Case Study : kindergarten in Sant Pere Pescador Website : http://www.construction21.eu/ kindergarten in Sant Pere Pescador

PUBLISH BY CELAYA | 12 NOVEMBER 12

Project type : New Construction Building Type : Preschool, kindergarten, nursery Construction Year : 2011 Climate zone : Mediterranean North Net Floor Area : 270 m2 Construction/refurbishment cost : 506 000 € Number of Child : 41 Child Cost/m2 : 1 874 €/m2 Cost/Child : 12 341 €/Child

C/ Verge del Portalet , 17470 Sant Pere Pescador, España

// Description

This is a small project, carried out for a town hall (the smaller instance of the government), with a small budget and also dedicated to “small people”.

But it was born with BIG ambitions: it wants children to learn from scratch what is at stake in the world and therefore offers a building that breathes, is energy efficient and is built with proximity materials.

Thanks to the willingness of the client and the authors (the architects team have been granted with quality and eco-design European labels -ISO 9001 and ISO 14006-) and a grant from ICAEN (Catalan Institute of Energy), achieving the highest rating - A - in energy efficiency.

// Energy

Energy consumption Primary energy need : 72,00 kWh PE/m2/year Primary energy need for standard building : 211,00 kWh PE/m2/year Calculation method : RD: 47/2007 Final Energy : 27,80 kWh FE/m2/year Breakdown for energy consumption : Energy heating demand...... 8.6 (kW / m2/ año) Energy cooling demand...... 20.1 (kW / m2 / año) Energy electricity demand...... 18.5 (kW / m2 / año) Renewable energy...... 75% // Renewables & systems

Systems Heating system :

Geothermal heat pump Low temperature floor heating

Hot water system :

Heat pump

Cooling system :

Geothermal heat pump Fan coil

Ventilation system :

Single flow

Renewable systems :

Heat pump (geothermal)

Renewable energy production : 75,00 %

// Environment

GHG emissions

GHG in use : 16,40 KgCO2/m2/year Methodology used : Conversion factors published periodically in IDAE

// Products

Contact : Polígon Industrial c/, nº 117 17200 Tel. 972304156 Fax 972610192

Website: http://www.cork-2000.com/

Product category: Finishing work / Partitions, insulation

// Costs

Construction and exploitation costs Renewable energy systems cost : 15 000,00 € // Urban Environment

Urban environment : This is a new construction project located in an equipment and services area located within a block formed by the streets Provenza, Delícies, Marinade and Empori Street, the thermal town of Sant Pere Pescador, province of . page 4 / 4