2015 MAINTENANCE WORK PLAN

ADAMS COUNTY TOTAL FUNDS - $1,146,099

11/17/2014

2015 ROUTINE SERVICES

WORK 2013 WORK PLAN DRAINAGEWAY NAME- LOCAL NEARBY WORK WORK PLAN NO. TRIBUTARY NAME GOVERNMENT STREETS DESCRIPTION TYPE BUDGET

1 BIG DRY CREEK- WESTMINSTER FROM U/S TO 200 L.F. D\S OF VEGETATION MANAGEMENT & --- 750 TANGLEWOOD CREEK 121ST AND DELAWARE DEBRIS REMOVAL

2 BIG DRY CREEK- ADAMS CO. 144TH AVENUE TO YORK VEGETATION MANAGEMENT & --- 1,500 LAKE ERIE TRIB. NO 1 STREET DEBRIS REMOVAL

3 BIG DRY CREEK- THORNTON BIG DRY CREEK TO YORK STREET VEGETATION MANAGEMENT & --- 1,500 WADLEY SOUTH CREEK DEBRIS REMOVAL

4 BRANTNER GULCH THORNTON FOREST DRIVE TO DEBRIS REMOVAL --- 500 BLVD. SOUTH OF 124TH AVE

5 BRANTNER GULCH THORNTON HOLLY STREET DEBRIS REMOVAL --- 500

6 BRANTNER GULCH- THORNTON N.W. OF COLORADO BLVD. VEGETATION MANAGEMENT & --- 500 TRIBUTARY 5 AND 124TH AVE. DEBRIS REMOVAL (EASTLAKE RESVR. D'WAY)

7 BRANTNER GULCH - TRIB 3 THORNTON JASMINE STREET DEBRIS REMOVAL --- 500 LAKEVIEW TRIBUTARY

8 CITY PARK DRAINAGEWAY WESTMINSTER 800 LF D/S OF LOWELL TO 400 LF VEGETATION MANAGEMENT & --- 750 U/S OF LOWELL DEBRIS REMOVAL

9 CLEAR CREEK ADAMS CO. N.E. OF 56TH & LOWELL VEGETATION MANAGEMENT & --- 750 DEBRIS REMOVAL

10 CLEAR CREEK ADAMS CO. S.E.OF 78TH & WASHINGTON DEBRIS REMOVAL --- 750 METRO VIEW DETENTION

11 CLEAR CREEK- ADAMS CO. BROADWAY AND 70TH VEGETATION MANAGEMENT & --- 500 DEBRIS REMOVAL

12 DUPONT DRAINAGE ADAMS CO. 80TH AVE. AT BRIGHTON RD. VEGETATION MANAGEMENT & --- 2,000 80TH AVE DETENTION DEBRIS REMOVAL

13 GRANGE HALL CREEK THORNTON RIVERDALE ROAD TO VEGETATION MANAGEMENT & --- 1,000 COLORADO BLVD. DEBRIS REMOVAL

14 GRANGE HALL CREEK NORTHGLENN IRMA ST. TO LARSON ST. VEGETATION MANAGEMENT & --- 4,000 AT 105TH. DEBRIS REMOVAL

15 GRANGE HALL CREEK ADAMS CO. FROM S. PLATTE R. TO DEBRIS REMOVAL --- 1,000 2100 FT UPSTREAM.(BROMLEY)

16 GRANGE HALL CREEK NORTHGLENN STEELE STREET EXTENDED TO DEBRIS REMOVAL --- 1,500 YORK STREET EXT. FOX RUN

17 GRANGE HALL CREEK NORTHGLENN WASHINGTON STREET TO LARSON VEGETATION MANAGEMENT & 500 DRIVE DEBRIS REMOVAL

GRANGE HALL CREEK NORTHGLENN I-25 TO GRANT DRIVE DEBRIS REMOVAL 1,500

GRANGE HALL CREEK- NORTHGLENN FROM 113TH TO 116TH WEST OF VEGETATION MANAGEMENT & --- 1,500 CLAUDE COURT TRIB. RAILROAD TRACKS. DEBRIS REMOVAL

GRANGE HALL CREEK- NORTHGLENN ALONG 112TH FROM VEGETATION MANAGEMENT & --- 3,500 TRIBUTARY NE 113TH TO WASHINGTON DEBRIS REMOVAL

GRANGE HALL CREEK - NORTHGLENN WASHINGTON STREET TO GRANT DEBRIS REMOVAL --- 500 TRIBUTARY S STREET AT 101ST AVENUE

HIDDEN LAKE D'WAY ADAMS CO. CLEAR CREEK TO HIDDEN LAKE VEGETATION MANAGEMENT & --- 2,500 AT 67TH DEBRIS REMOVAL

HOFFMAN DRAINAGEWAY ADAMS CO. AT 86TH AVE. FROM SPR TO D/S VEGETATION MANAGEMENT & --- 2,500 OF STEELE&WELBY RD TO 88TH DEBRIS REMOVAL

KALCEVIK GULCH ADAMS CO. FROM IRRIGATION DITCH TO VEGETATION MANAGEMENT & --- 1,500 MARIPOSA AND 70TH DEBRIS REMOVAL

LITTLE DRY CRK.(ADCO) WESTMINSTER LOWELL TO SHERIDAN BLVD. VEGETATION MANAGEMENT & --- 1,500 EXCEPT WOLFF TO 75TH DEBRIS REMOVAL ADAMS COUNTY 2015 ROUTINE SERVICES CONTINUED WORK 2013 WORK PLAN DRAINAGEWAY NAME- LOCAL NEARBY WORK WORK PLAN NO. TRIBUTARY NAME GOVERNMENT STREETS DESCRIPTION TYPE BUDGET

LITTLE DRY CRK.(ADCO) ADAMS CO. CLEAR CREEK TO 64TH AVE. DEBRIS REMOVAL --- 2,500 DETENTION POND

LITTLE DRY CRK.(ADCO) ADAMS CO. 64th AVE. TO FEDERAL BLVD. DEBRIS REMOVAL --- 750

LITTLE DRY CRK.(ADCO)- WESTMINSTER FROM CONF. WITH LITTLE VEGETATION MANAGEMENT & --- 500 SHAW HEIGHTS TRIBUTARY DRY CK. TO 1025 FT. U/S. DEBRIS REMOVAL

McKAY LAKE OUTFALL THORNTON I-25 TO WASHINGTON STREET VEGETATION MANAGEMENT & --- 1,000 DEBRIS REMOVAL

NIVER CREEK ADAMS CO. S. PLATTE R. CONFLUENCE VEGETATION MANAGEMENT & --- 3,000 TO D/S EXPLORADOR CALLE. DEBRIS REMOVAL

NIVER CREEK ADAMS CO. FROM D/S EXPLORADOR CALLE REMOVE - DEBRIS/SILT --- 750 TO WASHINGTON STREET.

NIVER CREEK THORNTON NW OF I-25 AND 88TH AVE. REMOVE - DEBRIS/SILT --- 1,500 NIVER DETENTION POND

NIVER CREEK THORNTON NIVER DET. POND TO PECOS VEGETATION MANAGEMENT & --- 1,500 STREET. DEBRIS REMOVAL

NIVER CREEK FEDERAL HTS WEST OF ZUNI ST. AT 98TH REMOVE - DEBRIS/SILT --- 750 RUSTON PARK

NIVER CREEK- THORNTON NW OF I-25 AND 86TH AVE. VEGETATION MANAGEMENT & --- 1,500 TRIBUTARY L DEBRIS REMOVAL

NIVER CREEK- FEDERAL HTS HURON ST. TO BELL ROTH POND VEGETATION MANAGEMENT & --- 1,500 TRIBUTARY L DEBRIS REMOVAL

NIVER CREEK- FEDERAL HTS ELM CT REGIONAL DETENTION REMOVE - DEBRIS/SILT --- 750 TRIBUTARY M W. 96TH & ELM COURT

NIVER CREEK - THORNTON PECOS STREET TO CACTUS DRIVE DEBRIS REMOVAL --- 1,000 TRIBUTARY M

SAND CREEK COMMERCE S. PLATTE TO QUEBEC ST. REMOVE - TREES AND DEBRIS/SILT --- 750 CITY AT DROP STRUCTURES

SAND CREEK AURORA AIRPORT BLVD. TO COLFAX VEGETATION MANAGEMENT & --- 1,500 AVENUE. DEBRIS REMOVAL

SAND CREEK AURORA TOLLGATE CREEK TO SABLE DEBRIS REMOVAL --- 1,500

SAND CREEK AURORA BARANMOR DITCH TO PEORIA DEBRIS REMOVAL 1,500 ---

SAND CREEK- AURORA PEORIA ST.TO SABLE BLVD VEGETATION MANAGEMENT & --- 7,500 BARANMOOR DITCH DEBRIS REMOVAL

SAND CREEK- AURORA SAND CREEK TO PEORIA DEBRIS REMOVAL --- 1,500 BARANMOOR DITCH

SOUTH - BRIGHTON S.PLATTE TO 168TH AVE & 19TH VEGETATION MANAGEMENT & --- 3,500 BRIGHTON NORTH OUTFALL TO FULTON DITCH AT AUGUST LN DEBRIS REMOVAL

SOUTH PLATTE RIVER - BRIGHTON HIGHWAY 85 TO SOUTH PLATTE DEBRIS REMOVAL 150 LONG PEAK STREET OUTFALL RIVER

SOUTH PLATTE RIVER - BRIGHTON S.P.R.TO CARDINAL AVENUE VEGETATION MANAGEMENT & --- 2,500 BRIGHTON SOUTH OUTFALL DEBRIS REMOVAL

TANGLEWOOD CREEK WESTMINSTER 121ST AVENUE TO 123RD AVENUE DEBRIS REMOVAL 500

TOLLGATE CREEK AURORA SAND CREEK TO E. COLFAX AVE DEBRIS REMOVAL --- 1,500

WESTERLY CREEK AURORA COLFAX AVE TO MONTVIEW BLVD DEBRIS REMOVAL --- 1,000 MONTVIEW BLVD TO E. 26TH AVE

2015 ROUTINE SUBTOTAL 73,900

2015 RESTORATION SERVICES WORK 2013 WORK PLAN DRAINAGEWAY NAME- LOCAL NEARBY WORK WORK PLAN NO. TRIBUTARY NAME GOVERNMENT STREETS DESCRIPTION TYPE BUDGET

ANNUAL SEDIMENT REMOVALS

1 BIG DRY CREEK THORNTON 144TH WAY TO WADLEY SOUTH REMOVE - DEBRIS/SILT CONST 2,500 CREEK ANNUAL WORK.

2 BIG DRY CREEK THORNTON WADLEY SOUTH CREEK REMOVE - DEBRIS/SILT CONST 2,500 TO 152ND AVENUE ANNUAL WORK.

3 BIG DRY CREEK THORNTON 152ND AVENUE TO E-470 REMOVE - DEBRIS/SILT CONST 2,500 ANNUAL WORK.

4 BIG DRY CREEK THORNTON DS OF YORK STREET TO 156TH REMOVE - DEBRIS/SILT CONST 2,500 AVENUE ANNUAL WORK.

5 CLEAR CREEK ADAMS CO. FROM S.PLATTE RIVER TO REMOVE - TREES AND DEBRIS/SILT CONST 2,000 52ND AVENUE. ANNUAL WORK.

6 DUPONT DRAINAGE COMMERCE 72ND AVE. AND MAGNOLIA REMOVE - DEBRIS/SILT CONST 2,500 CITY LOS VAL PARK DETENTION ANNUAL WORK

7 DUPONT DRAINAGE- COMMERCE S.OF 69TH AVE.AND FAIRFAX RESERVOIR REPAIR-SILT CONST 5,000 FAIRFAX TRIBUTARY CITY DRIVE. FAIRFAX DETENTION. REMOVAL. ANNUAL WORK.

8 DUPONT DRAINAGE- COMMERCE 64TH AVE. AND OLIVE ST. REMOVE - DEBRIS/SILT CONST 2,500 FAIRFAX TRIBUTARY CITY OLIVE PARK DETENTION ANNUAL WORK

9 GRANGE HALL CREEK NORTHGLENN EAST OF IRMA DRIVE REMOVE - DEBRIS/SILT CONST 2,500 ANNUAL WORK

10 GRANGE HALL CREEK NORTHGLENN I-25 TO GRANT DRIVE SEDIMENT REMOVAL CONST 15,000

11 GRANGE HALL CREEK NORTH NORTHGLENN GAYLORD STREET AND 109TH AVE SEDIMENT REMOVAL CONST 15,000 TRIBUTARY

12 GRANGE HALL CREEK NORTHGLENN ALONG E 112TH AVENUE FROM SEDIMENT REMOVAL CONST 10,000 TRIBUTARY NORTHEAST WASHINGTON AVE TO CLAUDE CT

13 GRANGE HALL CREEK- NORTHGLENN WEST OF PECOS REMOVE - DEBRIS/SILT CONST 3,000 NIVER CANAL ANNUAL WORK.

14 NIVER CREEK THORNTON NW OF I-25 AND 88TH AVE REMOVE - DEBRIS/SILT CONST 5,000 NIVER DETENTION POND ANNUAL WORK.

15 NIVER CREEK THORNTON THORNTON PARKWAY REMOVE - TREES AND DEBRIS/SILT CONST 1,000 ANNUAL WORK.

16 VARIOUS ADAMS CO. COUNTY-WIDE ALL REVEG, WEEDS, SEDIMENT CONST 25,000 CONTROL, RELATED EXPENSES CONTINUING PROJECTS

17 LITTLE DRY CREEK WESTMINSTER UPSTREAM OF LOWELL BLVD CHANNEL RESTORATION ENG CONST 350,000

18 NIVER CREEK TRIB M THORNTON UPSTREAM OF HURON STREET CHANNEL RESTORATION ENG 35,000 CONST 215,000

19 BRANTNER GULCH THORNTON UPSTREAM AND DOWNSTREAM OF WEED MANAGEMENT AND CONST 25,000 HOLLY STREET RESEEDING

20 GRANGE HALL CREEK THORNTON UPSTREAM OF COLORADO BLVD BANK STABILIZATION ENG 10,000 CONST 40,000

NEW PROJECTS

21 BIG DRY CREEK WESTMINSTER UPSTREAM OF BULL CANAL BANK STABILIZATION CONST 25,000

22 FAIRFAX PARK DETENTION COMMERCE CITY 69TH AVE AND FAIRFAX DR ANALYZE POND HYDRAULICS ENG 25,000 AND MAINTENANCE ADAMS COUNTY 2015 RESTORATION SERVICES CONTINUED WORK 2013 WORK PLAN DRAINAGEWAY NAME- LOCAL NEARBY WORK WORK PLAN NO. TRIBUTARY NAME GOVERNMENT STREETS DESCRIPTION TYPE BUDGET

23 BARANMOR DITCH AURORA SABLE TO I-225 DEBRIS AND TREE REMOVAL CONST 20,000

24 SAND CREEK AURORA CITY LIMITS TO TOLL GATE CREEK DEBRIS AND TREE REMOVAL CONST 75,000

25 BRANTNER GULCH ADAMS COUNTY RIVERDALE ROAD TO MANN NYHOLT SEDIMENT REMOVAL CONST 75,000 LAKE

26 CLEAR CREEK ADAMS COUNTY METRO VIEW DETENTION POND SEDIMENT REMOVAL CONST 25,000 78TH AVE AND WASHINGTON ST

27 VARIOUS ADAMS CO. COUNTY-WIDE ALL PERMITTING, PREP. FEES, ENG 20,000 REPORTS, RELATED EXPENSES

2015 RESTORATION SUBTOTAL 1,038,500

ADAMS COUNTY CONTINGENCY 33,699

TOTAL 2015 ADAMS COUNTY BUDGET 1,146,099 FILE NAME=2015 Adams County.XLS 2015 MAINTENANCE WORK PLAN

ARAPAHOE COUNTY TOTAL FUNDS- $1,878,345

11/17/2014

2015 ROUTINE SERVICES

WORK 2015 WORK PLAN DRAINAGEWAY NAME- LOCAL NEARBY WORK WORK PLAN NO. TRIBUTARY NAME GOVERNMENT STREETS DESCRIPTION TYPE BUDGET

1 BEAR CREEK SHERIDAN S. PLATTE RIVER TO LOWELL DEBRIS REMOVAL --- 2,400

2 BIG DRY CREEK(ARAPCO) ENGLEWOOD S PLATTE RIVER TO BELLEVIEW DEBRIS REMOVAL --- 1,500

3 BIG DRY CREEK(ARAPCO) LITTLETON BELLEVIEW TO LEHOW AVE. DEBRIS REMOVAL --- 1,000 SOUTH SUB.

4 BIG DRY CREEK(ARAPCO) ENGLEWOOD U/S BROADWAY TO DEBRIS REMOVAL --- 900 LITTLETON D/S LITTLETON BLVD

5 BIG DRY CREEK(ARAPCO) 85% G.W. VILL. U/S BROADWAY TO ORCHARD DEBRIS REMOVAL --- 1,200 15% CENTNNL ORCHARD RD.TO CHRRYWOOD

6 BIG DRY CREEK(ARAPCO) SEMSWA DEKOEVEND PARK , UNIVERSITY DEBRIS REMOVAL --- 4,500 -CENTENNIAL BLVD TO COLORADO

7 BIG DRY CREEK(ARAPCO)- SEMSWA BIG DRY TO UNIV TO NICHOLS PL VEGETATION MANAGEMENT & --- 2,800 BRANCH 2 -CENTENNIAL AND PHILLIPS TO COUNTY LINE DEBRIS REMOVAL

8 BIG DRY CREEK(ARAPCO)- SEMSWA UNIV. TO U/S OF STEELE VEGETATION MANAGEMENT & --- 1,300 NOBLES ROAD TRIB -CENTENNIAL DEBRIS REMOVAL

9 BIG DRY CREEK(ARAPCO)- SEMSWA COLO BLVD TO DRY CREEK RD VEGETATION MANAGEMENT & --- 1,800 NOBLES ROAD TRIB -CENTENNIAL DEBRIS REMOVAL

10 BIG DRY CREEK(ARAPCO)- SEMSWA OTERO AVE TO COUNTY DEBRIS REMOVAL --- 800 OTERO TRIB -CENTENNIAL LINE ROAD

11 GLENDALE COLORADO TO EXPOSITION DEBRIS REMOVAL --- 1,500

12 CHERRY CREEK SEMSWA DROP #18 TO DROP #19 TO DEBRIS REMOVAL --- 2,300 -ARAPCO YALE EXTENDED

12 CHERRY CREEK SEMSWA ECO PARK DEBRIS REMOVAL --- 2,500 -CENTENNIAL

12 CHERRY CREEK AURORA UPSTREAM OF ARAPAHOE ROAD DEBRIS REMOVAL --- 2,500

13 CHERRY CREEK- AURORA WEST TOLL GATE CREEK TO ILIFF DEBRIS REMOVAL --- 3,000 SPILLWAY

14 CHERRY CREEK- SEMSWA E.OF CHERRY CK. AT VALENTIA DEBRIS REMOVAL --- 300 BASIN 6 TRIB -ARAPCO NORTH OF ILIFF

15 CHERRY CREEK- SEMSWA SE OF PARKER ROAD AND REMOVE DEBRIS/SILT --- 1,400 CHENANGO TRIBUTARY -ARAPCO FREMONT AVENUE

16 CHERRY CREEK- SEMSWA CHERRY CREEK DRIVE TO VEGETATION MANAGEMENT & --- 1,400 CHERRY VISTA TRIB -ARAPCO ORCHARD ROAD DEBRIS REMOVAL

17 CHERRY CREEK- SEMSWA CONF WITH CHERRY CK TO VEGETATION MANAGEMENT & --- 2,200 DOVE CREEK -CENTENNIAL JORDAN RD AND POND D3 DEBRIS REMOVAL

18 CHERRY CREEK- FOXFIELD SE OF PARKER RD AND ARPAHOE VEGETATION MANAGEMENT & --- 1,000 PARKER RD WQ POND RD OFF OF RAMP DEBRIS REMOVAL

19 CHERRY CREEK- AURORA QUINCY AVE FROM PARKER DEBRIS REMOVAL --- 2,900 QUINCY DRAINAGE RD TO PARK PERIMETER RD

20 CHERRY CREEK- AURORA ABILENE CIR AT PARKER RD DEBRIS REMOVAL --- 700 SHOP CREEK POND TO PERIMETER RD ARAPAHOE COUNTY 2015 ROUTINE SERVICES CONTINUED

WORK 2015 WORK PLAN DRAINAGEWAY NAME- LOCAL NEARBY WORK WORK PLAN NO. TRIBUTARY NAME GOVERNMENT STREETS DESCRIPTION TYPE BUDGET

21 CHERRY CREEK- SEMSWA CALEY AVENUE, WEST OF VEGETATION MANAGEMENT & --- 1,200 VALLEY CLUB ACRES TRIB -ARAPCO PARKER ROAD DEBRIS REMOVAL

22 COTTONWOOD CREEK GREENWD VILL. ON PEORIA NORTH OF CALEY VEGETATION MANAGEMENT & --- 1,500 DEBRIS REMOVAL

23 DUTCH CREEK COL. VALLEY S PLATTE RIVER TO VEGETATION MANAGEMENT & --- 1,800 PLATTE CANYON ROAD DEBRIS REMOVAL

24 DUTCH CREEK- COL. VALLEY DUTCH CREEK TO PLATTE VEGETATION MANAGEMENT & --- 400 THREE LAKES TRIBUTARY RIVER DRIVE. DEBRIS REMOVAL

25 EAST TOLL GATE CREEK AURORA UPSTREAM OF HAMPDEN DEBRIS REMOVAL --- 1,500 - STORMWATER POND 504

25 EAST TOLL GATE CREEK- AURORA ALAMEDA TO MISSISSIPPI DEBRIS REMOVAL --- 1,000 EAST TOLL GATE TRIB

26 EAST TOLL GATE CREEK- AURORA MISSISSIPPI TO JEWELL EXTND. DEBRIS REMOVAL --- 1,700 EAST TOLL GATE TRIB

27 EAST TOLL GATE CREEK- AURORA TELLURIDE ST TO LOUISIANA AVE DEBRIS REMOVAL --- 1,500 EAST TOLL GATE TRIB

28 EAST TOLL GATE CREEK- AURORA MISSISSIPPI AVENUE TO DEBRIS REMOVAL --- 4,800 SIDE CREEK TRIBUTARY DUNKIRK STREET

29 GOLDSMITH GULCH GREENWD VILL. BERRY AVE TO VEGETATION MANAGEMENT & --- 1,000 ORCHARD ROAD DEBRIS REMOVAL

30 GREENWOOD GULCH GREENWD VILL. HOLLY ST. TO ORCHARD RD. DEBRIS REMOVAL --- 500

31 GREENWOOD GULCH SEMSWA ORCHARD RD TO MONACO WAY DEBRIS REMOVAL --- 400 -CENTENNIAL

32 GREENWOOD GULCH SEMSWA UPSTREAM OF MONACO WAY VEGETATION MANAGEMENT & --- 1,800 -CENTENNIAL DEBRIS REMOVAL

33 HAPPY CANYON CREEK SEMSWA CONF WITH CHERRY CK VEGETATION MANAGEMENT & --- 2,600 -ARAPCO TO JORDAN RD DEBRIS REMOVAL

34 HARVARD GULCH SEMSWA ON HOLLY PLACE BOTH NORTH DEBRIS REMOVAL --- 300 -ARAPCO AND SOUTH OF YALE AVE 2 DETENTION PONDS

35 LEE GULCH LITTLETON SANTA FE BLVD TO CLARKSON DEBRIS REMOVAL --- 6,200 SOUTH SUB. EXCLUDES WINDERMERE POND

36 LITTLE CREEK LITTLETON SANTA FE TO RAILROAD VEGETATION MANAGEMENT & --- 1,400 DEBRIS REMOVAL

37 LITTLE CREEK LITTLETON RAILROAD TO BEMIS ST. VEGETATION MANAGEMENT & --- 2,700 DETENTION POND DEBRIS REMOVAL

38 LITTLE CREEK LITTLETON LAKE AVE TO APACHE VEGETATION MANAGEMENT & --- 4,500 ALONG STERNE PARKWAY DEBRIS REMOVAL

39 LITTLE CREEK SEMSWA DRY CK ROAD & CLARKSON VEGETATION MANAGEMENT & --- 1,700 -CENTENNIAL DETENTION POND DEBRIS REMOVAL

40 LITTLE DRY CRK. (ARAPCO) ENGLEWOOD S. PLATTE RIVER TO SANTA FE VEGETATION MANAGEMENT & --- 1,800 DEBRIS REMOVAL

41 LITTLE DRY CRK. (ARAPCO) ENGLEWOOD SANTA FE TO EASTMAN EXT. DEBRIS REMOVAL --- 300

42 LITTLE DRY CRK. (ARAPCO) ENGLEWOOD BROADWAY TO PENNSYLVANIA DEBRIS REMOVAL --- 900 PENNSYLVANIA TO CLARKSON

43 LITTLE DRY CRK. (ARAPCO) CHERRY HILLS CLARKSON TO CITY DITCH DEBRIS REMOVAL --- 1,200 HUNTWICK LN TO BELLEVIEW

44 LITTLE DRY CRK. (ARAPCO) GREENWOOD VILLAGE DOWNSTREAM OF LONG ROAD VEGETATION MANAGEMENT & --- 2,300 DEBRIS REMOVAL

45 LITTLE DRY CRK. (ARAPCO) SEMSWA BROOK VALLEY WAY VEGETATION MANAGEMENT & --- 2,700 -CENTENNIAL TO FAIRFAX WAY DEBRIS REMOVAL ARAPAHOE COUNTY 2015 ROUTINE SERVICES CONTINUED

WORK 2015 WORK PLAN DRAINAGEWAY NAME- LOCAL NEARBY WORK WORK PLAN NO. TRIBUTARY NAME GOVERNMENT STREETS DESCRIPTION TYPE BUDGET

46 LITTLE DRY CRK. (ARAPCO) SEMSWA HOLLY DAM VEGETATION MANAGEMENT & --- 2,000 -CENTENNIAL FROM HOLLY ST. TO KRAMERIA DEBRIS REMOVAL

47 LITTLE DRY CRK. (ARAPCO) SEMSWA KRAMERIA TO ARAPAHOE RD. VEGETATION MANAGEMENT & --- 1,300 -CENTENNIAL DEBRIS REMOVAL

48 LITTLE DRY CRK. (ARAPCO) SEMSWA QUEBEC TO YOSEMITE VEGETATION MANAGEMENT & --- 4,400 -CENTENNIAL DEBRIS REMOVAL

49 LITTLE DRY CRK. (ARAPCO)- SEMSWA CONF WITH LITTLE DRY CK VEGETATION MANAGEMENT & --- 1,200 LIBERTY HILLS TRIB -CENTENNIAL TO DAHLIA CIRCLE DEBRIS REMOVAL

50 LITTLE DRY CRK. (ARAPCO)- SEMSWA COSTILLA BLVD TO EASTER VEGETATION MANAGEMENT & --- 500 SPRUCE CIRCLE TRIB -CENTENNIAL PLACE DEBRIS REMOVAL

51 MEADOWOOD DRAIN AURORA WEST TOLL GATE CREEK TO ILIFF DEBRIS REMOVAL --- 2,000

52 MEADOWOOD DRAIN AURORA ILIFF TO HAMPDEN AND DEBRIS REMOVAL --- 7,600 HAMPDEN TO QUINCY

53 NO NAME CREEK SEMSWA CHENANGO & PICADILLY VEGETATION MANAGEMENT & --- 1,100 -ARAPCO BELLEVIEW DETENTION POND DEBRIS REMOVAL

54 NO NAME CREEK SEMSWA QUINCY & HIMALAYA DEBRIS REMOVAL --- 900 -ARAPCO QUINCY POND

55 NO NAME CREEK- SEMSWA HAMPDEN AVE & PICADILLY VEGETATION MANAGEMENT & --- 2,700 NO NAME TRIBUTARY -ARAPCO TALL GRASS POND DEBRIS REMOVAL

56 PINEY CREEK SEMSWA TOWER RD TO ORCHARD RD DEBRIS REMOVAL --- 2,000 -ARAPCO

57 PINEY CREEK SEMSWA CALEY DRIVE DEBRIS REMOVAL --- 1,500 -CENTENNIAL

58 PINEY CREEK- SEMSWA TOWER RD, S. OF ORCHARD RD DEBRIS REMOVAL --- 1,900 REC. CENTER TRIBUTARY -ARAPCO RB5-RESERVOIR 1

59 PINEY CREEK- SEMSWA SOUTH OF FAIR AVE VEGETATION MANAGEMENT & --- 1,900 TUSCANY TRIBUTARY -CENTENNIAL WEST OF JERICHO WAY DEBRIS REMOVAL

60 PINEY CREEK- SEMSWA ORCHARD RD & JOPLIN WAY VEGETATION MANAGEMENT & --- 1,500 DIRECT FLOW AREA -CENTENNIAL RB2-POND 2 DEBRIS REMOVAL

61 PINEY CREEK- SEMSWA RIFLE ST. AT BERRY VEGETATION MANAGEMENT & --- 900 SMOKY HILL MIDDLE TRIB. -CENTENNIAL RB3-POND 3 DEBRIS REMOVAL

62 PINEY CREEK- SEMSWA PITKIN AT BERRY VEGETATION MANAGEMENT & --- 1,000 SMOKY HILL WEST TRIB. -CENTENNIAL RB3- POND 2 DEBRIS REMOVAL

63 PINEY CREEK- SEMSWA URAVAN CT. AT BERRY PL VEGETATION MANAGEMENT & --- 1,100 SMOKY HILL MID. TRIB.LEFT -CENTENNIAL RB4-POND 1 DEBRIS REMOVAL

64 PINEY CREEK- SEMSWA YAMPA ST. AT BERRY PL VEGETATION MANAGEMENT & --- 900 SMOKY HILL EAST TRIB -CENTENNIAL RB4-POND 2 DEBRIS REMOVAL

65 SJCD NORTH SEMSWA PORTLAND DRIVE EXTENDED VEGETATION MANAGEMENT & --- 300 -ARAPCO TO SHERIDAN DEBRIS REMOVAL

66 SJCD SOUTH- LITTLETON CONF WITH SJCD SOUTH 6200 VEGETATION MANAGEMENT & --- 800 NORTH TRIB TO PLATTE CANYON RD DEBRIS REMOVAL

67 SLAUGHTERHOUSE GULCH LITTLETON PRINCE TO RIO GRANDE VEGETATION MANAGEMENT & --- 500 DEBRIS REMOVAL

68 SLAUGHTERHOUSE GULCH LITTLETON RIO GRANDE TO WINDEMERE & DEBRIS REMOVAL --- 900 SOUTH SUB. POWERS PARK DET. POND

69 SLAUGHTERHOUSE GULCH SEMSWA GRANT ST. AND MAPLEWOOD VEGETATION MANAGEMENT & --- 3,400 -CENTENNIAL GRANT ST. DETENTION POND DEBRIS REMOVAL

70 SLAUGHTERHOUSE GULCH- LITTLETON CONF. WITH SLTRHOUSE TO DEBRIS REMOVAL --- 100 SOUTH TRIBUTARY ENERGY DISSIPATOR. N.W. OF WNDERMERE&POWERS ARAPAHOE COUNTY 2015 ROUTINE SERVICES CONTINUED WORK 2015 WORK PLAN DRAINAGEWAY NAME- LOCAL NEARBY WORK WORK PLAN NO. TRIBUTARY NAME GOVERNMENT STREETS DESCRIPTION TYPE BUDGET

71 SOUTH PLATTE RIVER- COL. VALLEY S. PLATTE RIVER VEGETATION MANAGEMENT & --- 900 COLUMBINE VALLEY TRIB TO FAIRWAY LANE DEBRIS REMOVAL

72 SOUTH PLATTE RIVER- COL. VALLEY SE BOWLES & PLATTE CANYON VEGETATION MANAGEMENT & --- 900 DRAINAGEWAY D ALONG BROOKHAVEN DEBRIS REMOVAL

73 SOUTH PLATTE RIVER- SEMSWA CALEY LN.TO FREMONT DR. EXT VEGETATION MANAGEMENT & --- 900 DRAINAGEWAY F -ARAPCO ALONG S.PLATTE CANYN.RD. DEBRIS REMOVAL

74 SOUTH PLATTE RIVER- SHERIDAN CLAY ST. TO HOOKER ST. REMOVE DEBRIS/SILT --- 300 SHERIDAN H.S. TRIB EXTENDED

75 TOLLGATE CREEK AURORA COLFAX TO CONFLUENCE WITH DEBRIS REMOVAL --- 2,000 WEST AND EAST TOLL GATE CREEKS

76 WEST HARVARD GULCH ENGLEWOOD RAILROAD TO ZUNI STREET DEBRIS REMOVAL --- 900

77 WEST TOLL GATE CREEK SEMSWA KILARNEY ST. & CRESTLINE VEGETATION MANAGEMENT & --- 1,500 -ARAPCO WILLAMETTE DETENTION POND DEBRIS REMOVAL

78 WEST TOLL GATE CREEK SEMSWA RIVIERA WAY & POWERS LANE VEGETATION MANAGEMENT & --- 900 -CENTENNIAL RIVIERA WAY DETENTION POND DEBRIS REMOVAL

79 WEST TOLL GATE CREEK- AURORA CONF. W/WEST TOLL GATE DEBRIS REMOVAL --- 9,700 SUMMER VAL RANCH TRIB TO PRINCETON DR.

80 WEST TOLL GATE CREEK- SEMSWA S. WACO ST. AT YAMPA CIR. VEGETATION MANAGEMENT & --- 900 YAMPA DRAW TRIBUTARY -CENTENNIAL LBO-POND 1 DEBRIS REMOVAL

81 WESTERLY CREEK AURORA POND ON NW CORNER OF ALAMEDA DEBRIS REMOVAL --- 1,000 AND HAMPDEN

82 WESTERLY CREEK AURORA ILIFF TO YALE DEBRIS REMOVAL --- 1,900 UPPER WESTERLY

83 WESTERLY CREEK AURORA E. OF HAVANA, ALAMEDA TO REMOVE DEBRIS --- 1,400 EXPOSITION. EXPO PARK DET.

84 WESTERLY CREEK- AURORA NW OF JEWELL & POTOMAC REMOVE DEBRIS --- 1,400 UTAH PARK TRIBUTARY JEWELL AVENUE WETLANDS

85 WILLOW CREEK (ARAPCO) SEMSWA CONF WITH LITTLE DRY TO VEGETATION MANAGEMENT & --- 2,100 -CENTENNIAL ENGLEWOOD DAM DEBRIS REMOVAL

86 WILLOW CREEK (ARAPCO) SEMSWA ENGLEWOOD DAM VEGETATION MANAGEMENT & --- 2,500 -CENTENNIAL LOW FLOW IN FLOOD POOL DEBRIS REMOVAL

87 WILLOW CREEK (ARAPCO) SEMSWA DRY CREEK ROAD TO DEBRIS REMOVAL --- 4,100 -CENTENNIAL COUNTY LINE ROAD.

88 WILLOW CREEK (ARAPCO)- SEMSWA CONF. WITH WILLOW CK TO DEBRIS REMOVAL --- 400 EAST TRIBUTARY -CENTENNIAL ROSEMARY

89 WILLOW CREEK (ARAPCO)- SEMSWA NICHOLS EXTENDED VEGETATION MANAGEMENT & --- 800 FOXHILL PARK TRIB -CENTENNIAL TO OTERO DEBRIS REMOVAL

90 WILLOW CREEK (ARAPCO)- SEMSWA CONF WITH WILLOW CREEK TO DEBRIS REMOVAL --- 300 HOMESTEAD TRIBUTARY -CENTENNIAL HOMESTEAD PARKWAY

91 WILLOW CREEK (ARAPCO)- SEMSWA CONF WITH WILLOW CREEK TO DEBRIS REMOVAL --- 600 SPRING CREEK -CENTENNIAL MINERAL AVENUE

92 WILLOW CREEK (ARAPCO)- SEMSWA MINERAL AVE. TO VEGETATION MANAGEMENT & --- 1,100 WEST SPRING CREEK -CENTENNIAL COUNTY LINE ROAD DEBRIS REMOVAL

93 WINDMILL CREEK SEMSWA BRIARWOOD TO BLACKHAWK ST VEGETATION MANAGEMENT & --- 6,000 -ARAPCO AND POND W8 AT JORDON AND DEBRIS REMOVAL MAPLEWOOD AND POND W9 AT SW CORNER OF POTOMAC AND CALEY

94 WINDMILL CREEK AURORA FROM CALEY AVENUE SOUTH DEBRIS REMOVAL --- 1,700 1000 FT

2015 ROUTINE SUBTOTAL 174,200 ARAPAHOE COUNTY 2015 RESTORATION SERVICES

WORK 2015 WORK PLAN DRAINAGEWAY NAME- LOCAL NEARBY WORK WORK PLAN NO. TRIBUTARY NAME GOVERNMENT STREETS DESCRIPTION TYPE BUDGET

ANNUAL SEDIMENT REMOVALS

1 BIG DRY CREEK - ENGLEWOOD HURON DETENTION POND SEDIMENT REMOVAL CONST 2,000 BIG DRY CREEK TRIBUTARY NW OF HURON ST&STANFORD AVE

2 LITTLE DRY CRK. (ARAPCO) SEMSWA HOLLY DETENTION POND SEDIMENT REMOVAL CONST 5,000 -CENTENNIAL N.E. HOLLY ST & ARAPAHOE RD

3 NO NAME CREEK SEMSWA CHENANGO & PICADILLY SEDIMENT REMOVAL CONST 2,000 -BELLEVIEW DETENTION POND -ARAPCO BELLEVIEW DETENTION POND

4 PINEY CREEK- SEMSWA PITKIN AT BERRY PL. SEDIMENT REMOVAL CONST 2,000 SMOKY HILL WEST TRIB -CENTENNIAL RB3-POND 2. DET. POND

5 PINEY CREEK- SEMSWA BERRY DRIVE & YAMPA ST SEDIMENT REMOVAL CONST 2,000 SMOKY HILL EAST TRIB -CENTENNIAL RB4-POND 2 DET. POND

6 PINEY CREEK- SEMSWA RIFLE STREET AT BERRY PL. SEDIMENT REMOVAL CONST 2,000 SMOKY HILL MIDDLE TRIB. -CENTENNIAL RB3-POND 3. DET. POND.

7 SLAUGHTERHOUSE GULCH SEMSWA MAPLEWOOD DR & GRANT ST SEDIMENT REMOVAL CONST 2,000 -CENTENNIAL GRANT STREET DETENTION

8 SLAUGHTERHOUSE GULCH LITTLETON POWERS AVE. & HURON ST SEDIMENT REMOVAL CONST 3,000 POWERS PARK DET. POND.

9 SO PLATTE RIVER COL. VALLEY S0 PLATTE RIVER & FAIRWAY SEDIMENT REMOVAL CONST 2,000 COLUMBINE VALLEY TRIB LANE

10 WILLOW CREEK (ARAPCO) SEMSWA ENGLEWOOD DETENTION SEDIMENT REMOVAL CONST 5,000 -CENTENNIAL POND, EASTER AVE & HOLLY

11 WILLOW CREEK (ARAPCO) SEMSWA SOUTH OF DRY CREEK ROAD AT SEDIMENT REMOVAL CONST 30,000 -CENTENNIAL HOMESTEAD PARKWAY.

12 VARIOUS ARAP CO COUNTY-WIDE ALL REVEG, WEEDS, AND CONST 40,000 SEDIMENT CONTROL CONTINUING PROJECTS

13 BIG DRY CREEK SEMSWA CHERRY KNOLLS PARK BANK PROTECTION AND DROP ENG 0 -CENTENNIAL STRUCTURE CONST 5,000

14 BIG DRY CREEK SEMSWA DEKOEVEND PARK BANK PROTECTION ENG 0 -CENTENNIAL CONST 20,000

15 CHERRY CREEK SEMSWA 17-MILE HOUSE SEDIMENT REMOVAL ENG 0 - CENTENNIAL CONST 65,000

16 GREENWOOD GULCH GREENWOOD VILLAGE HOLLY STREET REPAIR DROP STRUCTURES ENG 0 CONST 50,000

17 LITTLE DRY CREEK SEMSWA DOWNSTREAM OF KREMERIA DROP STRUCTURES AND BANK ENG 0 -CENTENNIAL STREET PROTECTION CONST 1,000

18 LITTLE DRY CREEK GREENWOOD VILLAGE BELLEVIEW TO UNIVERSITY DROP STRUCTURES AND BANK ENG 0 PROTECTION CONST 5,000

19 PINEY CREEK SEMSWA DOWNSTREAM OF CALEY BANK PROTECTION ENG 0 - CENTENNIAL CONST 20,000

20 WEST TOLL GATE CREEK AURORA UPSTREAM OF HAMPDEN WETLAND BANK CREDIT ENG 0 CONST 75,000

ARAPAHOE COUNTY 2015 RESTORATION SERVICES CONTINUED

WORK 2015 WORK PLAN DRAINAGEWAY NAME- LOCAL NEARBY WORK WORK PLAN NO. TRIBUTARY NAME GOVERNMENT STREETS DESCRIPTION TYPE BUDGET

NEW PROJECTS 21 BIG DRY CREEK ENGLEWOOD DOWNSTREAM OF BROADWAY BANK PROTECTION ENG 0 CONST 50,000

22 CHERRY CREEK GLENDALE COLORADO TO EXPOSITION TREE THINNING CONST 5,000

23 CONSTRUCTION MANAGER ARAP CO COUNTY-WIDE TBD ENG 0 SMALL PROJECTS FUND CONST 50,000

24 LITTLE DRY CREEK CHERRY HILLS BELLEVIEW TO WOODIE HOLLOW BANK PROTECTION AND ENG 50,000 PARK DROP STRUCTURE CONST 200,000

26 LITTLE DRY CRK. (ARAPCO) SEMSWA HOLLY DETENTION POND DAM MAINTENANCE ENG 0 -CENTENNIAL N.E. HOLLY ST & ARAPAHOE RD CONST 30,000

27 LITTLES CREEK LITTLETON AT GREENWOOD STREET EXTENDED BANK PROTECTION ENG 25,000 CONST 100,000

28 TOLLGATE CREEK AURORA DOWNSTREAM OF CHAMBERS BANK PROTECTION ENG 25,000 CONST 150,000

29 WILLOW CREEK SEMSWA UPSTREAM OF ARAPAHOE ROAD BANK PROTECTION ENG 0 -CENTENNIAL CONST 300,000

30 WILLOW CREEK SEMSWA ENGLEWOOD DETENTION DAM MAINTENANCE ENG 0 -CENTENNIAL POND, EASTER AVE & HOLLY CONST 50,000

31 WESTERLY CREEK AURORA EXPO PARK STORM SEWER OUTLET REPAIR ENG 25,000 CONST 0

32 WEST TOLLGATE CREEK AURORA HAMPDEN TO QUINCY TREE REMOVAL ENG 0 CONST 80,000

33 VARIOUS ARAP CO COUNTY-WIDE ALL PERMITTING FEES AND ENG 45,000

2015 RESTORATION SUBTOTAL 1,523,000

ARAPAHOE COUNTY CONTINGENCY 181,145

TOTAL 2015 ARAPAHOE COUNTY BUDGET 1,878,345

FILE NAME=2015 Arapahoe County.XLS 2015 MAINTENANCE WORK PLAN

BOULDER COUNTY TOTAL FUNDS - $1,061,814

11/17/2014

2015 ROUTINE SERVICES

WORK 2015 WORK PLAN DRAINAGEWAY NAME- LOCAL NEARBY WORK WORK PLAN NO. TRIBUTARY NAME GOVERNMENT STREETS DESCRIPTION TYPE BUDGET

1 BEAR CANYON CREEK BOULDER MOOREHEAD TO LEHIGH ST. VEGETATION MANAGEMENT & --- 1,000 ALONG TABLE MESA DR. DEBRIS REMOVAL

2 BOULDER CREEK- BOULDER CO. ALONG 75TH STREET NORTH VEGETATION MANAGEMENT & --- 1,250 HEATHERWOOD TRIB. OF JAY RD. DEBRIS REMOVAL

3 COAL CREEK - KENOSHA ERIE KENOSHA ROAD AND LOMBARDI ST VEGETATION MANAGEMENT & --- 3,000 FARMS POND DEBRIS REMOVAL

4 COAL CREEK - BOULDER CREEK ERIE ERIE PARKWAY TO MELLER STREET VEGETATION MANAGEMENT & --- 1,000 DITCH DEBRIS REMOVAL

5 COAL CREEK - BOULDER CREEK ERIE POND 1045 TO COUNTY LINE ROAD VEGETATION MANAGEMENT & --- 1,000 DITCH DEBRIS REMOVAL

6 COAL CREEK - BOULDER CREEK ERIE MELLER STREET TO TELLEEN DRIVE VEGETATION MANAGEMENT & --- 350 DITCH DEBRIS REMOVAL

7 COAL CREEK - BOULDER CREEK ERIE SW CORNER OF TELLEN AVENUE VEGETATION MANAGEMENT & --- 500 DITCH - POND 1056 DEBRIS REMOVAL

8 COAL CREEK - BOULDER CREEK ERIE U/S OF COUNTY LINE RD, SOUTH OF VEGETATION MANAGEMENT & --- 3,500 DITCH - POND 1045 UPRR TO 150 LF U/S OF TELLEN AVE DEBRIS REMOVAL

9 COAL CREEK - BOULDER CREEK ERIE NORTH OF ERIE PARKWAY VEGETATION MANAGEMENT & --- 800 DITCH - MELLER STREET AND W. OF MELLER STREET DEBRIS REMOVAL

10 COAL CREEK - BOULDER CREEK ERIE S. OF ERIE PARKWAY TO AUSTIN VEGETATION MANAGEMENT & --- 2,100 DITCH - POND 1044 AVENUE DEBRIS REMOVAL

11 COAL CREEK - BOULDER CREEK ERIE SW CORNER OF MEADOW SWEET VEGETATION MANAGEMENT & --- 800 DITCH - POND 1043 LANE U/S TO POPE DRIVE DEBRIS REMOVAL

12 COAL CREEK - BOULDER CREEK ERIE SW OF ERIE PARKWAY ALONG 119TH VEGETATION MANAGEMENT & --- 1300 DITCH - POND 1041 STREET TO MEADOW SWEET LN DEBRIS REMOVAL

13 COAL CREEK - BOULDER CREEK ERIE W. OF COUNTY LINE ROAD, SOUTH VEGETATION MANAGEMENT & --- 2700 DITCH - POND 1050 OF AUSTIN AVENUE DEBRIS REMOVAL

14 COAL CREEK (BOCO)- LAFAYETTE E. ELM STREET AND N. FINCH AVE DEBRIS REMOVAL --- 750 DRAINAGEWAY NO. 2

15 COAL CREEK (BOCO)- LAFAYETTE COAL CK TO S. BOULDER RD. VEGETATION MANAGEMENT & --- 3,000 DRAINAGEWAY NO. 4 TO MERLIN DR TO PUBLIC RD DEBRIS REMOVAL DISTEL DR TRIB FROM COAL CK TO AVALON AVE

16 COAL CREEK (BOCO)- LAFAYETTE COAL CK. TO 700 L.F. NORTH VEGETATION MANAGEMENT & --- 2,000 DRAINAGEWAY NO. 5 DEBRIS REMOVAL

17 COAL CREEK (BOCO)- LAFAYETTE COAL CK. TO MINOTAUR DR. VEGETATION MANAGEMENT & --- 850 DRAINAGEWAY NO. 6 DEBRIS REMOVAL

18 COAL CREEK (BOCO)- LAFAYETTE COAL CK. TO LYDIA DRIVE VEGETATION MANAGEMENT & --- 1,200 DRAINAGEWAY NO. 7 DEBRIS REMOVAL

19 COAL CREEK (BOCO)- LOUISVILLE E OF FRANKLIN CT DEBRIS REMOVAL --- 350 DRAINAGEWAY A HILLSBOROUGH WEST POND

20 COAL CREEK (BOCO)- LOUISVILLE COAL CREEK TO 96TH STREET VEGETATION MANAGEMENT & --- 750 DRAINAGEWAY B (HIGHWAY #42) DEBRIS REMOVAL

21 COAL CREEK (BOCO)- LOUISVILLE U/S OF CHERRY ST VEGETATION MANAGEMENT & --- 1,700 DRAINAGEWAY D TO DET. POND D OUTFALL DEBRIS REMOVAL

22 COAL CREEK (BOCO)- LOUISVILLE S. OF VIA APPIA WAY VEGETATION MANAGEMENT & --- 700 DRAINAGEWAY D DETENTION POND D DEBRIS REMOVAL

23 COAL CREEK (BOCO)- LOUISVILLE SOUTH OF W. DILLON ROAD TO DEBRIS REMOVAL --- 200 DRAINAGEWAY E COAL CREEK

24 COAL CREEK (BOCO) LAFAYETTE S PUBLIC RD TO U/S OF DEBRIS REMOVAL --- 750 DRAINAGEWAY 7 BOULDER COUNTY 2015 ROUTINE SERVICES CONTINUED WORK 2015 WORK PLAN DRAINAGEWAY NAME- LOCAL NEARBY WORK WORK PLAN NO. TRIBUTARY NAME GOVERNMENT STREETS DESCRIPTION TYPE BUDGET

25 COAL CREEK (BOCO) LOUISVILLE U/S AND D/S OF EMPIRE RD DEBRIS REMOVAL --- 400 (HWY 42) CULVERT

26 COAL CREEK (BOCO) SUPERIOR McCASLIN BLVD.TO 1ST AVE. DEBRIS REMOVAL --- 400 GRASSO PARK & AT 2ND AVE.

27 COAL CREEK (BOCO)- SUPERIOR EAST OF McCASLIN BLVD. , DEBRIS REMOVAL --- 1,250 McCASLIN BLVD. CROSSING NORTH OF ROCK CK. PKWY.

28 COAL CREEK (BOCO)- SUPERIOR NORTH OF COAL CREEK DRIVE, DEBRIS REMOVAL --- 400 SAGAMORE DRAINAGEWAY WEST OF NORTH 76TH AVENUE

29 DRAINAGEWAY G OUTFALL BOULDER COUNTY FROM ROCK TRAIL TO CONFLUENCE DEBRIS REMOVAL --- 500 INTO ROCK CREEK WITH ROCK CREEK

30 DRAINAGEWAY G LAFAYETTE UPSTREAM OF HIGHWAY 287 TO DEBRIS REMOVAL --- 1,250 104TH AVENUE

31 DRY CREEK NORTH- BOULDER CO. IRRIG. DITCH TO COLT DRIVE VEGETATION MANAGEMENT & --- 1,000 GUNBARREL EST. TRIB. W.OF LOOKOUT RD. & 75TH ST. DEBRIS REMOVAL

32 FOURMILE CANYON CK. BOULDER CO. 500 LF U/S OF BROADWAY TO DEBRIS REMOVAL --- 1,500 1500 LF D/S OF 28TH STREET

33 GOOSE CREEK BOULDER BOULDER CK. CONF AT POND VEGETATION MANAGEMENT & --- 8,000 TO FOOTHILLS PKWY. TO DEBRIS REMOVAL EDGEWOOD DR./FOLSOM ST. INCLUDES NORTH GOOSE CHNL

34 GOOSE CREEK- BOULDER D/S OF GLENWOOD TO 26TH ST. VEGETATION MANAGEMENT & --- 2,500 ELMERS TWOMILE CREEK DEBRIS REMOVAL

35 GREGORY CANYON CK BOULDER U/S & D/S WILLOWBROOK RD DEBRIS REMOVAL --- 200 6TH ST & AURORA 7TH ST., PLEASANT ST.

36 PRINCE LAKE NO 2 DRAINAGE ERIE WEST OF 111TH STREET VEGETATION MANAGEMENT & --- 1,000 POND 1025 DEBRIS REMOVAL

37 PRINCE LAKE NO 2 DRAINAGE ERIE NORTH OF ODEL DRIVE VEGETATION MANAGEMENT & 1,500 POND 1026 DEBRIS REMOVAL

38 ROCK CREEK SUPERIOR 100 LF D/S OF FLATIRON CIRCLE TO VEGETATION MANAGEMENT & --- 2,200 McCASLIN BOULEVARD DEBRIS REMOVAL

39 ROCK CREEK - SUPERIOR FROM 88TH & ROCK CK PKWY DEBRIS REMOVAL --- 400 COAL CREEK DRIVE TO D/S OF ROCK CK. PARKWAY DRAINAGEWAY

40 ROCK CREEK - SUPERIOR FROM ROCK CRK CIRCLE TO DEBRIS REMOVAL --- 250 COMMUNITY D'WAY EAST 2000 L.F. U/S. AND POND

41 ROCK CREEK - SUPERIOR FROM ROCK CK CIRCLE TO VEGETATION MANAGEMENT & --- 1,000 COMMUNITY D'WAY WEST TORREYS PEAK DR AND POND DEBRIS REMOVAL

INCL.SCHOOL SITE STORAGE DEBRIS REMOVAL --- 750 WEST OF INDIANA.

42 ROCK CREEK - SUPERIOR EAST OF ROCK CREEK PKWY., DEBRIS REMOVAL --- 400 KNOLLS STORAGE FACLTY SOUTH OF ROCK CREEK

43 ROCK CREEK - SUPERIOR FROM 88TH AND AMHERST TO VEGETATION MANAGEMENT & --- 1,000 LOWER ENTRY PARK ROCK CK.PKWY. AND 2 PONDS DEBRIS REMOVAL CHANNEL

44 ROCK CREEK - SUPERIOR FROM CONF. W/ROCK CREEK DEBRIS REMOVAL --- 600 MC CASLIN TRIBUTARY TO MCCASLIN BLVD. INCLUDES FLOR DETENTION

45 ROCK CREEK - SUPERIOR N.W. OF ROCK CREEK PKWY. & DEBRIS REMOVAL --- 750 PARKWAY STORAGE COALTON DR. S. OF ROCK CRK. FACILITY INCLUDE SAFEWAY OUTFALL.

46 SIXMILE RESERVOIR BOULDER CO. IDYLWILD TO BOULDER DITCH DEBRIS REMOVAL --- 200 DRAINAGE - ROARING FORK DRAW

47 SOUTH BOULDER CREEK BOULDER CO. KOA LAKE TO ARAPAHOE RD. DEBRIS REMOVAL --- 600

48 WONDERLAND CREEK BOULDER FROM KINGS RIDGE BLVD DEBRIS REMOVAL --- 300 TO 47TH

49 WONDERLAND CREEK BOULDER WINDING TRAIL DR TO 26TH DEBRIS REMOVAL --- 300 2015 ROUTINE SUBTOTAL 60,200 BOULDER COUNTY 2015 RESTORATION SERVICES

WORK 2015 WORK PLAN DRAINAGEWAY NAME- LOCAL NEARBY WORK WORK PLAN NO. TRIBUTARY NAME GOVERNMENT STREETS DESCRIPTION TYPE BUDGET

ANNUAL SEDIMENT REMOVALS

1 COAL CREEK (BOCO) ERIE PONDS, 1041, 1043, 1044 SEDIMENT REMOVAL CONST 60,000 BOULDER CREEK DITCH 1045, 1050

2 PRINCE LAKE NO 2 DRAINAGE ERIE PONDS 1025, 1026 SEDIMENT REMOVAL CONST 3,000 EAST AND WEST OF 111TH ST.

3 ROCK CK & TRIBS SUPERIOR VARIOUS DRAINAGEWAYS SEDIMENT REMOVAL CONST 15,000

4 WONDERLAND CREEK BOULDER BETWEEN 28TH AND 26TH SEDIMENT REMOVAL CONST 15,000

5 VARIOUS BOULDER CO. COUNTY-WIDE ALL REVEG, WEEDS, SEDIMENT CONST 25,000 CONTROL, RELATED EXPENSES

CONTINUING PROJECTS

6 ROCK CREEK BOULDER COUNTY CARLSON LASTOKA OPEN SPACE CHANNEL RESTORATION ENG CONST 80,000

7 BOULDER CREEK BOULDER COUNTY UPSTREAM OF 95TH STREET REVEGETATION ENG CONST 2,000

NEW PROJECTS

8 BEAR CANYON CREEK BOULDER HARRISON AVENUE LEVEE TREE REMOVAL ENG CONST 60,000

9 BEAR CANYON CREEK BOULDER FOOTHILLS PARKWAY TO AARON DEBRIS AND TREE REMOVAL ENG COURT CONST 300,000

10 COAL CREEK - BOULDER CREEK ERIE ERIE PARKWAY TO POND 1042 TREE REMOVAL ENG DITCH CONST 15,000

11 COAL CREEK - BOULDER CREEK ERIE POND 1045 TO COUNTY LINE ROAD TREE REMOVAL AND TRAIL REPAIR ENG DITCH CONST 50,000

12 COMMUNITY DRAINAGEWAY SUPERIOR UPSTREAM OF ROCK CREEK POND SEDIMENT REMOVAL ENG WEST CIRCLE CONST 30,000

13 COMMUNITY DRAINAGEWAY SUPERIOR UPSTREAM OF ROCK CREEK POND SEDIMENT REMOVAL ENG EAST CIRCLE CONST 30,000

14 ROCK CREEK SUPERIOR NEAR S. TORREYS PEAK DRIVE SEDIMENT REMOVAL ENG AND INDIANA STREET CONST 10,000

15 ROCK CREEK LAFAYETTE SOUTH OF HORIZON AVENUE SEDIMENT REMOVAL ENG CONST 75,000

16 BOULDER CREEK BOULDER COUNTY WEST OF HIGHWAY 287 BANK STABILIZATION ENG CONST 50,000

17 ROCK CREEK BOULDER COUNTY EAST OF 120TH STREET SOUTH OF BANK STABILIZATION ENG HORIZON AVENUE CONST 25,000

18 SOUTH BOULDER CREEK BOULDER COUNTY AT BASELINE ROAD DEBRIS REMOVAL AT BRIDGE ENG CONST 15,000

19 SOUTH BOULDER CREEK BOULDER COUNTY AT McSORLEY LANE DEBRIS REMOVAL AT BRIDGE ENG CONST 7,500

20 FOURMILE CANYON CREEK BOULDER COUNTY 30TH STREET TO 1,400 LF DEBRIS REMOVAL, TREE REMOVAL ENG DOWNSTREAM CONST 75,000

21 VARIOUS BOULDER CO. COUNTY-WIDE ALL PERMITTING, PREP. FEES, ENG 25,000 REPORTS, RELATED EXPENSES

2015 RESTORATION SUBTOTAL 967,500

BOULDER COUNTY CONTINGENCY 34,114

TOTAL 2015 BOULDER COUNTY BUDGET 1,061,814

FILE NAME=2015 Boulder County.XLS 2015 MAINTENANCE WORK PLAN

BROOMFIELD COUNTY TOTAL FUNDS - $270,261

11/17/2014

2015 ROUTINE SERVICES

WORK 2015 WORK PLAN DRAINAGEWAY NAME- LOCAL NEARBY WORK WORK PLAN NO. TRIBUTARY NAME GOVERNMENT STREETS DESCRIPTION TYPE BUDGET

1 AIRPORT CREEK BROOMFIELD WADSWORTH PKWY TO 116TH CIR DEBRIS REMOVAL --- 910 (WADSWORTH PKWY)

2 AIRPORT CREEK BROOMFIELD EAST OF US 36 DEBRIS REMOVAL --- 800 (DETENTION POND)

3 CITY PARK DRAINAGEWAY BROOMFIELD SHERIDAN BLVD TO 100 FT U/S VEGETATION MANAGEMENT & --- 640 (SHERIDAN BLVD) OF CHASE DEBRIS REMOVAL

4 CITY PARK DRAINAGEWAY BROOMFIELD 30 ft D/S OF US-287 TO BURBANK ST VEGETATION MANAGEMENT & --- 340 (MAIN ST) DEBRIS REMOVAL

5 CITY PARK DRAINAGEWAY-S. TRIBBROOMFIELD HWY 128 DETENTION POND VEGETATION MANAGEMENT & --- 800 (WEST LAKE DETENTION POND) TO DETENTION DR. DEBRIS REMOVAL

6 GAY RESERVOIR DRAINAGEWAY BROOMFIELD WILLOW RUN PKWY TO ZUNI ST. DEBRIS REMOVAL --- 640 (WILLOW RUN PARKWAY)

7 GAY RESERVOIR DRAINAGEWAY - BROOMFIELD WESTLAKE DRIVE TO MIDWAY BLVD DEBRIS REMOVAL --- 500 WEST LAKE TRIBUTARY

8 NISSEN RESV DRAINAGEWAY BROOMFIELD LOWELL BLVD TO 400 FT U/S DEBRIS REMOVAL --- 110 (LOWELL BLVD)

9 NISSEN RESV DRAINAGEWAY BROOMFIELD PERRY ST TO DEBRIS REMOVAL --- 550 (PERRY STREET) TENNYSON ST (EXT.)

10 NISSEN RESV DRAINAGEWAY BROOMFIELD 123RD PL TO SHERIDAN BLVD DEBRIS REMOVAL --- 110 (WEST 123RD PLACE)

11 NISSEN RESV DRAINAGEWAY BROOMFIELD MAIN ST TO 450 FT U/S DEBRIS REMOVAL --- 110 (MAIN ST)

12 QUAIL CREEK - BROOMFIELD 400 FT D/S OF PLASTER RESERVOIR DEBRIS REMOVAL --- 110 PLASTER RESERVOIR SPILLWAY

13 QUAIL CREEK TRIB A - BROOMFIELD ZUNI STREET DEBRIS REMOVAL --- 270 ALEXX AND MICHAELS POND

14 QUAIL CREEK BROOMFIELD SHERIDAN BLVD TO ASPEN CREEK DEBRIS REMOVAL --- 110 (ASPEN CK DRIVE) DR. 15 DEBRIS QUANTIFICATION AND BROOMFIELD COUNTY-WIDE COMBINED WITH JEFFERSON COUNTY --- 0 REPORTING

2015 ROUTINE SUBTOTAL 6,000 BROOMFIELD COUNTY 2015 RESTORATION SERVICES

WORK 2015 WORK PLAN DRAINAGEWAY NAME- LOCAL NEARBY WORK WORK PLAN NO. TRIBUTARY NAME GOVERNMENT STREETS DESCRIPTION TYPE BUDGET

ANNUAL SEDIMENT REMOVALS

1 CITY PARK DRAINAGEWAY - S TRIBBROOMFIELD WEST OF US 36 SEDIMENT REMOVAL, MAINTENANCE CONST 20,000 (WEST DETENTION POND)

2 ROCK CK BASIN D OUTFALL - BROOMFIELD 800 FT U/S ROCK CK BASIN D OUTFALL SEDIMENT REMOVAL CONST 50,000 LAC AMORA TRIBUTARY TO MAPLE CT.

3 QUAIL CREEK BROOMFIELD SHERIDAN TO 12OO FT U/S SHERIDAN SEDIMENT REMOVAL CONST 15,000

4 CITY PARK DRAINAGEWAY BROOMFIELD HWY 287 TO W. 6TH AVE SEDIMENT REMOVAL CONST (DETENTION POND)

5 VARIOUS BROOMFIELD COUNTY-WIDE ALL REVEG, WEEDS/SEDIMENT/VEG. CONST 3,000 CONTROL, RELATED EXPENSES CONTINUING PROJECTS

6 NISSEN RESV DRAINAGEWAY BROOMFIELD FIELD POND - SOUTH OF 10TH AVE SEDIMENT REMOVAL ENG CONST 10,000

NEW PROJECTS

7 CITY PARK DRAINAGEWAY BROOMFIELD SHERIDAN TO 120TH AVE (1400FT) REPAIR EXISTING FACILITIES ENG CONST 50,000

8 ROCK CREEK BROOMFIELD 96TH ST TO US 36 REPAIR EXISTING FACILITIES ENG CONST 100,000

9 VARIOUS BROOMFIELD COUNTY-WIDE ALL PERMITTING, PREP. FEES, ENG 3,000 REPORTS, RELATED EXPENSES

2015 RESTORATION SUBTOTAL 251,000

BROOMFIELD COUNTY CONTINGENCY 13,261

TOTAL 2015 BROOMFIELD COUNTY BUDGET 270,261 FILE NAME=2015 Broomfield County.XLS 2015 MAINTENANCE WORK PLAN

DENVER COUNTY TOTAL FUNDS-$2,671,223

11/17/2014

2015 ROUTINE SERVICES

WORK 2015 WORK PLAN DRAINAGEWAY NAME- LOCAL NEARBY WORK WORK PLAN NO. TRIBUTARY NAME GOVERNMENT STREETS DESCRIPTION TYPE BUDGET

1 BEAR CREEK LOWELL BLVD. TO WADSWORTH VEGETATION MANAGEMENT ---

2 BEAR CREEK- DENVER FROM CONFLUENCE W/ BEAR VEGETATION MANAGEMENT --- INGALLS TRIBUTARY CREEK TO INGALLS

3 BEAR CREEK- DENVER QUINCY TO OLD WADSWORTH. VEGETATION MANAGEMENT --- MARSTON LAKE NORTH BALSAM TO GARRISON ST.

4 BEAR CREEK- DENVER FROM CONFLUENCE W/ BEAR VEGETATION MANAGEMENT --- NEWGATE TRIB CREEK TO AMHERST

5 BEAR CREEK- DENVER WEST OF HARLAN AT LEHIGH VEGETATION MANAGEMENT --- PINEHURST TRIB AVE. BEHIND THE HOMES.

6 CHERRY CREEK DENVER S. PLATTE RIVER TO MARION VEGETATION MANAGEMENT ---

7 CHERRY CREEK DENVER UNIVERSITY TO COLORADO VEGETATION MANAGEMENT --- & EXPOSITION TO JEWELL AVE

8 CHERRY CREEK DENVER YALE AVE EXT. TO CHERRY VEGETATION MANAGEMENT --- CREEK DAM

9 CHERRY CREEK- DENVER YALE AVENUE TO PARKER RD VEGETATION MANAGEMENT --- BABI YAR TRIBUTARY

10 CHERRY CREEK- DENVER IOWA TO CHERRY CK DRIVE VEGETATION MANAGEMENT --- IOWA AVENUE TRIB

11 CHERRY CREEK- DENVER MINNESOTA DRIVE BETWEEN VEGETATION MANAGEMENT --- MINNESOTA DRIVE TRIB. HOLLY AND MONACO.

12 CHERRY CREEK- DENVER CHERRY CRK DR VEGETATION MANAGEMENT --- PARKER/MEXICO STORM AT JEWELL AVE

13 COON CREEK DENVER DOVER TO COUNTY LINE VEGETATION MANAGEMENT ---

14 DRY GULCH DENVER LAKEWOOD G.CONF.AT VEGETATION MANAGEMENT --- NEWTON ST TO SHERIDAN

15 GOLDSMITH GULCH DENVER CONFLUENCE TO EVANS, VEGETATION MANAGEMENT --- ILIFF AVE TO EASTMAN, INCL. DETENTION POND AND TIFFANY PLAZA TO I-225.

16 GOLDSMITH GULCH- DENVER MONACO TO KEARNEY. N.W. VEGETATION MANAGEMENT --- EVANS AVENUE TRIB. OF EVANS & MONACO.

17 GOLDSMITH GULCH DENVER UPSTREAM OF EASTMAN VEGETATION MANAGEMENT --- SOUTHMOOR PARK TRIB

18 HARVARD GULCH DENVER LOGAN TO COLORADO BLVD. VEGETATION MANAGEMENT --- ALONG HARVARD AVENUE AND YALE AVENUE.

DENVER COUNTY 2015 ROUTINE SERVICES CONTINUED

WORK 2015 WORK PLAN DRAINAGEWAY NAME- LOCAL NEARBY WORK WORK PLAN NO. TRIBUTARY NAME GOVERNMENT STREETS DESCRIPTION TYPE BUDGET

19 INTERSTATE 25 D'WAY DENVER I-25 CULVERT TO UNIVERSITY VEGETATION MANAGEMENT --- VETERAN'S PARK DET. POND

20 LAKEWOOD GULCH DENVER SOUTH PLATTE RIVER CONF. VEGETATION MANAGEMENT --- TO SHERIDAN BLVD. ALONG 12TH, 10TH, & 8TH AVENUES.

MONTBELLO CHANNELS

21 IRONDALE GULCH- DENVER ALONG MAXWELL PLACE VEGETATION MANAGEMENT --- MAXWELL TRIBUTARY

22 IRONDALE GULCH- DENVER ALONG UVALDA ST AND VEGETATION MANAGEMENT --- MONTBELLO TRIBUTARY 51ST AVENUE.

23 IRONDALE GULCH- DENVER N. OF 56TH AT ULVADA IN VEGETATION MANAGEMENT --- MONTBELLO TRIBUTARY ROCKY MTN ARSENAL

24 IRONDALE GULCH- DENVER FROM 56TH AVENUE U/S TO VEGETATION MANAGEMENT --- TOWER OUTFALL PARKFIELD LAKE

25 MONTBELLO DRAINAGE DENVER ALONG HAVANA,51ST, NOME, VEGETATION MANAGEMENT --- 49TH,ANDREWS, & 46TH AVE.

26 MONTBELLO DRAINAGE DENVER NE OF 56TH AND HAVANA IN VEGETATION MANAGEMENT --- ROCKY MTN ARSENAL

27 MONTBELLO DRAINAGE- DENVER ALONG TULSA COURT VEGETATION MANAGEMENT --- TULSA COURT TRIB

28 MONTBELLO DRAINAGE- DENVER ALONG 47TH AVE VEGETATION MANAGEMENT --- 47TH AVE. TRIBUTARY

29 MONTBELLO DRAINAGE- DENVER ALONG 45TH AVENUE. VEGETATION MANAGEMENT --- HAVANA TRIBUTARY ALONG HAVANA (45TH-51ST)

END OF MONTBELLO CHANNELS

30 SANDERSON GULCH DENVER S. PLATTE RIVER TO SHERIDAN VEGETATION MANAGEMENT ---

31 SOUTH PLATTE RIVER- DENVER S.W. OF 54TH & FRANKLIN VEGETATION MANAGEMENT --- NORTHSIDE PARK TRIB NORTHSIDE PARK

32 SOUTH PLATTE RIVER- DENVER N.E. OF 6TH AVE AND I-25 VEGETATION MANAGEMENT --- WEST SIDE TRIBUTARY ALONG SEARS BUILDING

33 WEIR GULCH DENVER S. PLATTE RIVER TO SHERIDAN VEGETATION MANAGEMENT ---

34 WEIR GULCH- DENVER FROM RALEIGH TO SHERIDAN VEGETATION MANAGEMENT --- 1ST AVE. TRIBUTARY

35 WEST HARVARD GULCH DENVER S PLATTE RIVER TO RAILROAD VEGETATION MANAGEMENT --- ZUNI TO DECATUR TO FEDERAL

36 WESTERLY CREEK DENVER 13TH TO 11TH & 11TH TO VEGETATION MANAGEMENT --- STARBOARD CIRCLE. INCL. KELLY ROAD DET.(AURORA)

37 WESTERLY CREEK DENVER FROM 3500 FT.N.OF ALAMEDA VEGETATION MANAGEMENT --- TO ALAMEDA.

38 WESTERLY CREEK DENVER LOWRY DETENTION FLOOD VEGETATION MANAGEMENT --- POOL TO HAVANA ST.

39 WESTERLY CREEK DENVER SAND CREEK TO 26TH EXT. VEGETATION MANAGEMENT --- NEW OPEN CHANNEL PORTION THRU OLD STAPLETON FIELD.

2015 ROUTINE SUBTOTAL 200,000 DENVER COUNTY 2015 RESTORATION SERVICES

WORK 2015 WORK PLAN DRAINAGEWAY NAME- LOCAL NEARBY WORK WORK PLAN NO. TRIBUTARY NAME GOVERNMENT STREETS DESCRIPTION TYPE BUDGET

ANNUAL PROJECTS

1 CHERRY CREEK- DENVER IOWA TO CHERRY CK DRIVE REMOVE SEDIMENT CONST 1,100 IOWA TRIBUTARY

2 INTERSTATE 25 D'WAY DENVER N.W.OF UNIVERSITY AND I-25. REMOVE SEDIMENT CONST 3,300 (VET'S PARK DET. POND) VETERAN'S PARK DET. POND

3 VARIOUS DENVER COUNTY-WIDE PERMIT SUPPORT SERVICES ENG 50,000

4 VARIOUS DENVER COUNTY-WIDE ENVIRONMENTAL SERVICES ENG 70,000

5 CITY (CASDP, ROW, PARKS) DENVER COUNTY-WIDE ALL PERMITTING, PREP. FEES, ENG 10,000 PERMIT RENEWAL REPORTS, RELATED EXPENSES

6 WESTERLY CREEK DAM DENVER FROM 3500 FT.N.OF ALAMEDA UPDATE OF O& M MANUAL ENG 30,000 KELLY ROAD DAM TO ALAMEDA. ANNUAL WEED AND DEBRIS MGMNT CONST 30,000 CONTINUING PROJECTS

7 CHERRY CREEK DENVER MONACO TO QUEBEC PRE CONST VEGETATION MANAGEMENT ENG 0 TREE THINNING CONST 15,000

8 HUSTON LAKE DENVER LAKESIDE ADJACENT TO OHIO AVE POST CONST MONITORING ENG 0 VEGETATION MANAGEMENT CONST 1,000

9 SANDERSON GULCH DENVER D/S OF ZUNI POST CONST MONITORING ENG 0 VEGETATION MANAGEMENT CONST 2,000

10 WEIR GULCH DENVER AT CONFLUENCE WITH SOUTH POST CONST MONITORING ENG 0 PLATTE RIVER VEGETATION MANAGEMENT CONST 10,000

11 WESTERLY CREEK DENVER D/S OF MONTVIEW, PHASE 2 & 3 POST CONST MONITORING ENG 0 VEGETATION MANAGEMENT CONST 20,000

12 WEST HARVARD GULCH DENVER AT CONFLUENCE WITH SOUTH POST CONST MONITORING ENG 0 PLATTE RIVER VEGETATION MANAGEMENT CONST 5,000

NEW PROJECTS

13 HAVANA POND DENVER 56TH AVENUE SPILLWAY REPAIR ENG 80,000 AND HAVANA CONST 1,900,000

14 SANDERSON GULCH DENVER LOWELL BLVD AND MEXICO AVE OUTFALL REPAIR ENG 20,000 CONST 50,000

2015 RESTORATION SUBTOTAL 2,297,400

DENVER COUNTY CONTINGENCY 173,823

TOTAL 2015 DENVER COUNTY BUDGET 2,671,223

FILE NAME=2015 Denver County.XLS 2015 MAINTENANCE WORK PLAN

DOUGLAS COUNTY TOTAL FUNDS-$936,485

11/17/2014

2015 ROUTINE SERVICES

WORK 2015 WORK PLAN DRAINAGEWAY NAME- LOCAL NEARBY WORK WORK PLAN NO. TRIBUTARY NAME GOVERNMENT STREETS DESCRIPTION TYPE BUDGET

1 BALDWIN GULCH PARKER NORTH OF PONDEROSA DRIVE VEGETATION MANAGEMENT --- DOUGLAS COUNTY 20 MILE RD TO S.PARKER RD

2 BIG DRY CREEK (ARAPCO) DOUGLAS COUNTY VARIOUS REACHES VEGETATION MANAGEMENT --- HILNDS RANCH D/S OF UNIVERSITY PARTICIPATE WITH HILNDS RANCH

3 BIG DRY CREEK (ARAPCO) DOUGLAS COUNTY COLETTE DR. TO WILDCAT DEBRIS REMOVAL --- SO SUBURBAN RIDGE PKWY

4 CHERRY CREEK PARKER LINCOLN AVE VEGETATION MANAGEMENT --- PONDS B AND C

5 CHERRY CREEK- PARKER FROM CHERRY CK REGIONAL VEGETATION MANAGEMENT --- APACHE PLUME TRIB TRAIL TO JORDAN ROAD

6 CHERRY CREEK- DOUGLAS COUNTY JORDON ROAD TO BUCKTHORN VEGETATION MANAGEMENT --- COTTONWOOD MEADOWS LANE

7 CHERRY CREEK- PARKER NORTH OF STROH RD AND E/W VEGETATION MANAGEMENT --- DRAINAGEWAY C OF MOTENBUCKER RD

8 CHERRY CREEK- PARKER SOUTH OF FRENCH CREEK MOWING & VEGETATION --- DRAINAGEWAY D AVE AND MOTSENBUCKER RD MANAGEMENT

9 CHERRY CREEK- PARKER FROM CONF. WITH CHERRY VEGETATION MANAGEMENT --- EAST STROH GULCH CREEK TO PARKER ROAD.

10 CHERRY CREEK- PARKER APACHE PLUME DRIVE TO VEGETATION MANAGEMENT --- GREEN GRASS TRIB JORDAN ROAD

11 CHERRY CREEK- PARKER LONGS WAY & PARKGLENN WAY MOWING & VEGETATION --- LONGS WAY TRIB POND 302, POND 303 MANAGEMENT

12 CHERRY CREEK- PARKER NORTH OF MAIN STREET BTWN MOWING & VEGETATION --- LONGS WAY TRIB 20 MILE AND DRANSFELT RDS MANAGEMENT

13 CHERRY CREEK- PARKER PARKER RD TO ROBINSON VEGETATION MANAGEMENT --- ROBINSON RANCH TRIB RANCH DR. (EAST SIDE)

14 CHERRY CREEK- PARKER VENTANA ST TO KEYSER MOWING & VEGETATION --- WEST STROH GULCH CREEK RD MANAGEMENT

15 DAD CLARK GULCH DOUGLAS COUNTY VARIOUS REACHES VEGETATION MANAGEMENT --- HILNDS RANCH BROADWAY TO H.RANCH PKWY PARTICIPATE WITH HILNDS RANCH

16 HAPPY CANYON CREEK DOUGLAS COUNTY ALONG LINCOLN AVE VEGETATION MANAGEMENT ---

17 HAPPY CANYON CREEK PARKER GREEN ACRES TRIBUTARY VEGETATION MANAGEMENT ---

18 MARCY GULCH DOUGLAS COUNTY 200 FT D/S OF BLAKELAND DR VEGETATION MANAGEMENT --- TO SANTA FE DRIVE

19 MARCY GULCH DOUGLAS COUNTY VARIOUS REACHES VEGETATION MANAGEMENT --- HILNDS RANCH TOWN CTR DR TO BROADWAY PARTICIPATE WITH HILNDS RANCH

20 NEWLIN GULCH PARKER CONF. WITH CHERRY CK TO VEGETATION MANAGEMENT --- RECREATION DR

21 NEWLIN GULCH DOUGLAS COUNTY LINCOLN AVE E. OF JORDAN RD. VEGETATION MANAGEMENT --- INCLUDING POND A DOUGLAS COUNTY 2015 ROUTINE SERVICES CONTINUED

WORK 2015 WORK PLAN DRAINAGEWAY NAME- LOCAL NEARBY WORK WORK PLAN NO. TRIBUTARY NAME GOVERNMENT STREETS DESCRIPTION TYPE BUDGET

22 NEWLIN GULCH- DOUGLAS COUNTY NEWLIN G.CONFLUENCE TO VEGETATION MANAGEMENT --- UPPER JORDAN RD TRIB STONEGATE U/S OF STONEGATE PARKWAY

23 NEWLIN GULCH- PARKER TOWN OF PARKER LIMIT AT VEGETATION MANAGEMENT --- UPPER JORDAN RD TRIB OAKMOOR PL TO FIREBRICK DR

24 SARA GULCH PARKER POND AT CANTERBERRY TRAIL VEGETATION MANAGEMENT --- TO D/S OF HOLLY HILLS WAY

25 SULPHUR GULCH PARKER CONF. WITH CHERRY CK TO VEGETATION MANAGEMENT --- PARKER RD AND PINE DR EXT TO 200 FT U/S WILLOW PK DR.

26 SULPHUR GULCH- PARKER QUAIL RUN LANE TO EAGLE RUN VEGETATION MANAGEMENT --- HOPE GULCH TRIB DRIVE & CANTERBERRY PRKWY TO MAIN STREET.

27 TALLMAN GULCH PARKER CONF. WITH SULPHUR TO VEGETATION MANAGEMENT --- TALLMAN DR TO WOODSIDE LN

28 TALLMAN GULCH- PARKER 400 FT D/S OF TALLMAN DR TO VEGETATION MANAGEMENT --- EAST TRIBUTARY 300 FT U/S OF TALLMAN DR

29 WILLOW CREEK (ARAPCO) LONE TREE COUNTY LINE RD TO LONE VEGETATION MANAGEMENT --- SO SUBURBAN TREE PARKWAY AND YOSEMITE TO LINCOLN

30 WILLOW CREEK (ARAPCO) LONE TREE REGIONAL DETENTION POND VEGETATION MANAGEMENT --- N. OF HERITAGE HILLS PKWY

31 WILLOW CREEK (ARAPCO) DOUGLAS COUNTY MERCURY DR. TO MAXIMUS VEGETATION MANAGEMENT --- SWEETWATER TRIBUTARY SO SUBURBAN IN SWEETWATER PARK

32 WILLOW CREEK (ARAPCO)- LONE TREE LONE TREE GOLF COURSE VEGETATION MANAGEMENT --- FAIRWAYS TRIBUTARY SO SUBURBAN TO ROSEMONT AVE

33 WILLOW CREEK (ARAPCO)- LONE TREE N. OF HERITAGE HILLS PRKWY VEGETATION MANAGEMENT --- HERITGE HILLS TRIBUTARY EAST OF YOSEMITE DETENTION POND

34 WILLOW CREEK (ARAPCO)- LONE TREE SUNNINGDALE BLVD TO VEGETATION MANAGEMENT --- WEST COOK CREEK LINCOLN.

35 MARCY GULCH DOUGLAS COUNTY TOWN CENTER DRIVE D/S FOR VEGETATION MANAGEMENT --- HILNDS RANCH 2600 FEET

36 APACHE PLUME DOUGLAS COUNTY DETENTION POND 5 VEGETATION MANAGEMENT ---

37 VARIOUS DOUGLAS COUNTY COUNTY-WIDE VEGETATION MANAGEMENT CONST 50,000

2015 ROUTINE SUBTOTAL 100,000 DOUGLAS COUNTY 2015 RESTORATION SERVICES

WORK 2015 WORK PLAN DRAINAGEWAY NAME- LOCAL NEARBY WORK WORK PLAN NO. TRIBUTARY NAME GOVERNMENT STREETS DESCRIPTION TYPE BUDGET

ANNUAL PROJECTS

1 BIG DRY CREEK DOUGLAS COUNTY SOUTH END WILDCAT RIDGE PARK SEDIMENT REMOVAL CONST 5,000 SO SUBURBAN NORTH TO DET. POND OUTLET

2 WILLOW CREEK LONE TREE HERITAGE HILLS POND SEDIMENT REMOVAL CONST 2,000

3 VARIOUS DOUGLAS COUNTY COUNTY-WIDE PERMIT SUPPORT SERVICES ENG 20,000

4 VARIOUS DOUGLAS COUNTY COUNTY-WIDE ENVIRONMENTAL SERVICES ENG 30,000

CONTINUING PROJECTS 5 SULPHUR GULCH PARKER CANTERBERRY CROSSING AND REPAIR EXISTING DRAINAGE ENG 0 RIVA RIDGE; TREE THINNING FACILITIES CONS 200,000

6 CHERRY CREEK PARKER HESS ROAD POST CONST MONITORING ENG 0 VEGETATION MANAGEMENT CONS 10,000

7 SULPHUR GULCH PARKER PINE DRIVE POST CONST MONITORING ENG 0 VEGETATION MANAGEMENT CONST 5,000

8 SULPHUR GULCH PARKER RIVA RIDGE POST CONST MONITORING ENG 0 VEGETATION MANAGEMENT CONST 5,000

9 BIG DRY CREEK HRMD UNIVERSITY, CHEESE RANCH POST CONST MONITORING ENG 0 VEGETATION MANAGEMENT CONST 5,000

10 DAD CLARK GULCH HRMD HIGHLANDS RANCH PARKWAY POST CONST MONITORING ENG 0 VEGETATION MANAGEMENT CONST 5,000

11 FONDER'S DRAW DOUGLAS COUNTY LIGHTENING VIEW WAY POST CONST MONITORING ENG 0 VEGETATION MANAGEMENT CONST 5,000

12 TIMBERS CREEK DOUGLAS COUNTY U/S OF FOX SPARROW RD POST CONST MONITORING ENG 0 VEGETATION MANAGEMENT CONST 2,000

13 NEWLIN GULCH DOUGLAS COUNTY STONEGATE PARKWAY POST CONST MONITORING ENG 0 VEGETATION MANAGEMENT CONST 15,000

14 VARIOUS DOUGLAS COUNTY COUNTY-WIDE POST CONST MONITORING CONST 10,000 VEGETATION MANAGEMENT

NEW PROJECTS

15 STERLING GULCH DOUGLAS COUNTY TITAN PARKWAY POST CONST MONITORING ENG 100,000 CONST 0

16 HAPPY CANYON CREEK DOUGLAS COUNTY SURRY RIDGE SUBDIVISION TREE THINNING/REMOVAL; ENG AND SCHROEDER RANCH BANK REPAIR CONST 45,000

17 TALLMAN TRIB EAST PARKER 600 FT D/S AND U/S TREE THINNING/REMOVAL ENG OF TALLMAN DR WEED MANAGEMENT CONST 6,000

18 SULPHUR GULCH PARKER CANTERBERRY CROSSING AND TREE THINNING/REMOVAL ENG 0 RIVA RIDGE CONS 10,000

19 WILLOW CREEK LONETREE MAXIMUS DRIVE OUTFALL REPAIR ENG 0 CONST 45,000

20 WILLOW CREEK LONETREE SOUTH LOST HILL DRIVE CHANNEL BANK REPAIR ENG 0 CONST 30,000

2015 RESTORATION SUBTOTAL 555,000

DOUGLAS COUNTY CONTINGENCY 281,485

TOTAL 2015 DOUGLAS COUNTY BUDGET 936,485 FILE NAME=2015 Douglas County.XLS 2015 MAINTENANCE WORK PLAN

JEFFERSON COUNTY TOTAL FUNDS - $1,581,773

11/17/2014

2015 ROUTINE SERVICES

WORK 2015 WORK PLAN DRAINAGEWAY NAME- LOCAL NEARBY WORK WORK PLAN NO. TRIBUTARY NAME GOVERNMENT STREETS DESCRIPTION TYPE BUDGET

1 BEAR CREEK MORRISON C-470 TO 1000 FT U/S HIGHWAY 8 DEBRIS REMOVAL --- 1,000

2 BEAR CREEK- LAKEWOOD MORRISON RD TO YALE AVE DEBRIS REMOVAL --- 290 COYOTE CREEK DETENTION INCLUDES DETENTION POND

3 BEAR CREEK- JEFF. CO. PIERCE ST AND KENYON VEGETATION MANAGEMENT & --- 2,160 PINEHURST TRIBUTARY COLORADO ACADEMY DET.PND DEBRIS REMOVAL

4 BIG DRY CREEK- WESTMINSTER KETNER RESERVOIR TO D/S DEBRIS REMOVAL --- 100 KETNER TRIBUTARY COUNTRYSIDE DRIVE

5 CLEAR CREEK- GOLDEN 10TH ST. TO D/S OF IOWA ST. DEBRIS REMOVAL --- 360 ARAPAHOE GULCH W. OF WASHINGTON AVE.

6 COON CREEK JEFF. CO. D/S OF FIELD STREET VEGETATION MANAGEMENT & --- 7,940 FOOTHILLS TO SIMMS STREET. DEBRIS REMOVAL

7 COON CREEK JEFF. CO. LEAWOOD DR TO FAIR DRIVE DEBRIS REMOVAL --- 510

8 COON CREEK- JEFF. CO. FROM CONFL WITH COON CK VEGETATION MANAGEMENT & --- 560 WESTRIDGE TRIB TO CULVERT OUTLET DEBRIS REMOVAL

9 DRY GULCH LAKEWOOD PIERCE ST TO SAULSBURY ST VEGETATION MANAGEMENT & --- 450 DEBRIS REMOVAL

10 DRY GULCH- LAKEWOOD NW OF 15TH PL. AND KIPLING STREET VEGETATION MANAGEMENT & --- 1,760 KIPLING ST DETENTION DEBRIS REMOVAL

11 DRY GULCH- LAKEWOOD N.W. OF 14TH AND LAMAR ST VEGETATION MANAGEMENT & --- 1,840 LAMAR ST DETENTION DEBRIS REMOVAL

12 DUTCH CREEK JEFF. CO. SHERIDAN BLVD EXTENDED TO U/S VEGETATION MANAGEMENT & --- 4,300 LEAWOOD KIPLING PKWY DEBRIS REMOVAL FOOTHILLS

13 KENNEYS RUN - WEST FORK GOLDEN 23RD ST. TO U/S OF H.S. VEGETATION MANAGEMENT & --- 500 DEBRIS REMOVAL

14 KENNEYS RUN GOLDEN ALONG S GOLDEN RD U/S OF FORD ST. VEGETATION MANAGEMENT & --- 340 DEBRIS REMOVAL

15 LAKEWOOD GULCH (6TH AVE) LAKEWOOD 8TH AVE. TO 6TH AVE. VEGETATION MANAGEMENT & --- 520 DEBRIS REMOVAL

16 LAKEWOOD GULCH (AMMONS ST) LAKEWOOD ALONG 7TH AVE U/S AMMONS ST. VEGETATION MANAGEMENT & --- 340 DEBRIS REMOVAL

17 LAKEWOOD GULCH (FLORA WAY) JEFF. CO. FLORA WAY AND 1ST AVE. VEGETATION MANAGEMENT & --- 1,280 DEBRIS REMOVAL

18 LAKEWOOD GULCH LAKEWOOD IN HOLBROOK PARK VEGETATION MANAGEMENT & --- 590 (HOLBROOK PARK) EAST OF GARRISON ST DEBRIS REMOVAL

19 LAKEWOOD GULCH LAKEWOOD LAKEWOOD CC TO U/S STILLING BASIN VEGETATION MANAGEMENT & --- 450 (LAKEWOOD COUNTRY CLUB) DEBRIS REMOVAL

20 LAKEWOOD GULCH LAKEWOOD MEADOW CREEK RD TO VEGETATION MANAGEMENT & --- 450 (MEADOW CREEK ROAD) LAKEWOOD CC DEBRIS REMOVAL

21 LAKEWOOD GULCH (VANCE ST.) LAKEWOOD FROM 8TH AND TELLER TO DEBRIS REMOVAL --- 300 U/S OF VANCE ST

22 LAKEWOOD GULCH LAKEWOOD U/S OF VAN GORDON TO DEBRIS REMOVAL --- 110 (VAN GORDON ST) EAST OF WELCH ST JEFFERSON COUNTY 2015 ROUTINE SERVICES CONTINUED

WORK 2015 WORK PLAN DRAINAGEWAY NAME- LOCAL NEARBY WORK WORK PLAN NO. TRIBUTARY NAME GOVERNMENT STREETS DESCRIPTION TYPE BUDGET

23 LENA GULCH (2OTH AVE) LAKEWOOD U/S & D/S OF 20TH AVE VEGETATION MANAGEMENT & --- 560 DEBRIS REMOVAL

24 LENA GULCH (ALKIRE ST) JEFF. CO. ALKIRE ST. TO AG. DITCH VEGETATION MANAGEMENT & --- 690 DEBRIS REMOVAL

25 LENA GULCH - CLEAR CREEK WHEAT RIDGE CLEAR CREEK TO W. 29TH AVE DEBRIS REMOVAL --- 2,660

26 LENA GULCH (KILMER ST) JEFF. CO. 200 LF D/S OF KILMER TO 1,100 LF U/S DEBRIS REMOVAL --- 570 PLEASANT VIEW KILMER

27 LENA GULCH (MT. VERNON RD) JEFF. CO. N OF D ST. TO 6TH AVE VEGETATION MANAGEMENT & --- 630 DEBRIS REMOVAL

28 LENA GULCH- JEFF. CO. PIKE ST. TO QUAKER ST. VEGETATION MANAGEMENT & --- 1,560 CRESTVIEW VILLA TRIB. U/S QUAKER DETENTION BASIN DEBRIS REMOVAL

29 LENA GULCH- JEFF. CO. 6TH AVE FRONTAGE TO ELLSWORTH VEGETATION MANAGEMENT & --- 3,230 DRAINAGEWAY G INCLUDING 3 DETENTION BASINS DEBRIS REMOVAL

30 LENA GULCH- JEFF. CO. KENDRICK AND 7TH TO 6TH DEBRIS REMOVAL --- 110 DRAINAGEWAY G (6TH AVE) AVE FREEWAY CULVERT

31 LENA GULCH- JEFF. CO. MOSS ST. TO PIKE ST. VEGETATION MANAGEMENT & --- 630 PLEASANT VIEW TRIBUTARY DEBRIS REMOVAL

32 LENA GULCH- WHEAT RIDGE U/S & D/S OF PARFET ST. VEGETATION MANAGEMENT & --- 450 ROLLING HILLS TRIBUTARY DEBRIS REMOVAL

33 LILLEY GULCH (KIPLING ST.) JEFF. CO. WADSWORTH TO KIPLING ST VEGETATION MANAGEMENT & --- 2,900 FOOTHILLS DEBRIS REMOVAL

34 LILLEY GULCH (PIERCE ST.) JEFF. CO. S KENDALL ST TO DEBRIS REMOVAL --- 1,210 FOOTHILLS WADSWORTH BLVD.

35 LILLEY GULCH (SIMMS ST.) JEFF. CO. ALONG W. BOWLES AVE VEGETATION MANAGEMENT & --- 1,260 FOOTHILLS D/S OF OAK ST.TO SIMMS ST. DEBRIS REMOVAL

36 LILLEY GULCH- JEFF. CO. WADSWORTH TO 200FT U/S FLOWER STVEGETATION MANAGEMENT & --- 2,530 NORTH BRANCH FOOTHILLS AND U/S & D/S OF HOLLAND WY & DEBRIS REMOVAL DET. BASIN (BOWLES & JELLISON)

37 LITTLE DRY CREEK (POMONA DR) ARVADA POMONA DR. TO CLUB CREST DR. DEBRIS REMOVAL --- 960

38 LITTLE DRY CREEK (SHERIDAN) WESTMINSTER SHERIDAN BLVD TO HARLAN ST. VEGETATION MANAGEMENT & --- 1,200 DEBRIS REMOVAL

39 LITTLE DRY CREEK- WESTMINSTER S. OF 88TH AVE. WEST OF SHERIDAN VEGETATION MANAGEMENT & --- 650 GENERAL CABLE TRIBUTARY BLVD DEBRIS REMOVAL

40 LITTLE DRY CK - TRIBUTARY B WESTMINSTER 750 FT D/S DOVER ST TO GARRISON ST DEBRIS REMOVAL --- 760

41 LITTLE DRY CREEK- WESTMINSTER N.W. CORNER OF SHERIDAN VEGETATION MANAGEMENT & --- 340 WESTMINSTER MALL TRIBUTARY AND 88TH AVE. DEBRIS REMOVAL

42 MASSEY DRAW JEFF. CO. C-470 TO WADSWORTH AND VEGETATION MANAGEMENT & --- 1,920 BALSAM ST. TO CARR ST. DEBRIS REMOVAL

43 MASSEY DRAW- JEFF. CO. MASSEY DRAW TO WADSWORTH VEGETATION MANAGEMENT & --- 1,470 NORTH TRIBUTARY FOOTHILLS ZEPHYR ST. TO CARR ST. DEBRIS REMOVAL GARLAND ST (EXT) TO IRIS WAY

44 McINTYRE GULCH (CARR ST.) LAKEWOOD CARR ST. TO GARRISON VEGETATION MANAGEMENT & --- 1,450 DEBRIS REMOVAL

45 McINTYRE GULCH (HOLLAND ST) LAKEWOOD HOLLAND ST. TO JEFFCO SCHOOL PED DEBRIS REMOVAL --- 150 BRIDGE

46 McINTYRE GULCH (UNION BLVD) LAKEWOOD 150 FT U/S MOORE ST TO OHIO AVE VEGETATION MANAGEMENT & --- 5,300 N & S SIDE OF ALAMEDA DEBRIS REMOVAL

47 McINTYRE GULCH- LAKEWOOD ALAMEDA SERVICE ROAD TO VAN VEGETATION MANAGEMENT & --- 1,170 S. BRANCH A GORDON CT. DEBRIS REMOVAL

48 MT OLIVET DRAINAGE- GOLDEN MCINTYRE ST, 50TH TO TABLE VEGETATION MANAGEMENT & --- 2,990 SWAMP ANGEL DET. BASIN MOUNTAIN PKY - SWAMP ANGEL DEBRIS REMOVAL

49 MT. VERNON CREEK MORRISON 470 L.F. U/S OF BEAR CREEK VEGETATION MANAGEMENT & --- 450 DEBRIS REMOVAL JEFFERSON COUNTY 2015 ROUTINE SERVICES CONTINUED

WORK 2015 WORK PLAN DRAINAGEWAY NAME- LOCAL NEARBY WORK WORK PLAN NO. TRIBUTARY NAME GOVERNMENT STREETS DESCRIPTION TYPE BUDGET

50 NORTH SANDERSON GULCH LAKEWOOD D/S NEWLAND ST. (EXT.) TO VEGETATION MANAGEMENT & --- 2,410 U/S BALSAM ST. DEBRIS REMOVAL

51 RALSTON CREEK ARVADA BROOKS DR. TO U/S MILLER ST DEBRIS REMOVAL --- 970

52 SANDERSON GULCH LAKEWOOD S OF JEWELL - U/S & D/S OF LAKE RD VEGETATION MANAGEMENT & --- 2,410 N OF JEWELL - ALLISON ST. TO DOVER, DEBRIS REMOVAL GARRISON ST TO KENDRICK RES.

53 SANDERSON GULCH- LAKEWOOD HOLLAND ST TO CARMODY PARK VEGETATION MANAGEMENT & --- 560 CARMODY PARK TRIBUTARY POND DEBRIS REMOVAL

54 SLOANS LAKE BASIN- EDGEWATER SLOAN LAKE TO INGALLS ST. VEGETATION MANAGEMENT & --- 3,400 REACH D - G DEBRIS REMOVAL

55 SLOANS LAKE BASIN- LAKEWOOD GENEVA CT. @ REED ST. VEGETATION MANAGEMENT & --- 560 REACH D - G (GENEVA CT) DEBRIS REMOVAL

56 SLOANS LAKE BASIN- LAKEWOOD S.E. OF 26TH AND WADSWORTH VEGETATION MANAGEMENT & --- 450 REACH F - L REED ST TO SAULSBURY ST DEBRIS REMOVAL

57 SLOANS LAKE DRAINAGE LAKEWOOD S.E. CORNER OF 26TH AND VEGETATION MANAGEMENT & --- 1,670 DETENTION BASIN WADSWORTH DETENTION BASIN DEBRIS REMOVAL

58 SJCD 6100 NORTH (DEPEW ST) JEFF. CO. D/S SHERIDAN BLVD. VEGETATION MANAGEMENT & --- 560 TO U/S OF DEPEW ST DEBRIS REMOVAL

59 SJCD 6100 (N) (MARSHALL ST) JEFF. CO. D/S KENDALL TO MARSHALL ST VEGETATION MANAGEMENT & --- 680 DEBRIS REMOVAL

60 SJCD 6100 (N) (QUARTO DRIVE) JEFF. CO. QUARTO DR. TO WADSWORTH BLVD VEGETATION MANAGEMENT & --- 1,660 DEBRIS REMOVAL

61 SJCD 6100 (N) (WEBSTER ST) JEFF. CO. PORTLAND AVE TO WEBSTER ST DEBRIS REMOVAL --- 380 FOOTHILLS

62 SJCD 6200 (S) - JEFF. CO. KEN CARYL AVE TO PIERCE COURT VEGETATION MANAGEMENT & --- 2,150 NORTH TRIBUTARY DEBRIS REMOVAL

63 SJCD 6200 (S) - JEFF. CO. 180 FT U/S DAVID DR. TO VANCE CT. VEGETATION MANAGEMENT & --- 450 TOPOLNICKI TRIBUTARY FOOTHILLS (EXT.) DEBRIS REMOVAL

64 S. LAKEWOOD GULCH (3RD. PL) LAKEWOOD 6TH AVE. TO 3RD PL (EXT) DEBRIS REMOVAL --- 330

65 S. LAKEWOOD GULCH (CODY ST) LAKEWOOD BAYAUD AV. AT CODY ST. VEGETATION MANAGEMENT & --- 610 TO 400 FT . U/S AT CCU POND OUTLET DEBRIS REMOVAL

66 TUCKER GULCH GOLDEN CLEAR CK TO DROP N OF IOWA DR. DEBRIS REMOVAL --- 780

67 WALNUT CREEK WESTMINSTER CHURCH RANCH RD TO D/S 800FT DEBRIS REMOVAL --- 480

68 WEAVER CREEK LAKEWOOD SW OF KIPLING ST/DARTMOUTH AVE VEGETATION MANAGEMENT & --- 790 TO U/S 1200 FT. DEBRIS REMOVAL

69 WEAVER CREEK - BERGEN TRIB JEFF. CO SE OF BELLEVIEW AVE AND C-470 DEBRIS REMOVAL --- 1,760 (DETENTION POND)

70 WEAVER CREEK (SIMMS ST) JEFF. CO 100 FT U/S OF QUINCY AVE TO SCHOOL DEBRIS REMOVAL --- 900 FOOTHILLS FENCE LINE U/S COLE ST

71 WEIR GULCH LAKEWOOD MISSISSIPPI AVE TO U/S JOHNSON WY VEGETATION MANAGEMENT & --- 1,220 DEBRIS REMOVAL

72 WEIR GULCH- LAKEWOOD DEPEW ST TO U/S HARLAN ST VEGETATION MANAGEMENT & --- 810 1ST AVE TRIBUTARY INGALLS ST TO 200 FT U/S DEBRIS REMOVAL

73 WEIR GULCH - BENTON LAKEWOOD BENTON ST TO DEPEW ST DEBRIS REMOVAL --- 1,390 DETENTION 74 WEIR GULCH- LAKEWOOD SHERIDAN BLVD TO DEPEW ST VEGETATION MANAGEMENT & --- 700 DAKOTA AVE. TRIBUTARY EATON ST TO 100FT U/S DEBRIS REMOVAL

75 WEIR GULCH- LAKEWOOD FLORIDA AVE TO 200FT D/S (MAIN RES. VEGETATION MANAGEMENT & --- 340 SOUTH WEIR GULCH TRIBUTARY TRAIL) DEBRIS REMOVAL

76 DEBRIS QUANTIFY AND REPORT COUNTY-WIDE COUNTY-WIDE ------1,580

77 CLEAR CREEK - GREENBELT WHEAT RIDGE WADSWORTH TO I-70 DEBRIS REMOVAL AS NEEDED --- 50,000

2015 ROUTINE SUBTOTAL 143,950 JEFFERSON COUNTY 2015 RESTORATION SERVICES

WORK 2015 WORK PLAN DRAINAGEWAY NAME- LOCAL NEARBY WORK WORK PLAN NO. TRIBUTARY NAME GOVERNMENT STREETS DESCRIPTION TYPE BUDGET

ANNUAL SEDIMENT REMOVALS

1 BEAR CREEK MORRISON AT CANON ST AND SEDIMENT REMOVAL CONST 50,000 D/S SODA LAKES ROAD

2 CLEAR CREEK WHEAT RIDGE (1) AT 44TH AVE SEDIMENT REMOVAL CONST 40,000

3 CLEAR CREEK WHEAT RIDGE (2) AT INDEPENDENCE (EXT) SEDIMENT REMOVAL CONST 50,000

6 DRY GULCH LAKEWOOD (1) 14TH AVE AND CARR ST - SEDIMENT REMOVAL CONST 7,500 RICHEY PARK

7 WEAVER CREEK JEFF. CO/FOOTHILLS AT SIMMS ST SEDIMENT REMOVAL CONST 25,000

8 WEIR GULCH LAKEWOOD (2) WADSWORTH BLVD CROSSING SEDIMENT REMOVAL CONST 30,000

9 VARIOUS COUNTY - WIDE COUNTY - WIDE ALL REVEG, WEEDS/SEDIMENT/VEG. CONST 50,000 CONTROL, RELATED EXPENSES

CONTINUING PROJECTS

10 DUTCH CREEK JEFF. CO. 900FT AND 1650 FT U/S FIELD ST REPAIR ISOLATED EROSION ENG CONST 30,000

11 LAKEWOOD GULCH LAKEWOOD D/S HARLAN ST BANK STABILIZATION ENG CONST 300,000

12 MASSEY DRAW - N. TRIBUTARY JEFF. CO. WEST OF DUDLEY REPAIR EXISTING FACILITY ENG FOOTHILLS CONST 50,000

13 SJCD 6200(S) JEFF. CO. ESTES PLACE REPAIR ISOLATED EROSION ENG CONST 150,000

NEW PROJECTS

14 MASSEY DRAW JEFF. CO. GARRISON ST TO CARR ST REPAIR EXISTING FACILITY ENG 30,000 TREE THINNING CONST 200,000

15 MASSEY DRAW - N. TRIBUTARY JEFF. CO. WEST OF CARR ST TREE REMOVAL ENG CONST 5,000

16 RALSTON CREEK ARVADA D/S INDIANA ST - VARIOUS LOCATIONS REPAIR ISOLATED EROSION ENG 20,000 CONST 120,000

17 WEAVER CREEK JEFF. CO. AT COLE ST REPAIR EXISTING FACILITY ENG FOOTHILLS CONST 7,500

18 WEIR GULCH JEFF. CO. UNION AVE TO 400 FT D/S REPAIR EXISTING FACILITY ENG 30,000 LAKEWOOD CONST 100,000

19 WEIR GULCH LAKEWOOD BELMAR PARK REPAIR ISOLATED EROSION ENG 50,000 CARR ST TO BALSAM CT CONST

20 VARIOUS COUNTY-WIDE COUNTY-WIDE ALL PERMITTING, PREP. FEES, ENG 50,000 MONITORING REPORTS, RELATED EXPENSES

2015 RESTORATION SUBTOTAL 1,345,000

JEFFERSON COUNTY CONTINGENCY 92,823

TOTAL 2015 JEFFERSON COUNTY BUDGET 1,581,773 FILE NAME=2015 Jefferson County.XLS