Mr. Shepherd's Bridge Project

Total Page:16

File Type:pdf, Size:1020Kb

Mr. Shepherd's Bridge Project Mr. Shepherd’s Bridge Project OBJECTIVES Research actual bridge designs Design a model bridge based on research Submit construction drawings for approval Build a bridge with toothpicks that can be tested for structural strength ALLOWABLE MATERIALS Regular round or flat wooden toothpicks Elmer's white glue Paper for the roadbed (optional) String for suspension designs only; 3 meters max (nylon offers high resistance to breakage under tension) RESEARCH AND SUBMITTAL OF APPROVAL DRAWINGS Each student will research bridge designs from literature or actual structures noting bracing points and reinforcements and how each design takes into account gravitational and load forces and the materials used. Each student will then create a bridge design and submit a drawing for approval (drawings should include dimensions (m) and 3 aspects of the bridge... a side view, a top view, and end view). Approved drawings will be returned and used to construct the bridge. Drawings can be actual size or scaled down; if you scale down you must include a drawing scale. Take your time on your drawings, it is not a race!!! DESIGN AND DRAWING CHANGES As you begin to construct your bridge, you will undoubtedly want to make improvements (changes) to your design. Design changes are allowed. However, you must revise your drawings showing the changes you intend to make and submit them for approval prior to proceeding with construction. Once change approval has been secured from Mr. Shepherd, construction can continue (be aware that I may make minor adjustments/improvements to your requested changes). SPECIFICATIONS Your target maximum weight of the finished bridge is 80 gm. (a total weight more than 80 gms. will be allowed but carries a grade reduction penalty...the greater the overage, the greater the penalty). Any design can be used as long as the roadbed is flat and unobstructed to allow a matchbox car to travel its length. The roadbed does not actually have to support the car; the car is used only to check clearance (i.e. the roadbed can be made of paper to save on weight). The bridge must be free standing and allow for a 2 cm. high x 30 cm. wide board to pass under the bridge while the bridge rests on a flat surface. The bridge will also need to span across my plastic recycling tubs which are placed 12” away from each other on top of my desk. Only the materials listed may be used to build the bridge. Excessive amounts of glue may not be used as part of the structure, i.e. the bridge or bridge joints may not be completely covered with glue. LOAD TESTING PROCEDURE Each bridge will be placed on two support structures (my two recycling tubs 12” apart edge to edge). An 8" long, 1/2" diameter wooden dowel will be set across the center of the bridge on top of the road surface (set perpendicular to and on top of the road). Heavy-duty wire is looped over each end of the dowel which supports hanging weights below the bridge. 1 kg weights are added until all the weights are used up (total of 11 kg. / 25 lbs.) or the bridge structurally fails (breaks). IMPORTANT DATES Check your individual class calendars for due dates; NOTE: there are two due dates for this project... design drawings are due first, then actual bridges). #1) Design drawings are due by the end of class on Friday 12/11 #2) Bridges are to be completed on a date that will be chosen on Wednesday of next week. GRADING RUBRIC Students will fill out and turn in their grading rubric for their bridge on their test day. All students must turn in a grading rubric form! Toothpick Bridge Project RUBRIC (turn in after bridge test) Date ___________ Student__________________________________ Class_____________ Weight applied ________________ gms. Bridge weight __________________gms. RATIO: ( weight held in gms / bridge weight in gms ) = __________ POSSIBLE RAW POINTS: Raw Points Earned Calculated Ratio Bridge Weight Bridge Weight Bridge Weight Bridge Weight up to 80 g 81-100 g 101-120 g 120+ g 100+ 100 97 94 90 90-99 99 96 93 89 80-89 98 95 92 88 70-79 97 94 91 87 60-69 96 93 90 86 50-59 95 92 89 85 40-49 94 91 88 84 30-39 93 90 87 83 20-29 92 89 86 82 10-19 91 88 85 81 1-9 90 87 84 80 DEDUCTIONS (APPLIES FOR ALL BRIDGES): 1. Clearance infractions: (underside height, pier width, car clearance, -1 pt. each): CIRCLE ONE: No deductions -1 -2 -3 2. Bridge deviates from approved drawings (-1 to -10 pts): CIRCLE ONE: No deductions -1 -2 -3 -4 -5 -6 -7 -8 -9 -10 Raw Points Earned Less deductions - NET PROJECT GRADE Bridge Building Websites to visit for detailed information: http://www.garrettsbridges.com/category/design http://www.mhhe.com/engcs/engmech/beerjohnston/vm/ppreview/CHAP06_files/frame.htm http://www.pghbridges.com/basics.htm http://nisee.berkeley.edu/godden/ http://bridgepros.com/ http://www.pisymphony.com/toothpick/toothpick1.htm Bridge Building Basics Because of the wide range of structural possibilities, this Spotter's Guide shows only the most common fixed (non-movable) bridge types. Other types are listed in the Bridge Terminology page. The drawings are not to scale. Additional related info is found on the other Terminology pages which are linked to the left. The four main factors are used in describing a bridge. By combining these terms one may give a general description of most bridge types. span (simple, continuous, cantilever), material (stone, concrete, metal, etc.), placement of the travel surface in relation to the structure (deck, pony, through), form (beam, arch, truss, etc.). The three basic types of spans are shown below. Any of these spans may be constructed using beams, girders or trusses. Arch bridges are either simple or continuous (hinged). A cantilever bridge may also include a suspended span. Examples of the three common travel surface configurations are shown in the Truss type drawings below. In a Deck configuration, traffic travels on top of the main structure; in a Pony configuration, traffic travels between parallel superstructures which are not cross- braced at the top; in a Through configuration, traffic travels through the superstructure (usually a truss) which is cross-braced above and below the traffic. Beam and Girder types Simple deck beam bridges are usually metal or reinforced concrete. Other beam and girder types are constructed of metal. The end section of the two deck configuration shows the cross-bracing commonly used between beams. The pony end section shows knee braces which prevent deflection where the girders and deck meet. One method of increasing a girder's load capacity while minimizing its web depth is to add haunches at the supported ends. Usually the center section is a standard shape with parallel flanges; curved or angled flanged ends are riveted or bolted using splice plates. Because of the restrictions incurred in transporting large beams to the construction site, shorter, more manageable lengths are often joined on-site using splice plates. Many modern bridges use new designs developed using computer stress analysis. The rigid frame type has superstructure and substructure which are integrated. Commonly, the legs or the intersection of the leg and deck are a single piece which is riveted to other sections. Orthotropic beams are modular shapes which resist stress in multiple directions at once. They vary in cross-section and may be open or closed shapes. Arch types There are several ways to classify arch bridges. The placement of the deck in relation to the superstructure provides the descriptive terms used in all bridges: deck, pony, and through. Also the type of connections used at the supports and the midpoint of the arch may be used - - counting the number of hinges which allow the structure to respond to varying stresses and loads. A through arch is shown, but this applies to all type of arch bridges. Another method of classification is found in the configuration of the arch. Examples of solid-ribbed, brace-ribbed (trussed arch) and spandrel-braced arches are shown. A solid-ribbed arch is commonly constructed using curved girder sections. A brace-ribbed arch has a curved through truss rising above the deck. A spandrel-braced arch or open spandrel deck arch carries the deck on top of the arch. Some metal bridges which appear to be open spandrel deck arch are, in fact, cantilever; these rely on diagonal bracing. A true arch bridge relies on vertical members to transmit the load which is carried by the arch. The tied arch (bowstring) type is commonly used for suspension bridges; the arch may be trussed or solid. The trusses which comprise the arch will vary in configuration, but commonly use Pratt or Warren webbing. While a typical arch bridge passes its load to bearings at its abutment; a tied arch resists spreading (drift) at its bearings by using the deck as a tie piece. Masonry bridges, constructed in stone and concrete, may have open or closed spandrels A closed spandrel is usually filled with rubble and faced with dressed stone or concrete. Occasionally, reinforced concrete is used in building pony arch types. Truss - simple types A truss is a structure made of many smaller parts. Once constructed of wooden timbers, and later including iron tension members, most truss bridges are built of metal. Types of truss bridges are also identified by the terms deck, pony and through which describe the placement of the travel surface in relation to the superstructure (see drawings above). The king post truss is the simplest type; the queen post truss adds a horizontal top chord to achieve a longer span, but the center panel tends to be less rigid due to its lack of diagonal bracing.
Recommended publications
  • Field Testing and Structural Analysis of Burr Arch Covered Bridges in Pennsylvania
    Field Testing and Structural Analysis of Burr Arch Covered Bridges in Pennsylvania Douglas Rammer1, James Wacker2, Travis Hosteng3, Justin Dahlberg4 and Yaohua Deng5 ABSTRACT: The Federal Highway Administration sponsored a comprehensive research program on Historic Covered Timber Bridges in the USA. This national program's main purpose is to develop improved methods to preserve, rehabilitate, and restore timber bridge trusses that were developed during the early 1800s and, in many cases, are still in service today. One of the many ongoing research studies is aimed at establishing a procedure for safely and reliably load- rating historic covered bridges though physical testing and improved structural modelling. This paper focuses on recent field work and analysis of four Burr Arch through-truss-type covered bridges located in Lancaster County, Pennsylvania. An overview of field evaluation methods, loading testing, and structural modelling procedures are included along with a comparison of field measurements and structural model prediction of bridge behaviour. KEYWORDS: loading rating, structural analysis, covered bridges, historical landmark, burr arch 1 INTRODUCTION 123 established for historic covered bridges. Given the historic nature and unusual geometric features of these The Federal Highway Administration (FHWA), in structures, a procedure needs to be established detailing partnership with the USDA Forest Products Laboratory how to safely and reliably determine load ratings for and the National Park Service (NPS), sponsored a historic covered timber bridges through physical testing. comprehensive national research program on Historic Covered Timber Bridges in the USA. The main purpose Similarly, the complex behavior and unique details of is to develop improved methods to preserve, rehabilitate, covered bridges make structural modeling a daunting task and restore timber bridge trusses that were first developed for the typical bridge engineer.
    [Show full text]
  • 100 ROSS STREET Pittsburgh, PA 15219
    100 ROSS STREET Pittsburgh, PA 15219 All SVN® Offices Independently Owned & Operated. ©2020 All Rights Reserved. DISCLAIMER The material contained in this Offering Brochure is furnished solely for the purpose of considering the purchase of the property within and is not to be used for any other purpose. This information should not, under any circumstances, be photocopied or disclosed to any third party without the written consent of the SVN® Advisor or Property Owner, or used for any purpose whatsoever other than to evaluate the possible purchase of the Property. The only party authorized to represent the Owner in connection with the sale of the Property is the SVN Advisor listed in this proposal, and no other person is authorized by the Owner to provide any information or to make any representations other than contained in this Offering Brochure. If the person receiving these materials does not choose to pursue a purchase of the Property, this Offering Brochure must be returned to the SVN Advisor. Neither the SVN Advisor nor the Owner make any representation or warranty, express or implied, as to the accuracy or completeness of the information contained herein, and nothing contained herein is or shall be relied upon as a promise or representation as to the future representation of the Property. This Offering Brochure may include certain statements and estimates with respect to the Property. These Assumptions may or may not be proven to be correct, and there can be no assurance that such estimates will be achieved. Further, the SVN Advisor and the Owner disclaim any and all liability for representations or warranties, expressed or implied, contained in or omitted from this Offering Brochure, or any other written or oral communication transmitted or made available to the recipient.
    [Show full text]
  • A Look at Bridges: a Study of Types, Histories, and the Marriage of Engineering and Architecture Cody Chase Connecticut College
    Connecticut College Digital Commons @ Connecticut College Architectural Studies Integrative Projects Art History and Architectural Studies 2015 A Look at Bridges: A Study of Types, Histories, and the Marriage of Engineering and Architecture Cody Chase Connecticut College Follow this and additional works at: http://digitalcommons.conncoll.edu/archstudintproj Recommended Citation Chase, Cody, "A Look at Bridges: A Study of Types, Histories, and the Marriage of Engineering and Architecture" (2015). Architectural Studies Integrative Projects. Paper 73. http://digitalcommons.conncoll.edu/archstudintproj/73 This Article is brought to you for free and open access by the Art History and Architectural Studies at Digital Commons @ Connecticut College. It has been accepted for inclusion in Architectural Studies Integrative Projects by an authorized administrator of Digital Commons @ Connecticut College. For more information, please contact [email protected]. The views expressed in this paper are solely those of the author. CODY CHASE SENIOR INTEGRATIVE PROJECT: INDEPENDENT STUDY ARCHITECTURAL STUDIES CONNECTICUT COLLEGE 2015 A"LOOK"INTO"BRIDGES" A"Study"of"Types,"Histories,"and"the"Marriage"of" Engineering"and"Architecture" " Cody"Chase"‘15" Architectural"Studies"Major,"Art"History"Minor" Senior"IntegraHve"Project" " Why Bridges? Where to begin? TYPES OTHER • Arch • Glossary • Beam/Girder/Stringer • Materials • Truss • History of Failures • Suspension • Models • Cable-Stayed • Moveable Span What makes a bridge stand up? FORCES ***Compression:
    [Show full text]
  • Historic Bridges of Somerset County Pennsylvania
    HISTORIC BRIDGES OF SOMERSET COUNTY PENNSYLVANIA Scott D. Heberling Pennsylvania Department of Transportation Federal Highway Administration HISTORIC BRIDGES OF SOMERSET COUNTY PENNSYLVANIA Scott D. Heberling Photographs by Scott D. Heberling and Stephen Simpson except as noted Layout and design by Christopher Yohn This publication was produced by Heberling Associates, Inc. for the Pennsylvania Department of Transportation and the Federal Highway Administration © 2010 Pennsylvania Department of Transportation ISBN-10: 0-89271-126-4 ISBN-13: 978-0-89271-126-0 CONTENTS 1 Somerset County’s Historic Bridges 3 Bridge Building in Pennsylvania 6 Stone Arch Bridges 10 Wooden Covered Bridges 21 Metal Truss Bridges 35 Concrete Bridges 43 Bridge Location Map 44 Sources Glessner Bridge Salisbury Viaduct Somerset County’s Historic Bridges Somerset County, high in the Laurel Highlands of southwestern Pennsylvania, is renowned for its stunning natural beauty and expansive rural landscapes. It is also rich in history. The county’s many historic farms, villages, and winding country roads contribute to a strong “sense of place” that appeals to residents and visitors alike. The people who have called Somerset County home for thousands of years have created a unique cultural environment unlike any other. From the ancient settlements in the “Turkeyfoot” region of the south, to the rolling farm country of Brothers Valley in the center, to the coal patch towns of the north, history is everywhere in Somerset County. Something interesting always seems to lie just around the next bend in the road. The county’s development was shaped by its hydrology and rugged topography. Although its forested hills hid immeasurable mineral wealth just below the surface they also limited the areas suitable for settlement and agriculture.
    [Show full text]
  • Bridges Tour 8-20-2012 Gp:Grant Street-3/28/06 8/21/12 2:36 PM Page 1
    bridges tour 8-20-2012 gp:Grant Street-3/28/06 8/21/12 2:36 PM Page 1 1. Renaissance Pittsburgh Downtown Pittsburgh Bridges Hotel I think the architecture of this city makes it a very beautiful city on a very impressive scale. The vibrancy and positive feeling 2. Byham Theater 13 & River Shores Walking Tour 11 that you get when you come here is incredibly impressive. 3. Roberto Clemente, 13 —Christopher Nolan, Director, “The Dark Knight Rises,” as quoted in Andy Warhol, and 10 3 Pittsburgh City Paper 08.03/08.10.2011 Rachel Carson Bridges N 4. Allegheny River 12 15 14 FREETOURS 5. Fort Duquesne Bridge 15 9 3 Old Allegheny County Jail Museum 8 6. Heinz Field Open Mondays through October (11:30 a.m. to 1:00 p.m.) 7. PNC Park 8 (except court holidays) 7 3 8. Roberto Clemente and City Main Streets Willie Stargell Statues Every Friday in October (Noon to 1:00 p.m.) 2 Offered in cooperation with the Urban Redevelopment 9. Allegheny Landing 1 4 Authority of Pittsburgh 10. Alcoa Corporate Center • October 5: Bloomfield 11. Andy Warhol Museum • October 12: Lawrenceville 12. Downtown Pittsburgh • October 19: West End Skyscrapers (view) • October 26: Strip District 6 5 13. David L. Lawrence Convention Center SPECIALEVENTS 14. Pittsburgh CAPA Not free. Reservations required. Space is limited. (Creative and Performing Sept. 8: Dormont Walking Tour Arts) 6–12 Sept. 15: Behind-the-Scenes Heinz History Center Tour 15. Allegheny Riverfront September Fridays at Noon Park Oct. 14: Shadyside Walking Tour (the same tour as June 24)—Filled Oct.
    [Show full text]
  • Kintersburg Bridge, PA-32-05
    THE THEODORE BURR COVERED BRIDGE SOCIETY OF PENNSYLVANIA, INC. VOLUME 40 - NUMBER 1 WINTER 2017 Kintersburg Bridge, PA-32-05 J. S. Fleming built this bridge across Crooked Creek in 1877 at a cost of $893. The 68 ft., single span crossing is one of only five Howe Truss covered bridges in the Commonwealth. It was named for Isaac Kinter, a local shopkeeper. Bypassed many years ago by a modern bridge, it is located off Tanoma Road on Musser Road in Rayne Township. One of four remaining covered bridges in Indiana County, PA, all are easily visited in one afternoon tour. - Photo by Thomas E. Walczak, September 25, 2016 - 1 - WOODEN COVERED SPANS VOLUME 40 - NUMBER 1, WINTER 2017 THE THEODORE BURR COVERED BRIDGE SOCIETY OF PENNSYLVANIA, INC. The material herein shall not be reproduced without prior written permission from this society. Editor Thomas E. Walczak 3012 Old Pittsburgh Road New Castle, PA 16101 The Old Covered Bridge Email: [email protected] By Charles Clevenger OFFICERS 2016-2017 New Boston, Ohio President .........................................................Thomas E. Walczak 3012 Old Pittsburgh Road A dusty dirt road meanders the ridge, New Castle, PA 16101 Then curves downhill 1st Vice-President ...................................................James Smedley To an old covered bridge. 4 Gamewell Garth Where I, in my youth, Nottingham, MD 21236 Spent hours at play; 2nd Vice-President ..................................................Ray Finkelstein Oh, I remember—‘tho it were yesterday. 4720 Horseshoe Trail Macungie, PA 180625 There, hearts of love, I carved on its beams, 3rd Vice-President ................................................... Steve Wolfhope 706 Jonathan Drive ‘Twas only yesterday- or so it seems.
    [Show full text]
  • Bridge Types in NSW Historical Overviews 2006
    Bridge Types in NSW Historical overviews 2006 These historical overviews of bridge types in NSW are extracts compiled from bridge population studies commissioned by RTA Environment Branch. CONTENTS Section Page 1. Masonry Bridges 1 2. Timber Beam Bridges 12 3. Timber Truss Bridges 25 4. Pre-1930 Metal Bridges 57 5. Concrete Beam Bridges 75 6. Concrete Slab and Arch Bridges 101 Masonry Bridges Heritage Study of Masonry Bridges in NSW 2005 1 Historical Overview of Bridge Types in NSW: Extract from the Study of Masonry Bridges in NSW HISTORICAL BACKGROUND TO MASONRY BRIDGES IN NSW 1.1 History of early bridges constructed in NSW Bridges constructed prior to the 1830s were relatively simple forms. The majority of these were timber structures, with the occasional use of stone piers. The first bridge constructed in NSW was built in 1788. The bridge was a simple timber bridge constructed over the Tank Stream, near what is today the intersection of George and Bridge Streets in the Central Business District of Sydney. Soon after it was washed away and needed to be replaced. The first "permanent" bridge in NSW was this bridge's successor. This was a masonry and timber arch bridge with a span of 24 feet erected in 1803 (Figure 1.1). However this was not a triumph of colonial bridge engineering, as it collapsed after only three years' service. It took a further five years for the bridge to be rebuilt in an improved form. The contractor who undertook this work received payment of 660 gallons of spirits, this being an alternative currency in the Colony at the time (Main Roads, 1950: 37) Figure 1.1 “View of Sydney from The Rocks, 1803”, by John Lancashire (Dixson Galleries, SLNSW).
    [Show full text]
  • ALTERNATIVE ROUTES from EAST to NORTH SHORE VENUES with GREENFIELD BRIDGE and I-376 CLOSED Department of Public Works - City of Pittsburgh - November 2015
    ALTERNATIVE ROUTES FROM EAST TO NORTH SHORE VENUES WITH GREENFIELD BRIDGE AND I-376 CLOSED Department of Public Works - City of Pittsburgh - November 2015 OBJECTIVE: PROVIDE ALTERNATE CAR AND LIGHT TRUCK ROUTING FROM VARIOUS EASTERN TRIP ORIGINS TO NORTH SHORE VENUES INBOUND OPTIONS FOR NORTH SHORE EVENTS: POSTED INBOUND DETOUR: Wilkinsburg exit 78B to Penn Avenue to Fifth Avenue to the Boulevard of the Allies to I-376 Westbound BEST ALTERNATIVE ROUTE: PA Turnpike to Route 28 to North Shore City of Pittsburgh | Department of Public Works 1 FROM BRADDOCK AVENUE EXIT TAKE Braddock north to Penn Avenue, follow posted detour. OR TAKE Braddock north to Forbes to Bellefield to Fifth Avenue to Blvd of the Allies to I-376. City of Pittsburgh | Department of Public Works 2 Map F OR TAKE Braddock south to the Rankin Bridge to SR 837 to (A) 10th Str. Bridge or (B) Smithfield Street Bridge to Fort Pitt Blvd to Fort Duquesne Bridge. FROM HOMESTEAD GRAYS BRIDGE TAKE Brownshill Road to Hazelwood Avenue to Murray Avenue to Beacon Street, to Hobart to Panther Hollow, to Blvd of the Allies, to I-376. Greenfield Bridge Closure Route: City of Pittsburgh | Department of Public Works 3 TAKE Brownshill Road to Beechwood Blvd to Ronald to Greenfield Avenue to Second Avenue to Downtown, re-enter I-376 at Grant Street or end of Fort Pitt Boulevard to Fort Duquesne Bridge to the North Shore. OR STAY ON SR 837 north (Eight Avenue in Homestead) to Smithfield Street Bridge to Ft Pitt Blvd to Fort Duquesne Bridge to North Shore City of Pittsburgh | Department of Public Works 4 SAMPLE ORIGINS/ALTERNATIVE ROUTES TO NORTH SHORE VENUES FROM: ALTERNATIVE ROUTES: Monroeville Area Through Turtle Creek & Churchill Boroughs to SR 130 (Sandy Creek Road & Allegheny River Boulevard) to Highland Park Bridge to SR 28 (SB) to North Shore.
    [Show full text]
  • “A People Who Have Not the Pride to Record Their History Will Not Long
    STATE HISTORIC PRESERVATION OFFICE i “A people who have not the pride to record their History will not long have virtues to make History worth recording; and Introduction no people who At the rear of Old Main at Bethany College, the sun shines through are indifferent an arcade. This passageway is filled with students today, just as it was more than a hundred years ago, as shown in a c.1885 photograph. to their past During my several visits to this college, I have lingered here enjoying the light and the student activity. It reminds me that we are part of the past need hope to as well as today. People can connect to historic resources through their make their character and setting as well as the stories they tell and the memories they make. future great.” The National Register of Historic Places recognizes historic re- sources such as Old Main. In 2000, the State Historic Preservation Office Virgil A. Lewis, first published Historic West Virginia which provided brief descriptions noted historian of our state’s National Register listings. This second edition adds approx- Mason County, imately 265 new listings, including the Huntington home of Civil Rights West Virginia activist Memphis Tennessee Garrison, the New River Gorge Bridge, Camp Caesar in Webster County, Fort Mill Ridge in Hampshire County, the Ananias Pitsenbarger Farm in Pendleton County and the Nuttallburg Coal Mining Complex in Fayette County. Each reveals the richness of our past and celebrates the stories and accomplishments of our citizens. I hope you enjoy and learn from Historic West Virginia.
    [Show full text]
  • Over Jones Falls. This Bridge Was Originally No
    The same eastbound movement from Rockland crosses Bridge 1.19 (miles west of Hollins) over Jones Falls. This bridge was originally no. 1 on the Green Spring Branch in the Northern Central numbering scheme. PHOTO BY MARTIN K VAN HORN, MARCH 1961 /COLLECTION OF ROBERT L. WILLIAMS. On October 21, 1959, the Interstate Commerce maximum extent. William Gill, later involved in the Commission gave notice in its Finance Docket No. streetcar museum at Lake Roland, worked on the 20678 that the Green Spring track west of Rockland scrapping of the upper branch and said his boss kept would be abandoned on December 18, 1959. This did saying; "Where's all the steel?" Another Baltimore not really affect any operations on the Green Spring railfan, Mark Topper, worked for Phillips on the Branch. Infrequently, a locomotive and a boxcar would removal of the bridge over Park Heights Avenue as a continue to make the trip from Hollins to the Rockland teenager for a summer job. By the autumn of 1960, Team Track and return. the track through the valley was just a sad but fond No train was dispatched to pull the rail from the memory. Green Spring Valley. The steel was sold in place to the The operation between Hollins and Rockland con- scrapper, the Phillips Construction Company of tinued for another 11/2 years and then just faded away. Timonium, and their crews worked from trucks on ad- So far as is known, no formal abandonment procedure jacent roads. Apparently, Phillips based their bid for was carried out, and no permission to abandon was the job on old charts that showed the trackage at its ' obtained.
    [Show full text]
  • Three Rivers Water Trail Access • Row Boats Or Sculls Points Are Available for Public Use
    WHAT IS A WATER TRAIL? Is kayaking strenuous? Water trails are recreational waterways on lakes, rivers or Kayaking can be a great workout, or a relaxing day spent oceans between specific points, containing access points floating or casually paddling on the river. and day-use and camping sites (where appropriate) for the boating public. Water trails emphasize low-impact use and What should I wear? promote resource stewardship. Explore this unique Pennsylvania water trail. Whatever you’re comfortable in! You should not expect to get excessively wet, but non-cotton materials that dry quickly are Three Rivers WHAT TYPES OF PADDLE-CRAFT? best. Consider dressing in layers, and wear shoes that will stay on your feet. • Kayaks • Canoes How do I use the storage racks? • Paddle boards Water Trail The storage racks at many Three Rivers Water Trail access • Row boats or sculls points are available for public use. These are not intended for long term storage. Store “at your own risk.” Using a lock you FREQUENTLY ASKED QUESTIONS: are comfortable with is recommended. Is it safe for beginners to paddle on the river? Flat-water kayaking, canoeing, or paddle boarding is perfect for beginners. It is easy to learn with just a Map & Guide few minutes of instruction. RUL THREE RIVERS E S & Friends of the Riverfront, founded in 1991, is WATER TRAIL dedicated to the development and stewardship of the Three Rivers Heritage Trail and Three R Developed by Friends of the Riverfront Rivers Water Trail in the Pittsburgh region. This EG PENNSYLVANIA BOATING REGULATIONS guide is provided so that everyone can enjoy the natural amenities that makes the Pittsburgh • A U.S.
    [Show full text]
  • Timber Bridges Design, Construction, Inspection, and Maintenance
    Timber Bridges Design, Construction, Inspection, and Maintenance Michael A. Ritter, Structural Engineer United States Department of Agriculture Forest Service Ritter, Michael A. 1990. Timber Bridges: Design, Construction, Inspection, and Maintenance. Washington, DC: 944 p. ii ACKNOWLEDGMENTS The author acknowledges the following individuals, Agencies, and Associations for the substantial contributions they made to this publication: For contributions to Chapter 1, Fong Ou, Ph.D., Civil Engineer, USDA Forest Service, Engineering Staff, Washington Office. For contributions to Chapter 3, Jerry Winandy, Research Forest Products Technologist, USDA Forest Service, Forest Products Laboratory. For contributions to Chapter 8, Terry Wipf, P.E., Ph.D., Associate Professor of Structural Engineering, Iowa State University, Ames, Iowa. For administrative overview and support, Clyde Weller, Civil Engineer, USDA Forest Service, Engineering Staff, Washington Office. For consultation and assistance during preparation and review, USDA Forest Service Bridge Engineers, Steve Bunnell, Frank Muchmore, Sakee Poulakidas, Ron Schmidt, Merv Eriksson, and David Summy; Russ Moody and Alan Freas (retired) of the USDA Forest Service, Forest Products Laboratory; Dave Pollock of the National Forest Products Association; and Lorraine Krahn and James Wacker, former students at the University of Wisconsin at Madison. In addition, special thanks to Mary Jane Baggett and Jim Anderson for editorial consultation, JoAnn Benisch for graphics preparation and layout, and Stephen Schmieding and James Vargo for photographic support. iii iv CONTENTS CHAPTER 1 TIMBER AS A BRIDGE MATERIAL 1.1 Introduction .............................................................................. l- 1 1.2 Historical Development of Timber Bridges ............................. l-2 Prehistory Through the Middle Ages ....................................... l-3 Middle Ages Through the 18th Century ................................... l-5 19th Century ............................................................................
    [Show full text]