Conwy Local Flood Risk Management Strategy

Total Page:16

File Type:pdf, Size:1020Kb

Conwy Local Flood Risk Management Strategy Conwy Local Flood Risk Management Strategy Strategy Document February 2013 Conwy County Borough Council ConwyECP Local ECP ECPFlood ECP RiskECP F:\DCIM\Draft Conwy Strategy DRAFT V4.docx Management Strategy24 July 2012 Strategy Document 2013 - 2017 February 2013 Conwy County Borough Council G.B. Edwards BEng (Hons) CEng FICE Head of Environment, Roads and Facilities Service, Mochdre Offices, Conway Road, Mochdre, Colwyn Bay, LL29 5AB. Tel. (01492) 574000 Fax. (01492) 575199 Conwy Local Flood Risk Management Strategy Issue and revision record Document Title Local Flood Risk Management Strategy Version 130225.TP11A.LFRMS.02 Status Approved Document version Notes Date 0.2 Cabinet Issue February 2013 Signature Name Date K Burton 25/02/13 Prepared by C Probert S Wasik 25/02/13 Checked by D Rowlands Approved by G Edwards 25/02/13 This document is issued for the party which commissioned it We accept no responsibility for the consequences of this and for specific purposes connected with the above-captioned document being relied upon by any other party, or being used project only. It should not be relied upon by any other party or for any other purpose, or containing any error or omission which used for any other purpose. is due to an error or omission in data supplied to us by other parties. This document contains proprietary intellectual property. It should not be used by other parties without consent from us and from the party which commissioned it. Copyright of Conwy County Borough Council Conwy Local Flood Risk Management Strategy We are happy to provide this information in alternative formats A Please Contact: HR and Equality Officer E-mail: [email protected] Telephone: 01492 576225 Conwy Local Flood Risk Management Strategy Content Chapter Title Page Glossary and Abbreviations of words and phrases commonly used in flood and coastal erosion risk management __ 10 Executive Summary i 1. Introduction 1 1.1 Introduction ________________________________________________________________________ 1 1.2 Strategic Environmental Assessment ____________________________________________________ 2 1.3 Habitats Regulations Assessments ______________________________________________________ 2 2. Guiding Principles 3 3. Legislative Context 4 3.1 History of Flood Risk Management ______________________________________________________ 4 3.2 The Flood and Water Management Act 2010 ______________________________________________ 5 3.3 The Pitt Review _____________________________________________________________________ 5 3.4 The Flood Risk Regulations 2009 _______________________________________________________ 5 3.5 The National Strategy for Flood and Coastal Erosion Risk Management _________________________ 6 3.6 Other Legislation ____________________________________________________________________ 7 4. Flood Risk in Conwy 9 4.1 Introduction ________________________________________________________________________ 9 4.2 Local Flood Risk ____________________________________________________________________ 9 4.3 Types of Flooding __________________________________________________________________ 12 4.3.1 Surface Water Flooding (pluvial) _______________________________________________________ 12 4.3.2 Groundwater Flooding ______________________________________________________________ 14 4.3.3 Fluvial Flooding ____________________________________________________________________ 14 4.3.4 Sewer or Highway Flooding __________________________________________________________ 17 4.3.5 Reservoir Flooding _________________________________________________________________ 17 4.3.6 Coastal Flooding ___________________________________________________________________ 18 4.4 A Combination Event _______________________________________________________________ 18 4.5 Coastal Squeeze ___________________________________________________________________ 19 4.6 Factors Increasing Flood Risk _________________________________________________________ 20 4.7 Methodology for Identifying Areas of Risk ________________________________________________ 20 4.8 Limitations of data __________________________________________________________________ 21 5. Climate Change 23 5.1 Climate Change ___________________________________________________________________ 23 5.2 Climate Change in Wales ____________________________________________________________ 24 6. Regional and Local Plans 25 6.1 Conwy County Borough Council Preliminary Flood Risk Assessment __________________________ 25 6.2 Conwy and Clwyd Catchment Flood Management Plan _____________________________________ 26 6.3 River Dee Catchment Flood Management Plan ___________________________________________ 26 6.4 North West Wales Catchment Flood Management Plan _____________________________________ 27 6.5 West of Wales Shoreline Management Plan 2 ____________________________________________ 27 6.6 North West England and North Wales Shoreline Management Plan SMP2 ______________________ 28 Conwy Local Flood Risk Management Strategy 6.7 River Basin Management Plan – Western Wales River Basin District and Dee River Basin District ____ 28 6.8 Conwy Tidal Flood Risk Assessment ___________________________________________________ 29 6.9 Conwy Strategic Flood Risk Assessment ________________________________________________ 29 6.10 Multi Agency Flood Plans ____________________________________________________________ 30 6.11 The Tidal Clwyd Flood Risk Management Strategy ________________________________________ 30 7. Managing the Likelihood of Flooding 31 7.1 Responsibilities of Environment Agency Wales ___________________________________________ 33 7.1.1 Coastal Erosion Risk Management Authority _____________________________________________ 34 7.1.2 Emergency Planning ________________________________________________________________ 34 7.1.3 Main Rivers _______________________________________________________________________ 34 7.1.4 Coastal Flooding ___________________________________________________________________ 35 7.1.5 Reservoirs ________________________________________________________________________ 35 7.1.6 Single Environment Body for Wales ____________________________________________________ 36 7.2 Powers and Responsibilities of Conwy County Borough Council ______________________________ 37 7.2.1 As a Lead Local Flood Authority _______________________________________________________ 38 7.2.2 Environment and Technical Services ___________________________________________________ 39 7.2.2.1 Strategic Leadership ________________________________________________________________ 39 7.2.2.2 Recording of Flood Incidents _________________________________________________________ 39 7.2.2.3 Investigation of Flood Incidents________________________________________________________ 41 7.2.2.4 Register of Flood Risk Assets _________________________________________________________ 44 7.2.2.5 Sustainable development ____________________________________________________________ 47 7.2.2.6 Designating Assets _________________________________________________________________ 47 7.2.2.7 Meeting the Flood Risk Regulations ____________________________________________________ 47 7.2.2.8 Consenting Works on Ordinary Watercourses ____________________________________________ 48 7.2.2.9 As SuDS Approval Body (SAB) ________________________________________________________ 48 7.2.2.10 Environment and Technical Services other Duties _________________________________________ 50 7.2.3 In Carrying out Emergency Planning ___________________________________________________ 53 7.2.4 As a Planning Authority ______________________________________________________________ 56 7.3 Dŵr Cymru – Welsh Water ___________________________________________________________ 58 7.3.1 Transfer of Responsibilities ___________________________________________________________ 59 7.3.2 Flood Risk Management _____________________________________________________________ 59 7.3.3 Reducing Sewer Flooding ____________________________________________________________ 60 7.3.4 System of public sewers and works ____________________________________________________ 60 7.3.5 Reservoir Undertaker _______________________________________________________________ 61 7.4 Conwy County Borough Council Environment, Roads and Facilities Service Department ___________ 62 7.4.1 Responsibility to maintain the Highways _________________________________________________ 62 7.4.2 Adoption of SuDS __________________________________________________________________ 62 7.4.3 Powers to deliver works _____________________________________________________________ 62 7.4.4 Response in an Emergency Flooding Event ______________________________________________ 62 7.5 North and Mid Wales Trunk Road Agency on behalf of the Welsh Government ___________________ 64 7.6 Powers and Responsibilities of Conwy’s Citizens (Businesses, Landowners and Local Households) __ 65 7.6.1 Property Owners and Residents _______________________________________________________ 65 7.6.2 Riparian Ownership ________________________________________________________________ 66 7.6.3 Utility and Infrastructure Providers _____________________________________________________ 66 7.6.4 Reservoir Undertaker _______________________________________________________________ 67 8. Local Outcomes and Measures 68 8.1 Conwy County Strategic Outcomes ____________________________________________________ 68 Conwy Local Flood Risk Management Strategy 8.2 Potential Measures _________________________________________________________________ 71 8.3 Adopt Natural Flood Risk Management
Recommended publications
  • Dolgarrog, Conwy
    900 Dolgarrog Hydro-Electric Works: Dolgarrog, Conwy Archaeological Assessment GAT Project No. 2158 Report No. 900 November, 2010 Ymddiriedolaeth Archaeolegol Gwynedd Gwynedd Archaeological Trust Craig Beuno, Ffordd y Garth, Bangor, Gwynedd, ll57 2RT Archaeological Assessment: Dolgarrog Hydro-Electric Works Report No. 900 Prepared for Capita Symonds November 2010 By Robert Evans Ymddiriedolaeth Archaeolegol Gwynedd Gwynedd Archaeological Trust Craig Beuno, Ffordd y Garth, Bangor, Gwynedd, LL57 2RT G2158 HYDRO-ELECTRIC PIPELINE, DOLGARROG ARCHAEOLOGICAL ASSESSMENT Project No. G2158 Gwynedd Archaeological Trust Report No. 900 CONTENTS Page Summary 3 1. Introduction 3 2. Project brief and specification 3 3. Methods and Techniques 4 4. Archaeological Results 7 5. Summary of Archaeological Potential 19 6. Summary of Recommendations 20 7. Conclusions 21 8. Archive 22 9. References 22 APPENDIX 1 Sites on the Gwynedd HER within the study area APPENDIX 2 Project Design 1 Figures Fig. 1 Site Location. Base map taken from Ordnance Survey 1:10 000 sheet SH76 SE. Crown Copyright Fig. 2 Sites identified on the Gwynedd HER (Green Dots), RCAHMW survey (Blue Dots) and Walk-Over Survey (Red Dots). Map taken from Ordnance Survey 1:10 000 sheets SH 76 SE and SW. Crown Copyright Fig. 3 The Abbey Demesne, from Plans and Schedule of Lord Newborough’s Estates c.1815 (GAS XD2/8356- 7). Study area shown in red Fig. 4 Extract from the Dolgarrog Tithe map of 1847. Field 12 is referred to as Coed Sadwrn (Conwy Archives) Fig. 5 The study area outlined on the Ordnance Survey 25 inch 1st edition map of 1891, Caernarvonshire sheets XIII.7 and XIII.8, prior to the construction of the Hydro-Electric works and dam.
    [Show full text]
  • List of Planning Decisions Issued 12.07.2021
    List of Planning Decisions Issued DC04ARP REPORT CRITERIA: Decisions issued between 12/07/2021 and 25/07/2021 Application No: 0/47860 Grid 294312,345308 Reference: Application Type: Full Target Date: 30/12/2020 Determination Level Delegated Decision Date: 13/07/2021 Development Type(s): Minor Development Extension Decision Type: Approved With Conditions Electorial Division: Uwchaled Community Council: Cyngor Cymuned Llangwm Community Council Location: Bryn Ffynnon Bryn Ffynnon Llangwm LL21 0RL Proposal: Extension to agricultural shed (retrospective) Application No: 0/48133 Grid 295460,376623 Reference: Application Type: Full Target Date: 30/03/2021 Determination Level Delegated Decision Date: 23/07/2021 Development Type(s): New Development Decision Type: Approved With Conditions Electorial Division: Gele Community Council: Cyngor Tref Abergele Town Council Location: Caer Ffynnon Ffordd Y Berth Abergele LL22 9AU Proposal: Erection of a new detached dwelling following outline approval for the erection of two dwellings Application No: 0/48168 Grid 268502,374845 Reference: Application Type: Listed Building Consent Target Date: 07/04/2021 Determination Level Delegated Decision Date: 19/07/2021 Development Type(s): Household Decision Type: Withdrawn Electorial Division: Pandy Community Council: Cyngor Tref Llanfairfechan Town Council Location: Grey Gables The Close Llanfairfechan Conwy LL33 0AG Proposal: Replacement of leaded windows in existing retained timber sub frames (Listed Building Consent) Application No: 0/48240 Grid 278673,382066
    [Show full text]
  • Clwyd Flood Risk Management Strategy
    Managing the risk of tidal flooding The tidal Clwyd Flood Risk Management Strategy is now complete What is the tidal Clwyd Flood Risk Manag ement Strategy? A flood risk management strategy is a 100 year plan that sets out how we should adapt, improve and generally prepare an area for dealing with flooding in the short term, medium term and long ter m. The tidal Clwyd strategy covers the north Wales coastline and inland tidal area between Abergele and the Denbighshire-Flintshire border near Prestatyn. It covers the main centres of population around Rhyl, Kinmel Bay and Prestatyn. In addition to the permanent residents living in the strategy area, many thousands of people visit the area each year, including holidaymakers at local caravan parks. The tidal Clwyd strategy recommends a solution to tackle both tidal flooding from the river and coastal flooding from the sea. The strategy will be reviewed regularly during its lifetime to take account of any changes that happen over time. What does the Strategy say? Our overarching strategy is that all properties in this area should be protected to their current standard or better, through a combination of improvements to existing flood defences in the short term, and by realigning embankments in the medium to long term to make space for water. The existing coastal defences will be maintained and improved in future as necessary. The strategy These ke y principles form the basis of our strategy for managing flood risk. A combin ation of technical work, environmental assessment and consultation with stakeholders and loca l people helped us decide on the best short, medium and long term solutions.
    [Show full text]
  • Llyfrgell Genedlaethol Cymru = the National Library of Wales
    Llyfrgell Genedlaethol Cymru = The National Library of Wales Cymorth chwilio | Finding Aid - Papers regarding Penybont, Llanfair Talhaiarn, (NLW MS 16094iE & iiG.) Cynhyrchir gan Access to Memory (AtoM) 2.3.0 Generated by Access to Memory (AtoM) 2.3.0 Argraffwyd: Mai 12, 2017 Printed: May 12, 2017 Wrth lunio'r disgrifiad hwn dilynwyd canllawiau ANW a seiliwyd ar ISAD(G) Ail Argraffiad; rheolau AACR2; ac LCSH Description follows NLW guidelines based on ISAD(G) 2nd ed.; AACR2; and LCSH https://archifau.llyfrgell.cymru/index.php/papers-regarding-penybont-llanfair- talhaiarn archives.library .wales/index.php/papers-regarding-penybont-llanfair-talhaiarn Llyfrgell Genedlaethol Cymru = The National Library of Wales Allt Penglais Aberystwyth Ceredigion United Kingdom SY23 3BU 01970 632 800 01970 615 709 [email protected] www.llgc.org.uk Papers regarding Penybont, Llanfair Talhaiarn, Tabl cynnwys | Table of contents Gwybodaeth grynodeb | Summary information .............................................................................................. 3 Natur a chynnwys | Scope and content .......................................................................................................... 3 Trefniant | Arrangement .................................................................................................................................. 4 Nodiadau | Notes ............................................................................................................................................. 4 Pwyntiau mynediad | Access points ..............................................................................................................
    [Show full text]
  • NLCA07 Conwy Valley - Page 1 of 9
    National Landscape Character 31/03/2014 NLCA07 CONWY VALLEY Dyffryn Conwy – disgrifiad cryno Dyma ddyffryn afon lanwol hwyaf Cymru, sydd, i bob diben, yn ffin rhwng gogledd- orllewin a gogledd-ddwyrain y wlad. Y mae’n dilyn dyffryn rhewlifol, dwfn sy’n canlyn ffawt daearegol, ac y mae ganddi orlifdiroedd sylweddol ac aber helaeth. Ceir yn ei blaenau ymdeimlad cryf o gyfyngu gan dir uwch, yn enwedig llethrau coediog, serth Eryri yn y gorllewin, o ble mae sawl nant yn byrlymu i lawr ceunentydd. Erbyn ei rhan ganol, fodd bynnag, mae’n ymddolennu’n dawel heibio i ddolydd gleision, gan gynnwys ystâd enwog Bodnant, sydd a’i gerddi’n denu ymwelwyr lawer. Mae ei haber yn wahanol eto, yn brysur â chychod, gyda thref hanesyddol Conwy a’i chastell trawiadol Eingl-normanaidd (Safle treftadaeth y Byd) yn y gorllewin, a thref fwy cyfoes Deganwy yn y dwyrain. Er yn cynnwys trefi Conwy a Llanrwst, a sawl pentref mawr a mân, cymeriad gwledig iawn sydd i’r fro hon. Mae’r gwrychoedd trwchus y dolydd gleision a chefndir trawiadol y mynyddoedd yn cyfuno yn ddelwedd gymharol ddiddos, ddarluniadwy. © Crown copyright and database rights 2013 Ordnance Survey 100019741 www.naturalresources .wales NLCA07 Conwy Valley - Page 1 of 9 Summary description This is the valley of Wales’ longest tidal river, whose valley effectively forms the border between the north-east and the north-west of Wales. It follows a deep, fault-guided, glacial valley and contains significant flood plain and estuary areas. The upper (southern-most) section has a strong sense of containment by rising land, especially from the steep wooded slopes of Snowdonia to the west, from which a number of small rivers issue down tumbling gorges.
    [Show full text]
  • Supporting-Statement
    CONSTRUCTION AND OPERATION OF TWO B8 WAREHOUSING UNITS WITH ANCILLARY OFFICE SPACE, INCLUDING PREPARATORY EARTHWORKS, HARDSTANDINGS AND ASSOCIATED INFRASTRUCTURE ON LAND AT TIR LLWYD ENTERPRISE PARK, ST. ASAPH AVENUE, KINMEL BAY, CONWY. PLANNING APPLICATION DOCUMENT NOVEMBER 2019 Chester Office | Well House Barns | Chester Road | B r e t t o n | C h e s t e r | C H 4 0 D H South Manchester Office | Camellia House | 76 Water Lane | W i l m s l o w | S K 9 5 B B t 0844 8700 007 | e [email protected] PROPOSED B8 WAREHOUSING UNITS PLANNING APPLICATION DOCUMENT TIR LLWYD ENTERPRISE PARK NOVEMBER 2019 2482-02 FINAL DRAFT FOR CONSULTATION CONTENTS PART 1: PLANNING APPLICATION FORM & CERTIFICATES PART 2: DESIGN & ACCESS STATEMENT PART 3: SUPPORTING STATEMENT 1.0 INTRODUCTION & SCOPE OF THE APPLICATION 1.1 Introduction 1.2 The Applicant 1.3 Background 1.4 The Proposed Development 1.5 The Site and Its Surroundings 1.6 Scope of the Application 2.0 PLANNING HISTORY 2.1 Introduction 2.2 Relevant Planning History 3.0 DESCRIPTION OF THE PROPOSED DEVELOPMENT 3.1 Introduction 3.2 The Proposed Development 4.0 PLANNING POLICY CONTEXT AND APPRAISAL 4.1 Introduction 4.2 The Development Plan 4.3 Material Considerations 4.4 Planning Policy Appraisal 4.5 Summary and Conclusions 5.0 TRAFFIC AND TRANSPORTATION 5.1 Introduction 5.2 Conclusions of the Highway Technical Note i PROPOSED B8 WAREHOUSING UNITS PLANNING APPLICATION DOCUMENT TIR LLWYD ENTERPRISE PARK NOVEMBER 2019 2482-02 FINAL DRAFT FOR CONSULTATION 6.0 DRAINAGE & FLOOD CONSEQUENCES 6.1 Introduction
    [Show full text]
  • Historic Settlements in Denbighshire
    CPAT Report No 1257 Historic settlements in Denbighshire THE CLWYD-POWYS ARCHAEOLOGICAL TRUST CPAT Report No 1257 Historic settlements in Denbighshire R J Silvester, C H R Martin and S E Watson March 2014 Report for Cadw The Clwyd-Powys Archaeological Trust 41 Broad Street, Welshpool, Powys, SY21 7RR tel (01938) 553670, fax (01938) 552179 www.cpat.org.uk © CPAT 2014 CPAT Report no. 1257 Historic Settlements in Denbighshire, 2014 An introduction............................................................................................................................ 2 A brief overview of Denbighshire’s historic settlements ............................................................ 6 Bettws Gwerfil Goch................................................................................................................... 8 Bodfari....................................................................................................................................... 11 Bryneglwys................................................................................................................................ 14 Carrog (Llansantffraid Glyn Dyfrdwy) .................................................................................... 16 Clocaenog.................................................................................................................................. 19 Corwen ...................................................................................................................................... 22 Cwm .........................................................................................................................................
    [Show full text]
  • Clwyd Catchment Summary 2016
    Clwyd Management Catchment Summary Date Contents 1. Background to the Clwyd Management Catchment summary ......................................... 3 2. The Clwyd Management Catchment ................................................................................ 4 3. Current Status of the water environment ......................................................................... 7 4. The main challenges ........................................................................................................ 9 5. Objectives and measures .............................................................................................. 11 6. Water Watch Wales ....................................................................................................... 18 Page 2 of 19 www.naturalresourceswales.gov.uk 1. Background to the Clwyd Management Catchment summary This management catchment summary supports the 2015 updated Western Wales River Basin Management Plan (RBMP). Along with detailed information on the Water Watch Wales (WWW) website, this summary will help to inform and support delivery of local environmental improvements to our groundwater, rivers, lakes, estuaries and coasts. Information on WWW can be found in Section 6. Natural Resources Wales has adopted the ecosystem approach from catchment to coast. This means being more joined up in how we manage the environment and its natural resources to deliver economic, social and environmental benefits for a healthier, more resilient Wales. It means considering the environment as a whole,
    [Show full text]
  • Llyfrgell Genedlaethol Cymru = the National Library of Wales Cymorth
    Llyfrgell Genedlaethol Cymru = The National Library of Wales Cymorth chwilio | Finding Aid - Coed Coch and Trovarth Estate Records, (GB 0210 TROVARTH) Cynhyrchir gan Access to Memory (AtoM) 2.3.0 Generated by Access to Memory (AtoM) 2.3.0 Argraffwyd: Mai 04, 2017 Printed: May 04, 2017 Wrth lunio'r disgrifiad hwn dilynwyd canllawiau ANW a seiliwyd ar ISAD(G) Ail Argraffiad; rheolau AACR2; ac LCSH This description follows NLW guidelines based on ISAD(G) Second Edition; AACR2; and LCSH https://archifau.llyfrgell.cymru/index.php/coed-coch-and-trovarth-estate-records-2 archives.library .wales/index.php/coed-coch-and-trovarth-estate-records-2 Llyfrgell Genedlaethol Cymru = The National Library of Wales Allt Penglais Aberystwyth Ceredigion United Kingdom SY23 3BU 01970 632 800 01970 615 709 [email protected] www.llgc.org.uk Coed Coch and Trovarth Estate Records, Tabl cynnwys | Table of contents Gwybodaeth grynodeb | Summary information .............................................................................................. 3 Hanes gweinyddol / Braslun bywgraffyddol | Administrative history | Biographical sketch ......................... 3 Natur a chynnwys | Scope and content .......................................................................................................... 4 Trefniant | Arrangement .................................................................................................................................. 4 Nodiadau | Notes ............................................................................................................................................
    [Show full text]
  • The River Conwy Catchment Management Plan Action Plan; 1995
    U > ^ [ J 2 S THE RIVER CONWY CATCHMENT MANAGEMENT PLAN ACTION PLAN; 1995 NRA I National Rivers Authorii Welsh Region CONTACTING THE NRA The national head office of the NRA is in Bristol Enquiries about the Conwy Catchment Management Plan should be directed to: Telephone: 01454 - 624400 Dr Ken Jones, The Welsh Region head office is in Cardiff Area Planning and Support Services Coordinator, Telephone: 01222 - 770088 H ighfield, Priestley Road, The Area Manager for the Northern Area of the Welsh Caernarfon, Region is: G w ynedd, Roger Thomas, LL55 1HR Bryn Menai, Holyhead Road, B an g o r, G w y n edd . L L 57 2EF NRA Copyright Waiver. This report is intended to be used widely and may be quoted, copied or reproduced in any way, provided that the extracts are not quoted out of context and due acknowledgement is given to the National Rivers Authority. Acknowledgement:- Maps are based on the 1992 Ordnance Survey 1:50,000 scale map with the permission of the Controller of Her Majesty’s stationary Office © Copyright. WE 2k E AMOM 3 95 Ill THE N R A' S VISION FOR THE CONWY CATCHMENT The Afon Conwy catchment features immediate flow will be safeguarded through the careful attractions for those whose interests lie outdoors, consideration of all abstraction licence applications ranging from the simple enjoyment of the often which predominantly have related to hydro-electric breathtaking scenery through to active participation in power schemes in recent times, and property will be sports such as fishing, canoeing and climbing. protected from flooding to a standard which is consistent with the land use and economically The catchment is also home to a population of about justifiable.
    [Show full text]
  • Landscape Strategy July 2019
    Proposed residential development at Maes y Felin Glan Conwy. Landscape Strategy July 2019 Tirlun Barr Associates Landscape Architecture Tan y Berllan, Llanbedr y Cennin, CONWY. LL32 8UY www.tirlunbarr.com ISSUED Maes y Felin GLAN CONWY Landscape Strategy. CONTENTS PAGE 1.0 Introduction 2 2.0 Landscape purpose 4 3.0 Landscape context 5 4.0 Landscape Strategy Proposals 9 5.0 Landscape Design Approach including mitigation 13 6.0 Landscape implementation and ongoing maintenance 14 FIGURES Figure 1 Site Location Figure 2 Landscape Strategy Proposals Figure 3 LANDMAP Visual and Sensory Aspect Area Character Data Author Status Checked Date JAB Draft 1 PW 10.07.19 JAB Issued V1 PW 13.07.19 This report has been prepared by Tirlunbarr Associates on behalf of Calon Homes Ltd. in connection with a proposed residential development on land known as Maes y Felin, in Glan Conwy, Conwy County and takes into account their particular instructions and requirements. It is not intended for and should not be relied on by any third party and no responsibility is undertaken to any third party. 1 Issued V1 1.0 Introduction 1.1 This document has been prepared by Tirlunbarr Landscape Architects on behalf of Calon Homes Ltd. in support of proposed residential development on land located at Maes y Felin, on the southern edge of Glan Conwy, Conwy County. 1.2 The following Landscape Strategy responds to Conwy Councils Adopted September 2016 Local Validation List which requires the Preparation of a Landscaping Strategy for ‘’All planning applications (full and outline) for major development.’’ 1.3 The proposal on land south of Glan Conwy village (referred to as Maes y Felin) comprises residential development on land allocated for Residential development within the Councils Adopted Local Development Plan as illustrated below.
    [Show full text]
  • View a List of Current Roadworks Within Conwy
    BWLETIN GWAITH FFORDD / ROAD WORKS BULLETIN (C) = Cyswllt/Contact Gwaith Ffordd Rheolaeth Traffig Dros Dro Ffordd ar Gau Digwyddiad (AOO/OOH) = Road Works Temporary Traffic Control Road Closure Event Allan o Oriau/Out Of Hours Lleoliad Math o waith Dyddiadau Amser Lled lôn Sylwadau Location Type of work Dates Time Lane width Remarks JNCT BROOKLANDS TO PROPERTY NO 24 Ailwynebu Ffordd / Carriageway 19/10/2020 OPEN SPACES EAST Resurfacing 19/04/2022 (C) 01492 577613 DOLWEN ROAD (AOO/OOH) B5383 HEN GOLWYN / OLD COLWYN COMMENCED O/S COLWYN BAY FOOTBALL CLUB Ailwynebu Ffordd / Carriageway 19/10/2020 OPEN SPACES EAST Resurfacing 19/04/2022 (C) 01492 577613 LLANELIAN ROAD (AOO/OOH) B5383 HEN GOLWYN / OLD COLWYN COMMENCED from jct Pentre Ave to NW express way Gwaith Cynnal / Maintenance Work 26/07/2021 KYLE SALT 17/12/2021 (C) 01492 575924 DUNDONALD AVENUE (AOO/OOH) A548 ABERGELE COMMENCED Cemetary gates to laybys Gwaith Cynnal / Maintenance Work 06/09/2021 MWT CIVIL ENGINEERING 15/10/2021 (C) 01492 518960 ABER ROAD (AOO/OOH) 07484536219 (EKULT) C46600 LLANFAIRFECHAN COMMENCED 683* A543 Pentrefoelas to Groes Cynhaliaeth Cylchol / Cyclic 06/09/2021 OPEN SPACES SOUTH Maintenance 29/10/2021 (C) 01492 575337 PENTREFOELAS TO PONT TYDDYN (AOO/OOH) 01248 680033 A543 PENTREFOELAS COMMENCED A543 Pentrefoelas to Groes Cynhaliaeth Cylchol / Cyclic 06/09/2021 OPEN SPACES SOUTH Maintenance 29/10/2021 (C) 01492 575337 BRYNTRILLYN TO COTTAGE BRIDGE (AOO/OOH) 01248 680033 A543 BYLCHAU COMMENCED A543 Pentrefoelas to Groes Cynhaliaeth Cylchol / Cyclic 06/09/2021
    [Show full text]