiency of community buildings in the parishes of Allostock, Byley, Lach Dennis, Lostock Gralam and Rudheath. It is hoped Storengy’s Community Fund will deliver energy efficiency improvements that will demonstrate to the local community the benefits of new technologies and will be a catalyst for them to make energy improvements in their own homes.

For Low Carbon Community Fund queries please contact J O’Donnell (John.O’[email protected])

Lostock Green Methodist Church Hall The proposed energy efficiency improvements to Lostock Green Methodist Church Hall were presented: • Replacement PVC windows (3) • Replacement Door • Insulate existing External Door • Replace Light fittings with low energy units and install additional sensors • Replace Existing Boiler • Upgrade Boiler Management system and monitoring controls

It was agreed that the proposed improvements could be supported by the Low Carbon Community Fund.

ACTION: Submit request for funding - Kathy O’Donoghue

Storengy UK Limited King street, Northwich, Cheshire, CW9 7SE Tel: 00 44 1606 814 680 – Fax: 00 44 1606 4 44 67 Registered in England 6311795

ACTION: Arrange for transfer of funding to Lach Dennis Parish Council – J O’Donnell

Allostock Village Hall The proposed replacement of the Allostock Village Hall roof using Parish Council funds was discussed. Storengy agreed to funding any insulation associated with the roof replacement. Details were provided of insulation requirements.

ACTION: Confirm the timing of replacement works and confirm if the quotation covers all the insulation for the roof replacement – F Still

Lostock Gralam Community Centre Email received from Liz Wood with quotations for: • Fire Door • Loft Insulation • LED Lighting • Ventilation Fans • Emergency Exit lighting

No parish councillor attended the meeting

ACTION: Contact Liz Wood and arrange a visit to community centre – J O’Donnell

Rudheath Youth Centre No parish councillor attended the meeting

Byley Village Hall Email received via CWAC from John Beecroft requesting funding for solar panels.

No parish councillor attended the meeting

ACTION: Contact John Beecroft and arrange visit to Byley – J O’Donnell

4. OPEN FORUM

No further questions were raised.

5. DATE AND LOCATION OF THE NEXT MEETING

4.00 pm on the 15 March 2017 at the Stublach Site .

ACTION – Confirm to John O’Donnell if you can attend the next meeting - Parish Councilors