Hope Wharf, 37 Greenwich High Road, London Se10 8Lr Mixed Use for Sale | 1,491 - 1,545 Sq Ft | £390,000 - £475,000

Total Page:16

File Type:pdf, Size:1020Kb

Hope Wharf, 37 Greenwich High Road, London Se10 8Lr Mixed Use for Sale | 1,491 - 1,545 Sq Ft | £390,000 - £475,000 HOPE WHARF, 37 GREENWICH HIGH ROAD, LONDON SE10 8LR MIXED USE FOR SALE | 1,491 - 1,545 SQ FT | £390,000 - £475,000 LONDON'S EXPERT COMMERCIAL UNION STREET PARTNERS PROPERTY ADVISORS SOUTH OF THE RIVER 10 STONEY STREET UNIONSTREETPARTNERS.CO.UK LONDON SE1 9AD T 020 3757 7777 HOPE WHARF, 37 GREENWICH HIGH ROAD, LONDON SE10 8LR GROUND FLOOR UNITS FOR SALE 1,491 - 1,545 SQ FT | £390,000 - £475,000 DESCRIPTION AMENITIES Hope Wharf is new build, mixed-use development, located on Mixed Use Greenwich High Road. The development is well connected and Shell Specification located close to both Greenwich Station and Deptford Bridge DLR, Glazing providing easy access in to both Central London and Canary Wharf. Capped-off Services The development also benefits from nearby attractions such as the Cutty Sark and Greenwich Park and is within easy walking distance Car Parking of Greenwich's diverse range of shops, bars and restaurants. TERMS Both available units are offered in shell condition, with glazing installed and capped-off services. Unit 1 is on the ground floor of PRICE RATES S/C Block A and has A2,B1 and D1 uses. Unit 2 is on the ground floor of £390,000 - £475,000 To be advised. To be advised. Unit D and has A1, A2, A3, B1 and D1 uses. One car parking space is 250 year long leasehold. also available for each unit. AVAILABILITY FLOOR SIZE (SQ FT) Rent (PSF) AVAILABILITY Unit 1 1,491 £390,000.00 Under Offer Unit 2 1,545 £475,000.00 Available TOTAL 3,036 GET IN TOUCH LUKE AUSTERBERRY VINCENT CHEUNG BEVERLEY HEDGE Union Street Partners Union Street Partners Strettons 020 3757 8579 020 3757 8571 020 8520 9911 [email protected] [email protected] [email protected] SUBJECT TO CONTRACT. UNION STREET PARTNERS FOR THEMSELVES AND THE VENDOR OF THIS PROPERTY GIVE NOTICE THAT THESE PARTICULARS DO NOT FORM, OR FORM PART OF, ANY OFFER OR CONTRACT. THEY ARE INTENDED TO GIVE FAIR DESCRIPTION OF THE PROPERTY AND WHILST EVERY EFFORT HAS BEEN MADE TO ENSURE THEIR ACCURACY THIS CANNOT BE GUARANTEED. ANY INTENDING PURCHASER MUST THEREFORE SATISFY THEMSELVES BY INSPECTION OR OTHERWISE. NEITHER UNION STREET PARTNERS, NOR ANY OF ITS EMPLOYEES, HAS ANY AUTHORITY TO MAKE OR GIVE ANY FURTHER REPRESENTATIONS OR WARRANTY WHATSOEVER IN RELATION TO THIS PROPERTY. ALL PRICES AND RENTS QUOTED ARE NET OF VAT.
Recommended publications
  • Greenwich Waterfront Transit
    Greenwich Waterfront Transit Summary Report This report has been produced by TfL Integration Further copies may be obtained from: Tf L Integration, Windsor House, 42–50 Victoria Street, London SW1H 0TL Telephone 020 7941 4094 July 2001 GREENWICH WATERFRONT TRANSIT • SUMMARY REPORT Foreword In 1997, following a series of strategic studies into the potential for intermediate modes in different parts of outer London, London Transport (LT) commenced a detailed assessment under the title “Greenwich Waterfront Transit” of a potential scheme along the south bank of the Thames between Greenwich Town Centre and Thamesmead then on to Abbey Wood. In July 2000, LT’s planning functions were incorporated into Transport for London (TfL). A major factor in deciding to carry out a detailed feasibility study for Waterfront Transit has been the commitment shown by Greenwich and Bexley Councils to assist in the development of the project and their willingness to consider the principle of road space re-allocation in favour of public transport. This support, as well as that of other bodies such as SELTRANS, Greenwich Development Agency,Woolwich Development Agency and the Thames Gateway London Partnership, is acknowledged by TfL. The ongoing support of these bodies will be crucial if the proposals are to proceed. A major objective of this exercise has been to identify the traffic management measures required to achieve segregation and high priority over other traffic to encourage modal shift towards public transport, particularly from the private car. It is TfL’s view,supported by the studies undertaken, that the securing of this segregation and priority would be critical in determining the success of Waterfront Transit.
    [Show full text]
  • London Heathrow International Airport Terminal 5
    Concepts Products Service London Heathrow International Airport Terminal 5 1 Project Report London Heathrow International Airport Terminal 5 The UK’s largest free standing building. The new Terminal 5, developed by BAA for the exclusive use of British Airways at London Heathrow International Airport, is one of the largest airport terminals in the world. The whole Terminal 5 has five floors, each the size of ten football pitches, redefining the passenger experience at Heathrow Airport and setting new standards both in terminal design and customer satisfaction. The development provides Europe’s largest and most overcrowded airport with the capacity to handle an additional 30 - 35 million passengers per annum. London Heathrow International Airport Terminal 5 Developer: BAA plc Architects: Rogers Stirk Harbour + Partners (formerly Richard Rogers Partnership) / Pascall & Watson Ltd Tenant: British Airways plc 2 Building new solutions. Lindner undertakes major worldwide projects in all areas of interior finishes, insulation technology, industrial services and building facades. From pre-planning through to project completion Lindner is your partner of choice. The Company’s extensive manufacturing capability enables quality to be strictly maintained whilst allowing maximum flexibility to meet individual project requirements. Environmental considerations are fundamental to all Lindner’s business principles. Through partnerships with clients Lindner turns concepts into reality. 3 Our business activities at T5 The following products were designed, manufactured and installed by Lindner - Facades - Drop & Slide Ceilings - Disc Ceilings - Raft Ceilings - Mesh Ceilings - Tubular Ceilings - Partitions - Beacons and FID Trees 4 5 Facades 6 The facade of a building is the most important part of the cladding. Terminal 5´s facades are made up of over 45,000 m² of glass, equating to 7,500 bespoke glass panels and were installed in T5A and T5B, the Car Park, the Control Tower and also at the Rail Station.
    [Show full text]
  • Buses from North Greenwich Bus Station
    Buses from North Greenwich bus station Route finder Day buses including 24-hour services Stratford 108 188 Bus Station Bus route Towards Bus stops Russell Square 108 Lewisham B for British Museum Stratford High Street Stratford D Carpenters Road HOLBORN STRATFORD 129 Greenwich C Holborn Bow River Thames 132 Bexleyheath C Bromley High Street 161 Chislehurst A Aldwych 188 Russell Square C for Covent Garden Bromley-by-Bow and London Transport Museum 422 Bexleyheath B River Thames Coventry Cross Estate The O2 472 Thamesmead A Thames Path North CUTTER LANE Greenwich 486 Bexleyheath B Waterloo Bridge Blackwall Tunnel Pier Emirates East india Dock Road for IMAX Cinema, London Eye Penrose Way Royal Docks and Southbank Centre BLACKWALL TUNNEL Peninsula Waterloo Square Pier Walk E North Mitre Passage Greenwich St George’s Circus D B for Imperial War Museum U River Thames M S I S L T C L A E T B A N I Elephant & Castle F ON N Y 472 I U A W M Y E E Thamesmead LL A Bricklayers Arms W A S Emirates Air Line G H T Town Centre A D N B P Tunnel Y U A P E U R Emirates DM A A S E R W K Avenue K S S Greenwich Tower Bridge Road S T A ID Thamesmead I Y E D Peninsula Crossway Druid Street E THAMESMEAD Bermondsey Thamesmead Millennium Way Boiler House Canada Water Boord Street Thamesmead Millennium Greenwich Peninsula Bentham Road Surrey Quays Shopping Centre John Harris Way Village Odeon Cinema Millennium Primary School Sainsbury’s at Central Way Surrey Quays Blackwall Lane Greenwich Peninsula Greenwich Deptford Evelyn Street 129 Cutty Sark WOOLWICH Woolwich
    [Show full text]
  • Deptford Church Street & Greenwich Pumping Station
    DEPTFORD CHURCH STREET & GREENWICH PUMPING STATION ONLINE COMMUNITY LIAISON WORKING GROUP 13 July 2021 STAFF Chair: Mehboob Khan Tideway • Darren Kehoe, Project Manager Greenwich • Anil Dhillon, Project Manager Deptford • Natasha Rudat • Emily Black CVB – main works contractor • Audric Rivaud, Deptford Church Street Site Manager • Anna Fish– Deptford Church Street, Environmental Advisor • Robert Margariti-Smith, Greenwich, Tunnel & Site Manager • Rebecca Oyibo • Joe Selwood AGENDA Deptford Update • Works update • Looking ahead • Noise and vibration Greenwich Update • Works update • Looking ahead • Noise and vibration Community Investment Community Feedback / Questions DEPTFORD CHURCH STREET WHAT WE’RE BUILDING DEPTFORD WORKS UPDATE SHAFT & CULVERT Shaft • Vortex pipe installed and secondary lining complete • Tunnel Boring Machine crossing complete • Vortex generator works on-going Culvert • Excavation complete • Base slab and walls complete • Opening to shaft complete DEPTFORD WORKS UPDATE COMBINED SEWER OVERFLOW (CSO) CSO Phase 1: Interception Chamber • Internal walls and roof complete • Mechanical, Electrical, Instrumentation, Controls, Automation (MEICA) equipment installation on-going CSO Phase 2: Sewer connection • Protection works of Deptford Green Foul Sewer complete • Secant piling works complete • Capping beam and excavation to Deptford Storm Relief Sewer on-going time hours: Monday to Friday: 22:00 to 08:00 DEPTFORD 12 MONTHS LOOK AHEAD WHAT TO EXPECT AT DEPTFORD CSO: connection to existing sewer Mitigations • This work will take place over a 10 hour shift – the time of the shift • Method of works chosen to limit noise will be dependent on the tidal restrictions in the Deptford Storm Relief Sewer’ generation such as sawing concrete into • Lights to illuminate works and walkways after dark blocks easily transportable off site.
    [Show full text]
  • Ultimate Spectators Guide to the London Marathon
    ULTIMATE SPECTATORS GUIDE TO THE LONDON MARATHON We recommend you purchase a Travelcard to travel around London on the day as this will allow access to Rail, Tube and Bus at no extra charge. Zones 1-2 should be adequate for the travelling around the route, however if you need to go further afield, please check which zones you’ll be travelling in. Buses no longer accept cash payments. You’ll need to use a Travelcard, Oyster card or pay with a contactless debit/credit card. Please note that whilst we do have cheering stations at Tower Bridge (mile 12) and along the Victoria Embankment (mile 24) these will be manned by volunteers and we do not recommend you go to those points on race day. This is because these areas are extremely busy and it can take a long time to move through the crowds. By skipping Tower Bridge, you have more chance of seeing your runner at multiple points on the route, and by going straight to mile 25 from 19 you’ll cheer them on from the end! START AREA Although it’s advised not to accompany your runner to the start due to the high volumes of people, if you decide to see them off, please be aware that spectators will not be allowed into the assembly areas of the start. Once you’ve said your farewells and good lucks, head down the Avenue out of Greenwich Park. Once out of the park, turn left onto Nevada Street and keep walking as it turns into Burney Street.
    [Show full text]
  • Unit 1 Hope Wharf, 37 Greenwich High Road, London SE10 8LR Long Let Nursery in Greenwich (15 Year Lease with RPI Linked Reviews)
    Unit 1 Hope Wharf, 37 Greenwich High Road, London SE10 8LR Long let Nursery in Greenwich (15 year lease with RPI linked reviews) Investment Highlights Offers in excess of £625,000 • Newly constructed nursery let on a new 15 year lease • Situated within a prominent residential development in Greenwich, London • 1,491 sq ft of ground floor accommodation with outdoor space and car parking Income • Let to ‘Twinnie Day Nursery Limited’ for 15 years (without £40,000 break) at a passing rent of £40,000 per annum • 5 yearly rent reviews to the higher of RPI (collar and cap of 2% and 4%) and the open market rent. • Excellent transport links to Central London with nearby stations including Greenwich Station and Deptford Bridge DLR NIY 6.10% Location Situation London Borough of Greenwich has a population of The property is situation on Hope Wharf which is 254,557 residents (2011 census). Greenwich has located on Greenwich High Road in close proximity experienced extensive regeneration over the last 2 to both Greenwich Station and Deptford Bridge decades and attracted a large amount of DLR, both of which provide access to Central investment into the locality, including developments London and Canary Wharf. such as the New Capital Quay and the Greenwich Peninsula. Transport Links Distance Greenwich is strategically located to the south east Deptford Bridge DLR 0.2 miles of Central London with excellent transport links via Greenwich Station 0.4 miles Greenwich Station (National Rail) and Deptford A2 120 yards Bridge DLR. The area is best known for the National Maritime There’s a variety of restaurants, bars, shops and Museum, Royal Observatory, Cutty Sark and the markets nearby, including the well known Cutty O2 Arena, which attract over a million tourist each Sark and Greenwich Market which is just over a 15 year.
    [Show full text]
  • Mary Ney Chief Executive the Royal Borough of Greenwich Woolwich Town Hall 16 April 2014 Wellington Street Woolwich London
    Mary Ney Chief Executive The Royal Borough of Greenwich Woolwich Town Hall 16 April 2014 Wellington Street Woolwich London. SE18 6PW Via email [email protected] Dear Ms Ney, THE LOCAL GOVERNMENT ACT 1986 NOTICE UNDER SECTION 4A(5) I enclose a written notice to your authority of a proposed direction which the Secretary of State for Communities and Local Government is minded to give to your authority under section 4A of the Local Government Act 1986. Yours sincerely, Paul Rowsell Paul Rowsell Tel 0303 44 42005 Deputy Director – Democracy Email [email protected] Department for Communities and Local Government 3/J1, Eland House Bressenden Place London SW1E 5DU THE LOCAL GOVERNMENT ACT 1986 NOTICE UNDER SECTION 4A(5) The Secretary of State hereby gives the local authority known as the Royal Borough of Greenwich notice of a direction that he proposes to give to the authority under section 4A of the 1986 Act. Having regard to the information available to him about the local authority’s publicity, the Secretary of State proposes to direct the Royal Borough of Greenwich to comply by no later than 1 May 2014 with all of the provisions of the Recommended Code of Practice on Local Authority Publicity issued under section 4 of the Local Government Act 1986 on 31 March 2011 having been approved by a resolution of each House of Parliament. The Royal Borough of Greenwich may make written representations to the Secretary of State about the proposed direction within the period of 14 days beginning with the day on which this notice is given to it.
    [Show full text]
  • South East London Green Chain Plus Area Framework in 2007, Substantial Progress Has Been Made in the Development of the Open Space Network in the Area
    All South East London Green London Chain Plus Green Area Framework Grid 6 Contents 1 Foreword and Introduction 2 All London Green Grid Vision and Methodology 3 ALGG Framework Plan 4 ALGG Area Frameworks 5 ALGG Governance 6 Area Strategy 8 Area Description 9 Strategic Context 10 Vision 12 Objectives 14 Opportunities 16 Project Identification 18 Project Update 20 Clusters 22 Projects Map 24 Rolling Projects List 28 Phase Two Early Delivery 30 Project Details 50 Forward Strategy 52 Gap Analysis 53 Recommendations 56 Appendices 56 Baseline Description 58 ALGG SPG Chapter 5 GGA06 Links 60 Group Membership Note: This area framework should be read in tandem with All London Green Grid SPG Chapter 5 for GGA06 which contains statements in respect of Area Description, Strategic Corridors, Links and Opportunities. The ALGG SPG document is guidance that is supplementary to London Plan policies. While it does not have the same formal development plan status as these policies, it has been formally adopted by the Mayor as supplementary guidance under his powers under the Greater London Authority Act 1999 (as amended). Adoption followed a period of public consultation, and a summary of the comments received and the responses of the Mayor to those comments is available on the Greater London Authority website. It will therefore be a material consideration in drawing up development plan documents and in taking planning decisions. The All London Green Grid SPG was developed in parallel with the area frameworks it can be found at the following link: http://www. london.gov.uk/publication/all-london-green-grid-spg .
    [Show full text]
  • History of London Timeline Cut out the Following Cards and Glue Them in the Correct Order on the Timeline
    History of London Timeline Cut out the following cards and glue them in the correct order on the timeline. 18th Century 2005 A Victorian London Terror Attack 1599 14th Century The Globe Theatre The Great Plague 20th Century 1834 Damage and Expansion Houses of Parliament Fire 1863 AD 43 The London Underground London Located 11th Century 1485 – 1603 London Alone Tudor Times 1665 AD 60 The Great Fire of London The Roman’s London 1605 2000 The famous Gunpowder Plot The London Eye 1066 The Tower of London 5th – 7th Century St. Paul’s Cathedral visit twinkl.com This famous theatre is where many Unfortunately, there was lots of damage to of William Shakespeare’s plays were London due to bombings during the Second performed. However, in 1613, it was World War including to St. Paul’s Cathedral. burnt down by a staged cannon fire in London once again expanded and many one of his plays. Today, a new 1990s big department stores such as Harrods and Globe Theatre, close to the original Selfridges were built. building, still holds performances of Shakespeare’s plays. 200 years after Guy Fawkes tried to Due to its trading links, Britain and London blow up the Houses of Parliament, became very powerful with goods from all over an accidental fire spread through the world being imported. the main building leaving only Westminster Hall undamaged. The th During the 18 century and Queen Victoria’s replacement was built ten years reign, the population of London expanded and later and still remains there today. many of the buildings we still see in London today were built during the Victorian times.
    [Show full text]
  • Tower of London's 1,000 Year Old Facebook Timeline: List of Dates
    Tower of London’s 1,000 year old Facebook timeline: list of dates View the timeline at www.facebook.com/toweroflondon Date Event Description 1066 First royal Having defeated the English at the Battle of fortress Hastings, William the conqueror builds a established Norman stronghold to keep hostile Londoners on site at bay. 1080s Work Work on the White Tower begins - and takes begins on about twenty years to complete. The stone the White tower becomes the tallest building in the Tower country, dominating the London skyline. 2 February Flambard Ranulf Flambard, chief tax-collector, is 1101 becomes imprisoned by King Henry I for extortion. He the first has a rope smuggled inside a barrel of wine, prisoner and climbs out of a window - whilst the and first drunken guards are asleep. escapee 1241 Earliest It is reported that a vision of St Thomas known Becket, Keeper of Works at the Tower before sighting of his murder in 1170, ‘appears’ to a priest during a ghost at the building of the inner curtain wall, the Tower apparently reducing the work to rubble by striking it with his cross. 1255 An elephant Henry III receives the Tower’s biggest animal joins the gift: a male African elephant from King Louis Royal IX of France. For over 600 years, strange and Menagerie exotic animals are sent as royal gifts and kept at the Tower of London, as symbols of foreign lands and political connections. 1275-79 Traitors’ Edward I builds St Thomas’ Tower and the Gate is built water gate known as Traitors’ Gate - famous for being the way into the Tower for those soon to be executed 1279 The Royal For nearly 600 years the nation’s coins are Mint moves mass produced on Mint Street at the Tower.
    [Show full text]
  • Greenwich TC Visitor
    Greenwich Meridian Island C to The O2 H Island R I L and Blackwall Tunnel D Gardens S A L WE RO PELTON T St. Joseph ST FERRY RO A Gardens AD C E T H ham RC Church W es N P U ath K A OO GREENWICH R LW C W ICH EET L C RO STR A AD L FERRY H B C A W AN L L A A V to East TOWN CENTRE Y S H S 6 E N O E 0 R 2 AN Greenwich Library, L T S S L A Trinity K The Forum E I DA S Thames Barrier and N T D Thames Path S R @ Greenwich OA R M Hospital O LE E R Woolwich S E A T A T H R D Tunnel T E R C E A E O ROA T G A L L A R Highbridge F O L D Greenwich Foot A M R S Wharf W . T B 16 ST R AD O E E V O S I N R R O A UT CH LN T CR I D A . LW W RD R E E Greenwich O E V O TR E AD W S RO USKAR S T A T TR T LE D E F A Pier L N D 4 O E T R R NAN O E AN OLD B B E ach I T Re R Greenwich S H Arches U ROYAL D E P G WOO L A R A R N G COLLEGE WAY S T R E Leisure D T AD ha K E RO NAVAL 6 .
    [Show full text]
  • Charlton Riverside SPD
    Charlton Riverside SPD Draft February 2017 Contents 1 Introduction 1 2 Vision and Objectives 2 3 Context 13 4 Development Concept 29 5 Theme 1 – A Residentially Diverse Charlton Riverside 41 6 Theme 2 – An Economically Active Charlton Riverside 49 7 Theme 3 – A Connected and Accessible Charlton Riverside 61 8 Theme 4 – An Integrated and Lifetime Ready Charlton Riverside 73 Draft9 Theme 5 – A Well-designed Charlton Riverside 87 10 Theme 6 – A Sustainable and Resilient Charlton Riverside 113 11 Theme 7 – A Viable and Deliverable Charlton Riverside 121 12 Illustrative Masterplan 135 Appendices Charlton Riverside SPD | February 2017 iii List of Figures Figure Page Figure Page Figure Page 1.1 SPD Area 3 5.4 Development densities 47 8.7 Green Bridge Option 1 83 1.2 Basis of this SPD and how it should be used 5 6.1 Existing land use (at ground floor) 50 8.8 Green Bridge Option 2 84 3.1 The City in the East 14 6.2 Economic activity at Charlton Riverside 52 8.9 Green Crossing 85 3.2 Charlton Riverside 15 6.3 Angerstein and Murphy’s Wharves 53 9.1 Character areas 88 3.3 Economic activity at Charlton Riverside 17 6.4 Riverside Wharf 54 9.2 Neighbourhood and local centres 91 3.4 Existing building heights 18 6.5 Proposed ground floor uses 55 9.3 Neighbourhood Centre/High Street 92 3.5 Flood risk 20 6.6 Proposed upper floor uses 56 9.4 Retail and commercial uses 93 3.6 Public Transport Accessibility Level (PTAL) 21 6.7 Employment locations 57 9.5 Historic assets map 95 3.7 Existing open space 22 7.1 Proposed network of streets 62 9.6 Block structure
    [Show full text]