<<

Training brings peace of mind in ballast water treatment and more

British Survey, UK Case story

British Antarctic Survey (BAS) vessels – RRS James Clark Ross and tions in difficult conditions, BAS had Alfa operates in some of the world’s RRS . Soon, however, Laval train crew members in all of these harshest and most remote these will replaced by the highly systems. environments. When installing Alfa advanced RRS Sir David Attenborough, Laval systems on its new research built in the UK by Cammell Laird. A demanding workplace vessel, the organization sent crew Besides doing a job currently handled members for in-depth training at Alfa Laval has provided the RRS Sir by two vessels, the RRS Sir David Alfa Laval training centres. David Attenborough with a range Attenborough will operate in some of of prominent systems: high-speed the world’s most severe and remote Part of the UK’s Natural Environment separators for fuel treatment, Alfa Laval marine areas. Since the vessel will be Research Council, BAS delivers and PureBilge for oily water treatment and vital to polar research, logistics and enables world-leading research in harsh Alfa Laval PureBallast 3 for ballast water subsea surveys, the crew must be able polar environments. For over 20 years, treatment, which is a new and unfamiliar to identify and rectify any issues with the organization has depended on two application. To ensure smooth opera- the systems on board. “Because we’re in , getting last-minute spare parts or specialized technicians from a supplier is almost out of the question,” says Carrie-Anne Harris, Second Engineer on the RSS Sir David Attenborough. “If we or the machinery fail at some level, it can have a huge impact on things like funding for the scientific projects, or on the personnel situated at the polar research centres. As the ship will be carrying food and supplies, any problems that can’t be fixed quickly will result in major disruption and substantial cost.”

Gaining first-hand insights “Because we have a lot of new equip- ment on board, it was crucial for us to get the right training,” Harris says. She notes that Alfa Laval separators and even PureBilge have been used on the older BAS research vessels, but that operating knowledge has often been Skills bring security Experience matters passed along from crew member to When it comes to ballast water treat- In general, Harris was impressed by crew member. When operations begin ment, the equipment on RRS David the open dialogue between Alfa Laval on RRS Sir David Attenborough, BAS Attenborough is entirely new – as is the trainers and the course participants. wants not only the equipment – but also application. When the vessel enters “All of our instructors were very knowl- the crew’s insights – to be fresh. operation, it will be the first time crew edgeable and practical, and I got the members have had to comply with impression that they’ve been with Alfa “This was my first visit to Alfa Laval for the global legislation targeting invasive Laval for a very long time,” she says. training,” Harris continues. “It was really species. Receiving thorough training for “But it wasn’t just two days of sitting in useful to be able to ask questions, as PureBallast 3 was therefore a high priority. a classroom and listening. It was very you can get a deeper understanding much a two-way conversation.” of why things work, not just how “It’s something very new that none of us they work. This helps in the long run, had ever worked with before,” Harris What Harris and her peers appreciated because if you understand why a piece explains. “Our deck officers were a little most, however, was the hands-on of equipment operates in a certain way, worried by the fact that they can’t pump nature of the instruction, which gave it makes it much easier to diagnose water into the ship without putting them opportunities to practise the problems if something goes wrong.” through this system. But once we had theory in the workshop. “It’s all very nice been through the training, it became looking at a presentation, but it’s so clear that the system itself is very simple much more valuable to be able to touch and easy to use. Being able to see it it,” she concludes. “As engineers, we and having someone talk us through it like to learn with our hands.” really gave us peace of mind.”

Pr on oje ti ct lu a o n Total solutions in ballast water treatment s d & in g s n i t Compliance a PLANNING AND SOLUTION PROJECT AND INSTALLATION PERFORMANCE ASSURANCE n l

l

n a

a and t

l

i

o • Validated solution for your need • Correct and on-time delivery • Confidence in proving compliance

P performance n • Easy integration • Time and money saved in installation • No business interruptions

P e e • Simple and secure • Successful start-up • Lasting performance rf nc orm ra investment ance assu • Crew prepared for operation

100001252-2-EN 1905 Alfa Laval reserves the right to change specifications without prior notification.

How to contact Alfa Laval Up-to-date Alfa Laval contact details for all countries are always available on our website at www.alfalaval.com.