Town Committee Bozdar Wada

Total Page:16

File Type:pdf, Size:1020Kb

Town Committee Bozdar Wada TOWN COMMITTEE BOZDAR WADA No. TCBZ/ / 9 /2018 Dated: c/ )/' To, The Director (C.B) Sindh Public Service Procurement Regularly Authority, Government of Sindh Karachi SUBJECT: TENDER NOTICE / Enclosed herewith NIT BEAR No: TCBZ/ / Dated: /— D3"," dully signed along with the following documents for hoisting on the Government website. Notification of Procurement Committee (Rule-7) Annual Procurement Plan for the F.Y 20 18-19 (Rule-il) Notification of Redressal Committee (Rule-3 1) Complete set of Bidding Documents. Cross Cheque bearing No. 21625510 Dated: 01-03-2018 an amounting to Rs. 2000/- Rupees (Two Thousand Only) DA/as above airman Town Committee Bozdar Wada çL4 Email: tcbw2018gmai1.com Phone No: 0243- 621011 OFFICE OF THE TOWN COMMITTEE BOZDARWADA NOTC/BW/ ( /2018 BW DATED: e t- - NOTICE INVITING TENDER Sealed tender the invited from all interested illegible bidders/contractors on standard bidding documents forms for procurement of below mentioned works of the Town committee Bozdar wada Taluka Than mirwah Distrct khairpur mirs. S# Name of Work Estimate Total Earnest money Bid tender fees Time (M)Cost (2%) Allowed for completatio n epair maintenance &construction of surface drain 0.700 14000/- 1000/- 12 Months Phase—I ward no. 01 Town Bozdar Wada 4 pair maintenance &construction of surface drain 0.8 00 16000/- 1000/- 12 Months wt Phase-Il ward no. 01 Town Bozdar Wada epair maintenance &construction of surface drain 0.500 1000/- 500/- 12 Months at Phase-I ward no.02 Town Bozdar Wada 4 Repair maintenance &construction of surface drain 0.700 14000/- 1000/- 12 Months at phase-Il ward no. 02 Town Bozdar Wada 5 Providing & laying brick pavement at various 0.550 11000/- 1000/- 12 Months village Phase-I ward no. 03 Town Committee Bozdar Wada 6 Providing & laying brick pavement at various 0.6 50 13000/- 1000/- 12 Months village Phase-lI ward no. 03 Town Committee Bozdar Wada 7 Construction of RCC Slab Culverts at Various 0.800 16000/- 1000/- 12 Months Places in Ward No. 03 Town Committee Bozdar Wada 8 Providing & laying brick pavement at various 0.700 14000/- 1000/- 12 Months village Phase-I ward no. 04 Town Committee Bozdar Wada 9 Providing & laying brick pavement at various 0.500 10000/- 500/- 12 Months village Phase-Il ward no. 04 Town Committee Bozdar Wada 10 Construction of RCC Slab Culverts at Various 0.800 16000/- 1000/- 12 Months Places in Ward No. 04 Town Committee Bozdar Wada 11 Providing & laying brick pavement at Village 0.550 11000/- 1000/- 12 Months Ghaman Shar Phase-I ward no.05 Town Committee Bozdar Wada 12 Providing & laying brick pavement at Village 0.450 9000/- 500/- 12 Months Ghaman Shar Phase-il ward no. 05 Town Committee Bozdar Wada 13 Providing & laying brick pavement at Village 0.700 14000/- 1000/- 12 Months Islamabad Pir Arbab Shah & Moula Bux Shar Town Committee Bozdar Wada 14 Construction of RCC Slab Culverts at Various 0.800 16000/- 1000/- 12 Months Places in Ward No. 05 Town Committee Bozdar Wada 15 Repair maintenance &construction of surface drain 0.600 12000/- 1000/- 12 Months at village Mehrab Khan Rind Phase-I Town Bozdar Wada 16 Repair maintenance &construction of surface dram 0.400 8000/- 500/- 12 Months at village Mehrab Khan Rind Phase-I! Town Bozdar Wada 17 Construction Of Cc Block Main Chowk To Jamia 0.700 14000/- 1000/- 12 Months Masjid City Bozdar Phase-I 18 Construction Of Cc Block Main Chowk To Jamia 0.700 14000/- 1000/- 12 Months Masjid City Bozdar Phase-I! 19 Construction Of Cc Block Main Chowk To Jamia 0.700 14000/- 1000/- 12 Months Masjid City Bozdar Phase-I!! 20 Construction Of Cc Block Main Chowk To Jamia 0.700 14000/- 1000/- 12 Months Masjid City Bozdar Phase-TV 21 Construction Of Cc Block Main Chowk To Jamia 0.700 14000/- 1000/- 12 Months Masjid City Bozdar Phase-V 22 Construction Of Cc Block Main Chowk To Jamia 0.700 14000/- 1000/- 12 Months Masjid City Bozdar Phase-VT 23 Construction Of Cc Block Main Chowk To Jamia 0.800 16000/- 1000/- 12 Months Masjid City Bozdar Phase-VU 24 Construction of compound wall for Imam Bargah 0.600 12000/- 1000/- 12 Months at Village Mehrab Khan Rind 25 Repair of Town Committee Office of Town 1.000 20000/- 1500/- 12 Months Bozdar Wada 26 Construction of Surface Drain TiC Brick Pavement 0.500 10000/- 500/- 12 Months at Village Walidad Joyo 27 Repair of Dargah Haji Hassan Shah Ward No. 03 0.600 12000/- 1000/- 12 Months 28 Supply 2.0 Nos Chungchi of Bargah from Internal Offer rate 10000/- 1000/- 12 Months streets of city Bozdar Wada 29 Supply of fumigation spray machine Offer rate 10000/- 1000/- 12 Months 30 Supply of 50.0 Nos dustbin with in installation Offer rate 10000/- 1000/- 12 Months various points of city Bozdar Wada and area of Whole Town Committee where needed TERMS & CONDITIONS 1. All terms and conditions can be seen in the office of undersigned during office hours on my working day. 2. The contact documents/blank tenders can be obtained from office of undersigned on payment on tender seen on refundable on any working day from the date of hoisting of SPPRA website upto 21-03-2018 11:00 AM and receive back same day at 01:00 PM and will be open upto same day 02:00 PM in resence of interested contractor of their authorized representive who may desired to be present. 3. 2% of specified amount against wach work in shape of pay order/bank draft in favour of town committee Bozdar Wada shall be attached with the tender. 4. Tender in unsealed cover/without 2% tender fee will not be entertained and discarded. 5. The single envaloph procedure adopted for tender work as per SPPRA, rules 2010 and amended 2013. 6. Tender can be seen/download on authorities websites SPPRA www.ppra.sindh.gov.pk 7. The procuring agency reserves the right to accept or reject one or all tenders subject to relevant provisions of SPPRA rules 2010. 8. Affidavit to the effect that the FirmlContractor has not be blank listed previously by any executing agency. 9. Affidavit with effect that all documents / particulars / information furnished are true and correct. NOTE: 2c time the nest date of issued and opening of un-responded works contract documents / blanks tenders can be obtained from office of undersigned on payment on tender fee on non-refundable on any working day upto 06-04-2018 at 11:00 AM and received back same day at 01:00 PM and will be open upto same day 02:00 PM in Presences of interested contractors of their authorized representative who may desired to be present. IRMA Town Committee Bozdar Wada 1. The Director CB SPPRA Government of Sindh Karachi with a request to upload on the website of SPPRA. ANNUAL PROCUREMENT PLAN TOWN COMMITTEE BOZDAR WADA FOR THE FINANCIAL YEAR 2018-19 S# Description of Procurement Quantity Estimated Unit Estimate Funds Source of finds Proposed Timing of Procurement Remarks (Where Cost Where Total Cost Allocated ADPINon ADP Procurement Applicable) applicable 2018-19 Method 21id I Repair maintenance &construction of 0.700 0.700 Own Fund Single stage Q 3rd Qtr Subject to availability of funds surface drain at Phase —I ward no. 01 One Enveloph Town Bozdar Wada 2 Repair maintenance &construction of 0.800 0.800 Own Fund Single stage Pt Qir 2 Qtr Subject to availability of funds surface drain at Phase-Il ward no. 01 One Enveloph Town Bozdar Wada 3 Repair maintenance &construction of 0.500 0.500 Own Fund Single stage 1 Qtr 2t Qtr Subject to availability of funds surface drain at Phase-I ward no. 02 One Enveloph Town Bozdar Wada 4 Repair maintenance &construction of 0.700 0.700 Own Fund Single stage 10 Qtr 2t Qtr Subject to availability of funds surface drain at phase-Il ward no. 02 One Enveloph Town Bozdar Wada 5 Providing & laying brick pavement at 0.550 0.550 Own Fund Single stage 15t Qtr 21t( Qtr Subject to availability of funds various village Phase-I ward no. 03 One Enveloph Town Committee Bozdar Wada 2nd Q. 6 ProvIding & laying brick pavement at 0.650 0.650 Own Fund Single stage Itt Qtr Subjectto availability of funds various village Phase-Il ward no. 03 One Enveloph Town Committee Bozdar Wada 2fld Qtr 7 Construction of RCC Slab Culverts at 0.800 0.800 Own Fund Single stage Subject to availability of funds Various Places in Ward No. 03 Town One Enveloph Committee Bozdar Wada 2nd 8 Providing & laying brick pavement at 0.700 0.700 Own Fund Single stage 10 Qn Qtr Subject to availability of funds various village Phase-I ward no. 04 One Enveloph Town Committee Bozdar Wada 2nd 9 Providing & laying brick pavement at 0.500 0.500 Own Fund Single stage 10 Qfl Qtr Subject to availability of funds various village Phase-Il ward no. 04 One Enveloph Town Committee Bozdar Wada 2nd 10 Construction of RCC Slab Culverts at 0.800 0.800 Own Fund Single stage itt Qti Qtr Subject to availability of funds Various Places in Ward No. 04 Town One Enveloph Committee Bozdar Wada 1st 2nd 11 Providing & laying brick pavement at 0.550 0.550 Own Fund Single stage Subject to Village Ghaman Shar Phase-I ward no. One Qtr Qtr availability of 05 Town Committee Bozdar Wada Enveloph funds 1st 2nd 12 Providing & laying brick pavement at 0.450 0.450 Own Fund Single stage Subject to Village Ghaman Shar Phase-Il ward One Qtr Qtr availability of no.
Recommended publications
  • SEF Assisted Schools (SAS)
    Sindh Education Foundation, Govt. of Sindh SEF Assisted Schools (SAS) PRIMARY SCHOOLS (659) S. No. School Code Village Union Council Taluka District Operator Contact No. 1 NEWSAS204 Umer Chang 3 Badin Badin SHUMAILA ANJUM MEMON 0333-7349268 2 NEWSAS179 Sharif Abad Thari Matli Badin HAPE DEVELOPMENT & WELFARE ASSOCIATION 0300-2632131 3 NEWSAS178 Yasir Abad Thari Matli Badin HAPE DEVELOPMENT & WELFARE ASSOCIATION 0300-2632131 4 NEWSAS205 Haji Ramzan Khokhar UC-I MATLI Matli Badin ZEESHAN ABBASI 0300-3001894 5 NEWSAS177 Khan Wah Rajo Khanani Talhar Badin HAPE DEVELOPMENT & WELFARE ASSOCIATION 0300-2632131 6 NEWSAS206 Saboo Thebo SAEED PUR Talhar Badin ZEESHAN ABBASI 0300-3001894 7 NEWSAS175 Ahmedani Goth Khalifa Qasim Tando Bago Badin GREEN CRESCENT TRUST (GCT) 0304-2229329 8 NEWSAS176 Shadi Large Khoski Tando Bago Badin GREEN CRESCENT TRUST (GCT) 0304-2229329 9 NEWSAS349 Wapda Colony JOHI Johi Dadu KIFAYAT HUSSAIN JAMALI 0306-8590931 10 NEWSAS350 Mureed Dero Pat Gul Mohammad Johi Dadu Manzoor Ali Laghari 0334-2203478 11 NEWSAS215 Mureed Dero Mastoi Pat Gul Muhammad Johi Dadu TRANSFORMATION AND REFLECTION FOR RURAL DEVELOPMENT (TRD) 0334-0455333 12 NEWSAS212 Nabu Birahmani Pat Gul Muhammad Johi Dadu TRANSFORMATION & REFLECTION FOR RURAL DEVELOPMENT (TRD) 0334-0455333 13 NEWSAS216 Phullu Qambrani Pat Gul Muhammad Johi Dadu TRANSFORMATION AND REFLECTION FOR RURAL DEVELOPMENT (TRD) 0334-0455333 14 NEWSAS214 Shah Dan Pat Gul Muhammad Johi Dadu TRANSFORMATION AND REFLECTION FOR RURAL DEVELOPMENT (TRD) 0334-0455333 15 RBCS002 MOHAMMAD HASSAN RODNANI
    [Show full text]
  • Sindh Community Mobilization Program Quarterly Progress Report (January 1, 2019 to March 31, 2019)
    SINDH COMMUNITY MOBILIZATION PROGRAM QUARTERLY PROGRESS REPORT (JANUARY 1, 2019 TO MARCH 31, 2019) Date: April 30, 2019 CMP is made possible by the support of the American People through the United States Agency for International Development (USAID) CMP is implemented by Blumont Engineering Solution (BES) under Contract Award No: AID – 391 – C – 13 – 00006 This report was produced for USAID. Table of Contents A. PROGRAM SUMMARY ........................................................................................................................ 5 B.1. SUMMARY OF ACCOMPLISHMENTS DURING JANUARY 1, 2019 – MARCH 31, 2019 .............................................................................................................................................................................. 6 B.2. MISSION STRATEGIC FRAMEWORK (MSF) INDICATOR SUMMARY FOR JANUARY 2019 – MARCH 2019 .................................................................................................................... 8 C. STATUS OF ACTIVITIES AS PER COMPONENT ..................................................................... 10 Component I: Increase Communities’ Involvement in GOS Reform of Consolidation, Merging, and Upgrading Schools ............................................................................................................. 10 Component II: Improve Community and District Administration Coordination for Increased Girls Enrollment .......................................................................................................................
    [Show full text]
  • Data Collection Survey on Infrastructure Improvement of Energy Sector in Islamic Republic of Pakistan
    ←ボックス隠してある Pakistan by Japan International Cooperation Agency (JICA) Data Collection Survey on Infrastructure Improvement of Energy Sector in Islamic Republic of Pakistan Data Collection Survey ←文字上 / 上から 70mm on Infrastructure Improvement of Energy Sector in Pakistan by Japan International Cooperation Agency (JICA) Final Report Final Report February 2014 February 2014 ←文字上 / 下から 70mm Japan International Cooperation Agency (JICA) Nippon Koei Co., Ltd. 4R JR 14-020 ←ボックス隠してある Pakistan by Japan International Cooperation Agency (JICA) Data Collection Survey on Infrastructure Improvement of Energy Sector in Islamic Republic of Pakistan Data Collection Survey ←文字上 / 上から 70mm on Infrastructure Improvement of Energy Sector in Pakistan by Japan International Cooperation Agency (JICA) Final Report Final Report February 2014 February 2014 ←文字上 / 下から 70mm Japan International Cooperation Agency (JICA) Nippon Koei Co., Ltd. 4R JR 14-020 Data Collection Survey on Infrastructure Improvement of Energy Sector in Pakistan Final Report Location Map Islamabad Capital Territory Punjab Province Islamic Republic of Pakistan Sindh Province Source: Prepared by the JICA Survey Team based on the map on http://www.freemap.jp/. February 2014 i Nippon Koei Co., Ltd. Data Collection Survey on Infrastructure Improvement of Energy Sector in Pakistan Final Report Summary Objectives and Scope of the Survey This survey aims to collect data and information in order to explore the possibility of cooperation with Japan for the improvement of the power sector in Pakistan. The scope of the survey is: Survey on Pakistan’s current power supply situation and review of its demand forecast; Survey on the power development policy, plan, and institution of the Government of Pakistan (GOP) and its related companies; Survey on the primary energy in Pakistan; Survey on transmission/distribution and grid connection; and Survey on activities of other donors and the private sector.
    [Show full text]
  • ADP 08-09 All Districts(CP-RAM)6/25/2004 Rs
    DISTRICT WISE SCHEMES INCLUDED IN PROVINCIAL ADP 2008-09 KHAIRPUR Rs. In million SR # G. Status of Estimated Estimated Throw- Allocation Serial Name of Scheme the Cost Expenditure forward 2008-09 No. schemes upto June, 08 12 3456 Transport & Communication Ongoing 1 141 Widening / Reconditioning of Hingorja - Approved 76.698 74.500 2.198 5.000 Seharja Thari Mirwah road mile 0/0-17/0 = 17- 0 (M) = 27.37 Kms. 2 142 Widening / Reconditioning of road from Approved 89.268 78.340 10.928 5.000 Khairpur (Luqman) to main Machi Chowk mile 0/0-8/6 = 8-6 (M) = 14.08 Kms 3 143 Widening / Reconditioning of road from Approved 100.226 105.723 -5.497 5.000 Rashdi Petrol Pump to Ripri via Ahmedpur Manghanwari road mile 0/0-17/2 = 17-2 (M) = 27.77 Kms. 4 144 Reconditioning of road from Gambat Approved 75.081 41.473 33.608 8.000 Sobhodero via Thatti mile 0/0-10/0 = 10- 0 (M) = 16.10 Kms. 5 145 Block Scheme for improvement of Provincial Approved 40.138 41.519 -1.381 0.100 roads in each District. 6 146 Widening / Reconditioning of road from Kot Approved 104.230 53.000 51.230 30.000 Diji Tando Mastee up to new National Highway Mile 0/0-8/6 = 8-6 (M) = 14.08 Kms. 7 147 Widening / Reconditioning to Lakha to Approved 99.577 11.000 88.577 8.000 Kandiari road Mile 0/0-13/6 = 13-6 (M) = 22.13 Kms. 8 148 Widening / Reconditioning Kot Diji – Tando Approved 125.808 46.000 79.808 20.000 Masti New N / Way Ahmedpur Wada Mahasar and Khowaja Road Mile 0/0-17/5 = 17-5 (M) = 28.37 Kms.
    [Show full text]
  • Budget Execution Report 2Nd QUARTER 2020-21
    Budget Execution Report 2nd QUARTER 2020-21 31th December, 2020 Government of Sindh Finance Department Table of contents: Introduction ............................................................................................................................................................................. 2 Table 1 Interim Fiscal Statement .......................................................................................................................................... 3 Table 2 Revenue by Object .................................................................................................................................................... 4 Table 3 Revenue by Department........................................................................................................................................... 7 Table 4 Expenditure by Department .................................................................................................................................... 9 Table 5 Recurrent Expenditure by Department, Grant and Object ............................................................................... 20 Table 6 Provincial ADP by Sector and Sub-sector .......................................................................................................... 41 Table 7 Development Expenditure by Sector, Subsector and Scheme ....................................................................... 42 Table 8 Current Capital Expenditure ...............................................................................................................................
    [Show full text]
  • National Assembly Polling Scheme
    ELECTION COMMISSION OF PAKISTAN FORM 28 [See Rule 50] LIST OF POLLING STATIONS FOR A CONSTITUENCY Election to the National Assembly Sindh No. & Name of Constituency:- NA-208 Khairpur-I Number of Booths Number of Voters assigned In case of Rural areas In case of Urban Areas Serial No of assigned to Polling to Polling Stations voters on E Stations S.No. No. & Name of Polling Station A in case of Name of Electoral Census Block Name of Electoral Census Block bifurcation Male Female Total Male Female Total Area Code Area Code of EA 1 2 3 4 5 6 7 8 9 10 11 12 13 1 GPS Saleem Abad MC Khairpur 333040101 861 735 1596 2 2 4 MC Khairpur 333040106 861 735 1596 2 2 4 2 GPS Boys Faiz Abad Colony (Male) MC Khairpur 333040102 312 0 312 3 0 3 MC Khairpur 333040103 254 0 254 MC Khairpur 333040104 306 0 306 MC Khairpur 333040105 217 0 217 1089 0 1089 3 0 3 3 GGPS Faiz Abad Colony (Female) MC Khairpur 333040102 0 228 228 0 3 3 MC Khairpur 333040103 0 202 202 MC Khairpur 333040104 0 250 250 MC Khairpur 333040105 0 233 233 0 913 913 0 3 3 4 District Council Office Khairpur-I MC Khairpur 333040201 495 422 917 2 1 3 MC Khairpur 333040206 495 422 917 2 1 3 District Council Office Khairpur-II 5 MC Khairpur 333050405 1231 0 1231 4 0 4 (Male) MC Khairpur 333050410 Page 1 of 130 Number of Booths Number of Voters assigned In case of Rural areas In case of Urban Areas Serial No of assigned to Polling to Polling Stations voters on E Stations S.No.
    [Show full text]
  • Ehsaas Emergency Cash Payments
    Consolidated List of Campsites and Bank Branches for Ehsaas Emergency Cash Payments Campsites Ehsaas Emergency Cash List of campsites for biometrically enabled payments in all 4 provinces including GB, AJK and Islamabad AZAD JAMMU & KASHMIR SR# District Name Tehsil Campsite 1 Bagh Bagh Boys High School Bagh 2 Bagh Bagh Boys High School Bagh 3 Bagh Bagh Boys inter college Rera Dhulli Bagh 4 Bagh Harighal BISP Tehsil Office Harigal 5 Bagh Dhirkot Boys Degree College Dhirkot 6 Bagh Dhirkot Boys Degree College Dhirkot 7 Hattain Hattian Girls Degree Collage Hattain 8 Hattain Hattian Boys High School Chakothi 9 Hattain Chakar Boys Middle School Chakar 10 Hattain Leepa Girls Degree Collage Leepa (Nakot) 11 Haveli Kahuta Boys Degree Collage Kahutta 12 Haveli Kahuta Boys Degree Collage Kahutta 13 Haveli Khurshidabad Boys Inter Collage Khurshidabad 14 Kotli Kotli Govt. Boys Post Graduate College Kotli 15 Kotli Kotli Inter Science College Gulhar 16 Kotli Kotli Govt. Girls High School No. 02 Kotli 17 Kotli Kotli Boys Pilot High School Kotli 18 Kotli Kotli Govt. Boys Middle School Tatta Pani 19 Kotli Sehnsa Govt. Girls High School Sehnsa 20 Kotli Sehnsa Govt. Boys High School Sehnsa 21 Kotli Fatehpur Thakyala Govt. Boys Degree College Fatehpur Thakyala 22 Kotli Fatehpur Thakyala Local Govt. Office 23 Kotli Charhoi Govt. Boys High School Charhoi 24 Kotli Charhoi Govt. Boys Middle School Gulpur 25 Kotli Charhoi Govt. Boys Higher Secondary School Rajdhani 26 Kotli Charhoi Govt. Boys High School Naar 27 Kotli Khuiratta Govt. Boys High School Khuiratta 28 Kotli Khuiratta Govt. Girls High School Khuiratta 29 Bhimber Bhimber Govt.
    [Show full text]
  • Download Download
    Int. J. Econ. Environ. Geol. Vol. 9Shar (3)13 et -al.18 /,Int.J.Econ.Environ.Geol.Vol. 2018 9(3) 13-18, 2018 Open Access Journal home page: www.econ-environ-geol.org ISSN: 2223-957X c Assessment of Soil Quality of Taluka Thari Mirwah, District Khairpur, Sindh, Pakistan Shafqat Hussain Shar1, Abdul Razak Mahar1, Inyatullah Rajpar2, Mumtaz Ali Saand1, Ameer Ahmed Mirbahar1, Khalil Ahmed Ansari1, Rafat Saeed3, Muzafar Hussain Sirohi1* 1Department of Botany, Shah Abdul Latif University Khairpur, Sindh, Pakistan 2Sindh Agriculture University, Tando Jam, Sindh, Pakistan 3Department of Botany, Federal Urdu University of Arts, S & T, Karachi, Pakistan *Email: [email protected] Received: 11 July, 2018 Accepted: 22 September, 2018 Abstract: Soil salinity is an increasing threat for agriculture. The knowledge of physical and chemical properties of the soil is vital for the assessment of the capacity of soil for better plant productivity and improvement through management practices. We assessed the soil of ten union councils of Taulka Thari Mirwah, district Khairpur. The soil was evaluated for pH, EC, organic matter and salt contents through standardized methods. The overall soil was found to be slightly alkaline (pH 8 ± 0.6 SD), with a varied texture among the sites. The soil EC (10 ± 7.9 SD dS/m) was recorded to be comparatively higher than the surrounding districts. The study did not find any significant variation in various salt contents in the area. The organic contents were lower than the advised extent. However, the management practices were suggested to improve the health of soil for better productivity.
    [Show full text]
  • Sindh Community Mobilization Program
    SINDH COMMUNITY MOBILIZATION PROGRAM Quarterly Progress Report – Year IV, Quarter II (January 1, 2017 – March 31, 2017) Date: April 30, 2017 CMP is made possible by the support of the American People through the U.S. Agency for International Development (USAID). CMP is implemented by International Relief and Development (IRD) under Contract Award No: AID-391-C-13-00006. This report was produced for review by USAID. CMP Year IV, Quarter II Report 1 Table of Contents Table of Contents ................................................................................................................................................ 2 ACRONYMS ........................................................................................................................................................ 3 1. PROGRAM SUMMARY ........................................................................................................................... 6 2. SUMMARY OF ACCOMPLISHMENTS DURNG REPORTING PERIOD....................................... 7 3. STATUS OF THE ACTIVITIES AS PER THE COMPONENTS ......................................................... 9 3.1. Component I: Increase Community Involvement in the GOS Reforms of Merging, Consolidating, and Upgrading Schools ......................................................................................................... 9 3.2. Component II: Improve Community and District Government Coordination for Increased Girls’ Enrollment ..........................................................................................................................................
    [Show full text]
  • Khairpur Blockwise
    POPULATION AND HOUSEHOLD DETAIL FROM BLOCK TO DISTRICT LEVEL SINDH (KHAIRPUR DISTRICT) ADMIN UNIT POPULATION NO OF HH KHAIRPUR DISTRICT 2,405,523 413,044 FAIZ GANJ TALUKA 224,004 43,496 KARUNDI TC 10,411 2067 CHARGE NO 03 10,411 2067 CIRCLE NO 01 10,411 2067 339030101 1,922 381 339030102 2,114 408 339030103 2,276 474 339030104 663 146 339030105 916 181 339030106 1,077 186 339030107 1,443 291 PACCA CHANG STC 93,718 18239 AKARI TC 12,883 2380 AKARI 12,883 2380 339010101 1,308 245 339010102 1,126 210 339010103 808 160 339010104 1,413 265 339010105 959 204 339010106 765 155 339010107 786 145 339010108 955 179 339010109 1,133 183 339010110 1,107 176 339010111 1,454 249 339010112 1,069 209 HUSSAIN PATO TC 16,498 3367 CHEENA 2,498 529 339010312 1,235 268 339010313 1,263 261 HUSSAIN PATO 3,788 775 339010301 978 196 339010302 1,538 340 339010303 1,272 239 KHENYARI 5,796 1105 339010304 1,606 292 339010305 1,309 263 339010306 1,431 288 339010307 1,450 262 MEHAR ALI UNAR 4,416 958 339010308 706 155 339010309 1,618 317 339010310 949 225 339010311 1,143 261 KANDIARI TC 16,868 3151 GADANO 939 147 339010415 939 147 Page 1 of 53 POPULATION AND HOUSEHOLD DETAIL FROM BLOCK TO DISTRICT LEVEL SINDH (KHAIRPUR DISTRICT) ADMIN UNIT POPULATION NO OF HH KANDIARI 4,447 812 339010401 1,145 217 339010402 1,069 192 339010403 1,595 281 339010404 638 122 NINDHERO 7,161 1380 339010405 962 143 339010406 1,002 185 339010407 1,052 222 339010408 1,327 280 339010409 997 221 339010410 1,157 198 339010416 664 131 PALYO LASHARI 641 135 339010411 641 135 SAHTO 1,381 271 339010412
    [Show full text]
  • MINUTES of the (14Th ) MONTHLY REVIEW MEETING of DISTRICT HYDERABAD
    MINUTES OF THE (14th ) MONTHLY REVIEW MEETING OF DISTRICT HYDERABAD Monthly Review Meeting (M.R.M) of District, Hyderabad for the Month of January, 2013 was held on 13.2.2013 at meeting Hall of DG Health Office, Hyderabad. Written invitations to participate were sent to the Administrator/ DCO, the D.H.O, all Focal persons of Vertical Programs, District Population Officer i.e EPI, TB DOTS,MNCH, National Program, Malaria Control, Hepatitis, DHIS & DEWS, representatives WHO, all I/c Medical Officers/ FMOs/LHVs etc. List of Participants S S Names Designation Names Designation # # 1. Abdul Shakoor Shaikh RPD-I 38 Waseem jokhio SO 2. Dr Qaisar Qaimkhani DOH(M&PH) 39 Dr. Mumtaz Rajper FMO 3. Mr. Mustafa Kamal Tagar DSM, PPHI 40 Dr. Neelofer Kazi FMO 4. Dr Kashif Ali Channar Asstt Professor 41 Mr. Athar Ali Memon Ex: M&E 5. Dr.Farzana Chachar Sonologist 42 Dr Atif MO 6. Dr. Sono Khan Bhurgri T.H.O Hyd Rural 43 Dr. Yasir MO 7. Dr. Naila Sheikh FMO 44 Dr. Mehwish FMO 8. Dr. Sadia Pir FMO 45 Dr. Fareeda FMO 9. Dr. Shabnum DDO 46 Dr. Shabnum Tunio FMO 10. Dr. Rafique Ahmed MO 47 Dr. Rukhsana Dal Sonologist 11. Dr. Ammnullah Ogahi SMO 48 Dr. Farzana Agha WMO 12. Dr. Azeem Shah SMO I/C 49 Dr. Kapil Dev M O HQ 13. Dr. A. Rahim Khatian SMO I/C 50 Sanjar Kumar Asst.Store 14. Dr. Raza Muhammad SMO I/C 51 Dr. Yasir Ali MO 15. Dr. Muqadus Ali MO 52 Dr. Ashok Kumar MO 16.
    [Show full text]
  • Introduction
    Blacksmith Street off Shahi Bazar, Sukkur. P# 071-5625355, M#: 0334-2915700 , E: [email protected] www.agssukkur.com Introduction A.G & Sons City Distributor Mr.M.Ilyas Memon (Managing Director) Mr.Arsalan Memon (Branch Manager) Pharmaceuticals Distribution Network Pharmaceuticals & Consumer Sole Distributor Blacksmith Street Off Shahi Bazar, Sukkur. Mochi Bazar Off Shahi Bazar, Sukkur. Email: [email protected] Email: [email protected] Safe Medicine House Rite Distributor Mochi Bazar Off Shahi Bazar, Sukkur. opp: Memon Masjid, Mochi Bazar, Sukkur. Mr.Javed Memon (Branch Manager) Mr.Muhammad Ismaiel (Branch Manager) Email: [email protected] Email: [email protected] Time Medicine Distributor Star Medicine House Shaddani Shopping Centre, Station Road, Ghotki. Dahar wah Road, Deharki Mr. Waheed Shaikh (Branch Manager) Mr. Muhammad Ali (Branch Manager) Email: [email protected] Email: [email protected] More Medicine House Rose Medicine House Hazzari Dar, Station Road, Shikarpur. Opp A-SECTION POLICE STATION KHAIRPUR Mr.Waqar Shaikh (Branch Manager) Mr. Sarmad Ali (Operation Manager) Email: [email protected] Email: [email protected] Best Distributor Care Medicine Distributors Quetta Road, Jacobabad Awan Market, Kandh Kot. Mr. Barkat Soomro (Branch Manager) Mr. Sanjay (Operation Manager) Email: [email protected] Email: [email protected] Noor Distributor Station Road, Gambat Mr. Sami ullah (Operation Manager) Email: [email protected] Managing Director Branch Managers Store Incharge Computer
    [Show full text]