Offshore Grid Delivery Models for Ireland Options Paper for Offshore Wind

Total Page:16

File Type:pdf, Size:1020Kb

Offshore Grid Delivery Models for Ireland Options Paper for Offshore Wind Final report: Offshore grid delivery models for Ireland Options paper for offshore wind Submitted by: Sil Boeve, Barry Vree, Carmen Wouters, Lennard Sijtsma, Ainhoa Villar Lejarreta, Anna Pulo and Wolfgang Schlez Navigant Netherlands B.V. Stadsplateau 15 3521 AZ Utrecht The Netherlands 030 662 3300 navigant.com Reference No.: 210668 ORDER NO: EIR-010347 31 March 2020 ©2020 Navigant Netherlands B.V. Final report: Offshore grid delivery models for Ireland DISCLAIMER This report (“report”) was prepared by Navigant Netherlands B.V. (Navigant)1 and is protected by copyright. Navigant’s conclusions are the results of the exercise of its reasonable professional judgment and the information available at the time this report was prepared. The reader hereby agrees and acknowledges he is bound by the disclaimers and/or limitations on liability set forth in the report. Navigant does not make any representations or warranties of any kind with respect to (i) the accuracy or completeness of the information contained in the report, (ii) the presence or absence of any errors or omissions contained in the report, (iii) any work performed by Navigant in connection with or using the report, or (iv) any conclusions reached by Navigant as a result of the report. Any use of or reliance on the report, or decisions to be made based on it, are the reader’s responsibility. Navigant accepts no duty of care or liability of any kind whatsoever to you, and all parties waive and release Navigant from all claims, liabilities and damages, if any, suffered as a result of decisions made, or not made, or actions taken, or not taken, based on this report. 1 On October 11, 2019, Guidehouse LLP completed its previously announced acquisition of Navigant Consulting Inc. In the months ahead, we will be working to integrate the Guidehouse and Navigant businesses. In furtherance of that effort, we recently renamed Navigant Consulting Inc. as Guidehouse Inc. ©2020 Navigant Netherlands B.V. Page i Final report: Offshore grid delivery models for Ireland DEVELOPING AN OFFSHORE GRID DELIVERY MODEL FOR IRELAND – KEY MESSAGES Ireland has ambitious climate targets towards 2030, including the addition of at least 3.5 GW of offshore wind capacity as stated in the Climate Action Plan (CAP) and supported by a Renewable Energy Support Scheme (RESS). Criteria have been identified to define “Relevant Projects” from the large pipeline of offshore wind projects in Ireland to be included in a transitional scheme to facilitate a fast build-out of offshore wind. A suitable grid delivery model needs to be adopted to develop the targeted offshore wind capacity in Ireland. Navigant carried out a comprehensive review of international approaches and developed four delivery model options that are tailored to the Irish context. The two main classes of grid delivery models in the international context are plan-led and developer-led models2, representing both ends of a spectrum of model options: Developer-led model Plan-led model Developers prepare the requirements for consents, A State Body and/or the TSO is the responsible party select and pre-develop wind farm sites and develop for the complete process of wind farm site selection and build both offshore wind farm and transmission and pre-development and offshore grid connection assets (offshore substation, export cables and development. This model is applied in e.g. the onshore connection assets). This model is applied in Netherlands. e.g. the United Kingdom. Source: Navigant. Seven key drivers in Ireland impact the model design. These drivers include cost levels, environmental impact, future proofing of policies and technologies, required infrastructure, compatibility with Relevant Projects, social acceptance and timely achievement of the 2030 targets. Four enduring grid delivery models tailored to the Irish context were assessed, ranging from a fully developer-led model to a fully plan-led model. The models represent a set of options, each with their advantages and disadvantages, to indicate a spectrum of options fit for the Irish context. The constituent elements of the four models presented could be combined in a variety of ways to form a wide range of additional model options. It follows that the model option or options ultimately chosen will not necessarily be set out in the report and could contain elements of two or more options. A brief description of these grid delivery models is as follows: Option 1. Option 2. Option 3. Option 4. Developer- Plan-defined, developer consents Plan-led, developer builds Plan-led led and builds State defines minimum distance from shore for wind farms, as well Fully Developers responsible for offshore as onshore grid connection points Fully plan-led developer-led wind farm transmission asset and available onshore grid capacity grid delivery grid delivery construction, ownership, operation for RESS auctions; EirGrid pro- model model and maintenance in plan-led model actively plans and coordinates onshore grid reinforcements Source: Navigant. The advantages of the developer-led model include compatibility with the Relevant Projects that can be developed quickly and that are more likely to be compatible with existing legislative and policy frameworks and leveraging existing developer experience in the delivery of offshore wind farms. The disadvantages include minimal onshore-offshore transmission asset coordination, the likelihood that any public acceptance campaign will be focused on a single project rather than multiple projects, greater risk of additional infrastructure with associated environmental 2 Plan-led and developer-led can also be referred to as centralised and decentralised grid delivery models, respectively. ©2020 Navigant Netherlands B.V. Page 1 Final report: Offshore grid delivery models for Ireland impact and more complexity involved in future proofing of offshore transmission assets. Option 2 provides mitigation to some of these disadvantages compared to option 1. The advantages of the plan-led model include long-term onshore-offshore transmission coordination with the potential for reduced infrastructure, the ability to craft a coordinated public acceptance process covering multiple projects and ease of future proofing of technology. The disadvantages include the time needed to develop new governmental capabilities, and policy, regulatory, licence and legislative frameworks which are likely required, challenges with state bodies simultaneously developing multiple offshore and onshore renewable energy and transmission projects, and incompatibility with Relevant Projects. Option 3 gives developers control of the construction of both the offshore wind farm and transmission assets, reducing potential risks as perceived by the offshore wind industry. A transition towards a more plan-led model option (3 or 4) could offer a pathway to leverage the timing advantages of more developer-led models in the short term and allows greater coordination of onshore-offshore grid development in the medium to long-term. As always, the overall suitability of each model option in the Irish context highly depends on the emphasis and relative weighting of certain criteria to reflect key stakeholder interests. It is important that a timely decision is made to determine which grid delivery model will be adopted in Ireland, to ensure preparations for this model can commence in time such that the 2030 renewable targets are achievable. ©2020 Navigant Netherlands B.V. Page 2 Final report: Offshore grid delivery models for Ireland EXECUTIVE SUMMARY Ongoing developments Ireland Ireland has ambitious climate targets towards 2030, including the addition of at least 3.5 GW of offshore wind capacity as stated in the Climate Action Plan (CAP) and supported by a Renewable Energy Support Scheme (RESS). Criteria for “Relevant Projects” have been defined to qualify some projects from the large pipeline of offshore wind projects in Ireland to be included in a transitional scheme to facilitate a fast build-out of offshore wind. To support the roll-out of offshore wind capacity, various developments are ongoing in Ireland that are relevant for the choice of grid delivery model for offshore wind: • A Climate Action Plan has been developed with ambitious targets of achieving at least 3.5 GW of offshore wind capacity in 2030; currently only 25 MW is operational; • The RESS support scheme is under development with multiple auction rounds planned by 2030. The RESS 1 design foresees a technology-neutral auction scheme (except for the solar preference category) in which offshore wind competes against other technologies. Future RESS rounds are expected to offer offshore wind specific support, as outlined in the CAP; • An update in marine spatial planning is being conducted with the development of the National Marine Planning Framework (NMPF) and Marine Planning and Development Management (MPDM) Bill, which will impact marine spatial planning and the consenting process for offshore wind developments. These updates are compatible with both a plan-led and developer-led grid delivery model; • Several legacy offshore wind projects in Ireland have progressed further in development than others by e.g. acquiring a lease or grid connection offer. The Department of Housing, Planning and Local Government (DHPLG) together with the Department of Communications, Climate Action and Environment (DCCAE) has defined criteria to qualify some of these as Relevant Projects, which can continue their development under a “transition protocol” prior to enactment
Recommended publications
  • Public Participation and Transparency in Power Grid Planning
    Public Participation and Transparency in Power Grid Planning Recommendations from the BESTGRID Project Handbook – Part 1 BESTGRID PARTNERS Transmission System Operator (TSO) Partners Natagora asbl www.natagora.be 50Hertz Transmission GmbH Julien Taymans (Waterloo-Braine l'Alleud project) www.50hertz.com [email protected] Dr Dirk Manthey, [email protected] Phone: +32 (0) 81 390 720 Phone: +49 (0) 30 5150 3419 98 rue Nanon, B-5000 Namur Eichenstr. 3A, D-12435 Berlin German Environment Aid (DUH) Elia System Operator NV www.duh.de www.stevin.be Liv Becker (Suedlink / Bertikow-Pasewalk) Jeroen Mentens (Stevin project) [email protected] [email protected] Phone: +49 (0) 30 2400 867 98 Phone: +32 (0) 2 546 7957 Hackescher Markt 4, D-10178 Berlin Christophe Coq (Waterloo-Braine l'Alleud project) Germanwatch e.V. [email protected] www.germanwatch.org Phone: +32 (0) 2 382 2334 Leon Monnoyerkaai 3, B-1000 Brussels Rotraud Hänlein, [email protected] Phone: +49 (0) 30 2888 356 83 National Grid Stresemannstr. 72, D-10963 Berlin www.nemo-link.com International Institute for Applied Systems Analysis (IIASA) Phil Pryor, [email protected] www.iiasa.ac.at Phone: +44 (0)7795 641 431 Warwick Technology Park, Gallows Hill, Warwick, Joanne Linnerooth-Bayer, [email protected] UK-CV346DA Dr Nadejda Komendantova, [email protected] Phone: +43 (0) 676 83 807 285 TenneT TSO GmbH Schlossplatz 1, A-2361 Laxenburg www.suedlink.tennet.eu Marius Strecker, [email protected] Naturschutzbund Deutschland (NABU) Phone: +49 (0) 921 50740 4094 www.nabu.de Bernecker Str.
    [Show full text]
  • Offshore Wind and Hydrogen: Solving the Integration Challenge
    OFFSHORE WIND AND HYDROGEN SOLVING THE INTEGRATION CHALLENGE OSW-H2: SOLVING THE INTEGRATION CHALLENGE 1 ACKNOWLEDGMENTS The study was jointly supported by the Offshore Wind Industry Council (OWIC) and Offshore Renewable Energy (ORE) Catapult, and delivered by ORE Catapult. The Offshore Wind Industry Council is a senior Government and industry forum established in 2013 to drive the development of the UK’s world- leading offshore wind sector. OWIC is responsible for overseeing implementation of the UK Offshore Wind Industrial Strategy. ORE Catapult is a not-for-profit research organisation, established in 2013 by the UK Government as one of a network of Catapults in high growth industries. It is the UK’s leading innovation centre for offshore renewable energy and helps to create UK economic benefit in the sector by helping to reduce the cost of offshore renewable energy, and support the growth of the industry. AUTHORS: ANGELIKI SPYROUDI KACPER STEFANIAK DAVID WALLACE STEPHANIE MANN GAVIN SMART ZEYNEP KURBAN The authors would like to thank a number of organisations and stakeholders for their support through Steering Committee and Expert Group meetings or individually. They include, in alphabetical order: Atkins (David Cole), BEIS (Tasnim Choudhury, Simone Cooper Searle, David Curran, Rose Galloway – Green, Fiona Mettam, Alan Morgan, Allan Taylor, Mark Taylor, Rita Wadey, Alex Weir) Committee on Climate Change (Mike Hemsley, David Joffe, Julia King), Crown Estate Scotland (Mark McKean), EDF Energy (David Acres), Energy Systems Catapult (Nick
    [Show full text]
  • Facts and Figures 2019
    Contact and imprint Facts Publisher Design 50Hertz Transmission GmbH Heimrich & Hannot GmbH and Figures Heidestrasse 2 10557 Berlin Images T +49 30 5150 0 50Hertz 2019 F +49 30 5150 2199 Jan Pauls info@ 50 hertz.com Frank Wölffing Board of Management Printing Stefan Kapferer (CEO) PocketPlaner Dr. Frank Golletz (CTO) FP Werbung GmbH Dr. Dirk Biermann (CMO) Marco Nix (CFO) Sylvia Borcherding (CHRO) 50hertz.com For a successful energy transition in a sustainable world You can find our sustainability report online at csr.50hertz.com enmark About us Our tasks nerginet Key figures In the north and east of Germany, cleswig-olstein we operate the high voltage grid Lubmin Value TenneT reliably ensuring electricity supply Market facilitation – Gstrow GRID-RELATED KEY FIGURES WESTE for around 18 million people. EI CETE NORTHE 2 We are part of the amburg EI CETE Grid area 109,702 km TenneT European integrated Our grid with voltage levels of 150 kilo- Our locations Total lenghts of lines market. (equivalent to power 10,490 km volt (kV), 220 kV and 380 kV extends P circuit length) thereof overhead lines 380 kV 7,250 km over a circuit length of 10,490 km. 50Hertz Netzquartier Eastern Regional Centre Lower axony Poland CET We deliver the (Headquarters) Sigmund-Bergmann-Str. 1 EI CETE thereof overhead lines 220 kV 2,607 km 50ert-Netquartier Heidestrasse 2 03222 Lübbenau/ BerlinCarlottenburg Neuenagen At our eleven locations, over 1,100 infrastructure of bei Berlin thereof sea cables 220 kV 290 km 10557 Berlin Spreewald employees ensure that electricity the future TenneT Wolmirstedt thereof sea cables 150 kV 270 km flows around the clock in Berlin, Service location Röhrsdorf Trusteeship – Northern Regional Centre thereof underground cables 73 km Brandenburg, Hamburg, Mecklen- WESTE Lbbenaupreewald Substations and switching We transparently integrate Rostocker Chaussee 18 Southern Regional Centre EI CETE 74 burg-Western Pomerania, Saxony, stations (number) renewable energies 18273 Güstrow Zentrales Umspannwerk 8 Saxony-Anhalt and Thuringia.
    [Show full text]
  • Electricity Systems and Markets) EDF R&D
    European system with an efficient coordinated use of flexibilities for the integration of a large share of RES Vera Silva Research program director « Electricity systems and markets) EDF R&D EU-SysFlex overall objective EU SysFlex objective is to contribute to developing a market design and regulation framework able to foster the development of innovative flexibility approaches to address the technical shortfalls of a European system with high RES. These innovative approaches cover both the technical capability for providing the right flexibilities and system services and the ability of TSOs to integrate these into system and network operation. EU-SysFlex will make a major contribution to a cost effective system transformation to meet EU world leading RES objectives Three pillars of EUSysFlex approach System needs TSO driven Whole system driven Technical shortfalls Economic shortfalls Market driving innovation to respond to system needs Demonstrations/ Scalability Market design and Replicability/ TSO Services/ Products/ enhancement & operations simulation Procurement/Remuneration regulation evolution Flexibility Roadmap – Implementation and exploitation Scalability and System Implementation Exploitation of results replicatbility benefits Roadmap business creation EU SysFlex will provide a significant improvement of EU innovation capacity by combining “top-down” and “bottom- up” approaches to flexibility enabled by a strong consortium - Cost effective enhancement of flexibility and system services capability - new approaches and tools
    [Show full text]
  • Eirgrid Plc Annual Report 2014
    EirGrid plc Annual Report 2014 www.eirgrid.com Our Mission Contents To provide quality, efficient, Chairperson’s Report 2 independent transmission and Chief Executive’s Review 6 market services for the benefit Financial Review 10 Operational Highlights of everyone across the island 14 Grid25 Initiatives 22 of Ireland. Europe 28 Corporate Social Responsibility 32 The Board 34 Organisational Structure 40 Executive Team 42 Financial Statements 47 Image Bibliography 113 EirGrid - It’s Your Grid Working with you for our energy future Ireland needs a safe, secure electricity network, to power our homes, schools, hospitals, farms and businesses. EirGrid Group is the organisation entrusted with the responsibility of managing the electricity grid in Ireland and Northern Ireland. As the designated Transmission System Operator and Market Operator, we operate the grid throughout the island of Ireland. We also own and operate the 260km East West Interconnector that runs between Ireland and Great Britain. We are a commercially run semi-state company, which operates in the interest of all people on the island. Our role is to deliver the electricity from where it is generated to where it is needed. We manage the network as safely and efficiently as possible, ensuring there is enough capacity to meet demand at any given time, 365 days of the year. EirGrid also operates the independent all-island electricity market, facilitating the buying of wholesale electricity by the suppliers who sell to the end user. We don’t participate in the wholesale or retail market, as we neither buy nor sell electricity. A quality electricity network is essential for everyone on the island of Ireland and one which we are proud to manage on your behalf.
    [Show full text]
  • Dansk Energi Brev
    To: Energinet Astrid Buhr Broge [email protected] [email protected] Dok. ansvarlig: CAC Sekretær: Sagsnr: s2013-388 Doknr: d2021-22033-1.0 30. august 2021 Energinet consultation on the methodology for procurement of counter- trade energy Dansk Energi welcomes Energinet’s consultation on the methodology for procurement of so-called countertrade energy. Energinet has highlighted several issues driving the proposed methodology over the past year. However, the central task of a TSO is not to arrange a border specific market setup according to cli- mate effects or according to the costs of specific market dispatches. The central task of a TSO is to facilitate markets that provides correct price and investments signals in compliance with EU-regulation. Energinet’s proposed methodology seeks to address an internal German issue – lack of capacity in TenneT’s transmission grid – which has previously resulted in heavy reduction of capacity on the Dan- ish-German border. While this was solved with the Joint Declaration and Tennet Commitments in 2017-2018, Energinet’s proposed methodology rolls back these advances. The proposed methodology will sustain a distorted day-ahead market price formation in Denmark, an intraday market in DK1 with no export capacity towards Germany and an intraday market in Denmark where Energinet directly or through a third party is by far the largest market participant. These are not efficient elements in a well-functioning wholesale market and Dansk Energi does not consider it compliant with EU-regulation, nor do we consider it a proportional solution to address the internal German grid congestion. At this stage, Dansk Energi would like to highlight the following concerns and objections: 1.
    [Show full text]
  • Tennet Integrated Annual Report 2019
    TenneT Holding B.V. Integrated Annual Report 2019 Key figures 2019 Safe workplace Diverse workforce Safety (TRIR) Gender ratio 4.8 23% 77% Satisfied capital providers* Environmental impact ROIC % Greened of our carbon footprint 5.1 27.4% Grid availability Safeguard capital structure* Grid availability FFO/Net debt 99.9998% 14.8% Future proof grid* Our workforce Annual Investments (EUR million) Number of employees (internal and external) 3,064 4,913 Engaged stakeholders Healthy financial operations* Reputation survey EBIT (EUR million) fairly strong to very strong 768 * Based on underlying figures Table of contents Integrated 2019 at a glance 2 Annual Letter from the Board 4 Report 2019 * About TenneT 6 Profile 6 Our strategy and value creation 9 Materiality analysis 14 * Our performance in 2019 16 Deliver a high security of supply 16 Ensure critical infrastructure for society 23 Create a sustainable workplace 30 Contents Create value to transition to a low carbon economy 36 Secure a solid financial performance and investor rating 44 Solve societal challenges with stakeholders and through partnerships 50 Statements of the Executive Board 57 Our Executive Board 58 Supervisory Board Report 60 Supervisory Board Report 60 Remuneration policy 66 Board remuneration 68 Our Supervisory Board 72 * Governance and risk management 74 Corporate governance 74 Risk management and internal control 76 Risk management and internal control framework 79 Compliance and integrity 80 Risk appetite 82 Key risks 83 Financial statements 87 Consolidated financial statements 88 Notes to the consolidated financial statements 95 Company financial statements 147 Notes to the company financial statements 149 Other information 152 Profit appropriation 152 Independent auditor’s report 153 Assurance report of the independent auditor 160 About this report 163 Reconciliation of non-IFRS financial measures 168 SWOT Analysis 169 Key figures: five-year summary 170 Glossary 171 * These sections reflect the director’s report as mentioned by Part 9 of Book 2 of the Dutch Civil Code.
    [Show full text]
  • System Plan 2018 – Electricity and Gas in Denmark 2 System Plan 2018
    SYSTEM PLAN 2018 – ELECTRICITY AND GAS IN DENMARK 2 SYSTEM PLAN 2018 CONTENTS 1. A holistic approach to electricity and gas planning ......................................3 1.1 Energinet’s objectives and the political framework .............................................. 3 1.2 New organisation ............................................................................................................. 4 1.3 Analysis and planning .................................................................................................... 5 1.4 Research and development .......................................................................................... 8 1.5 Environmental reporting ..............................................................................................10 1.6 Energy efficiency ............................................................................................................11 2. Electricity .........................................................................................................16 2.1 Security of electricity supply ......................................................................................17 2.2 Resources to safeguard balance and technical quality ......................................22 2.3 Cooperation with other countries ..............................................................................24 2.4 Cooperation with other grid operators ....................................................................29 2.5 Planning for conversion and expansion of electrical installations
    [Show full text]
  • Firmness Deadlines
    List of Bidding Zone borders and/or their subsets and their corresponding day-ahead firmness deadlines List of Bidding Zone borders and/or their subsets of interconnectors Day-ahead firmness List of responsible TSOs deadline Austria (AT) Czechia (CZ) <> D-1 10:00 APG CEPS Austria (AT) Hungary (HU) <> D-1 10:00 APG MAVIR Austria (AT) Italy (NORD) <> D-1 11:00 APG TERNA Austria (AT) Slovenia (SI) <> D-1 11:00 APG ELES Belgium (BE) France (FR) <> D-1 11:00 ELIA RTE Belgium (BE) Netherlands (NL) <> D-1 11:00 ELIA TenneT TSO B.V. Belgium (BE) Great Britain (GB) <> D-1 11:00 ELIA, Nemo Link NGESO, Nemo Link Croatia (HR) Hungary (HU) <> D-1 10:00 HOPS MAVIR Croatia (HR) Slovenia (SI) <> D-1 11:00 HOPS ELES Czechia (CZ) Germany (DE) <> D-1 10:00 CEPS 50Hertz Czechia (CZ) Germany (DE) <> D-1 10:00 CEPS TenneT TSO GmbH Czechia (CZ) Poland (PL) <> D-1 10:00 CEPS PSE Denmark (DK1) Denmark (DK2) <> D-1 11:00 Energinet Energinet Denmark (DK1) Germany (DE) <> D-1 11:00 Energinet TenneT TSO GmbH Denmark (DK2) Germany (DE) <> D-1 11:00 Energinet 50Hertz France (FR) Germany (DE) <> D-1 11:00 RTE Amprion, Transnet BW 1 | P a g e List of Bidding Zone borders and/or their subsets of interconnectors Day-ahead firmness List of responsible TSOs deadline France (FR) Italy (NORD) <> D-1 11:00 RTE TERNA France (FR) Spain (ES) <> D-1 11:00 RTE REE Germany (DE) Amprion, Netherlands (NL) <> D-1 11:00 TenneT TSO GmbH TenneT TSO B.V.
    [Show full text]
  • System Operation Stakeholders Committee
    System Operation Stakeholders Committee Materials for meeting 16th September 2020 1.1 Review of the Agenda Time Agenda Topics Documents Lead 1. Opening Uros Gabrijel 13:30-13:35 1.1 Review of the agenda Agenda 13:35-13:45 1.2 Review and approval of minutes from previous meeting Minutes 13:45-13:55 1.3 Review of actions Slides Ana Cigaran 13:55-14:15 2. Update on the implementation actions at pan-EU level Slides Ana Cigaran 3. System Operation Guideline Slides 14:15-14:30 3.1 Cost Benefit Analysis for FCR providers by Limited Energy Reservoirs: Luca Ortolano Status update 3.2 Information on Exchange\Sharing of reserves 14:30-15:00 Mohamed El Jafoufi 15:00-15:15 4. CGM Program Implementation Update Derek Lawler 15:15-15:45 5. NC ER Implementation update Slides Rafal Kuczynski 5.1 Update on TCM Status according to Art. 4. 6. Information on Low frequency Pump disconnection & energy storage units Rafal Kuczynski\Walter Sattinger 15:45-16:00 6.1 Why low frequency pump disconnection is triggered at different frequencies across Europe? 6.2 Outlook on the plans for the energy storage units 16:00-16:15 16:15-16:30 7. AOB – Next meeting 9th December Uros Gabrijel 2 1.3 Review of actions Ana Cigaran 3 1.3 Review of actions (I) ACTION ANSWER STATUS 1. Note for future SO GL active library to include pre- Preparation for SO GL Active Library Open qualification process aFRR, mFRR, RR. is in good progress both for the Digital and content part.
    [Show full text]
  • Ginet, Svenska Kraftnät and Statnett
    Explanatory document concerning the proposal from the Transmission system operators Ener- ginet, Svenska kraftnät and Statnett for the deter- mination of LFC blocks within the Nordic synchro- nous area in accordance with Article 141(2) of the Commission Regulation (EU) 2017/1485 of 2 Au- gust 2017 establishing a guideline on electricity transmission system operation 1 Content 1. Introduction ................................................................................................................ 3 2. Legal requirements and interpretation ............................................................................ 3 2.1 Legal references and requirements ..................................................................... 3 2.2 Interpretation and scope of the proposal ............................................................. 4 3. Proposal for LFC blocks in the Nordic Synchronous Area ................................................... 5 3.1 Current status in the Nordic synchronous system ................................................. 5 3.2 Assessment of prerequisites for the proposal........................................................ 6 3.3 Process to form a block with three parties............................................................ 7 3.4 Expected impact of the proposed load-frequency control structure .......................... 8 3.5 Public consultation ............................................................................................ 8 4. Timescale for implementation ......................................................................................
    [Show full text]
  • Tennet's Annual Market Update 2020
    Annual Market Update 2020 Electricity market insights 7 April 2021 Introduction Introduction Annual Market Update 2020, an electricity market review focused on the Netherlands and Germany, including wider European trends Main findings This Annual Market Update (AMU) is focussed on relevant developments on the Central Western European electricity markets, and the Dutch and German electricity markets in particular. This is the third edition of the Wholesale market prices TenneT Annual Market Update. Previous editions of the AMU and its predecessor the TenneT Market Review can be found here. Fuel prices & The developments in the Annual Market Update are structured alongside several main topics: generators • The chapter Wholesale market prices discusses wholesale day-ahead and identifies price trends. • As our electricity system is still highly dependent on fossil-fuelled power, the chapter Fuel prices describes Capacity & developments in hard coal, natural gas and emission allowance prices, as well as the margins for generators. generation • The chapter Capacity & generation focuses on the supply side of the electricity system and discusses developments in installed capacity and generation. RES support • Support for renewables in the Dutch and German system are discussed in the chapter RES support schemes, schemes by looking at budget distribution, awarded capacity and generation in the subsidy schemes. • In the chapter Wholesale market integration the storyline zooms out and includes the interactions of the Dutch Wholesale market and German electricity system with neighbouring systems. Additionally, the ongoing efforts of coupling EU integration electricity markets are discussed in this chapter. • The last two chapters focus on mechanisms in place to ensure the stability and functioning of the electricity system for both the Netherlands and Germany: Balancing measures, to ensure supply and demand is equal at Balancing all times; and redispatch measures, to resolve congestion in the grid.
    [Show full text]