Project name Work scope Completion time Residue Hydrotreating catalyst Project, DDE Progressing Zhangzhou

MMA Project, Feasibility Study Progressing

PVDC Expansion Project, EPC Progressing

EO/EG Project, Yizheng P+C Progressing

SSBR Project, P+C Progressing

SSBR Project, Zhenjiang DDE+Ps Progressing

MMA Uprate Project, EPC Progressing

IPTA Project, Texas BDE+DDE Progressing

PTA Project, BDE+DDE Progressing

EO/EG Project, Yizheng EPs Progressing

Ethylene Terminal Project, Yizheng EPC Progressing

HIPS Project, Zhenjiang DDE 2014

EO3 Plant ASU Project, Yizheng EPs 2014

CPL Project, Fujian BDE+DDE 2014

EPDM Project, Zhejiang EPs 2014

Polyisocyanate Project, Shanghai EPsCm 2014

PTA Project, Phase II, BDE+DDE 2014

PTA Project, Yizheng BDE+DDE 2014 PTA Project, BDE+DDE 2014

PTA Project, Phase IV, Ningbo BDE+DDE 2014

PVC Revamping Project, Ningbo DDE 2014

SIS Project, Nantong EPC 2012

PTA Project, Zhejiang E 2012

PTA Project, Dalian E 2012

NBR Project, Nantong EPC 2012

PTA Project, Hainan E 2012

PTA Project, Phase II, Dalian E 2013

MMA Up-rate Project, Shanghai FEED 2011

IIR Project, Ningbo E 2014

PVC Revamping Project, Ningbo DDE 2014

Phenol Project, Ningbo E 2014

PTA Project, Feasibility Study 2011

PTA Revamping Project, Shanghai E 2011

SAN Project, Phase III, Ningbo E 2011

Ethene Set Revamping Project, E 2011

PTA Project, Ningbo E 2011 PTA Revamping Project, Dalian E 2011

LP Ethylene Tank & BOG Recovery System EPC 2010 Project, Ningbo

Polysilicon Project, Baoding EPC 2010

EA Project, Yangzhou E 2010

Product Quality Improvement Project, EPCC 2009 Thailand

PVC Project, Ningbo BDE 2008

BR Project, Nantong E 2008

PTA Project, Dalian E 2008

SEBS Project, Nantong E 2007

Butadiene Extraction & Propylene Project, E 2007 Malaysia

ABS Project, Phase III, Zhenjiang E 2006

PP Project, Ningbo E 2006

IPA Project, Ningbo E 2005

EO/EG Project, Huizhou EPC 2005

PVDC Project, Nantong E 2005

PTA Project, Shanghai EPC 2005

Acrylic Fiber Project, Ningbo E 2005

MDI/TDI Project, Shanghai E 2005 ABS Project, Phase I/II, Ningbo E 2005

Tank Project, Ningbo E 2005

PTA Revamping Project, E 2004

LDPE Project, EPC 2004

SAR Project, Shanghai E 2004

MMA Project, Shanghai E 2004

PVC Project, Ningbo E 2004

PVC Project, Ningbo E 2004

Fibers Project, Shanghai E 2004

Fibers Project, Haicheng Feasibility Study 2003

Alkylation Project, Talin E 2003

West-East Natural Gas Tunnel Crossing River Cm 2003 Project, Nanjing

Phenol Project, Kaohsiung E 2003

Synthetic Rubber Project E 2002

ABS Project, Zhenjiang EPC 2002

ABS/SAN Project, Phase II, Iran E 2002

Electron Material Project, Guangdong E 2001

PFA Project, Zhenjiang E 2001 IEM Chlor-Alkali Project, Kentukey E 2001

VCM Debottleneck Project, Texas E 2001

PTA Project, Xiamen EPC 2001

Nuclear Power Plant Steel Structure Project E 2001

PTA Project, Shanghai Feasibility Study 2000

SAN Project, Phase II, Zhenjiang PC 2000

GPS/IPS Project, Taiwan E 2000

Agrochemical Project, Nantong EPC 2000

Butanediol Project, Changhwa E 2000

Power Plant Project, Mailiao E 2000

Alkylation Project, Mailiao E 1999

No. 3 Caprolactam Project, Kaohsiung E 1999

LPG Terminal Project EPC 1999

PVC Project EPCm 1999

CDU Project, Mailiao E 1998

Tank Project, Mailiao E 1998

Utilities P/R Project, Mailiao E 1998 Phenol Project, Mailiao E 1998

RCC Unit Utilities Project, Mailiao E 1998

MTBE Project, Mailiao E 1998

Residue Catalytic Cracking Project, Mailiao E 1998

VGO HDS Project, Mailiao E 1998

DCU Project, Mailiao E 1998

LPG Fractionation & Sweetening Project, E 1998 Mailiao

SRU Project, Mailiao E 1998

SWS/ARU Project, Mailiao E 1998

VDU Project, Mailiao E 1998

Kuanyin No.2 Plant Air Separation Project, E 1997 Kuanyin

Manufacturing Project, Singapore E 1997

Phthalic Anhydride Project, Chunghwa E 1997

EG Project, Mailiao E 1997

IEM Chlor-Alkali Project E 1997

HDPE Project, Mailiao E 1997

PTA Plant Off Plot Project E 1996

No.1 PTA Project, Indonesia E 1996 SAN Project, Phase II, Kaohsiung E 1995

ABS/SAN Project, Phase II, Chiayi E 1995

No.2 EB/SM Plant Revamping Project, E 1995 Kaohsiung

No.2 Polypronpylene Plant Project, Thailand E 1995

EPS Project, Shangdong E 1995

No.1 - No.4 LPVGC/HPVGT Project E 1994

Antibiotics Synthesis Project E 1993

PTA Project, Thailand Site Engineer 1993

Piping material control PMCS 3.0 system, includes painting CTCI and insulation